Loading...
HomeMy WebLinkAbout20090769 Ver 1_Application_20090713 a STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR U. S. Army Corps of Engineers Regulatory Field Office 151 Patton Avenue, Room 208 Asheville, NC 28801-5006 ATTN: Mr. Steve Lund NCDOT Coordinator EUGENE A. CONTI, JR. SECRETARY ?@ 0W, L12; JUL 1 3 2009 DENR - WA; FA UUALI'FY WETLANDS AND STCRMWNIIER BRANCH X90769 Subject: Application for Section 404 Nationwide Permit 23 and Section 401 Water Quality Certification for the proposed replacement of Bridge No. 144 over Sandy Run Creek on SR 1327 in Cleveland County, Federal Aid Project No. BRSTP-1327(2); State Project No. 8.2802001; Division 12; TIP No. B-4468, $240.00 Debit Work Order WBS Element 33717.1.1. Dear Sir: The North Carolina Department of Transportation (NCDOT) proposes to replace Bridge No. 144 over Sandy Run Creek on SR 1327. There will be 90 linear feet of permanent stream impacts on this project. Please see enclosed copies of the Pre-Construction Notification (PCN), permit drawings, stormwater management plan and design plans for the above-referenced project. The Programmatic Categorical Exclusion (PCE) was completed in January 2009 and was distributed shortly thereafter. Additional copies are available upon request. This project calls for a letting date of March 16, 2010 and a review date of January 26, 2010. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 2 76 9 31 59 8 July 8, 2009 TELEPHONE: 919-715-1334 FAX 919-715-5501 WE9SITE: WWWNCDOTORG LOCATION: 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 A copy of this permit application will be posted on the NCDOT Website at: http://www.ncdot.org/doh/preconstruct/pe/. If you have any questions or need additional information, please e-mail Erin Cheely at ekcheely@ncdot.gov. Sincerely, 6., -AZ2'A Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA W/attachment: Mr. Brian Wrenn, NCDWQ (5 Copies) Ms. Marella Buncick, USFWS Ms. Marla Chambers, NCWRC W/o attachment (see website for attachments): Dr. David Chang, P.E., Hydraulics Mr. Greg Perfetti, P.E., Structure Design Mr. Victor Barbour, P.E., Project Services Unit Mr. Mark Staley, Roadside Environmental Mr. M.L. Holder, P.E., Division Engineer Ms. Trish Simon, DEO Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USAGE, Wilmington Mr. Hank Schwab, PDEA Project Planning Engineer OaOF W A 7-,, 4 G a Office Use Only: Corps action ID no. DWQ project no. Form Version 1.3 Dec 10 2008 vre-construction Notification (P(;N) Form A. Applicant Information 1. Processing 1 a. Type(s) of approval sought from the Corps: ®Section 404 Permit ? Section 10 Permit 1 b. Specify Nationwide Permit (NWP) number: 23 or General Permit (GP) number: 1c. Has the NWP or GP number been verified by the Corps? ? Yes ® No 1d. Type(s) of approval sought from the DWQ (check all that apply): ® 401 Water Quality Certification - Regular ? Non-404 Jurisdictional General Permit ? 401 Water Quality Certification - Express ? Riparian Buffer Authorization 1 e. Is this notification solely for the record because written approval is not required? For the record only for DWQ 401 Certification: ? Yes ® No For the record only for Corps Permit: ? Yes ® No 1f. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? If so, attach the acceptance letter from mitigation bank or in-lieu fee program. ? Yes ® No 1 g. Is the project located in any of NC's twenty coastal counties. If yes, answer 1 h below. ? Yes ® No 1h. Is the project located within a NC DCM Area of Environmental Concern (AEC)? ? Yes ® No 2. Project Information 2a. Name of project: Replacment of Bridge No. 144 over Sandy Run Creek on SR 1327 (Mooresboro Rd.) 2b. County: Cleveland 2c. Nearest municipality / town: Mooresboro 2d. Subdivision name: not applicable 2e. NCDOT only, T.I.P. or state project no: B-4468 3. Owner Information 3a. Name(s) on Recorded Deed: North Carolina Department of Transportation 3b. Deed Book and Page No. not applicable 3c. Responsible Party (for LLC if applicable): not applicable 3d. Street address: 1598 Mail Service Center 3e. City, state, zip: