Loading...
HomeMy WebLinkAbout20090773 Ver 1_Stormwater Info_20090713THE JOHN R. WADAMS COMPANY, INC. ?R11 Ch 0 9- 0 7 7 3 THE WOODLANDS At Green Level Crossing CAR Y, NORTH CAROLINA STORMWATER IMPACT ANALYSIS STORMWATER MANAGEMENT DESIGN NITROGEN EXPORT CALCULATIONS Research Triangle Park, NC Post Office Box 14005 Research Triangle Park. North Carolina 27709 2905 Meridian Parkway Durham. North Carolina 27713 800-733.5646 919-361.5000 919361.2269 Fax Charlotte, NC 5311 Seventy-Seven Cenler Drive, Suite 66 Charlotte, North Carolina 28217 800-733-5646 704-527-0800 704-527-2003 Fax wvAv.;ohnrmcadams.com TOL-05060 Tiffany R. McCormack Associate Project Engineer- Stormwater Management Group James W. Caldwell, PE Project Manager - Stormwater Management Group Comprehensive I and Developinlent Design Setvices We hill) ortr elierrts srrcreed. 17 THE WOODLANDS Site Plan Storm water Impact Analysis Storm water Wetland Design Nitrogen Export Calculations Project Description and Summary Located on the northwest corner of the intersection between Mills Drive and Green Level Church Road in Cary, North Carolina is the proposed residential development known as The Woodlands. The project consists of 67.81 acres. The project is a single-family residential community that includes necessary utility improvements. The site as it exists (pre-development) is 100% wooded. The proposed site is located within the Cape Fear River Basin and within the watershed protection district for Jordan Lake. Therefore there is a post-development "low-density" limitation of 24% impervious. Also, per the Town of Cary Standards, post-development peak flow rates can be no greater than pre-development levels in the 1-year storm. If there is an increase between pre- and post-development flowrates, then stormwater detention is required for these storm events. The proposed development will cause an increase in the peak flowrates in the 1-year storm event. Conclusively, stormwater detention is required to reduce the post-development peak flowrates in the 1-year storm events back to pre-development levels. In order to meet the detention requirements, 3 constructed wetlands are proposed. Also included in the Town of Cary Standards is the control of nitrogen export to a maximum of 3.6 lbs/ac/yr. In order for the proposed site to meet the limitations, the three constructed wetlands work with level spreading flow through the 50' and 100' stream buffers to reduce nitrogen export to an acceptable level. The calculations contained within this booklet detail the total nitrogen export for the proposed site. Please refer to the watershed maps included in this report for identification of the portions of the proposed development that were included in this stormwater impact analysis. Calculation Methodolog ? Using the Wake County Soil Survey, the proposed site contains a combination of HSG C, and HSG D soils. Therefore, composite SCS Curve Numbers were then calculated based on the relative percentage of these soils groups. These composite curve numbers were then used in peak flow calculations. The soil survey map from which the soils were determined for this analysis has been included in this report. ? On-site topography is provided by GeoData