Loading...
HomeMy WebLinkAbout20181608 Ver 1_Construction Drawings_11x17_20181121PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESCOVER SHEETC0-1 VICINITY MAP NTS LOCATION MAP SCALE: 1" = 200' 11/16/2018 PROJECT AREA PIEDMONT CONCORD LAKE MULTI-USE DEVELOPMENT CONCORD LAKE ROAD KANNAPOILS, NC KIMLEY-HORN AND ASSOCIATES, INC. 200 N. TRYON STREET SUITE 200 CHARLOTTE, NORTH CAROLINA 28202 (704) 333-5131 TEL LICENSE NO. F-0102 CONTACT: ADAM ESSINK, P.E. SURVEYOR:ENGINEER: NOTES: ALL NECESSARY INSPECTIONS AND/OR CERTIFICATIONS REQUIRED BY CODES AND/OR UTILITY SERVICE COMPANIES SHALL BE PERFORMED PRIOR TO THE FINAL CONNECTIONS OF SERVICES. THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. GROUNDWATER NOTE: THE PRESENCE OF GROUNDWATER SHOULD BE ANTICIPATED ON THIS PROJECT. CONTRACTOR'S BID SHALL INCLUDE CONSIDERATION FOR ADDRESSING THIS ISSUE. R.B. PHARR & ASSOCIATES, P.A. 420 HAWTHORNE LANE CHARLOTTE, NORTH CAROLINA 28204 (704) 376-2186 TEL CONTACT: JUSTIN CLONINGER, PLS PROJECT CONTACT LIST: GEOTECH: SUMMIT ENGINEERING AND LABORATORY TESTING P.C. 3575 CENTRE CIRCLE DRIVE FORT MILL, SOUTH CAROLINA 29715 (704) 540-1717 TEL CONTACT: KERRY C. COOPER, P.E. CAROLINA DEVELOPMENT SERVICES 2649 BREKONRIDGE ROAD MONROE, NORTH CAROLINA 28110 (980) 238-1229 TEL CONTACT: JOHNATHAN MCCALL OWNER: 85 29 Know what's R EROSION CONTROL NOTESGENERAL CONSTRUCTION NOTES GROUND STABILIZATION GRADING NOTES: ALL WORK AND MATERIALS SHALL COMPLY WITH ALL CITY, COUNTY AND STATE REGULATIONS AND CODES AND O.S.H.A. STANDARDS. NO WORK WITHIN NCDOT RIGHT OF WAY SHALL TAKE PLACE WITHOUT ALL PERMITS. EXISTING STRUCTURES WITHIN THE CONSTRUCTION LIMITS ARE TO BE ABANDONED, REMOVED OR RELOCATED AS NECESSARY. ALL COST SHALL BE INCLUDED IN BASE BID. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL RELOCATIONS, INCLUDING BUT NOT LIMITED TO, ALL UTILITIES, STORM DRAINAGE, SIGNS, ETC. AS REQUIRED. ALL WORK SHALL BE IN ACCORDANCE WITH GOVERNING AUTHORITIES SPECIFICATIONS AND SHALL BE APPROVED BY SUCH. ALL COST SHALL BE INCLUDED IN BASE BID. AREAS TO BE DISTURBED SHALL BE IMPROVED PER THE CIVIL PLANS OR RESTORED TO THEIR ORIGINAL OR BETTER CONDITION. CONTRACTOR SHALL REPAIR ANY EXISTING FEATURES THAT ARE DAMAGED DURING CONSTRUCTION TO THE EXISTING OR BETTER CONDITION. SITE BOUNDARY, TOPOGRAPHY, UTILITY AND ROAD INFORMATION TAKEN FROM SIGNED ALTA/NSPS SURVEY PERFORMED BY R.B. PHARR & ASSOCIATES, P.A. ON JANUARY 30, 2007. ALL INFORMATION IS TO BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL EMPLOY ALL NECESSARY BARRICADES, SIGNS, FENCES, FLASHING LIGHTS, TRAFFIC MEN, ETC. FOR MAINTENANCE AND PROTECTION OF TRAFFIC AS REQUIRED BY THE NORTH CAROLINA DEPT. OF TRANSPORTATION (NCDOT). THE CONTRACTOR SHALL PROTECT ALL MONUMENTS, IRON PINS, AND PROPERTY CORNERS DURING CONSTRUCTION. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENT PROPERTIES. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION AS SHOWN ON THE GRADING AND DRAINAGE PLAN WITHOUT AUTHORIZATION IS SUBJECT TO A FINE. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS AND CITY OF KANNAPOILS. CONTRACTOR AGREES TO REPAIR ANY DAMAGE TO THE PUBLIC RIGHT-OF-WAY IN ACCORDANCE WITH THE STANDARDS OF THE NCDOT AND CITY OF KANNAPOLIS. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER ANY DISCREPANCIES FOUND BETWEEN THE ACTUAL FIELD CONDITIONS AND THE CONSTRUCTION DOCUMENTS AND SHALL WAIT FOR INSTRUCTION PRIOR TO PROCEEDING. THE CONTRACTOR SHALL MAINTAIN EACH STREAM, CREEK, OR BACKWASH CHANNEL IN A UNOBSTRUCTED STATE AND SHALL REMOVE FROM THE CHANNEL AND BANKS OF THE STREAM ALL DEBRIS, LOGS, TIMBER, JUNK AND OTHER ACCUMULATIONS. CONTRACTOR SHALL ADJUST AND/OR CUT EXISTING PAVEMENT AS NECESSARY TO ASSURE A SMOOTH FIT AND CONTINUOUS GRADE. CONTRACTOR SHALL POST ASSIGNED BUILDING PERMIT NUMBER AND ADDRESS ON BUILDING. IN ROLLING OR HILLY TERRAINS, SWEEPING OF THE STONE BASE AND/OR APPLICATION OF A TACK COAT MAY BE REQUIRED NEAR INTERSECTIONS. THESE REQUIREMENTS WILL BE ESTABLISHED BY THE INSPECTOR AND BASED ON FIELD CONDITIONS. CONTACT THE UTILITY COMPANY TO RELOCATE ANY EXISTING UTILITY AND/OR LIGHT POLES. ALL EXISTING FACILITIES WHICH CONFLICT WITH THE IMPROVEMENTS UNDER THE SCOPE OF THIS PROJECT MUST BE RELOCATED AT THE EXPENSE OF THE CONTRACTOR. THE CONTRACTOR MUST CALL THE APPROPRIATE UTILITY COMPANIES AT LEAST (3) THREE WORKING DAYS BEFORE ANY EXCAVATION TO REQUEST EXACT FIELD LOCATION OF UTILITIES. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO RELOCATE ALL EXISTING UTILITIES WHICH CONFLICT WITH THE PROPOSED IMPROVEMENTS SHOWN ON THE PLANS. THE CONTRACTOR SHALL COORDINATE WITH THE GEOTECHNICAL ENGINEER FOR APPROPRIATE SLOPE STABILIZATION ON ALL SLOPES STEEPER THAN 3:1. THE CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED FOR BLASTING ROCK IF BLAST ROCK IS ENCOUNTERED. CONTRACTOR SHALL BE SOLEY RESPONSIBLE FOR COMPLYING WITH ALL BLASTING AND SAFETY REQUIREMENTS ALL CUT OR FILL SLOPES SHALL BE 2:1 OR FLATTER UNLESS OTHERWISE NOTED. CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE GOVERNING CODES AND BE CONSTRUCTED TO SAME. ALL PROPOSED CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND PROTECTING EXISTING UTILITIES, AND SHALL REPAIR ALL DAMAGE TO EXISTING UTILITIES THAT OCCUR DURING CONSTRUCTION. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY TO TRANSITION BACK TO EXISTING GRADE. LIMITS OF CLEARING SHOWN ON GRADING AND DRAINAGE PLAN ARE BASED UPON THE APPROXIMATE CUT AND FILL SLOPE LIMITS, OR OTHER GRADING REQUIREMENTS. THE CONTRACTOR IS RESPONSIBLE FOR THE DESIGN AND IMPLEMENTATION OF ALL SHEETING, SHORING, BRACING AND SPECIAL EXCAVATION MEASURES REQUIRED TO MEET OSHA, FEDERAL, STATE AND LOCAL REGULATIONS PURSUANT TO THE INSTALLATION OF THE WORK INDICATED ON THESE DRAWINGS. THE DESIGN ENGINEER ACCEPTS NO RESPONSIBILITY FOR THE DESIGN(S) TO INSTALL SAID ITEMS. THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ANY DEWATERING AND MOISTURE CONDITIONING NECESSARY TO CONSTRUCT THE PROJECT AS SHOWN ON THE PLANS. GRADES, ELEVATIONS AND LOCATIONS SHOWN ARE APPROXIMATE. AS DIRECTED BY THE ENGINEER, THEY MAY BE ADJUSTED TO ACCOMMODATE UNFORESEEN CONDITIONS. STATIONS, OFFSETS AND ELEVATIONS REFER TO THE CENTER OF DROP INLETS, MANHOLES AND JUNCTION BOXES, AND THE MIDPOINT OF THE LIP FOR CATCH BASINS. ANY CONSTRUCTION OR USE WITHIN THE AREAS DELINEATED AS FLOODWAY DISTRICT FRINGE BOUNDARY LINE OR FLOODWAY DISTRICT ENCROACHMENT BOUNDARY LINE IS SUBJECT TO THE RESTRICTIONS IMPOSED BY THE FLOODWAY REGULATIONS OF MECKLENBURG COUNTY. 1) SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF A SITE WHERE LAND-DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: i) ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. ii) ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. 2) CONDITIONS - IN MEETING THE STABILIZATION REQUIREMENTS ABOVE, THE FOLLOWING CONDITIONS OR EXEMPTIONS SHALL APPLY: i) EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE. ii) ALL SLOPES 50' IN LENGTH OR GREATER SHALL APPLY THE GROUND COVER WITHIN 7 DAYS EXCEPT WHEN THE SLOPE IS FLATTER THAN 4:1. SLOPES LESS THAN 50' SHALL APPLY GROUNDCOVER WITHIN 14 DAYS EXCEPT WHEN SLOPES ARE STEEPER THAN 3:1, THE 7 DAY-REQUIREMENT APPLIES. iii) ANY SLOPED AREA FLATTER THAN 4:1 SHALL BE EXEMPT FROM THE 7-DAY GROUND COVER REQUIREMENT. iv) ALTHOUGH STABILIZATION IS USUALLY SPECIFIED AS GROUND COVER, OTHER METHODS, SUCH AS CHEMICAL STABILIZATION, MAY BE ALLOWED ON A CASE-BY-CASE BASIS. v) FOR PORTIONS OF PROJECTS WITHIN THE SEDIMENT CONTROL COMMISSION-DEFINED "HIGH QUALITY WATER ZONE" (I5A NCAC 04A. 0105) , STABILIZATION WITH GROUND COVER SHALL BE ACHIEVED AS SOON AS PRACTICABLE BUT IN ANY EVENT ON ALL AREAS OF THE SITE WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACT. vi) PORTIONS OF A SITE THAT ARE LOWER IN ELEVATION THAN ADJACENT DISCHARGE LOCATIONS AND ARE NOT EXPECTED TO DISCHARGE DURING CONSTRUCTION MAY BE EXEMPT FROM THE TEMPORARY GROUND COVER REQUIREMENTS IF IDENTIFIED ON THE APPROVED E&SC PLAN OR ADDED BY THE PERMITTING AUTHORITY. 3) ALL DIVERSION DITCHES SHALL BE PERMANENTLY MATTED WITH NAG SC-150 OR APPROVED EQUAL. TOTAL AREA DISTURBED = 41 ACRES LIMITS OF GRADING SHOWN ON THE PLAN ARE MAXIMUM LIMITS FOR EROSION CONTROL PURPOSES ONLY. SURVEYOR TO DETERMINE ACTUAL LIMIT. CONTRACTOR SHALL COORDINATE ALL WORK WITH NCDEQ. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF NCDEQ AND IS SUBJECT TO A FINE. GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF NCDEQ AND IS SUBJECT TO A FINE. ALL PERIMETER DIKES, SWALES, PERIMETER SLOPES, AND ALL SLOPES GREATER STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF NCDEQ. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. A GRADING PLAN MUST BE SUBMITTED FOR ANY GRADING THAT WAS NOT PREVIOUSLY APPROVED. DEVIATION FROM THESE PLANS AND NOTES WITHOUT THE PRIOR CONSENT OF THE OWNER, HIS REPRESENTATIVE, OR THE ENGINEER MAY BE CAUSE FOR THE WORK TO BE UNACCEPTABLE. EROSION CONTROL MEASURES SHALL BE INSTALLED PRIOR TO CONSTRUCTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE NORTH CAROLINA SEDIMENTATION POLLUTION CONTROL ACT OF 1973, THE LOCAL JURISDICTIONAL AGENCY, THE APPROVED EROSION CONTROL PERMIT, AND THESE PLANS AND SPECIFICATIONS. SUFFICIENT EROSION CONTROL PRACTICES MUST BE INSTALLED AND MAINTAINED TO RETAIN SEDIMENT WITHIN THE BOUNDARIES OF THE SITE AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. THE SEDIMENT BASINS AND DIVERSION DITCHES SHALL BE CLEANED OUT WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL SHALL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. ALL EROSION AND SEDIMENT CONTROL PRACTICES SHALL BE INSPECTED BY A CERTIFIED INSPECTOR TWICE A WEEK AND AFTER EVERY 0.5 INCH RAINFALL EVENT, BUT IN NO CASE LESS THAN TWICE EVERY WEEK. NEEDED REPAIRS SHALL BE INITIATED WITHIN 24 HOURS OF INSPECTION. SUBMIT WRITTEN REPORT WITH EACH INSPECTION TO THE OWNER. SEDIMENT WILL BE REMOVED FROM BEHIND THE SILT FENCING WHEN IT BECOMES 6-INCHES DEEP AT THE FENCE. THE FENCING WILL BE REPAIRED AS NECESSARY TO MAINTAIN SUFFICIENT BARRIER. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE PLANS AND SPECIFICATIONS TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. ALL DRAINAGE SWALES MUST BE GRASSED AND RIP-RAP MUST BE REPLACED AS REQUIRED TO CONTROL EROSION. RIP-RAP WILL CONSIST OF 50 TO 125 POUND STONES PLACED AT ALL HEADWALLS, AND WHERE NOTED ON CONSTRUCTION DRAWINGS. (SEE DETAIL SHEET FOR OUTFALL PIPE SIZE CHART) ADDITIONAL EROSION CONTROL MEASURES OR SILT BARRIERS TO BE PLACED AS DIRECTED BY THE LOCAL JURISDICTIONAL INSPECTOR. WHEN ANY CONSTRUCTION BORDERS A DRAINAGE COURSE: A. