June 5, 2009
Mr. Rob Ridings
NC DWQ, 401NVetlands Unit
2321 Crabtree Blvd., Suite 250
Raleigh, North Carolina 27604
Re: 401 Water Quality Certification
DWQ Project #: 20030726 ver.3
Cary Park Improvements Project
TOC Project Number ST-1085
Dear Mr. Ridings:
Please find included the revised stream impacts on the PCN form and a sketch of the transition from UT
to Morris Branch. At the request of USACOE, impacts to streams have been revised for review. Please
note that only the sheets with modifications are included for consideration of the re-certification. The
following lines have been revised on the form: B. 3c, C 3g, C. 3h, D. 41b & D. 8B.
Please advise us if you will need any other information regarding this request.
Sincerely,
Kyle Hubert, P.E.
Engineering Department
Town of Cary
(919) 462-3938
kyle.hubert@townofcary.org
C: Mr. Sajjad Alam, P.E., Parsons
TOWN Of CARY
316 North Academy Street • Cary, NC 27513• PO Box 8005• Cary, NC 27512-8005
te1919-469-4030 • fax 919-460-4935• www.townofcary.org
Alam, Sajjad" To "Kyle Hubert" <kyle.hubert@townofcary.org>
' .? <Sajjad.Alam@parsons.com> cc "Garrett, David" <David.Garrett@parsons.com>
06/02/2009 10:02 AM bcc
Subject Green Level to Durham Rd.: Revised PCN form
Kyle:
Please find attached revised PCN form for further action. Please resign and date the form before
submission to DWQ.
Let me know if you have any questions, or if I can be of any assistance.
Regards.
Sajjad Alam, P.E.
Parsons
C-919-539-7765
From: Garrett, David
Sent: Monday, June 01, 2009 12:54 PM
To: Alam, Sajjad
Subject: Revised PCN form
Sajjad,
The revised stream impacts have been marked on the attached PCN form. Please note that only those
sheets with modifications are being sent to DWQ for re-certification.
The following lines have been revised on the form: B. 3c, C. 3g, C. 3h,.D. 4b & D. 8b. Kyle should re-sign
and date the last sheet prior to submitting to DWQ. The attached sketch of the transition from UT to
Morris Branch should also be sent, as this was an addition requested by the USACE. DWQ contact info.
below.
Mr. Rob Ridings
NC DWQ, 401/Wetlands Unit
2321 Crabtree Blvd., Suite 250
Raleigh, North Carolina 27604
Re: 401 Water Quality Certification
DWQ Project # : 20030726 ver. 2
Cary Park Improvements Project
TOC Project Number ST-1085
David Garrett
Parsons
5540 Centerview Drive
Raleigh, NC 27606, Suite 217
Phone: (919) 854-1345
Direct Dial (919) 854-1342
Fax: (919) 851-2103
[mailto:david. carrett(c)parsons.com]
ST-1085 PCN mv.pdf 20D90326114743636.pdf
B. Project Information and Prior Project History
3. Project Description
3a . Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this
application: The land use is residential and retail. Urban and Highly Developed
3b. List the total estimated acreage of all existing wetlands on the property: NONE
3c. List the total estimated linear feet of all existing streams (intermittent and perennial on the property: yl4'
The existing stream length of Morris Branch from proposed R/W to proposed R/W is (perenni /Corp)The existing
stream length of the Unnamed tributary to Morris Branch from proposed RNV to proposed R/W is +/,26<ft. (intermiltent/DWQ)
3d. Explain the purpose of the proposed project: Widening this portion of Green Level to Durham Road is necessary in order
to ease projected traffic congestion in this area due increased retail and residential development. The existing two-lane facility
connects two existing four lane facilities. The over capacity of the two-lane facility creates congestion that inherently creates
hazards to the traveling public.