Raleigh, NC 27699-1598 3f. Telephone no_: (919) 431-6697 3g. Fax no.: (919) 431-2002 1h Finail M Arfrnee• k h 1 de t c Vv, y@no c .gov 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1 a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 35.34330 Longitude: - 81.70170 (DD.DDDDDD) (-DD.DDDDDD) 1 c. Property size: 1.3 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to proposed project: Sandy Run Creek (HUG 03050105) 2b. Water Quality Classification of nearest receiving water: C 2c. River basin: Broad 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: The land use in the project vicinity is approximately 60% Cultivated Land (mainly pasture), 30% Forest Land (including broadleaf and mixed deciduous forests) and 10% Disturbed Land (impervious surfaces, maintained roadsides and residential areas). 3b. List the total estimated acreage of all existing wetlands on the property: 0 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 329 linear feet 3d. Explain the purpose of the proposed project: To replace a structurally deficient bridge. Bridge No. 144 has a sufficiency rating of 44.2 out of 100 and a structural evaluation appraisal of 2 out of a possible 9 according to Federal Highway Administration (FHWA) standards. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 121-foot bridge with a 145-foot, 3-span bridge on the existing alignment with an off-site detour. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ®Yes ? No ? Unknown project (including all prior phases) in the past? Comments: 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ® Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: EcoScience Corporation Name (if known): Steven Lund Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. October 22, 2007 5. Project History 5a. Have permits or certifications been requested or obtained for ? Yes ® No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. C. Proposed Impacts Inventory 1. Impacts Summary 1 a. Which sections were completed below for your project (check all that apply): ? Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T Site 1 ? P ? T ? Yes ? Corps ? No ? DWQ Site 2 ? P ? T ? Yes ? Corps ? No ? DWQ Site 3 ? P ? T ? Yes ? Corps ? No ? DWQ Site 4 ? P ? T ? Yes ? Corps ? No ? DWQ Site 5 ? P ? T ? Yes ? Corps ? No ? DWQ Site 6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0 Permanent 0 Temporary 2h. Comments: No wetlands within project area. 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ - non-404, (feet) other) Site l ®P ? T stream UT to Sandy Run ? PER ® Corps 4 90 relocation Creek ® INT ? DWQ Site 2 ? P ? T ? PER ? Corps ?INT ?DWQ Site 3 ? P ? T ? PER ? Corps ? INT ? DWQ Site 4 ? P ? T ? PER ? Corps ? INT ? DWQ Site 5 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 90 Perm 0 Temp 3i. Comments: The maximum permanent impact in the stream from the construction of the proposed interior bent is an area of 58 square feet due to two 3'-6" diameter drilled shafts adjacent to the stream. 4 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number - waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 0. Total open water impacts 0 Permanent 0 Temporary 4g. Comments: No open water within project area. 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 5b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID Proposed use or (acres) number purpose of pond Excavat Flooded Filled Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 5i. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require mitigation, then you MUST fill out Section D of this form. 6a. ? Neuse ? Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet (square feet) Temporary T required? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ?P?T ?Yes No E] 6h. Total buffer impacts 6i. Comments: Project is not in a protected buffer area. D. Impact Justification and Mitigation 1. Avoidance and Minimization 1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The bridge will be replaced in place with an off-site detour and the new bridge will be longer than the existing one. There will be no discharge of deck drainage directly into the creek from the bridge. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. The proposed 4' base lateral ditch that is relocating the existing UT to Sandy Run Creek will be lined with permanent soil reinforcement matting (PSRM) instead of rip rap. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? ? Yes ® No No mitigation is proposed as there are minimal stream impacts (90 linear feet) and there are no HOW, ORW or other protected waters in the project area. Impacts for this project will not cause an adverse effect or significant loss of waters of the United States. 2b. If yes, mitigation is required by (check all that apply): ? DWQ ? Corps 2c. If yes, w hich mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ? Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by DWQ 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zone 1 3 (2 for Catawba) Zone 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1 a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. ? Yes ? No Comments: 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A 2b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c. If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stormwater Management Plan, then provide a brief, narrative description of the plan: See attached permit drawings. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW ? USMP apply (check all that apply): ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ? Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HQW (check all that apply): ? ORW ? Session Law 2006-246 ? Other: 4b. Has the approved Stormwater Management Plan with proof of approval been attached? ? Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 5b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No 9 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) 1a. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1 c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House? (if so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: 12. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? I ? Yes ® No I 2c. If you answered "yes" to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes additional development, which could impact nearby downstream water quality? ® No 3b. If you answered "yes" to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. The new bridge will be constructed in the same location as the old bridge. 14. Sewage Disposal (DWQ Requirement) I 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 10 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a. Will this project occur in or near an area with federally protected species or Yes ® ? No habitat? 5b. Have you checked with the USFWS concerning Endangered Species Act ® Yes ? No impacts? (Checked the USFWS website) ? Raleigh 5c. If yes, indicate the USFWS Field Office you have contacted. ® Asheville (Checked the USFWS website) 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? An NCDOT field survey for dwarf-flowered heartleaf was conducted on March 19, 2009. Marginally suitable habitat exists for this species within the project area, but no dwarf-flowered heartleaf plants were found ("No Effect"). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes ® No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 7b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 8b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps Dr. Gregory J. Thorpe, Ph D of, 1 7' 8 -C) Q ' , D Applicant/Agent s Printed Name Appl t/ nt's Signature ate (Agent's signature is valid only if n authorization letter from the applicant is provided.) U.S. ARMY CORPS OF ENGI WILMINGTON DISTRICT Action Id. SAW-2006-32957-323 County: Cleveland U.S.G.S. Quad: Boiling Springs North NOTIFICATION OF JURISDICTIONAL DETERMINATION n i ? Property Owner/Agent: Gregory J. Thorpe, Director RE Address: Project Development and Environmental Analysis Branch North Carolina Department of Transportation 1548 Mail Service Center, Raleigh, NC 27699-1548 Telephone No.: 919-733-3141 Property description: Size (acres) 7.5 approx. Nearest Town Dallas Nearest Waterway