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ANY BUILDING OR OTHER EXCAVATION SPOIL DIRT, CONSTRUCTION TRASH OR DEBRIS, ETC., FROM THE DRAINAGE AREA SHOWN HEREON IN A EXPEDITIOUS MANNER AS CONSTRUCTION PROGRESSES. B. THE CONTRACTOR HEREBY AGREES TO STOP ALL WORK AND RESTORE THESE IMMEDIATELY UPON NOTIFICATION BY THE LOCAL JURISDICTIONAL INSPECTOR AND/OR THE OWNER. FOR ALL CONSTRUCTION ALONG AND/OR ACROSS WATERWAYS, BANK PROTECTION AND STABILIZATION SHALL BE REQUIRED AS PER LOCAL JURISDICTIONAL EROSION CONTROL LAWS. ALL TREE PROTECTION AND EROSION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO COMMENCING CONSTRUCTION AND SHALL BE MAINTAINED IN PROPER WORKING ORDER UNTIL ALL DISTURBED AREAS ARE STABILIZED AND GROUND COVER IS ESTABLISHED. CONSTRUCTION ENTRANCE PADS SHALL BE INSTALLED BY THE CONTRACTOR AT CONSTRUCTION ACCESS POINTS PRIOR TO LAND DISTURBANCE. THE CONTRACTOR SHALL KEEP A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT ON SITE WHENEVER LAND DISTURBING ACTIVITY IS IN PROGRESS. INSTALL SILT FENCE ALONG THE DOWNSTREAM SIDE OF ALL PROPOSED CUT AND FILL CONSTRUCTION AND AS INDICATED ON PLANS. A TEMPORARY DIVERSION SWALE MAY BE USED IN LIEU OF SILT FENCE WHERE RUNOFF CAN BE DIRECTED TO A TEMPORARY SEDIMENT BASIN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PERFORM REQUIRED MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL DEVICES TO ENSURE THEIR FUNCTION AT ALL TIMES. CONTRACTOR SHALL MAINTAIN ALL EROSION CONTROL MEASURES UNTIL PERMANENT VEGETATION HAS BEEN ESTABLISHED. WHERE SEDIMENT IS TRANSPORTED ONTO A PAVED OR PUBLIC ROAD SURFACE, THE ROAD SURFACE SHALL BE CLEANED THOROUGHLY AT THE END OF EACH DAY. SEDIMENT SHALL BE REMOVED FROM THE ROADS BY SHOVELING OR SWEEPING AND TRANSPORTED TO A SEDIMENT CONTROL DISPOSAL AREA. STREET WASHING SHALL BE ALLOWED ONLY AFTER SEDIMENT IS REMOVED IN THIS MANNER. WHEN A CRUSHED STONE CONSTRUCTION ENTRANCE HAS BEEN COVERED WITH SOIL OR OR HAS BEEN PUSHED INTO THE SOIL BY CONSTRUCTION TRAFFIC, IT SHALL BE REPLACED WITH A DEPTH OF STONE EQUAL TO THAT OF THE ORIGINAL APPLICATION. CONTRACTOR TO PROTECT THE EXISTING EXPOSED SANITARY SEWER MANHOLES AT ALL TIMES DURING THE CONSTRUCTION. PERFORM A FINAL DEMUCKING OF ALL SEDIMENT CONTROL DEVICES BEFORE DEMOBILIZATION. BE ADVISED DIRECTLY PUMPING OUT A SEDIMENT BASIN IS CONSIDERED BYPASSING A STORMWATER CONTROL FACILITY IN VIOLATION OF SECTION IV (3) OF NPDES PERMIT NCG0100000 STORMWATER DISCHARGE PERMIT FOR CONSTRUCTION ACTIVITIES. IF ANY DRAINING OCCURS OF THE SEDIMENT BASIN, SUCH AS FOR MAINTENANCE OF THE BASIN OR CONVERSION TO THE POST-CONSTRUCTION STORMWATER MEASURE, THE DRAINAGE MUST OCCUR THROUGH A SILT BAG AND DISCHARGED IN A NON EROSIVE MANNER. [15A NCAC 4B 0105] ADDITIONAL SEDIMENT AND EROSION CONTROL NOTES: 1. SILT FENCE SHALL BE MAINTAINED AROUND THE PERIMETER OF ALL EARTHWORK AREAS TO PREVENT SEDIMENT TRANSPORT ONTO ADJACENT PROPERTIES OR OFFSITE ROADWAYS, AS APPLICABLE. 2.SILT FENCE FILTER BARRIERS SHALL BE INSTALLED AND MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND LANDSCAPING IS INSTALLED. 3.THE CONTRACTOR SHALL IMMEDIATELY CLEANUP AND REPAIR ALL EROSION DAMAGE AFTER DISCOVERY AND REINSTALL ADEQUATE CONTROL MEASURES AS NECESSARY TO PREVENT REOCCURRENCE OF DAMAGE. 4. CONSTRUCTION POINT OF ACCESS TO LIMIT DEPOSITS OF EARTH AND OTHER HAULED MATERIALS ONTO THE ADJACENT LOT. THE CONTRACTOR SHALL ROUTINELY CLEAN ALL SEDIMENT DEPOSITS AND DEBRIS FROM ROADWAY AS THEY OCCUR. SEEDING SCHEDULE AND SEEDBED PREPARATION SEEDING SCHEDULE 1.SEED, MULCH, AND FERTILIZE AS SHOWN ON THE PHASED EROSION CONTROL PLANS. 2.PROTECTIVE COVER MUST BE ESTABLISHED ON ALL DISTURBED AREAS, GRADED SLOPES AND FILLS. SEEDBED PREPARATION 1. GRADED SLOPES AND FILL - THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE WHICH CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. 2.SURFACE WATER CONTROL MEASURES TO BE INSTALLED ACCORDING TO THE PLANS. 3.AREAS TO BE SEEDED SHALL BE RIPPED AND SPREAD WITH AVAILABLE TOPSOIL 3" DEEP. TOTAL SEEDBED PREPARED DEPTH SHALL BE 4" TO 8" DEEP. 4.LOOSE ROCKS, ROOTS, AND OTHER OBSTRUCTIONS SHALL BE REMOVED FROM THE SURFACE SO THAT THEY WILL NOT INTERFERE WITH ESTABLISHMENT AND MAINTENANCE OF VEGETATION. SURFACE FOR FINAL SEEDBED PREPARATION, AT FINISH GRADES SHOWN, SHALL BE REASONABLY SMOOTH AND UNIFORM. 5.IF NO SOIL TEST IS TAKEN, FERTILIZER AND LIME SHALL BE ACCORDING TO SEEDING SPECIFICATIONS. 6.IF SOIL TEST IS TAKEN, PROVIDE LIME AND FERTILIZER ACCORDING TO THE SOIL TEST REPORT. 7.LIME AND FERTILIZER SHALL BE APPLIED UNIFORMLY AND MIXED WITH THE SOIL DURING SEEDBED PREPARATION. RIP RAP CONSTRUCTION SPECIFICATIONS 1. SUBGRADE PREPARATION - PREPARE THE SUBGRADE FOR RIP RAP AND FILTER TO THE REQUIRED LINES AND GRADES SHOWN ON THE PLANS. COMPACT ANY FILL REQUIRED IN THE SUBGRADE TO A DENSITY APPROXIMATING THAT OF THE SURROUNDING UNDISTURBED MATERIAL OR OVERFILL DEPRESSIONS WITH RIPRAP. REMOVE BRUSH, TREES, STUMPS AND OTHER OBJECTIONABLE MATERIAL. CUT THE SUBGRADE SUFFICIENTLY DEEP THAT THE FINISHED GRADE OF THE RIPRAP WILL BE AT THE ELEVATION OF THE SURROUNDING AREA. CHANNELS SHOULD BE EXCAVATED SUFFICIENTLY TO ALLOW PLACEMENT OF THE RIPRAP IN A MANNER SUCH THAT THE FINISHED INSIDE DIMENSIONS AND GRADE OF THE RIPRAP MEET DESIGN SPECIFICATIONS. 