HomeMy WebLinkAbout20181314 Ver 1_Response to DWR Request_20181203CLearWater C1earWater Environmental Consultants, Inc. www cwenv.com December 3, 2018 Ms. Sue Homewood North Carolina Department of Environmental Quality Division of Water Resources 450 W. Hanes Mill Rd Winston-Salem, NC 27107 Subject: Response to Request for Additional Information Watauga Storage, DWR #20181314 Watauga County, North Carolina Dear Ms. Homewood: Please reference the letter dated November 2, 2018 sent by the North Carolina Division of Water Resources (DWR) in response to the permit application submitted by C1earWater Environmental Consultants, Inc. (CEC), on behalf of HNH Futures, LLC represented by Mr. Chad Hollister. The permit application request written authorization for impacts to waters of the United States associated with construction of a storage facility. The comments provided by DWR are discussed below. DWR Comment #1. Please provide more details regarding avoidance and minimization of wetland impacts for this project: a. Please clarify how the number and size of parking spaces were determined. The number of parking spaces shown in the attached Figure CSN101 is the minimum required per code for a storage building. The larger spaces are for trailer and camper storage, which are not required by code, but are necessary due to the nature of the storage business. b. Please provide an analysis of the feasibility of a retaining wall to further minimize impacts to the wetlands. The installation of a retaining wall along the parking area would reduce the area of wetland disturbance by 0.023 acres, as determined by Clayton Engineering. This alternative was not selected due to the minimal reduction in impact, the additional cost that would be incurred, and additional temporary wetland impacts (including tree cutting). 32 Clayton Street Asheville, NC 28801 828-698-9800 Tel DWR #20181314 December 3, 2018 Page 2 of 3 DWR Comment #2. Please indicate whether there will be impacts to the vegetation within the remaining wetland. If vegetation management is proposed, please provide a management plan which indicates how the vegetation will be permanently maintainedlmanaged. The applicant will not include cutting, removing, or disturbing wetland vegetation outside of the construction limits as shown on Figure CGN101. DWR Comment #3. Please clarify whether there will be any temporary impacts from sediment and erosion control measures or for the purpose of construction activities. The temporary skimmer basin that will be utilized during construction is located in an upland area and will subsequently be converted into a permanent infiltration basin after construction is complete, therefore resulting in no further wetland impacts. See Figures CCN 101 and CGN 101. DWR Comment #4. The proposed stormwater control measures are carefully situated as to avoid wetland impacts. Please provide either a final approved stormwater management plan, ora more detailed proposed plan sheet which includes detailed sizing of the infiltration basins, as well as impacts from construction activities in order to support the indications that there will be no additional temporary or permanent impacts to the wetlands as a result of construction or installation of the stormwater control measures and associated infrastructure. The final stormwater management plan is attached for your reference. No wetland impacts are needed for stormwater treatment facilities. Following the site visit conducted with you and Amanda Fuemmeler from the United States Army Corps of Engineers (USACE) on October 29, 2018, additional email comments were received from the USACE. Responses to those comments are also included in this letter below: USACE Comment W. Can you provide the number of trees (or acres) that will be cleared far this project so I can coordinate with USFWS regarding listed bats in the area. The area to be cleared for this project includes young pine and young mixed hardwood. There are approximately 400-500 trees per acre with the majority of the trees between 3-6 inches in diameter at breast height. Therefore, approximately 620 trees will be removed from the 1.4 acre impact area. USACE Comment #2. Need to get clarification on if there will be any impacts to the remaining wetlands along old NC Hwy 421 such as clearing and what the long-term maintenance/plan is for this area. Page 2 DWR #20181314 December 3, 2018 Page 3 of 3 See response to DWR Comment 42 above. Additionally, a pre -construction meeting will be held as well as orange gate fencing will be installed along the wetland limit of disturbance to avoid further wetland impacts outside of the proposed construction area. USACE Comment #4. Mitigation for permanent impacts will be at a 2:1 ratio This mitigation ratio has been noted and an updated Acceptance Letter has been requested from the Division of Mitigation Services (DMS). We will forward a copy of the DMS letter upon receipt. Please do not hesitate to contact me if you have any additional questions or comments. Thank you for your time and consideration of this project. Sincerely, Antia Priest, P.W.S. Environmental Scientist R. Clement Riddle, P.W.S. Principal Copy Furnished: Amanda Fuemmeler, USACE Asheville Regulatory Field Office (via email) Page 3 Z O U Q J Q C� W J O U W D M N W M J J_ Z W W C.� Z_ L� Z Z Q Z Q U W 2 U ry Q w w z CD z w w O 77 z w V) z O U Z w ry O ry Q n z ry O LLI J O z 0 W V) w (D z Q 0 z Q z CD V) w 0 z ry w w z 0 z w z O U �g o_ U O 0 N ii LLi N n ryO 3 w o= 0 w N ry O Q 00 Z N O W 3 n, �w to cm cz U 0 O �NL.1 O 1-1N C w O N C O Z M Q I N N O Z 00 00Q N ry U w N O 3 � STORM DRAINAGE WATAUGA COUNTY DOMESTIC WATER X SANITARY SEWER BnONE STORAGE CHAD HOLLISTER NEW RIVER TOWNSHIP, WATAUGA CO., N.C. LIST OF CONTACTS TELEPHONE POWER DUKE ENERGY ARCHITECT X r^AC X CABLE PROJECT TEAM STRUCTURAL ENGINEER 0 PLUMBING, MECHINCAL, ELECTRICAL El CIVIL ENGINEER SOILS ENGINEER X SITE PLANNING & ZONING WATAUGA COUNTY FIRE DEPARTMENT BOONE FIRE DEPARTMENT CLAYTON ENGINEERING & DESIGN 304 15TH STREET SE PO BOX 2351 HICKORY, NC 28603 PHONE: 828-455-3456 CONTACT — WILL CLAYTON, PE SURVEYOR WILLARD SURVEYING, PA 527-2 CHURCH RD. BOONE, NC 28607 N — COVER SHEET VFE101 — EXISTING CONDITIONS !?rdgefiOd Rd — CIVIL SITE PLAN CSN501 — SITE DETAILS CGN 101 — GRADING AND DRAINAGE PLAN CGN501 — GRADING AND STORMWATER DETAILS CCN 101 — PRE—CONSTRUCTION EROSION CONTROL PLAN CCN 102 W E — EROSION CONTROL DETAILS CCN502 — EROSION CONTROL DETAILS LSN 101 — LANDSCAPING PLAN SPC101 — SPECIFICATIONS SPC102 h of Christ SPC103 — SPECIFICATIONS SPC104 — SPECIFICATIONS Sa a ledcali f Boone PROJECT LOCATION y Jz mall Leather ��# US 427S Appalachian Family Practice oldt 5 427 S ATM9 Archie Carroll Rd Archie Cwroll Rd Two Rivers Community School Ex = Jackson Sumner Habitat for & Associates Humanity Restore Trac m Food Llon Wildlife Unlimited Hunting a#d Appalachian Energy 111 k � wild chem err m s LOCATION MAP SCALE: N.T.S. SHEET LIST COV101 — COVER SHEET VFE101 — EXISTING CONDITIONS CSN101 — CIVIL SITE PLAN CSN501 — SITE DETAILS CGN 101 — GRADING AND DRAINAGE PLAN CGN501 — GRADING AND STORMWATER DETAILS CCN 101 — PRE—CONSTRUCTION EROSION CONTROL PLAN CCN 102 — POST—CONSTRUCTION EROSION CONTROL PLAN CCN501 — EROSION CONTROL DETAILS CCN502 — EROSION CONTROL DETAILS LSN 101 — LANDSCAPING PLAN SPC101 — SPECIFICATIONS SPC102 — SPECIFICATIONS SPC103 — SPECIFICATIONS SPC104 — SPECIFICATIONS CE&D JOB No.: 18023 N CARO CLAYTON ENGINEERING & m DESIGN, PLLC. z0 '10 No. P-1463 tip; FOR AGENCY REVIEW ENGINEER CA L - 407 •• .FNG EF'�'� o` `` 14 S FOR CONSTRUCTION . 09/24/18 DATE UTILITIES NOTICE: EXISTING UNDERGROUND UTILITIES ARE SHOWN AT APPROXIMATE LOCATIONS. ACTUAL LOCATIONS MAY VARY SIGNIFICANTLY. CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. CONTRACTOR AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES THAT RESULT FROM HIS FAILURE TO EXACTLY LOCATE AND PROTECT ANY AND ALL UNDERGROUND UITILITIES. COV1 01 ENGINEERING & DESIGN z O_ U Q Q LU J O U W m U) LU CID J J z LU W z cr LL z i z Q 0 z Q F- 0 LU U Q LU LU z 0 z LU LU ILLO F- 77 LU Cn z O U z LU F- F - 0 O Er Q z Er O LU J O z 0 LU Cn LU F- 0 z Q 0 Z Q J J CL z c� LU 0 06 cD Z LU LU z z LU z O ILLU O LU 0- 0 Er 0— LU w W IM Q Z O W CC LU F— U) U) W LU M z Q Cn Z_ Q 0 LU cn LU 1/2' RF Columbus Howard Investments, LLC Book of Records 1458, Pagge 242 / Plat Book 13, Page t PIN 2931-01-6816-000 Lot 11 �\ \ \ — \ / ri9h/ Of \� I.J. Bingham Estate ay / Bonnie Bingham CasUr Book of Records 1523, Pa e 165 \ \ ��1400" Plat Book 9, Page �9^' \ — — _ \ / 35 F Plat Book 9 Paq 150 PIN 2, 5-- 00✓ \ _ _ — — 7 \ Celia F. Strickland Book of Records 515 Page 645 PIN 2931-014111-000 3/4" IPF - �Ut 12 \ / \ by coordinate geometry I.J. fQm Estate I B6 �Tl` nie Cas 'on —LIMETLANDS \ Q o� Boo ofecords 213, Pagge W3- o I I Plat%ok 9, Page 39 Plat Bo�9, Page 150 / :� PIN 293 01-3 \ I I I 0� I I I 0) R/w MF Q) \ 1/2)) RF 71111 5/8 IPS \ \ 28.50) I JerrySt ars and wife Geraldine M. St ars � � �� �— \ � \ \ � / / — — /��`� Book of Records 15, Page 465 = �\ \ PIN 2931-01-4313-000 / 0/c/ �- POB 3/ W I \ \ S \ -1 \1 ole n �t29 6' donc. YW Mf� p ve nt /neI \ \ I cone. R/W MF \ \ 2 / �I latch basin � I \\ \ / I \\\\ 190 \ \ \ \ K ped. o N.C.D.0.1. —%ero`�tIc \\ arker EXISTING CONDITIONS SCALE: 1" = 30' I E S c iia Tredor Supp. y Co 1p •- App.aleChlen Erergv LV9 Us 42l S s f"' •, A ¢21 Auto $erylc a 'Is nlWd Ch ,,r c;.. LOCATION MAP SCALE: N.T.S. NOTES THIS SHEET: 1. SURVEY PERFORMED BY: WILLARD SURVEYING, PA 527-2 CHURCH RD BOONE, NC 28607 2. CONTRACTOR RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS SURVEY. 3. PARCEL ID NO. = 2931016509000 4. SITE ZONING = N/A 5. PROJECT SITE ACREAGE = 2.157 ACRES 6. SUBJECT PROPERTY IS IN DESIGNATED FLOOD ZONE "X" (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) (FIRM PANEL 3710293100J) M 00 z ,`1111111111//// AROC y CLAYTON ENGINEERING & m DESIGN, PLLC. No. P-1463 Q :.� O IN q /OF IA `111111111,,,,, CAR0� /0 SE SEA 4 FNGINE........ • o qM S CVP 69/24/1 z W Q M N Ca x m co 0 020, N U)z Z ww oO C � U W r W ZCO Z W U Z O U 1= PROJECT LOCATION W Bode Churg of Christ < QArlmal Nedleal 1//�,I • ' ® T Cemer of Boor Kingdcm Hall o` Jehol'ah's WItr*sm J RI Jgewocd SIM me mals Carrc 11 Leather �'d C[i'g2i S ApV PFactian Family Practice Cy -d' PdA.ch el O41 �4Z, S gnoll =d armor c,rd Fd Ai'A T P it Two Rivers Commurhy Shod Jackson Sumner !•V� S Assoc s Hu �. "estoremin eft Food Llon9 Y7ildl `e l d Hii11ng I E S c iia Tredor Supp. y Co 1p •- App.aleChlen Erergv LV9 Us 42l S s f"' •, A ¢21 Auto $erylc a 'Is nlWd Ch ,,r c;.. LOCATION MAP SCALE: N.T.S. NOTES THIS SHEET: 1. SURVEY PERFORMED BY: WILLARD SURVEYING, PA 527-2 CHURCH RD BOONE, NC 28607 2. CONTRACTOR RESPONSIBLE FOR FIELD VERIFYING EXISTING CONDITIONS SURVEY. 3. PARCEL ID NO. = 2931016509000 4. SITE ZONING = N/A 5. PROJECT SITE ACREAGE = 2.157 ACRES 6. SUBJECT PROPERTY IS IN DESIGNATED FLOOD ZONE "X" (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) (FIRM PANEL 3710293100J) M 00 z ,`1111111111//// AROC y CLAYTON ENGINEERING & m DESIGN, PLLC. No. P-1463 Q :.� O IN q /OF IA `111111111,,,,, CAR0� /0 SE SEA 4 FNGINE........ • o qM S CVP 69/24/1 z W Q M N Ca x m co 0 020, N U)z Z ww oO C � U W r W ZCO Z W U Z O U 1= W < F- < ct U J 0 w w 0 v) w w C) Z Z = 0 0 U m LU LU Z CIVIL U) O 0 0 U z z H X LU JOB NUMBER: 18023 DATE. 09/24/18 DRAWN BY: EMB CHECKED BY: �+ WS^ REVISIONS NO, DESCRIPTION DATE VFE101 SHEET 1 OF 14 z 0 I- 0 Q J Q (D Lu J O I- 0 Lu 3 co U) W CID J J Z w w 0 z cE LL- C) J_U W 0 cc cc Lu W z CD z Lu Lu LL O z Lu U) z O 0 z W I- rr O _ rr n w z O w J O z 0 W W W m I- 0 z D z Q U J J z U) W 0 06 z rr Lu W U z Z W coz 00 } r a cc) J N LL O N U1 rr W O O r cr z' cf)W � _ N� O O W 5 rr U) Q mz iR0 � Cc L0 w o = Q ~ U Z O U) W c� o w C Q 0 z N C3 z bs3: N Cc U Q W 'o cn o= W § H TNT I 2 3 4 CSN101 CSN501 CSN101 CSN501 CSN 101 CSN501 0 0 !;2 BUILDING SETBACK F X X - X x 0c) -cp 06 �- �� g Cas0 Qa e 105 x R5.00' No z \ a �o�� o\ pec°Cod 0, Qag e 150 CSN101 CS 501 good Q\a� o°� 0, Qa15-000 x e% 03 c o x 15.00' m D �I 24.00' X IR5.00' X X X p o p p p m T 93.00 • 11 : 11 : 11 0 N T1CCSNN501 I 30. right of way II I S 71°14'00" E 356.34t�__ ' I I 15.00' RR\Oi X SECURITY FEX E X o X I o CD0 N 220.00' BUILDING SETBACK a- 00 X I R5.00 R20.00' R40.00 R20.00' 0 2 STORY BUILDING / y Ln 34,400 SQ FT (BUILDING AREA)co 17,200 SQ FT (FOOTPRINT) y y I yv IV i IV IV IV IV IV IV -V IV -V / y y y IV R4 .0 ' IV IV -V IV -V /. /y y y y -V CD � 1 a e°C�e IV IV N -V IV ° `a g IV R20.00' Ce\`a ecoras �1-�1�1'00 � Q\N I I ��0 I X I I toI TN x x I I ,8.00:,8.00', 8.00 /3.00'�Q` S IV IV R2.32' y y x IV IV CD o y y 112.49' -V I y R 10.00' x e � m m� �� y y I `I--- X X X X X X IV o IV -V IV SECURITY KIOSK x IV -V -V C? 15.00' r\ LO IV -V / -V ®® y 150.00' W -V IV x.V y ® ®.-I x 15.00' �IV IV y XX IV � IV IV IV IV IV � / 00 y y y y y � SECUR FE X ,� I IV IV IV IV -V IV IV IV NCE X x y y y y y y y IV y / y IV �' y y / y y m DELINEATED WETLANDS AREA -V \ y -V ` cn y I \e C \age cn /y -V -V ,V U \10 y -V IV \-V IV IV / 'V J y y y I IV -V IV \ - IV/ �\IV IV IVy y Q\\V I �_ � `� BUILDING SETBACK ��-� � IV y y y IV y y y IV IV IV IV y y ��F o � IV IV -V IV IV -V ' IV IV\� \N - y - c0' / - - - -�\1y73 58 V -V y -V 0 51.96' 5 '\ N 1]'] 4 00 W I I o Old SHighwayUoo 421 `t-IAr� CC). Q.) Q\N I SITE PLAN SCALE: 1" = 20' R25.00' I o PROJECT DETAILS 1. OWNER: o JAMES L. BINGHAM W 1261 ROBY GREEN RD . c-) C:D, BOONE, NC 28607 0 O 40' 3. SITE ZONING = N/A 4. TOTAL SITE ACREAGE = 2.157 ACRES. w QC> (93,958.92 SQFT) U cn 5. TOTAL DISTURBED ACREAGE = 1.52 ACRES z 6. BUILDING SIZE: 34,400 SQ FT (2 STORY) C= O CD W z Q 0 BUILDING: 14,300 SQ FT (FOOTPRINT) o a, O TOTAL: 41,674 SQ FT LL_ Q! += o o W 10. SUBJECT PROPERTY IS IN DESIGNATED FLOOD � m ZONE "X" (AREAS DETERMINED TO BE OUTSIDE 0 THE 0.2% ANNUAL CHANCE FLOODPLAIN) 2 0 NOTES THIS SHEET: 1. CSI u) U THE WATAUGA COUNTY ENGINEERING DIVISION BEFORE ANY WORK m BEGINS. THE OWNER SHALL NOTIFY THE WATAUGA COUNTY ENGINEERING DIVISION AT LEAST 7 CALENDAR DAYS PRIOR TO COMMENCING ANY U-) WORK ON THE SITE. FAILURE TO PROVIDE REQUIRED NOTICE SHALL RESULT IN THE OWNERS RESPONSIBILITY TO UNCOVER ANY PRIOR Cc BELOW -GRADE WORK FOR VISUAL INSPECTION BY THE ENGINEERING w DIVISION. I COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH 0 I 3. ALL ROAD IMPROVEMENTS ARE TO BE COORDINATED WITH WATAUGA CIVIL COUNTY AND NCDOT ENGINEERING DEPARTMENT PRIOR TO z CONSTRUCTION. 4. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR w INTERSECTIONS. THESE REQUIREMENTS SHALL BE ESTABLISHED BY THE INSPECTOR BASED ON FIELD CONDITIONS. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE a 0 ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED IN WRITING FROM PROPERTY QD OWNERS. 6. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% I R25.00' 7. POLE BASES AND ELECTRICAL DESIGN FOR PARKING LOT LIGHT POLES SHALL BE SUBMITTED PRIOR TO BEGINNING INSTALLATION. 8. UNSUITABLE SUBBASE MATERIAL NOT IDENTIFIED BY THE SOIL TESTS, v o - CHECKED BY SITE AND REPLACED WITH SUITABLE BACKFILL. o 9. WHERE VERTICAL CURB AND GUTTER EXIST, ALL DRIVEWAY RAMPS SHALL BE CONSTRUCTED OF PORTLAND CEMENT A MINIMUM OF 6 -INCHES C) NO. DEEP. THE RAMP MUST RISE 4 -INCHES ABOVE THE FLOW LINE OF THE DATE GUTTER AT A POINT NO CLOSER THAN 2 -FEET FROM THE GUTTER. 0 m 10. ALL WORK TO BE COMPLETED IN NCDOT R/W TO BE COORDINATED WITH NCDOT. O o - OF o c I Q� U r z o� O m N 13°15'58"W �0 Q 29. 6' (tie I ne) � catch base PROJECT DETAILS N 1. OWNER: JAMES L. BINGHAM W 1261 ROBY GREEN RD 2 BOONE, NC 28607 0 2. PARCEL I.D. NO. = 2931016509000 W 40' 3. SITE ZONING = N/A 4. TOTAL SITE ACREAGE = 2.157 ACRES. w (D (93,958.92 SQFT) U 5. TOTAL DISTURBED ACREAGE = 1.52 ACRES z 6. BUILDING SIZE: 34,400 SQ FT (2 STORY) LJJ 7. PARKING PROVIDED: 20 SPACES (CARS) Ur 8. WATERSHED DISTRICT: N/A Q 9. IMPERVIOUS AREA BUILDING: 14,300 SQ FT (FOOTPRINT) PARKING: 27,374 SQ FT O TOTAL: 41,674 SQ FT LL_ BUILT UPON: 44.35% W 10. SUBJECT PROPERTY IS IN DESIGNATED FLOOD Z ZONE "X" (AREAS DETERMINED TO BE OUTSIDE THE 0.2% ANNUAL CHANCE FLOODPLAIN) 2 FIRM PANEL #3710293100) NOTES THIS SHEET: 1. THE OWNER SHALL SCHEDULE A PRE -CONSTRUCTION CONFERENCE WITH U THE WATAUGA COUNTY ENGINEERING DIVISION BEFORE ANY WORK m BEGINS. THE OWNER SHALL NOTIFY THE WATAUGA COUNTY ENGINEERING DIVISION AT LEAST 7 CALENDAR DAYS PRIOR TO COMMENCING ANY WORK ON THE SITE. FAILURE TO PROVIDE REQUIRED NOTICE SHALL RESULT IN THE OWNERS RESPONSIBILITY TO UNCOVER ANY PRIOR Cc BELOW -GRADE WORK FOR VISUAL INSPECTION BY THE ENGINEERING w DIVISION. 2. COORDINATE ALL CURB AND STREET GRADES IN INTERSECTION WITH INSPECTOR. z 3. ALL ROAD IMPROVEMENTS ARE TO BE COORDINATED WITH WATAUGA CIVIL COUNTY AND NCDOT ENGINEERING DEPARTMENT PRIOR TO z CONSTRUCTION. 4. IN ROLLING AND HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR w INTERSECTIONS. THESE REQUIREMENTS SHALL BE ESTABLISHED BY THE INSPECTOR BASED ON FIELD CONDITIONS. 5. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE a 0 ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED IN WRITING FROM PROPERTY OWNERS. 6. IN ORDER TO ENSURE PROPER DRAINAGE, KEEP A MINIMUM OF 0.5% SLOPE ON THE CURB. 7. POLE BASES AND ELECTRICAL DESIGN FOR PARKING LOT LIGHT POLES SHALL BE SUBMITTED PRIOR TO BEGINNING INSTALLATION. 8. UNSUITABLE SUBBASE MATERIAL NOT IDENTIFIED BY THE SOIL TESTS, BUT LOCATED DURING CONSTRUCTION, MUST BE REMOVED FROM THE CHECKED BY SITE AND REPLACED WITH SUITABLE BACKFILL. 9. WHERE VERTICAL CURB AND GUTTER EXIST, ALL DRIVEWAY RAMPS SHALL BE CONSTRUCTED OF PORTLAND CEMENT A MINIMUM OF 6 -INCHES REVISIONS NO. DEEP. THE RAMP MUST RISE 4 -INCHES ABOVE THE FLOW LINE OF THE DATE GUTTER AT A POINT NO CLOSER THAN 2 -FEET FROM THE GUTTER. 10. ALL WORK TO BE COMPLETED IN NCDOT R/W TO BE COORDINATED WITH NCDOT. N U z 2 0 0 20' 40' CARO CLAYTON ENGINEERING & rnn DESIGN, PLLC. zo =-A No. P-1463 O, IOF 'E s oo�,,,'� �•F SEA _ 4 7 �: �i •'•• ENGINE . o ;��l��q •. .••Pyr It 09 24 18 W c' N X ca °m 0 0 0(c �o N C/)L:dZ Z wm L °C Co � U W r W0 Z� W U z 0 0 w (D 0 ZD U) Q J0O E Cly w = czn W Z 2 00 U Lu m Cc w z CIVIL z w Hz C/) a 0 U JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY WSC REVISIONS NO. DESCRIPTION DATE CSN101 SHEET - OF z O U Q J Q Lu J O H H U LLl m cn LL m J J_ H Z Lu LL Z_ cc LL Z Z Q D Z Q U Lu _ U cr cr W Lu Z_ 0 Z W LJJ LL O z w w Z O U Z Lu H H cr O 2 H H cr Q - :z cr O Lu J O 2 Z 0 Lu w Lu m H O Z Q D z Q U J J Z Cn LL 0 co Z Ir Lu Lu Z z Lu z O U LL O Lu CLO 0 - Lu 2 F— LU Q z O W In Lu 2 F— ;z U W Lu F - Z Q U) Z_ Q D Lu U) Lu F— W11a-2P I I 24x18 Lo PED MNG one 3" GALV. STEEL POLE 0 N -Ill I it l li 11-1 l l 1 11 l 11 1 1}, N 0 PEDESTRIAN CROSSING SIGN R4-7 24" X 30" R3-2 30" X 30" RI -1 W1 1A-2 R5-1 30" X 30" 30" X 30" 30" X 30" 1. ALL SIGNS SHALL CONFORM WITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD) AND LOCAL CODE FOR COLOR, SIZE, REFLECTIVITY, AND HEIGHT. 2. SIGNS TO PLACED AS SHOWN ON THE PLANS. 3. FOR SIGNS NOT PROTECTED BY A STANDARD PARKING BUMPER OR BEHIND THE CURB PLACE STEEL POLE IN BOLLARD PER THE HANDICAP PARKING SIGN DETAIL. TYPICAL SIGN DETAILS 5 NO SCALE 2" S 9.5C 8" NCDOT CAB IMPROVED SUBGRADE — STANDARD DUTY PAVING SECTION NO SCALE CSN1011CSN501 ACCESSIBLE PRECAST SIGN (TYP) CONC WHEEL STOP ° 45 cN :AQP o� o bo rk 1>\��� sQ 4" WIDE WHITE STRIPE, 55 O' TYP 8'-0" MIN. MIN. 8'-0" VAN TYPICAL ACCESSIBLE PARKING SPACES HANDICAP PARKING SPACE DETAIL NO SCALE WHITE REFLECTIVE BACKGROUND STANDARD SIGN #R7 -8a v A v AC C ESSIB LE ALL LETTERING TO BE GREEN 9" X 12" RESERVED ALL LETTERING TO BE GREEN PARKIN G m STANDARD SIGN #R7-8 U z o 0 m SYMBOL TO BE WHITE p o WITH BLUE BACKGROUND O m cy a U o `'' WHITE REFLECTIVE BACKGROUND ~ o m 3 12" X 18" �o WHITE REFLECTIVE BACKGROUND MAXIMUM STANDARD SIGN #R7 -8d PENALTY ALL LETTERING TO BE GREEN $250 9" X 12" 1. ALL SIGNS TO BE 0.080" THICK ALUMINUM 2. ALL SIGNS SHALL CONFORM WITH ALL CURRENT A.D.A., FEDERAL, STATE AND LOCAL CODES AND REGULATIONS. CSN101ICSN501 12" VAN ACCESSI6 LE STANDARD SIGN #R7 -8a RESERVED PARKING NSTANDARD SIGN #R7-8 MAXIMUM PENALTY STANDARD SIGN #R7 -8d $ 250 "U" CHANNEL POST CONCRETE FILL 0016 WWW ��i��i��i 1 j/ir//!////!'/i 4" MIN. 3. PLACE "VAN ACCESSIBLE" SIGN IN FRONT OF III I I III III II III' III III VAN ACCESSIBLE SPACES ONLY. -III IIII I IIIII I IIIII I IIII IIII-1 I I—I I ONE AT EACH HANDICAP SPACE. ' I_ WHERE HANDICAP SPACES FACE EACH OTHER WITHOUT WALKWAY, THERE SHALL BE ONE POST WITH SIGNS MOUNTED BOTH SIDES HANDICAP PARKING SIGN 3 NO SCALE CSN101 CSN501 6'-0" r � 0 0 PLAN VIEW 7/8" ANCHOR HOLES CONCRETE: 4000 PSI ® 28 DAYS REINFORCING: 2—#4 REINFORCING BARS SIDE VIEW STANDARD WHEELSTOP 4 NO SCALE CSN101 CSN501 END VIEW Lu Lu U z Lu C� Q 0 LL CAR�� CLAYTON ENGINEERING & m DESIGN, PLLC. No. P-1463 Q SEA - 4 ���'�l �q M •S ..CVP ��.��. 9 24 18 1z z 0 0 Oli Q M N ca X 00 c) O 0,180 L N Llj U Z I-- Z LU m W O ad C/)U W r W0 z cf) Z W U z O U Lu Cr) (D Q 0 w 0 U) w 2 Cn W Z = 0 0 U m Lu Lu Z CIVIL J Lu CD o LuCD U) JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO. DESCRIPTION DATE CSN501 SHEET - OF z O F- U J Q O Lu J O F- F - C -) - F- U Lu m U) Lu En J J_ F - :E Lu Lu 0 Z Ir LL z z Q 0 z Q F- 0 Lu F- C-) Ir Q Cc Lu Lu Z: 0 z Lu w _ LL O F - z w cn z O U Z Lu F- F - CC O _ F- CC Q z cr O Lu J O _ z Q W u) ZD Lu m F- 0 z Q Q z Q U J J z 0 U) Lu 0 06 0 z Er Lu w � Z U :�fz ¢w CD= 0 0 o U N O O �F- �w O CE EL z� W N o F— co w U) Q z co � O -0 W � m 6 o = F- 0 Q z U cp o C) W C) cz Z5 w c C) 00 CDZ N C3 z o (5o �w U) �w F- 0 NOTES THIS SHEET: 1. ALL PRECAST DRAINAGE STRUCTURES SHALL MEET MATERIAL REQUIREMENTS OF ASTM C789 AND C850, LATEST REVISIONS. 2. ALL PRECAST DRAINAGE STRUCTURES SHALL BE INSTALLED IN ACCORDANCE WITH AASHTO DIVISION 11 SECTION 27, AND MANUFACTURERS SPECIFICATIONS. 3. THE PRECAST SUPPLIER/MANUFACTURER SHALL BE RESPONSIBLE FOR THE STRUCTURAL DESIGN OF THE STRUCTURE. GENERAL CONTRACTOR IS RESPONSIBLE FOR PROVIDING SHOP DRAWINGS AND DESIGN CALCULATIONS, i (SIGNED AND SEALED BY A LICENSED STRUCTURAL ENGINEER) FROM THE SUPPLIER TO THE ENGINEER. I 4. DRAINAGE STRUCTURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE CURRENT NORTH CAROLINA DEPARTMENT OF HIGHWAYS AND TRANSPORTATION DESIGN STANDARDS. I 5. UNDERGROUND FACILITIES, STRUCTURES AND UTILITIES HAVE BEEN PLOTTED FROM AVAILABLE SURVEYS AND RECORDS, AND THEREFORE THEIR LOCATION MUST BE CONSIDERED APPROXIMATE ONLY. THERE MAY BE OTHERS, THE I EXISTENCE OF WHICH IS PRESENTLY NOT KNOWN. CONTRACTOR SHALL VERIFY LOCATION OF ALL UTILITIES AT HIS OWN INITIATIVE AND EXPENSE. 6. THE CONTRACTOR SHALL COORDINATE FINISHED PAVEMENT GRADES WITH ELEVATIONS AND LOCATIONS OF EXISTING ROADS AND STREETS. 1I� 7. NO WORK SHALL COMMENCE ON SITE UNTIL A LAND DISTURBING PERMIT IS ISSUED BY THE APPROPRIATE AGENCY. 8. LENGTHS OF LINES INDICATED ON THE DRAWING FOR UTILITY SYSTEMS ARE APPROXIMATE ONLY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY FOR DETERMINING THE EXACT AMOUNT OF PIPING REQUIRED TO FURNISH A COMPLETE WORKING SYSTEM IN ACCORDANCE WITH THE INTENT OF THE DRAWINGS. — — 9. DIMENSIONS AND COORDINATES SHOWN AT CURB ARE TO FACE OF CURB. COORDINATES SHOWN AT CURB INLETS ARE AT CENTER OF CURB INLET. SPOT ELEVATIONS SHOWN AT CURB INLETS ARE AT TOP OF CURB. SPOT ELEVATIONS_ — — — SHOWN ON DROP INLETS ARE AT TOP OF INLETS. 10. FINISH CONTOURS SHOWN ARE TO TOP OF TOPSOIL, TOP OF PAVEMENT, TOP OF TNT 30 i right of way e\N � > � S71°14'00E 33C, - _ - / / 2:1 SLOPE 510 0 0 0 0 0 0 0 X X- I - CONTRACTOR TO VER LOCATION OF CUL�RT ND ADJUST AS NECESSARY O ENSURE FLOW TO NEW RI CULVERT IN: 503.50 SIDEWALK, ETC. CONTRACTOR SHALL PROVIDE GRADE TO SUBGRADE ELEVATION — — — — — — — _ _ — 36 LF 18" RCP REQUIRED. PAVEMENT SECTIONS AND SIDEWALK SECTIONS ARE PROVIDED FOR w / / — — LASS IV REFERENCE ONLY. 11. PROVIDE POSITIVE DRAINAGE AT ALL GRADED AREAS. PROVIDE UNIFORM (STRAIGHT) GRADE BETWEEN SPOT ELEVATIONS FINISH CONTOURS TOP OF OCD INLETS, ETC. OCD / i / _ _ — o CGN101 G 501 CGN10 CGN501\ 12. SEE ARCHITECTURAL PLANS FOR DOWNSPOUT LOCATIONS. 1 v 507.50 507.95 507.50 I V. OUT: 5 .00 I o x DOWNSPOUTS TO DISCHAR ONTO CONCRETE SPLASH BLOCKS \ -� 504 / IV \ �_— x — I UPPER FLOOR 508.50 LOWER F1gOR 498.50 / INFILTRATION c�0 W z ---/ y I TRENCH cv O I o� IV -V IV I L _ x / / -V //y \\ IV -V �m 500 O — — — y y y / DOWNSPOUTS TO_pisc+ R(E \ ONTO CONCRE-TE SPLASH BLOCKS y -V y I\ IVI \ x _ 2 -V y y �v 12 Soo X / cry / 497.00 497.00 �� IV -V IV y -V Q / I -V -V y / \ 4 LF 18" IV -V -V IV y IV � 5� \ IV �— — GLASS IV I � 0 0 0 0� 0 0 0 / / \ x > x x> x > x > y IV -V �� -V x �� I 2:1 SLOPE y y y IV y ------ CGN501 / y y 496 > 96 _ o m \ -V -V -V ,/ I NV. OUT:5 4.0 0c) IV 2:1 SLOPE O � / y / y y y y y y y / y \ v 'v y -v -----v y \ y �' • o ma y y y �� y l y I I N e has Q a01 y I �v y y \ \ y) _ a� e00�aS e °fie O y y \ y -V - \IV y y y y CGN 014CGN501 FILTRATION PASINI y/ I oN�c -T e \ I --ate— \ / IV �v -V y \ y j N 13° -V ,v \ -V / y -V \y y -V \ y 1 0 ��� \ \ I y y o � -V y y ° ' 58" -'v — �� — �� 29. 6 c / — — -- e 3-1�i y / (tie I ne) � \ `l N 1114-00 W __--- ---- -� I I Old °S° Highway21 C=D c -C:) '0c) °��`�-- -- _— — — �, �2 GRADING & DRAINAGE PLAN SCALE: 1" = 20' ARO" -, CLAYTON ENGINEERING & rnn DESIGN, PLLC. zo =� No. P-1463 sioo,,�'�=, SEA 4 �i ••••.ENGINE.•• o 14M C`S/24/18 1z 0 z 10 rZ W N ca X Om c) 0 I° Li N OLLH, Z Z w � �O Ix c~j) U W E W zco Z Lu U z O U Lu Q CD w C'3 cr Z Q O m F— U) w J 0 c=n Lu U) z o O Q m m W w z CIVIL z ui z Qr J z C 0 06 z Q V JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO DESCRIPTION DATE CGN101 SHEET - OF z O U J ¢ W J O H t - U Lu 00 Lu m J J_ H Z Lu W C13 Z_ Ir LL Z Z ¢ Q Z U Lu U W W Z_ (.3 Z W Lu _ O z W U) z O U z Lu cr O t— t— cr z O Lu J O z 0 Lu W ZD W m H O z cl Q D Z ¢ U J J Z C'3 U) W 0 06 C13 Z W W Z_ U Z W Z O U O Lu CL O d W _ H W Z O Lu Cc Lu _ z C'3 W 0 Lu 0 z U) O z_ ¢ 0 Lu U) Lu _ SOD. USE NON CLUMPING DEEP ROOTED SPECIES OBSERVATION WELL 4-6 INCH PVC PIPE WITH CAP. 20 -FOOT SPACING �— 4" SAND LAYER ABOVE WASHED STONE VARIES 2' WASHED STONE LINE WITH GEOFABRIC AROUND TOP, BOTTOM, AND SIDES SUBGRADE TO MEET 0.5 IN/HR INFILTRATION RATE INFILTRATION TRENCH/BASIN DETAIL NO SCALE CSN1011CSN501 DEPTH = 1' 0 i WALL E WALL DIA. WALL TONGUE OR GROOVE WEIGHT A B C D E 15" 2-1/4" 1-3/4" 970 6" 27" 46" 73" 30" 18" 2-1/2" 1-3/4" 1340 9" 27" 46" 73" 36" 24" 3" 1-3/4" 1820 9-1/2" 43-1/2" 30" 73-1/2" 48" 30" 4-1/4" 3-7/8" 2400 12" 54" 19-3/4" 73-3/4" 60" 36" 4-3/4" 3-7/8" 1 5500 1 15" 1 63" 34-3/4" 97-3/4" 72" DIA. +1" A WALL —TONGUE OR GROOVE' . • WALL— FLARED END SECTION NO SCALE WIDTH = 0.0' RIPRAP CHECK DAMS AS NECESSARY T II IIII \—NAG LINER SC15013N, STAPLE PATTERN CONSTRUCTION SPECIFICATIONS: 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS AND OTHER OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. VEGETATE THE SWALE IMMEDIATELY AFTER CONSTRUCTION. MAINTENANCE: „C„ INSPECT DRAINAGE SWALE ONCE A MONTH AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. DRAINAGE DITCH 3 NO SCALE CGN101 CGN501 A REINFORCED CONCRETE PIPE CONFORMS TO ASTM C-76, ASTM -C-443, AASHTO M-170, AND AASHTO M-198. L CGN1011CGN501 —WALL PLAN N SECTION A RIP -RAP DISSIPATOR NO SCALE CGN1011CGN501 Lu Lu U Z Lu CD Q 0 ILL CAROB1111111111//I I� CLAYTON ENGINEERING & rn DESIGN, PLLC. =AIN P-1463 ~ " F OF W Q M N caX M p O (° d N W U Z F- Z W Cc W UO U) U W W r Z o M W U Z O U cr ¢ w H C/) ¢w o J F- 0 � w Lu oZ 0 0 U °; m W Z CIVIL Lu Q C/) 0 J c� C/) c,6 w 2 C) Z O Q JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO. DESCRIPTION DATE CGN501 SHEET - OF z O U Q J Q Lu J O U Lu m C/) Lu En J J z W w c �3 z L L. Z z Q 0 z Q U Lu U Ir Q Er Lu Lu z CD Z Lu Lu _ L L. O Z Lu Cn Z O U z Lu Er ZDO _ Er Q z m O Lu J O _ z Lu Cn ZDW CID H O z Q Z Q U J J z C/) W 0 06 z rr W W z cD z W z O U U- 0 m Lu m O m CL W _ W m Q Z O Lu Ir Lu _ H z C3 Lu 0 Lu z Q Cn O z Q W W TEMPORARY SKIMMER BASIN #1 MIN. DIMENSIONS: 60' L X 30' W MIN. STORAGE: 1,980 CU. FT. MIN. SURFACE AREA: 1,625 SQ. FT. TOP ELEV: 494.00' BOT. ELEV: 491.00' 0 30' 60' SPILLWAY ELEV.: 493.00' TEMP. SPILLWAY WIDTH: 5' DIVERSION DITCH SKIMMER SIZE: 3.0" ORIFICE SIZE: 0.75" < TEMPORARY SEDIMENT TRAP NOTES: 1. DIMENSIONS MEASURED AT SPILLWAY ELEVATION. ALL TRAPS SHALL HAVE AN ADDITIONAL 1.5' OF FREEBOARD ABOVE THE SPILLWAY ELEVATION. 