HomeMy WebLinkAbout20081158 Ver 1_More Info Received_20090713U8- Its $ 119@20wr JUL 1 3 [C?G9 MEMORANDUM wEAAt?s woo SSTTR'A EAR 0R0CH DATE: July 10, 2009 sw? TO: Ms. Annette Lucas Mr. Alan Johnson NCDENR - 401 Oversight & NCDENR - DWQ k Express Permitting Unit Mooresville Regional Office 2321 Crabtree Blvd., Suite 250 610 E. Center Street Raleigh, NC 27604 Mooresville, NC 281 1 5 design resource group 919.733.1786 704.663.1699 FROM: Scott Kiger RE: Campus Corners / The Flats At Mallard Creek Charlotte, North Carolina Ms. Lucas and Mr. Johnson: Please find attached the following information for your review and records of the Campus Corners which is changing names to The Flats At Mallard Creek. This project was subject to and approved under the city of Charlottes PCCO. (1) set of stamped approved plans (1) set of the approved drainage calculations (1) copy of the Planned MultiFamily Approval Letter (1) copy of the Campus Corners 401 Permit (1) copy of the Campus Corners 404 Permit (1) copy of the Mallard Creek Ltd. 401 Transfer Request 7-7-09 (1) copy of the Mallard Creek Ltd. 404 Transfer Request 7-7-09 If you have any questions regarding these comments please don't hesitate to call. cott R. Kiger Design Res urce roup, PA 2459 wilkinson boulevard, suite 200 landscape architecture urban design > civil engineering = land planning - traffic engineering charlotte, nc 28208 p 704-343-0608 f704-358-3093 CITY OF CHARLOTTE PLANNED MULTI-FAMILY TENTATIVE APPROVAL OF PRELIMINARY SUBDIVISION PLAN Name of Project: Location of Subdivision: Owner's Name: Address: Campus Corners East Mallard Creek Church Road Charlotte, North Carolina Vestcor Communities 3020 Hartley Road Suite 300 Jacksonville, Fl 32257 (City, State, Zip) 904.260.3030 (Telephone Number) moraanavestcor. com (E-Mail Address) 1 Date of application submitted for Preliminary Plan approval: 3 1' 16, s CITY ENGINEERING DEPARTMENT: The preliminary plan for this subdivision is approved for construction and development in accordance with the Engineering provision of the City of Charlotte Subdivision Ordinances City Engineering Department I? ?2L4 Date ' CHARLOTTE-MECKLENBURG PLANNING DEPARTMENT: The preliminary plan for this subdivision is approved for construction and development in accordance with all provision of City of Charlotte Subdivision Ordinance. Planning Stuff ( n Date Note: The approval of this preliminary Subdivision Plan may be appealed within ten days of the date signed by the Planning Department Staff, in accordance with Section 4.102 and 4.103 of the Subdivision Ordinance. This appeal may be initiated by any person aggrieved or by any officer, department, board, or bureau of the City of Charlotte or Mecklenburg County. www.charlottMIanningy orgy August 25, 204- DWQ# 08-1158 Mecklenburg County Mr. Dan Cimaglia WP East Acquisitions, LLC 1001 Morehead Square Dr., Ste. 250 Charlotte, NC 28203 Subject, Campus Corners APPROVAL o 401 Water Quality Certification with Additional Conditions Dear Mr. Cimaglia: You have our approval, in accordance with the attached conditions and those listed below, to impact 185 linear fleet (lf) of intermittent stream to Mallard Creep in order to construct the subject development in Mecklenburg County, as described in your application received by the Division of Water Quality (DWQ) on July 29, 2008. After reviewing your application, we have determined that this project is covered by Water Quality General Certificati=on Number 3705, which can be viewed can our web site at http://h2o.enr,state nC Usincwetlands. The General Certification allows you to use Nationwide Permit Number 39 once it is issued to you by the U-S. Army Corps of Engineers. Please note that you should get any other federal, state or local permits before proceeding with your project, including those required by (but not limited to) Sediment and Erosion Control, Non-Discharge, and Water Supply Watershed regulations. The above noted Certification will expire when the associated 404 permit expires unless otherwise specified in the General Certification.. This approval is only valid for the purpose and design that you described in your application. If you change your project, you must notify us in writing, and you may be required to send us a new application for a new certification. If the property is sold, the new yawner must be given a copy of the Certification and approval letter-, and is thereby responsible for complying with all conditions. In addition to the requirements of the certification, you must also comply with the following conditions; 1. The Mooresville Regional Office shall be notified in writing once construction at the approved impact areas has commenced. ?3<ii4itrt-tl?res,tl???kii n=,_t-G`)'! 4_r>rbfi4>n a- ? LLtf 1 _ tf?(('(I4r; sr a.?t.}jCiral til altt3 2. Storm water discharge structures at this site shall be constructed in a manner such that the potential receiving streams (of the discharge) will not be impacted due to sediment accumulations, scouring or erosion of the stream hanks. 3. Prier to construction, a final, written storm water management plan (including a signed and notarized Operation and Maintenance Agreement) shall be submitted to the 401 Oversight and Express Permitting Unit (2321 Crabtree Blvd,, Suite 258. Raleigh, NC, 27-04) within 60 days of the issuance of the 401 Mater Quality Certification, The storm water management plans shall be approved in writing by this Office before the impacts specified in this Certification occur. You have the option of using the Express Review Program for expedited approval of these plans. If you propose to use the Express Review Program, remember to include the appropriate flee with the plan. The storm water management plan must include construction plans, specifications, storm water BtV1P worksheets, and supporting calculations. The storm water best management practices are required to be appropriate for the surface water classification and designed to remove at least 85% TSS according to the most recent version of the NC DENR Storm crater Best Management Practices Manual. These facilities must be designed to treat the runoff from the entire project, unless otherwise explicitly approved by the Division of Water Quality. Also, before any permanent building is occupied at the subject site, the facilities (as approved by this Office) shall be constructed and operational, and the storm water management plan (as approved by this Office) shall be implemented. The structural stormwater practices as approved by this Office as well as drainage patterns must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. 4. Upon completion of the project, the applicant shall complete and return the enclosed -Certificate of Completion" form to the 401A/Vetla ds unit of the NC Division of Water Quality, 5, Continuing Compliance. The applicant (WP East Acquisitions, LLC; Dan Cimaglia) shall conduct all activities in a manner so as not to contravene any state water quality standard (including any requirements for compliance with section 303(d) of the Clean Water Act) and any ether appropriate requirements of state and federal law, if DWQ determines that such standards or laws are not being met (including the failure to sustain a designated or achieved use) or that state or federal law is being violated, or that further conditions are necessary to assure compliance, DWQ may reevaluate and modify this certification to include conditions appropriate to assure compliance with such standards and requirements in accordance with 15 A NCAC 2H.0507(d). Before codifying the certification, DWQ shall notify the applicant and the US Army Corps of Engineers, provide public notice in accordance with 15A NCAC 2H.0503 and provide opportunity for public hearing in accordance with 15A NCAC 2H.0504. Any new or revised conditions shall be provided to the applicant in writing., shall be provided to the United States Army Corps of Engineers for reference in any permit issued pursuant to Section 414 of the Clean Water Act, and shall also become conditions of the 484 Permit for the project. If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing, You must act within 60 days of the data that you receive this letter. To ask for a hearing,. send a written petition that conforms to Chapter 160E of the North Carolina Ge-eral Statutes to the Office of Administrative Hearings, 6714 Mail Service Center., Raleigh, N.C. 27699-6714, This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Mater Quality under Section 401 or the Clean Water Act. If you have any questions, please telephone Mr. Alan Johnson in the Mooresville Regional Office at 704-663-1699 or Ms. Cyndi Karoly in the Central Office in Raleigh 919-733-5+721.. Sincerely, for Coleen H. Sullins Attachments cc: Army Corps of Engineers. Asheville Ian McMillan, Wetlands Unit MRQ, Land Quality Central Files File Copy Len Rindner U.S. ARMY CORPS OF ENGINEERS WILMINGTON DISTRICT Action ID. SAW-2008-02222-360 County: !!'Ceeklenbure USES Quad: Harrisburg GENERAL PERMIT (REGIONAL AND NATIONWIDE) VERIFICATION Property Owner rkuthorized Agent: ?N'P East Acttuisitions. LL,C. Attn: Dan Cimaglia Address: 1001 Morehead Square Drip°e. Suite 250 CCharlotte, NC 282033 Telephone No.: Size and location of property (water body, road nante:`number, town, etc.): Campus Corners Apartments located on an 8.2 acre tract off of East '.Mallard Church Road; in Charlotte Description of`prpjccts area and activity: This permit authorizes impacts to 0.03 acre of wetlands and 185 LF of an intermittent, UT-Mallard Creek for the purpose of ac+ omodattin the construction of multi-family housing, associated parking, and a star water management facility. Applicable Law: Z Section 404 (Clean Water Act. 33 USC° 1344) ? Section 10 (,Rivers and Harbors Act, 33 U SC 4035) Authorization: Regional General Permit Number: Nationwide Permit Number: 18 Your work is authorized by the above referenced permit provided it is accomplished in strict accordance,, th the attached conditions and your submitted plans, Any violation of the attached conditions or deviation from your submitted plans may subject the permittee to a stop work order. a restoration order ancFor appropriate Iega.l action. Timis verification will remain valid until the expiration date identified below unless the nationwide authorization is modified, suspended or revoked- If., prior to the expiration date identified below, the nationwide permit authorisation is reissued and or modified, this verification will remain valid until the expiration date identified below, provided it complies with all requirements of the modified nationwide permit. If the nationwide permit authorization expires or is suspended, revoked, or is modified, such that the activity would no lonµ: er comply with the terms and conditions of the nationwide permit, activities which have commenced (i.e.. are under construction) or are under contract to commence in reliance upon the nationwide permit, will remain authorized provided the avtivi,N is completed within twelve months of the date of the nationwide permit's expiration, modification or re?,oeatjon, unless discretionary authority has been exerL:i`cd on a case-by.-case basis to modiR', suspend or revoke the authorisation, Activities subject to Section 49 (as indicate:l above} may also require an individual S:i >n 401 Fates Quality Certification. You should contact the NC D1 ?'kion of Water Quality (telephone (919) 733-1 to determine Section 401 requirements. For activities occurring w=ithin the twenty coastal counties sultjcct to regulation under dhe C olstal .area Management Act (CA MA). prior to f7egi.nnin work you must conti,t time N.C.:Di\ i,ion of( z Management. This I partment of the Array veri Ii?ation cleats not relieve the permittee of the responsibility to obtain anv other required Federal, State or local approval-, permits. If there are any questions regarding this verification. any ofthe conditions of the Permit, or the Corp.,; of I ngince-rs regulatory program, phase contact Steve Chapin at 928-1-17 1-"'9fff}. Corps Rt= ulatctry Official Ste C Ii i +itt Daie: August ?l. 2t){)8 Expiration Date cif' Verif ication: August 21, 2010 The lZ'ilniin?Ion oniimiaci t: pt oviilin tits hi h si 1e",,el ofsuppart to the public. t t. ensure we 41it .lr'n14 :f11t \N f 4?) ill 1,L?ii. t O :oil #T .7? _h aLIS1Ci i3tl1C. Determination of Jurisdiction: A. r-1 rlasC on relif?itn3r_F .ippmar tt z il' It'.'t A ilic 1. \ iI,:Iudin.. ands .4 nlnit? the ah',!v af c ,. drwribcd pr(ject area. `A hi., M liniinar°, detemiinati to is not art app ;:aF,:l it; action t ilic 1)e:i4ultatory Program :' dm mstrat-ive Appeal Proxs,, j Clc:ente 33 C1 R P.Irt 131. B. ? There arc Xa\ i+uable Watc_rs of the United tt s 1{ idiin the aibo-v-e i cscriN:: rroWct ar a hjr t to the fi thu Rive.r,? and l i a.-Nir=:Act and Lctatata 404 it the Li::z3n WaiCr A?'t_ liCrYrtit r tliref?lent`, i Clt)i1 ! } 1, Unless there is & ham-,c iii the hi" c,r our nul?li,;I? i rrLt iatt:3214, this determimition may bu r=,' ie,? up,,;: f-,,r a period not to cxL.+. iit i' ars from the date of this nou i ';.lien. C. T1tc t are wfitL?rs o thu US an&w wetlands within tine above described prc>,ject area subject to the permit requirements of Se:tlon -fit.)-} of tics' Clean Water Act (CW )(33 USC § 12f'"-i. Lnless them isa changer in the lay{ or our publidied, e rulatic i?. di,, dcic nimation may be relied upon for a period not to exceed fig=e, years f-on, die date of this n 'ti:<iiion. D. n llic jurisdictionril arras within the above tie.,rilxc pTo1j,%:i ai°a have been identified under a prev=ious action. Please rcteren jurk ictjonai determination :swell -, Ac_tion ID Basis of Jurisdictional Determination: The rite contains wt:tlartd, as determined by the SAC E 1987 Wetland Delineation Manual and is udta:ent to a stream hannel eiat exhil nl, mdicatcrs of ordinary high water marks- The A allard t T ! uItit ti ?trtaT23 channel on the prc,pcric is an unnarred tributan, to Mallard Creek which flo N into M flows, into the Ro,,kv RI cr kdti:'r, lo,r s into the Yadkin ti\'cr and uluniziely flov; ?, tt, the Atlantic Ocean thro h the MallardC.rcekt-Rok'+'Rivcr'-Yadk-1ri 1.ILC:r=v l:in 1ki?icli isa`ce:;Ion 10 waterway at Bh-?,:!t Falls dam. Appeals Information. {This information des not apple to preliminary d °t{ Z .z l i ..., k indicated b, Para graph A. above). Attached ifs this ?i Rl.i`<itiilil 1? an i,E i :`{`eel ?i1:2s iCti )ilal di t Sit74Patit i1. fti>U Fie 3i? in tiiiiLiit {';'t?: tlt ii appro cJ ftirisdi.ti_"1a1 determlr,iili tt.. you car; r? ak1 . t', i l:i?11)t?t lint: sappt.. tlnd-. 'IR L . Tl its 7t ?T3.11 fiiiidis'i{tiltlu313tit,: >i ?l? a1 l is tti t at>i utCt ;tier, tixr.,npc:al(Ri'{; CO= vour-xjtist tot, appeal this dtt stiJmn1,.:i)mplctel 112 i iorn'i +'til,: follouingaddres-7' District Erigineet. W IImingIor) 4t UialoryProgram Attn: Steve Chapin, Proie; t 151 partor, Al,:nu koll r l 2 Asheville, N ru' t azolin:i 2ti`01i1 in order for an RFA to K' a .ct t u h, !h i orl,s, ?Iie Corps must determine that it is complete, t ;:i it r et . iii. criteria for appeal under 3 £ R part :1.?. and that it has been received by the Division t_)rtici;:.• :Iii=.i; (-t? L\ ,i the elate of the l* AT'. Slhould you dc:ij#: I,? submit an RFA 16rm, it must be re,:'ei e at tl V. 0,,,In btl days from the Issu, )aie b ow. **It is notnecessary to submit an Rf , 1,rrn "o the Division Office if you ate m x, to in, met in,? icon in this correspondence.** Corps Rcgu1xo-.\ Official: `,.,vc C nat iri Issue fate: August 21. 2008 C'opN ur ni,%bed: Mr= Leoinar-tf ''+. Rinduer Permit Number: SAW-2008-(1' 222)-3) 60 Permit. Type: N WI Name of County: kloc icabur Name ofPennittec: WP East.Ac?.luisitkn s, LLB':, Attn: Ilan Cima lia lute of Issuance: Aua st 21, 200 Project 't : nagger: Ste\ e Chapin Upon completion of the activio Zultno ''Ld \ this permit and any mitigation required by the, permit, sfL.,,n this certification and return it to :he following address, U .S. 'army Corps of Engineers, Attention: CESAW-RG-A 151 Patton Avenue, Room'208 Ashes i11L, North Carolina 28901-5006 Please note that your pe; emit: cc ac,, ivitt is subject to compliance inspection by an U. S. Army Carps of Engineers re resentati? e. f _,ou fail to ?:nnipi} «ith this permit you are ;?snicct t permit suspension, modification, or c?it3i ?tii}n. 1 hereby certify, that the work authorized by the above referenced permit has be!ca completed in accordance: with the terms and conditions ofth: said permit, and required tmiti1Jti(M Was completed in accordance with the permit conditions. S itunat ure cif Permittee Date Applicant: )4`i- East Acquisitions. LLC "Ile S 1. _'JO7,- ? Date-, zkuLust y 008 ' W Att'n: Dan Ctrriat lta ?0222-36') Att ached is. See Section below INITIAL PROFFERED PERMIT (Standard Permit or Letter of A permission) PROFFERED PER-MII i,'Stt.ndard Permit or i:?tit??+? B PERMIT DE? IAL C X APPROVED JURISDICTIONAL DETERMINATION D E-RIv TN A'1'ION, PRELIMINARY J RISDIC I`1't NA.L DET E y ??? ?y? e ea -of ?'j, Ond ti omens riding nAdwiny? t 1e above f - tl? ? l ? M 3wcs+W D'YM-?.I...?.'.ll?vi.?t o?`reg Q. . INITIAL PItC FFLR () P I t.Vl pCIMit. ACCEPT: If you receittu.I Stun al'a flea-nit. o I la ,: 31 tht p T1Y i do.-timvnt and return it to the distrscl engit.?:.; ?o ,t!: authorizations If you rece;\ d a _ Et t o Pcrln];s son (I l ll' 1. is 2 i t ate.' ,SI ibe LOP and your tt ork is caught)"i.,,cJ- ? .; itu t L on die Standard w°'i tmi air .t c^t tl t o tli€: l (>i' T1leitn tti:il l >t..i j:i M,: pc nllt in its enli,-e". <"£Tit1 waivall "l f `YtS t, appc it to periXilt lilt ltti in-, Its ti;I=, and .t?„ tiEtt)n aaG a:pmprcmt'e i iUrlti tit tl }t«il /t 1tt;71llmatiiln a aSStSeicTtC It lth the p li it,, OBJECT. if you object it, tite nr 1'1iF (Siand.- -C or I ()P) f>? iillti c. t:l:ta I - i 1111i .