2. SAND AND GRAVEL FILTER BLANKET - PLACE THE FILTER BLANKET IMMEDIATELY AFTER THE GROUND FOUNDATION IS PREPARED. FOR GRAVEL, SPREAD FILTER STONE IN A UNIFORM LAYER TO THE SPECIFIED DEPTH. WHERE MORE THAN ONE LAYER OF FILTER MATERIAL IS USED, SPREAD THE LAYERS WITH MINIMAL MIXING. 3.SYNTHETIC FILTER FABRIC - PLACE THE CLOTH FILTER DIRECTLY ON THE PREPARED FOUNDATION. OVERLAP THE EDGES BY AT LEAST 12 INCHES, AND SPACE ANCHOR PINS EVERY 3 FT ALONG THE OVERLAP. BURY THE UPSTREAM END OF THE CLOTH A MINIMUM OF 12 INCHES BELOW GROUND AND WHERE NECESSARY, BURY THE LOWER END OF THE CLOTH OR OVERLAP WITH THE NEXT SECTION AS REQUIRED. TAKE CARE NOT TO DAMAGE THE CLOTH WHEN PLACING RIPRAP. IF DAMAGE OCCURS REMOVE THE RIPRAP AND REPAIR THE SHEET BY ADDING ANOTHER LAYER OF FILTER MATERIALS WITH A MINIMUM OVERLAP OF 12 INCHES AROUND THE DAMAGE AREA. IF EXTENSIVE DAMAGE IS SUSPECTED, REMOVE AND REPLACE THE ENTIRE SHEET. 4.WHERE LARGE STONES ARE USED OR MACHINE PLACEMENT IS DIFFICULT, A 4-INCH LAYER OF FINE GRAVEL OR SAND MAY BE NEEDED TO PROTECT THE FILTER CLOTH. 5. STONE PLACEMENT - PLACEMENT OF RIPRAP SHOULD FOLLOW IMMEDIATELY AFTER PLACEMENT OF THE FILTER. PLACE RIPRAP SO THAT IT FORMS A DENSE, WELL-GRADED MASS OF STONE WITH A MINIMUM OF VOIDS. THE DESIGNED DISTRIBUTION OF STONES THROUGHOUT THE MASS MAY BE OBTAINED BY SELECTIVE LOADING AT THE QUARRY AND CONTROLLED DUMPING DURING FINAL PLACEMENT. PLACE RIPRAP TO ITS FULL THICKNESS IN ONE OPERATION. DO NOT PLACE RIPRAP BY DUMPING THE THROUGH CHUTES OR OTHER METHODS THAT CAUSE SEGREGATION OF STONE SIZES. TAKE CARE NOT TO DISLODGE THE UNDERLYING BASE OR FILTER WHEN PLACING THE STONES. 6. THE FINISHED SLOPE SHOULD BE FREE OF POCKETS OF SMALL STONE OR CLUSTERS OF LARGE STONES. HAND PLACING MAY BE NECESSARY TO ACHIEVE THE PROPER DISTRIBUTION OF STONE SIZES TO PRODUCE A RELATIVELY SMOOTH, UNIFORM SURFACE. THE FINISHED GRADE OF RIPRAP SHOULD BLEND WITH THE SURROUNDING AREA. NO OVERFALL OR PROTRUSION OF RIPRAP SHOULD BE APPARENT. 7. INSPECT CHANNELS AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. MAKE REPAIRS IMMEDIATELY. MAINTAIN ALL VEGETATION ADJACENT TO THE CHANNEL IN A HEALTHY VIGOROUS CONDITION TO PROTECT THE AREA FROM EROSION AND SCOUR DURING OUT-OF-BAN FLOW. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS MAINTENANCE PLAN 1.THE CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE OF EROSION AND SEDIMENT CONTROL DEVICES. 2. THE CONTRACTOR SHALL CHECK ALL EROSION AND SEDIMENT CONTROL PRACTICES FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE E VERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY BY THE CONTRACTOR TO MAINTAIN ALL PRACTICES AS DESIGNED. ALSO PER NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) GENERAL STORMWATER PERMIT, A RAIN GAUGE MUST BE INSTALLED ON SITE. THE RAIN GAUGE MUST BE KEPT ONSITE AND INSPECTIONS BY THE CONTRACTOR MUST BE MADE AND LOGGED AFTER EVERY HALF INCH OF RAINFALL AND ONCE A WEEK. 3. THE CONTRACTOR SHALL REMOVE SEDIMENT FROM SEDIMENT BASIN WHEN STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. 4.THE CONTRACTOR SHALL REMOVE SEDIMENT FROM BEHIND SLIT FENCE WHEN IT BECOMES 0.5 FEET DEEP AT THE FENCE. SLIT FENCE WILL BE REPAIRED AS NECESSARY TO MAINTAIN A BARRIER. 5.THE CONTRACTOR SHALL FERTILIZE, RESEED AS NECESSARY, AND MULCH ALL SEEDED AREAS ACCORDING TO SPECIFICATIONS IN THE VEGETATIVE PLAN TO MAINTAIN A VIGOROUS, DENSE VEGETATIVE COVER. . UTILITY NOTES 1.THE CONTRACTOR IS RESPONSIBLE FOR HORIZONTALLY AND VERTICALLY LOCATING AND PROTECTING ALL PUBLIC OR PRIVATE UTILITIES (SHOWN OR NOT SHOWN) WHICH LIE IN OR ADJACENT TO THE CONSTRUCTION SITE. AT LEAST (3) WORKING DAYS PRIOR TO ANY DEMOLITION, GRADING, OR CONSTRUCTION ACTIVITY, THE CONTRACTOR SHALL NOTIFY THE NORTH CAROLINA ONE-CALL UTILITIES LOCATION SERVICE (ULOCO) AT (800)632-4949 FOR PROPER IDENTIFICATION OF EXISTING UTILITIES WITHIN THE SITE. 2.SHOULD ANY UNCHARTED OR INCORRECTLY CHARTED UTILITIES BE ENCOUNTERED, THE CONTRACTOR SHALL CONTACT THE OWNER IMMEDIATELY FOR DIRECTIONS. 3.CONTRACTOR SHALL COORDINATE ANY INTERRUPTION OF UTILITY SERVICE WITH OWNER AND RESPECTIVE UTILITY COMPANY REPRESENTATIVE. 4. ANY PLANNED INTERRUPTION OF UTILITY SERVICE SHALL BE GIVEN A 48 HOUR NOTICE TO THE UTILITY COMPANY AND THE OWNER. 5.CONTRACTOR SHALL SAW CUT, REMOVE, AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO INSTALL UNDERGROUND ELECTRIC,TELEPHONE, SEWER, WATER, AND COMMUNICATION CONDUITS. 6.ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH LOCAL POWER COMPANY STANDARDS. INSPECTION NOTES EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT THE SEDIMENT AND EROSION CONTROL MEASURES ON A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF-INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF-INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEBSITE: http://deq.nc.gov/about/divisions/energy-mineral-land-resources/erosion-sediment-control/forms AS A MINIMUM, THE INSPECTIONS SHALL BE PERFORMED AFTER EACH OF THE FOLLOWING PHASES OF A PLAN: 1.INSTALLATION OF PERIMETER EROSION AND SEDIMENT CONTROL MEASURES. 