2. SIDE SLOPES SHALL BE NO GREATER THAN 2:1 (H:V). 3. TEMPORARY SKIMMER BASINS TO BE REMOVED UPON COMPLETION OF DRAINAGE FACILITIES AND INSTALLATION OF INLET PROTECTION. THE PURPOSE OF THE EROSION CONTROL MEASURES, SHOWN ON THESE PLANS, SHALL BE TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS, RESULTING FROM CONSTRUCTION ACTIVITIES, FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS. IF FIELD INSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SITE, APPROPRIATE MODIFICATIONS WILL BE MADE TO CORRECT ANY PLAN DEFICIENCIES. GROUND COVER: WHENEVER LAND -DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE ACRE, IF MORE THAN ONE CONTIGUOUS ACRE IS UNCOVERED, GRADE SLOPES & FILLS: THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER(S). 1/21 RF Plat buU, , _ PIN 2931-01-6bin Lot 11 — \\ /801uu y l.J. Bingham Estate _ ` \ \ \ \ — of way / Bonnie Bingham Cash,lm S>> y Book of Records 1523, Paqe 165 Plat Book 9, Page Js�9 Plat Book 9, Paq 150 PIN 2931-01-38157— 00✓ 7 \ — EROSION CONTROL NOTE: PER NCDEQ AND NPDES REQUIREMENTS, GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. 1.52 ACRES DISTUR7ED - - CCN101 CCN501 / Celia F. Striplul IU Book of Records 575 Page 645 PIN 2931-01-111-000 /4 IF f TEMPORARY 18" RCP UNDER­CgNSTRUeTtrW ENT EXEXIT \ TYP. 7 / / \ CCN101 CCN502 \ \ W \ ]�Ut 12 by,.coordinA geometyI. \ ol J.rf�m Estate SF \° \ 41 �� I I Dnie Caste �,� —F �, \ �, �, �, �1 — I C/)oBoecords 213, Page 7- J \NN' J' \ �'k 9, Page 149PlaCCN101 CCN501-3625-000Plat BooPage 150 � % � � � � 5 PIN 293�SKIMMER BASIN 1 C/\j Qwjo oIQ � I I II 1 L L L � 14/ ' �L L �L �L\ I TYP. � Q) �A � � � � � � \ 490 I I I J \ Eenc MF \ CCN101 R/W CCN501 I X X — � / I I i \ TYP. \1/�a I \l» RF\5196' Z�:o \ \' \ 11-991?o I I I I j �'� \ 492 �I / / 5/8» IPS \ Jerry Styers and wife,---- Geraldine ife,Gera dine M. Styers Book of Records 15, Page 465 PIN 2931-01-4313-000 \ 0c/ \� �,-71 ` POB ole n pgvem nt conc. R/W MF \ \ \ J ped. o N.C.D.0.T. \\mer ,00pptic� \ / CCN101 CCN501 TYP. I I I I I _ /4t _ dII 29 ' � %e . 8 bonc. y W M� eI _ 4r - I latch bas 6» I I O EROSION AND SEDIMENT CONTROL NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PROCEDURES APPROVED BY NCDEQ AND WATAUGA COUNTY. THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH ALL APPROVED PROCEDURES WHICH MAY BE PERTINENT TO THE PROJECT. 2. ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS SHALL BE PROTECTED BY A TEMPORARY CONSTRUCTION ENTRANCE TO PREVENT TRACKING OF MUD ONTO PUBLIC RIGHT-OF-WAYS. AN ENTRANCE PERMIT FROM NCDOT IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN STATE RIGHT-OF-WAYS. 3. SEDIMENT CONTROL DEVICES, SUCH AS SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, CHECK DAMS OR OTHER MEASURES NOT LOCATED IN PROPOSED FILL OR EXCAVATION AREAS, SHALL BE CONSTRUCTED PRIOR TO ALL OTHER LAND DISTURBANCE. AN ON-SITE PRE - CONSTRUCTION MEETING WILL BE HELD BETWEEN THE ENGINEER AND THE CONTRACTOR TO IDENTIFY THOSE MEASURES TO BE INITIALLY INSTALLED. 4. MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE ACCOMPLISHED IN ACCORDANCE WITH PROCEDURES APPROVED BY NCDEQ & WATAUGA COUNTY. MAINTENANCE WILL INCLUDE THE REPAIR OF MEASURES DAMAGED BY ANY SUBCONTRACTOR INCLUDING THOSE OF THE PUBLIC UTILITY COMPANIES. AT THE PRECONSTRUCTION MEETING, THE CONTRACTOR WILL SUPPLY THE OWNER WITH THE NAME OF THE INDIVIDUAL WHO WILL BE RESPONSIBLE FOR ENSURING MAINTENANCE OF INSTALLED MEASURES ON A DAILY BASIS. 5. SURFACE FLOWS OVER CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER REDIRECTING FLOWS FROM TRANSVERSING THE SLOPES OR BY INSTALLING MECHANICAL DEVICES TO SAFELY LOWER WATER DOWNSLOPE WITHOUT CAUSING EROSION. 6. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT THE TIME OF CONSTRUCTION TO INSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. 7. THE CONTRACTOR SHALL STRIP AND PILE TOPSOIL AT THE LOCATIONS SHOWN ON THIS PLAN OR AS DIRECTED BY THE ENGINEER. SILT FENCE SHALL BE PLACED AT THE TOE OF THE STOCKPILE AFTER STRIPPING OF TOPSOIL IS COMPLETE. 8. THE CONTRACTOR SHALL COMPLETE DRAINAGE FACILITIES WITHIN 30 DAYS FOLLOWING COMPLETION OF ROUGH GRADING AT ANY POINT WITHIN THE PROJECT. THE INSTALLATION OF DRAINAGE FACILITIES SHALL TAKE PRECEDENCE OVER ALL UNDERGROUND UTILITIES. OUTFALL DITCHES FROM DRAINAGE STRUCTURES SHALL BE STABILIZED IMMEDIATELY AFTER CONSTRUCTION OF SAME. THIS INCLUDES INSTALLATION OF EROSION CONTROL STONE WHERE REQUIRED. 9. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED IN ALL AREAS, WHICH ARE NOT DESIGNATED FOR PAVING, UNDERGROUND UTILITIES OR STRUCTURAL USES SUCH AREAS SHALL NOT BE EXPOSED FOR PERIODS EXCEEDING 10 DAYS. TEMPORARY VEGETATIVE COVER MAY BE ELIMINATED IN FAVOR OF FINAL VEGETATIVE COVER IF CONSTRUCTION AND SEASONAL CONDITIONS PERMIT. 10. ALL AREAS DESIGNATED FOR PAVING, UNDERGROUND UTILITIES, AND STRUCTURAL USE SHALL BE STABILIZED AS SOON AS POSSIBLE, BUT NOT EXCEEDING 10 DAYS FOLLOWING INSTALLATION. NO MORE THAN 300' OF SANITARY SEWER, STORM SEWER, OR WATER LINES ARE TO BE OPEN AT ONE TIME. 11. THE TERM SEEDING, FINAL VEGETATIVE COVER OR STABILIZATION, ON THIS PLAN SHALL MEAN THE SUCCESSFUL GERMINATION AND ESTABLISHMENT OF A STABLE GRASS COVER FROM A PROPERLY PREPARED SEEDBED CONTAINING THE SPECIFIED AMOUNTS OF SEED, LIME, AND FERTILIZER. IRRIGATION SHALL BE REQUIRED AS NECESSARY TO ENSURE ESTABLISHMENT OF GRASS COVER. 12. ALL SLOPES STEEPER THAN 3:1 SHALL REQUIRE THE USE OF EROSION CONTROL BLANKETS SUCH AS EXCELSIOR BLANKETS TO AID IN THE ESTABLISHMENT OF A VEGETATIVE COVER. INSTALLATION SHALL BE IN ACCORDANCE WITH MULCHING AND MANUFACTURER'S INSTRUCTIONS. 13. INLET PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS AS SOON AS PRACTICAL FOLLOWING CONSTRUCTION OF SAME. REPLACE TEMPORARY INLET PROTECTION WITH SILT SACK, AFTER INSTALLING FRAME, GRATE, AND CURB AND GUTTER. 14. BASE COURSE MATERIAL SHALL BE PLACED IN ALL STREET & PARKING AREAS WITHIN 30 DAYS OF FINAL GRADING. 15. TEMPORARY EROSION CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED AFTER NCDEQ INSPECTION AND RELEASE. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED. 16. SEE CCN502 FOR SEEDING, SEED BED PREPARATION AND MAINTENANCE SCHEDULE 17. SEE CGN501 FOR STORM DRAINAGE SCHEDULE. 18. TOTAL DISTURBED AREA = 1.52 ACRES. (TOTAL) 19. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EROSION CONTROL PLAN APPROVAL IF NECESSARY FOR ANY RELATED BORROW AREA. 20. OFF-SITE WASTE OR BORROW AREAS SHALL BE APPROVED BY WATAUGA COUNTY PRIOR TO THE IMPORT OF ANY BORROW OR EXPORT OF ANY WASTE TO OR FROM THE PROJECT SITE. \ I GRADING AND EROSION CONTROL LEGEND J � I - \ I @'__-100 1 \\ \SIF � l \ 1:j PRECONSTRUCTION EROSION CONTROL PLAN 01.MLC: I = OU W Lu U z LuQ 0 LL EXIST. MINOR CONTOUR EXIST. MAJOR CONTOUR PROP. MINOR CONTOUR Q z Z PROP. MAJOR CONTOUR PROP. SPOT ELEVATION -SF—SILT FENCE 0 30' 60' LIMITS OF DIST. TEMP. INLET PROTECTION (SILT SACK) TEMP. DIVERSION DITCH SF sv SILT FENCE OUTLET > INLET PROTECTION > CHECK DAM .� �N11CAR0 ' ,, CLAYTON ENGINEERING & rnn DESIGN, PLLC. =� No. P-1463 OF 1111 I,,, CA SEA 4 7 ENGINE. o Q` ®'l144 S. 18 z W Q Cl) N x Cam 0 01"')CL N Lu C/)z Z w� w � MO 19 C/)U W r W0 z Cl) Z W U z O U Er Q W ZD < F- J 0 w J F- 0 0 C/) w 2 cn W Z 0 0 U Lu m m w Z CIVIL z z J 0 CCF - z C o 0 z C) 0 � 0 Lu JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO. DESCRIPTION DATE CCN101 SHEET 6 OF 14 z O F- 0 U Q J Q CO Lu J O F- F- 0 - F - U Lu m Cn Lu En J J z Lu w 0 z rr LL Z z Q 0 z Q F- 0 Lu U Ir Q CC Lu Lu z cD Z Lu w 2 LL O F- 77 Lu Cn Z O U z Lu Er O F— CC Q z CC O Lu J O 2 z Lu Cl) ZD Lu CID F- 0 O z Z Q U J J CL z 0 Cn Lu 0 06 0 z rr Lu Lu z cD z Lu z O U LL O F- rr Lu n O m CL W 2 W m Q Z O W CC Lu H z (3 U) Lu 0 Lu z Q Cn O z Q m 0 Lu U) Lu THE PURPOSE OF THE EROSION CONTROL MEASURES, SHOWN ON THESE PLANS, SHALL BE TO PRECLUDE THE TRANSPORT OF ALL WATERBORNE SEDIMENTS, RESULTING FROM CONSTRUCTION ACTIVITIES, FROM ENTERING ONTO ADJACENT PROPERTIES OR STATE WATERS. IF FIELD INSPECTION REVEALS THE INADEQUACY OF THE PLAN TO CONFINE SEDIMENT TO THE PROJECT SITE, APPROPRIATE MODIFICATIONS WILL BE MADE TO CORRECT ANY PLAN DEFICIENCIES. GROUND COVER: WHENEVER LAND -DISTURBING ACTIVITY IS UNDERTAKEN ON A TRACT COMPRISING MORE THAN ONE ACRE, IF MORE THAN ONE CONTIGUOUS ACRE IS UNCOVERED, GRADE SLOPES & FILLS: THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER, OR OTHER ADEQUATE EROSION -CONTROL DEVICES OR STRUCTURES. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNER(S). EROSION CONTROL NOTE: PER NCDEQ AND NPDES REQUIREMENTS, GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. 1/2' RF UUu . Plat 13Uun PIN 293141'48// Lot 11 •�� • •• J. Bingham Estate _ : `\ way / Bonnie Bingham Cashier- �y Book of Records 1523, Page 165 Plat Book 9, Page 9 Plat Book 9 Paq 150 z \ PIN 293141-3815— 00 \ _ \ — 7 Cela F. StrlCKlullu 4 � Book of Records 515 Page 645 CCN, 01 CCN501 PIN 2931-01-111-000 -\�8»R � � \ 3/4» IPF v \ CONSTRUCTION LIMIT — \ CCN101 CC 501 ✓ _ TYP. \ kot 12 bye coordina geomek .J. �m Estate :• � o cy nie Cash gn �, — �, �, �, �, �, �, �, �1 I BoVp f ecords 213, Pagge 9 4— I Platlok 9, Page T49 Plat Bo Page 150 �, \ \, \L'�, : ' ® �, \L' \L' PIN 293M1_3625-000 \ I co m I I ®� Q) / I I ®® 9 \ / C 101 CC 501 _ x 0' I Com\ CCN101 N5. Q)/ 'R WMf \ TYP01 \1/ 14/ \1// I I I \ 1/2" RF / rY 5/8" IPS 1) Jerry Styers and wife, Geraldine M. St ers y Q Book of Records 15 Page 465 PIN 2931-01— 313-000 \ /c/ POB W I I \ \ S \ -7 /\ ole n (fie9 6' bonc. YW M� j p ve nt lr�e) I I 124" x 46" I cont. R/W MIF \ \ 7 ' latch basin I I I O EROSION AND SEDIMENT CONTROL NOTES: 1. ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH PROCEDURES APPROVED BY NCDEQ AND WATAUGA COUNTY. THE CONTRACTOR SHALL BE THOROUGHLY FAMILIAR WITH ALL APPROVED PROCEDURES WHICH MAY BE PERTINENT TO THE PROJECT. 2. ALL POINTS OF CONSTRUCTION INGRESS AND EGRESS SHALL BE PROTECTED BY A TEMPORARY CONSTRUCTION ENTRANCE TO PREVENT TRACKING OF MUD ONTO PUBLIC RIGHT—OF—WAYS. AN ENTRANCE PERMIT FROM NCDOT IS REQUIRED PRIOR TO ANY CONSTRUCTION ACTIVITIES WITHIN STATE RIGHT—OF—WAYS. 3. SEDIMENT CONTROL DEVICES, SUCH AS SEDIMENT BASINS AND TRAPS, PERIMETER DIKES, CHECK DAMS OR OTHER MEASURES NOT LOCATED IN PROPOSED FILL OR EXCAVATION AREAS, SHALL BE CONSTRUCTED PRIOR TO ALL OTHER LAND DISTURBANCE. AN ON—SITE PRE— CONSTRUCTION MEETING WILL BE HELD BETWEEN THE ENGINEER AND THE CONTRACTOR TO IDENTIFY THOSE MEASURES TO BE INITIALLY INSTALLED. 4. MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES SHALL BE ACCOMPLISHED IN ACCORDANCE WITH PROCEDURES APPROVED BY NCDEQ & WATAUGA COUNTY. MAINTENANCE WILL INCLUDE THE REPAIR OF MEASURES DAMAGED BY ANY SUBCONTRACTOR INCLUDING THOSE OF THE PUBLIC UTILITY COMPANIES. AT THE PRECONSTRUCTION MEETING, THE CONTRACTOR WILL SUPPLY THE OWNER WITH THE NAME OF THE INDIVIDUAL WHO WILL BE RESPONSIBLE FOR ENSURING MAINTENANCE OF INSTALLED MEASURES ON A DAILY BASIS. 5. SURFACE FLOWS OVER CUT AND FILL SLOPES SHALL BE CONTROLLED BY EITHER REDIRECTING FLOWS FROM TRANSVERSING THE SLOPES OR BY INSTALLING MECHANICAL DEVICES TO SAFELY LOWER WATER DOWNSLOPE WITHOUT CAUSING EROSION. 6. SEDIMENT CONTROL MEASURES MAY REQUIRE MINOR FIELD ADJUSTMENTS AT THE TIME OF CONSTRUCTION TO INSURE THEIR INTENDED PURPOSE IS ACCOMPLISHED. 7. THE CONTRACTOR SHALL STRIP AND PILE TOPSOIL AT THE LOCATIONS SHOWN ON THIS PLAN OR AS DIRECTED BY THE ENGINEER. SILT FENCE SHALL BE PLACED AT THE TOE OF THE STOCKPILE AFTER STRIPPING OF TOPSOIL IS COMPLETE. 8. THE CONTRACTOR SHALL COMPLETE DRAINAGE FACILITIES WITHIN 30 DAYS FOLLOWING COMPLETION OF ROUGH GRADING AT ANY POINT WITHIN THE PROJECT. THE INSTALLATION OF DRAINAGE FACILITIES SHALL TAKE PRECEDENCE OVER ALL UNDERGROUND UTILITIES. OUTFALL DITCHES FROM DRAINAGE STRUCTURES SHALL BE STABILIZED IMMEDIATELY AFTER CONSTRUCTION OF SAME. THIS INCLUDES INSTALLATION OF EROSION CONTROL STONE WHERE REQUIRED. 9. TEMPORARY VEGETATIVE COVER SHALL BE PROVIDED IN ALL AREAS, WHICH ARE NOT DESIGNATED FOR PAVING, UNDERGROUND UTILITIES OR STRUCTURAL USES. SUCH AREAS SHALL NOT BE EXPOSED FOR PERIODS EXCEEDING 10 DAYS. TEMPORARY VEGETATIVE COVER MAY BE ELIMINATED IN FAVOR OF FINAL VEGETATIVE COVER IF CONSTRUCTION AND SEASONAL CONDITIONS PERMIT. 10. ALL AREAS DESIGNATED FOR PAVING, UNDERGROUND UTILITIES, AND STRUCTURAL USE SHALL BE STABILIZED AS SOON AS POSSIBLE, BUT NOT EXCEEDING 10 DAYS FOLLOWING INSTALLATION. NO MORE THAN 300' OF SANITARY SEWER, STORM SEWER, OR WATER LINES ARE TO BE OPEN AT ONE TIME. 11. THE TERM SEEDING, FINAL VEGETATIVE COVER OR STABILIZATION, ON THIS PLAN SHALL MEAN THE SUCCESSFUL GERMINATION AND ESTABLISHMENT OF A STABLE GRASS COVER FROM A PROPERLY PREPARED SEEDBED CONTAINING THE SPECIFIED AMOUNTS OF SEED, LIME, AND FERTILIZER. IRRIGATION SHALL BE REQUIRED AS NECESSARY TO ENSURE ESTABLISHMENT OF GRASS COVER. 12. ALL SLOPES STEEPER THAN 3:1 SHALL REQUIRE THE USE OF EROSION CONTROL BLANKETS SUCH AS EXCELSIOR BLANKETS TO AID IN THE ESTABLISHMENT OF A VEGETATIVE COVER. INSTALLATION SHALL BE IN ACCORDANCE WITH MULCHING AND MANUFACTURER'S INSTRUCTIONS. 13. INLET PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS AS SOON AS PRACTICAL FOLLOWING CONSTRUCTION OF SAME. REPLACE TEMPORARY INLET PROTECTION WITH SILT SACK, AFTER INSTALLING FRAME, GRATE, AND CURB AND GUTTER. 14. BASE COURSE MATERIAL SHALL BE PLACED IN ALL STREET & PARKING AREAS WITHIN 30 DAYS OF FINAL GRADING. 15. TEMPORARY EROSION CONTROL MEASURES ARE NOT TO BE REMOVED UNTIL ALL DISTURBED AREAS ARE STABILIZED. AFTER STABILIZATION IS COMPLETE, ALL MEASURES SHALL BE REMOVED AFTER NCDEQ INSPECTION AND RELEASE. TRAPPED SEDIMENT SHALL BE SPREAD AND SEEDED. 16. SEE CCN502 FOR SEEDING, SEED BED PREPARATION AND MAINTENANCE SCHEDULE 17. SEE CGN501 FOR STORM DRAINAGE SCHEDULE. 18. TOTAL DISTURBED AREA = 1.52 ACRES. (TOTAL) 19. CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING EROSION CONTROL PLAN APPROVAL IF NECESSARY FOR ANY RELATED BORROW AREA. 20. OFF—SITE WASTE OR BORROW AREAS SHALL BE APPROVED BY WATAUGA COUNTY PRIOR TO THE IMPORT OF ANY BORROW OR EXPORT OF ANY WASTE TO OR FROM THE PROJECT SITE. 4 I GRADING AND EROSION CONTROL LEGEND \ \ \ ped. a \ U CCN101 CCN501 / TMP' J I 00 \ \ \ y,/ 0 30' 60' EXIST. MINOR CONTOUR N.C.D.O.T. \ \ `fiber optic \\\ \ U EXIST. MAJOR CONTOUR arks oC / I w F < PROP. MINOR CONTOUR I J 0 w I uu PROP. MAJOR CONTOUR F- _ \\ 0 O U) \ \ \ \ I @'__-10O PROP. SPOT ELEVATION \ � \ \ SIF SF SF SILT FENCE oZ l \ \ 1 LIMITS OF DIST. p 0 U Lu TEMP. INLET PROTECTION (SILT SACK) m ' TEMP. DIVERSION DITCH SF sF SILT FENCE OUTLET m w > INLET PROTECTION > CHECK DAM POST -CONSTRUCTION EROSION CONTROL PLAN SCALE: 1" = 30' ui ui U z ui0 Q 0 LL N U M 00 Z 0 30' 60' O AR0 :moo 4 �ti9 CLAYTON ENGINEERING & rnn DESIGN, PLLC. =� No. P-1463 N OF SEA 4 7 ENGINE. o Q` ., `,. ®' l 1q M S. 18 z W Q Cl) N Ca x DO c� 0 0(D �N �z Z w� w � �O C/) U 19 W r WCD ZCl) W U z O U oC Q w F < U) J 0 w J F- 0 O U) w N w oZ = p 0 U Lu m m w Z CIVIL z of U 0 �CC � Z cn 0 z z 0 U U z0 C/) U) CC 0- Lu JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC /� REVISIONS NO. DESCRIPTION DATE CCN102 SHEET 7 OF 14 Z O H U Q J Q CD Lu J O H H- U w m cn Lu En J J_ H- z Lu 75 w u ry G_ LL Z z G G Q F_ U Lu U m Q m Lu Lu z U G Lu LLI _ O F- 77 z Lu U) z O U Z Lu H CC _ O Q m z m O Lu J O z_ Lu U) Lu m F- 0 z z Q U J J m z 0 U) Lu 0 06 U G_ rr LJJ Lu ' Z Lu z O IF_ Q J U O o rf- w m O I rr 0 - Lu = F- LU LU m Q O Lu CC Lu = F- CD C3 U) �o w 2 .z Q U) 0 �z Q . o Lu :W Lu _ F - TOP VIEW 9 GAUGE SUPPORT WIRE TO PREVENT SAGGING WATER ENTRY UNIT WITH TRASH SCREEN TLUH ORIFICE OPENING INSIDE THE HORIZONTAL TUBE WITH A CONSTANT HYDRAULIC HEAD SCHEDULE 40 PVC PIPE (BARREL OR ARM) FLEXIBLE HOSE SKIMMER DETAIL NOT TO SCALE STEEL SUPPORT, POST,cI^c END VIEW ENT PIPE POTENTIAL FOR PIPING CAN OCCUR. PROPER DESIGN TO MINIMIZE DISCHARGE AROUND PIPE MUST OCCUR. WAI EK EN I NY UNI I DISCHARGE PIPE SCHEDULE 40 GENERAL NOTES: 1. PROPER DESIGN MUST BE COMPLETED TO MINIMIZE PIPING AROUND DISCHARGE PIPE. 2. PROPER ORIFICE OPENING MUST BE SELECTED TO ENSURE POND DRAINS IN CORRECT AMOUNT OF TIME. MODIFICATIONS MAY BE REQUIRED IF FIELD CONDITIONS WARRANT A CHANGE. 3. EMBANKMENT MUST BE COMPACTED TO DESIGN SPECIFICATIONS. 4. EMERGENCY SPILLWAY MUST BE CORRECTLY SIZED AND EROSION PROTECTION INSTALLED. 5. EROSION PROTECTION MUST BE INSTALLED ALONG THE EMBANKMENT AND AT THE DISCHARGE END OF THE PIPE. 6. INSPECT SYSTEM REGULARLY TO ENSURE IT IS FUNCTIONING IN A CORRECT MANNER. EARTHEN EMBANKMENT EMERGENCY SPILLWAY PVC VENT PIP SCHEDULE 40 PVC PIP (BARREL OR ARM) t=Nlr" FLEXIBLE HOSE - / SIDE VIEW BAFFLE, TYP. STAKE TO QI IPPC)PT WIRE - __,. .`.' ryy I \`,..• ,. ;.. COIR MESH OR SIMILAR, STAPLED INTO BOTTOM AND SIDES WITH 12" STAPLES CSD 12" O.C. CROSS-SECTION CONSTRUCTION SPECIFICATIONS: 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL POSTS OR SAW HORSES ACROSS THE WIDTH OF THE SEDIMENT TRAP. 3. STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES, SPACED A MAXIMUM OF 4 FEET APART, AND INSTALLED UP THE SIDES OF THE BASIN AS WELL. THE TOP OF THE FABRIC SHOULD BE 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 4. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND THE OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. h 5. WHEN USING POSTS, ADD A 9 GAUGE SUPPORT WIRE ACROSS THE TOP OF THE MEASURE ' TO PREVENT SAGGING. 6. WRAP POROUS MATERIAL, LIKE JUTE BACKED BY COIR MATERIAL, OVER A SAWHORSE OR THE TOP WIRE. HAMMER REBAR INTO THE SAWHORSE LEGS FOR ANCHORING. THE FABRIC SHOULD HAVE FIVE TO TEN PERCENT OPENINGS IN THE WEAVE. ATTACH FABRIC TO A SUPPORT WIRE AND A SUPPORT STRUCTURE WITH ZIP TIES, WIRES, OR STAPLES. 7. THE BOTTOM AND SIDES OF THE FABRIC SHOULD BE ANCHORED IN A TRENCH OR PINNED WITH 12 -INCH EROSION CONTROL MATTING STAPLES AT 12" SPACING. 8. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. MAINTENANCE: INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. L = 1.4 x DEPTH TO THE OVERFLOW MINIMUM LENGTH APPLIES MAINTAIN DEPRESSION TO MINIMIZE CHANCE OF SKIMMER BECOMING STUCK OUTLEF;.yCLA5S''J RI,P..FtAI? ;.:;;::. :'.,:`^ ; SECOND CHAMBER :. 25% OF SURFACE AREA BAFFLES NOT TO SCALE DEWATERING ZONE FILTER FABRIC ign-Foammm-so sma wasomm- H=2' MIN. I =III ISI= SEDIMENT F1 1'.., I I III STORAGE ZONE SKIMMER BASIN CROSS-SECTION VIEW NOT TO SCALE EMERGENCY III SPILLWAY III IIILl IILl III 'I 1�� II II' - ANTI -SEEP COLLAR n LOAT i f� CLASS B RIPRAP - i� A FLOW NATURAL GROUND RIPRAP HEADWALL A O PIPE INVERT 36" PIPE MAX NATURAL GROUND FILTER BERM NCDOT #5 OR #57 WASHED STONE PLAN VIEW RIPRAP HEADWALL 1' MIN HEIGHT FROM ROAD SHOULDER NATURAL GROUND 6 MAX STD. STRENGTH EAB MAX STRENGTH F RIC WITH WIR EENrc WOVEN WIRE FENCE (14 GA MIN AND MAX 6" MESH SPACING) FILTER FABRIC BACKFILL TRENCH WITH SOIL - AND COMPACT THOROUGHLY EMBED FILTER CLOTH MIN 8" INTO GROUND CROSS-SECTION V LVGRECH PERSPECTIVE VIEW VIIIV. NOTE: STRUCTURAL STONE SHALL BE (CALSS "B") STONE FOR EROSION CONTROL PURPOSES. SEDIMENT CONTROL STONE SHALL BE NO. 5 OR NO. 57 STONE SILT FENCE 6" MIN. FLOW - 1 12" THICK SEDIMENT CONTROL STONE STRUCTURAL STONE NCDOT #5 OR #57 WASHED STONE SECTION A -A 5' MIN STEEL POSTS, DRIVEN MIN 24" INTO GROUND -WOVEN WIRE FENCE (14 GAUGE, MAX 6" MESH SPACING) 1.33 LB./LF STEEL POST 5' MIN LENGTH PLASTIC OR WIRE TIE NATURAL GROUND UI - of m N of w I J 00 LL 0 = Z p w 00 z CLASS B RIPRAP CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE AREA OF ALL DEBRIS THAT MIGHT HINDER EXCAVATION AND DISPOSAL OF SOIL. w 2. INSTALL THE CLASS B OR CLASS I RIRAP IN A SEMICIRCLE AROUND THE PIPE INLET. THE STONE SHOULD BE BUILT UP HIGHER ON EACH END WHERE IT TIES INTO THE EMBANKMENT. THE MINIMUM w CREST WIDTH OF THE RIPRAP SHOULD BE 3 FEET, WITH A MINIMUM BOTTOM WIDTH OF 11 FEET. THE MINIMUM HEIGHT SHOULD BE 2 FEET, BUT ALSO 1 FOOT LOWER THAN SHOULDER OF THE EMBANKMENT OR DIVERSIONS. 3. A 1 FOOT THICK LAYER OF NC DOT #5 OR #57 STONE SHOULD BE PLACED ON OUTSIDE SLOPE OF U RIPRAP. z 4. THE SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE OUTSIDE OF THE STONE w HORSESHOE 18 INCHES BELOW NATURAL GRADE. Q 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT AREA PROPERLY, AND STABILIZE WITH GROUND COVER. 0 LL MAINTENANCE: INSPECT RIP -RAP PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (Y2 INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER. TEMPORARY INLET PROTECTION NOT TO SCALE CCN101- CONSTRUCTION SPECIFICATIONS: 1. CONSTRUCT THE SEDIMENT BARRIER OF STANDARD STRENGTH OR EXTRA STRENGTH SYNTHETIC FILTER FABRICS. 2. ENSURE THAT THE HEIGHT OF THE SEDIMENT FENCE DOES NOT EXCEED 24 INCHES ABOVE THE GROUND SURFACE. 3. CONSTRUCT THE FILTER FABRIC FROM A CONTINUOS ROLL CUT TO LENGTH OF THE BARRIER TO AVOID JOINTS. WHEN JOINTS ARE NECESSARY, SECURELY FASTEN THE FILTER CLOTH ONLY AT A SUPPORT POST WITH 4 FEET MINIMUM OVERLAP TO THE NEXT POST. 4. SUPPORT STANDARD STRENGTH FILTER FABRIC BY WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH FASTENED SECURELY TO THE UPSLOPE SIDE OF THE POSTS. EXTEND THE WIRE MESH SUPPORT TO THE BOTTOM OF THE TRENCH. FASTEN THE WIRE REINFORCEMENT, THEN FABRIC ON THE UPSLOPE SIDE OF THE FENCE POST. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 5. WHEN A WIRE MESH SUPPORT FENCE IS USED, SPACE POSTS A MAXIMUM OF 8 FEET APART. SUPPORT POSTS SHOULD BE DRIVEN SECURELY INTO THE GROUND A MINIMUM OF 24 INCHES. 6. EXTRA STRENGTH FILTER FABRIC WITH 6 FEET POST SPACING DOES NOT REQUIRE WIRE MESH SUPPORT FENCE. SECURELY FASTEN THE FILTER FABRIC DIRECTLY TO POSTS. WIRE OR PLASTIC ZIP TIES SHOULD HAVE MINIMUM 50 POUND TENSILE STRENGTH. 7. EXCAVATE A TRENCH APPROXIMATELY 4 INCHES WIDE AND 8 INCHES DEEP ALONG THE PROPOSED LINE OF POSTS AND UPSLOPE FROM THE BARRIER. 8. PLACE 12 INCHES OF THE FABRIC ALONG THE BOTTOM AND SIDE OF THE TRENCH. 9. BACKFILL THE TRENCH WITH SOIL PLACED OVER THE FILTER FABRIC AND COMPACT. THOROUGH COMPACTION OF THE BACKFILL IS CRITICAL TO SILT FENCE PERFORMANCE. 10. DO NOT ATTACH FILTER FABRIC TO EXISTING TREES. MAINTENANCE: INSPECT SEDIMENT FENCES ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. SILT FENCE 2 NOT TO SCALE ccN1o1-1a2 ccNsal SILT FENC 3' MAX. 3' FILTER FAE ON GROUND BURY 6" OF IN TRENCH CROSS SECTION FRONT VIEW SILT FENCE STONE OUTLET 3 NO SCALE CCN101-102 CCN501 'i 0 0 o- W a o_ x w 1 " TO 2" TAMP SOIL FIRMLY z co SOIL RETENTION MAT NO. 11 MIN (WOOD OR MANMADE FIBRE) GAUGE WIRE y�~12" MAX 4:1 OR FLATTER 6" MAX STEEPER THAN 4:1 • • • . .CENTER ROW MAY BE ELIMINATED • WHEN SLOPE IS LESS THAN 4:1 5' MAX 4:1 OR FLATTER 3' MAX STEEPER THAN 4:1 EDGE AND END JOINTS TO BE OVERLAPPED 2" MIN VAR. VAR. NOTE: SOIL STABILIZATION MATS SHALL BE INSTALLED PER MANUFACTURERS SPECIFICATIONS. SOIL STABILIZATION MATS SHALL BE PLACED ON ANY DISTURBED SLOPES GREATER THAN 3:1. SOIL STABILIZATION MAT -INSTALLATION NO SCALE LK�Pf[iY�[KNR.'Si71 CONSTRUCTION SPECIFICATIONS: 1. CLEAR THE ENTRANCE AND EXIT AREA OF ALL VEGETATION, ROOTS, AND OTHER OBJECTIONABLE MATERIAL AND PROPERLY GRADE IT. 2. PLACE THE GRAVEL TO THE SPECIFIC GRADE AND DIMENSIONS SHOWN ON PLANS, AND SMOOTH IT. Z 3. PROVIDE DRAINAGE TO CARRY WATER TO A SEDIMENT TRAP OR OTHER mi SUITABLE OUTLET. oN 4. USE GEOTEXTILE FABRICS BECAUSE THEY IMPROVE STABILITY OF THE FOUNDATION IN LOCATIONS SUBJECT TO SEEPAGE OR HIGH WATER TABLE. MAINTENANCE: MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2" STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE EXIT , NOT TO SCALE ccN101-10CC 2 N501 CARO -,, l' �o ti9-; CLAYTON ENGINEERING & m DESIGN, PLLC. -,A No. No. P-1463 Q OF N.. s o 'O v' SE 407 iso � 09/24/18 z W 10 c\I N ca X m� 0 O 1° � N cn Z Z w0 Lu c ad C/) U E 2 W r W g 0 z� z W U z O U LL] CD 0 i/) Q J O O C/) w 2 cS Lu Z = p O U Lu m > Lu z CIVIL J O cnH O J U Q r z Z Lu O p cn O Lu JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO DESCRIPTION DATE CCN501 SHEET H OF 14 z O U ¢ J 0 Lu _J O H- H - U Lu m U) Lu CID J J_ z Lu w ( `:3 Z rr LL Z z Q z U W H U Er ¢ Lu Lu z c� z Lu LL _ LL O H- z Lu U) z O U z Lu H t= m O _ t= m z Er O Lu J O _ Z Lu U) Lu CID H- O Z Q 1) z U J J Z U) Lu D co Z rr LJJ LJJ Z CD z Lu z O J U LL O 12E Lu 0- 0 Iz Lu _ F_ Lu Iz ¢ Z O Lu Iz Lu _ H- Z U) Lu 1) Lu H- 0 Z U) 0 Z ¢ m Lu Lu SEEDBED PREPARATION (SP) SP -1 FILL SLOPES 3:1 OR STEEPER TO BE SEEDED WITH A HYDRAULIC SEEDER (PERMANENT SEEDINGS). GRASS LINED CHANNELS. 1. LEAVE THE LAST 4-6 INCHES OF FILL LOOSE AND UNCOMPACTED, ALLOWING ROCKS, ROOTS, LARGE CLODS AND OTHER DEBRIS TO REMAIN ON THE SLOPE. 2. ROUGHEN SLOPE FACES BY MAKING GROOVES 2-3 INCHES DEEP, PERPENDICULAR TO THE SLOPE. 3. SPREAD LIME EVENLY OVER SLOPES AT RATES RECOMMENDED BY SEEDING METHODS (SM -1). SP -2 FILL SLOPES 3:1 OR STEEPER (TEMPORARY SEEDINGS) 1. LEAVE A LOOSE, UNCOMPACTED SURFACE. REMOVE LARGE CLODS, ROCKS, AND DEBRIS WHICH MIGHT HOLD NETTING ABOVE THE SURFACE. 2. SPREAD LIME AND FERTILIZER EVENLY AT RATES RECOMMENDED BY SEEDIMG METHODS (SM -3) 3. INCORPORATE AMENDMENTS BY ROUGHENING OR GROOVING SOIL SURFACE ON THE CONTOUR. SP -3 GENTLE AND FLAT SLOPES 1. REMOVE ROCKS, AND DEBRIS. 2. APPLY LIME AND FERTILIZER AT RATES RECOMMENDED BY SEEDING METHODS (SM -2); SPREAD EVENLY AND INCORPORATE INTO THE TOP 6" WITH A DISK, CHISEL PLOW, OR ROTARY TILLER. 3. BREAK UP LARGE CLODS AND RAKE INTO LOOSE, UNIFORM SEEDBED. 4. RAKE TO LOOSEN SURFACE JUST PRIOR TO APPLYING SEED. 14 DAY STABILIZATION CLAUSE ALL DISTURBED AREAS WHICH ARE TO BE LEFT IDLE FOR PERIOD OF 14 DAYS OR LONGER ARE TO RECEIVE TEMPORARY VEGETATION AND /OR MULCH. SEEDING METHODS (SM) SM -1 FILL SLOPES STEEPER THAN 3:1 (PERMANENT SEEDINGS) USE HYDRAULIC SEEDING EQUIPMENT TO APPLY SEED AND FERTILIZER. APPLY 40001b/acre GROUND AGRICULTURAL LIMESTONE AND 10001b/acre 10-10-10 FERTILIZER. AFTER AUG 15, USE UNSCARFIED SEED FOR SERICEA LESPEDEZA. FOR NEATER APPERANCES, OMIT SERICEA AND SUBSTITUTE 401b/acre BAHIAGRASS OR 15Ib/acre BERMUDA GRASS (USE UNHULLED BERMUDA IN THE FALL). SM -2 GENTLE TO FLAT SLOPES OR TEMPORARY SEEDINGS 1. BROADCAST SEED AT THE RECOMMENDED RATE WITH A CYCLONE SEEDER, DROP SPREADER, OR CULTIPACKER SEEDER. 2. RAKE SEED INTO THE SOIL AND LIGHTLY PACK TO ESTABLISH GOOD CONTACT. 3. APPLY 40001b/acre GROUND AGRICULTURAL LIMESTONE AND 1000 Ib/acre 10-10-10 FERTILIZER. 4. BETWEEN MAR 31 -AUG 20, APPLY 501b/acre KOBE LESPEDEZA, KEEP MOWED; SEED PERMANENT MIXTURE IN EARLY FALL. SM -3 TEMPORARY SEDDING 1. APPLY 20001b/acre GROUND AGRICULTURAL LIMESTONE AND 7501b/acre 10-10-10 FERTILIZER. SM -4 GRASS LINED CHANNELS; APPLY 4000Ib/acre GROUND AGRICULTURE LIMESTONE AND 10001b/acre 10-10-10 FERTILIZER. PLACE LININGS AS NOTED ON PLANS. MULCH (MU) MU -1 STEEP SLOPES (3:1 OR GREATER) APPLY 1001b/1,000 sq. ft. GRAIN STRAW. COVER WITH NETTING AND STAPLE TO THE SLOPE. MU -2 GENTLE SLOPES (LESS THAN 3:1) APPLY 1001b/1,000 sq. ft. GRAIN STRAW. COVER WITH ASPHALT OR WITH NETTING AND STAPLE TO THE SLOPE. MU -3 APPLY 1001b/1000 sq. ft. AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. MAINTENANCE (MA) MA -1 REFERTILIZE IN LATE WINTER OR EARLY SPRING THE FOLLOWING YEAR. MOW AS DESIRED. RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. EROSION CONTROL MAINTENANCE SCHEDULE ALL SEDIMENT AND EROSION CONTROLS ARE TO BE INSPECTED AT LEAST ONCE EVERY SEVEN (7) CALENDAR DAYS AND AFTER ANY STORM EVENT OF 0.5 INCHES OR GREATER OF PRECIPITATION DURING AND 24-HOUR PERIOD. INSPECTION NOTES: 1. A RAIN GAUGE SHALL BE MAINTAINED IN GOOD WORKING ORDER ON THE SITE, UNLESS ANOTHER RAIN MONITORING DEVICE HAS BEEN APPROVED BY THE DIVISION OF WATER QUALITY. 