<.nditic;ns therein.. you naay request that the permit be modified aecordint'l?. Y •u nltl?t , +rri ,l tr ? cti ?i iI ;', ,±li? ,: II ::I€ ; F;ttirn ill. firm to the district engineer. )'our ob cctious must be received b" the district tni;ine •tittlltt Y,! tiI::3'• Cif IiTC tl lie i itl2? nc111 ' ? tti 11';II forfeit V{3iir r2' lit i s upnedl ii)ti;' 1e11er. 111:: C,.`trl i ? il.''.SIC', t?:t, `t ulliatt' 1i)ll<' ik?!...l: ? 3?ii F7i?:1. <#} tilt 7+:1 ."I the permit in the future. Llpar rc u 1 t i permit to address :di of your a oti,-- `nis 13} 2I odifl Ili: T ` 1Silt; l ? SLI ti ?,,o n o voui `i having dC't rfi7iIl fj III<It tii? } L FI:1, tint"tuf f i> ° 1} tU l i;ti F Ct i,tlltitl tt'TtiI4i1 :1I2 i , 5.:; i4ti3Si ?',u ohieCt unN, iti ` Will send you a proiterei. pcrnli( for \,our rvi:o l ld rzalor, ,l 111dl,,al::J IFI s4rtion }1 ? li?tt B: PROFFERED PERMIT. You may accent or appa l the l)cr trait • AC'C I :PT: if you received a l tanda-d document and return :E .(iii'.' uzstrict er .3., per for i:i=< 1 r If you received ii 1 . ,C S 3i isL; ?Tli tit<; <r 'T l }i J, t ltP ti :I t" lT the UP and you t<,)..: i „zlt.`Ii€Tt _ C . Y,tur authorization. on the Standard Permit or ac-ccPta nL. .: tl/t i (W zn? ni , diat o" the permit to 't, 1;11n,,t an? v ..1? i i to aiv al die permit, P.ncludin- it-; terrrms anti cond]1,1011 1Il' ;lists? 'tOri lt3 ttidictiC713 s1 iiet£ SIIII12317on+ <lti?; ;,1t _ 1['1 is t '; l - C.1?i. • APPEAL: If you choo%e it) dt hne &, r r.>tic J p1 :2 f Sian1ard c3- Lof" fx; a:.ye t :'rTTms and corl?.+:ic,n you . t 1, _ Sc--Ff ;r, II ?t ftri ma3 appeal the declined permit until 'r h7? t n-Onc,;r? . Adiul i1:strar,t E L:i I l,j , mpIetfi.t and sending the form to th dil i +: n 4F.t'Iiwl ,T. 1111 f0rlil ,4!u,` 11 l}, the jl i',l 1i `251ti S2(lr Y ?j$Yln 60 days ofit,, ,.-.. {.'i this nouli ce.. C: PERMJT DE-4NTI.AL. You may appeal the denial of a permit under dic ? o:q, ?_1( Linginc-:ris AJ-1.;ni,,fm-,6ve Appcai Is, .; _ nz ccmiTipicun Section li tmfthas norm and sending the frlrTn to the division en4inecr. hi ? > n7 Tma t Tic' 21 Ins' th:.i±t.;t,> within Eli days of the bate of this notice. D: APPROVED JURISDICTIONAL DETERMINATION-": YoU May accept or :la)t)e jl tliC el fD or provide new in rn tion. • ACC°EP , You do not need to n at i f,, ffi : Corp,, to accept a approv JD. I silt re ?cJ nclttf? ?Ef C , I t? .. ,Ei.3lt ?+ iii. s , ';?1' t}ae dat4 <mf ?nsthat you accc-p: the approved J.D in ats ? itl t. and waive ?l 9intj,., :t JDl tflis mail e. me # appeal Pl-o e,? i < i.3I31 `scat ?' 4iCLIe?n II eat Iht i.?l ..:£Ir li ,ft: 1=:.I<j , ... ... + i .+ ., 4;,>) m £, tit i4 ,, t,. . ` tE:t i.ai t'i'+S f1T7 tS?>r-t(;r:°r I3.'Itiltii €IlI tli i", i11L Cit.-3.: i,i .,:f.. 3t)?i ?` E. PRELIMINARY JURISDICTIONAL DETERMINATION-: You do not nc;Id !tio r,:- p Ana Corps : ? .}l.? 11?1`. .. L`1 +:?ii .13le. t! l`1 ? 'ti 1+?? ? ? ? . -.?'clhr 1 . ? i?. ' .I Y. (? p r € ? .inam J.D 1j .?? .tt imi t ca tc` €w' i' .i3 r .rx,- ,ID, ! I, ll i i 2 } {eR j ? - gp y q ?y t .S g ?? g ? Y 1 5 > ? { { ? y ?? ? ( .> t? jjT Athe l3" ?• .ii\?S It..l 1 li. t. ?n c- instiu:tion. Al s ?qou 318a provi .: n?:w . 3.D \?)ZI413 i. . 14iV {,:Y?? CLp #.•£3I? .. 'i?iJSl y?.Z.l l.t ' { c'm SECTION I1- REQUEST FOR APPEAL or OBJECTIONS TO AN P ITIAL PROFFERED PERMIT REASONS ? OR APPF kL CM OBJEClIJNtDcscrt'ne VOLIF .._.,.?; . ?,??u 11 t:i. dec,.sion or dour € bject.ions to an initial protTered permit in clear cc}???3?c tatem n?s. ?'ou naN attach addit € val nfor .iti(:)n this form to clarity where your reasons orobjco,lons are addressed in the aidnainistrativ record..) ADDITIONAL INFORMATION: The appeal is limited to a cif the adminisira lvc r?:,:or€l. the Corps memorandum for the record of the appeal conference or tmeetingg, an piny sui)plemcntul it t;?t-mati n that the review officer has deteT-mined is needed to clarify the a dzuinistrative \clthc r "he appeal 11it nor the C€#z:-!s may add new information or analyses to the record. POD' OF CONTACT FOR QUEST10NS OR fNFOW0 ATION: i?. ou a% L qucs?ii n ret? >?c'.in this deci,llon t,ie if you t t1i. qucs,,joi ? re. dir._ tl., aF-,€,.l r-), appeal process v€ u may cc)ntac;t: you may als,F cant tet: Steve Chapin, Project Mari-oge Mr-Mic ha. I". Bell. LiSACE, Asheville Regulatory Fig:ld Office A€ rnir i>tt at,ti;: Mite, Revie ° W.- 151 Patton ,Ave, Room 20', Asheville NC ?880 U. S. rmiy C carps of Ivn trrecrs> Sc?utl} Atlantic Division 828-271-7980 60 Fo zvt Street, Room QN1I .a. Cc,-orgia 3030:1-?Sfsl RIGHT OF ENTRY : Your ?marmatare below grants the right o to Corps of F.;n_ I,z_ t_ ~ ,,.-s nncl, and any . aovernment consultants. to c:onduct ins c';tigations of the projt_:ct site dui-i u t hLc ourse o Clie appeal process. You will be provided a 15 da notice of anti lie invest n-,ati€mn, and will have the ,-, spj )rtun1fl to participate in 0 sit,, i vestieations. 9 Date: ' CIc !,.mnv lunnacr: Si xnaturc € f appellant € r a,Jez3t. For appeals on Initial Proffered Permits and approved Jurisdictional Deterrinnations send this form tn. District Engineer, Wilniing4on ReggulatorT Division, Attrr.Stcv Chapin, Project Manager, Asheville RegulatorA Field Office, 151 Patton :Avenue, Room. 208, kshec ille. NC; x8801. For Permit denials and Proffered Permits send this form t€3: Division Engineer. Commander. t- S. 1rmy Engineer Dig isiun, South . tiarnic. Atin: Mr. Mike hell, AdrninistratiN e Appeal Officer, C'> SAD. -F`T-t'O-R. 60 For,,, th '`treef. Room !MIS, Atlanta. C eor=.;ia 0 WI-S'801 C'l SAW-RCi-A!C'l, p:r, D TF:: t:?; 2t. ?t.lr MEMORANDUM FOR RECORD SUBM-C 71. Consideration :ii'C'Utlnpensaton, Mvig.ititan and i' t.4 s t 113n pacts to l ,?}.. ,z e'r ii Spy ;c;. C;ultt?,? Resources and ls,, .., :::' ? -;la Habitat. 1. Action IL). SAW-2008-02222-360 2. Project Name and Location: WP East Acquisitions, LLC, Att n Dan C:Lmaglia.i Campus Corners Apartments located on an 8.2 acre tract off of East Mallard Church Road; in Charlotte 3. M jii;ti ation [Section 404(b)(1) Guidelines]. a. Ias ipp'icant avoided and nisinitni ed impacLs to the maximum practicable extent? YES If' NO. l_:4TkIM: h. e:om ,)cn: torv n,tt fiat ion L.xp .I is Minimal Impacts and aetuatic reso-urces are of low quality. 4. Enda ger Species (Section i of the, ESA). a,/'??1 Will am threatened fly :tli;t<?I1t,.,ri-c-d sp:':'It? ?3!'"..I.i?{ii liabl:ais be ?\ a%l- a project'! ; s'.\O: Fedcr Illy' iTttozs m-'erect i ihrc tt Qd smecie,,. staff lis[rd Sp iita ?P? tl 'G ?l coal"nu ..:c,4. If YES. describe steps taken to addr"ss concernsi: . Cultural Resources (Section 106 of 111,10. a; 5V ill an c': iic t?ioacted i ;7 O hi. ,li z ,'' ')IMICIL11-C- b,.y 1, <l rI7F stC1S Ittl{ ;i ,tF .let.tt'k' `itll ('r21. . Essential Fish i labia-,t (50 CFR Pa-t "'oo, a. Is this a pr(?jt?, th'-- <td-? sc!N .. , t c" en,Jal ti.sls habitat"' NO b? If YES, sic-XcTit steal «ake t to at is ?: Basis for Jurisd ction. Cot p? r LEONARD S. RINDNER, PL:LC. nvir«nme tal Planning Consultant 3714 Spokeshave Lane Professional Wedand Scientist Matthews. NC 28105 Land Planning (704) "4-2277 July 7, 2009 Mr. Alan Johnson NC'Dl ?\'l2 ?Mooresville Regional Office 610 1-test Center Strict. Suitt 301 Mooresville, NC 28115 Ile: Transfer of )'V O 08-1158 to Mallard Creel: Ltd. From NVT Fast Ac(luisifions, 111,C" Charlotte. Mecklenburg County, NC Dear Mr. Johnson: On behalf of my client. Mr. Will Morgan of Mallard Creek Ltd_, f a requesting a transler of the Approval of 401 Water QuI- III\ Certification with Additional Conditions. In addition, the pr(j t site is sui?jc;c:t to the City Of Ch Irlottc's Mate delegated Stormwater Program that mots the requirements of phase 11 NI'DES stor-mwater program. This is applicA through their Post Construction Control Ordinance (PCCO), The City ol'C h arlotte will require the 4043401 to be issued prior tc3 approving the phins. Therefore we are rcclucstin`i that the transferred 401 Water Quality Certification be issued -,vitla the 9Ollolt`ing m2 "fic:iu'L)n to the stormwater management condition. -An approval letter from the City of Charlotte and at leis one copy of the approved MP including; plan details. ca:lculmons and other supporting inf it-mation must be submitted prior to any approved impacts to streams andror wetlands". It is verv i Ui jort<int to dote that the dcvc:lopci-, engittc:crs, Itirl platmers on this prolcct have no predictaNc way of accurately determining the throe tr ime for the revie?k jnd approval of the compreh«taiic development plans once the plans arc ?Libmiucd Lo tlae City- i C liarlc3ttc, Therefore the N('[)F',R should allow the time necessary to submit the approval lc`ttcr wid plans from the Cit} of Charlotte to NCD NR or include langu a c that allows for additional ticaic tit be requested if` ut:-eclcd. Plc askicoill, iron- it-you have any questions. Thank you lt)r your con?,idc -ation. ?IU? r aj.-.f-owird P limier, PWS Fin Ironinciii.il I'l,irming Consultant ;.' ProiessiOnal '!4 ctland Scientist Cc. Mr. YVIll MorjTim N4 third creek'. l:tti. 'O"t) Ihirtlc,N Rohl-, Suke 300 Jack.., ul . I tic. I 1 ' ? Iv _ u m -1- ...mot., o' ..m °t* nk . ON! T SO -s.La! tj I'a73Ayr ?E V. '.HN 02: 1tiy ii, j'f..nnr d Cr;.,? _i Im-P l i r 4?tsI"Ez•tT?'. Ihs NOT "alfl(. on 3=..._ RAW. A& i. A . Wm v 1 4 .s nmv 01TC:: ,,:0 1a :f '7% a_, A' t is an Han, . ro r i1 Can t . A- A in f'? i _1 .':'.?ji". No Rit ?a7,s.'C. A ..Js,.f'?f,.;n "01 al;, t ...:'s, Wily i a:-nt f ? ?A0 ,' d 10400 h t. ..r=,_ ar Ij fa _ ,<s. P"" :rw. - tY `P E, AA ; .N W 2 '"PF'.1'vrAL V1 401 4'.. .w3 s ;. ?r t, j f !i`if `'o;:v 1 al li,?C?,€ L _l?}'Jil e is`e'<i':ii;-; .as have ,. a= r3pp(, iaf in _.uf,? anc;, 111 £ t:; ... s£_. f ? t3 Apa t 05 War f E. * ?Ir u! ;ntv>'.-q._ _.w to ivy ?.. ?.. l;', If r'.''£.;e ..,r..^,.., } tie £so;,C.: a. n cc ? >'£?ts"„? VV',J£,.,: i L.'??.' w??. ?N .?9 _ ._ ,"i?... i ;. }w',L' -, u']ha ?'tt'`r..?3i erl 4 If i ff Sis rL:"•`.,t ? s _ ' Q-19!G>une;zfl ? A,'?t;,n-,'n': "_#:. ca;.'. ?v _;vw'e,-j or; •_s" f yy+? rr n f 't e ?_ _......__. ?.._ _....._ .?f.._.?3 - T Engn e rs r}e aL.x st y ft' f,E y ?S-' tr.:'il"4''k+ .??:.,1 £. •.. '.f !_ _ ,.T a :^ ? t. y s .. p.,,``,,,.....: hl; 04" ym m.;',t'om`.`':{ .. c - Er- 'I _. gulat The:: . f "r-. :.f &M '>W Wr kt-:.-l th': „` }4s ?.4 :*"d i.. _ £ '??'?. hi#Y• ?"f{.r i"' :3 S. -..7i -; r .?# z.,_, i your r nitm. 1 you •+i a " ?f`. .. r.--?i'=l <„.._st'? '.?? 2 .?L'??'„ i. ?? ? rf..;; J ?°?1' ? ,.. .,?'itija.r•„`, "? vi _F''t £f? ie. ...? ?£>. z5 a 'r a M _. sx ":? 1 ?L r? `.r 1"•? z .j'? 1t £ y i`_; ?-e ? e4 ' a ?' _i Ji;F to °•. CWTP? WS T" 4-le s" r a f 1 .vaci;a?a i;,?i+(`? Mv_ t ?; "..?. 1- :t, ,- ?,i _.,. nr"` .. - - _ A ii. j 4 t t ,fie It ; lver?,ic tt of ,,: y,.mns r v`r mA ;'y An + 2121 QaAr e ._ . . w `f6catit!i Sri water ;" a g.me3 ! ; is s snail be a;-.,•rnd i 9 tx 3 e `€m; a? is s# ewlity1 in ". i i WY i ., a:. a_- 7a;- CPU= i ?:. Inq the 'Exprr'ss ! ga f esp . _?? approval - . a. !' =ew Pr !dram j•-ti.`nVe 4 c.hw ` If< you, propose to use Tt Express r t a p ropi-tate fee w$ 1h the rJan The _.. 3rm', v,,aier #mari clan ma._! ij i. Ei', . pi-vn i`ions O ,{ biz~i E141F L', ?... _'.. .. ? `? tiitp: <rji`ot*,- C te si.S la "' vi-i z id ACT an! des# .n T SS 1 AQ: W the MOSI ,C' w `-' ... r t I` -,d .u l....,,, .. ?$ Lwow ? .., .. a apt; r, a-'e!?t UtJ1![s.J a .u. Wilms :A- :,r: :P4 bv Ws Er i. ?.. ,3istt iY m A'r tic ;tans g- _. e SK jc? A: s, ._ ?. _ .,?.)SW .ate , . . J r .. - .. -.. _ . 211 1" a ? r 11- :w L3_ R ^` .1 r° 17, C n, ?4 l Yin t_, 1 ?_„? r - tt t ?,. t,4. ?? Ott.-, Cr. P"I -,,f E, i6?}i? IY .r. I yJ}. eh"i 4{ # l.?t+ S, i 4, ?i3??ie Y.lf )?3.. Cd r}.,., IJI !I:-,, to P 0, L .- z- rrt'kar "A'I # C) a tlr. Dan Cimaglia V F' East Acquisttioris, LL <001 tb ithead Square Dr., Ste. 250 Charlotte, NC 28201-T Subject: C -iip s Corners PPRsOV.," L of 401 Vv'at»r Qualifv? Clertifi atv:m viith 'kdditjr;na ', . € titww", Dear Mr, Cfmay'ia_ Can A.'unust 25 2:008 a V ater OUalit'i' Cert ifc a. liof, issued ?c r the C-il lr) error additional cow)d4icm 3 stated that the stag -vvould apprcwe he s'wate, rianagt rr '. plan} H shoWdld have state V e Mate r de egated local autlj.., r?'iust a prcve the storm water rrlanager.'ient plan Giver that t0elkienburg u;c-=ur?iy has a r C, <3 ?`, a delegated program > t'"it'?' an review review and af??ircved ste stcfm plan , eytensior, "ror-l the a'le of iSss? a-,'lc -A *this l+.:'Iler for the rtl r is qwte?. ? j?r rappr ;al letter an J ?kar? must be submitted tv lh;-% ,Male fa,, f 'es" a t',s .irat all sther ?vn iti?ns ?) t1he previously issued ! erttflC' a iC)'n "r'l f you hav any questions please telephone Mr ,talarl JCf,PSrwI ID the lvlo j C-Iffice at 7.,?4-553 1699 Dr Ms C n;;r partly in the r",rai 3f-fice in F,aiPiah _.1 `3, f 1, jle r1 1. '?, l we r ry iy (7r'; r ;Englnees5 lan (3ctJOlan Vietianc-js 1, fM Rindner: Len J NCDEN N,-)`'h 3rt_ 1t" ; Cje, -jr'r aenf, E-Jrr,. rcjnmi? -nl -3r1 r'bVural R- Division of Water Quality DiiVQ# 08- 1 1:7; Vecklenburg Count Y Mr Dar Cis"r~iaglia 'VP East Acquisitions, ..L 100) > Mx h ad Square Dr, Ste, 250 C Subject: Campus Stormwater Ran E:xtensiQr APPROVAL of 4C, tVaIC-r 01-lali y, C4rtific-aton wit dditictnal Conditions t Dear Mr, On Au-gust 2-5 2100 a ""ater Quality CertifiCati n was issued fur the subject site Additional C:nnditton K? stated that a storm water p#an had to be submitted within 60 clay's Df the issuance of *Me -'ertificatton December 2008, a 150 day extension was orantec I' ?ias been regj stcd that a;; add!*.iona extension be granted due to he current economic conditions Th+?rCf:>re an, addifional 120_ day extension f sr the star mwater plan is hereby granted A copy of the approval fetter arij plan n-Ust be submrl;-r-d tr--j the -,fate Teri cur files This is the final exteri ion any futive c que-st poll -`e?r?ire a neVV ?iUbmitlal for a 4101 Cerlificatior, Be advised Inat all other conditi3ns of the ,prey jousiy issued Cerkfi atiDn sill! anpi?,. If you ha'v a 3 y' questions, please telephone IAr Alan Johnson in the Mooresvilie Regional Office at 704-66'15-11E--99 r Us Cyndi Karon y if, the C:en rai Office in Paleigh Stn?erel? A rCroIE-- Sullir s An 'Corps of iar, M?Mulan `k'Jollands Unit i .. ..s - . .. NS ?rl,?7? 411 $Y.i LEONARD S. RINDNE PLLC Environmental Planning Consultant 3715 Spokeshave Lane Professional Welland Scientist Mattl ews, NC 28105 Land Planning (704) 904-2277 July 7. ?009 Mr_ Steve Chapin L.tS :army Corp, e,f Lngincers - Reg. Field Office, 151 Patton Avenue - Room 208 Asheville. NC 28801 - 5006 Re. Transfer of SAW 2008-02222-360 to Mallard Creek Ltd. From WP East Acquisitions, laic, Charlotte, Merl lenburp. County, NC Dear Mr. Chapin: On behalf of my clie-,nt, Mr. Will Morgan of Mallard Creep Ltd., T am requesting a transfer of the nationwide permit verification in accordance with Condition =-2 5 Ofttw Nat lonwide Permit General Conditions. In accordance with Conditien#25 a copy of ttte natic nwi e permit verification must be attached to the letter, and the letter trust contain the following statement and signature. "When the structure or work authorized by this nati jnwide pennit are still in existence it the time, the property is transfer -ed, the terms and conditions oi'this naallonu ide permit, inchldirw the sp, c i al conditions, N, 'll cow inue to be bindinL, on the new owns-rts`f of the. property. To Aid itc the tr.mt .,fer of this nationwide; permit and the associated liabifilic, associated with compliance with its terms and eo ditions, have the transferee: sir'n and date below." (Transfere=e) (Date) L lezist ,g ntact T019 /ou have any questions. 9"I1 1''Onaird S. R.indner. P WS Fnl ironmental Planning Con?,ultani Professional Wetland Seient st Cc: Mr. Will Morgan Mallard Creek, Ltd. -10N Hartley Read. Soitc 00 Jac ksonvillc. Flu 3-2-257 I`c le. 904--` N ?-7810 LEONARD S. RINDNE PLLC Environmental Planning Consultant 3714 Spokeshave Lane Professional wetland Scientist Matthews, VC 28105 Land Planning Tel+e: (704) 904-2277 July 7, 2009 Mr. Will Morgan Mallard Creek, Ltd. 3020 Hartley Road, Suite 300 Jacksonville, FL 12257 Tele.904-288-7810 Re; Transfer of SAW 00"2222-360 to Mallard Creek Ltd. From WP East Acquisitions, LLC, Charlotte, Mecklenburg Coruwty, NC Dear Mr. Morgan: In order to interface with the United States Army Corps of Enginecrs and the North Carolina Department of Natural Resources l will need your authori7 t ion. P ease sign the followinu statement. This letter authorizes Leonard S. Rindner, 'Lit C, as our firm'; agent in ratter, related to If iaters of the L7.S. and Totem. of a?Vrrrtlr Carolina for the referenced project site. This includes interfacing with the United States Army Corps of Engineers and the North Carolina Department of Natural Resource:. Vrarne Date Please contact me if you have any questions or require additional exphin ctio n. Thank yews f L eonard S. Rindnc r,. PWS nN ironz ent.al Planning Consultant Proiession \VcHand Scientist l?.fPL-?£`Piaii}?'.2St..? t°tr+. zt 3S, ?3•' +... ..i.,t?. n;.' ?-i ... ?? j .. ,.. JuC"s" t'?::rat t+s? r< # r I 4:7 _. L+'?"- lz) V A' ?) :'i ' S NNE t??it?A22'_- (ei ? s? lc?? Erii t?r IlArrllklt'i 1'9'r-. ( 101"r ,,,;hx ...A '%'oo \! 1' f ao ACCIUMr{art+; l t Q W'rt, l?utt t:jamogtt', l001 Murchcad Squarv Dncc. Suite 2qf -- -- No "Ov "nd is E_ .,m K. J . aw vwn . i, ( untpus £ oratr," parlinenh lc cumd un an W wsc•+c use oa of f: -t Mallilrd ( Burch Road; in Ch.trit)tte aw, aid a Ilk pt"mik Eii3thorim fTi13 cis tea 0,0y , III' 'US5 Ll' cafun intermittent. t"C•-Mallard Creek fcrr the yttrrwt c (? :icrr>rr cidigtipz the cr wartimitin ail mulli-family hoot in;,, usscicialtA parking, and a storm",tier marmegemcm fucihti ?` .. .. ., .. ate. .. ..?, . ... .. ..._. .. .,. _.SIt;4'... ham ut jtrrWrAmal J Vi rat L.'d. >.i:'. i' a. a Permit tbc° ` N ';'ilc ofP;:a"B'MICC, P . :tom, Neq.:"I . n. 1 t, Anil I („ ry ; . Date, 2 1, Upon iwn, ; u';`,i ) W, .1cnn [ anj ! Iil' _?,. , sy. n V ..nii,, Am and `C: um A Lvov Iitli°it'Mu ,it161t'A; !'Lli*torl A\ ,ttO ill' iT F. :I- dl€i:. _'_i 'tb1 ?f' ) ',Y l r! cJh icil .