Loading...
HomeMy WebLinkAbout20180340 Ver 2_401 Application_20181115WETLANDS & WATERS Mr. Alan Johnson NC Division of Water Resources c/o 401 and Buffer Permitting Unit 1617 Mail Service Center Raleigh, NC 27699 RE: Sylvan Creek Subdivision, SAW -2015-02027 Sylvan Creek Properties, LLC Nationwide Permit 3 Verification & 401 WQC Denver, Lincoln County, North Carolina C 1 Mr. Johnson, November 12, 2018 Attached, please find information pertaining to a requested Water Quality Certification associated with a recently submitted Pre -Construction Notification for a Nationwide Permit 3 Verification request. This request is for impacts associated with repair of an existing dam and control structure that was damaged as a result of Hurricane Michael on October 11th, 2018. The project is located in Denver, North Carolina, just south of NC -16 Business and north of St. James Church Road. A previous permit verification and corresponding Water Quality Certification was recently issued for impacts associated with the development of this project for the Action ID number referenced above. Impacts consist of 0.13 acres of open water impacts for purpose of the dam and control structure repair and 16 linear feet of stream impacts for purpose of riprap outlet protection. The riprap will be pressed into the stream bed at the existing grade such that there is no loss of function. As such, compensatory mitigation is not proposed for these additional impacts. Please do not hesitate to call if you have any questions about the provided information. Best regards, / �./' 7 lz9 Perry Isner 704.773.4239 Enclosures: Updated Pre -Construction Notification pages Dam Repair Plan and Impact Exhibits Field photos depicting breach CHRISTOPHER HUYSMAN WETLANDS & WATERS, INC. TAMP BANDY 1 70 DEW DROP ROAD 41 OB LB PROPST DRIVE SPARTA, NC 213675 CONOVER, NC 2B61 3 336.406.0906 B2B.302.3437 CHRIS. H UYSMAN@GMAIL. COM JTAMPBAN DY(o_) GMAIL. COM WAT f,9 r Q < Office Use Only: Corps action ID no. DWQ project no. Form Version 1.4 January 2009 Page 1 of 10 PCN Form — Version 1.4 January 2009 Pre -Construction Notification (PCN) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: Section 404 Permit ❑ Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 29, 3 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? Yes ❑ No 1 d. Type(s) of approval sought from the DWQ (check all that apply): 401 Water Quality Certification — Regular ❑ Non -404 Jurisdictional General Permit ❑ 401 Water Quality Certification — Express ❑ Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ❑ Yes 0 No For the record only for Corps Permit: ❑ Yes m No 1f. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in -lieu fee program. ❑ Yes [g No 1g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1h below. ❑ Yes Z No 1 h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ❑ Yes N No 2. Project Information 2a. Name of project: Sylvan Creek 2b. County: Lincoln 2c. Nearest municipality / town: Denver 2d. Subdivision name: Sylvan Creek 2e. NCDOT only, T.I.P. or state project no: 3. Owner Information 3a. Name(s) on Recorded Deed: Multiple Names; see enclosure 3b. Deed Book and Page No. 11 E - 355 3c. Responsible Party (for LLC if applicable): 3d. Street address: 16400 Huntersville Concord Rd 3e. City, state, zip: Huntersville, NC 