2. A WRITTEN RECORD OF THE DAILY RAINFALL AMOUNTS SHALL BE RETAINED AND ALL RECORDS SHALL BE MADE AVAILABLE TO DWQ OR AUTHORIZED AGENT UPON REQUEST. (NOTE: IF NO RAINFALL OCCURRED, THE REPORT MUST RECORD "ZERO") 3. EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED TO ENSURE THAT THEY ARE OPERATING CORRECTLY. INSPECTION RECORDS MUST BE MAINTAINED FOR EACH MEASURE. AT A MINIMUM, INSPECTION OF MEASURES MUST OCCUR AT THE FREQUENCY INDICATED BELOW: (a) ALL EROSION AND SEDIMENTATION CONTROL MEASURES MUST BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS, AND (b) ALL EROSION AND SEDIMENT CONTROL MEASURES MUST BE INSPECTED WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. 4. ONCE LAND DISTURBANCE HAS BEGUN ON THE SITE, STORMWATER RUNOFF DISCHARGE OUTFALLS SHALL BE INSPECTED BY OBSERVATION FOR EROSION, SEDIMENTATION, AND OTHER STORMWATER DISCHARGE CHARACTERISTICS. INSPECTIONS OF THE OUTFALLS SHALL BE MADE AT LEAST ONCE EVERY SEVEN CALENDAR DAYS WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 0.50 INCHES OF RAIN PER 24 HOUR PERIOD. 5. INSPECTIONS ARE ONLY REQUIRED TO BE MADE DURING NORMAL BUSINESS HOURS. 6. THE PERMITTEE SHALL REPORT TO THE DWQ CENTRAL OFFICE OR APPROPRIATE REGIONAL OFFICE ANY VISIBLE SEDIMENT BEING DEPOSITED IN ANY STREAM etc., ORALLY OR ELECTRONICALLY WITHIN 24 HOURS FROM THE TIME THE PERMITTEE BECAME AWARE OF THE CIRCUMSTANCES. 7. A WRITTEN SUBMISSION OF THE REPORT SHALL BE PROVIDED WITHIN 5 DAYS OF THE INCIDENT. WRITTEN REPORT SHALL CONTAIN DESCRIPTION OF THE SEDIMENT DEPOSITION, AND ACTIONS TAKEN TO ADDRESS THE CAUSE OF THE DEPOSITION. 8. RECORDS OF INSPECTIONS MADE DURING THE PREVIOUS 30 DAYS SHALL REMAIN ON THE SITE AND AVAILABLE DURING NORMAL WORKING HOURS. OLDER RECORDS MUST BE MAINTAINED FOR THREE YEARS AFTER THE PROJECT IS COMPLETED. ELECTRONIC RECORDS MAY BE USED, IF PROVIDING EQUAL ACCESS AND UTILITY AS THE HARD COPIES. 9. SEE NCGO1 PERMIT FOR REQUIRED INFORMATION TO BE INCLUDED IN THE INSPECTION RECORDS. PER NCDEQ AND NPDES REQUIREMENTS, GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES (NCG01) NCDENR/DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STABILIZATION TIMEFRAMES (EFFECTIVE AUG. 3, 2011 SITE AREA DESCRIPTION SEEDING MIXTURE SEEDBED 20 % PERIMETER DIKES, SWALES, 7 DAYS NONE AREA DITCHES, SLOPES 800 PSI PERMANENT TEMPORARY PREPARA- SEEDING 7 DAYS MAINTE- 80 % NO. DESCRIPTION SEASON Ib/ac Ib/ac TION METHOD MULCH NANCE NOTES 1 STEEP AUG 20 - TALL FESCUE 100 14 DAYS SP -1 SM -1 MU -1 MA -1 BETWEEN MAY 1 - ' SLOPES; LOW OCT 30 SERICEA LESPEDEZA 30 m C/) w o AUG 15, ADD 101b/acre LL] MAINTENANCEFEB 1 - KOBE LESPEDEZA 10 2-7 _ � 0 GERMAN MILLET OR (GREATER U m Lu 151b/acre SUNDAN THAN 3:1) APR 15 cr GRASS. PRIOR TO Lu z MAY 1 OR AFTER CIVIL 0 AUG 15 ADD 401b/acre M RYE GRAIN 2 LOW AUG 20 - BLEND OF 225 c� z APPLY 401b/acre OF o MAINTENANCE OCT 25 TWO TURF- O NITROGEN AFTER A AREAS (3:1 SLOPES FEB 1 TYPE FESCUES Lu JOB NUMBER: STAND OF GRASS HAS 18023 OR LESS) - MAR SP -3 SM -2 MU -2 MA -1 BEEN ESTABLISHED. 31 CHECKED BY: WSC AVOID APPLYING REVISIONS NO. DESCRIPTION DATE NITROGEN DURING THE BLEND OF TWO 25 SUMMER MONTHS. SHEET 9 OF 14 KENTUCKY SEE SM -2 (NOTE 4) BLUEGRASS VARIETIES. 3 TEMPORARY JAN 1 - RYE GRAIN 120 TREAT TEMPORARY SEEDING MAY 1 KOBE LESPEDEZA 50 DIVERSION AS LOW - SP -2 SM -3 MU -1 MA -1 MAINTENANCE, PERMANENT (AREA 2) MAY 1 - GERMAN MILLET 40 AUG 15 TOPSOIL STOCK - AUG 15 -INCLUDE RYE GRAIN 120 PILES HERE DEC 30 4 GRLIASASS FEB 1 - TALL FESCUE 200 BETWEEN APR 15 - NED APR 15 AUG 20, PLACE GERMAN CHANNELSMILLET SP -1 SM -4 MU -3 MA -1 AT 40Ib/acre. AUG 20 - TALL FESCUE 200 BETWEEN NOV 1 - OCT 30 FEB 1, PLACE RYE GRAIN 1201b/acre, & KOBE LESPEDEZA 501b/acre PER NCDEQ AND NPDES REQUIREMENTS, GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES STEEPER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. NPDES STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES (NCG01) NCDENR/DIVISION OF ENERGY, MINERAL AND LAND RESOURCES STABILIZATION TIMEFRAMES (EFFECTIVE AUG. 3, 2011 SITE AREA DESCRIPTION STABILIZATION TIMEFRAME EXCEPTIONS 20 % PERIMETER DIKES, SWALES, 7 DAYS NONE MULLEN BURST DITCHES, SLOPES 800 PSI TRAPEZOID TEAR ASTM D-4533 HIGH QUALITY WATER (HOW) ZONES 7 DAYS NONE 80 % APPARENT OPENING SIZE ASTM D-4751 IF SLOPES ARE 10' OR LESS IN LENGTH FLOW RATE SLOPES STEEPER THAN 3:1 7 DAYS AND ARE NOT STEEPER THAN 2:1, ASTM D-4491 0.55 SEC -1 PERMITTIVITY 14 DAYS ARE ALLOWED 1.5 SEC -1 SLOPES 3:1 OR FLATTER 14 DAYS 7 DAYS FOR SLOPES GREATER THAN 50' IN LENGTH < ALL OTHER AREAS WITH 14 DAYS NONE, EXCEPT FOR PERIMETERS ' SLOPES FLATTER THAN 4:1 AND HQW ZONES SEQUENCE OF CONSTRUCTION ACTIVITIES: 1. DETERMINE AND MARK LIMITS OF DISTURBANCE. 2. NOTIFY THE ARO INSPECTOR BEFORE ANY LAND DISTURBING ACTIVITY IS STARTED. 3. CONSTRUCT STABILIZED CONSTRUCTION ENTRANCE. 4. PLACE PERIMETER SEDIMENT FENCE, CONSTRUCT SEDIMENT BASINS. 5. REMOVE TOPSOIL AND STOCKPILE FOR USE ON SLOPES. 6. STOCKPILE AREA IS DESIGNATED ON PLANS OR AS DIRECTED BY ENGINEER. 7. PLACE REMAINING SEDIMENT FENCES, ROUGH GRADE SITE, CONSTRUCT CHANNELS, INSTALL CHANNEL LININGS. 8. CONSTRUCT STORM DRAINAGE. EXCAVATED DROP INLET PROTECTION AND OUTLET PROTECTION TO BE CONSTRUCTED CONCURRENTLY WITH STORM DRAINS. 9. PLACE TEMPORARY SEEDING ON ALL DISTURBED AREAS. 10. COMPLETE FINAL GRADING. 11. PLACE PERMANENT SEEDING AND DO FINAL LANDSCAPING. 12. NOTIFY THE ARO INSPECTOR AFTER SITE IS STABILIZED. 13. REMOVE TEMPORARY EROSION CONTROL MEASURES AFTER SITE IS STABILIZED. 14. NO EROSION CONTROL DEVICES CAN BE REMOVED WITHOUT PRIOR APPROVAL FROM THE INSPECTOR. PARTIAL PLAN HOLD-DOWN STAKES AT 10' SPACING ALONG SLOPE 15" FLEXIBLE PIPE > diel a mw -3-d lxilX.XY_1: TO GO THROUGH DIKE 4'-0" MIN 2 1� PIPE 11 V�� H = V_8" .�' CONSTRUCTION SPECIFICATIONS: 1. THE TOP OF THE EARTH DIKE OVER THE INLET PIPE AND THOSE STAKE DIKES CARRYING WATER TO THE PIPE SHALL BE AT LEAST 1 FOOT HIGHER AT ALL POINTS THAN THE TOP OF INLET PIPE. TIE DOWN AT END 2. THE PIPE SHALL BE FLEXIBLE WITH WATER TIGHT CONNECTING BANDS. FLEXIBLE PIPE SHALL BE STAKED ON EITHER SIDE. 4'-0" 3. A RIP RAP APRON SHALL BE PROVIDED AT THE OUTLET, IF RIPRAP PAD MIN EMPTYING INTO A DISTURBED AREA. 4. THE SOIL AROUND AND UNDER THE INLET PIPE AND ENTRANCE SECTION SHALL BE HAND TAMPED IN 4" LIFTS TO THE TOP IAMMH N �00�0�00�0�00 �0�00 / PROFILE 5. FOLLOW-UP INSPECTION AND ANY NEEDED MAINTENANCE SHALL BE PERFORMED AFTER EACH STORM. 1'-6" 1'-0" FLEXIBLE PIPE SLOPE DRAIN 10 NOT TO SCALE CCN1o2 CCN502 2'-0" MIN RIP RAP CHECK DAMS SFR ....... �9� pR 6" FREEBOARD �F4, Fvo STEEP CUT OR FILL111 _- SLOPE -ITT Ft F TIT=_1 Ff=ITI _U t=__1 I '� - I I I I I I -III -III -III -III III I I I I II II-= -11111 S-0" CONSTRUCTION SPECIFICATIONS: NAG LINER - SC150BN, STAPLE PATTERN "C" III 1. REMOVE AND PROPERLY DISPOSE OF ALL TREES, BRUSH, STUMPS AND OTHER III OBJECTIONABLE MATERIAL. 2. ENSURE THAT THE MINIMUM CONSTRUCTED CROSS SECTION MEETS ALL DESIGN REQUIREMENTS. 3. ENSURE THAT THE TOP OF THE DIKE IS NOT LOWER AT ANY POINT THAN THE DESIGN ELEVATION PLUS SPECIFIED SETTLEMENT. 4. PROVIDE SUFFICIENT ROOM AROUND DIVERSIONS TO PERMIT MACHINE REGRADING AND CLEANOUT. 5. VEGETATE THE RIDGE IMMEDIATELY AFTER CONSTRUCTION, UNLESS IT WILL REMAIN IN PLACE LESS THAN 30 WORKING DAYS. MAINTENANCE: INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS AND MAKE TIMELY REPAIRS AS NEEDED. WHEN THE AREA PROTECTED IS PERMANENTLY STABILIZED, REMOVE THE RIDGE AND THE CHANNEL TO BLEND WITH THE NATURAL GROUND. TEMPORARY DIVERSION DITCH NOT TO SCALE CCN101-102 ccIN502 PAVEMENT SHOULDER NOTE: DITCH CHECK TO BE REMOVED TEMP. STONE INSIDE CLEAR ROADSIDE RECOVERY DITCH CHECK AREA PRIOR TO TRAFFIC OPERATIONS. SPACING = HEIGHT OF DITCH CHECK x 100 SLOPE 'K CLASS B STONE BACK SLOPE TEMPORARY STONE DITCH CHECK CLASS A OR CLASS B STONE _ z DITCH SLOPE EDGE OF BACK \ SLOPE \ ISOMETRIC VIEW SHOULDER PAVEMENT SEE PLANS FOR PROP. SHLD. DESIGN ALTERNATE PROP. TRENCH SECT. DITCH SLOPE TYPICAL CROSS SECTION ROADWAY GRADE POINT SHOULDER POINT z CLASS A OR CLASS B STONE _ w N DITCH POINT 4' TO 6' TYPICAL LONGITUDINAL SECTION RIP -RAP CHECK DAM NOT TO SCALE INSTALLATION DETAIL DUMP STRAP 1" REBAR FOR BAG T REMOVAL FROM INLET SILTSACK� 1.25 LB/LINEAR FT STEEL POSTS ATTACH 19-GUAGE HARDWARE CLOTH (1/4 MESH OPENINGS) TO POSTS WITH WIRE TIES AT THE TOP, MIDDLE ---- BOTTOM FOLD HARDWARE CLOTH TO OVERLAP ENDS AND SECURE TO POSTS WITH WIRE TIES - N I I II POST INSTALLATION DETAIL NCDOT #5 OR #57 WASHED STONE I ' o} I o III' -III' N =III=III 3111 =I 111' BURY HARDWARE CLOTH 2'-0" MIN FILTERED WATER STONE AND HARDWARE CLOTH 2 EACH DUMP STRAP EXPANSION RESTI (1/4" NYLON RO 2" FLAT WASHER: INSTALLATION DETAIL Cz I :; LO TEMPORARY STORM DRAINAGE INLET PROTECTION NOT TO SCALE L BURY HARDWARE CLOTH (SEE DETAIL) HARDWARE CLOTH INSTALLATION DETAIL CONSTRUCTION SPECIFICATIONS: 1. UNIFORMLY GRADE A SHALLOW DEPRESSION APPROACHING THE INLET. 2. DRIVE 5 -FOOT STEEL POSTS 2 FEET INTO THE GROUND SURROUNDING THE INLET. SPACE POSTS EVENLY AROUND THE PERIMETER OF THE INLET, A MAXIMUM OF 4 FEET APART. 3. SURROUND THE POSTS WITH WIRE MESH HARDWARE CLOTH. SECURE THE WIRE MESH TO THE STEEL POSTS AT THE TOP, MIDDLE, AND BOTTOM. PLACING A 2 -FOOT FLAP OF THE WIRE MESH UNDER THE GRAVEL FOR ANCHORING IS RECOMMENDED. 4. PLACE CLEAN GRAVEL (NCDOT #5 OR #57 STONE) ON A 2:1 SLOPE WITH A HEIGHT OF 16 INCHES AROUND THE WIRE, AND SMOOTH TO AN EVEN GRADE. 5. ONCE THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, REMOVE ACCUMULATED SEDIMENT, AND ESTABLISH FINAL GRADING ELEVATIONS. 6. COMPACT AREA PROPERLY AND STABILIZED IT WITH GROUNCOVER MAINTENANCE: INSPECT INLETS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2" OR GREATER) RAINFALL EVENT. CLEAR THE MESH WIRE OF ANY DEBRIS OR OTHER OBJECTS TO PROVIDE ADEQUATE FLOW FOR SUBSEQUENT RAINS. TAKE CARE NOT TO DAMAGE OR UNDERCUT THE WIRE MESH DURING SEDIMENT REMOVAL. REPLACE STONE AS NEEEDED. CCN101-102 BAG D ETAI L EXPANSION RE DUMP STRAP INSTALLATION DETAIL SILT SACK NOT TO SCALE CCN 102 CCN502 S I LTSAC Ko SPECIFICATIONS NOTE: THE SILTSACK oWILL BE MANUFACTURED FROM A WOVEN POLYPROPYLENE FABRIC THAT MEETS OR EXCEEDS THE FOLLOWING SPECIFICATIONS. REGULAR FLOW SILTSACKo (FOR AREAS OF LOW TO MODERATE PRECIPITATION AND RUN-OFF) PROPERTIES TEST IEIIIOD UNTS GRAB TENSILE STRENGTH ASTM D-4632 300 LBS GRAB TENSILE ELONGATION ASTM D-4632 20 % PUNCTURE ASTM D-4833 120 LBS MULLEN BURST ASTM D-3786 800 PSI TRAPEZOID TEAR ASTM D-4533 120 LBS UV RESISTANCE ASTM D-4355 80 % APPARENT OPENING SIZE ASTM D-4751 40 US SIEVE FLOW RATE ASTM D-4491 40 GAL/MIN/SQ FT PERMITTIVITY ASTM D-4491 0.55 SEC -1 HI -FLOW SILTSACKo (FOR AREAS OF MODERATE TO HEAVY PRECIPITATION AND RUN-OFF) PROPERRES To 1E1a URTS GRAB TENS LE STRENGTH ASTM D-4632 265 LBS GRAB TENSILE ELONGATION ASTM D-4632 20 % PUNCTURE ASTM D-4833 135 LBS MULLEN BURST ASTM D-3786 420 PSI TRAPEZOID TEAR ASTM D-4533 45 LBS UV RESISTANCE ASTM D-4355 90 % APPARENT OPENING SIZE ASTM D-4751 20 US SIEVE FLOW RATE ASTM D-4491 200 GAL/MIN/SQ FT PERMITTIVITY ASTM D-4491 1.5 SEC -1 011-ARSORRANT SII MACK o (FOR AREAS WHERE THERE IS A CONCERN FOR OIL RUN-OFF OR SPILLS) DEPENDING ON YOUR PARTICULAR APPLICATION, THE SILTSACK CAb BE MADE FROM EITHER ONE OF THE ABOVE FABRICS WITH AN OIL-ABSORBANT PILLOW INSERT OR, MADE COMPLETELY FROM AN OIL-ABSORBANT SILTSACK q WITH A WOVEN PILLOW INSERT. L1J Lij U z Lij0 Q 0 LL .� o CARE CLAYTON ENGINEERING & m DESIGN, PLLC. zo =� No. P-1463 OF NCA FE s o..�/��': S 407 NG I �� r• 0= ,"',������,, 09/24/18 z i 4A 0 0 W coN X m0 O 12° a_ N UU)j z Z w0 Lu i F__ O U) U W r Od W CD z� W U z O U Er ¢ Lu LIJ O 0 m CJS � J < Q w 0 m C/) w o LL] Z 2-7 _ � 0 U m Lu > cr Lu z CIVIL 0 M 0 J U Q c� z W o O 0 O rr Lu JOB NUMBER: 18023 DATE: 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO. DESCRIPTION DATE CCN502 SHEET 9 OF 14 z O F- 0 Q J Q cD W J 0 F- H - 0 Lu m cn W m J J_ H- z Lu w c� z LL Z z Q 0 z Q F- 0 Lu _ 0 Cc Q cr Lu Lu z z Lu Lu 0 F- 71 Lu z O 0 z Lu F- m m 0 _ F- m Q a z CE 0 Lu J 0 z 0 Lu Lu CID F- 0 z 0 z Q J J z 0 Lu 0 06 0 z LL.I Lu z cD z Lu z 0 J 0 LL_ O F- �� Lu O Er a_ W _ LU EL Q � Z 0 Lu Er Lu _ F- 71 C'3 W LL.I �o LL.I H- r) z Q U) 0 z 0 Lu W Lu _ F- ALL TREES SHALL MEET AMERICAN STANDARD FOR NURSERY STOCK (ANSI Z60.1-2004) FOR EXAMPLE: CALIPER HEIGHT (RANGE) MAX. HEIGHT MIN. ROOT BALL DIA. MIN. ROOT BALL DEPTH 2" 12-14' 16' 24" 3" 14-16' 18' 32" 16" 21" NOTES: 1. REMOVE WIRE AND NYLON TWINE FROM BALL AND CANOPY. 2. SOAK ROOT BALL AND PLANT PIT IMMEDIATELY AFTER INSTALLATION. 3. STAKING IS REQUIRED FOR ALL TREES IN R.O.W. OR UPON REQUEST OF ARBORIST. 4. REMOVE EXCESS SOIL FROM SITE AND DISPOSE OF IN A LEGAL MANNER. 3/4" NYLON STRAP 5, RESEED UNMULCHED, DISTURBED AREAS. ROOT CROWN TO BE AT FINISH GRADE 4" HIGH / 6" WIDE MAXIMUM BERM OUTSIDE OF ROOTBALLS 3 - 1"x2"x18" WOOD STAKES WITH CENTERED 3/8" HOLE DRIVEN IN LINE WITH STRAP EQUALLY SPACED AROUND TREE REMOVE TYPICAL EXCESS SOIL_ 111111w FROM ROOT CROWN REMOVE TOP 1/3 BURLAP AND ANY NAILS/PINS, ETC. REMOVE TOP 1/3 OF WIRE BASKET WHERE PRESENT RAISE PIT BOTTOM TO SET ROOT CROWN AT THE CORRECT HEIGHT. FIRM SOIL UNDER ROOT BALL. i.. SLIP KNOT WITH STOP KNOT. 6" LARGER THAN TREE DIAMETER KEEP MULCH AWAY FROM TRUNK 1" TO 2" !mTEgIIIIImIIIIlwNDISTURBED SOILIIII ROOT BALL DIA.12" VARIES TREE PLANT NG (FOR SINGLE AND MULTI—STEM TREES) gin ham Estate � — I.J. g w C as Snnle Bingham523, Pa e 165 S Book of Records g Plat Book 9, P°ge 150 z 00 PPIN 89319 P 31500 � /. 02 �90 of l� CSsh.� Snle 00 VIN" of records 2 page°94g� � B ok g Paaa,e 1 000 / Plat 8 5�-3625 � PIN 293 \IV \ \ I _4" MAXIMUM LAYER OF MULCH FINISH GRADE BACKFILL AS SPECIFIED NOT TO SCALE d wile, ooc Srry Sayers a Sayers z Geraldine M e 465 I of Records 15,43139 pp0 Book PIN 2931-01 I I cont. R�w MF TYP. COLLAR MIN. 2" HT. 4" LAYER OF APPROVED - MULCH 4 "V" TRENCH AROUND ENTIRE PLANTING BED EDGE OF PLANTING BED SPACING VARIES SEE LANDSCAPE PLAN , 6 y z -PLANT MIX TAMP SOIL MIX UNDER EACH PLANT BALL TO MINIMIZE SETTLEMENT TYPICAL PLANTING BED DETAIL CROWN HEIGHT IN INCHES EQUALS MEDIAN WIDTH IN FEET TO 12" MAX. FINAL 1 GRADE 10" ',EX. —\ f—10' (EX.)�EXISTING GRADE TYPICAL BED CROWNING NOTES: 1. SCARIFY ROOT MASS OF CONTAINERIZED PLANT MATERIAL. 2. INSTALL CONTAINERIZED PLANTS AT FINSHED GRADE 3. TAMP PLANTING MIX FIRMLY AS PIT IS FILLED AROUND EACH PLANT BALL. 4. OMIT COLLAR AROUND EACH SHRUB WHEN IRRIGATION SYSTEM IS PRESENT. 5. SOAK EACH PLANT BALL AND PIT IMMEDIATELY AFTER INSTALLATION. 1'P. TAGGERED ROWS EQUAL SPACING J EDGE OF BETWEEN ALL PLANTS PLANTING BED TYPICAL PLANTING BED PLAN NOT TO SCALE SHRUB PLANT NG BED Columbus Book 0f Records qq Plat 8OA1 1 6816-000 I� 3o' PIN 2 I right of way I I I I 01 _ d �' S S. H i h -' way X21 LANDSCAPE PLAN SCALE: 1" = 30' � ' a F . Strickland Cell 515 Page 645 I gook °PIN 2931 01-b�111-000 I LANDSCAPE LEGEND KEY QUANTITY COMMON NAME z (BOTANICAL NAME) LARGE CANOPY TREES 01 2 AMERICAN ELM 0 (ULMUS AMERICANA) 02 2 WILLOW OAK Q (QUERCUS PHELLAS) 03 3 RIVER BIRCH C3 p w u) o Lu (BETULA NIGRA) LANDSCAPE NOTES: (1) NEW PLANTING STANDARDS NEW PLANTINGS SHALL COMPLY WITH THE FOLLOWING STANDARDS: (A) MINIMUM SIZE (1) DECIDUOUS CANOPY OR SHADE TREES SHALL HAVE A MINIMUM HEIGHT OF EIGHT FEET AND BE A MINIMUM OF TWO INCHES IN CALIPER AT THE TIME OF PLANTING, AS DETERMINED IN THE AMERICAN STANDARD FOR NURSERY STOCK, ANSI Z60.1-2004, AS AMENDED. (2) UNDERSTORY, SMALL MATURING, OR ORNAMENTAL TREES SHALL HAVE A MINIMUM HEIGHT OF SIX FEET AND BE A MINIMUM OF ONE—AND—ONE— FOURTH (1 1/4) INCHES IN CALIPER AT TIME OF PLANTING, AS DETERMINED IN THE AMERICAN STANDARD FOR NURSERY STOCK, ANSI Z60.1-2004, AS AMENDED. (3) EVERGREEN TREES SHALL HAVE A MINIMUM HEIGHT OF SIX FEET AND BE A MINIMUM OF TWO INCHES IN CALIPER AT THE TIME OF PLANTING. (4) MULTI—STEM TREES, WHETHER CANOPY OR UNDERSTORY, SHALL HAVE AT LEAST THREE STALKS AND BE A MINIMUM OF EIGHT FEET IN HEIGHT ABOVE GROUND LEVEL AT THE TIME OF PLANTING. (5) LARGE SHRUBS SHALL BE AT LEAST THREE FEET IN HEIGHT AT THE TIME OF PLANTING, AND SHALL REACH THE REQUIRED MINIMUM PERFORMANCE HEIGHT WITHIN FOUR YEARS OF INSTALLATION. (6) SMALL SHRUBS SHALL BE AT LEAST TWO FEET IN HEIGHT AT THE TIME OF PLANTING, AND SHALL REACH THE REQUIRED MINIMUM PERFORMANCE HEIGHT WITHIN FIVE YEARS OF INSTALLATION. (7) IN CASES WHERE AN AGGREGGATE CALIPER INCH (ACI) REQUIREMENT IS UTILIZED TO DERIVE A REQUIRED AMOUNT OF VEGETATION, AND THE ACI FIGURE INCLUDES A FRACTION, AND APPLICANT MAY: (A) UTILIZE A TREE OR TREES WITH A CALIPER INCH MEASUREMENT EXCEEDING THE MINIMUM SIZE AT TIME OF PLANTING STANDARD OF THIS SUBSECTION IN ORDER TO MEET THE REQUIRED ACI; OR (B) ROUND THE ACI FIGURE UPWARDS UNTIL THE FIGURE CORRESPONDS WITH A WHOLE NUMBER OF TREES MEETING THE MINIMUM SIZE AT TIME OF PLANTING STANDARD. (8) IN CASES WHERE APPLICATION OF THE REQUIREMENTS IN THE SUBSECTION RESULT IN A FRACTION IN THE NUMBER OF SHRUBS TO BE PROVIDED, THE MINIMUM NUMBER OF SHRUBS TO BE PROVIDED SHALL BE ROUNDED UPWARDS TO THE NEXT HIGHEST WHOLE NUMBER. i N 0 z Z 0 30' 60' Q CLAYTON ENGINEERING & m DESIGN, PLLC. zo :AIN P-1463 Q OF A) Q SE 40 GI III, '09/24/18 W N X m'D 0 0", a o Z0 N c/) Z Z w� w � cl:o c~j) U W r W Z� cl) W 0 z O 0 Q Lu Lu C/) 0 _ 0 _ C/) C3 p w u) o Lu Z 0 0 U Lu m w z CIVIL Q Lu 0 U z a C/) C) JOB NUMBER: 18023 DATE, 09/24/18 DRAWN BY: EMB CHECKED BY: WSC REVISIONS NO. DESCRIPTION DATE LSN 101 SHEET 10 OF 14 Z O H U Q J Q C3 LU J O F -- U LU m W LU m J J_ Z UJ 2i LU O z z z Q Z Q U LU U m Q Cc LU LU z_ C3 z LU LU 2 O z LU W z O U Z: LU H Cc H O 2 Cc Q m z Cc O w J O _ z_ D LU LU m O z Q D z Q U J J m z w 0 06 Z LU LU z_ C3 z W z O U LiO m w 0- 0 O m m LU I - w m Q Z O LU m LU _ I - z C� LU 0 LU 2 0 z Q Co O z_ Q 0 w CIO LU SECTION 02222 - EXCAVATION, BACKFILLING, AND COMPACTING FOR UTILITIES PART 1 -GENERAL 1.01 SUMMARY This section includes the excavation, bedding and backfilling of utilities necessary to perform work indicated on drawings and contract documents. 1.02 RELATED REQUIREMENTS Construction drawings Specs. Section 02110 SITE PREPARATION Specs. Section 02200 EARTHWORK 1.03 SUBMITTALS A. Shop drawings or details pertaining to site utilities are not required unless use of materials, methods, equipment or procedures contrary to drawings or these specifications are proposed. Do not perform work until required shop drawings have been accepted by Owner. B. The Contractor shall contact all utility companies and determine if additional easements will be required to complete the project. Contractor shall provide written confirmation of the status of all easements to the owner's Construction Manager at the time of the preconstruction conference or no later than 90 days prior to the project possession date. PART 2 -PRODUCTS A. Bedding Material: Processed sand and gravel free from clay lumps, organic or other deleterious material and complying with following gradation requirements: U.S. Sieve Size Percent Passing (by weight) 1 inch 100 3/4 -inch 90-100 3/8 -inch 20-55 No. 4 0-10 No.8 0-5 B. Steel Casing Pipe: Comply with AWWA C-201 or C-202, minimumgrade B, size and wall thickness as indicated on drawings. PART 3 -EXECUTION 3.01 SUMMARY A. Set all lines, elevations and grades for utility and drainage system work and control system for duration of work, including careful maintenance of bench marks, property corners, monuments or other reference points. Maintain in operating condition existing utilities, active utilities and drainage systems encountered in utility installation. Repair any surface or subsurface improvement shown on drawings. Verify location, size, elevation and other pertinent data required to make connections to existing utilities and drainage systems as indicated on drawings. Contractor shall comply with local codes and regulations. 3.02 EXCAVATION, TRENCHING AND BACKFILLING A. Perform excavation as indicated for specified depths. During excavation, stockpile materials suitable for backfilling in orderly manner far enough from bank of trench to avoid overloading, slides or cave-ins. B. Remove excavated materials not required or not suitable for backfilling or embankments and waste off-site. Any structures discovered during excovation(s) shall be disposed of as specified. C. Prevent surface water from flowing into trenches or other escalations by temporary grading or other methods, as required. Remove accumulated water in trenches or other excavations by pumping or other acceptable methods. D. Open cut excavation with trenching machine or backhoe. Where machines other than ladder or wheel -type trenching machines are used, do not use clods for backfill. Dispose of unsuitable material and provide other suitable material at no additional cost to owner. E. All excavation shall be unclassified. 3.03 TRENCH EXCAVATION A. The local utility companies shall be contacted before excavation shall Dig trench at proper width and depth for laying pipe, conduit or Cut trench banks as nearly vertical as practical and remove stones as necessary to avoid point -bearing. Over -excavate rock, wet or unstable soil, if encountered, from trench bottom as necessary to provide suitable base for continuous and uniform bedding as directed by soils engineer. B. All trench excavation side walls greater than 5 feet in depth shall be sloped, shoring, sheeted braced or other wise supported b means of the sufficient strength to protect the 9 P P 9. � PP Y 9 workmen within them in accordance with the applicable rules and regulations established for construction by the Department of Labor, Occupational Safety and Health Administration and by local ordinances. Lateral travel distance to an exit ladder or steps shall not be greater than 25 feet in trenches 4 feet or deeper. C. Accurately grade trench bottom to provide uniform bearing and support for each section of pipe on bedding material at every point along entire length, except where necessary to excavate for bell holes, proper sealing of pipe joint, or other required connections. Dig bell holes and depressions for joints after trench bottom has been graded. Dig no deeper, longer or wider than deeded to make joint connection properly. D. Trench width requirements below the to of the pipe shall not be less than 12" not more than 18" wider than outside surface of an pipe or conduit that is to be installed to q P PP Y PP designated elevations and grades. All other trench width requirements for pipe, conduit or cable shall be at least practical width that will allow for proper compaction of trench backfill. E. Trench depth requirements measured from finished grade or paved surface shall meet the following requirements or applicable codes and ordinances. 1. Water Mains: 36" to top of pipe barrel 2. Sanitary Sewer: Elevations and grades as indicated on drawings. 3. Storm Sewer: Depths, elevations and grades as shown on drawings. 4. Electrical Conduits: 24" minimum to top of conduit or as required by NEC 300-5, NEC 710-36 codes or the local utility company requirements, whichever is deeper. 5. TV Conduits: 18" minimum to top of conduit or as required by the local utility company, whichever is deeper. 6. Telephone Conduits: 18" minimum to to of conduit or as required b the local utility company, whichever is deeper. P P � q Y Y P Y� P 7. Gas Mains and service: 30' minimum to top of pipe, or as required by the local utility company, whichever is deeper. 3.04 SHEETING AND BRACING Provide sheeting and bracing, when necessary, in trenches and other excavations where protection of workmen required. Sheeting may be removed after sufficient backfilling to protect against damaging or injurious caving. 3.05 PIPE BEDDING Accurately cut trenches for pipe or conduit that is installed to designed elevations and grades to line and grade from 4" below bottom of pipe and to width as specified. Place 4" of bedding material, compact in bottom of trench, and accurately shape to confirm to lower portion of pipe barrel. After pipe installation, place select backfill as determined in Section 02200, and compact in maximum 8" layers measured loose to the top of the trench. 3.06 TRENCH BACKFILLING A. Criteria: Trenches shall not be backfilled until required test are performed and the utility systems comply with and are accepted by applicable governing authorities. Backfilling trenches as specified. If improperly backfilled, reopen to depth required to obtain proper compaction. Backfill and compact, as specified, to properly correct condition in an acceptable manner. B. Backfilling: After pipe or conduit has been installed, bedded and tested as specified, backfill trench or structure excavation with specified material placed in 8" maximum loose lifts. Compact to minimum density of 98% of optimum density in accordance with ASTM D 698. C. Compaction: Exercise proper caution when compacting immediately over top of pipes or conduits. Water jetting or flooding is not permitted as method of compaction. D. Compaction Testing: If determined by the owner and at the owner's expense an independent testing laboratory shall perform test at intervals not exceeding 200'-0' or trench for the first and every other eight -inch (8") lift of compacted trench backfill and furnish copies of test results as specified. SECTION 02401 -WATER VALVES, VALVE BOXES, AIR RELIEF VALVES AND TAPPING SLEEVE & VALVES 1.1 INTRODUCTION This section covers the requirements for furnishing and installing the abovementioned items and their respective appurtenances as detailed on the plans. This shall include all labor, equipment, materials and q 9 9 P PP P incidentals that are necessary to complete installation of subject items in accordance with the plans and specifications. All supplied materials shall be of a type and class as specified hereiThis section will specify storage and handling, excavation, bedding, laying and coupling of joints and backfilling. All construction shall be as specified as herein, unless written deviation is received from the Engineer. Work under this section shall be measured by the actual number of components and paid for at unit prices established in the Contract. 1.2 CATALOG CUT SUBMITTALS Contractor shall submit 4 copies of catalog cuts to Engineer for review for all materials that are required to complete the work as described in the associated plans. Engineer will retain two sets of original submittals and return two sets to the Contractor with the appropriate response annotated. 1.3 STORAGE AND HANDLING The Contractor shall inspect the materials upon receipt for visible defects prior to off loading. The Contractor shall unload all valves and appurtenances as so to avoid any deformation or other injury. The Contractor shall implement appropriate measures during storage such that no storm water may pass through or encumber the materials. All materials shall be stored in such a manner that they will drain and so protect them from contamination or freezing. If any material is found to be defective during installation, then same material shall be removed and replaced with appropriate quality and type at the Contractors expense. 