< ..vm z,xw . ..ri t r•-'-sti it N`,il?';It?" :??Si'wt'1S:s'i'.tc' ,. ,'E?u ...:? €t'? ?:?s:?Tl?'1 ?r ii ti ..t. ;1:?, .?i, ,, ..`c' .. 1.'.'': . 1 , VCM WnOy O V "> + i; k ...Dais. Q BW .{l t i. i1Cii.E°C3am k. 4i'ttl- ,tit .".L .S.'fES ?.?qu!Zion4 07 1w ... c ?? ?dIC !: 3C: f a v_ - - - - - - ------- M: Dan C , Iii: Allow 1: --Tt&i I IAI ?a .RN11T j A V A! XtE'('1.Ot';I3.?i RII11t11i?'•:i_ I?i1?_R"?i11i k F'RELI.NIINARN !?. RISDICI It NAL Df TI_i \lNA i POIN : 'INITI,At PRCfI Fi,RRFD I'f=RMT1, You Tmt', i "sW Pi kti U _.i TC ,.+ ..a..14 W ,ii.., 44 c. ZOOK' „sr ..... ;ai:111tf; lan; ml +i Its! .,.-,, w. a i.?f l... p..(i;;i4 a, 0.. ). .z _. i ,....,f: On , it ...i_ ? _ ?._ . .?,.,.. .,. -.:3i'h You i°="£i::- . . , fh, Mk ..'Fi, ..d1a>...i.,., ?,IL , o..., ,. AV-, ....4_ _ .1. wow: 3 ? ._.. Li px-?4nF..., r....3I_ ,,F,.. .Y1 .. ... .. ,. ' r .. . 4 ,v..AX I s°. m.. .. illc£ .. .4 - titer %1.. .. ,... E .... r ?. .. . ... ._. not ..,,.,1&aP. .VWMI it .. amok to _.'F.. _. w- a n7 i :M.c. . % _ .. T q { _ .. , ' h[ 1 ?ti N?I ? ;'?+,.i dFi n I w ;?_ ??: ,ix. .i t =' f •; r?r C ... .. ,.? _.. APP ROOK"', ? . PRELIkif\A Y R Ri DIC i ?0", L Lei: `l'"1,;??1I`?>>'??? ,,3? ._:. 1 ,C "+ t? I ?IL ;?rt l,'`. t rz;l ?•a # is tnird 111:1 ?t? ILi tFli ,S: it S?C• '?t'?i.'-;..C?: 2. t??s ?. cr-i3L IiIt3, . ii• ?,.??i ?'?`? a .a, .... >. ,?S :} x ..l?z'u..>a ... !w€?i ?',t G. i'L.;, ,?, IIII(mIla!1 ?I1 ?0 6u, ,iIC> T'Lt?CiLr {1 1? r _RE ST ? A m }$7f ?`! fl?+S TOAlf INM4L PROF FE 'b ERIN411.. %t rw RF SO\y i?(JP 1Pf', ??tkiT2 i 114 t.i?f 7Tt+;'?Cc{ )C,.TiI 1171" 16-,Tnt l lard iit >L lof i??' 7'"€ l.l.?[( ::"C .4(}L;C'. 4i .ti x..tlL eiC: it:. i.> t .'t, f ..,.... .. P__ Is sSii:1 ?4, iA, u . ° c •+ _... f _ _ o! 1 tic : r ?C.aI :'•x SerCflz . Of *"1L'I11i+# 11d1ItI; 2tli ,]I,, `'1`IC1L' {}tilt v, :11 .,t:t ;i1l ;31.eocx: :it .,, -ti .«[ir .t,. c i" 1' fT? k old #ICm I 'Z'rM Ifie location of :tlt is Miti:+n .',a, 1 . ;i11'e:i€ ti?c ,- R INTORM ATI ON: i ?IC"? 211c. I 1- Osil { EL I{ T .-.t'IE' ...?. . E..'` ,.t'?`I --3 iiSL' }'t a+:C•l.? i??' ..'r.. .. . .,. i .. .. '. .- ',. n,oi L-`. .. it L: IMP tt ` yI l 't1'i?i Ems. Z t??6 ils??S? ? _ cc., ._.. E c r :t?) i31 i?#I Tfl#tial Pr4fert-A P€ 'nuts and 3t} i#i} {{? ,? ti#"ttiC9it :1+st?:;? E);'t(`rii ;n1t1ofv S€'I"lt this f grin to: District E' nr :inter. ?8 i1ITIlT3;,',ton Re,,,,tiWt4)r, WN ission,. Vtrl:,Mve £' k. pi-o.:.'€'I % : iia,_*en i'he ille ReLlukwit'd Field Office- 151 flatton cnue. Room 26S, ,,hv,,, iflc• " C: 28801 For P rrltit dcni;€ls and i'r€Affered Per it1% S,vn 1 this fc,rn, iz:: I.Di%i?.ion f,nginrcr. ( ornman&.,r. t -S, k rmN l' v--oi cer 1)it #sits#i, '"?Otnh Nlikx Bd ?€l ?azaisdr tiAc ?.lif ai t)ffl i t. i'J:* 3 -#:: 1- `{ t+tS '?;r x Ti ?+? cat ;;=rr 1 SLUI.L,.">? Wi St1,.(,i„t k F. Cstui4....^:i:pp4 rl .`l! , ..ilt,. ,,..c. , "M wni ?4........ { ..l:LI`.! j\t`?td1:°iC's i.`lti t".`s wmi F NA 1100:,`-i. 3 > SAW-20CS-02222-360 N+Tr East Acquisitions., + `tr t'an x°=-a 1 :. a Campus Corners Apartments located on an 8-2 acre tract off of East Mallard C}st:rch Road; .n --barlotte i 1lMinimal §111uczs am nquittic rk-sottzt-, If fkW tiMfli,.. . S:'... .. ?? t.. <., ,...... .. c. it's 101 , ._ _ ... . ..:Y ..• 5 con m" KC v \. - , . IMP t " #-e 0 W f r t , ? CO. , _ VII s I Drainage Study for o8- I ? s a UNCC -Campus Corners Charlotte, North Carolina 1@@R01MR JUL 1 3 2009 Prepared for: WATER QUALITY 14?TI,, AND 310RMVMATER BRANCH WP East Aquisitions, LLC 1001 Morehead Square Drive, Suite 350 f Charlotte, North Carolina 28203 Prepared by: LI'? • ce Gw-- P 1230 West Morehead St., Suite 214 Charlotte, NC 28208 Phone: (704) 343-0608 Fax: (704) 358-3093 November 7, 2008 JtAL 034267 /I • IZ' 06 Gc/ wL• O k4N N litll\\ 18111 f 1 1 1 1 1 1 1 1 I 1 Drainage Study for UNCC - Campus Corners TABLE OF CONENTS Chapter 1- Executive Summary 1.1 Introduction 1.2 Vicinity Map 1.3. Existing Conditions 1.4 Proposed Project 1.5 Summary of Results 1.6 Conclusion 1.7 References 041-115 11/6/2008 SECTION 1 Chapter 2 - Post Construction Controls Ordinance 2 2.1 Introduction 2.2 Vicinity Map Chapter 3 - Hydrologic Analysis 3 3.1 Design Procedure Form: Wet Pond 3.2 City of Charlotte - Land Development Division: Wet Pond Worksheet 3.3 City of Charlotte - Land Development Division: Detention Worksheet 3.4 HydroCAD - Drainage Diagram 3.5 Hydrologic, Water Quality & BMP Analyses 3.5.1 - Charlotte - 1 Inch, 6-Hour Storm Analysis 3.5.2 - Type II -1 Year, 24-Hour Storm Analysis 3.5.3 - Charlotte - 2 Year, 6-Hour Storm Analysis 3.5.4 - Charlotte - 10 Year, 6-Hour Storm Analysis 3.5.5 - Charlotte - 25 Year, 6-Hour Storm Analysis 3.5.6 - Charlotte - 50 Year, 6-Hour Storm Analysis 3.5.7 - Charlotte - 100 Year, 6-Hour Storm Analysis 3.5.8 - Water Balance Analysis 3.6 Forebay Weir and Berm Design 3.7 BMP Riser Buoyancy Calculation 3.8 Summary of Controls Provided Chapter 4 - Storm Drain Hydraulic Analysis 4 Prepared By: Design Resource Group, P.A. r i i i 1 1 Drainage Study for UNCC - Campus Corners TABLE OF CONENTS (Cont'd) Chapter 5 - Erosion Control Calculations 5.1 Rip Rap Apron Design 5.2 Skimmer Sediment Basin Calculations 5.3 Temporary Sediment Basin Calculations Chapter 6 - Appendices Appendix A - Project Location & Watershed Determination Appendix B - Pre-Developed Drainage Exhibit Appendix C - Post-Developed Drainage Exhibit Prepared By: Design Resource Group, P.A. 041-115 11/6/2008 SECTION 5 6 1 Drainage Study for 041-115 ' UNCC - Campus Corners 11/6/2008 1 I!. Chapter 1 - Executive Summary Prepared By: Design Resource Group, P.A. 1 Drainage Study for 041-115 ' UNCC - Campus Corners 11/6/2008 1.1 - Introduction 1 The UNCC - Campus Corners project site is located in the northeast quadrant of the intersection of East Mallard Creek Church Road and Bonnie Cone Lane within the City of Charlotte, North Carolina. The property consists of the piece of land along the frontage of East Mallard Creek Church Road beginning at Bonnie Cone Lane and terminating approximately 1000 feet to the northwest at the intersection of Stone Quarry Road. The Vicinity Map (See Below) has been included to better detail the surrounding area. This drainage report has been design to specifically address the requirements set forth in the Charlotte-Mecklenburg Storm Water Design Manual, the BMP Design Manual and the recently enacted Post Construction Control Ordinance. In doing such, we have provided the necessary hydrologic analyses for all of the required storm events, the hydraulic analysis of the proposed storm drain system, analysis and verification of all water quality issues, verification of the detention requirements and the design of all appurtenances that go along with these specific topics. 1.2 - Vicinity Map Prepared By: ' Design Resource Group, P.A. VICINITY MAP NOT To SCALE Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1.3 - Existing Conditions C l h b urrent y, t e su ject property consists of four adjacent parcels of land (Mecklenburg Tax Parcel Numbers 051-401-02, 051-401-04, 051-401-06 & 051-401-07) making up approximately 8.2 acres. There is currently an uninhabited home on a portion of this property along with three additional graded pads adjacent to this lot. Per our research, it would appear that the lot immediately to the west of the existing residence previously ' contained a home as well, but this structure has been removed and the pad cleared of debris. The majority of this property is composed of heavily wooded terrain and, per our boundary survey and topographical analysis, a prominent drainage feature is located in the northwest corner of the property. The existing terrain appears to slope gradually from the southeast corner to the northwest corner of the property, which allows all runoff to exit the site via an existing 60" RCP culvert crossing under Stone Quarry Road. Several additional drainage features appear to cross through sections of the property but, in general, all appear to be tributary to the major drainage channel and convey the storm water through the culvert as previously discussed. A summary of the significant storm events analyzed in this report and the subsequent runoff assumed to be leaving this property are referenced in the table below: t 1 TABLE 1 Summary of Existing Conditions Storm Event Existing Peak Flow cfs 2 Year, 6 Hour Storm 6.03 10 Year, 6 Hour Storm 17.41 25 Year, 6 Hour Storm 23.53 1.4 - Proposed Project ' The proposed UNCC- Campus Corner project will be a multifamily development consisting of 116 residences in two freestanding complexes as well as all associated sidewalks, curbs and gutters, underground utilities, wet detention pond and a single ' project entrance accessible from Bonnie Cone Lane. All runoff generated on the proposed development shall be collected in the onsite storm drain system and conveyed into the proposed detention basin in the northeast corner of the property where it will be detained per the recommendations of the Charlotte- Mecklenburg BMP Design Manual until the proper water quality has been achieved. At that time, said runoff shall exit the basin through an engineered water quality riser at Prepared By: Design Resource Group, P.A. Drainage Study for UNCC - Campus Corners 041-115 11/6/2008 which time it shall be returned to the existing watershed as it exits the property through the existing RCP culvert crossed under Stone Quarry Road. The proposed peak flows generated by the runoff in the developed condition are summarized in the table below: TABLE 2 Summary of Developed Conditions Storm Event Developed Peak Flow cfs 2 year, 6 hour storm 2.17 10 year, 6 hour storm 16.31 25 year, 6 hour storm 23.42 ¦ 1.5 - Summary of Results 1 In accordance with the standards set forth in the Charlotte-Mecklenburg BMP Design Manual, the existing and developed conditions were modeled for analysis and verification of the design. Using the methodology set forth in the design manual, the results were routed using HydroCAD (Ver. 8) Stormwater Modeling System. The results of the analysis are provided for review in Chapter 3 of this report. For a quick reference, we have provided the following table comparing these scenarios: TABLE 3 Existing vs. Developed Conditions Storm Event Existing Peak Flow Developed Peak Flow Difference cfs cfs 2 year, 6 hour storm 6.03 2.17 -3.86 10 year, 6 hour storm 17.41 16.31 -1.10 25 year, 6 hour storm 23.53 23.42 -0.11 Per Table 3 above, the developed peak flows are designed to exit the site at the same location as in the existing condition. As you can see from this table, the developed condition offers a reduction in flow at the outlet location thus the downstream condition in this area is being improved as a result of this development. Prepared By: ' Design Resource Group, P.A. li C 1 [ I 1 L 1 1 t 1 Drainage Study for UNCC - Campus Corners 1.6 - Conclusion 041-115 11/6/2008 As a result of the analysis performed in this report, it is our opinion that the construction of the onsite development and related appurtenances will result in no negative downstream impacts. In addition to the reduced flows leaving the site, we are providing additional water quality benefits that either meet or exceed the requirements set forth in the Post Construction Controls Ordinance. With the proper construction of the onsite storm drain improvements and WQ Basin per our plans, our analysis shows that all onsite runoff will be safely collected and conveyed through the development and, ultimately, discharged in compliance with the specifications set forth in the Charlotte-Mecklenburg BMP Design Manual. 1.7 - References "Charlotte-Mecklenburg BMP Design Manual". City of Charlotte, North Carolina. Revised April 30, 2008 "Charlotte-Mecklenburg Storm Water Design Manual". City of Charlotte Engineering Department. City of Charlotte, North Carolina. July 8, 1993 Prepared By: Design Resource Group, P.A. 1 1 1 1 1 1 1 1 1 1 1 1 Drainage Study for L NCC - Campus Corners 041-115 11/6/2008 Chapter 2 - Post Construction Controls Ordinance Prepared By: Design Resource Group, P.A. D t J Drainage Study for UNCC - Campus Corners 2.1- Post Construction Controls Ordinance Applicability Test PCCO Conditional Applicability Rezoning Approved Test on or after Nov. 15, 1999 041-115 11/6/2008 Planning Submittal YES* Accepted for Review Prior to July 1, 2008 *Conditional Rezoning approved after November 15,1999, but the project is still conditioned to adhere to the regulations of the Post Construction Controls Ordinance. Type of Project = NO ' Residential Development ' Does the: 1. Development cum. disturb more than 1.0 acre and have < 24% BUA? 2. Lot size have < 20000 sf & was subdivided prior to 07/01/08? 3. Development not ' become part of a larger common plan? Entitled to Common Law Vested Rights NO NO Is the lot less than one acre? Transit or Distressed Area? ' NO NO Has a Valid Zoning use permit or Certificate of Building Code Compliance or Building Permit been issued prior to July 1, 2008 NO Watershed Dist Yadkin and SW > Catawba Apply 50' and NO + 100' Undisturbed Six Mile Creek Buffers ~ Watershed? >24% BUA Density > 10% w/o TP BUA Mitigation HIGH Development & ' Provide FLrov"i 85% --i Not I-1 or 1-2 _ Natural Zoning Area Continued on Next Page Prepared By: Design Resource Group, P.A. ' Drainage Study for UNCC - Campus Corners ' Continued from Previous Page Provide 70% TP Treatment j Downstream Analysis Not Provide 1-Year, Performed 24-Hour I Volume Control 1 Provide 10-Year and 25-Year, 6- Hour Peak Control 11 Requirements of the Post Construction Controls Ordinance have been met 2.2 - PCCO Requirements 041-115 11/6/2008 Per the PCCO flow chart shown above, the project is determined to be in compliance with the new regulations provided the following conditions are met: a) Provide 50' and 100' Undisturbed Buffers per Sections 305A-2 & 305B-4. • There are no intermittent nor perennial streams within the project boundary, so this particular provision does not apply to this project. b) The system is designed to provide a water quality to achieve a min. 85% TSS removal rate per section 305B-2 • The Water Treatment for this project is designed to meet the minimum TSS removal rates per Table 4.2.1 of the Char-heck BMP Design Manual. Prepared By: Design Resource Group, P.A. 1 1 1 t 1 Drainage Study for UNCC - Campus Corners 041-115 11/6/2008 c) The project is to provide Natural Area in accordance with sections 501- 505 • Natural Area has been provided around the site in accordance with sections 501-505 of the PCCO. d) The system is designed to achieve a min. 70% TP treatment per section 307 • The Water Treatment for this project is designed to meet the minimum TP requirements per Table 4.2.1 of the Char-heck BMP Design Manual. e) The Detention Basin shall be designed to provide Volume Control for the 1-Yr., 24-Hr Storm per section 305B 5 • The Detention Basin and Riser are designed to release the CPv over the minimum 48-hour drawdown time per section 305B-5 of the PCCO. f) Provide peak control for both the 10-yr and the 25-yr, 6-hr storms. • The Detention Basin and Riser are designed to provide peak control by limiting the developed runoff so as not to exceed the runoff generated by these specific storms in the existing/predeveloped condition. As is demonstrated in the remainder of this report, all of the applicable requirements set forth by the newly enacted Post Construction Controls Ordinance shall be met in the construction of this project. In addition to the PCCO, we have taken into consideration all of the design policies as laid out in both the Charlotte-Mecklenburg Storm Water Design Manual and the Charlotte-Mecklenburg BMP Design Manual. 1 Prepared By: Design Resource Group, P.A. ' Drainage Study for UNCC - Campus Corners t Chapter 3 - Hydrologic Analysis ' 3.1- Design Procedure Form: Wet Pond n 1 Prepared By: ' Design Resource Group, P.A. 041-115 11/6/2008 rlo(te ikec?tetabu? STORM ,A?. -?? - Se,vrces ' 4.2.7 Design Procedure Form Design Procedure Form: Wet Pond POND FEASIBILITY NOTES: 1 1 11. Is the use of a wet pond appropriate? Confirm other design criteria and applicability. (PRELIMINARY HYDROLOGIC CALCULATIONS 3. Compute, WQ„ water quality volume requirements Compute Runoff Coefficient, R„ Compute, WQ„ volume requirements Rv = 0.49.2 WQv = 0.399 acre-ft Compute WQp peak flow Compute modified SCS curve number 5. Compute CP, Compute S (maximum retention) Compute 1-yr, 24-hr rainfall depth Compute Qd (runoff volume) Compute CP„ (channel protection volume) Estimate tc (time of concentration) Estimate q„ Compute Approximate Storage Volume 6. Compute release rates Compute WQv release rate Compute CP, release rate Compute site hydrologic input parameters Development Conditions Area CN (SCS curve number) Adjusted CN (curve number adjusted for 1-inch storm) Time of concetration WQp = 9-30 acre-ft CNm-.,site = 233 ; Use 94.0 for calculation Sonsite = 1.364 Soffsile = 2.821 Rainfall Depth = 2.5B inches Qd-.night = 1.450 inches Qd-offsight - 0.840 inches CPv= 1.051 acre-ft tc-onsite = 9-M hours tc-offsite - Q,5A hours %= 222 cfs/mil/inch Storage Vol. = 1.051 acre-ft Release Rate = 0.050 cfs Release Rate = 0.3533 cfs Pre-Developed Onsite Offsite 8.15 ac 2.49 ac Z5 ZZ N/A N/A 0A.a 0M Post-Developed Onsite Offsite 7.28 ac 2.46 ac M Z-8 94 94 0M 0_5A WATER DETENTION BASIN DESIGN Pretreatment Volume Volpre = Acres of Impervious Area (0.2")(1712") 9. Compute Permanent Pool Volume and Water Quality Extended Volume Compute WQv/ PPS Compute PP„ Size extended detention - pool volume is greater of WQ„ or CP„ WQpre1 0.033 acre-ft WQpre2 = 0.036 acre-ft `See Summary of Controls for Req'd & Prov'd Areas WQpre / PP„ = 03M PP„= 1.360 acre-ft ED Pool Vol. = 1,051 acre-ft 10. Conduction grading and determine storage available - for permanent pool (and WQv-ED volume if applicable Prepare an elevation-storage table and curve using the average area method for computing volumes 1 1 1 1 1 1 1 1 1 1 1 tVtraa?arrr F*WFISTOTER R !NVA Servrc?a ?