3e. Describe the overall project in detail, including the type of equipment to be used: ST-1085 is the widening of SR 1625,
greenways, grading, paving, drainage structures, 2@9'x8' RCBC (Morris Branch), 1@66' RCP (Unnamed tributary) and
1@12'x10' (Greenway/Pedestrian Crossing). Major grading and paving equipment will be used.
4. Jurisdictional Determinations
4a. Have Jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property / X Yes ? No ? Unknown
project (including all prior phases) in the past?
Comments: Attached Aid# 20301001/200321324
4b. If the Corps made the jurisdictional determination, what type
? Preliminary X Final
of determination was made?
4c. If yes, who delineated the jurisdictional areas? Agency/Consultant Company: ESI (Natural Resource
Report, dated: September 2002.)
Name (if known): Jeff Harbour, ESI, Inc.
4d. If yes, list the dates of the Corps jurisdictional determinations or State determinations and attach documentation.
Verified: Amanda Jones(Corp) & Steve Mitchell 7/09102(DWQ) & Thomas Brown(Corp) 9/14/2005
Verified call with James.Shern (Corp) through email on 1121/09 (see attachment)
5. Project History
5a. Have permits or certifications been requested or obtained for X Yes ? No ? Unknown
this project (including all prior phases) in the past?
5b. If yes, explain in detail according to "help file" instructions.
A Nationwide 14 and 401 Certification (DWO) was issued by Thomas Brown (Corp) and Cyndi Karoly (DWO) on September 14,
2005 and has since expired on March 18, 2007. ( AID 200321001/200321324 )
The project was delayed due to funding issues and associated developer agreements.
6. Future Project Plans
6a. Is this a phased project? ? Yes X No
6b. If yes, explain.
C. Proposed Impacts Inventory
1. Impacts Summary
la. Which sections were completed below for your project (check all that apply):
? Wetlands X Streams - tributaries ? Buffers
? Open Waters ? Pond Construction
2. Wetland Impacts
If there are wetland impacts proposed on the site, then complete this question for each wetland area impacted.
2a. 21b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdiction
number- Type of impact Type of wetland Forested (Corps - 404, 10 Area of impact
Permanent (P) or (if known) DWQ - non-404, other) (acres)
Temporary T
W1 ? P ? T ? Yes ? Corps
? No ? DWQ
W2 ? P ? T ? Yes ? Corps
? No ? DWQ
W3 ? P ? T ? Yes ? Corps
? No ? DWQ
W4 ? P ? T ? Yes ? Corps
? No ? DWQ
W5 ? P ? T ? Yes ? Corps
? No ? DWQ
W6 ? P ? 7 ? Yes ? Corps
? No ? DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
If there are perennial or intermittent stream impacts (including temporary impacts) proposed on the site, then complete this
question for all stream sites impacted.
3a. 31b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction Average Impact
number - (PER) or (Corps - 404, 10 stream length
Permanent (P) or intermittent DWQ - non-404, width (linear
Temporary (T) (INT)? other) (feet) feet)
51 X P ? T 2@9.0'x8.0'
Box culvert
Morris Branch
X PER
? INT
X Corps
? DWQ
9.0'
255'
(Road Crossing) y?
1 @66" RCP
S2 X PEI T (Road Crossing) 8
2@ 48" RCP
Unnamed 7rib.
? PER
X Corps
5.5'
.26r
(Greenway To Morris Branch X INT ?DWQ 21
Crossing)
S3 ? PEI T ? PER ? Corps
? INT ? DWQ
S4 ? P ? T ? PER ? Corps
? INT ? DWQ
S5 ? P ? T ? PER ? Corps
? INT ?DWQ
S6 ?P?T ? PER ? Corps
2
?INT ?DWQ
3h. Total stream and tributary impacts 6'L6'
3i. Comments: ?/?S
D. impact Justification and Mitigation
1. Avoidance and Minimization
1 a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing project.