1.4 MATERIALS A. Gate Valves: All Gate Valves shall as a minimum reflect a rating of 200 psi, contain clearway equal to the full nominal diameter of the adjoining pipe, be open left operation (counterclockwise), reflect the name and date of manufacture, be of non -rising stem type, contain a directional arrow for operation cast into the body, have a 2" operating nut for control and contain Mechanical Joint connections. All requirements shall be meet unless specified on the plans or directed by the Engineer in writing. All materials shall withstand a hydraulic test pressure of equal to twice the rated pressure and Contractor shall provide written proof of test from manufacturer upon request. A.1 Resilient Seated Wedge Valve: Gate Valves 2" through 36" diameter shall be of cast iron or ductile iron body, resilient seated wedge type valves conforming to the requirements of AWWA Standard C 509 and/or AWWA Standard C 500. Unless specifically approved in writing by the Engineer all valves shall be from one manufacturer and all parts interchangeable. Gate valves shall conform to ASTM A-536 as it relates to cast iron or ductile iron manufacturer of the body, bonnet and gate. Shell thickness of components shall conform to the thickness in Table 2, Sect. 4.4 of AWWA Standard C 509 or AWWA Standard C 500 as appropriate. Valve body and bonnet coating shall conform to AWWA Standard C 550 and include fusion bonded epoxy coating for the interior and exterior surfaces of the valve. The gate shall be completely covered with a rubber coating securely fixed to all ferrous surfaces. The gate and rubber coating shall conform to ASTM D429. Valve stems shall be of cast bronze construction. Valves shall contain a stuffing box, which located above the thrust collar, which will contain 0 -rings for sealing. The valve shall be of type construction that allows replacement of the ring seals while the valve is fully open and under pressure. Valves 16" and larger in diameter shall be designed and constructed in such a manner as to include beveled reduction gears to reduce the number of turns and torque required to operate valves. A.2 Double Disc Valves: Gate valves larger than 36° diameter shall be ductile iron body, double disc parallel seat conforming to AWWA Standard C 500. All valves shall be from one manufacturer with interchangeable parts. Gate valves shall conform with ASTM A 536 as it relates to manufacturer of body, bonnet and gate constructed of ductile iron. Entire valve body and bonnet shall be coated on interior and exterior surfaces. Gates shall be constructed of cast iron smooth and continuous without pockets on either face. Cam surfaces shall be open to the bottom. Gate ring seals shall be inserted into a dovetail groove under pressure and make up a single insertable finish. Gate valves shall operate as a bottom wedging design with a two-part wedge contact. Wedge and Hook shall be separate castings. Valve stems shall be of cast bronze construction. Valves shall contain a stuffing box, which located above the thrust collar, which will contain 0 -rings for sealing. The valve shall be of type construction that allows replacement of the ring seals while the valve is fully open and under pressure. Valves 16" and larger in diameter shall be designed and constructed in such a manner as to include beveled reduction gears to reduce the number of turns and torque required to operate valves. All rollers, tracks and scrapers shall be of bronze casting. Bypasses shall be supplied and installed as a part of all valves. Bypass shall be a minimum of 3" diameter and operating mechanism shall be of resilient seated wedge type. A. Valve Boxes: All valve boxes shall be adjustable screw type with a base sized to fit over the valve yoke and a lid with "water" cast integral. All valve boxes shall be constructed of domestic or foreign cast iron that complies with the requirements of ASTM A 48. Valve boxes shall be the appropriate range of adjustment for the site and Contractor should minimize the use of extensions. B. Air Valve: All air valves shall operate as both an air/vacuum valve and air release valve simultaneously in one unit. The air/vacuum portion of the appurtenance shall operate such that during the filling operation, or when necessary, it will allow large amounts of air to be expelled from the line to avoid substantially compressing air in the line and also operate to effectively allow air to reenter the line in the case that internal pressures would approach negative values, such as happens with line breaks or separations. The air release portion of the valve shall operate such that it automatically releases minute amounts of air as necessary while in service. All air valves shall contain a rating of 150 psi with a test rating of 300 psi. Body and cover shall be manufactured of cast iron conforming to ASTM A126, Class B. The float shall be stainless steel with stainless steel guide and rated to withstand ultimate system surge pressure successfully. Valves 4" and larger shall have floats of stainless steel with dual stainless steel guides and rated to withstand ultimate system surge pressure successfully. The body and cover shall be constructed of cast iron and be concentrically located. All internal parts shall be stainless steel or Buna-N rubber. A. Tapping Sleeve and Valve: All sleeves shall have flanged outlet of appropriate size and strength to accommodate the tapping valve. Topping valve shall be resilient seat wedge ate valve design with each flange capable of accepting 99 PP 9 PP 9 9 9 9 9 P P 9 the sleeve, tap machine face, or mechanical joint connection to adjacent pipe. Tapping sleeves up to 12" shall be Stainless Steel Wrap Around type. Tapping sleeves 12" and larger shall be Ductile Iron Full Body type. All tapping sleeve and valves shall be of the size and type detailed on the plans. Stainless steel tapping sleeves shall be constructed of two-piece stainless steel jointed by grade 18-8 stainless steel bolts. The gasket shall be girded virgin SBR compound rated for water service per ASTM D2000 and the gasket shall provide full range pipe coverage. Outlet pipe shall be constructed of grade 18-8 stainless steel and be schedule 5. All sleeves shall contain a %"test outlet with brass plug for the purpose of air testing the sleeve. All connections to the existing system shall be coordinated with the Water Purveyor having jurisdiction. 1.5 INSTALLATION A. Excavation This section shall cover the excavation and proper disposal of any and all materials disturbed during the construction of trenches which is further defined as all excavation necessary for the proper installation storm or sanitary sewers and any appurtenances and waterlines and any appurtenances. This section shall further cover any work deemed appropriate by the Engineer. Excavation shall be done to the lines and grades as depicted or detailed on the plans or as directed by the Engineer. All work involving this section shall be coordinated with any Grading, Site Utility work or other construction on the project site and shall be maintained satisfactorily so that adequate drainage is provided at all times. Any roots that protrude into the trench lines shall be trimmed flush with the trench walls. All excavation shall be open cut unless otherwise depicted on the plans or specifically authorized by the Engineer. If after excavation the bottom of the proposed trench is found to contain rock, materials which can not be removed with standard and prudent construction equipment or is unsuitable for providing a uniform bearing surface then some material shall be removed to a depth not less than 8" below proposed depth, backfilled with approved material and compacted. Excavation widths shall be such that not less than one full diameter of the pipe is clear between the outside face of the pipe and each closest trench wall or inside face sheeting, shoring, or trench box as necessary. Excavated materials to be used during backfill operation shall be suitable material, significantly free from debris and/or rocks and approved by the Engineer. Acceptable material which is excavated shall be neatly and compactly deposited at the sides of the trench where space provides but at no time closer than 2' 0" from the closest side of the trench. When stockpiling of material is required, the Contractor at his expense shall do so at an approved site and this site shall be kept and neat to avoid unsightly appearance. Stockpiling shall be arranged to allow for natural drainage without pollution of water by erosion. B. Sheeting, Bracing and Trench Boxes As appropriate reference to OSHA Regulation 1926.652(b), the Contractor will be required to keep the sides of excavation vertical by sheet, bracing or the use of trench boxes to prevent movement by slides or settling of the side to prevent injury or displacement of PPa or appurtenance or diminished the required working space adjacent to pipe. Furthermore, the Contractor may be required, for the purpose of preventing injury to persons, property or adjacent structures, to leave sheeting or bracing in place. All measures employed, when required, shall extend a minimum of 18" above existing grade and a maximum of 48" above grade. In no case shall timbers, beams or other sheeting/bracing materials be left in the trench, which may form or promote voids that cannot easily be corrected during the backfilling operation or compaction of backfill. It is agreed upon by these specifications that where it is necessary to leave sheeting or bracing intact and backfilled that the Owner is under no obligation to pay Contractor for time or materials involved in constructing such measures. Contractor shall assume and accept any and all risk associated with or encumbered by failure to implement proper and necessary sheeting, bracing or trench box use on any excavation and will be held responsible for caving, settlement and all other damages resulting there from. C. Valves Prior to each installation, the Contractor shall make sure the interior is wiped clean and the valve is test operated by opening and closing. All valves shall be set with the operating mechanism plumb and at the location depicted on the plans. Initial backfill shall be thoroughly compacted by hand around the valve body to a distance of 12" in all directions and compaction by mechanical means such as vibratory trench roller or striking compactor shall be thoroughly achieved to a distance of 3' 0" each side. D. Valve Boxes A valve box shall be installed over every underground valve. All valve boxes shall be set plumb with the valve; the operating mechanism of the valve shall be centered in the top opening and their lid flush with finished grade. E. Air Valves All air valves shall be installed in a cast iron meter box with a minimum of 18" by 24" clear inside dimension and at the exact location as depicted on the plans. F. Topping in Sleeve and Valve All tapping sleeves shall be installed at the exact location as depicted on the plans. All tapping sleeves shall be installed per strict conformance with manufactures specification, flange perfectly horizontal with existing pipe and bolts tightened with a torque wrench to the proper specification. All tapping valves shall follow valve installation requirements. The tapping sleeve shall be air tested prior to performing the tap into the existing line. 1.6 BACKFILLING AND COMPACTION A. Trenches shall be backfilled immediately upon approval of pipeline construction. B. Roadways and Crossing Full depth and width of trench shall be backfilled b placing material in uniform layers not to exceed 12"thick and shall be thoroughly compacted b approved mechanical compactors under optimum moisture P YP 9 Y 9Y P Y PP P P conditions. Compaction of the trench shall be to 95% as determined b Standard Proctor Test for all areas outside the paved area and an depth exceeding 18" below finished surface of asphalt. The to 18" P Y P Y P 9 P P of an trench direct) under pavement or within 36" of the edge of pavement shall be compacted to 100% as determined b Standard Proctor Test. If existing material is not suitable for obtaining compaction Y Y P 9 P P Y 9 9 P then select backfill shall be used when requested b the Engineer. All paving and base course affected shall be removed and replaced with new material of equal or better quality with like texture and color q Y 9 P 9 P 4 q Y as the adjacent pavement. All backfill methods shall be in strict compliance with manufactures recommendations and all methods shall be instituted such that no damage, misalignment, or unjointing of the pipe or appurtenances is experienced. Backfill shall be kept free of organics (grasses, sticks, stumps, roots etc.), stones (all stones over 1" diameter within first 12" of backfill and all stones over 2.5" diameter for the remainder of the backfill), any frozen soil or other soil which is not suitable for backfill (highly plastic clay) or any other objectionable items. All backfill shall be installed and graded in a manner that erosion or saturation will not negatively affect the backfilled area. Heavy equipment shall not be operated over any pipe or appurtenance until it has been properly backfilled and has minimum cover as required by the plans. Where any part of the required cover is above proposed finished grade, the Contractor shall place, maintain and lastly remove such material at no additional cost to the Owner. Any pipe or appurtenance, which becomes mis-aligned, shows excessive settlement or has been damaged by the Contractor shall be corrected or replaced as deemed necessary by the Engineer/Owner at no additional cost to the Owner. Prior to acceptance, the Contractor shall properly maintain all installations in such a manner that they will operate without failure. C. Finish Grading All areas disturbed shall be graded to a continuous finish without irregularities or abrupt changes and shall not consist of areas, which will retain water or cause foreseeable future maintenance. Prior to acceptance, all debris, excess material, trash or any unsightly occurrence shall be removed and the project site shall be in a neat and satisfactory condition. SECTION 02500 -LEAKAGE TESTING 1.1 INTRODUCTION All structures are required to be watertight and all pressure and gravity piping and pipelines shall be tested by the Contractor as directed by this section and/or the Engineer/Owner. All tests shall be organized by the Contractor at the Engineers convenience. All labor, equipment, water, materials, gauges, meters and any other items shall be furnished by the Contractor at his expense. In the case of a failed test, minor defects will be corrected and retested immediately. Any failure due to a major defect will constitute stopping the test and rescheduling with Engineer/Owner. 1.2 STRUCTURES All fluid containing structures shall be subject to a gravity pressure test by filling the structure with water to overflow, or as directed by the Engineer, and observing the water level for a period not less than 24 hours. Leakage will be considered to be within the allowable limits for structures when there is no visible sign of leakage evident by either moisture on exposed surfaces or water level drop in excess of 1 inch within the 24-hour period. All wall castings or penetrations shall be plugged temporarily during the test period. If leakage exceeds the allowable limit, the work shall be repaired by removing and replacing the defective portions, waterproofing the inside and outside or by other methods as approved by the Engineer. 1.3 PRESSURE PIPING All pressure piping shall be subject to a hydrostatic pressure/leakage test in accordance with AWWA C605-13. Upon satisfactorily constructing the pipeline, including all appurtenances called for on the associated plans, and effectively backfilling the trench the hydrostatic test shall be conducted. The Contractor shall prepare a testing plan/schedule to be approved by the Engineer, which will effectively test the entire section to be constructed, and at no time test more than 4000 If of pipeline at one time. As the pipeline is being filled with water in preparation of the test, all air shall be expelled from the pipe. If sufficient exit points are not available, the Contractor at his expense shall install air reliefs of a type and location as approved by the Engineer. The pipeline shall be subjected to a hydrostatic pressure of 150 psi or 50 psi above existing line static pressures, which ever is greater, for a period of 2 hours or as specified by the Engineer. Pressure shall be applied to the line by means of hand pump for lines 2" and smaller or by approved mechanical means for larger lines Allowable leakage shall not exceed that determined by the following formula: L=SD Pl 148,000 L = Allowable leakage in gallons per hour. S = Length of line under test in feet. D = Nominal diameter of pipe in inches. P = Average test pressure in psi. Any visible leak shall be corrected to minimize water leakage no matter of the allowable leakage calculation. All pipe and appurtenances found to be defective during the hydrostatic test shall be removed and/or corrected at the Contractors expense and Engineers approval. All materials shall be subject to manufacturer's recommendations for storage, pretesting, etc. After a successful test has been obtained the Contractor shall notify the Engineer in writing and request written recognition from Engineer of acceptable test results. CLAYTON 9 ENGINEERING & m DESIGN, PLLC. No. P-1463 Q i�, Opti, ''9TF OF •�OFESS/��. �: • 2 SE 9• _ 40 F G ••• `o ,q M •S • C P, fill 11 09/24/18 1Z Z i IIA 10W c\J N Ca x 00 °' 0 0,0a_ w C\I '� U w 07 z wir7 Z w cc -O �__ 1W cn U W �_ r W0 Z CY) UZ W U z O U Q LU O CD Q Q C J ~- O= o U) w _ C/) LU a o � z O =o U w m Lu z CIVIL W Z O H Q U_ LL U LU W U O JOB NUMBER: 18023 DATE 09/24/18 DRAVN,N BY. WSC CHECKED BY: WSC REVISIONS I0 DESCRIPTION DATE SPC101 SHEET 11 OF 14 Z O 1- U Q J Q C3 LU J O I- I - U LU C0 U) LU C0 J J_ 1-__ 2: LU LU C.`3 z Fr LL Z Z Q r_) Z Q U LU = U Ir Q _ LU LU Z_ CD Z LU LU 2 H Li - 0 1- Z LU U) Z O U Z: LU Cc H O 2 Cc Q 0- Z: Cc O LU J O = z_ 0 LU U) LU C0 H O z Q 0 z Q U J J 11 Z CD LU 0 06 CD Z 11= LU LU Z_ C3 Z LU Z O U LJ_ O _ LU IL O _ 0 - LU H LU _ Q Z O LU rr LU = H Z CD U) LU 0 LU 170 z Q U) O Z:_ Q Cr 0 LU U) LU = SECTION 02722 - EXTERIOR SANITARY SEWERS AND APPUTENANCES PART 1 - GENERAL 1.1 GENERAL DESCRIPTION: This section covers the furnishing of supervision, materials, labor, equipment and miscellaneous items necessary to construct sewers and appurtenances as shown on the plans and as specified herein, complete, tested, and ready for service. All pipe and appurtenances shall be of the class and type as indicated on the plans and designated hereon. 1.2 GENERAL INTENTION: The work covered by this section consists of all supervision, excavation, bedding, laying pipe, jointing and coupling pipe sections, and backfilling necessary to install the various types of pipe required to complete the project. PART 2 -MATERIALS 2.1 MATERIALS: All materials shall be first quality with smooth interior and exterior surfaces, free from cracks, blisters, honeycombs and other imperfections, and true to theoretical shapes and forms throughout. All materials shall be subject to the inspection of the Engineer at the plant, trench, or other point of delivery, for the purpose of culling and rejecting material that does not conform to the requirements of these specifications. Such material shall be marked by the Engineer and the Contractor shall remove it from the project site upon notice being received of its rejection. As particular specifications are cited, the designation shall be construed to refer to the latest revision under the same specification number, or to superseding specifications under a new number except provisions in revised specifications that are clearly inapplicable. 2.1.1 Handling and storing materials: The Contractor shall unload pipe so as to avoid deformation or other injury thereto. Pipe shall not be rolled or dragged over gravel or rock during handling. When any joint or section of pipe is damaged during transporting, unloading, handling, or storing, the undamaged portions of the joint or section may be used where partial lengths are needed, or, if damaged sufficiently, the Engineer will reject the joint or section as being unfit for installation. If any defective pipe is discovered after installation, it shall be removed and replaced with sound pipe or shall be repaired by the Contractor in an approved manner and at his own expense. 2.2 Pipe and Fittings: 2.2.2 Polyvinyl Chloride Pipe (PVC): Polyvinyl Chloride Pipe (PVC) pipe shall meet the requirements of ASTM D 3034, latest editions, and be suitable for use as a gravity sewer conduit. The pipe shall be SDR 35 unless otherwise specified. The pipe shall be supplied in standard laying lengths of 20 feet and 12.5 feet. 2.2.2.1 PVC Pipe Joints: All PVC pipe joints shall be of an integral bell and spigot of the some material as the pipe with a solid cross-section rubber "0" ring securely locked in place at the point of manufacture. Service saddles and other fittings shall be supplied by the pipe manufacturer and shall be of the some material and type of construction as the pipe material. 2.2.3 Ductile Iron Pipe (DIP): Ductile Iron Pipe shall be manufactured in accordance with ANSI Specification A 21.51. All ductile iron pipe shall be Class 50 unless other wise specified and shall be lined with cement mortar not less than 1/16" -inch thick conforming to ANSI Specification A 21.4. 2.2.3.1 DIP Joints: Slip or "push -on" joints shall be manufactured in accordance with ANSI Specification A 21.11. Bells of "slip" joint pipe shall be contoured to receive a bulbshoped, circular rubber gasket, and plain ends shall have a slight taper to facilitate installation. The pipe manufacturer shall furnish the lubricant used in making up the joints. The jointing shall be done by guiding the plain end into the bell until contact is made with the gasket and by exerting a sufficient compressive force to drive the joint home until plain end makes full contact with the base of the bell. 2.2.4 Reinforced Concrete Pipe: Reinforced concrete pipe shall be furnished in sizes and classes shown and specified on the Contract Drawings and the Bid Schedule. All pipes under this Section shall conform to the latest revisions of ASTM CC -76 - Reinforced Concrete Culvert, Storm and Sewer Pipe. The provisions of ASTM C-655 may also be utilized. Reinforced concrete pipe shall be anufactured by centrifugal or vertical casting methods. For vertical casting methods, mechanical vibration shall be provided to insure proper consolidation of concrete. Density of cured concrete shall be 150 lbs./ft. or greater. 2.2.4.1 Concrete Pipe Test: All shipments of pipe shall be tested at the Contractor's expense in accordance with ASTM C-76 Section 11 (2) except as modified. Preliminary testing for extended deliveries shall include 3 -edge bearing tests to the .01 -inch crack on three (3) sections of each size pipe. Testing shall be by an approved testing laboratory. Specimens up to 0.5 percent of the number of each size of pipe furnished shall be tested, except that in no case shall less than two specimens be tested. The laboratory making the tests shall furnish the Engineer with three (3) certified copies of these tests. No pipe shall be laid before the Engineer approves test reports. 2.2.4.2 Concrete pipe shall be manufactured in joint lengths of 8 feet or greater. 2.2.4.3 Results of absorption tests performed on the pipe shall not exceed 6.5 percent. 2.2.4.4 The alkalinity of the concrete cover over the inner reinforcing steel on the inside pipe wall at the crown shall be no less than 0.50 (50 percent) expressed as calcium carbonate equivalent. The manufacturer shall determine the alkalinity of the concrete cover at intervals determined b the Engineer. Samples for alkalinity determination shall be obtained b drilling q Y Y 9 P Y Y 9 one -inch diameter holes in the pipe interior to the reinforcing steel. The ground concrete from this drilling shall be the sample material used for the alkalinity determination. Core holed in test pipe may be suitably repaired b a method approved b the Engineer and used on the project. The laboratory making the test shall furnish the Engineer with three 3 certified copies of these PP Y Y P Y PP Y 9 P 1 rY 9 9 () P tests. No pipe shall be laid before the Engineer approves these reports. 2.2.4.5 Bell and spigot reinforced concrete sewer a shall be joined with an O-ring rubber gasket type joint conforming to the applicable provisions of ASTM C-361 latest revisions. A groove PP J 9 9 YP J 9 PP P � shall be provided in the spigot end to receive the rubber gasket and it shall be so formed that when the joint is complete, the gasket will be deformed to a near rectangular shape and P9 1 P 9 9 P confined on all four sides. All inside surfaces of the bell and outside closure of the joint and at an degree or partial closure shall be parallel within one degree and have an angle of not J Y 9 P P 9 9 more than two degrees with the longitudinal axis of the pipe. The gasket shall be the sole element utilized in sealing the joint from either internal or external hydrostatic pressure. Gaskets shall be the product of a manufacturer having at least five ears experience in the manufacturer of rubber gaskets for pipe joints. The gaskets shall have smooth surfaces free from blisters P 9 Y P 9 PP J porosity, and other imperfections. The joint shall be assembled in accordance with the standard directions of the gasket manufacturer. 2.2.4.6 The pipe manufacturer shall design walls to meet the following requirements. 2.2.4.6.1 Pipe wall sections shall meet the structural requirements for pipe classes stated in the Bid Schedule for each size pipe. 2.2.4.6.2 Concrete cover over the inner reinforcingcage shall be a minimum of 1 inch greater than that required to meet structural properties. This may be accomplished b moving the inner 9 9 4 P P Y P Y 9 reinforcingcage towards the outside of the pipe, b adding concrete on the inside of the pipe, b adding concrete on the outside of the pipe, or both. Inside pipe diameter shall not be 9 PP � Y 9 PP � Y 9 PP � PP decreased. 2.2.4.6.3 Reinforcingshall be sufficient) strong so that the pipe, without the additional interior cover, will meet the 3 -edge bearing test requirements of ASTM C-76 for the .01 -inch crack. Y 9 PP � 9 9 q 2.2.5 Steel Sanitary Sewer Pipe: Steel sanitary sewer pipe shall conform to ASTM A-53 Grade B or ASTM A-139 Grade B standard specifications. Steel sewer pipe shall have minimum yield strength of 35 000 psi and a minimum tensile strength of 60 000 psi with a wall thickness of .375 inches. External and internal surfaces shall have protective coatings. Coating shall consist of 9 � P 9 P P 9 9 a coal -tar rimer followed b hot coal -tar enamel at least 1/16 -inch thick or roved equal. P Y / PP q 2.2.6 Steel Casing Pipe: Steel casing shall conform to ASTM A-53 Grade B or ASTM A-139 Grade B Standard specifications. Casing pipe shall have a wall thickness as follows: 30" 0.312 inches wall thickness 26" 0.312 inches wall thickness 16" 0.250 inches wall thickness External surfaces of steel casing pipe to have a protective coating. This coating shall consist of a coal -tar primer followed by hot coal -tar enamel at least 1/16 -inch thick, or approved equal. 2.3 Manholes: See Section 02601 Manholes, Drop Manholes and Conflict Manholes PART 3 - EXECUTION 3.1 Preparation of pipe foundation: The a foundation shall be prepared to be uniform) firm and shape be true to the lines and grades as shown on the Contract Drawings. An deviation or P PP PP P P Y p 9 9 Y field adjustment will require the approval of the Engineer. The Contractor shall be responsible for the finished work conforming to proper line and grade. 