Sandy Run Creek River Basin Catawba USGS HUC 03050105 Coordinates N 35.3251 Location description Bridge No, 144 on SR 1327 north of Mooresboro, TIP B-4468 Indicate Which of the Following Apply: OCT 30 2007 14,? DKION OF )i HWAYS PChiw-OfF1CE OF NATL11ML EKVF W 81.1829 _ Based on preliminary information, there may be wetlands on the above described property. We strongly suggest you have this property inspected to determine the extent of Department of the Army (DA) jurisdiction. To be considered final, a jurisdictional determination must be verified by the Corps. This preliminary determination is not an appealable action under the Regulatory Program Administrative Appeal Process ( Reference 33 CFR Part 331). There are Navigable Waters of the United States within the above described property subject to the permit requirements of Section 10 of the Rivers and Harbors Act and Section 404 of the Clean Water Act. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification- X There are surface waters on the above described property subject to the permit requirements of Section 404 of the Clean Water Act (CWA)(33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ We strongly suggest you have the wetlands on your property delineated. Due to the size of your property and/or our present workload, the Corps may not be able to accomplish this wetland delineation in a timely manner. For a more timely delineation, you may wish to obtain a consultant. To be considered final, any delineation must be verified by the Corps. The wetland on your property have been delineated and the delineation has been verified by the Corps. We strongly suggest you have this delineation surveyed. Upon completion, this survey should be reviewed and verified by the Corps. Once verified, this survey will provide an accurate depiction of all areas subject to CWA jurisdiction on your property which, provided there is no change in the law or our published regulations, may be relied upon for a period not to exceed five years. X The surface waters have been delineated and surveyed and are accurately depicted on the GPS plat provided by EcoScience Corporation and dated 13 March 2006. Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. _ There are no waters of the U.S., to include wetlands, present on the above described property which are subject to the permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification. The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA). You should contact the Division of Coastal Management in Washington, NC, at (252) 946-6481 to determine their requirements. Page l of 2 Action ID: SAW-2006-32957-323 Placement of dredged or fill material within waters of the US and/or wetlands without a Department of the Army permit may constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). If you have any questions regarding this determination and/or the Corps regulatory program, please contact Steven Lund at 828-271-7980. Basis For Determination: Sandy Run Creek and its tributary are perennial waters that exhibits a distinct ordinary high water mark and flow directly to the Broad River, a navigable water. Remarks: Consultant's report dated 13 March, 2006 identifies Sandy Run Creek and an unnamed tributary in the project area consisting of an approximate 1100-foot long by 300-foot wide corridor centered on the existing bridge site. Corps Regulatory Official: Steven W. Lund, Project Manager, Asheville Regulatory Field Office Date: October 22, 2007 Expiration Date: October 22, 2012 Corps Regulatory Official (Initial): ?.' FOR OFFICE USE ONLY: • A plat or sketch of the property and the wetland data form must be attached to the file copy of this form • A copy of the "Notification Of Administrative Appeal Options And Process And Request For .Appeal" form must be transmitted with the property owner/agent copy of this form. If the property contains isolated wetlands/waters, please indicate in "Remarks" section and attach the "Isolated Determination Information Sheet" to the file copy of this form. Copy Furnished: Ms. Heather Jean Saunders, EcoScience Corporation, 1101 Haynes Street, Suite 101, Raleigh, NC 27604 Page 2 of 2 PROJECT- LOCATION CLEVELAND COUNTY WETLAND/STREAM IMPACTS Permit Drawings Sheet 1 of ; C NCDOT DIVISION OF HIGHWAYS CLEVELAND COUNTY PROJECT: 33717.L1 (B-4468) BRIDGE NO.144 ON SR 1327 (MOORESBORO ROAD) OVER SANDY RUN CREEK SHEET 1 OF 10 4/14/09 0 O 0: z I? o? v z Z OOH ' O lip za O?z o O ? ev O p a a a O aF.l w W rN. i D r ? 