Corporation and The John R. McAdams Company, Inc. ? HEC-HMS by The United States Army Corps of Engineers was used to generate pre-development peak flow rates in the 1-year events and post-development peak flow rates in the 1-, and I00-year storm events. ? A composite SCS curve number was calculated the proposed site for both the pre- and post-development conditions. Pre-development land cover conditions were determined using survey and GIS information. The area of each cover condition was measured in AutoCAD for use in the calculation of the composite curve numbers. The post-development land cover conditions were taken from the proposed development plan. ? Individual single-family lots are assumed to have 5420, 5650 and 5690 square feet of impervious each depending on the sub-basin in which the lots are located. ? Rainfall data for the Raleigh-Durham region is from USWB Technical Paper No. 40 and NOAA Hydro-35. This data was used to generate a depth-duration- frequency table describing rainfall depth versus time for varying return periods in the RDU region. Rainfall depths from this table were then input into HEC-HMS for hydrologic calculations. ? For the 1-year storm rainfall data, the SCS Type 11 storm distribution with a precipitation depth of 3.00 inches in a 24-hour period was used. ? The pre- and post-development times of concentration for the proposed site were calculated using the SCS Segmental Approach (TR-55, 1986). Each Tc path was divided into segments consisting of overland flow, shallow concentrated flow, and channel flow. The overall time of concentration is the sum of the individual segment times. ? The stormwater constructed wetland design calculations were performed in accordance with the N.C. Stormwater Best Management Practices manual (NCDENR April 1999). ? Nitrogen removal rates for BMPs in series were calculated serially. For example, a constructed wetland with a level spreader for the l" event drawn down over 2-5 days would have nitrogen removal rates of 40% and 30%, respectively. The wetland would remove 40% of the nitrogen then the level spreader through the 50' buffer would remove 30% of the remaining 60%, for a total removal rate of 58%. This serial calculation is approved by DWQ in calculating overall removal efficiency. 1-((1- 4096) * (1- 30%)) = 58% Discussion of Results The proposed stormwater management facilities for the proposed development provide detention for the three sub-basins within the site for the 1-year storm event. Wetlands, 2A, 2B, and 2C also pass the 100-year storm event with adequate freeboard. All calculations associated with pre- and post-development are shown in this report. Please refer to the next few sections in this report for any detailed calculations. THE WOODLANDS TOL-05060 SUB-BASIN 1 Event SUB-BASIN 2 Event 1- SUB-BASIN 3 Event Wetland 2A Normal Pool Elevation [ft] 287.00 Top of Dam [ft] 290.33 -T66--'Year WSE jft] ? 289.53 0-Year Freeboard [ft] 0.80 Wetland 26 _Normal Pool Elevation [ft] = 295.00 ---'_a Top of Dam Ift] =? 300.00 100-Year WS_E [ft] =C _ _ 298.98 _ r Freeboard Ift] 1.02 _ Wetland 2C Normal?Pool Elevation ft - 287.00 _Top of Dam 292.00 100-Year WSE [ft] =J?_ 291.13~_ 100.Year Freeboard [ft] =1?