Loading...
HomeMy WebLinkAbout20060364 Ver 4_Application_20090714 STATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEVERLY EAVES PERDUE GOVERNOR U.S. Army Corp of Engineers Regulatory Field Office 69 Darlington Ave. Wilmington, NC 28402-1890 Attention: Brad Shaver NCDOT Coordinator July 2, 2009 Cj (0- GW4 EUGENE A. CONTI, JR. SECRETARY L9 @1 L111 `" yo, JUL .14 12??9 aENR rTeR CUU Ty WErLAIIDS AND STM2 JW.;IER8RA.Nr,4 SUBJECT: Request for Reissuance of Nationwide 23 Permit for the proposed replacement of Bridge No. 21 over Northeast Cape Fear River on NC 210 in Pender County, Division 3. Federal Aid No. BRSTP-0210(4), State Project No. 8.1271001; TIP No. B-4223. Debit $240 from WBS No. 33567.1.1. Reference: Section 404 Nationwide Permit 23, Action I.D. 200101172 issued January 16, 2007. The above referenced permit, issued to the North Carolina Department of Transportation for B-4223, has expired and a reissuance is necessary for construction to be completed. Please find enclosed a new PCN in the most recent format. All other documentation and drawings received with the original permit application, dated March 2, 2005, and any subsequent Permit Modification requests, remain valid.. Regulatory Approvals Section 404 Permit: All aspects of this project are being processed by the Federal Highway Administration as a "Categorical Exclusion" in accordance with 23 CFR 771.115(b). The NCDOT requests that a Nationwide Permit 23 authorize these activities. Section 401 Permit: We anticipate 401 General Certification number 3701 will apply to this project. All general conditions of the Water Quality Certifications will be met. The NCDOT is requesting written concurrence from the N.C. Division of Water Quality. Therefore, in accordance with 15A NCAC 2H, Section .0500(a), we are providing five copies of this application to the NCDWQ for their review and approval. Authorization to debit the $240 Permit Application Fee from WBS Element 33567. 1.1 is hereby given. MAILING ADDRESS: NC DEPARTMENT OF TRANSPORTATION PROJECT DEVELOPMENT AND ENVIRONMENTAL ANALYSIS 1598 MAIL SERVICE CENTER RALEIGH NC 27699-1598 TELEPHONE: 919-431-2000 FAX: 919431-2002 WEBSITE: WWW.NCDOT.ORG LOCATION: 4701 ATLANTIC AVENUE SUITE 116 RALEIGH NC 27604 CAMA: CAMA Major Development Permit No. 123-06 was issued on June 30, 2006. This permit does not have an expiration date and therefore remains valid. A copy of this permit application will be posted on the NCDOT website at: httn: //www. ncdot.ore/doh/l)reconstruct/pe/neu/nermit. html Thank you for your assistance with this project. If you have any questions or need additional information please contact Mrs. Veronica Barnes at (919) 431-6758 or vabames@ncdot.gov. Sincerely Gregory J. Thorpe, Ph.D. Environmental Management Director, PDEA Cc: w/attachment Mr. Brian Wrenn, NCDWQ (5 Copies) Mr. Steve Sollod, NCDCM W/o attachment (see website for attachments) Dr. David Chang, P.E., Hydraulics Mr. Jay Bennett, P.E., Roadway Design Mr. Majed Alghandour, P. E., Programming and TIP Mr. Art McMillan, P.E., Highway Design Mr. Scott McLendon, USAGE, Wilmington Mr. Travis Wilson, NCWRC Mr. Gary Jordan, USFWS Mr. Ron Sechler, NMFS Ms. Anne Deaton, NCDMF Mr. Brian Yamamoto, P.E., PDEA Mr. Mark Staley, Roadside Environmental Mr. Greg Perfetti, P.E., Structure Design Mr. Victor Barbour, P.E., Project Services Unit Mr. H. Allen Pope, P.E., Division 3 Engineer Mr. Mason Herndon, Division 3 Environmental Officer Ms. LeiLani Paugh, NEU 4. Applicant Information (if different from owner) 4a. Applicant is: ? Agent ? Other, specify: 4b. Name: not applicable 4c. Business name (if applicable): 4d. Street address: 4e. City, state, zip: 4f. Telephone no.: 4g. Fax no.: 4h. Email address: 5. Agent/Consultant Information (if applicable) 5a. Name: not applicable 5b. Business name (if applicable): 5c. Street address: 5d. City, state, zip: 5e. Telephone no.: 5f. Fax no.: 5g. Email address: B. Project Information and Prior Project History 1. Property Identification 1a. Property identification no. (tax PIN or parcel ID): not applicable 1 b. Site coordinates (in decimal degrees): Latitude: 34.443 Longitude: - 77.833 (DD.DDDDDD) (-DD.DDDDDD) 1c. Property size: 11 acres 2. Surface Waters 2a. Name of nearest body of water (stream, river, etc.) to Northeast Cape Fear proposed project: 2b. Water Quality Classification of nearest receiving water: B; Sw 2c. River basin: Cape Fear 3. Project Description 3a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application: Rural and minimally developed with forest cover. 