Loading...
HomeMy WebLinkAbout20181621 Ver 1_PCN Form Submission_20181126DWR MOM— of Water Resources Pre -Construction Notification (PCN) Form September 29, 2018 Ver 3 tial Review Has this project met the requirements for acceptance in to the review process?* r Yes r No Is this project a public transportation project?* G Yes r No Change only if needed. BIMS # Assigned 20181621 Is a payment required for this project?* r No payment required r Fee received r Fee needed - send electronic notification Select Project Reviewer* Amy Annino:eads\amannino Information for Initial Review 1a. Name of project: SUGAR HILL ROAD 1a. Who is the Primary Contact?* ALLEN GURLEY 1b. Primary Contact Email:* allengurley@gmail.com Date Submitted 11/26/2018 Nearest Body of Water MUDDY CREEK Basin Catawba Water Classification SPRING WATER Site Coordinates Latitude: n/a A. Processina Information County (or Counties) where the project is located: McDowell Is this project a public transportation project?* r Yes r No Longitude: n/a 1a. Type(s) of approval sought from the Corps: * Section 404 Permit (wetlands, streams and waters, Clean Water Act) f- Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? F Nationwide Permit (NWP) F- Regional General Permit (RGP) W Standard (IP) Version# * 1 Reviewing Office* Asheville Regional Office - (828) 296-4500 1c. Primary Contact Phone:* (828)460-2700 1c. Has the NWP or GP number been verified by the Corps? r Yes IT No 1d. Type(s) of approval sought from the DWR: rJ 401 Water Quality Certification - Regular r 401 Water Quality Certification - Express rJ Non -404 Jurisdictional General Permit r Riparian Buffer Authorization F Individual Permit * 1e. Is this notification solely for the record because written approval is not required? For the record only for DWR 401 Certification: r Yes r No For the record only for Corps Permit: r Yes r No 1f. Is this an after -the -fact permit application?* r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No 1g. Is payment into a mitigation bank or in -lieu fee program proposed for mitigation of impacts? r Yes r No Acceptance Letter Attachment 1h. Is the project located in any of NC's twenty coastal counties? r Yes r No 1j. Is the project located in a designated trout watershed? C Yes IT No B. Applicant Information 1d. Who is applying for the permit? V Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? r Yes r No 2. Owner Information 2a. Name(s) on recorded deed: GURLEY PROPERTIES LLC 2b. Deed book and page no.: PIN 1700-07-2038 2c. Responsible party: 2d. Address Street Address SUGAR HILL ROAD Address Line 2 city MARION Postal / Zip Code 28752 2e. Telephone Number: (828)460-2700 2g. Email Address:* aIlengurley@gniai1.com C. Project Information and Prior Project History 1. Project Information 1b. Subdivision name: (if appropriate) 1c. Nearest municipality/town: MARION 2. Project Identification State / Frovince / R�gim NC Q�untry MCDOWELL 2f. Fax Number: (828)684-3663 2a. Property Identification Number: PIN 1700-07-2038 2c. Project Address Street Address SUGAR HILL ROAD Address Line 2 CRY MARION Fbstal / Zip Code 28752 3. Surface Waters 3a. Name of the nearest body of water to proposed project:* MUDDY CREEK 3b. Water Resources Classification of nearest receiving water:* SPRING WATER 3c. What river basin(s) is your project located in?* Catawba 3d. Please provide the 12 -digit HUC in which the project is located. n/a 4. Project Description and History 2b. Property size: ONE State / Frovince / Region NC Country MCDOWELL 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* RESIDENTICAL PROPERTY WITH A RUN OFF FOR HIGH WATER 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* r Yes r No r Unknown 4d. Attach an 8 1/2X11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2X11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: NONE 4g. List the total estimated linear feet of all existing streams on the property: 150 FEET 4h. Explain the purpose of the proposed project:* TO DEVELOP THE LAND FOR COMMERICAL 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* TO PUT PIPE TO HANDLE THE WATER FLOW UNDER THE HIGHWAY 150 FEET. INSTALL BY TRACKHOE 4j. Please upload project drawings for the proposed project. 5. Jurisdictional Determinations 5a. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No Comments: 5b. If the Corps made a jurisdictional determination, what type of determination was made?* r Preliminary r Approved r Not Verified r Unknown r WA Corps AID Number: 5c. If 5a is yes, who delineated the jurisdictional areas? Name (if known): Agency/Consultant Company: Other: 5d1. Jurisdictional determination upload r Unknown 6. Future Project Plans 6a. Is this a phased project?* r Yes r No Are any other NWP(s), regional general permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands W Streams -tributaries F Open Waters r Pond Construction 3. Stream Impacts ❑ Buffers 3a. Reason for impact(?) 3b.lmpact type * 3c. Type of impact* 3d. S. name * 3e. Stream Type * 3f. Type of 3g. S. width * 3h. Impact (?) Jurisdiction* length* F S1 n/a Tem ora P rY Culvert Jn/a ::Tttt] Both 150 Average (fee[) 150 (linear feet) 31. Total jurisdictional ditch impact in square feet: 22,500 31. Total permanent stream impacts 0 31. Total stream and ditch impacts: 150 3j. Comments: ASKING FOR 150 FEET E. Impact Justification and Mitigation 1. Avoidance and Minimization 3i. Total temporary stream impacts: 150 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: n/a 1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques: n/a 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? r Yes r No 2b. If this project DOES NOT require Compensatory Mitigation, explain why: UNKNOWN F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? r Yes r No If no, explain why: UNNAMES STREAM 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No 2b. Does this project meet the requirements for low density projects as defined in 15A NCAC 02H .1003(2)? r Yes r No Comments: v G. Supplementary Information 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federal/state/local) funds or the use of public (federal/state) land?* r Yes r No 2. Violations (DWR Requirement) 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15ANCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B.0200)?* r Yes r No 2b Provide an explanation of the violation(s): 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3b. If you answered "no," provide a short narrative description. ALL THE WORK WILL BE DONE ON THIS PROPERTY 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* r Yes r Nor N/A 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? r^ Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* r Yes r No 5d. Is another Federal agency involved?* r Yes r No r Unknown 5e. Is this a DOT project located within Division's 1-8? r Yes r No 5f. Will you cut anytrees in order to conduct the work in waters of the U.S.? r Yes r No 5g. Does this project involve bridge maintenance or removal? r Yes r No Sh. Does this project involve the construction/installation of a wind turbine(s)?* r Yes r No 5i. Does this project involve (1) blasting, and/or (2) other percussive activities that will be conducted by machines, such as jackhammers, mechanized pile drivers, etc.? r Yes r No 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? n/a Consultation Documentation Upload 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* r^ Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* n/a 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* r Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* n/a 7c. Historic or Prehistoric Information Upload 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA -designated 100 -year floodplain?* r Yes c No 8c. What source(s) did you use to make the floodplain determination?* n/a Miscellaneous Comments Miscellaneous attachments not previously requested. Signature u W By checking the box and signing below, I certify that: • I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a "transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); • I agree to conduct this transaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act'); • I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: ALLEN GURLEY Signature Sign Date 11/26/2018