Loading...
HomeMy WebLinkAbout20041246 Ver 3_Site Inspection_20090707NC®ENR North Carolina Department of Environment and Natural Resources Division of Water Quality Beverly Eaves Perdue Coieeo H. Sullins Governor Director .lulu 7, 2009 Mr. Mike Pettyjohn, P.1?. Division 1:nginccr N.C. Department olTransportation Post Office Box 250 North Wilkesboro, North Carolina 28659 Subject: Inspection US Ilighway 321 DWQ Project No. 041246 TIP No. R-223713 Caldwell County Dear Mr. Pettyjohn: Dee Freeman Secretary On June 24, 2009. 1 visually inspected the construction work on US I lighway 321 in Caldwell County and the project appeared to he in good shape. Construction work is mainly taking place at the northern and southern ends of the project The a'osion and sedimentation control suuclures. vegetative covering. mulching and matting appear to be working properly. Continue to ensure that all sediment and erosion control structures arc maintained and that seeding and mulching are performed as needed to protect downstream waters. Please refer to the attached inspection report for additional comments and recommendations. If you have questions, please call me at 828-296-4500. Sincerely. Michael R. Parker Environmental Senior Specialist Attachment cc: Frank Gioscio, P.li. Heath Slaughter, Division 1 I, DEO Neil Trivette, Roadside Environmental Transportation Permitting Unit Niki Maher, NPS Assistance and Compliance Oversight Unit Mike Parker, Asheville Regional Office (Peav ohn) US I li dma) X21 line 2009 hupechon Location: 2090 U.S Hghway 70. Swanearoa, North Carolina 26778 Phone: 628-296 4 50 FAX: 826-2997043 i Customer Service: 1-677-623 67-8 Intemel'. w ,.mvalerquality.org An Fnual pppommilyl A(6nnalive AOtion Employer One NorthCarolina Naturally D\V'U Site Visits for DOT Projects Field Sheet DWQ representative: Michael R. Parker Date: June 24, 2009 County: Caldwell Region; Asheville DOT Division: Division Activity: X .101 Compliance fvttluation ? Complaint ?MV'Q I:ollosv Up l'.valuation ? Other DWQ 401 R:F? NW Pcrmit IP fl: 3481 Project Name: Location of Project: U S 1142hway 321 Widenioe US 321 North of Lenoir to South of Blowing Rock, NC Project Complete: ?Ycs X No Activities (DOT): ? Bridge X? Culvert ? Bottomless Culvcrl ? Bottomless Arch X? Riprap InleUOmlct Stabilization ? Spoil Pile ? Borrow Pit ? Wetland Mitigation ? Stream Restoration ? BUfler Restoration ? Bank Stabilization X? Othcr Additional Wetland Impacts: ? yes If no. estimated date of completion: Water Oualily Concerns (ll\\'U): ? Steam Standards Violation X? Turbidity ? I'ividenceofspills ? Oil/Petroleum ? Solid Waste ? Failed I:: & S control mcasw'cs X? Sedimentation Impacts ? Stormwater Pcrmit V iolation ? Dill ? Other X? no ? Zone 1 I:sl Acres Additional Sucam Impacts: ? yes X? no Estimated Acres ? Zone 2 F,st Acres Fst Linear feet Estimated linear feet of impact: Buffer Impacts: ?NCUse ?Tar-Pam ?Randleman ?Catawba /onc I: ?Ycs ?No I'si linear II/ acreage uhbuller impact ft/ ac Zone 2: ?Ycs ?No I st linear I't/ acreage of hllfler impact fl/ ac Buffer Designation: ?1[sempt ?Allowable ?Allowablc w/mitieation ?Prohibited Name of Waterway(s): UWQ Site Visits for DOT Protects Background Info Rocky Cove ('Leek, Gocen5eld Branch, unnamed tributary to Puncheon Camp Creck, unnamed uihutary to Right Fork Mulberry Creek, unnamed o ibutarv to 1,01 Port: Mulberrv Creek Basin/ Subbasin: Cl '13 -030831 Yadkin-03070 I Weiland 'fype ?Isolated s?Non-Isolated (Waters of US) Stream Class: ?Class 13 ?303d Listed ?WS-11 ?WS-V ?S13 X?ClassC ?CRW ?'frout ?Ws-III ?NSW ?13Qw ?ws-I X?WS-1V ?SA ?CA Type of Authorized Impact: X?CulVert ?13ottomlCSS Culvert ?Bridgc ?l3ottomless Arch X?Riprap 1111000MICl Stahilization X?hill Authorized Wetland Impacts Authorized Stream Impacts: Additional comments: Compliance Issues Identified Compliance issues identified ?O--I/10"iacrc X?I/II°'to1/3'uacre 0.16 acres ? 1/3"' to 1.0 acre ?> 1.0 acre ?< 150 linear feet X?> 150 linear feet ?yes X? No ?Ycs ?No If yes, complete the section below: Looked at entire project. Most work is taking place at the northern and southern ends of the project. Some other minor fill and grading wort: is taking place along the rest of the project. Roadway shoulders are being worked and permanently seeded. There are some concerns about the southern part of the project. Stecp slopes and sediment could pose a problem if not properly controlled. This area should be watched carefully and additional sediment and erosion measures may be required. Continue to maintain sediment and erosion control structures to protect state surface waters.