2.INSTALLATION OF SEDIMENT TRAPS/BASINS. 3. CLEARING AND GRUBBING OF EXISTING GROUND COVER. 4. COMPLETION OF ANY PHASE OF GRADING THAT REQUIRES PROVISION OF STABILIZATION. 5. INSTALLATION OF MEASURES DURING ANY PHASE OF THE PROJECT. 6. COMPLETION OF CONSTRUCTION OR DEVELOPMENT. 7. INSTALLATION OF STORMWATER RETENTION MEASURES. 8.QUARTERLY UNTIL THE ESTABLISHMENT OF PERMANENT GROUND COVER IS FULLY ESTABLISHED. HYDROSEED MULCH WITH PAM APPLICATION GUIDELINES ALL HYDROSEEDING SPECIFIED FOR THIS SITE SHALL INCLUDE PAM ADDITIVE MEETING THE REQUIREMENTS OF THESE PLANS AND GUIDELINES BELOW. HYDROSEEDING SHALL BE INSTALLED AS THE FIRST MEASURE OF SLOPE STABILIZATION WITH EROSION CONTROL MATTING BEING PLACED OVER THE APPLICATION. 1.MANUFACTURER RECOMMENDED APPLICATION RATE (PER ACRE COVERAGE): SITE APPLICATION RATES VARY BY SOIL CONTENT AND GRADE OF SLOPE AND SHALL BE VERIFIED BY SITE SPECIFIC SOIL TESTING AS OUTLINED IN THE FLOCCULANT/POLYACRYLAMIDE (PAM) APPLICATION NOTES. a. GENTLE TO MODERATE SLOPES (0 TO 4H:1V) i.HIGH CLAY CONTENT: 10-20 # POWDER OR 1.0-2.0 GALLONS EMULSION ii. HIGH SAND CONTENT: 25-50 # POWDER OR 2.0-3.0 GALLONS EMULSION b.STEEP SLOPES (3H:1V TO 1H:1V) i. HIGH CLAY CONTENT: 20-35 # POWDER OR 1.0-2.5 GALLONS EMULSION ii.HIGH SAND CONTENT: 40-50 # POWDER OR 2.5-3.0 GALLONS EMULSION 2. ADD PAM EMULSION OR POWDER TO ALL HYDROSEEDING MIXES AT THE ABOVE APPLICATION RATES OF NO MORE THAN 30 POUNDS OF POWDER AND NOR MORE THAN 2.5 GALLONS PER 3000 GALLONS OF WATER, AND THEN APPLIED AT THE RATE OF 3000 GALLONS OF HYDROSEED MIX/ ACRE (NOTE: POLYMER ADDITIONS ARE LIMITED BY EXTREMELY HIGH VISCOSITY, DO NOT EXCEED THE RECOMMENDED DOSAGE RATES.) SITE TESTING SHALL DETERMINE THE CORRECT POLYMER TYPE. 3.PAM SHALL BE ADDED SLOWLY AS THE FINAL ADDITIVE TO THE HYDROSEEDING MIX TO HELP AVOID POLYMER CLUMPING THAT COULD RESULT IN CLOGGING OF THE SPRAYING EQUIPMENT. 4.THE HYDROSEED MIX SHALL BE APPLIED IMMEDIATELY AFTER MIXING DUE TO THE VISCOUS NATURE OF THE PAM POLYMER. 5.THE STRAW, MULCH, AND/OR EROSION CONTROL MATTING SHALL BE APPLIED OVER THE HYDROSEEDED APPLICATION AS SPECIFIED IN THE DRAWINGS.PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESGENERAL NOTESC0-2 SOILS TYPE LEGEND EROSION CONTROL LEGEND XxX CcB2 CECIL SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED CcD2 CECIL SANDY CLAY LOAM, 8 TO 15 PERCENT SLOPES, MODERATELY ERODED CeB CECIL-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES ChA CHEWACLA SANDY LOAM, 0 TO 2 PERCENT SLOPES ENB ENON SANDY LOAM, 2 TO 8 PERCENT SLOPES EnD ENON SANDY LOAM, 8 TO 15 PERCENT SLOPES EoB ENON-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES IdB IREDELL LOAM, 2 TO 6 PERCENT SLOPES PoB POINDEXTER LOAM, 2 TO 8 PERCENT SLOPES PoD POINDEXTER LOAM, 8 TO 15 PERCENT SLOPES TOTAL DISTURBED AREA: 41 SOIL TYPE LIMITS OF DISTURBANCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SLOPE ARROW LIMITS OF DRAINAGE SUB-BASIN TEMPORARY/PERMANENT DIVERSION DITCH OR BERM, SEE DETAIL SHEET SWPPP INFORMATION SIGN PROPERTY LINE RIP RAP APRON , RIP-RAP SHALL BE GRADED AT 0.0% SLOPE TEMPORARY SILT FENCE SOIL TYPE BOUNDARY SLOPE MATTING (SC150 UNLESS OTHERWISE SPECIFIED) TEMPORARY PROTECTION FENCE/ HIGH HAZARD SILT FENCE TEMPORARY SLOPE DRAIN SEE DETAIL SHEET STONE FILTER RING COIR WATTLE CHECK DAM, SEE DETAIL SHEET CONSTRUCTION EXIT EE DETAIL SHEET TEMPORARY RISER SKIMMER, SEE DETAIL SHEET TEMPORARY JUTE NET BAFFLES 12" COIR WATTLE/FILTREX FILTER SOX, SEE DETAIL SHEET. LOD SIS CE CD JN DD# ECB SF PF RR SD # SFR CW SK (SEE DETAIL SHEETS FOR TYPICAL DETAILS AND GENERAL NOTES. THIS SHEET FOR ADDITIONAL NOTES. EROSION CONTROL NOTES: 1. CONTRACTOR SHALL PROTECT EXISTING PLANT MATERIAL NOT DESIGNATED FOR REMOVAL OR RELOCATION FROM DAMAGE DURING CONSTRUCTION. 2. CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. 3. LIMITS OF CONSTRUCTION AND CONTRACTOR STAGING AREAS SHALL BE LIMITED TO THE PROPERTY BOUNDARY, UNLESS NOTED OTHERWISE ON THESE PLANS. 4. LIMITS OF DEMOLITION INDICATED ON PLAN ARE MINIMUM. CONTRACTOR SHALL REMOVE AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO FACILITATE CONSTRUCTION IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) DAMAGED DURING THE CONSTRUCTION INCLUDING PROPERTY CORNERS, MONUMENTS, ETC. 6. CONTRACTOR SHALL COORDINATE WITH THE CITY OF KANNAPOLIS TO OBTAIN ALL NECESSARY DEMOLITION PERMITS PRIOR TO THE START OF ANY DEMOLITION WORK. 7. REMOVE VEGETATION AND GRASS IN AREAS TO RECEIVE NEW ASPHALT AND CONCRETE PAVEMENTS. 8. THE CONTRACTOR SHALL DEMOLISH AND REMOVE OFF-SITE FACILITIES WITHIN THE PROJECT SITE TO INCLUDE BUILDINGS, CONCRETE STRUCTURES (ABOVE GROUND AND FOUNDATION), SITE LIGHTING STRUCTURES, PAVEMENTS AND SECONDARY UTILITIES. ALL MATERIALS SHALL BE PROPERLY DISPOSED OF PER LOCAL AND STATE REGULATIONS. 9. ALL PRIMARY UTILITIES DISCOVERED DURING DEMOLITION OPERATIONS THAT SERVE ACTIVITIES OTHER THAN THE EXISTING STRUCTURE SHALL BE PROPERLY PRESERVED AND PROTECTED. 10. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY UNFORESEEN OR ADVERSE CONDITIONS, INCLUDING UNCHARTED UTILITIES, DISCOVERED DURING DEMOLITION OPERATIONS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) WHICH ARE DAMAGED DURING CONSTRUCTION, INCLUDING PROPERTY CORNERS, MONUMENTS, VEGETATION, ETC. DB# IP INLET PROTECTION EoB ChA EnB EnB DD2 CW PF PF LOD LOD LOD LOD LOD LOD LOD SF RR1A RR 1B ECB ECB ECB SF SD1B SD1A DB1 CONSTRUCTION SEQUENCE PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLPHASE 1C2-1Know what's R NORTH IdB DD4 SD 2B LOD LOD LOD LOD LOD LOD LOD SFR SFR SFR IP RR 2B RR JN JN SD 3A RR3A RR 3B ECB ECBECB ECB ECB SD 2A RR2A RR 2C SD 3B SOILS TYPE LEGEND EROSION CONTROL LEGEND XxX CcB2 CECIL SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED CcD2 CECIL SANDY CLAY LOAM, 8 TO 15 PERCENT SLOPES, MODERATELY ERODED CeB CECIL-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES ChA CHEWACLA SANDY LOAM, 0 TO 2 PERCENT SLOPES ENB ENON SANDY LOAM, 2 TO 8 PERCENT SLOPES EnD ENON SANDY LOAM, 8 TO 15 PERCENT SLOPES EoB ENON-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES IdB IREDELL LOAM, 2 TO 6 PERCENT SLOPES PoB POINDEXTER LOAM, 2 TO 8 PERCENT SLOPES PoD POINDEXTER LOAM, 8 TO 15 PERCENT SLOPES TOTAL DISTURBED AREA: 41 SOIL TYPE LIMITS OF DISTURBANCE EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR SLOPE ARROW LIMITS OF DRAINAGE SUB-BASIN TEMPORARY/PERMANENT DIVERSION DITCH OR BERM, SEE DETAIL SHEET SWPPP INFORMATION SIGN PROPERTY LINE RIP RAP APRON , RIP-RAP SHALL BE GRADED AT 0.0% SLOPE TEMPORARY SILT FENCE SOIL TYPE BOUNDARY SLOPE MATTING (SC150 UNLESS OTHERWISE SPECIFIED) TEMPORARY PROTECTION FENCE/ HIGH HAZARD SILT FENCE TEMPORARY SLOPE DRAIN SEE DETAIL SHEET STONE FILTER RING COIR WATTLE CHECK DAM, SEE DETAIL SHEET CONSTRUCTION EXIT EE DETAIL SHEET TEMPORARY RISER SKIMMER, SEE DETAIL SHEET TEMPORARY JUTE NET BAFFLES 12" COIR WATTLE/FILTREX FILTER SOX, SEE DETAIL SHEET. LOD SIS CE CD JN DD# ECB SF PF RR SD # SFR CW SK (SEE DETAIL SHEETS FOR TYPICAL DETAILS AND GENERAL NOTES. THIS SHEET FOR ADDITIONAL NOTES. EROSION CONTROL NOTES: 1. CONTRACTOR SHALL PROTECT EXISTING PLANT MATERIAL NOT DESIGNATED FOR REMOVAL OR RELOCATION FROM DAMAGE DURING CONSTRUCTION. 2. CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. 3. LIMITS OF CONSTRUCTION AND CONTRACTOR STAGING AREAS SHALL BE LIMITED TO THE PROPERTY BOUNDARY, UNLESS NOTED OTHERWISE ON THESE PLANS. 4. LIMITS OF DEMOLITION INDICATED ON PLAN ARE MINIMUM. CONTRACTOR SHALL REMOVE AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO FACILITATE CONSTRUCTION IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) DAMAGED DURING THE CONSTRUCTION INCLUDING PROPERTY CORNERS, MONUMENTS, ETC. 6. CONTRACTOR SHALL COORDINATE WITH THE CITY OF KANNAPOLIS TO OBTAIN ALL NECESSARY DEMOLITION PERMITS PRIOR TO THE START OF ANY DEMOLITION WORK. 7. REMOVE VEGETATION AND GRASS IN AREAS TO RECEIVE NEW ASPHALT AND CONCRETE PAVEMENTS. 8. THE CONTRACTOR SHALL DEMOLISH AND REMOVE OFF-SITE FACILITIES WITHIN THE PROJECT SITE TO INCLUDE BUILDINGS, CONCRETE STRUCTURES (ABOVE GROUND AND FOUNDATION), SITE LIGHTING STRUCTURES, PAVEMENTS AND SECONDARY UTILITIES. ALL MATERIALS SHALL BE PROPERLY DISPOSED OF PER LOCAL AND STATE REGULATIONS. 9. ALL PRIMARY UTILITIES DISCOVERED DURING DEMOLITION OPERATIONS THAT SERVE ACTIVITIES OTHER THAN THE EXISTING STRUCTURE SHALL BE PROPERLY PRESERVED AND PROTECTED. 10. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY UNFORESEEN OR ADVERSE CONDITIONS, INCLUDING UNCHARTED UTILITIES, DISCOVERED DURING DEMOLITION OPERATIONS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) WHICH ARE DAMAGED DURING CONSTRUCTION, INCLUDING PROPERTY CORNERS, MONUMENTS, VEGETATION, ETC. DB# IP INLET PROTECTION CONSTRUCTION SEQUENCE PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLPHASE 1C2-2Know what's R NORTH SOILS TYPE LEGEND EROSION CONTROL LEGEND XxXXxX EROSION CONTROL NOTES: CcB2 CECIL SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED CcD2 CECIL SANDY CLAY LOAM, 8 TO 15 PERCENT SLOPES, MODERATELY ERODED CeB CECIL-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES ChA CHEWACLA SANDY LOAM, 0 TO 2 PERCENT SLOPES ENB ENON SANDY LOAM, 2 TO 8 PERCENT SLOPES EnD ENON SANDY LOAM, 8 TO 15 PERCENT SLOPES EoB ENON-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES IdB IREDELL LOAM, 2 TO 6 PERCENT SLOPES PoB POINDEXTER LOAM, 2 TO 8 PERCENT SLOPES PoD POINDEXTER LOAM, 8 TO 15 PERCENT SLOPES (SEE DETAIL SHEETS FOR TYPICAL DETAILS AND GENERAL NOTES. THIS SHEET FOR ADDITIONAL NOTES. SLOPE ARROW SWPPP INFORMATION SIGN RIP RAP APRON , RIP-RAP SHALL BE GRADED AT 0.0% SLOPE TEMPORARY SILT FENCE TOTAL DISTURBED AREA: 41 1. CONTRACTOR SHALL PROTECT EXISTING PLANT MATERIAL NOT DESIGNATED FOR REMOVAL OR RELOCATION FROM DAMAGE DURING CONSTRUCTION. 2. CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. 3. LIMITS OF CONSTRUCTION AND CONTRACTOR STAGING AREAS SHALL BE LIMITED TO THE PROPERTY BOUNDARY, UNLESS NOTED OTHERWISE ON THESE PLANS. 