28078 3f. Telephone no.: 3g. Fax no.: 3h. Email address: Page 1 of 10 PCN Form — Version 1.4 January 2009 C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams — tributaries ❑ Buffers ® Open Waters ❑ Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. Wetland impact number Permanent (P) or Temporary T 2b. Type of impact 2c. Type of wetland 2d. Forested 2e. Type of jurisdiction Corps (404,10) or DWQ (401, other) 2f. Area of impact (acres) W1 P Culvert Headwater Wetland Yes Corps 0.06 W2 Choose one Choose one Yes/No W3 Choose one Choose one Yes/No W4 Choose one Choose one Yes/No W5 Choose one Choose one Yes/No W6 Choose one Choose one Yes/No 2g. Total Wetland Impacts: 0.06 2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. Stream impact number Permanent (P) or Temporary (T) 3b. Type of impact 3c. Stream name 3d. Perennial (PER) or intermittent (INT)? 3e. Type of jurisdiction 3f. Average stream width (feet) 3g. Impact length (linear feet) S1 P Culvert UT to Forney Creek PER Corps 5 135 S2 T Cofferdam UT to Forney Creek PER Corps 5 10 S3 P Culvert Forney Creek PER Corps 8 148 S4 T Cofferdam Forney Creek PER Corps 8 12 S5 P Stabilization UT to Forney Creek PER Corps 4 16 S6 Choose one - 3h. Total stream and tributary impacts 321 3i. Comments: Impact S-5 consists of riprap stabilization and outlet protection for new impoundment and control structure. Riprap stabilization is a permanent impact but will be pressed into stream bed at existing elevation such that aquatic life passage is preserved and there is no loss of stream function. As such, compensatory mitigation for this impact is not proposed. Page 4 of 10 PCN Form — Version 1.4 January 2009 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then indivi ually list all open water impacts below. 4a. Open water impact number Permanent (P) or Temporary T 4b. Name of waterbody (if applicable) 4c. Type of impact 4d. Waterbody type 4e. Area of impact (acres) 01 P Fill/ control structure Pond 0.13 02 Choose one Choose 03 Choose one Choose 04 Choose one Choose 4f. Total open water impacts 0.13 4g. Comments: Impacts are necessary for construction of new impoundment and control structure as a result of breaching of the original dam. Breach occurred on 10/11/18 as a result of Hurricane Michael. 5. Pond or Lake Construction If pond or lake construction proposed, the complete the chart below. 5a. Pond ID number 5b. Proposed use or purpose of pond 5c. Wetland Impacts (acres) 5d. Stream Impacts (feet) 5e. Upland (acres) Flooded Filled Excavated Flooded Filled Excavated P1 Choose one P2 Choose one 5f. Total: 5g. Comments: 5h. Is a dam high hazard permit required? ❑ Yes ❑ No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If any impacts require miticiation, then vou MUST fill out Section D of this form. 6a. Project is in which protected basin? ❑ Neuse ❑ Tar -Pamlico ❑ Catawba ❑ Randleman ❑ Other: 6b. Buffer Impact number - Permanent (P) or Temporary T 6c. Reason for impact 6d. Stream name 6e. Buffer mitigation required? 6f. Zone 1 impact (square feet) 6g. Zone 2 impact (square feet B1 Yes/No B2 Yes/No B3 Yes/No B4 Yes/No B5 Yes/No B6 Yes/No 6h. Total Buffer Impacts: 6i. Comments: Page 5 of 10 SHOP DRAWING SUBMITTALS CONTRACTOR SHOP DRAWING SUBMITTALS SHALL INCLUDE BUT NOT BE LIMITED TO THE FOLLOWING ITEMS: 1. THE 60 -INCH DIAMETER ALUMINIZED CORRUGATED METAL PIPE RISER. 