-- Elevation Area Average Depth Incremental Cumulative Volume Area Volume Volume above Permanent Pool (MSL) (acres) (acres) (ft) (acre-ft) (acre-ft (acre-ft) 618.0 0.09 0.09 0.00 0.00 0.00 0.00 621.0 0.14 0.12 3.00 0.35 0.35 0.00 626.5 0.31 0.23 5.50 1.24 1.58 0.00 627.58 0.39 0.35 1.08 0.38 1.96 0.38 628.44 0.41 0.40 0.86 0.34 2.30 0.72 629.08 0.43 0.42 0.64 0.27 2.57 0.99 629.58 0.44 0.44 0.50 0.22 2.79 1.21 12. WQ„ Orifice Computations Average ED release rate Release rate = 0.050 cfs Average head, h=(ED elev-Permaent Pool Elev.)/2 h = 0.545 ft Area of orifice from orifice equation: Q=CA(2gh)u.5 A = 0.014 ft2 Diameter = 1.6 in 13. Compute release rate for CP, control and establish CP„elevation WSEL = 628.44 ft Release rate Release rate = 0.353 cfs Average head h=CP„ elev-Permanent pool elev)/2 h = 1.04 ft Area of orifice from orifice equation: Q=CA(2gh)0 5 A = 0.072 ft2 Diameter = 3.6 in 14. Calculate QP release rate and water surface elevation Set up a stage-storage-disc harge relationship Peak stage for (WQ„), the 1-inch, 6-hour storm Peak Stage = 627.58 ft Peak stage for (CP„ ), the 1-inch, 24-hour storm Peak Stage = 628.44 ft Peak Q10- Undeveloped Q10-undev = 17.41 cfs Peak Q10- Developed Q1o-dev= 16.31 cfs Peak Q25- Undeveloped Q25-undev= 23.53 cfs Peak Q25 - Developed Q25-dev = 23.42 cfs Size emergency spillway, calculate 50-yr WSEL and set top of embankment elevation WSEL50 = 629.33 ft Embankment Elevation = 629.88 ft 15. Investigate potential wet detention basin hazard Notes: classification 16. Assess maintenance access and safety features 17. Attach landscape plan Drainage Study for 041-115 1 UNCC - Campus Corners 11/6/2008 Chapter 3 - Hydrologic Analysis ' 3.2 - City of Charlotte - Land Development Division: Wet Pond Worksheet 1 L Prepared By: Design Resource Group, P.A. L! City of Charlotte - Land Development Division Wet Pond Worksheet Project Name: Date: ioi2Ri2nnR BMP location narrative: Attach schematic describing wet pond location and information relative to BMP. All of the post-developed area, 7.3 acres, and an additional portion of the offsite tributary area, 2.5 acres, of this project drains to the single detention basin located in the northeast corner of the property. This basin is designed to be a wet pond with volume control for the 1-yr, 24-hour storm event as well as providing peak control to both the 10-yr and 25-yr, 6-hour storm events per the requirements of the PCCO. In addition to the flood attenuation, the basin also achieves the water quality requirements (85% TSS removal, 70%TP Treatment) as required by the newly enacted ordinance. *-Per the new PCCO, the basin sizing is a function of: WQv/PPv=0.30, no longer sized per the SA/DA ratio. **-The PCCO does not require additional storage depth in the proposed basin for sediment accumulation. ummarv Basin drainage area to pond: 9.73 ac. (Delineated on attached drainage area map) Proposed Impervious Area Percentage: 49.1 % (Detailed impervious area calculations attached) SA/DA ratio required: 0.03 (Use State BMP manual chart) Permanent Pool Surface Area Required: N/A* sq. ft. Permanent Pool Surface Area Provided: 13358.0 sq. ft. Permanent Pool Elevation: 626.50 ft. (elevation of the orifice invert) Forebay Volume Percentage: 19.5 % (calc showing between 15% and 25% attached) Average Depth Provided: 5.5 ft. (calculation attached) Runoff volume: 0.408 acre-ft. (calculation attached) ' Diameter of orifice: 1.6 in. (for water quality drawdown between 2-5 days) Emergency pipe diameter: 24 in. (calculations attached) Temporary Pool Elevation: 627.58 ft. (routing calculations attached) Spillway Elevation: 629.58 ft. (calculation attached) Spillway weir length: 24 ft. (calculation attached) Top of Berm Elevation: 630.50 ft. Freeboard Provided: , in. Basin Diagram (fill in the blanks) Permanent Pool Elevation 626.50 7,777 5 Sediment Removal Elevation N/A** 5 .............................. 621.00 25% Bottom Elevation % Sediment Removal Elevation N/A ......................... 25% Bottom Elevation ?]_$_OD Forebay Main Pond i CHARLOT . EN M1EEMIN & PROPEM MMMGEMMr Land Development Division 600 East Fourth Street, Charlotte, North Carolina 28202-2844 Revised 7/2005 Telephone: 704/336-6692 Fax: 704/336-6586 landpermits.charmeck.org Drainage Study for 1 LJNCC - Campus Corners 11 I' Chapter 3 - Hydrologic Analysis 3.3 - City of Charlotte - Land Development Division Detention Worksheet Prepared By: Design Resource Group, P.A. 041-115 11/6/2008 City of Charlotte Land Development Division l' Post Construction Controls/Detention Worksheet The following section is information that is required by the City's NPDES permit for permanent tracking of proposed BMPs and compliance with the Post Construction Ordinance. Complete all information. I' Project Name: LJNCC - Campus Corners Date: 10/31/2008 Project Address: 523 East Mallard Creek Church Road Charlotte NC 28262 Subdivision Name (if different from above): N/A Phase: N/A Developer Name: WP East Acquisitions LLC I? Development Type (Check One): ? Single Family ®Multi-Family ? Mixed Use ? Commercial ? Institutional Owner Name: WP East Acquisitions LLC Owner Address: 1001 Morehead Square Drive Suite 250 Charlotte North Carolina 28203 Owner Phone: Main:( ) 332 - 8995 Fax: ( 704 ) 332 - 8997 Owner e-mail: Carter H Sim el <chs woodpartners com> Total Project Area: 8.18 acres Total Disturbed Area: 7.28 acres Zoning: R-17MF (CD) Watershed (Check One): ? Central Catawba ? Western Catawba ® Yadkin-Southeast Catawba ? Six Mile Original Parcel ID(s): 05140101,05140102,05140104,05140106,& 05140107 % Built-Upon Area: 4.47 acres Stream Buffer Area: N/A Natural Area: 0.487 acres Mitigation Distressed Business District? ? Yes N No Transit Station Area? ? Yes N No Is site under one acre? ? Yes N No Total Phosphorous Mitigation? ? Yes N No Natural Area mitigation? N Yes ? No 1 I Revised: August 2008 Page 1 of 6 The following sections help to provide information on volume and peak controls for the site. Attach BMP Inset tables and Design Procedure Forms for each BMP to show that each is sized appropriately per the design requirements. 1H fl Project Description: Attach brief explanation of detention plans and any assumptions if necessary. All of the post-developed area, 7.3 acres, and an additional portion of the offsite tributary area, 2.5 acres, of this project drains to the single detention basin located in the north east corner of the property. This basin is design to be a wet pond with volume control for the 1-yr, 24-hr storm event as well as providing peak control to both the 10-yr and 25-yr, 6-hr storm events per the new requirements of the PCCO. In addition to the flood attenuation, the basin also achieves the water quality requirements (85% TSS removal and 70% TP treatment) established by the new ordinance. PRE-DEVELOPED SUMMARY: (Node IS) Basin area: 8.14 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpre: 25.6 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Curve Number, Cnpre: 75 PRE-DEVELOPED SUMMARY: (Node 2S) Basin area: 2.46 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpre: 36.2 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Curve Number, Cnpre: 77 POST DEVELOP - ED SUMMARY: (Node 21S) Basin area: 7.28 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpost: 5.0* min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Me cklenburg Storm Water Design Manual - SCS Travel Time. Runoff Coefficient, Rv- 0.492** Water Quality Volume, WQv (ac-ft)- 0.305 Curve Number, Cnpost: 88 Curve Number, CNpost(modified)- 94 Channel Protection Volume, CPv (ac-ft) - 0.879 CPv Release Rate (cfs) 0.353** POST-DEVELOPED SUMMARY: (Node 22S) Basin area: 2.46 ac. (Delineated on attached drainage area map) Time of Concentration, Tcpost: 32.2 min. (Based on the SCS Method) (Tc path shown on attached map) Reference 3.9.6 of the Charlotte-Mecklenburg Storm Water Design Manual - SCS Travel Time. Runoff Coefficient, Rv- 0.492** Water Quality Volume, WQv (ac-ft)- 0.103 Curve Number, Cnpost: 78 Curve Number, CNpost(modified)- 94 Channel Protection Volume, CPv(ac-ft) - 0.172 CPv Release Rate (cfs) 0.353** * - 5.0 min. is the minimum Tc per the Charlotte-Mecklenburg Storm Water Design Manual ** - Runoff Coefficients (Rv) and CPv Release Rates are calculated from the total developed Onsite & Offsite Areas Revised: August 2008 Page 2 of 6 1 DETENTION SUMMARY Computer Method Used*: HydroCAD Ver. 8 8.0 *Land Development Plan Review Staff will verify all detention submittals using HEC-1 for compliance with the City of Charlotte Zoning Ordinance, Section 12.6 This summary is to accompany all detention analysis and is not intended to replace that requirement. 1 1 1 Pre (cfs) Post (cfs) Routed (cfs) Elevation (Comments) 1" N/A l yr. N/A 2 yr. 6.03 19.52 2.18 Includes 1.34 cfs of Bypassed Runoff 10 yr. 17.41 37.34 16.33 Includes 3.06 cfs of Bypassed Runoff 25 yr. 23.53 46.37 23.43 Includes 3.96 cfs of Bypassed Runoff 50 yr. N/A 100 yr. N/A ' Note- 2-year storm is required only for sites required detention per Chapter 12 of the zoning ordinance. If a downstream analysis has been performed, submit complete justification for the results. 1 ' Revised: August 2008 Page 3 of 6 PRE-DEVELOPED SUB-BASIN CALCULATIONS: ' Sub-basin Name/Level: 1S (Coordinate with attached drainage area map) 1 1 1 DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: 2S (Coordinate with attached drainage area map) ¦ Type of Flow Sheet Unpaved Shallow Conc. (Unpaved) Travel Length (ft.) 200 84 Slope (%) 4.0 3.81 Mannings (n) 0.40 Time (min.) 28.7 1 4 Pie Shallow Conc. Paved 45 477 3.56 6.94 0.013 . 0.10 6 0 . TOTAL N/A N/A N/A Tc pre - 36.2 - Acreage 1.64 Land Use Woods Fair Soil Type WkD WkB Hydrologic Group C ' 0.2 Paved Prkjj, WkD C 0.43 %2 ac Lots 25% WkD C ' 0.15 50-75° Grass WkD WkB C Total = 2.48 Revised: August 2008 Page 4 of 6 Type of Flow Sheet Unpaved Travel Length (ft.) 200 Slope (%) 13.00 Mannings (n) 0.40 Time (min.) 17.9 Shallow Conc. Un aved 572 6.10 7.7 TOTAL N/A N/A N/A =Tc-- 25.6 Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (Acreagerrotal Area) z (CN) 6.54 Woods Fair WkD WkB C 73 58.6 0.15 Paved Prkiz. WkD 8 1.8 0.04 Dirt Road WkD C 87 0.4 0.07 Gravel Road WkD 89 8 1.34 W kB 50-75° o Grass WkD C 9 13.1 Total = 8.14 I- XT PRE- CN Weighted CN (Acreage/Total Area) z (CN) 73 48.3 98 10.2 80 14.3 79 4.6 CNp, = 77 POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: 21S (Coordinate with attached drainage area map) Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved Shallow Conc. (Unpaved) TOTAL N/A N/A N/A Tc Post= **5.0 ** Per Section 3.6.4 of the Charlotte-Mecklenburg Storrnwater Ordinance, the minimum Tc path shall be no less than 5 minutes Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (AcreagdTotal Area) : (CN) 0.34 Woods Fair WkD WkB C 73 3.4 4.32 Paved Prk Roof WkD C 98 58.1 15 Dirt Roads WkD C 87 1.8 2.47 >75° Grass WAD, WkB C 74 25.1 7.28 CNr°st= 88 ' POST-DEVELOPED SUB-BASIN CALCULATIONS: Sub-basin Name/Level: 22S (Coordinate with attached drainage area map) i 1 Type of Flow Travel Length (ft.) Slope (%) Mannings (n) Time (min.) Sheet Unpaved 200 A no 0.40 28 7 Shallow Conc. (Unpaved) - Pipe 45 3.56 0,013 0 10 Nominal Time to Pond - 2 TOTAL N/A N/A N/A Tc post = 32.2 Acreage Land Use Soil Type Hydrologic Group CN Weighted CN (AcreagdTotal Area) z (CN) 1.61 Woods Fair WkD WkB C 73 47. 0.26 Paved Prk Roof WkD C 98 10.4 0.06 Paved Prk Roof WkD C 98 2.4 0.44 ' 2 ac lots 25° o Im WkD WkB C 80 14.3 0.09 50-75° Grass WkD WkB C 79 2.9 2.46 CN = 78 I Revised: August 2008 Page 5 of 6 STORAGE / DISCHARGE CALCULATIONS Elevation Underground * Above Ground Total Acc. Volume (cf) Acc. Volume for all Structures (cf) Area (sq. ft.) Inc. Volume (cf) Ace. Volume (cf) (Above and Underground) 626.50 13544 0 0 0 627-59 17??? 17174 17174 17174 628.44 17960 14252. 212 32126 629.08 18616 11704 43840 43840 629.58 19133 9437 53277 53277 M Stage Discharge Co= orifice coefficient: Cw = weir coefficient. Orifice Area unit shall be square feet (sf . Elevation / Stage Orifice 1 1.6 In. Orifice 2 3.6 In. Orifice 3 5.5' x 0.25' Weir 2/Em. Spillway Outlet Control Pipe Total Q (cfs) (ft) 626.50 Inv. 0.014 Area Co= 0.6 627.58 Inv. 0.072 Area Cc= 0.6 628.44 Inv. Co= 0.6 . (Controlled by outlet pipe/strucq 24.0 Ft. 629.58 Inv. Cw= 3.0 24 Dia. 70.0 Length 618.12 Inv. Co= 0.9 618.00 0.00 0.00 0.00 0.00 0.00 0.00 619.00 0.00 0.00 0.00 0.00 4.27 4.27 620.00 0.00 0.00 0.00 0.00 14.26 14.26 621.00 0.00 0.00 0.00 0.00 20.74 20.74 622.00 0.00 0.00 0.00 0.00 25.67 25.67 623.00 0.00 0.00 0.00 0.00 29.79 29.79 624.00 0.00 0.00 0.00 0.00 33.42 33.42 625.00 0.00 0.00 0.00 0.00 36.68 36.68 626.00 0.00 0.00 0.00 0.00 39.67 39.67 626.50 0.00 0.00 0.00 0.00 41.10 41.10 627.00 0.04 0.00 0.00 0.00 42.46 42.50 627.59 0.07 0.00 0.00 0.00 44.05 44.12 628.00 0.08 0.18 0.00 0.00 45.08 45.34 628.44 0.09 0.29 0.00 0.00 46.18 46.56 629.00 0.11 0.39 17.37 0.00 47.55 65.42 629.08 0.11 0.40 18.91 0.00 47.79 67.21 629.58 0.12 0.47 26.61 0.00 48.94 76.14 630.00 0.12 0.52 31.67 19.18 49.90 101.39 • CHAIiLOTFE. Revised: August 2008 Bjlwu N&If0? Land Development Division 600 East Fourth Street, Charlotte, North Carolina 28202-2844 Telephone: 704/336-6692 Fax: 704/336-65861andpermits.charmeck.org Page 6 of 6 1 Drainage Study for 041-115 LTNCC - Campus Corners 11/6/2008 1 Chapter 3 - Hydrologic Analysis 3.4 - HydroCAD - Drainage Diagram ?I n Prepared By: ' Design Resource Group, P.A. 1S (2S Pre-site Pre-Off-site 11S 12S Post site w/ CNm Post-Off-site W/ CNm 10P P WQ and Detention BMP 22S 23S 21S Post-Off- ite (rev Tc) Post-Release Post-site 20P WQ and Detention BMP Subcat Reachl on Link ?? 041-115 CD-BMP ' Prepared by Design Resource Group, P.A. Page 2 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Area Listing (all nodes) Area (acres) CN Description (subcats) ' 10.260 73 Woods, Fair, HSG C 1 S,2S 21 S 22S 23S 23S ' 2.469 74 >75% Grass cover, Good, HSG C (21 S) 2.242 79 50-75% Grass cover, Fair, HSG C (1 S,2S,22S,23S,23S,23S) ' 0 886 80 1/2 . acre lots, 25% imp, HSG C (2S,22S) ' 0.193 87 Dirt roads, HSG C (1 S,21 S) 0.146 89 Gravel roads, HSG C (1S,23S) 9.733 94 CNm (11S,12S) ' 5.066 98 Paved parking & roofs (1 S,2S,21 S,22S,22S,23S,23S) 30.994 I Drainage Study for 041-115 ' UNCC - Campus Corners 11/6/2008 1 I I, 1 n Chapter 3 - Hydrologic Analysis 3.5.1- Charlotte -1 Inch, 6-Hour Storm Analysis 1 t Prepared By: ' Design Resource Group, P.A. 041-115 C D-B M P Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by De sign Resource Group P A HydroCADO 8.00 , . . Page 4 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 1S: Pre-site Runoff = 0.13 cfs @ 3.78 hrs, Volume= 0.021 af, Depth= 0.03" ' Runoff b SCS T y R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs dt= 0.08 hrs Charlotte 1-in 6-h , r Charlotte 1-in 6-hr Rainfall=1.00" Area (sf) CN Description 284,752 73 Woods, Fair, HSG C ' 6,447 1,786 98 Paved parking & roofs 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair HSG C ' 354,840 , 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area ' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' 7.7 572 Woods: Light underbrush n= 0.400 P2= 3.12" 0 0610 1 23 . . Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 f s ' 25.6 772 Total ' Subcatchment IS: Pre-site Hydrograph 0.14 '.. __ 0.13 Charlotte i-in 6-hr Charlotte 1-in 6 -hr 0.12 Rain all=! 0.11 ------------- Rurtoff?4reF'=3 {J ,Msf- j 0.1 -, Runoff Vot6me=0.p21 of - Runoff `Depth=?0 03" .. 0.09 -- 0.08 i - - - ' _ _; Flow Length=772' T _ _ c=25.6 min 007 0 - CM -45 .06 0 05- -- -- - - - --- - - - - - - - -- - - - - - - - - - - - - - - - - - r-- -- r= - --- i . 0.04' 0.03- -- 4- 0.02-' - * - 0 2 4 6 8 1, 12 14 16 18 20 22 . 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) r 041-115 CD-BMP Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by Design Resource Group P A HydroC %DO 8.00 , . . Page 5 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 2S: Pre-Off-site Runoff = 0.07 cfs @ 3.84 hrs, Volume= 0.010 af, Depth= 0.05" Runoff b SCS T R y -20 method, UH=SCS, Time Span= 0.00-48.00 hrs dt= 0 08 hrs , . Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" ' Area (sf) CN Description 71,438 73 Woods, Fair, HSG C ' 11,195 19,297 98 Paved parking & roofs 80 1/2 acre lots 25% im HSG C , p, 6,316 79 50-75% Grass cover, Fair, HSG C 108,246 77 Weighted Average ' 92,227 Pervious Area 16,019 Impervious Area ' Tc Length Slope Velocity Capacity Description min feet ft/ft ft/sec cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' ' 1.4 84 Woods: Light underbrush n= 0.400 P2= 3.12" 0 0381 0 98 . . Shallow Concentrated Flow, shallow to culvert ' 0.1 45 Woodland Kv= 5.0 fps 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18 0" Area= 1 8 sf Peri = 4 7' ' . . m . r= 0.38 6.0 477 n= 0.013 Concrete pipe, straight & clean 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet ' Woodland Kv= 5.0 fps 36.2 806 Total t 1 041-115 CD-BMP Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by Design Resource Group, P.A. Page 6 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 1 1 I I 1 1 041-115 CD-BMP Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=9.00" Prepared by Design Resource Group, P.A. HydroCADO 8.00 s/n 003942 © 2006 -lydroCAD Software Solutions LLC Page 7 10/28/2008 Subcatchment 11 S: Post site w/ CNm [49) Hint: Tc<2dt may require smaller dt Runoff = 8.28 cfs @ 3.12 hrs, Volume= 0.305 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Area (sf) CN Description 316,943 94 CNm 316,943 Pervious Area Tc min 5.0 t Length Slope Velocity Capacity Description (feet) (ft/ft) (ft/sec) (cfs) Direct Entry, direct entry 5 minute min. Subcatchment 11S: Post site w/ CNm ® Runoff 041-115 C D-BM P Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by Design Resource Group, P.A. Page 8 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 12S: Post-Off-site (rev Tc) w/ CNm Runoff = 1.35 cfs @ 3.48 hrs, Volume= 0.103 af, Depth= 0.50" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" _ Area (sf) CN Description 107,027 94 CNm 107,027 Pervious Area Tc Length Slope Velocity Capacity Description min (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 1.4 84 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 2.0 Direct Entry, nominal time for site SD entry to and 32.2 329 Total Subcatchment 12S: Post-Off-site (rev Tc) w/ CNm Hydrograph I , .as ors 1 ®Runoff Charlotte 4466-hr Charlotte 1-in 6,hr 1 I Rainfall=1.00" 1 I I I Runoff ;Arqa=1:07,027:sf I - - - ;- Runoff Volume 0 103'af 1 Runoff: Depth=0.50" 1 ' Flow Length=329' w I ; 1 I Tc=32;2 min c CN=94 1 I , I ' I I I I I I I I 1 I I I I I I I I I I 1 I I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 1 041-115 C D-BM P Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by Design Resource Group, P.A. HydroC %DO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC Page 13 10/28/2008 Pond 10P: WQ and Detention BMP Inflow Area = Inflow 9.733 ac, Inflow Depth = 0.50" for Charlotte 1-in 6-hr event _ Outfl 8.59 cfs @ 3.12 hrs, Volume= 0.409 of ow Primary = 0.07 cfs @ 6.24 hrs, Volume= 0.216 af, Atten= 99%, 0.07 cfs @ 6 24 hrs Volum = Lag= 186.7 min . , e 0.216 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs dt= 0.08 hrs , Peak Elev= 27.58'@ 6.24 hrs Surf.Area= 16,882 sf Storage= 17,022 cf Plug-Flow detenti C on time= 1,268.4 min calculated for 0.215 of (53% of inflow) enter-of-Mass d et. time= 1,239.4 min ( 1,457.6 - 218.2 ) Volume Invert Avail.Stora a Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation feet Surf.Area Perim. Voids Inc.Store Cum.Store Wet Are 8.00 s -ft feet (%) (cubic-feet) (cubic feet) 4,099 263 2 0 0 . a ) (sq ft 19.00 20 00 . . 0 0 4,652 279.8 0.0 0 0 5 238 4,099 4 866 . , 297.0 0.0 0 , 21.00 0 5,923 354.8 0.0 0 5,706 22.00 6,698 405.1 0.0 0 0 0 8,722 23.00 7,574 453.1 0.0 0 11,787 24.00 0 8,551 502.2 0.0 0 15,094 25.00 0 9,605 550.0 0.0 0 18,857 26.00 10,782 595.1 0.0 0 0 22,893 26.50 0 13,544 610.0 0.0 0 27,043 27.00 28.00 16,064 675.0 100.0 7,393 7,393 0 17 476 72 28,503 35 158 29.00 , 5 .6 100.0 16,765 24,158 18,530 584.6 100.0 18 000 , 45,343 30.00 , 42,159 21,640 600.3 100.0 20 065 62 223 46,590 , , 48,185 ' Device Routing Invert Outlet Devices #1 Primary 26.50' 1.6" Vert. Orifice/Grate C= 0.600 Primary OutFlow Max=0.07 cfs @ 6.24 hrs HW=27.58' (Free Discharge) L1=Orifice/G t ra e (Orifice Controls 0.07 cfs @ 4.86 fps) 1 1 1 041-115 C D-BM P Charlotte 1-in 6-hr Charlotte 1-in 6-hr Rainfall=1.00" Prepared by Design Resource Group, P.A. HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Softwnra Snit iris- r Page 14 0 2 4 6 8 10 12 14'11 6 18 20 22 24 26 Time (hours) 28 30 32 34 36 38 40 42 44 46 48 1 1 r 1 Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1 i Chapter 3 - Hydrologic Analysis 3.5.2 - Type II -1 Year, 24-Hour Storm Analysis i 1 1 1 r Prepared By: Design Resource Group, P.A. 041-115 CD-BMP Type l/ 24-hr Charlotte 7 yr 24-hr Rainfall=2.58" Prepared by Design Resource Group, P.A. Page 18 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 1S: Pre-site Runoff = 4.82 cfs @ 12.22 hrs, Volume= 0.474 af, Depth= 0.70" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Type II 24-hr Charlotte 1-yr 24-hr Rainfall=2.58" 1 I Subcatchment 1S: Pre-site Hydrograph ® Runoff Areas CN Description 284,752 73 Woods, Fair, HSG C 6,447 98 Paved parking & roofs 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair, HSG C 354,840 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area Tc mLin) Length (feet) Slope (ft/ft) Velocity (ft/sec) Capacity Description (cfs) 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' 7.7 572 0.0610 1.23 Woods: Light underbrush n= 0.400 P2= 3.12" Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 f s 25.6 772 Total i 3 0 U. 1 1 1 1 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 86 38 40 42 44 46 48 Time (hours) 041-115 CD-BMP Type// 24-hr Charlotte 7 yr 24-hr Rainfall=2.58" P ' repared by Design Resource Group P A HydroCADO 8.00 , . . Page 19 s/n 003942 © 2006 HvdroCAD Software Solutions LLC 10/28/2008 Subcatchment 2S: Pre-Off-site Runoff = 1.37 cfs @ 12.35 hrs, Volume= 0.164 af, Depth= 0.79" Runoff by SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs dt= 0 08 hrs , . Type II 24-hr Charlotte 1-yr 24-hr Rainfall=2.58" Area (sf) CN Description 71,438 73 Woods, Fair, HSG C 11,195 19,297 98 Paved parking & roofs 80 1/2 acre lots 25% i HSG C , mp, 6,316 79 50-75% Grass cover Fair, HSG C 108,246 77 Weighted Average 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description min feet (ft/ft) ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' 1.4 84 Woods: Light underbrush n= 0.400 P2= 3.12" 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert 0.1 45 Woodland Kv= 5.0 fps 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18 0" Area= 1 8 f P i ' ' . . s er m= 4.7 r= 0.38 6.0 477 n= 0.013 Concrete pipe, straight & clean 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 36.2 806 Total 1 ' 041-115 CD-BMP Type l/ 24-hr Charlotte 1-yr 24-hr Prepared by Design Resource Grou P A Rainfall=2.58" p, . . HydroC %DO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC Page 23 10/28/2008 Subcatchment 21 S: Post-site [49] Hint: Tc<2dt may require smaller dt R ff uno = 17.21 cfs @ 11.95 hrs, Volume= 0.879 af, Depth= 1.45„ Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Type II 24-hr Charlotte 1- r 24 h R i f " y - r a n all=2.58 Area (sf) CN Description 14 691 73 Wood F H , s, air, SG C 188,113 98 Paved parking 8L roofs 6,620 87 Dirt roads, HSG C 107,528 74 >75% Grass cover, Good, HSG C 316,952 88 Weighted Average 128,839 Pervious Area 188,113 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (c s' i 50 Direct Entry, direct entry 5 minute min. Subcatchment 21S: Post-site Hydrograph 19 18 _ ..._ ?.... _ 17,21 ors ? ... _ , ? Runoff i I-'- --- Type_?Ia_iar Char?otte 1 ?r24-hr 16 _ -.. _r_... ... 1 15 i.._ _ .... Rainfaal 2.58" 14 --Runoff Area=316 952sf- , - _ ... .. _. ... 13 Runoff Volume 0.819 of ----------- 12 - 11 I - Runo Depth 1.45" - - - - -c7-5A min _ 3 I -: -, - I I I o 9- - -; .. -... -I 6-1 - F- - - - - - - - _ ------------ 5 _-------------- 2 _ ,...... .. L .. ... ....... I_ - ._ ... L. .._ . ._ _ _ _ _ . 1 - - - I I - - - ------ 1 0 0 2 4 fi 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) r 041-115 C D-BM P Type 1124-hr Charlotte 1-yr 24-hr Rainf ll=2 " a .58 Prepared by Design Resource Group, P.A. H droC %DO 8.00 s/n 003942 © 2006 H droCAD Software Solutions LLC Page 24 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Runoff = Ru ff b 1.58 cfs @ 12.30 hrs, Volume= 0.172 af, Depth= 0.84" no y SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs = , dt 0.08 hrs Type II 24-hr Charlott 1 e -yr 24-hr Rainfall=2.58" Areas CN Descri tion 70,188 73 Woods, Fair, HSG C 11,200 2,190 98 Paved parking & roofs 98 Paved arki & p ng roofs 19,301 80 1/2 acre lots, 25% imp, HSG C 4,130 79 50-75% Grass cover, Fair, HSG C 107,009 78 Weighted Average 88,794 Pervious Area 18,215 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' 1.4 84 Woods: Light underbrush n= 0.400 P2= 3.12" 0.0381 0.98 Sh allow Concentrated Fl ow, shallow to culvert 0.1 45 Woodland Kv= 0.0356 11.22 19.82 Circular Channel 0 fps (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' 2 0 n= 0.013 Concrete pipe, straight & clean 32.2 329 Direct Ent nominal time for site SD entry to and Total r r r r r r 1 041-115 CD-BMP Type // 24-hr Charlotte 1-yr 24-hr Rainfall=2.58" Prepared by Design Resource Group, P.A. Page 25 HydroCADO 8.00 s/n 003942 © 2006 HvdroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) I I I I I I I I I I I I 171 I I 1 I I I 1 I I I 1 I 1 _. I I I I I I I I ? I I 3 1 I p LL 1 I 1 I I I I I I I I I I I I I I I I I I I I I 1 I I I I I I I i 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 402 44 46 48 Time (hours) 041-115 CD-BMP Type 11 24-hr Charlotte 7 yr 24-hr Rainfall=2.58" Prepared by Design Resource Group, P.A. Page 26 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 23S: Post-Release [49] Hint: Tc<2dt may require smaller dt Runoff = 1.42 cfs @ 11.97 hrs, Volume= 0.071 af,, Depth= 0.94° Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Type II 24-hr Charlotte 1-yr 24-hr Rainfall=2.58" Area (sf) CN Description 4,627 73 Woods, Fair, HSG C 1,229 73 Woods, Fair, HSG C 1,172 98 Paved parking & roofs 1 348 98 Paved parking & roofs 3,161 89 Gravel roads, HSG C 21,141 79 50-75% Grass cover, Fair, HSG C ' 2,865 79 50-75% Grass cover, Fair, HSG C 4,529 79 50-75% Grass cover, Fair, HSG C 39,072 80 Weighted Average 37,552 Pervious Area 1,520 Impervious Area 041-115 CD-BMP Type lI 24-hr Charlotte 1-yr 24-hr Rainfall=2 58" Prepared by Design Resource Group P.A. . , HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC Page 29 10/28/2008 Pond 20P: WQ and Detention BMP Inflow Area = 9.733 ac, Inflow Depth = 1.30" for Charlotte 1-yr 24-hr event Inflo w _ 17.55 cfs @ 11.96 hrs, Volume= 1.051 of Outflo w 0.44 cfs @ 16.57 hrs, Volume= 0.683 af, Atten= 98%, Lag= 276.5 min Primary = 0.44 cfs @ 16 57 hrs Volum = . , e 0.683 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs dt= 0 08 hrs , . Peak Elev= 28.44'@ 16.57 hrs Surf.Area= 17,938 sf Storage= 31,990 cf ' Plug-Flow detention time= 759.9 min calculated for 0.682 of (65% of inflow) Center-of-Mass det. time= 650.6 min ( 1,481.0 - 830.4 ) Volume Invert Avail.Stora a Storage Descri tion #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet Area feet s -ftfeet % (cubic-feet) (cubic-feet) 18.00 4,099 263 0 2 0 . (sq ft) . . 19.00 4,652 279.8 0.0 0 0 20.00 5 0 0 238 297 4,099 4,866 , .0 0.0 0 0 21.00 5,923 354.8 0.0 0 0 5,706 22.00 6,698 405.1 0.0 23.00 7,574 453 0 0 0 1 0 8'722 11,787 . . 24.00 8,551 502.2 0.0 0 0 0 0 15,094 25.00 9,605 550.0 0.0 0 0 18,857 i 26.00 10,782 595.1 0.0 0 0 22,893 26.50 13,544 610.0 0.0 27,043 27.00 16,064 675.0 100.0 7,393 7,393 0 28.00 17 476 57 28,503 35,158 , 2.6 100.0 16,765 24,158 29.00 18,530 584.6 100.0 18 000 42 1 45,343 , , 59 30.00 21,640 600.3 100.0 20,065 62,223 46,590 48;185 Device Routing Invert Outlet Devices #1 Pri ' mary 18.12 24.0" x 70.0' long Culvert RCP, square edge headwall Ke= 0 500 , Outlet Invert= 17.00' S=0.01607' Cc= 0.900 . n= 0.012 Concrete pipe, finished #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0 600 . #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 #4 Device 1 ' ' ' 28.44 5.50 W x 0.25'H Vert. Orifice/Grate X 4.00 C= 0.600 #5 Device 1 29.58' 24 0' lon x 0 5' b . g . readth Broad-Crested Rectangular W eir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Prim O ? ary utFlow Max=0.39 cfs @ 16.57 hrs HW=28.44' (Free Discharge) scharge) =Culvert (Passes 0.39 cfs of 46 19 cfs ote ti l fl . p n a ow) 2=Orifice/Grate (Orifice Controls 0.09 cfs @ 6.59 fps) 3=Orifice/Grate O if ( r ice Controls 0.29 cfs @ 4.06 fps) =Orifice/Grate (Orifice Controls 0.01 cfs @ 0.16 fps) 1 =Broad-Crested Rectangular Weir (Controls 0.00 cfs) 1 041-115 CD-BMP Type // 24-hr Charlotte 1-yr 24-hr Rainfall=2.58" Prepared by Design Resource Group, P.A. Page 30 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P- WQ and Detention BMP 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1 7 LI I Chapter 3 - Hydrologic Analysis 3.5.3 - Charlotte - 2 Year, 6-Hour Storm Analysis 1 ?J 1 1 Prepared By: Design Resource Group, P.A. 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Design Resource Group, P.A. Page 60 HydroCADO 8.00 s/n 003942 © 2006 HvdroCAD Software Solutions LLC 10/28/2008 i Subcatchment 1S: Pre-site Runoff = 4.65 cfs @ 3.48 hrs, Volume= 0.357 af, Depth= 0.53" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" Area (so CN Description 284,752 73 Woods, Fair, HSG C 6,447 98 Paved parking & roofs 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover Fair HSG C 354,840 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area Tc Length Slope Velocity Capacity Description min (feet) (ft/ft) (ft/sec) (cfs) 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' 7.7 572 0 0610 1 23 Woods: Light underbrush n= 0.400 P2= 3.12" . . Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 25.6 772 Total ® Runoff 041-115 CD-BMP Charlotte 6-hr 2 yr Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Design Resource Group, P.A. Page 61 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 2S: Pre-Off-site Runoff = 1.38 cfs @ 3.63 hrs, Volume= 0.126 af, Depth= 0.61" R ff b SCS T R uno y -20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 2- yr Charlotte 6-hr 2-yr Rainfall=2.28" Area (sf) CN Description 71,438 73 Woods, Fair, HSG C 11,195 19,297 98 Paved parking & roofs 80 1/2 acre lots, 25% imp, HSG C 6,316 79 50-75% Grass cover, Fair, HSG C 108,246 77 Weighted Average 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 1.4 84 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 6.0 477 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet ' Woodland Kv= 5.0 fps 36.2 806 Total 1 1 1 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Design Resource Group, P.A. Page 62 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 2S: Pre-Off-site Hydrograph I I I I I I I Charlotte 6-hr I I I 2-yr Pharlotte 6-hr 2-yyr I ,q i' I Rainfall 2.28". I 1 Runoff Area 108 - sf w I I 1 I Runoff Volume=0.126 of o ? ' I R?inoff Depth-0.61 flow: Length=806' I I I I T=36.2 min I I CN=77 I I 1 I I I ® Runoff _. .. .. .I.... a ?,. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) I? h LJ 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2 yr Rainfall=2.28" Prepared by Design Resource Group, P.A. Page 65 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 21S: Post-site [491 Hint: Tc<2dt may require smaller dt ' Runoff = 18.03 cfs @ 3.16 hrs, Volume= 0.725 af, Depth= 1.20" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" Area (sf) CN Description 14,691 73 Woods, Fair, HSG C 188,113 98 Paved parking & roofs 6,620 87 Dirt roads, HSG C ' 107,528 74 >75% Grass cover, Good, HSG C ` 316,952 88 Weighted Average 128,839 Pervious Area ' 188,113 Impervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, direct entry 5 minute min. Subcatchment 21S: Post-site Hydrograph 20 _ _ _ ®Runoff 19/ ---- 18 Charlotte 6 hr 17 _ _.. _. :._ _.. L ' 16 --L- -- ---L --L - - - --; --:2-yr;Qhar]0 -te 6-hr-2-yr-- 15:7 L L i L 1 r?fa ' I 2.28 4 •1 Q'tQ ? I - „-- -- 1 ; 13 L 1 41- 12 rea=3. 6'952 sf . - - Rlu.no ff.A U 11 ,? 1 1 , - , w 10 - Runoff VoCume=D X25-a - 0 UL 9 _ L. 8 Ruoff Depth-1:2O"- -- , -,-- -- --; --, - -- 'Tor-5- - in - .0 ra?ili? 5 - .. ._ ... i- .. -._ .. - - - CN 88 I 4 r - - - - - - ' I I I - - - - - 1 3 " - -' I I I I 2 I O ', 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 ' 041-115 CD-BMP Charlotte 6-hr 2 yr Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Design Resource Grou P A p, . . Page 66 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Runoff = 1.58 cfs @ 3.56 hrs, Volume= 0.133 af, Depth= 0.65" ' R ff b uno y SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" Area (so CN Description 70,188 73 Woods, Fair, HSG C 11,200 98 Paved parking & roofs 2,190 98 Paved parking & roofs 19,301 80 1/2 acre lots, 25% imp, HSG C 4,130 79 50-75% Grass cover, Fair, HSG C ' 107,009 78 Weighted Average 88,794 Pervious Area 18,215 Impervious Area ' Tc Le th Sl V ng ope elocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 1.4 84 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 2.0 Direct Entry, nominal time for site SD entry to pond 32.2 329 Total 1 1 1 041-115 CD-BMP Charlotte 6-hr 2 yr Charlotte 6-hr 2-yr Rainfall=2.28" ' Prepared by Design Resource Group, P.A. Page 67 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 22S: Post-Off-site (rev Tc) Hydrograph ' ? ®Runoff ass, ? , i Charlotte 6-hr Z-yr Charlotte 6-hr 2-yr Rai6fall=2.28" Runoff Area^107,00.9sf__ w 1 , ' i RUn0f V0lurrie=0.133 of Runoff'D6pth 0.65 1=1ow 1en9th=329' ' Tc=32.2 min GN=78 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 C 1 1 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Prepared by Design Resource Grou P A Rainfall=2.28" p, . . Page 68 H droCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 23S: Post-Release [49] Hint: Tc<2dt may require smaller dt ' R ff uno = 1.34 cfs @ 3.18 hrs, Volume= 0.055 af, Depth= 0.74" Runoff by SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs ' Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" _ Area (sf) CN Description 4,627 73 Woods, Fair, HSG C 1,229 73 Woods, Fair, HSG C 1,172 98 Paved parking & roofs ' 348 98 Paved parking & roofs 3,161 89 Gravel roads, HSG C 21,141 79 50-75% Grass cover, Fair, HSG C 2,865 79 50-75% Grass cover, Fair, HSG C 4,529 79 50-75% Grass cover, Fair, HSG C 39,072 80 Weighted Average 37,552 Pervious Area 1,520 Impervious Area Tc Length Slope Velocity Capacity Description ' (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum ' Subcatchment 23S: Post-Release Hydrograph . ti1 G ' I ®Runoff I Charlotte 6-hr I 2 r Pharlbtte 6 -hr 2-yr I Rainfall Z28".. w Runoff Area=39,072 sf Runoff VoI n ie=0.055 of LL RUnoffDepth 0 74" .. , , I I Tc=5 0 min 1 CN=80 0-4 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" ¦ Prepared by Design Resource Group, P.A. Page 71 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ¦ Pond 20P: WQ and Detention BMP Inflow Area = 9.733 ac, Inflow Depth = 1.06" for Charlotte 6-hr 2-yr event ¦ Inflow _ 18.18 cfs @ 3.16 hrs, Volume= 0.858 of Outflow 0.83 cfs @ 5.46 hrs, Volume= 0.572 af, Atten= 95%, Lag= 138.1 min Primary = 0.83 cfs @ 5.46 hrs, Volume= 0.572 of ¦ Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Peak Elev= 28.46'@ 5.46 hrs Surf.Area= 17,955 sf Storage= 32,279 cf ¦ Plug-Flow detention time= 787.1 min calculated for 0.571 of (67% of inflow) Center-of-Mass det. time= 763.4 min ( 982.6 - 219.3 ) ¦ Volume Invert Avail.Storage Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area ' (feet) (sq-ft) (feet) (%) (cubic-feet) (cubic-feet) (sq-ft) 18.00 4,099 263.2 0.0 0 0 4,099 ¦ 19.00 20.00 4,652 5 238 279.8 0.0 0 297 0 0 0 0 0 0 4,866 5 70 , . . , 6 21.00 5,923 354.8 0.0 0 0 8,722 22.00 6,698 405.1 0.0 0 0 11 787 ¦ 23.00 7,574 453.1 0.0 0 0 , 15,094 24.00 8,551 502.2 0.0 0 0 18,857 25.00 9,605 550.0 0.0 0 0 22,893 26.00 10,782 595.1 0.0 0 0 27,043 ¦ 26.50 13,544 610.0 0.0 0 0 28,503 27.00 16,064 675.0 100.0 7,393 7,393 35,158 ¦ 28.00 29.00 17,476 18 530 572.6 100.0 16,765 584.6 100 0 18 000 24,158 42 159 45,343 46 590 , . , , , 30.00 21,640 600.3 100.0 20,065 62,223 48,185 ¦ Device Routing Invert Outlet Devices #1 Primary 18.12' 24.0" x 70.0' tong Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 17.00' S=0.0160'/' Cc= 0.900 n= 0.012 Concrete pipe, finished ¦ #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0.600 #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 #4 Device 1 28.44' 5.50'W x 0.25'H Vert. Orifice/Grate X 4.00 C= 0.600 ¦ #5 Device 1 29.58' 24.0' long x 0.5' breadth Broad-C rested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1 .00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 ¦ Primary OutFlow Max=0.56 cfs @ 5.46 hrs HW=28.46' (Free Discharge) t- =Culvert (Passes 0.56 cfs of 46.23 cfs potential flow) ¦ 2=Orifice/Grate (Orifice Controls 0.09 cfs @ 6.62 fps) 3=Orifice/Grate (Orifice Controls 0.29 cfs a@ 4.11 fps) =Orifice/Grate (Orifice Controls 0.18 cfs @ 0.44 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 041-115 CD-BMP Charlotte 6-hr 2-yr Charlotte 6-hr 2-yr Rainfall=2.28" ' Prepared by Design Resource Group, P.A. Page 72 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Pond 20P: WQ and Detention BMP Hydrograph 20 - - - - - - - ----- -------- ---------- -------------------- - -' - - - - --- - - - - - - - - - - --- - - - - - - - - - - - - - - - - -- ® Inflow ® Primar 19 - -- - --1nf1aw-Area=9- '33ac-- y 18 . . -- -- -- - 17 16 -- -- -- ---- -- -- - - Poak Elegy=28.?4fi' - 15 14 Storage=32279 Cf - - - - 13 _, 12 .? 