1 v w CL w = _J C) Q ?, w Q- d (n ?\\? J Q om? -I w 'N 0 PermR Drawing Srieet : of _„?„ PROPERTY OWNERS NAMES AND ADDRESSES PARCEL NO. NAMES ADDRESSES PLATO D. CROWDER Permit Drawing Sheet of ' O o Y 0 ? p p m N G N m s O'1 MM \ W C 014 ® it O w Z- a o z Z a ? C V ? N A " y r, pq m p ?n C C ? E 1p t? e V Q w p2 p m3 w V o o $ a? N €(n E06 'S O V] U a ? c m EE O pmp F- ? = 3 U c W Z • , A u ? .? $ ? < > C_ p U x w h W 3 ?r w E ? } wY pC p m ? LL3 CL 0 w J N t C F E 1? i m o C 'Jt e G O 8 J E 7 E E 0 H q Permit Drawing N Z < Sheet of __ F o z STORMWATER MANAGEMENT PLAN Project: 33717.1.1 TIP No. B-4468 Cleveland County 4/21/2009 Hydraulics Project Manager: Dennis Hoyle, P.E. (URS Corporation), Marshal Clawson, P.E. (NCDOT Hydraulics Unit) ROADWAY DESCRIPTION The project B4468 consists of replacing bridge No. 144 on SR 1327 (Mooresboro Road) over Sandy Run Creek. The existing structure consists of wood, steel and concrete and the proposed structure is to be a three span prestressed cored slab superstructure, 145'-0" in length. The total length of the roadway TIP project is 0.095 miles. The project B4468 creates impacts to one unnamed tributary to Sandy Itun Creek. Table 1 lists this stream and the proposed crossing structure. The project drainage system consists of grated inlets with associated pipe systems and lateral storm water ditches. Table 1. List of Stream Crossings in Project B-4468 Site # Station Stream Name Drainage area Proposed Structure -L- 18+00 to 18+75 UT to Sandy 4' Lateral Base I LT Run Creek 24.5 acres Ditch (Min. D = 2') Lined w/ PSRM ENVIRONMENTAL DESCRIPTION The stream listed in Table 1 has been classified as jurisdictional. Stream impacts have been avoided and minimized by keeping roadway fill slopes at 3:1 or steeper. BEST MANAGEMENT PRACTICES AND MAJOR STRUCTURES The primary goal of Best Management Practices (BMPs) is to prevent degradation of the states surface waters by the location, construction and operation of the highway system. The BMPs are activities, practices and procedures taken to prevent or reduce stormwater pollution. The measures that will be used on this project are placing rip rap pads at the outlets of the two proposed pipes and to line the proposed lateral ditch with permanent soil reinforcement matting (PSRM). The pipe outlets will have rip rap pads in order to disperse the concentrated flow, reduce the outlet velocity and prevent future erosion. The proposed 4' base lateral ditch that is relocating the existing stream will be lined with PSRM which is more environmentally sensitive than to line it with rip rap. tsh_pormit.dgn CT: y 0 O c r N e U O U O 0 O T N ut N U m o o 2 ? 5 n O N (n O 0 0 < O = < o O o O y II II IP II II II ?' A W O P O O ? N m ? a ° o y 2 ? m m O D 0 Gl r r S 2 m z _ 0 O N c c m .v O I y j O y y A Q -I A Ib ((m? m n n O m a '? II z n A P ° I ? O O P U O N. ' A r c c I o ? F o r Na N ? M ? mfA o " o a = O C o Z n\ n y ? gn I .. N r yY a N fl m UJ I O E ? k h n x y ay? yy ` x h N C D ' ro U U TIP PROJECT: B-4468 s C?? 4 CC ioa?u P444o To Mooresooro Q mO cot E Mooro -- ` J sboroa 1 Tc r. . _ _ vaai?? yep N _ - = I 5 o. u o H011, r ct, E Rd / h ?.J r ? y y U V boo b _.-? __ 14 b b ? M n n yC? S (? y a a A N N OD a r a? m ?? l p a ?