2. RISER STEPS. 3. BOTTOM DRAIN 8" GATE VALVE. 4. THE 8 -INCH DIAMETER RESERVOIR DRAIN VALVE, VALVE STEM AND STEM GUIDES. 5. BOTTOM DRAIN AND RISER TRASH RACKS. 6. THE 48 -INCH DIAMETER ALUMINIZED CMP BARREL AND THE MATERIAL USED TO SEAL THE JOINTS. 7. THE REINFORCEMENT STEEL FOR THE RISER FOOTING, AND CONCRETE EMERGENCY SPILLWAY. 8. CONCRETE MIX DESIGN REGARDING THE SPILLWAY RISER ANTI -FLOTATION BLOCK AND EMERGENCY SPILLWAY. 9. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS TO STEWART, 101 N. TRYON STREET, CHARLOTTE NORTH CAROLINA, 28202, TELEPHONE NUMBER 704-909-3516, THESE DRAWINGS ARE REQUIRED TO BE REVIEWED AND APPROVED BY STEWART PRIOR TO ORDERING, PURCHASE OR FABRICATION OF THE RESPECTIVE ITEMS. STEWART WILL REVIEW THE SUBMITTED MATERIAL AND RESPOND TO THE CONTRACTOR WITHIN TWO WORKING DAYS OF RECEIVING SUBMITTAL. CAST IN PLACE CONCRETE SPECIFICATIONS CONCRETE FOR THE SPILLWAY RISER BASE SHALL MEET THE FOLLOWING MINIMUM SPECIFICATIONS: 1. THE MAXIMUM ALLOWABLE SLUMP SHALL BE 4 INCHES NO WATER SHALL BE ADDED TO THE MIXTURE AT THE SITE. 2. THE MINIMUM COMPRESSIVE STRENGTH SHALL BE 3,000 PSI AT 28 DAYS. 3. THE CONCRETE SHALL HAVE FROM 4 TO 6 PERCENT ENTRAINED AIR BY VOLUME 4. THE TOTAL CHLORIDE ION CONTENT OF THE CONCRETE FROM ALL SOURCES SHALL NOT EXCEED 0.08 PERCENT. STEEL REINFORCEMENT SPECIFICATIONS THESE SPECIFICATIONS REGARD THE STEEL REINFORCEMENT IN THE FOUNDATION FOR THE RISER FOUNDATION. 1. ALL STEEL SHALL BE GRADE 60 MINIMUM (60 KSI YIELD STRENGTH) 2. ALL REINFORCEMENT BARS SHALL BE No. 4. 3. STEEL SHALL BE PLACED AS INDICATED ON THE DRAWINGS. 4. ALL STEEL REINFORCEMENT SHALL BE FREE FROM LOOSE OR FLAKY RUST, SOIL, OIL, GREASE, PAINT OR OTHER DELETERI( 5. STEEL REINFORCEMENT AT THE SITE SHALL BE STORED ABOVE GROUND ON PLATFORMS, SKIDS OR OTHER SUPPORTS ANC AND PROTECTED FROM MECHANICAL INJURY OR CORROSION. 6. ALL STEEL SHALL BE SHAPED BY THE MANUFACTURER IN ACCORDANCE WITH THE PROJECT REINFORCEMENT BAR SCHEDU REINFORCEMENT BARS WILL BE ALLOWED. 7. ALL REINFORCEMENT STEEL SHALL BE PLACED IN ACCORDANCE WITH ALL REQUIREMENTS OF ACI 318-05 8. THE CONTRACTOR SHALL NOTIFY STEWART WHEN STEEL IS PLACED AND 24 HOURS PRIOR TO PLACEMENT OF CONCRETE F STEEL. DIRECTION 35.52434°N 234 deg(T) 081,01944°W ACCURACY 5 m DATUM WGS84 Sylvan Creek Dam breach 2018-10-11 16:05:54-04:00 DIRECTION 35.52403°N ACCURACY 5 m 278 deg(T) 081.019851W DATUM WGS84 a *> Sylvan Creek Dam breach 2018-10-11 16:07:21-04:00 DIRECTION 35.52393°N ACCURACY 5 m 341 deg(T) 081.01979°W DATUM V.GS84 ti : o 4 Sylvan Creek Dam breach 2018-10-11 16:07:05-04:00 DIRECTION 35.52395°N ACCURACY 5 m 305 deg(T) 081.02006°W DATUM WGS84 rrI".. r 1 00- a Sylvan Creek . Dam breach 2018-10-11 16:08:01-04:00 DIRECTION 35.52391°N ACCURACY 5 m 187 deg(T) 081.02005°W DATUM WGS84 3 t x, Sylvan Creek Dam breach 2018-10-11 16:08:13-04:00 DIRECTION 35.52342% ACCURACY 5 m 14 deg!T) 081.02009°W DATUM WGS84 Sylvan Creek Dam breach 2018-10-11 16:12:41-04:00 DIRECTION 296 deg(T) Sylvan Creek 35.52401°N 081.019991W ACCURACY 5 m DATUM WGS84 ... -zV11 T111111111lu Dam breach 2018-10-11 16:10:00-04:00 DIRECTION 35.52343°N ACCURACY 5 m 159 deg(T) 081.02008°W DATUM WGS84 N i \ ��' fw'. i r Sylvan Creek Dam breach 2018-10-11 16:12:58-04:00