1 3 10 c U. 9 ` 8 g 5 ? 4 3 - 083 ds ' 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 ' Time (hours) 1 1 1 1 1 1 ' Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 Chapter 3 - Hydrologic Analysis ' 3.5.4 - Charlotte -10 Year, 6-Hour Storm Analysis Prepared By: ' Design Resource Group, P.A. 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group, P.A. Page 32 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 1S: Pre-site Runoff = 13.63 cfs @ 3.45 hrs, Volume= 0.991 af, Depth= 1.46" ' Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" t Area (so CN Description 284,752 73 Woods, Fair, HSG C 6,447 98 Paved parking & roofs ' 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair, HSG C 354,840 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 7.7 572 0.0610 1.23 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 25.6 772 Total Subcatchment IS: Pre-site Hydrograph I 15 I 14 1a.63 er - - .. ®Runoff ------ r _ _ r - - Charlotte 6-1 ti- 1-V-Vr dha Fott$ 6-1 ry -?Wyr 13 12 i.... _ . Raanfall=3 72"... Runoff Area 354,840 sf ? ' ' I I 1 Runoff Volume 0.991 of 10 noff-Depth=1.46 s -;faow-Longth=772' Tc' 6rrain_. 25 r I I 1 I_ CN75 ------------ rf'. - -r-- -- -- ---- r 2 7 LL -':: --f-- I »r I 1 I _ __ 6 I I I , 1 I _.... r. _. 4 I I - - - - - - - - - - - - - - 3 I I I , I -,---r_ -- - --- - -- i. 2 r.. _ _ ,.. .. _. F. _. ._ _ r I 1 1 I I I I -- - --- 00 2 4 6 8 10 1 ' 2 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group, P.A. Page 33 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 2S: Pre-Off-site Runoff = 3.78 cfs @ 3.60 hrs, Volume= 0.330 af, Depth= 1.60" Runoff b SCS T R y -20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10 -yr Charlotte 6-hr 10-yr Rainfall=3.72" Area (sf) CN Description 71,438 73 Woods, Fair, HSG C 11,195 19,297 98 Paved parking & roofs 80 1/2 acre lots 25% im HSG C , p, 6,316 79 50-75% Grass cover, Fair, HSG C 108,246 77 Weighted Average 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description 1 min feet ft/ftft/sec cfs 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' 1 1.4 84 Woods: Light underbrush n= 0.400 P2= 3.12" 0 0381 0 98 . . Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 1 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1 8 sf Perim= 4 7' = 0 38' . . r . n= 0.013 Concrete pipe, straight & clean 6.0 477 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 36.2 806 Total 1 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group, P.A. Page 34 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 r Subcatchment 2S: Pre-Off-site Hydrograph _ _._ _ _ _ _ _ 1 j ---------- ' I I 4- 1378 - ®Runoff ' I r Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall I ? Runoff Area=108,246 sf Runoff Volume=0:330-af Runoff Depth=1.60" ;Flow Length=806' Tc=36.2 min I 77 ... 3 CN 2 LL I 1 I ' I I I I I I I 1 i I .... I I 1 I I I I .I I . ? I I 1 I I I I I r 1 I i ' I I I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 r E iJ 1 041-115 CD-BMP Charlotte 6-hr 10 yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group P A , . . Page 37 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 21S: Post-site [49] Hint: Tc<2dt may require smaller dt R ff = uno 33.41 cfs @ 3.15 hrs, Volume= 1.498 af, Depth= 2.47" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" Area (so CN Description 14,691 73 Woods, Fair, HSG C 188,113 98 Paved parking & roofs 6,620 87 Dirt roads, HSG C 107,528 74 >75% Grass cover, Good, HSG C 316,952 88 Weighted Average 128,839 Pervious Area 188,113 Impervious Area Tc Length Slope Velocity Capacity Description min) (feet) (ft/ft) (ft/sec) (cfs) ' 5.0 Direct Entry, direct entry 5 minute min. Subcatchment 21 S: Post-site Hydrograph I ------------ _ _ _ -------- ------- - --- - - - - - - -- - - - - - 36 --- 3s at os 34 Runoff - Charlotte 6-hr-10-qr dharlotte 6-fir-l0-yr 32 30 - r--: - --r-- : - - - - - r - - Rainfall=3.-2" - - --?- =- --?- -- --- -- --- ?---- - -Runofff-Area=-3-16x9§2-s€ 28 R ¢ - - _ - - ? - - L - - _ _ - ` - - L unof Volurne=-1;498 of ` - 26 ' 1 :.....Runoff Depth=2:47"... 24 i 22 TC Clrl71$- -_ v 20 18 - 16 - !. . 1 14 I 12 I 10 8 ` 6 _ 4 - ` - - - - - I _ I 2 1 1 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 041-115 CD-BMP Charlotte 6-hr 10 yr Charlotte 6-hr 10 yr Rainfall=3 72" . Prepared by Design Resource Group, P.A. Page 38 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Runoff = 4.19 cfs @ 3.54 hrs, Volume= 0.341 af, Depth= 1.67" Runoff b SCS T R 20 y - method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10 -yr Charlotte 6-hr 10-yr Rainfall=3.72" Area (sf) CN Description 70,188 73 Woods, Fair, HSG C 11,200 2,190 98 Paved parking & roofs 98 Paved parking & roofs 19,301 80 1/2 acre lots, 25% imp, HSG C 4,130 79 50-75% Grass cover, Fair HSG C ' 107,009 78 Weighted Average 88,794 Pervious Area 18,215 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Li ht d b h " g un er rus n= 0.400 P2= 3.12 1.4 84 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean ' 2.0 Direct Entry, nominal time for site SD entry to pond 32.2 329 Total 1 1 041-115 CD-BMP Charlotte 6-hr 10 yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group, P.A. Page 39 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Hydrograph 1 : ' I 1 ®Runoff a.l S CIS ? I I i : I 1 - -' _ - - - - _. - - - - Charlotte- 9-hr:10-yr- Charlotte-6-k r 10-yr- 4 Rainfalf=3.72" I 1 Runoff Area=107,009 sf Runoff Volume=0.341 of Runoff 13Opth=1.67.'.. 3 - flow Length=329' w Tc=32.2 min CN=78 O a 2 I I I I 1 I I 1 I I I I 0 2 4 6 8 10 12 14 16 18 20 T 2 24''2i6' 4 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" ' Prepared by Design Resource Group, P.A. Page 40 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 23S: Post-Release (49] Hint: Tc<2dt may require smaller dt Runoff = 3.06 cfs @ 3.16 hrs, Volume= 0.135 of Depth= 1.81" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" ' Area (sf) 4 627 CN 73 Description Woods Fa HSG C , , ir, 1,229 73 Woods, Fair, HSG C 1,172 98 Paved parking & roofs ' 348 98 Paved parking & roofs 3,161 89 Gravel roads, HSG C 21,141 79 50-75% Grass cover, Fair, HSG C 2,865 79 50-75% Grass cover, Fair, HSG C 4,529 79 50-75% Grass cover Fair HSG C 39,072 80 Weighted Average 37,552 Pervious Area ' 1,520 Impervious Area Tc Length Slope Velocity Capacity Description _(min) (feet) (ft/ft ) (ft/sec) (cfs) 5.0 Direct Entry, minimum ' Subcatchment 23S: Post-Release 1 1 2 - 3 o LL 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 _ ® Runoff 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" ' Prepared by Design Resource Group, P.A. Page 43 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P: WQ and Detention BMP Inflow Area = 9.733 ac, Inflow Depth = 2.27" for Charlotte 6-hr 10-yr event Inflow 34.28 cfs @ 3.15 hrs, Volume= 1.839 of Outflow 13.25 cfs @ 3.43 hrs, Volume= 1.552 af, Atten= 61 %, Lag= 16.8 min Primary = 13.25 cfs @ 3.43 hrs, Volume= 1.552 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Peak Elev= 28.80'@ 3.43 hrs Surf.Area= 18,322 sf Storage= 38,563 cf 1 Plug-Flow detention time= 312.5 min calculated for 1.550 of (84% of inflow) Center-of-Mass det. time= 299.9 min ( 514.3 - 214.5 ) ' Volume Invert Avail.Storage Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic-feet) (cubic-feet) (sq-ft) 18.00 4,099 263.2 0.0 0 0 4,099 ' 19.00 4,652 279.8 0.0 0 0 4,866 20.00 5,238 297.0 0.0 0 0 5,706 21.00 5,923 354.8 0.0 0 0 8,722 22.00 6,698 405.1 0.0 0 0 11,787 23.00 7,574 453.1 0.0 0 0 15,094 24.00 8,551 502.2 0.0 0 0 18,857 25.00 9,605 550.0 0.0 0 0 22,893 26.00 10,782 595.1 0.0 0 0 27,043 26.50 13,544 610.0 0.0 0 0 28,503 27.00 16,064 675.0 100.0 7,393 7,393 35,158 ' 28.00 17,476 572.6 100.0 16,765 24,158 45,343 29.00 18,530 584.6 100.0 18,000 42,159 46,590 30.00 21,640 600.3 100.0 20,065 62,223 48,185 Device Routing Invert Outlet Devices #1 Primary 18.12' 24.0" x 70.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 17.00' S= 0.0160'/' Cc= 0.900 n= 0.012 Concrete pipe, finished #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0.600 #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 ' #4 Device 1 28.44' 5.50'W x 0.25'H Vert. Orifice/Grate X 4.00 C= 0.600 #5 Device 1 29.58' 24.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=13.23 cfs @ 3.43 hrs HW=28.80' (Free Discharge) t-1=Culvert (Passes 13.23 cfs of 47.07 cfs potential flow)2=Orifice/Grate (Orifice Controls 0.10 cfs @ 7.20 fps) 3=Orifice/Grate (Orifice Controls 0.35 cfs @ 4.99 fps) =Orifice/Grate (Orifice Controls 12.77 cfs @ 2.32 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 041-115 CD-BMP Charlotte 6-hr 10-yr Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Design Resource Group, P.A. Page 44 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 1 1 1 i Drainage Study for 041-115 ' LJNCC - Campus Corners 11/6/2008 Chapter 3 - Hydrologic Analysis ' 3.5.5 - Charlotte - 25 Year, 6-Hour Storm Analysis i 1 Prepared By: Design Resource Group, P.A. 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Prepared by Design Resource Group, P.A. Page 74 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 1S: Pre-site Runoff = 18.48 cfs @ 3.44 hrs, Volume= 1.339 af, Depth= 1.97" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Area (sf) CN Description 284,752 73 Woods, Fair, HSG C ' 6,447 98 Paved parking & roofs 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair, HSG C 354,840 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area ' Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 7.7 572 0.0610 1.23 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 25.6 772 Total Subcatchment 1S: Pre-site r Hydrograph I 1 , i 1 F i 1 -- --- _ -- - - -- 20 18" s - - E Runoff 19 16 Chariotfe-lir 25-yf Charlotte 6-17 =yr - -- 17 •: I I , Rainfali=4.40" -?- ---?__r_ -- - -- _F -- Runoff Area=354,840 sf - --- 15 Runoff Volume 1 339 of 14 _ ; ,.. _ ._ ,.. - ,_ ;. ,. _ .. _ , ;..._ Runoff. Depth;.°1 ?7•,_ 1 3 fFJow-Length=772'_. 12 ..... Ta- 25. 11 6' CNi5_. r-. - ... r r- 7...._ 10 -------------- LL 9 8 1 - r - - - - - - - - - r - - - - - r--------r--r- ------------ I r ---- r - - r-----r-----r--r--r-- -r-- r - - _ 1 5 - 4 i 3 2 PER; 0 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Prepared by Design Resource Group, P.A. Page 75 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 2S: Pre-Off-site Runoff = 5.05 cfs @ 3.59 hrs, Volume= 0.441 af, Depth= 2.1.3" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Area (sf) CN Description 71,438 73 Woods, Fair, HSG C 11,195 98 Paved parking & roofs 19,297 80 1/2 acre lots, 25% imp, HSG C 6,316 79 50-75% Grass cover Fair, HSG C 108,246 77 Weighted Average 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3 12" 1.4 84 0.0381 0.98 . Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 6.0 477 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 36.2 806 Total F-11 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Prepared by Design Resource Group, P.A. Page 76 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 2S: Pre-Off-site Hydrograph III Runoff 5 Charlotte 6-hr 25-yr Charlotte 6-hr 26-yr ' RaihfaI1=4.40" ' Runoff Area=108,246 sf ' - ?--- ---. ? -------- ----- - -,- -Ruh-otf norvrrre=0.44i - at-4 RUnoff Depth=2.13" ;Flow Length=806' C =36-Z min 3 CN=77 0 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 ' Time (hours) 1 1 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Prepared by Design Resource Group, P.A. Page 79 ydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 21S: Post-site [49] Hint: Tc<2dt may require smaller dt Runoff = 41.08 cfs @ 3.15 hrs, Volume= 1.881 af, Depth= 3.10" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Area (so CN Description 14,691 73 Woods, Fair, HSG C 188,113 98 Paved parking & roofs 6,620 87 Dirt roads, HSG C ' 107,528 74 >75% Grass cover, Good HSG C 316,952 88 Weighted Average 128,839 Pervious Area ' 188,113 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, direct entry 5 minute min. Subcatchment 21S: Post-site Hydrograph 46 ---- -' - - - 44 42 4? I -- _ _ . L _ ®Runoff 40 L ;..... r .... ; ;. _ : Charlotte h-hr 25 yr Gharfotfe 6-hr _25-ye _ ... 38 36 34 r.._ _. , _ in 1=4.40" RunoffArea..316.9.52. sf_ 32 - Runoff Volume=1.881. of - 30 --Rpnoff-Depthi=3.1-W- 26 26 min 8... CN 24 8 - - - 22 r tL 20 .. - r • I L - 18 - - _ .. . ..... ..... . - ...L .. --_I '-- - -'-- I 16 _ _. _ .- -- - - -- - 14 -- - - - L - - 12 10 ' _ - - - ------------ '-- -- ------ 1 I-- _ -- r - --I -- -- -- 1 I I I 8 L_ _ L ... .. ,. ... _- __ _. _.. _.. __ F. ... _. ,. 4 2 - r- - -.---r--r--.- .-- r- - -- - -- I 0 .. 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ' 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Prepared by Design Resource Group P A , . . Page 80 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 r Subcatchment 22S: Post-Off-site (rev Tc) Runoff = 5.56 cfs @ 3.53 hrs, Volume= 0.453 af, Depth= 2.21" R ff uno by SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 25 -yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Areas CN Description 70,188 73 Woods, Fair, HSG C 11,200 98 Paved parking & roofs ' 2,190 98 Paved parking & roofs 19,301 80 1/2 acre lots, 25% imp, HSG C 4,130 79 50-75% Grass cover, Fair, HSG C ' 107,009 78 Weighted Average 88,794 Pervious Area 18,215 Impervious Area ' Tc L th Sl eng ope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3.12" 1.4 84 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps ' 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean ' 2.0 Direct Entry, nominal time for site SD entry to pond 32.2 329 Total 1 1 1 1 041-115 CD-BMP Charlotte 6-hr 25 yr Charlotte 6-hr 25-yr Rainfall=4.40" ' Prepared by Design Resource Group P A P 81 , . . age HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Hydrograph 6 . _. _. L. ? ? .. - t -- _.._. _ _._ ... :. _. _.... -_ __ - ._ ._ I I I I I I I , , ® Runoff 5.56'cfs t t i Charlotte 9-hr: 25-yr Charlotte 6-hr 25-yr j ' 5- -- -x - -r -r --- -- r - ---I-- - - - - -I- - - -RairrfaN 4.40!-- Runoff Area=107,009 sf Runoff Volume=0.453 of - ;- Runoff Doh pt-2:2V 4 ;Flow Length=329' I I I ? I Tc=32.2 min CN=78 ... 3- .2 LL I I I I 2 ? i I I I I ? 1 I I I I I ? I I I I ? I ? I I 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) ' 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Prepared by Design Resource Group, P.A. Page 82 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 ' Subcatchment 23S: Post-Release [49] Hint: Tc<2dt may require smaller dt Runoff = 3.96 cfs @ 3.15 hrs, Volume= 0.178 af, Depth= 2.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Area (sf) CN Description ' 4,627 73 Woods, Fair, HSG C 1,229 73 Woods, Fair, HSG C 1,172 98 Paved parking & roofs 348 98 Paved parking & roofs 3,161 89 Gravel roads, HSG C 21,141 79 50-75% Grass cover, Fair, HSG C 2,865 79 50-75% Grass cover, Fair, HSG C 4,529 79 50-75% Grass cover, Fair, HSG C 39,072 80 Weighted Average 37,552 Pervious Area ' 1,520 Impervious Area ' Tc Length (min) (feet) Slope Velocity Capacity Description (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, minimum ' Subcatchment 23S: Post-Release Hydrograph ' 041-115 CD-BMP Charlotte 6-hr 25 yr Charlotte 6-hr 25-yr Rainfall=4.40" Prepared by Design Resource Group, P.A. Page 85 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P: WQ and Detention BMP Inflow Area = 9.733 ac, Inflow Depth = 2.88" for Charlotte 6-hr 25-yr event ' Inflow _ 42.41 cfs @ 3.15 hrs, Volume= 2.334 of Outflow 19.46 cfs @ 3.37 hrs, Volume= 2.047 af, Atten= 54%, Lag= 13.3 min Primary = 19.46 cfs @ 3.37 hrs, Volume= 2.047 of ' Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Peak Elev= 29.08'@ 3.37 hrs Surf.Area= 18,774 sf Storage= 43,675 cf ' Plug-Flow detention time= 241.9 min calculated for 2.043 of (88% of inflow) Center-of-Mass det. time= 231.8 min ( 444.8 - 213.0 ) ' Volume Invert Avail.Storage Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) ' Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic-feet) (cubic-feet) (sq ft) 18.00 4,099 263.2 0.0 0 0 4,099 19.00 4,652 279.8 0.0 0 0 4,866 20.00 5,238 297.0 0.0 0 0 5,706 21.00 5,923 354.8 0.0 0 0 8,722 22.00 6,698 405.1 0.0 0 0 11,787 23.00 7,574 453.1 0.0 0 0 15,094 24.00 8,551 502.2 0.0 0 0 18,857 25.00 9,605 550.0 0.0 0 0 22,893 ' 26.00 10,782 595.1 0.0 0 0 27,043 26.50 13,544 610.0 0.0 0 0 28,503 27.00 16,064 675.0 100.0 7,393 7,393 35,158 ' 28.00 17,476 572.6 100.0 16,765 24,158 45,343 29.00 18,530 584.6 100.0 18,000 42,159 46,590 30.00 21,640 600.3 100.0 20,065 62,223 48,185 ' Device Routine Invert Outlet Devices #1 Primary 18.12' 24.0" x 70.