\ O \`. S o i2 2 1! y vR ocii I z? A o OD ? W e I; h i c - O MU + ng gR __-- - - -- _ __ _ . y ? tD 1 V v A as ? m Sf[e rsRE730raRV T!ra i€,g 54?.?x g? f sp 5w s? a ?a ? e e \ ? ?y5 i ` I I \ a LT 11 11 / i/ r? 11 II u ? n n u n ?u u u n ?R 564 ?I 4 I .pb teo .g I m? O,p N Q m 8 a1 1 .018 1 ?I OP a 17W7 !Q! sa 1 i ;e i' 9' ii- ;y Fs all sg3 fn a a n s x o L :?yL =E` ?koa. t'"as r 'c %S mmR l TpN 9 R?IS H itd N y 09 I I = d.ey\Proj\B4468_Bdy_pz64_perm, l2.dgn lel- O T O wI o ? m D T Z. ? W 2 m z 0 C) cli rn? Z O rn I r I Z (/) II 4 O a } TAN C p?N R I rA? OZO N 1r1? A O DSO N 1 ANN W {S N i (n o?. ?? ?Oti n is \ 'S 0 Ox± Zo\ COI j 'I 2 0 'o cm m Nn mZ ms D? r AN Om I y= m(n m? (n A_ A MC) CO o z O? I I I ------------------To ---------9--------r 0 X X-__-x MOSS X i$ 3 v SL a ?z 1 1 , I' I? jc I j I I I i 'I I I' I, I I '. i. I REVISIONS uj- m=E LO m° m? O,P s c II Z 00 o 0 " o FO C I V? O O I r , 3 -nAm m A .vaiic± m?0 0v N OZ00 ANN 4 0I r fn co 1 sr Sf- S\ ? Sf i ? 2 m /I C rlnOOD DyOm v On B -2 L'- NC 24+51.36 = -L-STA.15+06.03 16.87' LT ?I o: ?f l / l l 1 / II I I II I I I I '. II / / . J O v COD --I A0 00 vn a)m 0 as =cn ak" 2ro 0 0 m D Z mm 0 1 ? (r)CD nm 4 m cn \ n Z \ ?- 19 ? w ? w \ IU\ o \ oa LDM &20\ Z7 \ Std-_- a -- 2 - 1 - I A` ?o 4 _ 0 Y?YS5r ey ?? n O N E5 A N --r P T- V N Fi-F D R2 2FH J FH1 J IIA J n J ?R i I• If Ldgn 5 /14/ 99 b " 1 0 J 4 3 ) CID k r I Ct T EF A -- -- - ---- --------- _. - I N S Ml iii ii --------- --- - - .::. __._ ..... ......... ......... _.- -------- --------- --------- ---- 1H H ; ,I I'r _ ._ _ - --------- - - - ---- - - - - - - - - - - - - - ---- -------- - --------- ---- C T - _ aan B. N rn I? O J a W I r y cr b N rn ID 01 g E?MR c ?$05MA m u uuuunono C HMM R y J [td •\r oaowayy\gpo \b4468_rdy_tsh.dgn $$$USERNAME SS $ 1 09/08/99 CONTRACT.• TIP PROJECT: B-4468 o 0 o O rm v ?' A H N y A O y v O Z T r l? n Q f/ 2 O i D z m 1 - Z° w y m O o o fria -! ! a = v Z o Jsl A O z " "•. $? • L col L c o 8 n ° g g To .W.m„a tea' `"n`vrrn--- 0 n 2 o o y m m M..? - - o° 4) m z $ 9 0 u u a 11 u 11 x m n ? w Z- ° II O O O IJ fmJ o r p\ wee 65 dl TO P4Y? 9aeaeaR° o a m N = • C ~_ ?O. OZ {n F 0 m 1. 9 a z 7n a, o r Iv b = v -C A A O ° I h A m ``J o ?? o II C - p III ? y 2 ?? o ; I ?i ?y '?l-• ? ? ? .-: ? ?'6I • ooo?G ? 0 IN, 'IY r \ 1i a N K m ro, ;'i b w C a 7 a a Ii ° m ? ?• a I as 'C E e y + ?1 n r N I -p M uu o n y y z 7 . V V o iw :. a v i S i? ioA 'aO V V w > xx ?? u a A E? a h by li??, ? m d? Ln ( m -? O S Z m O s i ? b y O 11 5 5 m I r r ? ' i V N 0 Zo .? oz m+P Z° ° u w n? < ?r O'm ?n m += +m ° e I O gp C, I' i f; 5 m P C 6 U '° 8 R p A P + Q O / 0 e / Z r I? co Q J 0 A s ? `V `L C --i T--= 7 m m W N < X11 m ym>9 >9 y.>9 >9 • 9 „ 9 S Zmy9 ya amya y9 y9 i > m 9 9 9 2 C > 9 > 9 > 9 m ° P _ u _ m r m i m < 9 • 9 » y a m<b aTv m < m9 T<> r• ma < < a 1 r as O 2 a ma m ma m ` a m ry 9 1 ti T ! ?T TX pK OX s e > r m mm m Z m T?9-91 a? y?9H T V > I m y C 9<>S >• S1S m Y > _ a+ > iam > T?v T T mP D a D > a U O> °09 09 O> •„? ' TS Tm iIZ TS T \ 9 O+ r P S y r r Y r + T > 4~ r y Yy m> "1 T O Y fN m P y m ?^ z mro y r ° mmi O A mmz mp M mi mp z ym9 . mp m m° T y y a . 11 zmm mm >Tm ° p ° a Z m za ? m ? . m m YmP mm m - a a-? m 9 9 P m m p 0? Pp Oa °m ti w 2 > m > > 9 om vm iom o o om of l n n c yvo c° m° TO o r\ zaa 9 s a \/ m m a o e a " ^ - S a 2 o m ? 9 om< m ° < O yyT aaa yT T y < y _ 9 u _ ' y m m m m m ya ° a ° °. . o y pP m a v om m m m 1 i - m £sC? / i Z \ 0 T ° +n fs L Y I ?I? 4 p + !3 _ R -p o cl r 0 Z IN m CA m m p i5 ? / •S O Z -? p N - co - F) o O 71 i I r a` z P V1 + q° r - )PP 7 P, !^ :0 N ° Q F g F 4 +p mu+ F +U ; n -1 p ? V z g; 8w 08 ?^ 8$g ? 8g C m Z ° O O?ox pz C, T O m o o ? +4 Z ++ ++. a y +O P 4 $u g $8 00° w 1 A 11 \? N. ? I v ? r G S ? 1 O -' t O (? I w S a A s ? 1 s ? V m• ? ? I M N 1 rn c ., Nalm T/er ralslona caWsf cF gpnpr In slallm and cirfWs ya Ile rIgM of way nvumafs and m adlaslmead In the wiferl/ne and bwe/lm allgwmf. . NJJ 4-21-09 Vf 5= Om w o 2 02 00 Z W My 22 0 m m?, m O3 A m AZ I I ~ 0 31 \ m & .iwao ? I? I? r??\ i it I o:R Zz Fi II I'I o? Vly ^r I Iy I? m„ z O ? v ------------=-vim I /r IMF IV O ? 1gr \ to $ \ \+ $ # r JJ a =2F • _ _ 1\ I 1 r $ PIN $10, I4#Ol7A MIR i : III 4 III; 'li: Lam- ? ii \ \\ / / Y ? 1 I \ rao ? `\ \ yv o,° \\ I I D9 N 1J I +NNi a?i # I 11 3 ?m $? 20 w ? ? _ 11 O. a IrI Il 11 II II II II II II II 11 ?11 II )).OT II II II ?11 11 I I SIM 23 II li v m m m A A, v 0 N w A P V co ?z N O N N N N r N A A r rn y rn N r A V V ti rn r m I r w b N V m r YEP RRRR 4 4 II I p 4 1 II 1 N A