The project has been realigned to avoid filling of the unnamed tributary to Morris Branch. This realignment avoids +/-180 ft of
channel. The box culvert crossing and the 66" RCP is proposed to be buried one foot at the inlet and outlet inverts. 2:1 side
slopes on road fill at the site are being used to reduce the impact to streams. All stormwater will be discharged into energy
dissipators or Pre-formed Scour Holes before entering the channel. Additionally the 2@9x8 box culvert will incorporate sills on
the inlet and outlet of the culvert. The sill will assist in maintaining a low flow channel, which is the same width as the existing
channel, through one barrel.
1b. Specifically describe measures taken to avoid or minimize the proposed impacts through construction techniques.
Construction and Erosion and Sedimentation Control will adhere to Best Management practices to reduce sediment laden
runoff. The Erosion Control plan will be reviewed by NCDEHR Land Quality. During construction of the Box culvert, the base
flow will be maintained during construction.
2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State
2a. Does the project require Compensatory Mitigation for
impacts to Waters of the U.S. or Waters of the State? X Yes ? No
2b. If yes, mitigation is required by (check all that apply): X DWQ X Corps
2c.
If yes, which mitigation option will be used for this
project? ? Mitigation bank
X Payment to in-lieu fee program
? Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name of Mitigation Bank:
3b. Credits Purchased (attach receipt and letter) Type Quantity
3c. Comments:
4. Complete if Making a Payment to In-lieu Fee Program
4a. Approval letter from in-lieu fee program is attached. X Yes
4b. Stream mitigation requested: "v5
linear feet
4c. If using stream mitigation, stream temperature: X warm ? cool ?cold
4d. Buffer mitigation requested (DWQ only): square feet
4e. Riparian wetland mitigation requested: acres
4f. Non-riparian wetland mitigation requested: acres
4g. Coastal (tidal) wetland mitigation requested: acres
41h. Comments:
5. Complete if Using a Permittee Responsible Mitigation Plan
5a. If using a permittee responsible mitigation plan, provide a description of the proposed mitigation plan.
5. Endangered Species and Designated Critical Habitat (Corps Requirement)
5a. Will this project occur in or near an area with federally protected species or ? Yes ® No
habitat?
5b. Have you checked with the USFWS concerning Endangered Species Act Yes ® No
impacts?
® Raleigh
5c. If yes, indicate the USFWS Field Office you have contacted.
?. Asheville
5d. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical
Habitat?
Wake County USFWS listing dated March 7, 2002 (Final Environmental Assessment April 2004)
6. Essential Fish Habitat (Corps Requirement)
6a. Will this project occur in or near an area designated as essential fish habitat? ? Yes ® No
6b. What data sources did you use to determine whether your site would impact Essential Fish Habitat?
NOAH and Sbuth and Mid Atlantic Fishery Management Councils
7. Historic or Prehistoric Cultural Resources (Corps Requirement)
7a. Will this project occur in or near an area that the state, federal or tribal
governments have designated as having historic or cultural preservation ? Yes ® No
status (e.g., National Historic Trust designation or properties significant in
North Carolina history and archaeology)?
7b. What data sources did you use to determine whether your site would impact historic or archeological resources?
SHPO and Wake County Courthouse (Cary Parks Improvement Project, Architectural Investigation, Feb.2002 and Final
Environmental Assesmenl April 2004)
8. Flood Zone Designation (Corps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ® Yes ? No
Coo w
8b. If yes, explain how project meets FEMA requirements: M w) be,z i SS 0C
8c. What source(s) did you use to make the floodplain determination? NCFPM-Town of Cary fir;) Z,rj' .
Kyle Hubert
?, ?-
6/ 5/01
Applicant/Agent's Printed Name A plicant/Agent's Signature
(Agent's signature is valid only if an authorization letter from the applicant Date
is rovitled.
? by
s,
onq
_ I
I
I I
? I
r Jy I
CM
I
? I
vd
'174-90 Dl Jd
I
?S°l?S SS DDS SS
Q I
?J 7Of 9Z ? I 1 I F i I? ?-