3b. List the total estimated acreage of all existing wetlands on the property: > 5 acres 3c. List the total estimated linear feet of all existing streams (intermittent and perennial) on the property: 200 3d. Explain the purpose of the proposed project: To replace a functionally obsolete bridge. 3e. Describe the overall project in detail, including the type of equipment to be used: The project involves replacing a 590-foot bridge with a 920-foot, 10-span bridge on new alignment south of the existing bridge. Traffic will be maintained on the existing bridge during construction. Standard road building equipment, such as trucks, dozers, and cranes will be used. 4. Jurisdictional Determinations 4a. Have jurisdictional wetland or stream determinations by the Corps or State been requested or obtained for this property / ® Yes ? No ? Unknown project (including all prior phases) in the past? Comments: Action ID 200101172 4b. If the Corps made the jurisdictional determination, what type ? Preliminary ®Final of determination was made? 4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: Environmental Services, Name (if known): Jeff harbour Inc. Other: 4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation. January 2, 2002 5. Project History 5a. Have permits or certifications been requested or obtained for ® Yes ? No ? Unknown this project (including all prior phases) in the past? 5b. If yes, explain in detail according to "help file" instructions. This is a request for a reissuance of an expired permit. The original permit was issued on January 16, 2007 under Action I.D 200101172. The original permit approved of wetland impacts of 0.52 acre and an onsite mitigation plan that would restore 0.95 acre of wetlands. This project is currently under construction. 6. Future Project Plans 6a. Is this a phased project? ? Yes ® No 6b. If yes, explain. I? C. Pioposed Impacts Inventory 1. Impacts Summary 1a. Which sections were completed below for your project (check all that apply): ® Wetlands ® Streams - tributaries ? Buffers ? Open Waters ? Pond Construction 2. Wetland Impacts If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted. 2a. 2b. 2c. 2d. 2e. 2f. Wetland impact Type of jurisdiction number - Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact Permanent (P) or (if known) DWQ - non-404, other) (acres) Temporary T Site 1 ® P ? T Fill Riparian ® Yes ® Corps 0.52 ? No ? DWQ Site 2 ? P ? T ? Yes ? Corps ? No ? DWQ Site 3 ? P ? T ? Yes ? Corps ? No ? DWQ Site 4 ? P ? T ? Yes ? Corps ? No ? DWQ Site 5 ? P ? T ? Yes ? Corps ? No ? DWQ Site 6 ? P ? T ? Yes ? Corps ? No ? DWQ 2g. Total wetland impacts 0.52 Permanent .2h. Comments: 3. Stream Impacts If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this question for all stream sites impacted. 3a. 3b. 3c. 3d. 3e. 3f. 3g. Stream impact Type of impact Stream name Perennial Type of Average Impact length number - (PER) or jurisdiction stream (linear feet) Permanent (P) or intermittent (Corps - 404, 10 width Temporary (T) (INT)? DWQ - non-404, (feet) other) Site 1 ® P ? T Permanent fill NE Cape Fear ® PER ? INT ® Corps ? DWQ 500 0.014 ac Site 2 ? P ® T Temporary fill NE Cape Fear ® PER ? INT ® Corps ? DWQ 500 0.008 ac Site 3 ? P ? T ? PER ? Corps ? INT ? DWQ Site 4 ? P ? T ? PER ? Corps ? INT ? DWQ Site 5 ? P ? T ? PER ? Corps ? INT ? DWQ Site 6 ? P ? T ? PER ? Corps ? INT ? DWQ 3h. Total stream and tributary impacts 0.014 Perm 0.008 Temp 3i. Comments: 4. Open Water Impacts If there are proposed impacts to lakes, ponds, estuaries, tributaries, sounds, the Atlantic Ocean, or any other open water of the U.S. then individual) list all open water impacts below. 4a. 4b. 4c. 4d. 4e. Open water Name of impact number- waterbody Type of impact Waterbody type Area of impact (acres) Permanent (P) or (if applicable) Temporary T 01 ?P?T 02 ?P?T 03 ?P?T 04 ?P?T 4f. Total open water impacts X Permanent X Temporary 4g. Comments: 5. Pond or Lake Construction If and or lake construction proposed, then complete the chart below. 