3.1.1 Bedding: Whenever the nature of the ground will permit, the excavations at the bottom of the trench shall have the shape and dimensions of the outside lower third of the circumference of the pipe, care being taken to secure a firm bearing support uniformly throughout the length of the pipe. A space shall be excavated under and around each bell to sufficient depth to relieve it of any load and to allow ample space for filling and finishing the joint. The pipe, when thus bedded firmly, shall be on the exact grade. In case the bed shape in the bottom of the trench is too low, the pipe shall be completely removed from position, and earth of suitable quality shall be placed and thoroughly tamped to prepare a new foundation for the In no case shall the pipe be brought to grade by blocking up under the barrel or bell of the some, but a new and uniform support must be provided for the full length of the pipe. Where rock or boulders are encountered in the bottom of the trench, the some shall be removed to such depth that no part of the pipe, when laid to grade, will be closer to the rock or boulders than 6 inches. A suitable tamped and shaped foundation of approved material shall be placed to bring the bottom of the trench to proper subgrade over rock or boulders. The preparation of the pipe bedding shall be in accordance with the typical trench cross sections as shown on the Contract Drawings for the type of pipe being installed. Crushed stone use for pipe bedding shall be shovel sliced so that the materiel fills and supports the haunch area and encases the pipe to the limits shown on the trench cross sections. 3.1.2 Bedding at creek crossing: Where it is necessary to cross a creek, the following requirements pertain. 1a) One foot of cover where the sewer is located in rock. 2a) Three feet of cover in other material unless ferrous pipe is specified. More cover in major streams. 3a) In paved stream channels, the top of the sewer line shall be placed below the bottom of the channel pavement. 3.1.3 Proper backfilling shall take place to prevent erosion or siltation. b) If crossing above water, Ductile Iron Pipe shall be used and the bottom of the pipe shall be above the 25 -year flood elevation and special care taken to ensure minimal erosion on the creek banks. 3.1.3 Poor foundation material: Where the foundation material is found to be of poor supporting value, the Engineer may make minor adjustment in the location of the pipe to provide a more suitable foundation. Where this is not practical, the foundation shall be conditioned by removing the existing foundation material by undercutting to the depth as directed by the Engineer and backfilling with foundation conditioning material consisting of crushed stone. 3.1.4 Crushed stone for pipe bedding: Crushed stone for pipe bedding and for foundation conditioning is to be size #67 in ASTM designation D 488, "Standard Sizes of Coarse Aggregate for Highway Construction: (AASHTO M-43, size #67) The sieve analysis of #67 stone is as follows: 100% passing 1" 90% - 100% passing %" 20% - 55% passing 3/8" 0% - 10% passing #4 0% - 5% passing #8 3.2 Water in pipe trench: The Contractor shall remove all water which may encountered or which may accumulate in the trenches by pumping or bailing and no pipes shall be laid until the water has been removed from the trench. Water so removed from the trench must be disposed of in such a manner as not to cause damage to work completed or in progress. 3.3 Laying Pipe: Y 9 P 3.3.1 Manufacturer's recommendations: All piping is to be installed in strict accordance with the manufacturer's recommendations and the contract material specifications. PP 9 P 3.3.2 Proper tools and equipment: Proper tools, implements, and facilities satisfactory to the Engineer shall be provided and used for the safe and convenient prosection of pipe laying. All pipe and other materials used in the laying of pipe will be lowered into the trench piece be piece by means of a suitable equipment in such a manner to prevent damage to the pipe, materials, to the protective coating on the pipe, materials, and to proved a safe working condition to all personnel in the trench. Each piece of pipe being lowered into the trench shall be clean, sound and free from defects. It shall be laid on the prepared foundation, as specified Section 02722-5 elsewhere to produce a straight line on a uniform grade, each pipe being laid so as to form a smooth and straight inside flow line. Pipe shall be removed at anytime if broken, damaged or displaced in the process of laying some, or of backfilling the trench. 3.3.3 Cutting pipe: When cutting short lengths of pipe, a pipe cutter as approved by the Engineer will be used and care will be taken to make the cut at right angles to the center line of the pipe or on the exact skew as shown on the plans. In the case of push -on pipe, the cut ends shall be tapered with a portable grinder or coarse file to match the manufactured taper. 3.3.4 Location of groove or bell: All pipe shall be laid with the groove or bell end upgrade, and the spigot or tongue fully inserted. All pipe joints will be constructed in strict accordance with the pipe manufactures specifications and materials and any deviation must have prior approval of the Engineer. 3.3.5 Pipe deflection: All pipe installations shall be tested for deflection. No pipe shall exceed deflection of 5 percent. The maximum deflection per joint of flexible joint pipe shall be that deflection recommended by the manufacturer. A stopper or plug shall be installed in the pipe mouth when pipe laying is not in progress. 3.4 Minimum Separation 3.4.1 The following minimum separations must be maintained. a) any private or public water supply source, including and WS -1 waters or class I or class II impounded reservoirs used as a source of drinking water. 100 ft. b) waters classified WS -II, WS -III, B, SA, ORW, HQW, or SB 50 ft. c) any other stream, lake or impoundment 10 ft. d) any building foundation 5 ft. e) any basement 10 ft. f) top slope of embankment or cuts of 2 feet or more vertical height 10 ft. g) interceptor drains 5 ft. h) groundwater lowering and surface drainage ditches 10 ft. i) any swimming pool 10 ft. j) storm sewers (vert.) 12 in. (horz.) 12 ft. k) water mains (vert.) 18 in. (horz.) 10 ft. 1) benched trenches (horz.) 18 in. 3.4.2 Where the required minimum separations cannot be maintained ferrous sanitary sewer pipe with joints equivalent to water main standards must be used. However, the minimum q P rY P p 1 q separations shall not be less than 25 feet from a private well or 50 feet from a public water supply source. 3.5. N/A 3.6.1 Sanitary sewer lines shall be deep enough to serve all adjoining property and allow for sufficient slope in lateral lines. All sanitary sewer mains shall have the following minimum covers: a) 4 ft. from top of pipe to finish subgrade when under a roadway. b) 3 ft. from top of pipe to finished subgrade when outside a roadway. 3.6.2 The above requirements may be waved by authority of Director, in which case ductile iron pipe shall be used. 3.6.3 Sewer mains deeper than 12 feet require stone bedding. 3.6.4 Transitions between pipe materials shall occur at manholes. 3.6.5 Where sanitary sewer lines and water lines must cross, ductile iron pipe shall be used and pipes shall cross at near 90 degree angles with 18" minimum separation, as stated in the separation table. 3.6.6 Sewer mains shall be installed in dedicated public right of ways or in dedicated utility easements. 3.6.7 Sewer line easements shall be graded smooth, free from rocks, boulders, roots, stumps, and all other obstructions and seeded and mulched upon completion of construction. 3.6.8 Downstream manholes on sanitary sewer lines under construction shall be plugged and secured to prevent any seepage of water into or out of the line while under construction. 3.7.1 Initial backfill: The initial backfill for pipe shall be carefully placed to a level of 12 inches over the top of the pipe. This backfill shall be excavated soil free from debris, organic material and large rock and stones. Initial backfill shall be shovel sliced so that the material fills and supports the haunch area and encases the pipe to the limits shown on the trench cross sections on the Contract Drawings. 3.7.2 Final backfill: Final backfill for pipelines shall be defined as that portion of the trench from an imaginary line drawn 12 inches above the top of the pipe to the original ground surface. Final backfill will be done with suitable excavated material and tamped in 12 inch lifts. Debris, material not given to adequate compaction, and stone over one cubic foot will not be allowed within the trench limits. If material excavated is not suitable for backfilling, the Contractor shall, at no increased cost to the Owner, remove and dispose of such unsatisfactory material and shall backfill the trench with suitable material obtained elsewhere. 3.7.3 Steep Slope Protection: Sewers on 20 percent slopes or greater shall be anchored securely with concrete, or equal, with the anchors spaced as follows: a) Not greater than 36 feet center to center on grades 21 % to 35% b) Not greater than 24 feet center to center on grades 35% to 50% c) Not greater than 16 feet center to center on grades 50% and over 3.7.4 Compaction: 3.8.1 Within traffic areas: When pipelines installed within the ditch to ditch limits of any roadway, driveway or parking area etc., backfill shall be compacted to a minimum dry density of 95 percent of the maximum dry density in pounds per cubic foot as determined by the Standard Proctor Compaction Test. Backfill material shall be placed in 6 inch layers and thoroughly tamped or rolled to the required degree of compaction by sheepsfoot or pneumatic rollers, mechanical tampers, vibrators, etc. Successive layers shall not be placed until the layer under construction has been thoroughly compacted. 3.8.2 Outside Traffic Areas: In areas outside the ditch to ditch limits of a roadway,driveway, parking areas etc. backfill shall be compacted to a minimum d density of 90% of the maximum Y� P 9 P dry Y d density in pounds per cubic foot as determined b the Standard Proctor Compaction Test. An settlement shall be immediate) corrected. dry Y P P Y P Y Y 3.8.3 Equipment Traffic: Heavy equipment shall not be operated over any pipe until it has been properly backfilled and has a minimum cover of 24 inches. Where any part of the required cover is above the proposed finish grade, the Contractor shall place, maintain, and finally remove such material at no cost to the Owner. Pipe which becomes misaligned, shows excessive settlement, or has been otherwise damaged by the Contractor's operations shall be removed and replaced by the Contractor at no cost to the Owner. 3.8.4 Pipe maintenance: The Contractor shall maintain all pipes installed in a condition that they will function continuously from the time the pipe is installed until the project is accepted. 3.8 Manhole installation: 3.9.1 Precast concrete manhole: A recast concrete manhole shall be installed at each break in line or rade in each sanitary sewer as shown in detail on the Contract Drawings. Manhole P 9 rY 9 sections shall be set plumb and on a firm foundations. Each joint between sections and all wall openings shall be sealed with 2:1 sand -cement mortar mix and made watertight. An eccentric P 19 cone section and standard frame and cover is to be installed on each new manhole. Final adjustment to grade of all manholes shall be done with brick and mortar and each frame and cover shall be grouted firmly into place. 3.9.2 Manholes shall be spaced at a maximum distance of 400 feet apart for lines 12 inches in diameter or smaller and at a maximum of 500 feet apart for lines renter than 12 inches in P P P 9 diameter. 3.9.3 Manholes for sewers under 21 inches in diameter shall be a minimum of 4 feet in diameter. Manholes for sewer 21 inches in diameter or greater shall be 5 feet in diameter. All manholes requiring inside drops shall be a minimum of 5 feet in diameter. When two or more inside drops occur at one manhole, a minimum of 6 feet in diameter manhole shall be used. All manholes shall have a minimum access of 22 inches in diameter. 3.9.4 Manholes inverts: Manhole inverts shall be constructed of concrete or concrete and brick of semicircular section conformingto the inside diameter of the outlet sewer. Changes in size of 9 pipe or rade shall be made gradually and changes in direction constructed b using true Each manhole shall be provided with such channels for all connecting sewer pipes. Drop manholes PP 9 9 Y 9 Y 9 P 9 PP P shall be provided where invert separations exceed 2.5 feet. 3.9.5 Manholes located within the 100 year flood Iain or in areas of high round water shall abide b the following when applicable: Y P 9 9 Y 9 PP 3.9.5.1 Watertightness: 3.9.5.2 Manholes shall be pre -cast concrete or poured -in-place concrete. Manhole life holes and grade adjustment rings shall be sealed with non -shrinking mortar or other material approved by the Division. 3.9.5.3 Inlet and outlet pipes shall be joined to the manhood with a gasketed flexible watertight connection or any watertight connection arrangement that allows differential settlement of the pipe and manhole wall to take place. 3.9.5.4 Watertight manhole covers are to be used wherever the manhole tops may be flooded by street runoff or high water. Locked manhole covers may be desirable in isolated easement locations or where vandalism may be a problem. 3.9.5.5 Manholes shall be designed for protection from the 100 -year flood by either: a) Manhole rims shall be 12 inches (1 foot) above the 100 -year flood elevation or, b) Manholes shall be watertight and vented 12 inches (1 foot) above the 100 -year flood elevation. Manholes shall be vented every 1,000 feet or every other manhole, whichever is greater. 3.9.6 Corrosion Protection for Manholes: 3.9.6.1 Where corrosive conditions due to septicity or other causes are anticipated, consideration shall be given to providing corrosion protection on the interior of the manholes. 3.9.6.2 Where high flow velocities are anticipated, the manholes shall be protected against displacement b erosion and impact. High velocity is defined as 15 fps orgreater. 9 P P 9 P Y P 9 Y P 9 3.10 TESTING: All pipe installations shall be tested as specified herein. Tests shall be performed by Contractor at his expense in the presence of the Engineer or his representative. Testing shall not be performed until such time that all work which may affect the results of the testing has been completed. Where a test section fails to meet test requirements, Contractor shall make P Y 9 P q , corrections as specified herein and retest the section. The correct/retest procedure shall continue until such time as test requirements are met. 3.10.1 Air Test: All gravity sewer pipe. 3.10.1.1 Air test shall be conducted in strict accordance with the testing equipment manufacturer's instructions, including all recommended safety precautions. No one will be allowed in the manholes during testing. Equipment used for air testing shall be equipment specifically designed for this type of test, and is subject to approval of the Inspector. 3.10.1.2 The test shall be performed only on clean sewer mains after services are installed and the pipe is completely backfilled. Clean sewer mains by propelling snug fitting inflated rubber ball through the pipe with water. After completely cleaned, plug all pipe outlets with suitable test Brace each plug securely. 3.10.1.3 For pipe within test sections above the ground water table, add air slowly to the portion of the pipe installation under test unti Ithe internal air pressure is raised to the starting pressure of 4 psig. After the starting pressure is obtained, allow at least two minutes for air temperature to stabilize, adding only the amount of air required to maintain pressure. When pressure decreases to 3.5 psig. Start stopwatch. Determine the time that is required for the internal air pressure to reach 2.5 psig. 3.10.1.4 For pipe with test sections below the ground water table, determine the starting pressure for the test section, in psig, as follows: 1. Determine the maximum depth of pipe within the test section in feet. 2. Multiply this depth by 0.67 feet and add 9.3 feet. 3. Multiply the result in part 2 by 0.43 and round to the nearest 0.5 psig. After this starting pressure is obtained, continue the test in accordance with the procedure in the paragraph above. 3.10.2 Requirement: The test section shall be acceptable if the elapsed time for pressure drop of 1.0 psig is greater than the sum of the times shown below for all pipe sizes within the test section. PIPE DIAMETER (INCHES) PIPE LENGTH 4 6 8 10 12 15 18 21 24 25 0:04 0:10 0:18 0:28 0:40 1:02 1:29 2:01 2:38 50 0:09 0:20 0:35 0:55 1:19 2:04 2:58 4:03 5:17 75 0:13 0:30 0:53 1:23 1:59 3:06 4:27 6:04 7:55 100 0:18 0:40 1:10 1:50 2:38 4:08 5:56 8:05 10:34 125 0:22 0:50 1:28 2:18 3:18 5:09 7:26 9"55 11 "20 150 0:26 0:59 1:46 1 2:45 3:58 6:11 8:30 11I " 175 0:31 1:09 2:03 3:13 4:37 7:05 ;; m 11200 0:35 1:19 2:21 3:40 5:17 Ir ;; 12:06 225 0:40 1:29 2:38 4:08 5:40 11 1110:25 13:36 250 0:44 1:39 2:56 4:35 11" CIVIL 8:31 11:35 15:07 275 0:48 1:49 3:14 4:43 119:21 12:44 16:38 300 0:53 1:59 3:31 1 " " 10:12 13:53 18:09 350 1:02 2:19 3:47 "118:16 11:54 1 6:1 2 21:10 400 1:10 2:38 11" 1 6:03 9:27 13:36 18:31 24:12 450 1:19 2:50 11" 6:48 10:38 15:19 20;50 27:13 500 1:28 "115:14 7:34 11:49 17:01 23:09 30:14 3.10.3 Corrective Measures: If elapsed time is less than the specified amount, Contractor shall locate and repair leaks and repeat the test until elapsed time exceeds the specified amount. 3.11 Infiltration/Ex-filtration Test (Use All manholes): 3.1 1.1 The use of this method for sewer pipe, in lieu of air tests may be used as an alternate test method. 3.11.2 Procedure: 1. Infiltration: Immediately following a period of heavy rain a test of work constructed up until the time shall be made. Three measurements shall be made at one (1) hour intervals to compute the amount of the infiltration. Test for manholes only shall be conducted on individual manholes. Tests for pipe and manholes shall be performed on test sections not exceeding 600 linear feet of collector sewer and shall include both pipe and manholes. The Engineer reserves the right to use his judgment as to whether the ground is sufficiently saturated and/or whether the fall of rain is adequate to permit making infiltration tests. In the event that sufficient rain does not occur before the date of completion, the Contractor shall be required to conduct the tests at any time during a 30 -day period following this date. Should the Engineer determine that certain pipe of manholes couldn't be tested by infiltration methods, the Engineer may direct the filling of lines and the measurement of ex -filtration. The allowable rate of ex -filtration shall be the some as for infiltration. 2. Ex -filtration: Determine test sections as outlined for infiltrations tests. Install a temporary water plug at the inlet and outlet of the test section. Fill test section with clean water up to the bottom of the lowest manhole frame within the test section. Allow time for saturation of pipe and manholes refilling test section as required. Beginning with a full test section, allow at least eight (8) hours to elapse without adding water. Measure the water level at the beginning and end of the elapsed time above. Compute the volume of water lost in gallons per hour. 3.11.3 Test Requirements: The rate of water loss/gain shall be less than the rate, in gallons per hour, calculated for the test section using the following allowances: 1. Sewer main and manholes with or without service laterals; 100 gallons per 24 hours per inch of sewer main diameter per mile of sewer main (gpd/in-mil). 2. Manholes only; 1 gallon per 24 hours per vertical foot of manhole. 3.11.4 Corrective Measures: If actual leakage rate is greater than required leakage rate, Contractor shall locate and repair leaks and repeat the test until actual leakage is less than the required rate. SECTION 01568 SEDIMENT AND EROSION CONTROL PART 1 GENERAL 1.1 SECTION INCLUDES A. Erosion and sediment control shall be provided during the entire construction period as specified herein. 1.2 REFERENCED SECTIONS A. Section 02820 - Grassing 1.3 REQUIREMENTS A. Contractor shall comply with all local, state and federal laws, ordinances, rules and regulations pertaining to erosion and sediment control, including those promulgated by the State Administrative Code. Contractor shall indemnify and hold harmless the Owner and Engineer from and against all claims, damages, losses and expenses resulting from such work. B. Obtain Land Disturbance Permit from governmental agency having jurisdiction over project site. C. Contractor shall install and maintain a rain gauge, onsite, during construction. PART 2 PRODUCTS Not used PART 3 EXECUTION 3.1 EROSION AND SEDIMENT CONTROL MEASURES A. Contractor shall take all measures to control erosion and sedimentation alongpipeline rights-of-way, at the construction site including borrow and waste areas and temporary access P P 9 P rY roads, and at off-site areas especially vulnerable to damage from erosion and sedimentation. Work shall be scheduled so that areas subject to erosion are exposed for the shortest possible time. Temporary protection shall be required for exposed or disturbed areas until permanent vegetation is established, and shall consist of temporary grass cover (see Section 02820 - Grassing), mulch, netting or plastic sheets; except that temporary grass cover shall be provided where specifically noted on the plans. All temporary erosion and sediment control measures shall be removed within 30 days after final site stabilization is achieved or after the temporary measures are no longer required, unless otherwise directed. Trapped sediment remaining in place after removal of temporary measures shall be permanently stabilized to prevent further erosion and sedimentation. B. Temporary Silt Fences: Immediately after site clearing, temporary silt fences shall be placed in the locations as shown on the plans or as necessary to prevent erosion. Silt fences shall consist of a specially manufactured woven or nonwoven drainage and filtration fabric attached to a temporary support system of galvanized woven wire mesh and steel or wood posts. Height of fabric above grade shall be as shown. Fabric skirt shall be buried to anchor the bottom edge of the fabric. Posts shall be spaced not more than 10 feet apart. 1. As far as practicable, fences shall be located on uniform contours and arranged at right angles to the runoff direction. Fence ends shall be turned up the contour for a short distance to prevent bypass of silt. 2. Silt fences shall be inspected periodically and all necessary repairs promptly made. Sediment deposits shall be removed when deposits reach one-half the height Of the fence. Removed sediment shall be disposed of in a suitable area and stabilized to prevent erosion and sedimentation. 3. Silt fences shall be removed as soon as disturbed areas and slopes have been properly stabilized. 4. Filter fabric attached to existing chain link fence for erosion control purposes shall be installed as detailed for temporary silt fences, including height of fabric above grade and fabric skirt anchoring requirements. Fabric shall be the same material used for temporary silt fences. Fabric shall be removed as soon as disturbed areas and slopes have been stabilized. C. Silt Fence Inlet Protection shall be provided for storm drain inlet protection as detailed on the plans. 1. Barriers shall be inspected after each rainfall and repairs made as required. Sediment deposits shall be removed when deposits reach one-half the height the barrier. Removed sediment shall be disposed of in a suitable area and stabilized to prevent erosion and sedimentation. Barriers shall be removed the area stabilized when the drainage area has been properly stabilized. D. Stream Crossings: 1. Adequate sedimentation and erosion control measures must be implemented and maintained on the project site to avoid impacts to downstream aquatic resources. Temporary or q P P 1 P q P rY permanent herbaceous vegetation should be planted on all bare soil within 15 days of round disturbing activities to provide long-term erosion control. P 9 P Y 9 9 P 9 2. Under no circumstances should rock, sand or other materials be dredged from the wetted stream channel or opposite banks under authorization of this permit, except in the immediate vicinity of the sewer line crossing. Instream dredging has catastrophic effects on aquatic life, and disturbance of the natural form of the stream channel will likely cause the downstream erosion problems, possible affecting other land owners. 3. All instreom construction should be conducted in a dry work area. Sandbags, cofferdams, jersey barriers, flexible pipe, or other diversion structures should be used to minimize excavation into flowing water. 4. If utility lines are to be encased in concrete, adequate precautions should be taken to prevent direct contact between wet concrete and stream water. Uncured concrete affects water quality and is toxic to fish and other aquatic organisms. q Y q 9 5. Natural materials should be used as much as possible to restore stream banks at crossings. Ri ra should be limited to the stream bank below the high water mark and vegetation P 9 P P 9 � 9 should be used for stabilization above high water mark. 6. All affected wetland areas must be restored to pre -construction contour and condition. 7. All mechanized equipment operated in or near surface waters should be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. 3.2 EMERGENCY CONDITIONS A. If unusual) intense storms cause planned control measures to fail prompt restoration and cleanup of sediment deposits shall be made including damage to adjacentproperty. If Y P P P P P 9 9 1 construction is delayed or shut down, temporary cover of exposed and disturbed areas shall be provided. END OF SECTION SECTION 02050 DEMOLITION AND REMOVAL PART 1 GENERAL 1.1. RELATED DOCUMENTS A. GENERAL: Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, material, equipment, and services indicated on the Drawings or specified herein or reasonably necessary for and incidental to a complete job. 1.1. DESCRIPTION OF WORK A. GENERAL: The demolition of existing vegetation in indicated areas, removal of striping and curb and gutter, removal/reworking/verification of stone base, as well as demolition of sections of the existing retaining wall and fence. Also includes the relocation of one metal storage building at the direction of the Owner. 1.1. SUBMITTALS A. GENERAL: Submit proposed salvage, demolition and removal procedures to the Engineer for approval before work is started. Procedures shall provide for careful removal and disposition of materials specified to be salvaged, coordination with other work in progress, a detailed description of methods and equipment to be used for each operation and of the sequence of operations. 1.1. REQUIREMENTS A. GENERAL: The work includes demolition or removal of all construction indicated or specified. Do not begin demolition until authorization is received from the Engineer; refer to paragraph TITLE TO MATERIALS, hereinafter. Remove rubbish and debris from the job site daily, unless otherwise directed; do not allow accumulations inside or outside the building(s). Store materials that cannot be removed daily in areas specified by the Engineer. 