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 17.00' S=0.0160'/' Cc= 0.900 ' n=0.012 Concrete pipe, finished #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0.600 #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 ' #4 Device 1 28.44' 5.50'W x 0.25'H Vert. Orifice/Grate X 4.00 C= 0.600 #5 Device 1 29.58' 24.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 ' Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=19.40 cfs @ 3.37 hrs HW=29.08' (Free Discharge) L-1=Culvert (Passes 19.40 cfs of 47.73 cfs potential flow) ' 2=0rifice/Grate (Orifice Controls 0.11 cfs @ 7.63 fps) 3=Orifice/Grate (Orifice Controls 0.39 cfs @ 5.59 fps) =Orifice/Grate (Orifice Controls 18.90 cfs @ 3.44 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 1 041-115 CD-BMP Charlotte 6-hr 25-yr Charlotte 6-hr 25-yr Rainfall=4.40" Prepared by Design Resource Group, P.A. Page 86 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 r Pond 20P: WQ and Detention BMP Hydrograph i . 42 41 r Inflow 46 . ? s _ __ - - - - - - - - - -' - - - ® Primary 44 42 -- -- --- --- : --------- inflawrea=9.73- . _ 1 38 4 .,_ . _. Peak=Elev=X9:03' 36 34 - 43675 32 Cf ... Storage -- 30 - - - -- - - ..28 - -------- -- - - - -- - - 26 - --------- ------ - -- -- -------- --- f 24 O 22 LL 20 - - - - - - - - - - - - - - 1 946.ds -?_ _ _ - - - - - - - - -- - -- - -- - - -- -- --- 18 16 14 r- 12 - -- -- - -- - - 10 - 6 ______ __ - - - - - 2 0 0 2 4 6 8 10 12 14 16 ... ........... 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 0 Drainage Study for ' UNCC - Campus Corners 1 1 1 1 Chapter 3 - Hydrologic Analysis 3.5.6 - Charlotte - 50 Year, 6-Hour Storm Analysis 041-115 11/6/2008 ' Prepared By: Design Resource Group, P.A. 041-115 CD-BMP Charlotte 6-hr 50 yr Charlotte 6-hr 50 yr Rainfall=4.92" Prepared by Design Resource Group, P.A. Page 88 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment IS: Pre-site ' Runoff = 22.05 cfs @ 3.44 hrs, Volume= 1.619 af, Depth= 2.38" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt- - 0.08 hrs Charlotte 6-hr 50-yr Charlotte 6-hr 50-yr Rainfall=4.92" ' Areas CN Description 284,752 73 Woods, Fair, HSG C ' 6,447 98 Paved parking & roofs 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair, HSG C 354 840 75 Wei hted Avera , g ge 348,393 Pervious Area 6,447 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft ) (ft/sec) (cfs) ' 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3 12" 7.7 . 572 0.0610 1.23 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 25.6 772 Total ' Subcatchment IS: Pre-site Hydrograph 4 - -------- --r--- - r-- -----r-r- _r-- -- - - - ----------- -? - - -- - -- -- 23 z2.os 1-_ _. '-- I- - - - _ _ ._ _- - -- - -- ®Runoff 22 21 - - r - - - r - r - r Charlotte 6-hr-50-yr Charlotte 6-fir-50-yr- 20 Rainfall=4.92" 18 - ;.. -.. _ ... ;. _ _ Runoff Area 354;840 sf ' 17 _ _ -' - - - - -Runoff Molume 1;619 af_ 16 . - - - r - - - r - - ' 1s 14 w r - - - - r - - - - - r - _ 1 - Flow Ln6 772 - -- -- - - - ?- F Z - - 13 >` - C rr11n_ ' I 12 CN=75 o 10 1 . F 9 - . I 8 - - -- r , --r- -- - -- -r----- -- --- 3 -- - -- r -- -'--- - --- - -- -- - - 1 I I 1 i , i- 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 ' 041-115 C D-BM P Charlotte 6-hr 50-yr Charlotte 6-hr 50-yr Rainfal1=4.92" Prepared by Design Resource Group, P.A. Page 89 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 2S: Pre-Off-site Runoff = 5.99 cfs @ 3.58 hrs, Volume= 0.529 af, Depth= 2.56" Runoff by SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 50 -yr Charlotte 6-hr 50-yr Rainfall=4.92" Areas CN Description 71,438 73 Woods, Fair, HSG C 11,195 98 Paved parking & roofs 19,297 80 1/2 acre lots, 25% imp, HSG C 6,316 79 50-75% Grass cover, Fair, HSG C 108,246 77 Weighted Average 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0 400 P2= 3 " 1.4 84 . .12 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 6.0 477 0.0694 1.32 Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 36.2 806 Total 1 1 u 1 ' 041-115 CD-BMP Charlotte 6-hr 50-yr Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by Design Resource Group, P.A. Page 90 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 6 ' 4 h w 3 -- 0 LL 3 . 2 1 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 I Time (hours) 7 J ?J 1 r 1 041-115 CD-BMP Charlotte 6-hr 50-yr Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by Design Resource Group, P.A. Page 93 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 21 S: Post-site [49] Hint: Tc<2dt may require smaller dt Runoff = 46.41 cfs @ 3.14 hrs, Volume= 2.179 af, Depth= 3.59" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 50-yr Charlotte 6-hr 50-yr Rainfall=4.92" Area (sf) CN Description 14,691 73 Woods, Fair, HSG C 188,113 98 Paved parking & roofs 6,620 107,528 87 Dirt roads, HSG C 74 >75% Grass cover, Good HSG C 316,952 88 Weighted Average 128,839 188,113 Pervious Area Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 5.0 Direct Entry, direct entry 5 minute min. Subcatchment 21 S: Post-site Hydrograph 50 48 s ------------- - --r -r - r r - _ - - _ _ _ Runoff 46 -Charlotte 6-hr 50 yr Charlotte 64hr-50 yr. - 44 42 40 38 36 sa '.. ._ _.L ... ._ ?.. _. .- _ f2ainfal{ 4.92" - .:....._ -..._ . - r...._ ... - - - - Runoff Area-316,952. sf - - - - - - - - L -Rpnofif Volume=-2.-.17S of 7 ----------------- 32 Ol 30 - in- - ,- ,?- - CN 8$.. 26 0 24 U. 22 20 - , - -' - - r- - r__r -- - r r ?;.. - - - -- I I I ' 16 , I I I 16 ' 12 10 --- - 1-- -- -- 1 - - r r -- r-- r -- $ - - -- -r--r -- --r--r--------------r-------------------r-- ------._---- p 6 - 1 1 I -------------------------------- 2 4 - ----- ?- - - - -- ? ?-- - - -- - - 1 0 2 4 6 ' . 8 10 1 2 14 16 18 20 22 24 26 i8-i6-32-34-36-3"8' 8 30 32 34 36 38 40 42 44 46 48 Time (hours) ' 041-115 CD-BMP Charlotte 6-hr 50 yr Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by Design Resource Grou P A p, . . Page 94 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Runoff = 6.56 cfs @ 3.52 hrs, Volume= 0.541 af, Depth= 2.64" Runoff by SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 50 -yr Charlotte 6-hr 50-yr Rainfall=4.92" Area (so CN Description 70,188 73 Woods, Fair, HSG C 11,200 98 Paved parking & roofs 2,190 98 Paved parking & roofs 19,301 80 1/2 acre lots, 25% imp, HSG C 4,130 79 50-75% Grass cover, Fair, HSG C 107 009 78 Weighted Avera e , g 88,794 Pervious Area 18,215 Impervious Area T L c ength Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0.400 P2= 3 12" 1.4 84 . 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert Woodland Kv= 5.0 fps 0.1 45 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' n= 0.013 Concrete pipe, straight & clean 2.0 Direct Entry, nominal time for site SD entry to and 32.2 329 Total 1 1 1 I I 041-115 CD-BMP Charlotte 6-hr 50 yr Charlotte 6-hr 50-yr Rainfall=4.92" Prepared by Design Resource Group, P.A. Page 99 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P: WQ and Detention BMP Inflow Area 9.733 ac, Inflow Depth = 3.35" for Charlotte 6-hr 50-yr event Inflow 48.13 cfs @ 3.15 hrs, Volume= 2.720 of Outflow = 23.60 cfs @ 3.35 hrs, Volume= 2.433 af, Atten= 51 %, Lag= 12.0 min Primary = 23.60 cfs @ 3.35 hrs, Volume= 2.433 of Routing by Stor-Ind method, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Peak Elev= 29.33'@ 3.35 hrs Surf.Area= 19,517 sf Storage= 48,356 cf Plug-Flow detention time= 211.2 min calculated for 2.433 of (89% of inflow) Center-of-Mass det. time= 198.6 min ( 411.0 - 212.4 ) I Volume Invert Avail.Storage Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet.Area (feet) (sq-ft) (feet) (%) (cubic-feet) (cubic-feet) (sq ft) 18.00 4,099 263.2 0.0 0 0 4 099 19.00 4,652 279.8 0.0 0 0 , 4,866 20.00 5,238 297.0 0.0 0 0 5,706 21.00 5,923 354.8 0.0 0 0 8,722 22.00 6,698 405.1 0.0 0 0 11,787 23.00 7,574 453.1 0.0 0 0 15,094 24.00 8,551 502.2 0.0 0 0 18,857 25.00 9,605 550.0 0.0 0 0 22,893 26.00 10,782 595.1 0.0 0 0 27,043 26.50 13,544 610.0 0.0 0 0 28,503 27.00 16,064 675.0 100.0 7,393 7,393 35,158 28.00 17,476 572.6 100.0 16,765 24,158 45,343 29.00 18,530 584.6 100.0 18,000 42,159 46,590 30.00 21,640 600.3 100.0 20,065 62,223 48,185 Device Routing Invert Outlet Devices #1 Primary 18.12' 24.0" x 70.0' long Culvert RCP, square edge headwall , Ke= 0.500 Outlet Invert= 17.00' S=0.0160'/' Cc= 0.900 n= 0.012 Concrete pipe finished , #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0.600 #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 #4 Device 1 28.44' 5.50'W x 0.25'H Vert. Orifice/Grate X 4.00 C= 0.600 #5 Device 1 29.58' 24.0' long x ON breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=23.54 cfs @ 3.35 hrs HW=29.32' (Free Discharge) t _1 =Culvert (Passes 23.54 cfs of 48.31 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.11 cfs @ 7.99 fps) 3=Orifice/Grate (Orifice Controls 0.43 cfs @ 6.07 fps) =Orifice/Grate (Orifice Controls 23.00 cfs @ 4.18 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) n Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 Chapter 3 - Hydrologic Analysis 3.5.7 - Charlotte -100 Year, 6-Hour Storm Analysis 1 1 I 1 Prepared By: Design Resource Group, P.A. 041-115 CD-BMP Charlotte 6-hr 100 yr Charlotte 6-hr 100-yr Rainfall=5.40" Prepared by Design Resource Group, P.A. Page 46 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment IS: Pre-site Runoff = 25.86 cfs @ 3.35 hrs, Volume= 1.885 af, Depth= 2.78" Runoff by SCS TR-20 method, UH=SCS; Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 100-yr Charlotte 6-hr 100-yr Rainfall=5.40" Area so CN Description 284,752 73 Woods, Fair, HSG C 6,447 98 Paved parking & roofs 1,786 87 Dirt roads, HSG C 3,180 89 Gravel roads, HSG C 58,675 79 50-75% Grass cover, Fair, HSG C 354,840 75 Weighted Average 348,393 Pervious Area 6,447 Impervious Area Tc . Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 17.9 200 0.1300 0.19 Sheet Flow, sheet for 200' 7.7 572 0.0610 1.23 Woods: Light underbrush n= 0.400 P2= 3.12" Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5.0 fps 25.6 772 Total Subcatchment IS: Pre-site Hydrograph F -: 28 _I i - - - 25 26 _ Ctarlgtte 6-hr 00 ; 1yr Gharlotte:6 hr 100-yr -r- - - r - - 2a r - - r-- ----r - - -^ -- --'Ra15nfall=5.40"- 22 .... i.. Runoff Area=354;840 sf ' - - - - - - ' - Run¢ff Volume-1.885 of --- 20 _ runoff Depth=2.78"- 18 _ Flow Length-772' Tc=25 -- --- - --?-- - --- ---- 6 min _ 16 . -- --- - - --- - --- -- - - - - - = CN 75 0 14 I 12 10 I I I I - i 8 7-- q q --- - -- 2 r - r--r--r--r----r--r--r--r--°-------- I I 1 , 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 041-115 CD-BMP Charlotte 6-hr 100 yr Charlotte 6-hr 100-yr Rainfall=5 40" . Prepared by Design Resource Group, P.A. Page 47 HydroCADO 8.00 s/n 003942 © 2006 HvdroCAD Software Solutions LLC 10/28/2008 Subcatchment 2S: Pre-Off-site Runoff = 6.98 cfs @ 3.49 hrs, Volume= 0.613 af, Depth= 2.96" Runoff by SCS T R-20 method UH=SCS Time Span= 0.00-48.00 hrs dt- - 0.08 hrs Charlotte 6-hr 10 , 0-yr Charlotte 6-hr 100-yr Rainfall=5.40" Areas CN Description 71,438 73 Woods, Fair, HSG C 11,195 98 Paved parking & roofs 19,297 80 1/2 acre lots, 25% imp, HSG C . 6,316 79 50-75% Grass cover, Fair, HSG C 108,246 77 Weighted Average ' 92,227 Pervious Area 16,019 Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) ' 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' Woods: Light underbrush n= 0 400 P2= 3 12" 1.4 84 . . 0 0381 0 98 . . Shallow Concentrated Flow, shallow to culvert 0.1 45 Woodland Kv= 5.0 fps 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' 6.0 477 n= 0.013 . Concrete pipe, straight & clean 0 0694 1 32 . . Shallow Concentrated Flow, shallow to site outlet Woodland Kv= 5 0 f s 36.2 806 . p Total 1 r 041-115 CD-BMP Charlotte 6-hr 100 yr Charlotte 6-hr 100 yr Rainfall=5.40" Prepared by Design Resource Group, P.A. Page 51 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 21 S: Post-site [49] Hint: Tc<2dt may require smaller dt Runoff = 52.99 cfs @ 3.06 hrs, Volume= 2.456 af, Depth= 4.05" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 100-yr Charlotte 6-hr 100-yr Rainfall=5.40" Area (sf) CN Description 14,691 73 Woods, Fair, HSG C 188,113 98 Paved parking & roofs 6,620 87 Dirt roads, HSG C 107,528 74 >75% Grass cover Good, HSG C 316,952 88 Weighted Average 128,839 Pervious Area 188,113 Impervious Area Tc Length Slope Velocity Capacity Description min (feet) (ft/ft ) (ft/sec) (cfs) 5.0 Direct Entry, direct entry 5 minute min. Subcatchment 21S: Post-site Hydrograph 1 r 55 52 I , , Runoff x, - - I I Gharl6tte._6-hr 700 yr dh.arlotte 6 hr_10.0-yr. 50 Rainfall=5.40" r 45 ' I 1 Runoff Area' 314.952 sf Runoff Volume-2.456 of 40 -Runoff Depth=4.05.x_. _ Tc=5.0 min ,. 35 1 I I RCN8 8:. - 30 3 ----------------- -- I - - -------------- r LL 25 i I r - - 20 r 1 I I I - r - -- --- ! I I 10- 5 1 I -. L I - - - - L - - - ' - - - - - - - - 11 II - - L - - - - ` - - ` - - r 0 1 I I r 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 Time (hours) 38 40 42 44 46 48 041-115 CD-BMP Charlotte 6-hr 100-yr Charlotte 6-hr 100 yr Rainfall=5.40" Prepared by Design Resource Grou P A p, . . Page 52 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Runoff = R ff b 7.61 cfs @ 3.44 hrs, Volume= 0.625 af, Depth= 3.05" uno y SCS T R-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 10 0-yr Charlotte 6-hr 100-yr Rainfall=5.40" Area (so CN Description 70,188 73 Woods, Fair, HSG C 11,200 98 Paved parking & roofs 2,190 98 Paved parking & roofs 19,301 80 112 acre lots, 25% imp, HSG C 4 130 79 50-75% Grass cover Fair, HSG C 107,009 78 Weighted Average 88,794 Pervious Area 18,215 Impervious Area Tc Len th Sl g ope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 28.7 200 0.0400 0.12 Sheet Flow, sheet for 200' 1.4 84 Woods: Light underbrush n= 0.400 P2= 3.12" 0.0381 0.98 Shallow Concentrated Flow, shallow to culvert 0.1 45 Woodland Kv= 5.0 fps 0.0356 11.22 19.82 Circular Channel (pipe), 18" culvert Diam= 18.0" Area= 1.8 sf Perim= 4.7' r= 0.38' 2 0 n= 0.013 Concrete pipe, straight & clean . Direct Entry, nominal time for site SD entry to and 32.2 329 Total L 1 1 1 1 [1 041-115 CD-BMP Charlotte 6-hr 100 yr Charlotte 6-hr 100 yr Rainfall=5.40" Prepared by Design Resource Group, P.A. Page 53 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 22S: Post-Off-site (rev Tc) Hydrograph 8 I I zsi ors I ? I Runoff 1 I Charlotte 6-hr 100-yr Charlotte '6-hr 106-yr Rainfall=5:40-' Runoff Area=107 009 sf I I ... Run.Off..V ..lume.=U.62.$_af.. 6 f unoff Depth=3.05" 5 _ Flow Length=329' I I I ? TC=32.2 min ;CN=78 o 4 I ------------ 1 3 I _ I I I - _ 1 1 2 I I 1 1 , I I I , i I I I I I I I I I 1 I 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 Time (hours) 1 1 1 041-115 CD-BMP Charlotte 6-hr 900-yr Charlotte 6-hr 100-yr Rainfall=5.40" Prepared by Design Resource Group, P.A. Page 54 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Subcatchment 23S: Post-Release (49] Hint: Tc<2dt may require smaller dt Runoff = 5.38 cfs @ 3.07 hrs, Volume= 0.243 of Depth= 3.24" Runoff by SCS TR-20 method, UH=SCS, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Charlotte 6-hr 100-yr Charlotte 6-hr 100-yr Rainfall=5.40" Area (sf) CN Description 4,627 73 Woods, Fair, HSG C 1,229 73 Woods, Fair, HSG C 1,172 98 Paved parking & roofs 348 98 Paved parking & roofs 3,161 89 Gravel roads, HSG C 21,141 79 50-75% Grass cover, Fair, HSG C 2,865 79 50-75% Grass cover, Fair, HSG C 4,529 79 50-75% Grass cover Fair HSG C 39,072 80 Weighted Average 37,552 Pervious Area 1,520 Impervious Area 1 Tc min Length (feet) Slope Velocity Capacity Description (ft/ft) (fUsec) (cfs) 5.0 Direct Entry, minimum Subcatchment 23S: Post-Release Hydrograph 6 I , L. - I I , s3s ofs , ? I I I ®Runoff - : Charlotte 6-hr 100=yr Charlotte 6 hr 100 yr I Rainfall=5 40.... .: r I I RuhoffArea=39,072 sf I ' ' Runoff Volume=0.243 of I i I Runoff Depth=3:24" TC=5.0 min W I RCN=80 ; ' I I 3 3 »? I I I 1 i I I _.... I o I I I , I I ' I 1 I : I ? I ^ I I I , ? I I I I ' I I 0 2 4 6 8 10 12 14 1,6 1`8-2"O 22 2.'4..2'6 28 30 32 34 36 38 40 42 44 46 48 ' Time (hours) 041-115 CD-BMP Charlotte 6-hr 900-yr Charlotte 6-hr 900-yr Rainfall=5.40" Prepared by Design Resource Group, P.A. Page 57 HydroCAD® 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P: WQ and Detention BMP Inflow Area = 9.733 ac, Inflow Depth = 3.80" for Charlotte 6-hr 100-yr event Inflow _ 55.02 cfs @ 3.06 hrs, Volume= 3.081 of Outflow - 26.66 cfs @ 3.26 hrs, Volume= 2.794 af, Atten= 52%, Lag= 12.0 min Primary = 26.66 cfs @ 3.26 hrs, Volume= 2.794 of Ro ti b St I u ng y or- nd method, Time Span= 0.00-48.00 hrs, dt= 0.08 hrs Peak Elev= 29.54'@ 3.26 hrs Surf.Area= 20,170 sf Storage= 52,546 cf Plug-Flow detention time= 184.1 min calculated for 2.789 of (91 % of inflow) Center-of-Mass det. time= 176.2 min ( 383.9 - 207.6 ) Volume Invert Avail.Storage Storage Description #1 18.00' 62,223 cf Custom Stage Data (Irregular) Listed below (Recalc) Elevation Surf.Area Perim. Voids Inc.Store Cum.Store Wet Area feet (sq-ft) (feet) (%) (cubic-feet) (cubic feet) . (sq ft) 18.00 4,099 263.2 0.0 0 0 4 099 19.00 4,652 279.8 0.0 0 0 , 4 866 20.00 5,238 297.0 0.0 0 0 , 5 706 21.00 5,923 354.8 0.0 0 0 , 8 722 22.00 6,698 405.1 0.0 0 0 23.00 7 574 453 1 0 0 , 11,787 , . . 