5a. 51b. 5c. 5d. 5e. Wetland Impacts (acres) Stream Impacts (feet) Upland Pond ID number Proposed use or (acres) purpose of pond Excavat Flooded Filled ed Flooded Filled Excavated Flooded P1 P2 5f. Total 5g. Comments: 5h. Is a dam high hazard permit required? ? Yes ? No If yes, permit ID no: 51. Expected pond surface area (acres): 5j. Size of pond watershed (acres): 5k. Method of construction: 6 6. Buffer Impacts (for DWQ) If project will impact a protected riparian buffer, then complete the chart below. If yes, then individually list all buffer impacts below. If an impacts require miti gation, then you MUST fill out Section D of this form. 6a. ? Neuse ?Tar-Pamlico ? Other: Project is in which protected basin? ? Catawba ? Randleman 6b. 6c. 6d. 6e. 6f. 6g. Buffer impact number - Reason for impact Buffer Zone 1 impact Zone 2 impact Permanent (P) or Stream name mitigation (square feet) (square feet) Temporary T re uired? B1 ?P?T ?Yes ? No B2 ?P?T ?Yes ? No B3 ? P ? T ? Yes ? No 6h. Total buffer impacts 6i. Comments: D. Impact Justification and Mitigation 1. Avoidance and Minimization la . Specifically describe measures taken to avoid or minimize the proposed impacts in designing project. The proposed bridge is 330 feet longer than the existing bridge; the number of in-water bents is reduced from 10 to 5; 3:1 fill slopes will be used in jurisdictional areas;. 1 b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques. Best management Practices for the protection of Surface Waters and BMP's for Bridge Demolition and Removal; hand clearing will be used for the relocation of overhead powerlines; and inwater work moratorium will be in effect from Feb. 1 to June 30 to protect anadromous fish; adherence to Precautions for Construction in Areas that may be used by West Indian Manatee in North Carolina. 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for .impacts to Waters of the U.S. or Waters of the State? ® Yes ? No If no, explain: 2b. If yes, mitigation is required by (check all that apply): ® DWQ ® Corps 2c. If yes, which mitigation option will be used for this project? ? Mitigation bank ? Payment to in-lieu fee program ® Permittee Responsible Mitigation 3. Complete if Using a Mitigation Bank 3a. Name of Mitigation Bank: not applicable 3b. Credits Purchased (attach receipt and letter) Type Quantity 3c. Comments: 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. ? Yes 4b. Stream mitigation requested: linear feet 4c. If using stream mitigation, stream temperature: ? warm ? cool ?cold 4d. Buffer mitigation requested (DWQ only): square feet 4e. Riparian wetland mitigation requested: acres 4f. Non-riparian wetland mitigation requested: acres 4g. Coastal (tidal) wetland mitigation requested: acres 4h. Comments: 5. Complete if Using a Permittee Responsible Mitigation Plan 5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan. Onsite mitigation will be used, the replacement of the bridge will be longer then the current bridge. The longer bridge will allow the removal of 0.95 acres of fill in wetlands. 6. Buffer Mitigation (State Regulated Riparian Buffer Rules) - required by.DWQ 6a . Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? ? Yes ® No 6b . If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitigation. Calculate the amount of mitigation required. Zone 6c. Reason for impact 6d. Total impact (square feet) Multiplier 6e. Required mitigation (square feet) Zo ne 1 3 (2 for Catawba) Zo ne 2 1.5 6f. Total buffer mitigation required: 6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank, permittee responsible riparian buffer restoration, payment into an approved in-lieu fee fund). 6h. Comments: 9 E. Stormwater Management and Diffuse Flow Plan (required by DWQ) 1. Diffuse Flow Plan 1a . Does the project include or is it adjacent to protected riparian buffers identified ? Yes ® No within one of the NC Riparian Buffer Protection Rules? 