1.1. PROTECTION A. EXISTING WORK: Protect existing work which is to remain in place, that is to be reused, or which is to remain the property of the Owner, by temporary covers, shoring, bracing, and supports. Items which are to remain and [which are to be salvaged and] which are damaged during performance of the work shall be repaired to their original condition or replaced with new. Do not overload structural elements. Provide new supports and reinforcement for existing construction weakened by demolition or removal work. B. TREES: Protect trees within the project site that might be damaged during demolition and that are indicated to be left in place, by a 6 -foot high fence. Erect fence a minimum of 5 feet from the trunks of individual trees or follow the outer perimeter of branches of clumps of trees. Restore trees scarred or damaged by Contractor equipment or operations to a satisfactory condition or replace as determined by the Engineer. The Engineer shall approve restoration prior to its initiation. C. FACILITIES: Protect all electrical and mechanical services and utilities. Where removal of existing utilities and pavement is specified or indicated, provide approved barricades, temporary covering of exposed areas, and temporary services or connections for electrical and mechanical utilities. 1.1. EXPLOSIVES A. GENERAL: Use of explosives will not be permitted. 1.1. BURNING A. GENERAL: Burning will not be permitted. PART 2 PRODUCTS Not Applicable to this Section PART 3 EXECUTION 3.1 INSPECTION A. GENERAL: Examine the areas and conditions under which demolition and removal will be performed and notify the Engineer in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. 3.2 EXISTING FACILITIES TO BE REMOVED A. STRUCTURES: Remove indicated existing structures to grade and as indicated. 3.3 DISPOSITION OF MATERIAL A. TITLE TO MATERIALS: Except where indicated otherwise or specifically specified otherwise in other sections, all materials and equipment removed, and not reused, shall become the property of the Contractor and shall be removed from the Owner's property. Title to all materials resulting from demolition, and all materials and equipment to be removed, is vested in the Contractor upon approval by the Engineer of the Contractor's demolition and removal procedures, and authorization by the Engineer to begin demolition. The Owner will not be responsible for the condition or loss of, or damage to, such property after notice to proceed. Materials and equipment shall not be viewed by prospective purchasers or sold on the site. B. REUSE OF MATERIALS AND EQUIPMENT: Carefully remove and store materials and equipment indicated to be reused or relocated to prevent damage, and reinstall as the work progresses. 3.4 CLEAN UP A. DEBRIS AND RUBBISH: Remove and transport debris and rubbish in a manner that will prevent spillage on streets or adjacent areas. Clean up spillage from streets and adjacent areas. B REGULATIONS: Comply with federal, state, and local hauling and disposal regulations. (End of Section 02050) W_ LJJ U Z L1J CD Q OrG LL 111111 1 111,11 '/[��I 11 CLAYTON 9 ENGINEERING & M DESIGN, PLLC. 7: = No. P-1463 ~ �� ? ��O "9 O. ., T, v. 1111111111 N0 , O� ' 6 ESSj• 2 :Q SE _ 40 F �o �, �� S. '�,""1111►�`� 09/24/18 U Z O U Q LU C3 Q Q C !TC 01: J3:J aw� O = o U)w = C/) LU a Z o = O U w m > Ir LU Z CIVIL W Z O Q U_ U_ UI LU 1 0- Q C/ J 0 U M 0 - JOB NUMBER: 18023 DATE 09/24/18 DFAV ,N BY WSC CHECKED BY: WSC REVISIONS 10 I DESCRIPTION DATE SPC102 SHEET 12 OF 14 Z O 1— U Q J Q Cts w J O F-- F— U W m ZD U) W m J J_ F— Z W w C.`3 z Cc W Z_ Z Q Q Z Q F— U W F— = U Ir Q Cc w W Z_ CD Z W W F— O F— Z W Cn Z O U z W H Cr F— O = F- F— Cr Q Il Z Ir O W J O = Z_ 0 W U) ZD W m F -- O Z Q 0 z Q U J J CL z C.'3 U) W 0 06 Ct3 Z C� W W Z_ C3 Z W Z O U W O Cc W 0- O Cc Il W F— W Ir a Z O W rr W = I -- Z CD U) W I� W = F- 0 z Q Cn Ct3 z_ Q Cr 0 W U) W = F— SECTION 02220 EXCAVATION AND BACKFILL 1. GENERAL 1.1. RELATED DOCUMENTS 1.1.1. Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, materials, equipment, and services indicated on the Drawings, or specified herein, or reasonably necessary for or incidental to a complete job. 1.2. DESCRIPTION OF WORK 1.2.1. The extent of excavation and backfill is limited to the areas of construction and includes but is not necessaril limited to stock ilin of to soil site radin excavation of footin s and trenches , ( Y ) P 9 P 9 9, 9 , de—watering, filling, backfilling, compaction, finish grading, and spreading of topsoil. 1.2.2. Perform all excavation de—waterin sheetin bracin and backfillin in such a manner as to eliminate all ossibilit of underminin or disturbin the foundations of existin structures. , 9, 9, 9, 9 P Y 9 9 9 1.3. QUALITY ASSURANCE 1.3.1. REFERENCED STANDARDS: Unless otherwise indicated, all referenced standards shall be the latest edition available at the time of bidding. Any requirements of these Specifications shall in no way invalidate the minimum requirements of the referenced standards. Comply with the provisions of the following codes and standards, except as otherwise shown or specified. ASTM C33 Standard Specification for Concrete Aggregate ASTM D698 Test Methods for Moisture—Density Relations of Soils and Soil—Aggregate Mixtures Using 5.5 Ib. (2.49 kg) Rammer and 12 inch, (304.8 mm) Drop ASTM D3282 Recommended Practice for Classification of Soils and Soil -Aggregate Mixtures for Highway Construction Purposes 1.3.2. SOIL TESTING AND INSPECTION SERVICE: At the option of the Owner, additional compaction tests of all fill areas will be made by an independent testing laboratory. Rework any fill areas which fail to meet the compaction requirements as herein specified and perform this work at no additional cost to the Owner. Testing of fill areas will be provided by the Owner and paid for by the Owner, except that tests which reveal non—conformance with the Specifications and all succeeding tests for the same area, until conformance with the Specifications is established, shall be at the expense of the Contractor. 1.4. JOB CONDITIONS 1.4.1. EXISTING UTILITIES 1.4.1.a. Prior to beginning any excavation, locate all existing underground utilities in the areas of work. If utilities are to remain in place, provide adequate means of protection during earthwork operations. 1.4.1.b. Should uncharted or incorrectly charted piping or other utilities be encountered during excavation, consult the Engineer immediately for directions as to procedure. Cooperate with Owner and utility companies in keeping respective services and facilities in operation. The Contractor shall repair damaged utilities to the satisfaction of the Owner and utility companies at no additional cost to the Owner. 1.4.1.c. Do not interrupt existing utilities serving facilities occupied and used by others, except when permitted in writing by the Owner, and then only after acceptable temporary utility services have been provided. 1.4.1.d. Demolish, and completely remove from site, existing underground utilities that conflict with construction and are no longer active. Coordinate with utility companies for shut—off of services if lines are active. 1.4.2. . 1.4.3. TEMPORARY PROTECTION: Protect structures, utilities, sidewalks, pavements, and other facilities from damages caused by settlement, lateral movement, undermining, washout, and other hazards created by earthwork operations. 1.4.4. SHEETING AND BRACING: Make all excavations in accordance with the rules and regulations promulgated by the Department of Labor, Occupational Safety and Health Administration, "Safety and Health Re ulations for Construction." Furnish ut in lace and maintain such sheetin bracin etc. as ma be necessa to su ort the sides of the excavation and to revent an movement of earth which 9 P P 9, 9, Y ry PP P Y could in an wa diminish the width of the excavation to less than that necessa for ro er construction or could otherwise injure or dela the work or endan er adjacent structures roads utilities or Y Y ry P P J Y 9 J , other improvements. 1.4.5. DE—WATERING: 1.4.5.a. Provide pumping and drainage facilities adequate to keep the excavated area sufficiently dry from ground water and surface runoff so as not to adversely affect construction procedures or cause excessive disturbance of underlying natural soils. The drainage of all water resulting from pumping shall be arranged so as not to cause damage to adjacent properties. 1.4.5.b. Control the radin on the site so that the surface of the round will ro erl sloe to revent the accumulation of water on excavated or filled areas. 9 9 9 P P Y P P 1.4.5.c. The lowerin of the existin roundwater levels due to the construction activities includin de—waterin shall not cause settlement of adjacent structures which would result in damn e. If 9 9 9 9 9, 1 9 required, provide cutoff walls and/or recharge system to maintain ground water levels at elevations which will not cause damage to adjacent structures or facilities. 1.4.6. SITE INFORMATION 1.4.6.a. .lrllfil�Itf�\� JiT�II,I�\fAl�I1 A,f�[fl lfRf ��lA,r����lf7�1!\f�f��l�l�l�lr �,l2 fil�l�l� X11171�1f�M!R \7lw,fRS !\f 9,L�lft.A� W�Ri,i.. �i,w.�i��yV.1.iJ 1L<JV'��\L�IJRi JI��II�L�I�LI�It..,•�Zu,,.��e i iRWI ,ei�i i i„i„iiiw��,.,a.,��l�tiaiu,i,iws ��..,.�►19L�]<�LLUJ.-1�ILl1l Ll•]<SI..I�.l.f ��ws 1.�..1.�1 lnw�� I�I�II.f �.,.IRMSJ► "I��.l �,�t�; 2. PRODUCTS 2.1. DEFINITIONS 2.1.1. SATISFACTORY SUBGRADE SOIL MATERIALS: Soils com I in with ASTM D 3282 soil classification Grou s A 2 4 2 5 and 3. PY 9 P 2.1.2. UNSATISFACTORY SUBGRADE SOIL MATERIALS: Soils described in ASTM D 3282 soil classification Grou s 2 6 2 7 4 5 6 and A 7• also eat and other hi hl or anic soils unless , P A_—, A__, A_, A_, A_, _, P 9 Y 9 , otherwise acceptable to the Engineer. 2.1.3. COHESIONLESS SOIL MATERIALS: Gravels, sand—gravel mixtures, sands, and gravelly—sands. 2.1.4. COHESIVE SOIL MATERIALS: CIO a and silt ravels sand cls mixtures ravel silt mixtures cls a and silt sands sand silt mixtures cls s silts and ve fine sands. YY Y9 — Y 9 — YY Y — Y� ry 2.2. SOIL MATERIALS 2.2.1. BACKFILL AND FILL MATERIALS: Provide satisfactory soil materials for backfill and fill, free of masonry, rock, or gravel larger than (2) inches in any dimension, and free of metal, gypsum, lime, debris waste frozen materials ve etable and other deleterious matter. Use onl excavated material that has been sam led tested and certified as satisfacto soil material. 9 Y P rY 2.2.2. CRUSHED STONE: Crushed stone or crushed gravel placed under structures as indicated on the Drawings or used for pipe bedding shall meet the requirement of ASTM C 33, Gradation 57. 2.2.3. BORROW MATERIALS 2.2.3.a. Provide from off site all materials needed in addition to site excavations. Include in the Unit Price Bid all costs for obtainin haulin and lacin this material. [ ] 9, 9, P 9 2.2.3.b. All borrow materials ro osed for use must be a roved b the En ineer before materials are hauled to the site. Notif the En ineer at least fourteen 14 da s in advance of haulin an P P PP Y 9 Y 9 () Y 9 Y borrow material to the site so that borrow materials can be tested before bein used. 9 3. EXECUTION 3.1. GENERAL 3.1.1. INSPECTION: Examine the areas and conditions under which excavatin and backfillin is to be erformed and notif the En ineer in writin of conditions detrimental to the ro er and time) 9 9 P Y 9 9 P P Y completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. 3.1.2. DE—WATERING: 3.1.2.a. Prevent surface water and or round water from flowin into excavated areas. Use berms or drains a ditches to divert surface drains a awa from the excavation. Use an a roved subsurface / 9 9 9 9 Y PP de—waterin s stem such as boilin um in or a well oint s stem as conditions warrant to remove round water from areas to be excavated. The costs of de—waterin shall be included in the 9 Y 9, P P 9 P Y 9 9 res ective bid items as re uired of the com letion of the work in accordance with the Contract Documents. There will be no individual a item for de—waterin . P q P PY 9 3.1.2.b. The design of the subsurface de—watering system shall allow the contractor to develop a substantially dry and workable subgrade for the execution of subsequent operations. Ground water level shall be lowered at least three (3) feet below the final excavation elevation, prior to excavating within two feet of final subgrade elevation. Maintain pumps, sumps, suction and discharge lines, and other de—watering system components necessary to convey water away from the excavation. 3.1.2.c. Dispose of all water pumped or drained from the work in a suitable manner without undue interference with other work, damage to pavements, other surfaces or property. Provide suitable temporary pipes, flumes or channels for water which may flow along or across the site of the work. 3.1.3. MATERIAL STORAGE: 3.1.3.a. Stockpile satisfactory excavated materials where directed, until required for backfill or fill. Place, grade, and shape stockpiles for proper drainage. 3.1.3.b. Locate and retain soil materials away from edge of excavations. 3.1.4. DISPOSAL OF SURPLUS MATERIAL: Surplus excavated material not needed or acceptable for backfill shall, upon approval of the Engineer, be removed from the construction site and legally disposed of. 3.1.5. BRIDGING TRENCHES 3.1.5.a. Provide suitable and safe bridges and other crossings where required for the accommodation of travel; provide access to the property during construction, and remove said structures thereafter. 3.1.5.b. Bridge or backfill trenches in any portion of the travel lanes of roads at the end of each day's operation to provide for safe travel. No additional compensation will be made for this work. 3.1.6. PROTECTION OF STREAMS: Exercise reasonable precaution to prevent the silting of streams. Provide, at Contractor's expense, temporary erosion and sediment control measures to prevent the silting of streams and existing drainage facilities as directed by the Engineer or as indicated on the Drawings. 3.1.7. AIR POLLUTION: 3.1.7.a. Comply with all pollution control rules, regulations, ordinances, and statutes which apply to any work performed under the Contract, including any air pollution control rules, regulations, ordinances and statutes, or any municipal regulations pertaining to air pollution. 3.1.7.b. During the progress of the work, maintain the area of activity, including sweeping and sprinkling of streets as necessary, so as to minimize the creation and dispersion of dust. If the Engineer decides that it is necessary to use calcium chloride or more effective dust control, furnish and spread the material, as directed, and without additional compensation. 3.2. EXCAVATION 3.2.1. GENERAL: Excavation consists of the removal and dis osal of all materials encountered for footin s foundations i e work and other construction as shown on the Drawin s. Perform all excavation P 9 , , PP 9 work in com liance with a licable re uirements of overnin authorities havin jurisdiction. P PP q 9 9 9 J 3.2.2. STRIPPING: Remove all topsoil, vegetable matter, and organic materials over proposed excavations. Stockpile the stripped materials which are suitable for reuse and preserve for respreading on completed surfaces. Protect and maintain topsoil stockpile until needed. 3.2.3. EXCAVATION CLASSIFICATION: All excavation will be performed as unclassified excavation. 3.2.4. UNAUTHORIZED EXCAVATION: 3.2.4.x. Unauthorized excavation consists of the removal of materials be and indicated elevations without s ecific direction of the En ineer. Under footin s foundations bases etc. fill unauthorized Y P 9 9, excavation b extendin the indicated bottom elevation of the concrete to the bottom of the excavation without alterin the re uired to elevation. Lean concrete fill ma be used to brin elevations to Y 9 , 9 q P Y 9 ro er osition onl when acce table to the En ineer. P P P Y P 9 3.2.4.b. Elsewhere backfill and com act unauthorized excavations ass ecified for authorized excavations of the same classification unless otherwise directed b the En ineer. P P Y 9 3.2.5. EXCAVATION FOR STRUCTURES 3.2.5.a. Conform to elevations and dimensions shown within a tolerance of lus or minus one inch and extendin a sufficient distance from footin s and foundations to ermit lacin and removal of P 9 9 P P 9 concrete formwork, installation of services, other construction required, and for inspection. 3.2.5.b. In excavating for footings and foundations, take care not to disturb bottom of excavation. Excavate by hand to final grade just before concrete is placed. Trim bottoms to required lines and grades to leave solid base to receive concrete. Final footing excavations should not be allowed to remain open overnight without covering unless permitted by Engineer. 3.2.6. TRENCH EXCAVATION 3.2.6.x. GENERAL: (1) Perform all excavation of every description and of whatever substance encountered so that pipe or conduit can be laid to the alignment and depth shown on the Drawings. (2) Brace and shore all trenches, where required, in accordance with the rules and regulations, promulgated by the Department of Labor, Occupational Safety and Health Administration, "Safety and Health Regulations for Construction". (3) Make all excavations by open cut unless otherwise specified or indicated on the Drawings. 3.2.O.a. WIDTH OF TRENCHES: Excavate trenches sufficiently wide to allow proper installation of pipe, fittings and other materials and not more than 12 inches clear of pipe on either side at any point. Do not widen trenches by scraping or loosening materials from the sides. Where supports, and sheeting and bracing are required, trench may be of extra width so as to permit the placing of the trench supporting material. 3.2.O.b. TRENCH EXCAVATION IN EARTH: Earth excavation includes all excavation of whatever substance encountered. In locations where pipe is to be bedded in earth excavated trenches, fine grade the bottoms of such trenches to allow firm bearing for the bottom of the pipe on undisturbed earth. Where any part of the trench has been excavated below the grade of the pipe, fill the part excavated below such grade with pipe bedding material and compact at the Contractors expense. 3.2.O.c. TRENCH EXCAVATION IN FILL: If pipe is to be laid in embankments or other recently filled material, first place the fill material to the finish grade or to a height of at least one foot above the top of the pipe, whichever is the lesser. Take particular care to ensure maximum consolidation of material under the pipe location. Excavate the pipe trench as though in undisturbed material. 3.2.O.d. TRENCH EXCAVATION IN ROCK: Excavate rock, when encountered, to provide a clearance of at least 12 inches on each side of pipe, valves and fittings. Excavate trench below the bottom of the pipe barrel to a depth of 6 inches, unless shown otherwise on the Drawings, and refill with a compacted gravel bedding as herein specified or indicated on the Drawings. 3.2.O.e. TRENCH BOTTOM IN POOR SOIL: Excavate and remove unstable or unsatisfactory soils to a width and depth, as directed by the Engineer, and refill with a thoroughly compacted gravel bedding. The undercutting and filling with gravel bedding of unstable soils caused by flooding or insufficient dewatering shall be at the expense of the Contractor. 3.2.O.f. BELL HOLES: Provide bell holes at each joint to permit the joint to be made properly and to provide a continuous bearing and support for the pipe. 3.2.1. EXCAVATION NEAR EXISTING UTILITIES AND STRUCTURES 3.2.1.x. EXISTING UTILITIES (1) Attention is directed to the fact that there are pipes, drains, and other utilities in locations [adjacent to] the proposed work. Where information is available as to the location of existing pipes, drains, and other utilities, the approximate locations have been indicated on the Drawings; however, the completeness or accuracy of the information given is not guaranteed. (2) As the excavation approaches pipes, conduits, or other underground structures, discontinue digging by machinery and excavate by means of hand tools, as directed. Such manual excavation, when incidental to normal excavation, is included in the work to be done under items involving normal excavation. (3) Where determination of the exact location of a pipe or other underground structure is necessary for doing the work properly, the Contractor may be required to excavate test pits to determine such locations. When such test pits may be properly considered as incidental to other excavation, the work is understood to be included as a part of the excavation. 3.2.O.a. EXISTING STRUCTURES (1) Support and protect from damage all existing pipes, poles, wires, fences, guard rails, curbing, catch basins, manholes, property line markers, and other structures which do not require temporary or permanent relocation. (2) Restore or replace damaged items, without compensation, to the condition in which they were found immediately before the work under this project was begun. 3.2.1. ROCK EXCAVATION 3.2.1.a. GENERAL: (1) Rock consists of such materials in the original bed or well defined ledges which, in the opinion of the Engineer, cannot be removed with pick and shovel, ditching machine, backhoe, or other similar devices and which re uires drillin and blastin or the use of jack hammers or bull oints. Concrete and mason structures that re uire drillin and blastin for removal will be considered as rock unless q 9 9, 1 P ry q 9 9 otherwise provided for herein. Boulders or detached pieces of rock having volumes of more than 8 cubic feet are considered as rock. (2) Excavate rock, if encountered, to the lines and grades indicated on the Drawings or as directed; dispose of the excavated materials, and furnish acceptable material for backfill in place of the excavated rock. (3) In general, excavate rock in pipe trenches so as to be no less that 12 inches from the pipe after it has been laid. Before the pipe is laid, backfill the trench to the correct subgrade with thoroughly compacted, suitable material or, when so specified or indicated on the Drawings, with the same material as that required for bedding the pipe, furnished and placed at the expense of the Contractor. 3.2.O.a. EXCESS ROCK EXCAVATION: (1) If rock is excavated beyond the limits indicated on the Drawings, specified, or authorized in writing by the Engineer, the excess excavation, whether resulting from overbreakage or other causes, shall be backfilled, by and at the expense of the Contractor, as specified below: (2) In pipe trenches, fill excess excavation below the elevation of the top of the bedding, cradle, or envelope with material of the same type, placed and compacted in the same manner, as specified for the bedding, cradle, or envelope. Fill excess excavation above said elevation with earth as specified in the parograh 3.3.2., TRENCH BACKFILL. (3) In excavations for structures, fill excess excavation in the rock beneath foundations with concrete. Fill other excess excavation with earth as specified in the paragraph 3.3.1., BACKFILL AROUND STRUCTURES. 3.2.O.a. SHATTERED ROCK: If the rock below normal depth is shattered due to drilling or blasting operations of the Contractor, and the Engineer considers such shattered rock to be unfit for foundations, remove the shattered rock and backfill the excavation with concrete as required, except that in pipe trenches, screened gravel may be used for backfill, if approved. All such removal and backfilling shall be done by and at the expense of the Contractor. 3.2.O.b. PREPARATION OF ROCK SURFACES (1) Whenever so directed during the progress of the work, remove all dirt and loose rock from designated areas and clean the surface of the rock thoroughly, using steam to melt snow and ice, if necessary. Remove water in depressions as required so that the whole surface of the designated area can be inspected to determine whether seams or other defects exist. (2) Leave the surfaces of rock foundations sufficiently rough to bond well with the structures and embankments to be built thereon, and if required, cut to rough benches or steps. (1) Before any structure or embankment is built on or against the rock, clean from the rock all vegetation, dirt, sand, clay, boulders, scale, excessively cracked rock, loose fragments, ice, snow, and other objectionable substances. Use picking, barring, wedging, streams of water under sufficient pressure, stiff brushes, hammers, steam jets, and other effective means to accomplish this cleaning. Remove all free water left on the surface of the rock. 1.2.0.0. REMOVAL OF BOULDERS: Remove piles of boulders or loose rock encountered within the limits of earth embankments to a suitable place of disposal. 1.2.0.b. DISPOSAL OF EXCAVATED ROCK: Excavated rock may be used in backfilling trenches subject to the following limitations: (1) Do not use pieces of rock larger than permitted under the paragraph 3.3.2., TRENCH BACKFILL. (2) The quantity of rock used as backfill in any location must not be so great as to result in the formation of voids. (3) Do not place rock backfill within 16 inches of the surface of the finish grade, or in embankments for aeration basins. (4) Dispose of surplus excavated rock as specified in the subsection entitled DISPOSAL OF SURPLUS MATERIAL. 1.3. BACKFILL 1.3.1. BACKFILL AROUND STRUCTURES 1.3.1.0. GENERAL: Unless otherwise specified or indicated on the Drawings, use suitable material for backfill which was removed in the course of making the construction excavations. Do not use frozen material for the backfill and do not place backfill upon frozen material. Remove previously frozen material before new backfill is placed. 1.3.1.b. MATERIAL: Approved selected materials available from the excavations may be used for backfilling around structures. Obtain material needed in addition to that of construction excavations from approved banks or other approved deposits. Furnish all borrow material needed on the work. Place and compact all material, whether from the excavation or borrow, to make dense, stable fill. Use fill material which contains no vegetation, masses or roots, individual roots over 18 inches long or more than 1/2—inch in diameter, stones over 4 inches in diameter, or porous matter. Organic matter must not exceed minor quantities. 1.3.1.c. PLACING BACKFILL: Do not place backfill against or on structures until they have attained sufficient strength to support the loads (including construction loads) to which they will be subjected, without distortion, cracking, or other damage. Make special leakage tests, if required, as soon as practicable after the structures are structurally adequate and other necessary work has been done. Use the best of the excavated materials in backfilling within 2 feet of the structure. Avoid unequal soil pressures by depositing the material evenly around the structure. Place fill and backfill in layers not more than 6 inches thick, except as specified otherwise herein, and compact each layer evenly to the specified density. Do not backfill against concrete without Engineer's approval. 