4. LIMITS OF DEMOLITION INDICATED ON PLAN ARE MINIMUM. CONTRACTOR SHALL REMOVE AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO FACILITATE CONSTRUCTION IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) DAMAGED DURING THE CONSTRUCTION INCLUDING PROPERTY CORNERS, MONUMENTS, ETC. 6. CONTRACTOR SHALL COORDINATE WITH THE CITY OF KANNAPOLIS TO OBTAIN ALL NECESSARY DEMOLITION PERMITS PRIOR TO THE START OF ANY DEMOLITION WORK. 7. REMOVE VEGETATION AND GRASS IN AREAS TO RECEIVE NEW ASPHALT AND CONCRETE PAVEMENTS. 8. THE CONTRACTOR SHALL DEMOLISH AND REMOVE OFF-SITE FACILITIES WITHIN THE PROJECT SITE TO INCLUDE BUILDINGS, CONCRETE STRUCTURES (ABOVE GROUND AND FOUNDATION), SITE LIGHTING STRUCTURES, PAVEMENTS AND SECONDARY UTILITIES. ALL MATERIALS SHALL BE PROPERLY DISPOSED OF PER LOCAL AND STATE REGULATIONS. 9. ALL PRIMARY UTILITIES DISCOVERED DURING DEMOLITION OPERATIONS THAT SERVE ACTIVITIES OTHER THAN THE EXISTING STRUCTURE SHALL BE PROPERLY PRESERVED AND PROTECTED. 10. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY UNFORESEEN OR ADVERSE CONDITIONS, INCLUDING UNCHARTED UTILITIES, DISCOVERED DURING DEMOLITION OPERATIONS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) WHICH ARE DAMAGED DURING CONSTRUCTION, INCLUDING PROPERTY CORNERS, MONUMENTS, VEGETATION, ETC. SOIL TYPE BOUNDARY SOIL TYPE TEMPORARY PROTECTION FENCE/ HIGH HAZARD SILT FENCE TEMPORARY SLOPE DRAIN SEE DETAIL SHEET LIMITS OF DISTURBANCE EXISTING MAJOR CONTOUR STONE FILTER RING EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR TEMPORARY JUTE NET BAFFLES LIMITS OF DRAINAGE SUB-BASIN TEMPORARY/PERMANENT DIVERSION DITCH OR BERM, SEE DETAIL SHEET PERMANENT SEEDING SEE DETAIL SHEET FOR SCHEDULE PROPERTY LINE CONSTRUCTION EXIT SEE DETAIL SHEET ROCK CHECK DAM SEE DETAIL SHEET 12" COIR WATTLE/FILTREX FILTER SOX, SEE DETAIL SHEET. INLET PROTECTION TEMPORARY RISER SKIMMER, SEE DETAIL SHEET SLOPE MATTING (SC150 UNLESS OTHERWISE SPECIFIED) LOD SIS CE CD JN DD# PS SF PF RR SD # SFR CW SK DB# IP ECB EoB ChA EnB EnB DD2 CW PF PF LOD LOD LOD LOD LOD LOD LOD SF RR1A RR 1B ECB ECB ECB SF SD1A DB1 PS PS PS PS PS PS PS PS PS PS PS CONSTRUCTION SEQUENCE PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLPHASE 2C2-3Know what's R NORTH SOILS TYPE LEGEND EROSION CONTROL LEGEND XxXXxX EROSION CONTROL NOTES: CcB2 CECIL SANDY CLAY LOAM, 2 TO 8 PERCENT SLOPES, MODERATELY ERODED CcD2 CECIL SANDY CLAY LOAM, 8 TO 15 PERCENT SLOPES, MODERATELY ERODED CeB CECIL-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES ChA CHEWACLA SANDY LOAM, 0 TO 2 PERCENT SLOPES ENB ENON SANDY LOAM, 2 TO 8 PERCENT SLOPES EnD ENON SANDY LOAM, 8 TO 15 PERCENT SLOPES EoB ENON-URBAN LAND COMPLEX, 2 TO 10 PERCENT SLOPES IdB IREDELL LOAM, 2 TO 6 PERCENT SLOPES PoB POINDEXTER LOAM, 2 TO 8 PERCENT SLOPES PoD POINDEXTER LOAM, 8 TO 15 PERCENT SLOPES (SEE DETAIL SHEETS FOR TYPICAL DETAILS AND GENERAL NOTES. THIS SHEET FOR ADDITIONAL NOTES. SLOPE ARROW SWPPP INFORMATION SIGN RIP RAP APRON , RIP-RAP SHALL BE GRADED AT 0.0% SLOPE TEMPORARY SILT FENCE TOTAL DISTURBED AREA: 41 1. CONTRACTOR SHALL PROTECT EXISTING PLANT MATERIAL NOT DESIGNATED FOR REMOVAL OR RELOCATION FROM DAMAGE DURING CONSTRUCTION. 2. CONTRACTOR SHALL KEEP ALL SURROUNDING PUBLIC ROADWAYS AND DRAINAGE SYSTEMS FREE FROM DIRT, MUD, AND CONSTRUCTION DEBRIS AT ALL TIMES. 3. LIMITS OF CONSTRUCTION AND CONTRACTOR STAGING AREAS SHALL BE LIMITED TO THE PROPERTY BOUNDARY, UNLESS NOTED OTHERWISE ON THESE PLANS. 4. LIMITS OF DEMOLITION INDICATED ON PLAN ARE MINIMUM. CONTRACTOR SHALL REMOVE AND REPLACE ASPHALT PAVEMENT AS NECESSARY TO FACILITATE CONSTRUCTION IN ACCORDANCE WITH STATE AND LOCAL REGULATIONS. 5. CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) DAMAGED DURING THE CONSTRUCTION INCLUDING PROPERTY CORNERS, MONUMENTS, ETC. 6. CONTRACTOR SHALL COORDINATE WITH THE CITY OF KANNAPOLIS TO OBTAIN ALL NECESSARY DEMOLITION PERMITS PRIOR TO THE START OF ANY DEMOLITION WORK. 7. REMOVE VEGETATION AND GRASS IN AREAS TO RECEIVE NEW ASPHALT AND CONCRETE PAVEMENTS. 8. THE CONTRACTOR SHALL DEMOLISH AND REMOVE OFF-SITE FACILITIES WITHIN THE PROJECT SITE TO INCLUDE BUILDINGS, CONCRETE STRUCTURES (ABOVE GROUND AND FOUNDATION), SITE LIGHTING STRUCTURES, PAVEMENTS AND SECONDARY UTILITIES. ALL MATERIALS SHALL BE PROPERLY DISPOSED OF PER LOCAL AND STATE REGULATIONS. 9. ALL PRIMARY UTILITIES DISCOVERED DURING DEMOLITION OPERATIONS THAT SERVE ACTIVITIES OTHER THAN THE EXISTING STRUCTURE SHALL BE PROPERLY PRESERVED AND PROTECTED. 10. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY UNFORESEEN OR ADVERSE CONDITIONS, INCLUDING UNCHARTED UTILITIES, DISCOVERED DURING DEMOLITION OPERATIONS. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF ANY ITEMS OR EXISTING IMPROVEMENTS (NOT SCHEDULED FOR DEMOLITION) WHICH ARE DAMAGED DURING CONSTRUCTION, INCLUDING PROPERTY CORNERS, MONUMENTS, VEGETATION, ETC. SOIL TYPE BOUNDARY SOIL TYPE TEMPORARY PROTECTION FENCE/ HIGH HAZARD SILT FENCE TEMPORARY SLOPE DRAIN SEE DETAIL SHEET LIMITS OF DISTURBANCE EXISTING MAJOR CONTOUR STONE FILTER RING EXISTING MINOR CONTOUR PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR TEMPORARY JUTE NET BAFFLES LIMITS OF DRAINAGE SUB-BASIN TEMPORARY/PERMANENT DIVERSION DITCH OR BERM, SEE DETAIL SHEET PERMANENT SEEDING SEE DETAIL SHEET FOR SCHEDULE PROPERTY LINE CONSTRUCTION EXIT SEE DETAIL SHEET ROCK CHECK DAM SEE DETAIL SHEET 12" COIR WATTLE/FILTREX FILTER SOX, SEE DETAIL SHEET. INLET PROTECTION TEMPORARY RISER SKIMMER, SEE DETAIL SHEET SLOPE MATTING (SC150 UNLESS OTHERWISE SPECIFIED) IdB DD4 CD TYP. SD 2B CW LOD LOD LOD LOD LOD LOD LOD SFR SFR SFR IP RR 2B RR JN JN SD 3A RR3A RR 3B ECBECB ECB ECB SD 2A RR2A RR 2C SD 3B DD6 CD TYP.ECB PS PS PS PS PS PS PS PS CONSTRUCTION SEQUENCE PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLPHASE 2C2-4Know what's R NORTH SEDIMENT BASIN WITH PIPE OUTLET TEMPORARY SKIMMER RISER SEDIMENT BASIN WITH PIPE OUTLETTEMPORARY SKIMMER RISER SEDIMENT BASIN WITH PIPE OUTLET PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLDETAILSC2-5 BAFFLE SPECIFICATIONS MATERIALS: 1.USE MATTING MADE OF 100% COCONUT FIBER (COIR) TWINE WOVEN INTO HIGH STRENGTH MATRIX WITH THE PROPERTIES SHOWN IN TABLE 6.65A. 2.STAPLES SHOULD BE MADE OF 0.125 INCH DIAMETER NEW STEEL WIRE FORMED INTO A 'U' SHAPE NOT LESS THAN 12 INCHES IN LENGTH WITH A THROAT OF 1 INCH IN WIDTH. THE STAPLES ANCHOR THE POROUS BAFFLES INTO THE SIDES AND BOTTOM OF THE BASIN. 3. ENSURE THAT STEEL POSTS FOR POROUS BAFFLES ARE OF A SUFFICIENT HEIGHT TO SUPPORT BAFFLES AT DESIRED HEIGHT. POSTS SHOULD BE APPROXIMATELY 1-3/8" WIDE MEASURED PARALLEL TO THE FENCE, AND HAVE A MINIMUM WEIGHT OF 1.25 LB/LINEAR FT. THE POSTS MUST BE EQUIPPED WITH AN ANCHOR PLATE HAVING A MINIMUM AREA OF 14.0 SQUARE INCHES AND BE OF THE SELF-FASTENER ANGLE STEEL TYPE TO HAVE A MEANS OF RETAINING WIRE AND COIR FIBER MAT IN THE DESIRED POSITION WITHOUT DISPLACEMENT. 4. USE 9-GAUGE HIGH TENSION WIRE FOR SUPPORT WIRE. CONSTRUCTION: 1. GRADE THE BASIN SO THAT THE BOTTOM IS LEVEL FRONT TO BACK AND SIDE TO SIDE. 2. INSTALL THE COIR FIBER BAFFLES IMMEDIATELY UPON EXCAVATION OF THE BASINS. 3. INSTALL POSTS ACROSS THE WIDTH OF THE SEDIMENT TRAP. 4.STEEL POSTS SHOULD BE DRIVEN TO A DEPTH OF 24 INCHES AND SPACED A MAXIMUM OF 4 FEET APART. THE TOP OF THE FABRIC SHOULD BE A MINIMUM OF 6 INCHES HIGHER THAN THE INVERT OF THE SPILLWAY. TOPS OF BAFFLES SHOULD BE A MINIMUM OF 2 INCHES LOWER THAN THE TOP OF THE EARTHEN EMBANKMENT. 5. INSTALL AT LEAST THREE ROWS OF BAFFLES BETWEEN THE INLET AND OUTLET DISCHARGE POINT. BASINS LESS THAN 20 FEET IN LENGTH MAY USE 2 BAFFLES. 6.ATTACH A 9 GAUGE HIGH TENSION WIRE STRAND TO THE STEEL POSTS AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION WITH PLASTIC TIES OR WIRE FASTENERS TO PREVENT SAGGING. IF THE TEMPORARY SEDIMENT BASIN WILL BE CONVERTED TO A PERMANENT STORMWATER BASIN OF A GREATER DEPTH, THE BAFFLE HEIGHT SHOULD BE BASED ON THE POOL DEPTH DURING USE AS A TEMPORARY SEDIMENT BASIN. 7. EXTEND 9 GAUGE MINIMUM HIGH TENSION WIRE STRAND TO SIDE OF BASIN OR INSTALL STEEL T-POSTS TO ANCHOR BAFFLE TO SIDE OF BASIN AND SECURE TO VERTICAL END POSTS. 8.DRAPE THE COIR FIBER MAT OVER THE WIRE STRAND MOUNTED AT A HEIGHT OF 6 INCHES ABOVE THE SPILLWAY ELEVATION. SECURE THE COIR FIBER MAT TO THE WIRE STRAND WITH PLASTIC TIES OR WIRE FASTENERS. ANCHOR THE MATTING TO THE SIDES AND FLOOR OF THE BASIN WITH 12 INCH WIRE STAPLES, APPROXIMATELY 1 FT APART, ALONG THE BOTTOM AND SIDE SLOPES OF THE BASIN. 9. DO NOT SPLICE THE FABRIC, BUT USE A CONTINUOUS PIECE ACROSS THE BASIN. 10.ADJUSTMENTS MAY BE REQUIRED IN THE STAPLING REQUIREMENTS TO FIT INDIVIDUAL SITE CONDITIONS. MAINTENANCE: 1. INSPECT BAFFLES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2.BE SURE TO MAINTAIN ACCESS TO THE BAFFLES. SHOULD THE FABRIC OF A BAFFLE COLLAPSE, TEAR, DECOMPOSE, OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3.REMOVE SEDIMENT DEPOSITS WHEN IT REACHES HALF FULL, TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE BAFFLES. TAKE CARE TO AVOID DAMAGING THE BAFFLES DURING CLEANOUT, AND REPLACE IF DAMAGED DURING CLEANOUT OPERATIONS. SEDIMENT DEPTH SHOULD NEVER EXCEED HALF THE DESIGNED STORAGE DEPTH. 4.AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED, REMOVE ALL BAFFLE MATERIALS AND UNSTABLE SEDIMENT DEPOSITS, BRING THE AREA TO GRADE, AND STABILIZE IT. COIR FIBER BAFFLE MATERIAL PROPERTY REQUIREMENTS (TABLE 6.65A) THICKNESS TENSILE STRENGTH (WET) ELONGATION (WET) FLOW VELOCITY WEIGHT MINIMUM WIDTH OPEN AREA 900 x 680 LB/FT MINIMUM 0.30 IN. MINIMUM 69% x 34% MAXIMUM 10-12 FT/SEC 20 oz/SY (680 G/M^2) MINIMUM 6.5 FEET 50% MAXIMUM PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLDETAILSC2-6 WITH PERMANENT WOODY PLANTS. COIR WATTLE AND WILLOW FASCINES STABALIZING SLOPE FIGURE2A FIGURE2B PROPER PLACEMENT OF COIR WATTLE IN SLOPE NOTES: www.CADdetails.comPROTECTED BY COPYRIGHT - 11/06/06 COIR WATTLE: CHECK DAMS IN SLOPES & WATERWAYS 1. INSTALLATION TO BE COMPLETED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. ON DRAINAGE WAY LINED WITH TURF REINFORCEMENT MAT (TRM) OR EROSION CONTROL BLANKET (ECB), COIR WATTLE SHAL INSTALLED AS CHECK DAMS (FIG.1). 4. ON UNVEGETATED AND DISTURBED SLOPES OR SLOPES LINED WITH ECB, COIR WATTLE SHALL BE INSTALLED AS CHECK DAMS (FIG. 2B). 5. CONTRACTORS NOTE: FOR PRODUCT AND COMPANY INFORMATION VISIT http://www.rolanka.com/GN/scWatl.html. 6. 9" WATTLES ANCHOR IN TRENCH 1/4-1/3 ROLL AND SHOW STAKE SPACING. THE CONTRACTOR MAY CHOOSE TYPE OF CHECK DAM TO BE USED. CHECK DAM MAINTENANCE:PIEDMONT CONCORD LAKEPREPARED FORCAROLINA DEVELOPMENT SERVICESEROSION CONTROLDETAILSC2-7