Loading...
HomeMy WebLinkAboutWQ0028940_Remission Decision_20181118 ROY COOPER Gore,no, E MICHAEL S. REGAN � �� Sec,elm,, ? LINDA CULPEPPER Into nn,Dvecla 4.1, :, -h+ r NORTH CAROLINA ,finVit aninttrtdf Qtccddly November 28,2018 Maria Gaither Town Administrator Town of Shallotte PO Box 2287 Shallotte, NC 28459 Subject: Rescission of Wastewater Collection System Extension DWQ Permit No.WQ0028940 Brunswick County Dear Ms.Gaither: Reference is made to your request for rescission of the subject Wastewater Collection System Extension Permit, received by the Division on November 8, 2018. The proposed project will not be constructed. Therefore, in accordance with your request,Wastewater Collection System Extension Permit No.WQ0028940 dated June 24, 2005 is rescinded, effective immediately. If in the future,you determine that you need another wastewater collection system extension permit,you must first apply for and receive a new Wastewater Collection System Extension permit. Construction and operation of a wastewater collection system without a valid Wastewater Collection System Extension Permit will subject the Town of Shallotte to a civil penalty of up to$25,000 per day. If you have any further concerns, please do not hesitate to contact me at 919-707-3624 or via email [Deborah.Gore@ncdenr.gov]. Sincerely, (� Deborah Gore PERCS Unit Supervisor cc: File WQ0028940 WiRO (electronic copy) PERCS Permit File Q North Carolina Department of Environmental Quality I Division of Water Resources 1617 Mail Service Center I Raleigh,North Carolina 27699-1617 919-707-3600