1.3.2. TRENCH BACKFILL 1.3.2.x. GENERAL: (1) Unless otherwise specified or indicated on the Drawings, use suitable material for backfill which was removed in the course of making the construction excavations. Do not use frozen material for the backfill and do not place backfill on frozen material. Remove previously frozen material before new backfill is placed. Start backfilling as soon as practicable after the pipes have been laid, or the structures have been built and are structurally adequate to support the loads, including construction loads to which they will be subjected, and proceed until its completion. (2) With the exception mentioned below in this paragraph, do not backfill trenches at pipe joints until after that section of the pipeline has successfully passed any specified tests required. Should the Contractor wish to minimize the maintenance of lights, and barricades, and the obstruction of traffic, he may, at his own risk, backfill the entire trench as soon as practicable after installation of pipe and the related structures have acquired a suitable degree of strength. He shall, however, be responsible for removing and later replacing such backfill, at his own expense, should he be ordered to do so in order to locate and repair or replace leaking or defective joints or pipe. 1.3.0.0. MATERIALS: The nature of the materials will overn both their acce tabilit for backfill and the methods best suited for their lacement and com action in the backfill. Both are subject to the 9 P Y P P 1 approval of the Engineer. Do not place stone or rock fragments larger than (2) inches in greatest dimension in the backfill. Do not drop large masses of backfill material into the trench in such a manner as to endanger the pipe line. Use a timber grillage to break the fall of material dropped from a height of more than 5 feet. Exclude pieces of bituminous pavement from the backfill unless their use is expressly permitted. 1.3.0.b. ZONE AROUND PIPE: Place bedding material to the level shown on the Drawings and work material carefully around the pipe to insure that all voids are filled, particularly in bell holes. For backfill up to a level of 2 feet over the top of the pipe, use only selected materials containing no rock, clods or organic materials. Place the backfill and compact thoroughly under the pipe haunches and up to the mid—line of the pipe in layers not exceeding 6 inches in depth. Place each layer and tamp carefully and uniformly so as to eliminate the possibility of lateral displacement. Place and compact the remainder of the zone around the pipe and to a height of one foot above the pipe in layers not exceeding 6 inches and compact to a maximum density of at least 100 percent as determined by ASTM D698. 1.3.0.c. TAMPING 1 De osit ands read backfill materials in uniform arallel la ers not exceedin 12 inches thick before com action. Tam each la er before the next la er is laced to obtain a thorou hl com acted () P P , P Y 9 P P Y Y P 9 Y P mass. Furnish and use, if necessary, an adequate number of power driven tampers, each weighing at least 20 pounds for this purpose. Take care that the material close to the bank, as well as in all other portions of the trench, is thoroughly compacted. When the trench width and the depth to which backfill has been placed are sufficient to make it feasible, and it can be done effectively and without damn a to the a backfill ma on a roval be com acted b the use of suitable rollers tractors or similar owered a ui ment instead of b tam in . For com action b tam in or rollin the rate 9 P P, Y, PP P Y P q P Y P 9 P Y P 9( 9), at which backfilling material is deposited in the trench shall not exceed that permitted by the facilities for its spreading, leveling and compacting as furnished by the Contractor. 2 Wet the material b s rinklin if necessa to insure ro er com action b tam in or rollin . Perform no com action b tam in or rollin when the material is too wet either from rain or () Y P 9, ry, P P P Y P 9( 9) P Y P 9( 9) applied water to be compacted properly. 1.3.0.0. TRENCH COMPACTION: Com act backfill in a trenches to the maximum densit as shown on the Drawin s or as listed in the subsection entitled COMPACTION with a moisture content within P PP Y 9 the range of values of maximum density as indicated by the moisture—density relationship curve. 1.4. SITE GRADING 1.4.1. GENERAL: Uniformly grade areas within limits of grading under this section, including adjacent transition areas. Smooth finish the surface within specified tolerances; compact with uniform levels or slo es between oints where elevations are shown or between such oints and existin rades. P P P 99 1.4.2. GROUND SURFACE PREPARATION: Remove vegetation, debris, unsatisfactory soil materials, obstructions, and deleterious materials from ground surface prior to placement of fills. Plow, strip, or break u slo ed surfaces stee er than 1 vertical to 4 horizontal so that fill material will bond with existin surface. Sha a the sub rade as indicated on the Drawin s b forkin furrowin or lowin so that P P P 9 P 9 9 Y 9, 9• P 9 the first layer of new material placed thereon will be well bonded to it. 1.4.3. PLACEMENT AND COMPACTION 1.4.3.0. Place backfill and fill materials in la ers not more than 6 inches in loose de th. Before com action moisten or aerate each la er as necessa to rovide the o timum moisture content. Y P P Y ry P P Com act each la er to the re uired ercenta a of maximum densit for each area classification. Do not lace backfill or material on surfaces that are mudd frozen or contain frost or ice. P Y q P 9 Y P Y, 1.4.3.b. In areas not accessible to rollers or com actors com act the fill with mechanical hand tam ers. If the mixture is excessive) moistened b rain aerate the material b means of blade P P P Y Y , Y graders, harrows, or other approved equipment, until the moisture content of the mixture is satisfactory. Finish the surface of the layer by blading or rolling with a smooth roller, or a combination thereof, and leave the surface smooth and free from waves and ine ualities. q 1.4.3.c. Place backfill and fill materials evenly adjacent to structures, to the required elevations. Take care to prevent wedging action of backfill against structures. Carry the material uniformly around all parts of the structure to approximately the same elevation in each lift. 1.4.3.d. When existing ground surface has a density less than that specified under the subsection entitled COMPACTION for the particular area classification, break up the ground surface, pulverize, moisture—condition to the o timum moisture content and com act to re uired de th and ercenta a of maximum densit . P P q P P 9 Y 1.4.4. GRADING OUTSIDE BUILDING LINES: Grade to drain awa from structures to revent ondin of water. Finish surfaces free from irre ular surface chan es. Y P P 9 9 9 1.4.5. PLANTING AREAS: Finish areas to receive to soil to within not more than one inch above or below the re uired sub rade elevations com acted ass ecified and free from irre ular surface chan es. P q 9 , P P 9 9 1.4.6. WALKS: Shape the surface of areas under walks to line, grade, and cross—section, with the finish surface not more than zero inches above or one inch below the required subgrade elevation, compacted as specified, and graded to prevent ponding of water after rains. 1.4.7. PAVEMENTS 1.4.7.0. Shape the surface of the areas under pavement to line, grade and cross section, with finish surface not more than 1/2—inch above or below the required subgrade elevation, compacted as specified, and graded to prevent ponding of water after rains. Include such operations as plowing, discing, and any moisture or aerating required to provide the optimum moisture content for compaction. 1.4.7.b. Fill low areas resulting from removal of unsatisfactory soil materials, obstructions, and other deleterious materials, using satisfactory soil material. Shape to line, grade, and cross section as shown on the Drawings. 1.4.8. GRADING SURFACE OR FILL UNDER BUILDING SLABS: Grade smooth and even, free of voids, compacted as specified, and to required elevation. Provide final grades within a tolerance of 1/4—inch when tested with a 10—foot straightedge. 1.4.9. PROTECTION OF GRADED AREAS: Protect newly graded areas from traffic and erosion, and keep free of trash and debris. Repair and re—establish grades in settled, eroded, and rutted areas to specified tolerances. 1.4.10.RECONDITIONING COMPACTED AREAS: Where completed compacted areas are disturbed by subsequent construction operations or adverse weather prior to acceptance of work, scarify surface, reshape, and compact to required density prior to further construction. 1.5. RESPREADING TOPSOIL 1.5.1. GENERAL 1.5.1.a. This work consists of preparing the ground surface for topsoil application and removing topsoil from stockpile and placing and spreading the topsoil on smooth, graded areas in accordance with these Specifications. 1.5.1.b. Supply topsoil reasonably free from subsoil, clay lumps, stones, or other similar objects larger than 2 inches in greatest diameter, brush, stumps, roots, objectionable weeds or litter, excess acid or alkali, or any other material or substance which may be harmful to plant growth or a hindrance to subsequent smooth grading, planting, and maintenance operations. 1.5.1.c. Respread topsoil on all excavated areas and areas damaged by the work. 1.5.1.d. Clear the surface of the areas to be topsoiled of all stones larger than (2) inches in greatest dimension and all litter or other material which may be detrimental to proper bonding, the rise of capillary moisture, and the proper growth of the desired planting. Maintain the grades on the areas to be topsoiled in a true and even condition. Where grades have not been established, smooth grade the area and leave the surface at the prescribed grades in an even and properly compacted condition, which insofar as practical will prevent the formation of low places or pockets where water will stand. 1.5.1.e. Dump the topsoil in separate piles uniformly distributed on the designated areas so that when spread it will give a 4—inch depth of compacted topsoil over the graded area. Leave in place the Iles of to soil on an iven area until it has been determined that the re uirements of the S ecifications have been met and s readin has been authorized b the En ineer. Even/ s read the to soil P P Y 9 q P P 9 Y 9 Y P P over the areas b a blade rader or other a ui ment. S read in such a manner that rassin o erations can roceed with a minimum of soil re aration or tillin . Correct an irre ularities in the surface Y 9 q P P 9 9 P P P P 9 Y 9 , resultin from to soilin or other o erations insofar as ractical to revent the formation of low laces and ockets where water will stand. Do not lace to soil when it or the round surface is frozen 9 P 9 P P P P P P P 9 , excessively wet, or in a condition otherwise unsatisfactory for preparation of planting surfaces or smooth grading operations. 1.5.1.f. After the topsoil has been spread and the area smoothed to the specified grades, clear the surface of all stones, roots, other objects larger than 2 inches in greatest diameter, and of all wire, brush or other objects that may interfere with subsequent planting or maintenance operations. Remove promptly any topsoil or other dirt which may be brought upon concrete as a result of hauling of topsoil. 1.6. COMPACTION 1.6.1. GENERAL: Control soil com action durin construction rovidin at least the minimum ercenta a of densit s ecified for each area classification. P 9 P 9 P 9 Y P 1.6.2. PERCENTAGE OF MAXIMUM DENSITY RE UIREMENTS: After com action all fill will be tested in accordance with Method "C" of ASTM D698 unless s ecified otherwise. Exce t as noted otherwise for the Q P P P zone around pipe, provide not less than the following percentages of maximum density of soil material compacted at optimum moisture content, for the actual density of each layer of soil material—in—place. STRUCTURE FOUNDATIONS:Top 12" — 100%; Remainder — 95%UNDER BUILDING SLABS:Top 12" — 100%; Remainder — 95%UNPAVED AREAS:Compact full depth to — 92%WALKWAYS:Top 18" — 100%; Remainder — 95%DRIVES AND PARKING:To 24" — 100%• Remainder — 98%TRENCH BACKFILL PAVED AREAS :To 18" — 100%• Remainder — 95%TRENCH BACKFILL UNPAVED AREAS :Com act full de th to — 92%ALL OTHER BACKFILL: Top 24" — 100%; Remainder — 95%. 1.6.3. MOISTURE CONTROL: Where subgrade or layer of soil material must be moisture conditioned before compaction, uniformly apply water to surface of subgrade, or layer of soil material, to prevent free water appearing on surface during or subsequent to compaction operations. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to specified density. Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread and allowed to dry. Assist drying by discing, harrowing or pulverizing, until moisture content is reduced to a satisfactory value, as determined by moisture—density relation tests. 1.7. CARE AND RESTORATION OF PROPERTY 1.7.1. GENERAL 1.7.1.x. Enclose the trunks of trees which are to remain adjacent to the work with substantial wooden boxes of such height as may be necessary to protect them from piled material, equipment or equipment operation. Use excavating machinery and cranes of suitable type and operate the equipment with care to prevent injury to remaining tree trunks, roots, branches and limbs. 1.7.1.b. Do not cut branches, limbs, and roots except by permission of the Engineer. Cut smoothly and neatly without splitting or crushing. In case of cutting or unavoidable injury to branches, limbs, and trunks of trees, neatly trim the cut or injured portions and cover with an application of grafting wax or tree healing paint as directed. 1.7.1.c. Protect by suitable means all cultivated hedges, shrubs and plants which might be injured by the Contractor's operations. Promptly heel in any such trees or shrubbery necessary to be removed and replanted. Perform heeling in and replanting under the direction of a licensed and experienced nurseryman. Replant in their original position all removed shrubbery and trees after construction operations have been substantially completed and care for until growth is re—established. 1.7.1.d. Replace cultivated hedges, shrubs, and plants injured to such a degree as to affect their growth or diminish their beauty or usefulness, by items of kind and quality at least equal to the kind and quality existing at the start of the work. 1.7.1.e. Do not operate tractors, bulldozers or other power—operated equipment on paved surfaces if the treads or wheels of the equipment are so shaped as to cut or otherwise injure the surfaces. 1.7.1.f. Restore all surfaces, including lawns, grassed, and planted areas which have been injured by the Contractor's operations, to a condition at least equal to that in which they were found immediately before the work was begun. Use suitable materials and methods for such restoration. Maintain all restored plantings by cutting, trimming, fertilizing, etc., until acceptance. Restore existing property or structures as promptly as practicable and do not leave until the end of construction period. 1.7.2. FENCES: Remove fences which interfere with the Contractor's operation and (unless otherwise specified) later restore them to a condition at least as good as that in which they were found immediately before the work was begun, all without additional compensation. Restore fences as promptly as possible and do not leave until the end of the construction period. 1.7.3. PROPERTY MARKERS: Replace property line markers which are disturbed or removed. Have this work performed by a Registered Land Surveyor. (End of Section 02220) SECTION 02611 GRADED AGGREGATE BASE COURSE 1. GENERAL 1.1. RELATED DOCUMENTS Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, material, equipment, and services indicated on the Drawings, or specified herein or reasonably necessary for and incidental to a complete job. 1.2. DESCRIPTION OF WORK The work includes the placement of a graded aggregate base course upon a prepared subgrade and a prime coat, when directed, at locations shown on the Drawings. 1.3. RELATED WORK SPECIFIED ELSEWHERE Excavation and Backfill Section 02220 1.4. QUALITY ASSURANCE 1.4.1. Referenced Standards: Unless otherwise indicated, all referenced standards shall be the latest edition available at the time of bidding. Any requirements of these Specifications shall in no way invalidate the minimum requirements of the referenced standards. NCDOT North Carolina Department of Transportation Standard Specifications for Highway Construction, Latest Edition 1.4.2. Qualifications Of Workmen: Assign at least one person who is thoroughly trained and experienced in the skills required, who is completely familiar with the design and application of the work described for this Section, and who will be present at all times during progress of the work of this Section and direct all work performed under this Section. 1.4.3. For actual finishing of asphaltic concrete surfaces and operation of the required equipment, use only personnel thoroughly trained and experienced in the skills required. 1.5. JOB CONDITIONS 1.5.1. DUST CONTROL: Use all means necessary to prevent the spread of dust during performance of the work of this Section. Thoroughly moisten all surfaces as required to prevent dust being a nuisance to the public, neighbors, and concurrent performance of other work on the job site. 2. PRODUCTS 2.1. GRADED AGGREGATE BASE COURSE 2.2. Comply with the applicable material requirements of NCDOT Standard Specifications for Highway Construction. 2.3. PRIME COAT 2.4. Comply NCDOT Standard Specifications for Highway Construction, Bituminous Materials, for base priming when specified on the Drawings or directed by the Engineer. 3. EXECUTION 3.1. INSTALLATION, GENERAL 3.1.1. Subgrade: Preparation of the subgrade is covered in the applicable provisions of Section 02220, EXCAVATION AND BACKFILL. Construct the subgrade to consist of compacted fill material specified in the referenced section. 3.1.2 Loose Material: Remove all loose material from the compacted subgrade surface immediately before placing base course. 3.1.3 Proof—Roll: Proof—roll prepared subgrade surface to check for unstable areas and the need for additional compaction. Notify the Engineer of unsatisfactory conditions. Do not begin base course work until such conditions have been corrected and are ready to receive paving. 3.1.4 Thicknesses: Install thickness of base course as indicated on the Drawin s. In— lace com acted thicknesses will not be acce table if exceedin the followin allowable variation from thicknesses 9 P P P 9 9 shown on the Drawings: 3.1.5 Base Course: 1/2—inch 3.1.6 Surface Smoothness: Test the finished surface of the base course for smoothness, using a 3.1 m straightedge applied parallel with, and at right angles to, centerline of paved area. Surfaces will not be acceptable if exceeding the following tolerance for smoothness: 3.1.7 Base Course Surface: 1/4—inch 3.1.8 Grade Control: Establish and maintain the required lines and grades, including crown and cross—slope, for each course during construction operations. 3.2 GRADED AGGREGATE BASE COURSE 3.2.1 General: This work shall consist of a graded aggregate base course composed of materials as described in NCDOT Standard Specifications for Highway Construction, placed on a prepared foundation, mixed, shaped, compacted, and primed (when directed), all in accordance with these specifications. The base course shall conform to the lines, grades, dimensions and cross—sections shown on the Plans or as directed by the Engineer. 3.2.2 Installation Requirements: Comply with the requirements of NCDOT Standard Specifications for Highway Construction. 3.2.3 Prime Coat: Comply with the requirements of NCDOT Standard Specifications for Highway Construction. (End of Section 02611) SECTION 02612 BITUMINOUS PAVING 1. GENERAL 1.1. RELATED DOCUMENTS 1.2. Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, material, equipment, and services indicated on the Drawings, or specified herein or reasonably necessary for and incidental to a complete job. 1.3. DESCRIPTION OF WORK 1.3.1. GENERAL: 1.3.1.a. The extent of bituminous paving is shown on the Drawings and includes (but is not necessarily limited to) bituminous paving of roads, driveways, and parking areas. 1.3.1.b. The work includes the placement of an graded aggregate base course upon a prepared subgrade, a bituminous tack coat and wearing surface of asphaltic concrete. 1.3.2. RELATED WORK SPECIFIED ELSEWHERE: Excavation and Backfill Section 02220 1.4. QUALITY ASSURANCE 1.4.1. REFERENCED STANDARDS: Unless otherwise indicated all referenced standards shall be the latest edition available at the time of biddin . An re uirements of these S ecifications shall in no w0 9 Y q P Y invalidate the minimum re uirements of the referenced standards. q NCDOT North Carolina State Highway Department Standard Specifications for Highway Construction, Latest Edition 1.4.2. QUALIFICATIONS OF WORKMEN: 1.4.2.a. Assi n at least one erson who is thorou hl trained and ex erienced in the skills re uired who is com letel familiar with the desi n and a lication of the work described for this Section 9 P 9 Y P q P Y 9 PP , and who will be present at all times during progress of the work of this Section and direct all work performed under this Section. 1.4.2. b. For actual finishing of asphaltic concrete surfaces and operation of the required equipment, use only personnel thoroughly trained and experienced in the skills required. 1.5. JOB CONDITIONS 1.5.1. WEATHER LIMITATIONS: Apply bituminous tack coats only when the ambient temperature in the shade is above 50 degrees F. and when the temperature has not been below 35 degrees F. for 12 hours immediately prior to application. Construct bituminous surface course only when atmospheric temperature is above 40 degrees F., when the underlying base is dry, and when the weather is not rainy. Base course ma be laced when air tem erature is not below 30 de rees F. and risin unless otherwise directed b the En ineer. Y P P 9 9, Y 9 1.5.2. DUST CONTROL: Use all means necessa to revent the s read of dust durin erformance of the work of this Section. Thorou hl moisten all surfaces as re uired to revent dust bein a ry P P 9 P 9 Y q P 9 nuisance to the ublic nei hbors and concurrent erformance of other work on the ob site. P 9 , P 1 1.5.3. PROTECTION: Use all means necessa to rotect avement materials before durin and after installation and to rotect the installed work and materials of all other trades. ry P P , 9� � P 1.5.4. REPLACEMENTS: In the event of damage, immediately make all repairs and replacements necessary, to the approval of the Engineer, and at no additional cost to the Owner. 1.6. PRODUCT DELIVERY 1.6.1. GENERAL: Transport asphalt cement mixtures from the mixing plant to the project site in trucks having tight, clean compartments. Provide covers over asphalt cement mixture when delivering to protect the mixture from weather and to prevent loss of heat. During period of cool weather or for long—distance deliveries, provide insulation around entire truck bed surfaces. 2. PRODUCTS 2.1. GRADED AGGREGATE BASE COURSE: Comply with the applicable Subsections of NCDOT Specifications, GRADED AGGREGATE BASE COURSE (with prime). 2.2. HOT MIX ASPHALT SURFACE COURSE: Comply with the requirements of NCDOT Specifications, HOT MIX ASPHALT SURFACE COURSE. 2.2.1. COMPOSITION OF MIXTURE: Com I with the re uirements of NCDOT S ecifications Com osition of Mixture T e 1. Furnish sam les if re uested b the En ineer. P Y q P P YP P q Y 9 2.3. PARKING LINE PAINT: Provide white lane marking paint with chlorinated rubber base, a factory—mixed, quick—drying, non—bleeding material complying with FS TT—P-115, Type III, unless otherwise acceptable to the Engineer. 3. EXECUTION 3.1. INSPECTION 3.1.1. Examine the areas and conditions under which the bituminous avin will be installed and notif the En ineer in writin of conditions detrimental to the ro er and time) com letion of the work. Do P 9 Y 9 9 P P Y p not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. 3.1.2. Verify that pavement may be installed in strict accordance with the original design, all pertinent codes and regulations, and all pertinent portions of the referenced standards. 3.2. INSTALLATION, GENERAL 3.2.1. SUBGRADE: Preparation of the subgrade is covered in the applicable provisions of Section 02220, EXCAVATION AND BACKFILL. Construct the subgrade to consist of compacted fill material specified in the referenced section. 3.2.2. LOOSE MATERIAL: Remove all loose material from the com acted sub rade surface immediate) before lacin bituminous materials. P 9 Y P 9 3.2.3. PROOF—ROLL: Proof—roll prepared subgrade surface to check for unstable areas and the need for additional compaction. Notify the Engineer of unsatisfactory conditions. Do not begin paving work until such conditions have been corrected and are ready to receive paving. 3.2.4. THICKNESSES: Install thicknesses of base courses and surface courses as indicated on the Drawings for varying traffic and loading conditions. In—place compacted thickness' will not be acceptable if exceedin the followin allowable variation from thickness' shown on the Drawin s: 9 9 9 Base Course: 1/2", plus or minus Surface Course: 1/4", plus or minus 3.3. SURFACE SMOOTHNESS: 3.3.1. Test the finished surface of each asphalt concrete course for smoothness, using a 10' straightedge applied parallel with, and at right angles to, centerline of paved area. Surfaces will not be acceptable if exceeding the following tolerances for smoothness: Base Course Surface: 1/4" Wearing Course Surface: 3/16" 3.3.2. Check surfaced areas at intervals as directed by the Engineer. Test crowned surfaces with a crown template, centered and at right angles to the crown. Surfaces will not be acceptable if the finished crown surfaces vary more than 1/4" from the crown template. 3.3.3. GRADE CONTROL: Establish and maintain the required lines and grades, including crown and cross—slope, for each course during construction operations. 3.4. FRAME ADJUSTMENTS: 3.4.1. Set frames for manholes and other such units, within areas to be paved, to final grade as part of this work. Include existing frames or new frames furnished in other sections of these Specifications. 3.4.2. Surround frames set to grade with a ring of compacted asphalt concrete base prior to paving. Place asphalt concrete mixture up to one inch below top of frame; slope to grade, and compact with hand tamp. 3.4.3. Adjust frames as required for paving. Provide temporary closures over openings until completion of rolling operations. Remove closures at completion of the work. Set cover frames to grade, flush with surface of adjacent pavement. 3.5. EQUIPMENT: 3.5.1. The method employed in performing the work and all equipment, plant, machinery and tools, used in handling the materials and performing any part of the work shall be subject to the approval of the Engineer before work is started, and when found unsatisfactory shall be changed and improved as required. All equipment, tools, machinery and plants used must be maintained in a satisfactory working condition. 3.5.2. Comply with the requirements of NCDOT Specifications. 3.6. CONSTRUCTION REQUIREMENTS: 3.6.1. Comply with the requirements of NCDOT Specifications. 3.7. GRADED AGGREGATE BASE COURSE 3.7.1. GENERAL: This work consists of a base course composed of course aggregate, together with fine aggregate or binder material with water which is mixed, compacted, and primed, all in accordance with these Specifications and in conformity with the lines, grades, and typical cross section shown on the Drawings or as otherwise specified. 3.7.2. INSTALLATION REQUIREMENTS: Comply with the requirements of NCDOT Specifications. 3.7.3. PRIME COAT: Comply with the requirements of NCDOT Specifications. 3.8. HOT MIX ASPHALT SURFACE COURSE 3.8.1. INSTALLATION REQUIREMENTS: 3.8.1.0. Comply with the requirements of NCDOT Specifications, Equipment Requirements, and Construction Requirements. 3.8.1.b. Conform to the lines, grades, and cross sections indicated on the Drawings with thickness shown after full compaction. 