1 b . If yes, then is a diffuse flow plan included? If no, explain why. Comments: ? Yes ? No 2. Stormwater Management Plan 2a . What is the overall percent imperviousness of this project? N/A 21b . Does this project require a Stormwater Management Plan? ® Yes ? No 2c . If this project DOES NOT require a Stormwater Management Plan, explain why: 2d . If this project DOES require a Stonnwater Management Plan, then provide a brief, narrative description of the plan: See permit drawings. ? Certified Local Government 2e . Who will be responsible for the review of the Stormwater Management Plan? ? DWQ Stormwater Program ? DWQ 401 Unit 3. Certified Local Government Stormwater Review 3a. In which local government's jurisdiction is this project? not applicable ? Phase II 3b. Which of the following locally-implemented stormwater management programs ? NSW apply (check all that apply): ? USMP ? Water Supply Watershed ? Other: 3c. Has the approved Stormwater Management Plan with proof of approval been ? Yes ? No attached? 4. DWQ Stormwater Program Review ® Coastal counties 4a. Which of the following state-implemented stormwater management programs apply ? HOW (check all that apply):. ? ORW ? Session Law 2006-246 ? Other: 41b. Has the approved Stormwater Management Plan with proof of approval been attached? ® Yes ? No 5. DWQ 401 Unit Stormwater Review 5a. Does the Stormwater Management Plan meet the appropriate requirements? ® Yes ? No 51b. Have all of the 401 Unit submittal requirements been met? ® Yes ? No 10 F. Supplementary Information 1. Environmental Documentation (DWQ Requirement) la. Does the project involve an expenditure of public (federal/state/local) funds or the ® Yes ? No use of public (federal/state) land? 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State ® Yes ? No (North Carolina) Environmental Policy Act (NEPA/SEPA)? 1c. If you answered 'yes' to the above, has the document review been finalized by the State Clearing House? (If so, attach a copy of the NEPA or SEPA final approval letter.) ® Yes ? No Comments: 2. Violations (DWQ Requirement) 2a. Is the site in violation of DWQ Wetland Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), DWQ Surface Water or Wetland Standards, ? Yes ® No or Riparian Buffer Rules (15A NCAC 2B .0200)? 2b. Is this an after-the-fact permit application? ? Yes ® No 2c. If you answered 'yes' to one or both of the above questions, provide an explanation of the violation(s): 3. Cumulative Impacts (DWQ Requirement) 3a. Will this project (based on past and reasonably anticipated future impacts) result in ? Yes additional development, which could impact nearby downstream water quality? ® No 31b. If you answered 'yes' to the above, submit a qualitative or quantitative cumulative impact analysis in accordance with the most recent DWQ policy. If you answered "no," provide a short narrative description. 4. Sewage Disposal (DWQ Requirement) 4a. Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. not applicable 5. Endangered Species and Designated Critical Habitat (Corps Requirement) 5a . Will this project occur in or near an area with federally protected species or h bit ? ® El Yes No a at 51b. Have you checked with the USFWS concerning Endangered Species Act i ? ® Yes No mpacts? 5c. If yes, indicate the USFWS Field Office you have contacted. ® Raleigh , ? Asheville 5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat? USFWS list of Threatened and Endangered Species in Pender County (updated January 31, 2008). 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as essential fish habitat? ® Yes ? No 6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat? NMFS County Index 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation ? Yes No status (e.g., National Historic Trust designation or properties significant in North Carolina history and archaeology)? 71b. What data sources did you use to determine whether your site would impact historic or archeological resources? NEPA Documentation 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No 81b. If yes, explain how project meets FEMA requirements: NCDOT Hydraulics coordination with FEMA 8c. What source(s) did you use to make the floodplain determination? FEMA Maps Dr. Gregory J. Thorne, Ph D e 4jK T z ' Qq P A li t/A i d N ' . 6 - pp can gent s r nte ame Ap licant> ent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) 12