0 0 15 094 24.00 8,551 502.2 0.0 0 0 , 18 857 25.00 9,605 550.0 0.0 0 0 , 22,893 26.00 10,782 595.1 0.0 0 0 27 043 26.50 13,544 610.0 0.0 0 0 , 28 503 27.00 16,064 675.0 100.0 7,393 7,393 , 35 158 28.00 17,476 572.6 100.0 16,765 24,158 , 45 343 29.00 18,530 584.6 100.0 18,000 42,159 , 46 590 30.00 21,640 600.3 100.0 20,065 62,223 , 48,185 Device Routing Invert Outlet Devices #1 Primary 18.12' 24.0" x 70.0' long Culvert RCP, square edge headwall, Ke= 0.500 Outlet Invert= 17.00' S=0.01607' Cc= 0.900 n=0.012 Concrete pipe finished , #2 Device 1 26.50' 1.6" Vert. Orifice/Grate C= 0.600 #3 Device 1 27.58' 3.6" Vert. Orifice/Grate C= 0.600 #4 Device 1 28.44' 5.50'W x 0.25H Vert. Orifice/Grate X 4.00 C= 0 600 . #5 Device 1 29.58' 24.0' long x 0.5' breadth Broad-Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 Coef. (English) 2.80 2.92 3.08 3.30 3.32 Primary OutFlow Max=26.57 cfs @ 3.26 hrs HW=29.53' (Free Discharge) t - =Culv t P er ( asses 26.57 cfs of 48.81 cfs potential flow) 2=Orifice/Grate (Orifice Controls 0.12 cfs @ 8.29 fps) 3=O if /G r ice rate (Orifice Controls 0.46 cfs @ 6.46 fps) =Orifice/Grate (Orifice Controls 26.00 cfs @ 4.73 fps) =Broad-Crested Rectangular Weir ( Controls 0.00 cfs) 041-115 CD-BMP Prepared by Desi n Re Charlotte 6-hr 100-yr Charlotte 6-hr 100-yr Rainfall=5.40" sour G P g ce roup, .A. Page 58 HydroCADO 8.00 s/n 003942 © 2006 HydroCAD Software Solutions LLC 10/28/2008 Pond 20P: WQ and Detention BMP Hydrograph 60 5:o2ue - - - - - - - ® Inflow - - - - - , - ® Primary 55 Inflow. Area=9.133 a.c _ 50 I -- - - Peak- EI v=29.5 45 L..- I I _ ... Storage=525 cf 40 ^ w 35 I ! i . 3: 30 -I--- -- -- --- 25 - 20 15 I 10- 5 I 0 ?d- 0 2 4 6 8 10 I IT 12 14 16 18 20 22 24 26 28 30 32 34 i6"3'8 40 42 44 46 48 Time (hours) Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 r 1 Chapter 3 - Hydrologic Analysis 3.5.8 - Water Balance Analysis Prepared By: Design Resource Group, P.A. i « I O co O V m m w w m O (D O O O N N O w O V N O O O N V O M (P N O ?-- M V ) M O CD r (D M r I O M M V! O O r ((? co r L c V O (D O V N N O O V O r 1 (D O " N O O O M ? N O CO V M O N M O M O O r O r co V O O r O r > M (O T M (D Z O CD O C. M (D (D V Q) C. V O V r 0) N O O co V N O O O M O O to r 0 0 0 M V N M N O O P, CD O N M O O O r O U M ' tD I M ! ' (o O a W O w O v w w N r O CD V O m co O M O O V M N O O M O r O V O (. ?- 0 0 C) r O M M O O r (o V V N O O r U? V /- O_ O co O m I M O N ? W O N O M C) r co O CO O V O I-- O V M 0 co L O r CM O V M - C) O O r N ( (q co O W CO M O M r 0 O C) a0 M V O r O r M . O D V (V V Q O a L U O w o N O N Co r N O N O M m m (D r w 0 O O) C V O V O r N M O 0 0 Cl? Z M M V O O r (o N V M M O O r CD co V 7 m Q ! O to O O C) N N O O O co O V O - M O O O M (D N O `- M A N O V ? N O O O N N Q O m M V O O r (o (D M M M .-- O O N O r M Q C U m Z O V O r 0 (D O O V O (D co v N N O W O O R M O N O N O O O M . Q M V O O I., (D O O Cl) O O r O O J T M M M L Q > ° z E o V O a r m N o 0 0 (D o 0 m (D m V M O (D r O) O O M V C) O M V N O O O M CO cc N N M O O O r (D M N •- O O N (D M N N O O n U m a o 2 LL O V O O) (D /D M O O co O V M CO N r C) W O V 0 0 0 (n Q) O ! O V (`7 N O O M 0 V O a Z M v N O 0 r O r a O M M M . O O r (D CO N ? ? a O N y Q o V O r O V M O r O N O CO M (D O N 7 E O CD O M O 'W V O O r o M 'O O N V CD M o o co (n = of v CD CD r- (o C? W n N tm c co m :3 m LL a m L Cl) C) CO O O N O M m m to r r O (O O N O N (D r r 'n V Q O O r N M O O O O C) CO V/ m ..0 (h M C. O O Co M V O O r CD CD O C M M C ? c 1 k # k W U Z J ? Q ca J ? W H w d w N N w _ •^m N U _ U y L) U L) ^ '? L) 0 _ ^ ^ L) m m m `) m w m m '? N N ` . m :a m O C U C m U- ? O U O C U m O U ^ y w U U v .dr r .?.. m C `? v w ??.. v N C >` L C C O. C v U t0 L C C N O. C U (0 7 C O O l D U O f :6 m C O N O U U `) O O ;7 co m - 0 0 O m U O) C E a W (L N m U 01 C C Y U C Vi T 'a a O r a a C O C C N U n 0 C 10 CL C N C C > o o m m m > > C o m > m T m m > > C o m > c m ? (n a ? a w 0: a w = co WD ? a w 0: d w 5 co ix N M V O O r w m O N M V O to r CO O) O UV3,l JVCIN31VO HV3,k H31VM 1 E'. i 1 1 1 * f i t # O w O m M Cn CD CD O CD O O m N N CO co O V '- N O O m M V O M CD N O - m N V co 0 0 0 0 ?7 O M V - O O o O V M M C ? O i - O V O O co V N m O V O r O CO O N LO O O m N O co a co m V N 0 co r- CD a 0 0 V' M V O O' O O v > M > C6 Z O co c. O O) m LO co N O a 0 a t` m N O O O Cl) V N O O m N W O CD h m 0 0 m O CO /A CO N - 0 0 0 O M 0 N Cl) 0 0 0 O O M Y.. O Q W O co O V m CO N CO V O O m (D O m m O ?T M N O O m M CO O . O . ? O m CO f` C. M M - 'O O O O CO V N 0 0 O O M N M ?a ? ? M W O N O Cl) m CO CD O o v O h o c CO co O O f? M CO r C7 O O O m O M O N M O CO N M Cn cM O O O oO O O O M M N Q O Q N LL O O O N O N CO CO C O N O M m M O N ? O m W v r m V CO N O - C` M N C'7 O Cl O ' O m m O O CU N Z M M V O O O O C ? M Q i -c0) O O m M O (D O N' m O N ?. N m CO N m M O O CO V O_ V N m O m O CO m w M o 0 Q H M V .- O O O O N CO O O O O N Q C U N Z O O 1? O M M O V O O co 'Cf N m N O cq V M m y O N N O O m N r W M V , d o Ci o N o CO 0 0 0 C) N J T M > M r Z C O Q E U O V O V - m N O N O co O O m (D CO O M O (D r m O O m 0 t? O Cl) t7 N O O 0) N V' co A/ N M O O O O O M N O O O O c- p C) M O Q O > O V O m '- CD CO M N O co O V m w N M CO 'y O CO N O m CD n O V M N O O m M O W V N o 0 0 0 o ri ri .- o o o o a Z (h C1 M N O (n N O V O h 0 d' M CO M O N O M m •- CO CD E Q O W O M O m CO O O f` Cn Cl) O m Cl) O CO Cl) C7 O O O ?- M V 0 0 0 0 0 N W L N m M c M 7 C? a•• LL Q CO F Co 'm A O N O M CD Cl) CO CO CO O CD O N O N CO CO ' W) ' L m O. '.O l O f` N M O O m V V O m [p a ? - m It t C ?/ V/ O C ? M O O' O O O M V '- O O O O O C O C M M C 1 W U Z Q J m W N w w w N N ^ ? N ^ v N N u w ^ U N y .?.. 0 ^ U m y U 01 L yl L y N w ^ y :a O lU L N L ^ .n - 2 N g ^ y . .. N U C U N O U w O O C U N O U w U f6 C w l6 .?_. u C cc C N l6 C CO U L C 0 C N O. C U (0 L CO C N O. C U (0 01 O O U :6 U O C m C O O N U ZI N C v m rn O Cn N W a N o O " y O) C - a O /U U m f6 1G N a 0 ' O ? U C N a O tr - O C` r C " p ' - U C T 'V n M 0 C O C CL N N C C T 'V a Cp 0 c D C cx N ,,, C0 - C C C ` > O O C6 O > > 7 O > f0 7 [0 y > 7 O > W O o a m a D a W a a W m a o a w a a w s m a N M a CO co h co CD O .- N Co a to co I,. co m O i HVt I.l WCINBIVO NV3.1 N3J-VM Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 Chapter 3 - Hydrologic Analysis 3.6 - Forebay Weir and Berm Design ' Prepared By: Design Resource Group, P.A. 1 1 t 1 1 1 1 1 1 1 1 1 1 1 1 1 1 2 YEAR FLOW WIDTH RIP RAP BERM 1 "-0" AND WEIR H TOP OF BERM PERMANENT POOL TOP OF WEIR WEIR DETAIL Forebay #1 - Weir Design 2-yr Design Flow, cfs = 9.42 Q=C*L*Hjlz Weir Length (ft) = 20.0 Weir coeff. (Gravel crest), C= 3.0 Head (ft)= 0.29 Design driving head (ft)= 0.5 Crest Elev.= 626.50 Minimum 6" freeboard, top of berm elev. = 627.50 Forebay #2 - Weir Design 2-yr Design Flow, cfs = 9.42 Q=C*L*H 9 Weir Length (ft) = 20.0 Weir coeff. (Gravel crest), C= 3.0 Head (ft)= 0.00 Design driving head (ft)= 0.5 Crest Elev.= 626.50 Minimum 6" freeboard, top of berm elev. = 627.50 Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1 t Chapter 3 - Hydrologic Analysis 3.7 - BMP Riser Buoyancy Calculation 1 1 1 1 1 1 ' Prepared By: Design Resource Group, P.A. 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Density of Water (Ib/ft) 62.4 Density of Concrete (Ib/ft 3) 150 Design Information Top of Box Elevation 729.56 Bottom of Box Elevation 718.00 Inside Width (ft.) 6.0 Inside Length (ft.) 6.0 Wall Thickness (ft.) 0.5 Max Pool Elevation 729.51 Perm Pool Elevation 726.5 Lowest Inlet Elevation 726.5 Lowest Outlet Elevation 718.12 Void Height (Max Pool-Low Outlet) 11.39 (Controls) Void Height (Perm Pool-Bottom of Box) 8.5 Reauired Weight to Avoid Buovancv Void Vol = (W intXLintXHint) Void Vol (CO 410.04 Wt Void = Void Volume x d water Wt Void Vol (Ib) 25586.5 Required Weight (lb.) (+I0%) 28145 Actual Weight of the BMP Structure Wt Conc (Sidewalls Only) 22542 Wt Conc (6" Slab) Top* 0 *-No Concrete Top for this Structure Wt 6"Oversized Slab Bottom 9600 Actual Weight (Ib.) 32142 OK Drainage Study for 041-115 ' UNCC - Campus Corners 11/6/2008 1 1 1 1 1 Chapter 3 - Hydrologic Analysis 3.8 - Summary of Controls Provided 1 1 1 1 ' Prepared By, Design Resource Group, P.A. d? X 1 N O w C ' O U O l0 ' E M N m .n R F- 1 1 i i 1 `m a ca a c L t^ L ?- m M _a m _ .c a m _ a L '° a? L mm 07a m C• a 0 co m a M 0 m N m a L m O L m O L .? m o L= ' t) > i "> d! C "> ? d "> m a m d O m C ) a a a 0 d CMa M CL C d c O Of C 0 w c 0 Of an d r+ o vF w T 0) LO "0 U) '~ .2) Lo E - CD m M 6 N o N a v) a U) a m m N w Y M C O N O R >+ O C a O R O a co O a M to "O r- >, C ? O a E? Eto OYt OYO w U) L:M N ?O fAw 3 m E c` E° E° Q M Q m? 3 COD 3 m°• 3 mr o?= Ya . o m ° _° v ° v a o m ° v m m m E c L N 0 Lf) q- N U) N d C V O V 1° O C R . C O • i O O U) t `- NCO > m a > m '0 m m > m m m> O °' m w co N R p d E + m L E >` ma E >? m a E >+ m mO E N +' CE O a M O O "& C U) T- m L W r L m m> C. O CL U) CL U ) or 0 t w t N t N 0° ~ LL LL L F_ F••' m t w Q Q Q CD O W co OR CA r yv Z Z Z C; O Go m z Z N Q C O > J Co O O O 00 o O co co O th 00 co m? w cm N N M to co Y C D C D C D tN0 CND CND CND tND CND CND C m a m M CD W) CF) co CD O CD st Q Q C t) ;M O o O CD Ch 0 ti 0 ?- O - r Z Z CO) r o c v m m v m =' CDO U L L w L v "= L an O L o O L O O CD V m?N II w O Q O O N L m N L N U) tO L o O to o to V Q N Z O C x O x 0 75 x co -p O C Z W in c c c co ? J m Q Q co CD o :° L6 &6 ;M 0 V L LZ CL R M d d m m "d v C m m E O O (D 0 CD m O a x* N a O O ` +. L. I E w CD w a .? mc Cl O da a CL a a ; Y c o . x? ,. v o o Cat o N o a ° E o d w ,. O ` _o c w o d ` ` U. >% a c c LL tm o U a ?a ca E m a m E O a co m m w 1- ... U O O w t Drainage Study for 041-115 ' UNCC - Campus Corners 11/6/2008 f Chapter 4 - Storm Drain Hydraulic Analysis r Prepared By: ' Design Resource Group, P.A. 7 t 1 1 1 F 1 1 0 C O C d N d 3 N E 0 0 Z m R CL I V L? 1 I tJ 1 0 O O O N m O LO N N cf U) m tT M O O 0 M O O O N to C O m to M 00 O O O O O O O m V O d• r- n M O 0 N m ?T V M N M N M M M M M N M U') O O n M p O N n (D LO O M O O w m O O m co N CO > t1 _ N LO M O) O N W O O) O O O O O O) n M - CO M M M (0 O D (D v v M M co N M N M M M M N M v O m n M N t O O OD 00 LO O n co V V Q) tt O Cl) n n O m C Uo q V O c0 M U) 00 O O O N C (q (O U) N N M n N O (O n M n O •- N N N N M O N M M C' O C N Cl) M M R 'cT Q '?T V' V V V V C' Cl) N M Cl) M Cl) M C - (D co (D O O tD O CD (D to to (D co co (O O O co co (D co (O L+ to co U) R LO co n v V O N N O n n n O N m tl n V: M 7 -7 V c0 O _ O N V v n U) to O (n m q O O = (D N- U) co N N N N N N O n N N CO "T v N O C - N co CO co V O co co V (D V (O V to ?t (D [T co V O R O V co (D co tT CD N co Cl) co Cl) CO Cl) co M co M (O R (O O • M V E C O LO O O LO O O O O m to U) N m O U) co to O 'ct to to (0 a U) m O O O N (P O O O O N V V -: O N M n U) O n m U O V V V V U) U) U) ' M U) (D (D (D w V M R to IT M ' N V C 3 W M V V V V C ? a IT 'V V R V V C M V V V IT tT V O to to co to (O O CO to to (D (D co (D CO co co co (D co to CD (O O ? E Q to o N o o rn o 0 0 to to N rn 0 Co to to o v o o N ? w W O n 7 N O c0 O •7 O N v v M O N M n (n CO N O E O _ R V O v to U) U) to O co to (O (O U) (O V U) V M N O O C W V V O V V IT IT V R V V V V V R V V V V V M R Z co O O O to (D (O 0 co (D (D co co co co (D co co co co O O d m a 0 O O O N . i r o O n n C U) O O O a O O O O c O o 0 0 0 o U ) n (O t (n ( ( (n to o 0 0 (n U) W) Vn 3 J N V ?-- ?- O O O O O O O O O N ?-- O O O O N O t? L ' ' ' E m M co N (O I;r V) _ ? _ O N (A -;1 to CO lq O CO _ N O n to ? C N V n v m M N N (D M N n M M r r M O O n n U) O O O J J ) m m IT V N V N N N N N N N N N N OD IT V C U) V) U) N C N C N N N - - .-- .- - - - - - - - N N N ? ? ? •- _ J N v CL m m N n O tb (D M to M m IT M M I- O O M V tY' O n m N O O N ? N N N N N N M M 'T ,- 7 7 n n n (O U Q M OD W n to Cl) M M Cl) M M M M Cl) OD n n U7 M Cl) M n - U m O O N N n n -q* U) CO U) M N U) U) W 00 M U) O 'K:r M V % 7 w n n _ <D U) U) U) U) (o U) U) U) CD (O OR U) to (o U) U) O to U- V N N n N M N N N N N N N N N V N N (O V V V LO ' . ? N N N r N N r U) } o ? O l to O N M M O U7 U) W O 'cf m m U) to R M OD M V U) C . . w C ) O O O Cl) M M N N N. to (D U) U7 M Nr R O N N U) co O H v O c6 v •- O O O O O O O O O 6 n v v M N 11 r r r N - 'D O N Cl) Cl) M Cl) Cl) Cl) M M M M co Cl) M M M Cl) M M Cl) M Cl) Cl) >> L O O O O O O O O O O O O O O O O O O O O O O d N c n n n n n n n n n r? n n n n n n n n n n n c 7 t_ Q O N U) P- O N N O V O- OD M M M n O O Q) V x O V (O O O O O O O O O O O Cl? N _ O O U) C (? O O O O O O O O O O O O O O - O O O O O O O Cl) p C CD O U O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n O n 0 n C) V 6 6 O O 6 O O O C7 Cj O 6 6 tj c; O O O O O 6 O R o jp tc V' n (N U) n n cO to to O V CO N N O (D LO U) n CO N cD _ U) m (D N co N N O O O -7 -: -7 -7 O M O Lq O O n U) •' Q F- v Cl) Cl) O N O O O O O O O O O C) 'cT Cl) O O O O + (D E 01 t4 O O N U) O M M O U) N O N O O O V N O w ` m V O to N O O O O O O O O O C. O V O n U) O Q :a O O O O O O O O O O O O O O O O O O O O O C N M LO C' Cl) R O N to co M n 00 O N N M O U) m m m } } Y m _ _ N m N N Cl? co U m 5: m } m m m O ? co U U U U U U m n C - ` T m N O m V ? Q w N M V 0 to n 00 O O N M v (o CO n OD O E ~ C O - ? N N N - m Z J Z c 0 N x W 3 ) E 0 N c to S N 0) O) m CL 1 1 1 1 1 0 00 O O N ` m C ^. M O M O O M O OD O O M O (h O M to 6 to Lo 4 O 6 O' U 1 00 O Cl) O O R N j 0. M N C) 117 C) O (D co O In ro O 0 6 o 6 0 O U O OD D) CO V Cl) O Cl) O M ? R N R O t*? r- CC) a) 0 1- 00 C (D (D IT LO LO 'IT co co O (D (O (D t co O) M O) Cl) ? O 0) G CC? to N C) N (P ( (A = I O C) 00 C V V V V L O IN (D N (0 co co co CD co co O C) Cl) E C M CD N 0) N to n N 0 co N a co C W (O co CD co co (D co (D - O O Q co CD CD V) C) M 00 L r"" N N I N l W co 'IT LO LO T LO to LO CD LO V (D f - co (D LO D Z t o co co co co co co to m C C e O O _ O _ O u O O O E y J r OM ?- r r V to 3 0 ?. co I-- co to ? (C) N R (o O t o N a) J I N ) J (0 m V OO M r r r r r N C C N J N Q (0 d m N M O M N (D lO M 7 LO Cb ? U -i6 ] Q oD O u7 (O LO O r O v U U ? m; w CD 0) - tr) U) OD M co rn (1°n mLL N 0 0 0 v n ri U i2 C w o) rn IMO - co V C .V_. O 00 r-? c r .- r N II 0 O _ N L O co (Y) O Cl) O CO O Cl) O (1) O co O Cl N U) c r; r; r; n t` a .z7- E Q co O M Co v O f` v N o X c N N e . M O O O M a' U o 0 C) 0 0 C) 0 0 Cl) cq p o U O O 0 O O O O O 0 ` ? 0 0 0 0 6 0 0 0 0 N 00 M 0) a) m F Q U N OO U") 00 N N 'T r N O O O O O t N wm O 0) M LO O O 0) E a 0) U V N lO O O V ? Q ? O O O O O O O O ? C N lO CO Op N O r N N N M M N Cl) LM U U U U U m M, U li 00 m0 u to F "? O U c ? a E w C_ O N N N N N N N O JZ U Z 0 X W N N N E 0 U) 3 0 c m 2 Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1 1 Chapter 5 - Erosion Control Calculations 5.1- Rip Rap Design r 1 r 11 Prepared By: 1 Design Resource Group, P.A. Appendices 4 3 w (D 2 N U) Q CO i .2- LO v dsa= o lb 1000 ri• Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). r c Ou-az-r7 L CL ]C).46 C?; W= ? I$ f dogrrTak - - k -)(o.41a') - 0 Coo' 8.06.3 dLop?k I.SJ rl,,Lx _ 0.9© 3 5 10 20 50 100 200 500 . Q,= 19.'`1'lo Discharge (ft3/sec) f 1 1 1 1 ?j 1 r 1 1 j /??' -0; ?- 4 7 PC. OkS.Oz Appendices A Q? N_ CO Q ca a Gr 0 LO v d,,. = Q.-'Lk Curves may not be extrapolated. Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (Tw < 0.5 diameter). Q,o I?-(o3 crs = NO') , moo= 2 - o ' W= 15 N dso = 0-4-01 8.06.3 Q-1' ? . (03 Discharge (ft3/sec) ?? Kai a?4 ?3 Appendices 3 Curves may not be extrapolated. w Figure 8.06a Design of outlet protection protection from a round pipe flowing full, minimum tailwater condition (T. < 0.5 diameter). Q=zr41 aR _ 13.0 (gINA) c??a = 0. 4?0 drjAk -) 5 o = l .NCO. o. (00 f Ora, I.S-( de _ s.o6 '00) = 0 .90' I• v Q? N Q CO Q O LO , o,4c U=,Q :141 Discharge (ft3/sec) Drainage Study for L NCC - Campus Corners 1 1 1 1 Chapter 5 - Erosion Control Calculations 5.2 -Skimmer Sediment Basin Calculations 1 Prepared By: Design Resource Group, P.A. 041-115 11/6/2008 1 1 1 1 1 1 1 1 1 1 i 1 1 z Z ``' ? z z p c? o F Z z ° O w _ N V? o?aa 3a (f) < o oNCL < JCL zoo MOw MOO z F- W W Um(nW??ZN LW wmwX Uw lwi 6lwi0 w17 z F- W Q o d'zwu-ond'(Nm Q d'2kmQ O Z cV W_ Z H Z W M Y m W w 0 J D wX Z V) U W Q W J W (n F- Z_ W ZZ m II W ~ Z_ in 3 0 II Q w p Q i < f J J F LLI Z_ > . W Z0 N N -w U Z:2 ?w co O W W J t;;c O m a F - C) z W I J O U) ?a r II O ?` (If W cr w; U 3 V a <3 viva) ZH Z U Q p Q ? V O W N (a w -CL ?i Mara Ew za a 0 v, a w zo w 13 w OF z OO wW z2 ? w w a: z d a? UQ ? ? 00 °dv . . z w z w te a' N cr W J U (!) 0O O z } W Q 03 w J W :2 a rw w in. v? I g Q U I Li 6E 0 N 3 LLJ W J o w w z 0 N F-- W W Q Q. N? Y U O J m I- Q Q N O O Z V) m Li G 0 V) LL LLI V V) I IN al 1 61 .Gjj 9 I Drainage Study for 041-115 UNCC - Campus Corners 11/6/2008 1 1 1 Chapter 5 - Erosion Control Calculations 5.3 - Temporary Sediment Basin Calculations 1 11 I Prepared By: Design Resource Group, P.A. 1 1 1 1 1 r i a i Z LO 3 1 1 1 I 1 1 1 1 i 1 1 i Z I ? 1 1 1 Lo LLI if) Z O N O 00 U W Z 2 In 09 z l- ?Lo r4h O Z O_ H U w V) U) U) O U x Q in W9 LLJ ? m J L? IQi W O LL. !O J J U- m W O CL 0 o W w > W U Z Z? "T W a-i o U a o O< W N U O W N O K d Mv _ M ?Nad ? V d o N U z W C7 W o ~ d U a a. 6 2Zffi jW O W W a cr cr a. co O U Z o? C) LJ CL _j W m m to O Z J O D O W U J Q Q ?? Z _Z 0 J 1 t 1 L ? ? .1 1 ' } I t , Lo 1 O ? 0 ~' I 1 , 1 CV , 1 , 1 , 1 , I , 1 , 1 , Z t0 Z O ft2 Z LU OO??I U J N noZO W vW? UQ?0vi ~ I?wWwa. a OZ a z°}ail r U m Q l? L? W J U O0 H O Y U O J m H Q X E .1`'. 3 W J L O v ^? S? dvN U ? a w? >0> O? y 0 ? d WWI 50? ? dU U d= U v w v? z a W UQ ZWW O a z z N H O O Q z LLJ LLJ V J L_! Q n? 1__L LLJ cn A d w E--4 E- C!2 a W °a Oa w w A CH 8 Drainage Study for UNCC - Campus Corners Appendix A Project Location & Watershed Determination 041-115 11/6/2008 Prepared By: Design Resource Group, P.A. APPENDIX A -PROJECT LOCATION & WATERSHED DETERMINATION Drainage Study for UNCC - Campus Corners 1 CI 1 a 1 1 1 1 1 1 t 1 1 11 Prepared By: Design Resource Group, P.A. Appendix B Pre-Developed Drainage Exhibit 041-115 11/6/2008 Drainage Study for UNCC - Campus Corners Appendix C Post-Developed Drainage Exhibit 041-115 11/6/2008 Prepared By: Design Resource Group, P.A.