3.8.2. TYING TO EXISTING BITUMINOUS PAVEMENT: Where new pavement ties to existing pavement, cut the existing pavement to a straight line and completely remove all materials on the new pavement side of the cut and replace with new materials. Coat the cut line with a tack coat to furnish a bond between the existing surface course and the new surface course. Do not allow the new work to overlap the existin work. Notif the ro er authorities at least 10 da s before be innin the work of t in to the existin work. 9 Y P P Y 9 9 Y 9 9 3.8.3. DELAY OF SURFACE COURSE INSTALLATION: Install the base course durin construction of the roject. Immediate/ rior to the com letion of the roject brin the base course to the s ecified 9 P 1 Y P P P 1 , 9 P thickness, true the edges, apply a tact coat, in accordance with the type of base course used, then apply the surface course. 3.8.4. DRAINAGE: Crown or slope all paved areas for complete water drainage under all weather conditions. If required by the Engineer, hose down the surface to demonstrate proper drainage at the preliminary review when the project is completed and again at the end of the one year guarantee period. Remove and replace any area that shows puddling 30 minutes after hosing, at no additional cost to the Owner. 3.8.5. REMEDIAL MEASURES: Upon direction of the engineer, cut out and/or rework all surfaces and subgrade areas which do not meet the requirements of this Section; perform all remedial measures at no additional cost to the Owner. 3.8.6. PARKING LINE PAINTING: Paint parking lines 4 inches wide and of lengths indicated on the Drawings. Paint with mechanical equipment providing uniform straight edges, applied in 2 coats at the manufacturer's recommended rates. 3.8.7. CLEAN UP: Upon completion of paving, remove all surplus materials, dunnage, cartons, and other debris resultant from work of this Section. Leave entire work in satisfactory, acceptable, broom—clean condition. (End of Section 02612) SECTION 03300 CAST—IN—PLACE CONCRETE 1. GENERAL 1.1 SECTION INCLUDES A. Cast—in—place concrete 1.2 REFERENCES A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced to in the text by basic designation only. 1. AMERICAN CONCRETE INSTITUTE (ACI) a. ACI 304R Guide for Measuring, Mixing, Transporting, and Placing Concrete b. ACI 318/318R Building Code Requirements for Reinforced Concrete 2. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) a. ASTM A 615 Deformed and Plain Billet—Steel Bars for Concrete Reinforcement b. ASTM C 94 Ready—Mixed Concrete 1.3 SUBMITTALS A. SD -05, Design Data 1. Concrete mix designs. 1.4 QUALITY ASSURANCE A. Perform Work in accordance with ACI 301. PART 2 PRODUCCTS 2.1 CONCRETE A. Concrete: ASTM C 94: 4500 psi at 28 days using Type I or Type II cement; air—entrained to produce 5— to 7—percent air content, 4—inch maximum slump. 1. Aggregate for concrete: ACI 318. 2. Bar reinforcement: ASTM A 615, Grade 60, deformed. PART 3 EXECUTION 3.1 PLACEMENT A. The Engineer shall be contacted prior to placing all concrete to allow time for inspection. Place concrete in accordance with ACI 304R. Protect concrete from premature drying and excessively hot and cold temperatures. Maintain minimal moisture loss at a relatively constant temperature for the time necessary for hydration of the cement and proper hardening of the concrete. Cure for a minimum period of 7 days. 3.2 FORMWORK A. Provide formed surfaces with plywood finish. Use commercially manufactured metal ties and other form accessories. Leave no metal within 1 inch of surface in exposed work. Patch tie holes and repairable defective areas immediately after form removal. Remove honeycombed and defective concrete down to sound concrete. Use patching mortar consisting of one part cement to 2-1/2 parts sand with no more mixing water than necessary for handling and placing. W LJJ U Z L1J V Q G LL_ CA R CLAYTON 9 ENGINEERING & m DESIGN, PLLC. CD ;0 _ � ; No. P 1463 Q / �; F �� ,, OFA N CARO :� � / _: p� OFESS�O' Z ' �. �-7 . 2 SE _ 40 F G 'o ... • t �� y q M S . C� P%%%% ��,"""",`,, 09/24/18 Z i W _ c� N x 0 m o O� 0 LLj U 07 z w Z w O � Y 1W 07 U � _ W r W0 c� W U Z O U Q W W O C.3 Q W Q � J � O J w � O = o U) w _ W & a o z z Q o O = ~ U W m > Ir W Z CIVIL W z O Q U_ U_ U 9 W 1 0- Q W0 U M 0- JOB NUMBER: 18023 DATE 09/24/18 DRAVN,N BY. WSC CHECKED BY: WSC REVISIONS 10 DESCRIPTION DATE SPC103 SHEET 13 OF 14 z O U Q J Q Cts LU J O H U W m Cn W C0 J J_ H z LJJ LJJ U z Z Z Q D Z Q H U LL- LJJ H U cc Q W W Z_ Ct•3 Z W LJJ _ H LJ_ O H Z W Z O U z LJJ H Cc H O _ H Cc Q 0— Z: Ir O W J O _ Z_ 0 W C/) W C0 H- O Z Q 0 z Q U J J z C13 LJJ 0 025 z Cc LJJ LJJ Z_ C3 Z W Z O U IL O Cc LJJ 0- 0 Cc 0- W _ H w Cc Q Z O LJJ ryw _ H- z C.3 LJJ 0 LJJ _ H 0 z Q C0 C'3 z_ Q 0 LJJ LJJ H- SECTION 02451 REINFORCED CONCRETE PIPE 1. GENERAL 1.1. RELATED DOCUMENTS 1.1.1. Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, material, equipment, and services indicated on the Drawings or specified herein or reasonably necessary for and incidental to a complete job. 1.2. DESCRIPTION OF WORK 1.2.1. The work includes the installation of all reinforced concrete pipe shown on the Drawings. 1.2.2. RELATED WORK SPECIFIED ELSEWHERE: Excavation and Backfill Section 02220 1.3. QUALITY ASSURANCE 1.3.1. REFERENCED STANDARDS: Unless otherwise indicated, all referenced standards shall be the latest edition available at the time of bidding. Any requirements of these Specifications shall in no way invalidate the minimum requirements of the referenced standards: NCDOT North Carolina Department of Transportation Standard Specifications for Highway Construction, Latest Edition ASTM C33 Concrete Aggregates ASTM C76 Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe ASTM C150 Portland Cement ASTM C361 Reinforced Concrete Low— Head Pressure Pipe ASTM C443 Joints for Circular Concrete Sewer and Culvert Pipe, Using Rubber Gaskets AASHTO M 198 Joints for Circular Concrete Sewer and Culvert Pipe Using Flexible Watertight Gaskets ASTM C507 Reinforced Concrete Elliptical Culvert, Storm Drain, and Sewer Pipe ASTM C877 External Sealing Bands for Noncircular Concrete Sewer, Storm Drain, and Culvert Pipe ASTM C990 Joints for Concrete Pipe, Manholes, and Precast Box Sections Using Preformed Flexible Joint Sealants 1.3.2. MANUFACTURER'S QUALIFICATIONS: Only the products of a manufacturer regularly engaged in the manufacture of pipe used for the conveyance of water will be acceptable. 1.3.3. INSPECTION AND ACCEPTANCE OF PIPE: Acceptance will be on the basis of design, material tests, and inspection of the complete product. The quality of all materials used in the pipe, the process of manufacture, and the finished pipe shall be subject to inspection by the Engineer. Inspection may be made at the place of manufacture, or on the job site after delivery, or at both places and the pipe shall be subject to rejection at any time on account of failure to meet any of the specification requirements, even though sample pipe units may have been accepted as satisfactory at the place of manufacture. All pipe which is rejected must be immediately removed from the project site by the Contractor. 1.3.4. SUBMITTALS SHOP DRAWINGS; PIPE: Before fabrication, submit for approval drawings showing pipe dimensions, joints, reinforcement and other details. 1.3.5. MANUFACTURER'S CERTIFICATION: Manufacturer shall submit a letter certification stating that the pipe is manufactured and tested in accordance with ASTM C76 (latest edition). 2. PRODUCTS 2.1. MANUFACTURE OF PIPE 2.1.1. GENERAL: Use new pipe complying with ASTM C76 or ASTM C507, and with the additional requirements specified herein. Unless otherwise noted on the Drawings, provide Class III pipe with Wall B. All pipe approved will have an interior surface which is free from roughness, projection, indentations, offsets or irregularities of any kind. 2.1.2. PIPE LENGTHS: Furnish pipe in nominal 8 foot lengths. Shorter lengths may be used where required by Construction details or when approved by the Engineer. 2.1.3. LIFT HOLES will not be permitted in pipe. 2.1.4. REPAIRS: Pipe may be repaired, if necessary, because of occasional minor imperfections in manufacture or accidental injury during handling and will be acceptable if, in the opinion of the Engineer, the repairs are sound, properly finished and cured, and the repaired pipe conforms to the requirements of ASTM C76. Use mortar for repairs which has a compressive strength of 6,000 psi at the end of 28 days. 2.1.5. MARKING: Mark all pipe in accordance with ASTM C76; no pipe will be accepted unless these markings appear on all pipe. 2.2. JOINTING 2.2.1. GENERAL: Use rubber gaskets for flexible watertight joints. Conform to ASTM C443. 3. EXECUTION 3.1. INSPECTION 3.1.1. Examine the areas and conditions under which the pipe is to be installed and notify the Engineer in writing of conditions detrimental to the proper and timely completion of the work. Do not proceed with the work until unsatisfactory conditions have been corrected in an acceptable manner. 3.2. EXCAVATION 3.2.1. GENERAL: Excavate trenches in accordance with Section 02220, EXCAVATION AND BACKFILL. 3.3. PIPE HANDLING 3.3.1. GENERAL: Transport pipe to the job site and handle in such a manner as not to damage the pipe. 3.3.2. STOCKPILING: Stockpile within the rights— of— way so that no dangerous conditions will exist to life or property. Store pipe so that damage to surfaces and/or structures will be prevented. Provide suitable devices to support pipe when it is lifted. 3.4. PIPE INSTALLATION 3.4.1. GENERAL: Adhere to the rules, regulations and requirements of OSHA, Occupational Safety and Health Act. 3.4.2. PRECAUTIONS: Lay pipe in d rytrenches only. Keep all trenches completely free of water during beddin9, laying and jointing of pipe. De—water and use sheeting where required by field conditions. Pump or drain all water away from the work and dispose of in a suitable manner so that no damage occurs outside the construction easement. Do not permit water to rise in an unbackfilled trench after pipe has been placed. Promptly an repair damage within the construction easement. P Y 9 3.4.3. TOLERANCES: Unless otherwise directed by the Engineer in writing, lay all pipe straight between changes in alignment and at uniform grade between change in grade. When jointed in the trench, the pipe shall form a true and smooth line. 3.4.4. PIPE LENGTHS: Lay pipe in nominal 8 foot lengths; except the joints adjacent to any manhole shall have a minimum length of 2 feet. 3.4.5. TRENCH AND BED FOR PIPE: Conform to the requirements of NCDOT Standard Specifications. 3.4.5.a. After delivery alongside the trench, visibly inspect each length of pipe for damaged surfaces, breakage and conformance to specifications. 3.4.5.b. Acceptable pipe may be marked with paint or other permanent marking material so that the marks are plainly visible after installation in the trench and before the pipe is covered. Reject, stockpile, and remove from the site all pipe not conforming to specifications. 3.4.5.c. See Drawings for Bedding Conditions. Where no other bedding is indicated, place pipe on a shaped bed of undisturbed material. Before pipe is placed on the bedding material, excavate suitable bell holes so that after placement of the pipe, only the barrel receives bearing pressure from the supporting material. Support the entire length of the unit as shown on the Drawings. 3.4.5.d. Place pipe into its position in the trench in such manner and by such means as approved by the Engineer. Furnish approved devices to support all parts of the pipe unit when it is lifted. Protect pipe during handling against impact shocks and free falls. Do not permit hooks to come in contact with premoulded joint surfaces. Lower pipe into position in the trench and joint without disturbing the bedding or adjoining section of pipe. 3.4.5.e. Handle pipe having premoulded joint rings or attached couplings so that no weight, including the weight of the pipe itself, will bear on or be supported by the jointing material. Take care to avoid dragging the spigot ring on the ground or allowing it to be damaged by contact with gravel, crushed stone, or other hard objects. Do not subject the bell and spigot sections to direct stress of any kind except that required to effect the jointing. 3.4.6. PIPE LAYING: 3.4.6.a. Unless otherwise shown on the Drawings, all pipe will be laid in open trench construction. Start laying pipe at the lowest point and install the pipe so that the spigot end points in the direction of flow. Lay pipe to conform to the lines and grades indicated on the Drawings, unless otherwise directed by the Engineer in writing. 3.4.6.b. Clean all joint surfaces after the pipe units are aligned in the trench and are ready to be joined. Immediately before jointing the pipe, lubricate the bell or groove in accordance with the manufacturer's recommendations. Then carefully push pipe unit into place without damage to the pipe or gasket. Use suitable devices to force the pipe together so that they will fit with a minimum open recess inside or outside and so that they will have tightly sealed joints. Lay each pipe unit to form a close joint with the next adjoining pipe and bring the inverts continuously to the required grade. 3.4.6.c. Immediately after the pipe units are put together, inspect the position of the gasket in the joint using an approved feeler gauge to make sure it is properly positioned. Pull apart and remake all joints, using new gaskets, if the gasket has become damaged or improperly positioned. 3.4.6.d. Make all joints in accordance with manufacturer's recommendations which are subject to approval by the Engineer. Prior to backfill, fill bell holes with bedding materials and compact so that the spigot will not move in the bell of the adjoining pipe under backfill load. Do not permanently support pipe on saddles, blocking or boulders. 3.4.7. TEMPORARY PLUGS: At all times when pipe laying is not actually in progress, close the open end of pipe by temporary watertight plugs or by other approved means. If water is in the trench when work is resumed, do not remove the plug until all danger of earth or other material entering the pipe has passed. 3.4.8. STOPPERS: Close open ends of pipe or fittings to be used for future connections as shown on the Drawings. 3.4.9. BLOCKING: Provide concrete blocking where indicated on the Drawings. 3.4.10.BACKFILL: When pipe has been properly bedded, backfill trenches in accordance with Section 02220, EXCAVATION AND BACKFILL. 3.5. CLEAN UP 3.5.1. Follow backfill, as closely as conditions will allow, with clean up operations. 4. MEASUREMENT AND PAYMENT 4.1. GENERAL The Bid Price shall constitute full compensation for doing each item of work including all activities and incidentals required for the installation and completion of each item in accordance with the Contract Drawings, Specifications and requirements. Unless otherwise indicated and identified as a separate Bid Item to be measured and paid for as an individual and independent item of work, the Bid Price for each item shall be full compensation for the following activities: Furnishing and installing all materials and equipment, including excavation, disposal of surplus excavated or material, backfill, compaction, all necessary shoring and bracing, de—watering, handling water flows, protection of or removing and replacing base and pavement, property corners, signs, fences, landscaping, lawns, above and below ground utility lines and appurtenances, installation and maintenance of temporary sediment and erosion control facilities, maintenance of drives and streets, and cleaning up and establishing a permanent stand of grass on all unpaved disturbed surfaces incidental to the work item specified in the Contract Documents or required in restoring existing property disturbed during construction to its original condition or better. The price shall also constitute full compensation for all cleaning and testing of pipelines, testing of materials installed, and barricades, lighting, and flagmen as required for the protection of public. ITEM NO. 1 — REINFORCED CONCRETE PIPE Pipe will be paid for at the unit price per linear foot for pipe of various materials, types, and sizes measured from center to center of manholes and for various depths of cut measured on the centerline of the trench from the invert of the pipe to ground surface. The price shall include clearing, grubbing, unclassified excavation, stone removal, material laying, pipe bedding material, jointing, backfill, compaction, connection to manholes, pipe testing, surface restoration, cleanup, and all other work required for the satisfactory installation of pipe, except for other items listed in the bid. SECTION 02454 STRUCTURES 1. GENERAL 1.1. RELATED DOCUMENTS Requirements of the General and Supplemental Conditions apply to all Work in this Section. Provide all labor, materials, equipment, and services indicated on the Drawings, or specified herein, or reasonably necessary for or incidental to a complete job. 1.2. DESCRIPTION OF WORK This item shall consist of constructing catch basins, drop inlets and junction boxes, in accordance with these specifications, at the specified locations and conforming to the lines, grades, and dimensions shown on the plans or required by the Engineer. 1.3. RELATED WORK SPECIFIED ELSEWHERE: Excavation and Backfill Section 02220 1.4. QUALITY ASSURANCE 1.4.1. REFERENCE STANDARDS: Unless otherwise indicated, all referenced standards shall be the latest edition available at the time of bidding. Any requirements of these specifications shall in no way invalidate the minimum requirements of the referenced standards. NCDOT North Carolina Department of Transportation Standard Specifications for Highway Construction (Latest Edition) ASTM A615 Deformed and Plain Billet — Steel Bars for Concrete Reinforcement ASTM A616 Rail— Steel Deformed and Plain Bars for Concrete Reinforcement ASTM A617 Axle— Steel Deformed and Plain Bars for Concrete Reinforcement ASTM A706 Low— Alloy Steel Deformed Bars for Concrete Reinforcement ASTM C55 Concrete Building Brick ASTM C270 Mortar for Unit Masonry 1.5. SUBMITTALS 1.5.1. SHOP DRAWINGS; MANHOLE FRAME AND COVERS AND MANHOLE STEPS: Submit for approval shop drawings for grates, drains, manhole covers, frames and steps. 1.5.2. SHOP DRAWINGS; PRECAST CONCRETE MANHOLE SECTIONS: Submit for approval shop drawings for each type precast manhole sections. 2. PRODUCTS 2.1. GENERAL: Unless otherwise noted on the Drawings, the Contractor has the option of providing manholes constructed of concrete brick, concrete masonry units or precast manholes or vaults. 2.2. PORTLAND CEMENT CONCRETE: Concrete shall be 3,000 psi (28 day), as defined by the North Carolina Department of Transportation Standard Specifications for Highway Construction, (Latest Edition), Portland Cement and Portland Cement Concrete. All concrete shall be ready— mixed as produced by a reputable manufacturer, acceptable to the Engineer. 2.3. REINFORCING STEEL: Reinforcing steel shall conform to ASTM A615, A616, A617, or A706, Grade 60 and of the applicable size as indicated on the Detail Drawings. 2.4. CONCRETE BRICK: Concrete brick shall be sound, hard, regular and uniform in shape and of standard size (8" long x 2_ 1/4" high x 3— 5/8" wide). Concrete brick shall conform to ASTM Specifications C55, Grade N— 1. 2.5. MORTAR: Mortar shall be composed of Portland Cement, hydrated lime, and sand, in which the volume of sand shall not exceed three times the sum of the volumes of cement and lime. The proportions of cement and lime shall be as directed and may vary from 1:1/4 to 1:1/2. Mortar shall conform to ASTM C270, Type M. 2.6. CASTINGS: 2.6.1. The casting for the frames and covers shall be of good quality, strong, tough, even_ grained cast iron, smooth, free from scale, lumps, blisters, sand holes, and defects of every nature which would render them unfit for the service for which they are intended. 2.6.2. Frames and covers shall be as shown on the Drawings or approved equal. 2.7. PRECAST MANHOLES OR VAULTS 2.7.1. MANHOLE BASES, CAST—IN—PLACE CONCRETE: Conform to the requirements of Section 03300, CAST_ IN_ PLACE CONCRETE. 2.7.2. MANHOLE BASES, PRECAST CONCRETE: Conform to the requirements of ASTM C478. 2.7.3. MANHOLE SECTIONS, PRECAST CONCRETE: 2.7.3.a.Precast concrete manholes consist of a base section, riser sections, a transition and cone. Provide pipe openings, of suitable size to fit the pipe, in the base section or riser sections as required. Conform to the requirements of ASTM C478 with the following exceptions and additional requirements: Cement: Type II, except as otherwise approved. Minimum Wall Thickness: 5 inches Use gasket type joints as specified herein. Steam cure sections, do not ship for at least five days. 2.7.3.b.Acceptance of the sections will be on the basis of material tests and inspection of the completed project. 2.7.3.c.Suitably shape the tops of the bases by means of accurate bell— ring forms to receive the barrel sections. 2.7.4. RISER JOINTS: Provide riser joints of the rubber gasket type in which the gaskets are in compression and which will permit both longitudinal and angular movement. Design the bell and spigot ends to confine the gasket when the joint is in its final position. Provide each section with proper ends made of concrete formed on machined rings to insure accurate joint surfaces. The diameters of the joint surface, depended upon to compress the gasket, shall not vary from the theoretical diameters by more than 1/16 inch. Seal the joint with a rubber gasket so that the joint will remain tight under all conditions of service. Joints must be capable of withstanding an internal hydrostatic pressure of 10 psi with no visible signs of leakage. 2.7.5. GASKETS: Provide gaskets which conform to applicable sections of ASTM C361. Use gaskets of a special rubber composition having a texture to assure a watertight and permanent seal and the product of a 9 PP 9 P P 9 9 P manufacturer havingat least five ears ex erience in the manufacture of rubber gaskets for pipe joints. Use gaskets which are a continuous ring of flexible joint rubber of a composition and texture which are Y P 9 PP 1 9 9 1 P resistant to common ingredients of sewage, industrial wastes, and ground— water and which will endure permanently under the conditions likely to be imposed by this service. 2.8. CONCRETE MASONRY UNITS 2.8.1. HOLLOW LOAD— BEARING CONCRETE MASONRY UNITS: All concrete masonry units shall be modular in size with a nominal 8" by 16" face dimension for standard units and shall conform to ASTM C90, Grade N, Type I. 2.8.2. MASONRY JOINT REINFORCING: Joint reinforcing shall be made of zinc coated steel wire conforming to ASTM A— 166 Class 1 or ASTM A— 82 and shall be of the welded wire ladder type design with Standard 2.8.2. No. 9 gauge (0.1483") side rods and No. 9 gauge cross ties. Acceptable products include, "Blok— Lok" by A. A. Wire Products Co. and "Ladur Type" by Duro— 0— Wal, Inc. 3. EXECUTION 3.1. GENERAL 3.1.1. BASES: Structure bases may be precast or cast— in— place as indicated on the Drawings. 3.1.2. FRAMES, COVERS, AND/OR GRATES: Set manhole frames with the tops conforming accurately to the grade of the pavement of finished ground surface or as indicated on the Drawings or as directed. Set frames in a full bed of mortar so that the space between the top of the structure masonry and the bottom flange of the frame shall be completely filled with mortar and made watertight. Place a thick ring of mortar extending to the outer edge of the masonry all around the bottom flange. Finish the mortar flush with the top of the flange and with a slight slope to shed water away from the frame. 3.2. PRECAST STRUCTURES 3.2.1. PRECAST MANHOLE SECTIONS: 3.2.1.a.Handle and install each section in such a manner and by such means as to prevent damage. Set sections vertical with sections in true alignment. 3.2.1.b.lnstall base sections on firm stabilized foundation so prepared to prevent settlement and misalignment. Place pipe openings at the exact elevation and location to receive entering pipes. 3.2.1.c.lnstall riser sections, transitions and top sections level and plumb. Make joints in accordance with manufacturer's instructions to ensure a watertight installation. 3.2.1.d.After entering pipes are placed in the pipe openings and set to true alignment and grade, fill the annular space between the pipe and opening with a non— shrink grout to seal the joint watertight or with brick and mortar. When brick and mortar are used the outside of the brick shall be plastered with mortar 1/2 inch thick. 3.2.1.e.Lift holes will be allowed in precast manhole sections. After setting sections in place, thoroughly plug all holes in sections with mortar. Make mortar one part cement to 1— 1/2 parts sand; mix with water until slightly damp to the touch (just short of balling) and hammer mortar into the holes until it is dense and an excess of paste appears on the surface. Then finish smooth and flush with the adjoining surfaces. 3.3. BRICK STRUCTURES 3.3.1. LAYING BRICK: 3.3.1.a.Use only clean brick. Moisten as directed until bricks are neither so dry as to absorb water from the mortar, nor so wet as to be slippery when laid. Lay each brick in a full bed of mortar without requiring subsequent grouting, flushing, or filling. Walls of all structures shall consist of two widths of brick. When laying brick, the direction of every sixth (6) course shall be rotated 90 degrees to provide a tie between the brick courses. 3.3.1.b.Lay brick in level courses with mortar joints approximately 1/2" wide and uniform in thickness. Tool exposed joints and strike flush joints which will be plastered. 3.3.1.c.Set pipes as the work progresses. Completely fill the space between the pipe and masonry to insure a watertight seal. 3.3.2. PLASTERING AND CURING BRICK: Plaster outside face of masonry with mortar 1/2 inch thick. If required, moisten masonry prior to application of plaster. Carefully spread and trowel the plaster so that all cracks are thoroughly worked out. After hardening, check the plaster for bond and soundness by tapping. Remove replace any unbonded or unsound plaster. 3.4. CONCRETE MASONRY UNIT STRUCTURES (CMU) 3.4.1. LAYING CMU'S: CMU's shall not be wetted prior to laying. Lay CMU's in a level running bond patter and in a full bed of mortar approximately 3/8 inch wide and uniform in thickness. Tool all exposed joints and strike flush joints which will be plastered. Cut CMU's by acceptable methods. 3.4.2. REINFORCEMENT: 3.4.2.a.All CMU structures shall have both wall reinforcement and joint reinforcement. Wall reinforcement shall consist of a number 4 rebar placed in every other cell of CMU walls, and shall be tied to the bottom slab reinforcement. All rebar shall be tied with a minimum 12 inch lap. Upon placing rebar each cell of CMU's shall be filled with 4,000 psi concrete. 3.4.2.b.Joint reinforcement shall consist of the ladder type and shall be placed every 16" in height. Joint reinforcing shall be set in a full bed of mortar and shall be tied to adjoining walls with corner units, 32"x32" minimum. 3.4.3. WALL OPENINGS: Opening in walls around pipes shall be filled with either brick and mortar or non— shrink grout. ►►►11111111/j CARO4;-, CLAYTON 9 ENGINEERING & m DESIGN, PLLC. A No. P-1463 Q "'9TF OF A �,. 11111111111► ,,►►1111111///j Q�oF Es SE _ 40 F G ••. `o AS MC 09/24/18 1Z Z i 0 4A W C N Ca X COM 0 Oo Liw C,J Li U Z L7 Z w� Liu 1W I.- U)0 U) U W � r W0 Z CY) Z W U Z O U Q LU O CD � Q C TC 01: J J w O = o U) w _ LU a Z O =o U w m Ir W Z CIVIL W z O Q U_ U- 0 LU W U JOB NUMBER: 18023 DATE 09/24/18 DRAVN,N BY. WSC CHECKED BY: WSC REVISIONS IO DESCRIPTION DATE SPC104 SHEET 14 OF 14