- 0.87 STORMWATER MANAGEMENT CALCULATIONS JW Caldwell, PE Summary of Result- Phase 1 1/19/2007 Cha SOR.xIs SOR P1 TopoZone - The Web's Topographic Map Page I ol'I http://www,topozone, comlprint.asp?z=17&n=3963121.9999578&e=689311.000026289&s... 4/13/2006 0 0.3 0.6 0.9 1.2 1.5 km G 0 0.2 0.4 0.6 0.6 1 Mi Map center is 35.79400N, 78.9051°W (WGS84/NAD83) Green Level quadrangle M=-8.67 Projection is UTM Zone 17 NAD83 Datum G=1.226 r0()gIc �c Zt k § �J Y �rt 41i, PoInttfr 35`47'25.15" N ,78°54'28.53' W olov 292 ft Stre rr�in� �lll#!Ilii€1 r0()gIc �c Zt k § �J Y �rt r0()gIc THE WOODLANDS WATERSHED SOIL TR McCormack TOL-05060 INFORMATION 1 / 17/2007 I. SUB-BASIN SOIL DATA ==> Sub-basin #1 Symbol Name Soil Classification Au Augusta Fine Sandy Loam C CrB2 + Creedmoore Sandy Loam--- C r ?? - - C_ rC2 ?- - - Creedm oore Sandy Loam C CrE_ ? ?- _ Creedmoore Sandy Loam - C Wo _ Wehadkee and Bibb _ ?- D Wy Worsham Sandy Loam D ==> Sub-basin #2 S mbol Name Soil Classification CrB Creedmore Sandy Loam- C CrB2 Creedmore Sandy Loam i C CrC2 - _ reed ore Sandy Loam C CrE Creedmore Sandy Loam C Wo V - _Wehadkee and Bibb ??- - - D Wy _ Worsham Sandy Loam ?- -- D --? References: SOIL SURVEY: WAKE COUNTY NORTH CAROLINA. UNITED STATES DEPARTMENT OF AGRICULTURE: SOIL CONSERVATION SERVICE (IN COOPERATION WITH NORTH CAROLINA AGRICULTURE EXPERIMENT STATION). MAP #32 SCS TR-55. UNITED STATES DEPARTMENT OF AGRICULTURE. SOIL CONSERVATION SERVICE. 1986. to105060_S0ILS.xIs 1 of 2 THE WOODLANDS WATERSHED SOIL TOL-05060 INFORMATION U. SCS'CN DATA FOR EACH INDIVIDUAL, SUB-BASIN _=> Base SCS CN Data (Assume good condition) Cover Condition Hydrologic Soil -.- __- .. ?..---- HSG'C' Impervious ..Open_. _-74 Wooded 70? =_> Sub-basin #1 Assumptions ==> HSG 'C': 79% HSG 'D': 21% Cover Condition Composite SCS CN Impervious 98 Open 75 Wooded 71- Sub-basin #2 Assumptions =_> HSG'C': 85% HSG 'D': 15% Cover Condition Composite SCS CN . Impervious - ?. ?m.. 98 . - - - -__ open -_ - - - -_ _ 75 Wooded 71 > Sub-basin #3 Assumptions ==> HSG 'C': 87% HSG'D': 13% Cover Condition Composite SCS CN Impervious 98 __ _ Open _ 75 Wooded _ 71 HSG 'D' 98 80 - 7 TR McCormack 1/17/2007 t0105060_SOILS.As. 2 of 2 Y n 0 o '^ U a H ^i ? o . a a L A N ,? •.--?:N V?1 O a a a 0 J J Q LL Z 4 h'; V'7 V1 M ; M M p O ? xx x 0:00 z;z z ? x .. Z ' w 49 00 Z C; C> o Q C):- .... .... ... .. A ? ? 3 0 ? ?o q o v a C k A r 4 A w a z Q ri N N ix. O ae ID U O O O ? U N r4 a N a a 0 J J ZI Lat. 9 IT 00: 00: a, 6 CD.: 1,101 dI : : OS 00 00 ; ' tn NP 0 0 O O O:-:- M ? p p: N'N O ; N ! O OE L 1 L L O Q 03 C4! ;N:M C> 00 W N ?:M;?fl N MJ00 t/1 ?r2:- l? M >4 O v?M?N th CD C; C; C>; th N i ? •u ? Di i b V ?• 1D ?• , r-::; V t•1 I? 0o: ? : 0, C): h:Ul • --' W NjP:V OMD N+:r V1 j.. p.. v N N; M ?/1 O ! o cn C> : :; q, Cj: Q Q O O q ? C o ? ? i _ v 0 0 a 3 Vl R a ? Vl O IA:O O O N O O:O 00;\O: N QQ ti O O: hl N p lL7 T N fJ Vl N;CN:,,•, O cI: ?:N h i O C) O'r' t L b N lwnl 0 ? O • N O 0:~ v o o4s 06 R Vj k! : N W O N ti Y° ., 0009-r9c (6r6) 900*-60442 dIZ SOM XOH •0•d ON 'AHYd 31HNYIHS HOHY3S3H SHOA3AHO.S/SHMMd/SH33NIoN3 'ONI `kNddwoo 0111 SL1iVGWW '2I NHOP dHJ, dm .IxamoaaaQ-?wd L7942 YNITOHYO HIHON 'H013'IYH 0B 'HO H30NYX3'IY NJ, 70£2 .T r17C7? 1 M lOUV? IUXO lll 1 V 17 IL 1C1 V V 01 ONI ON 30 SH21HIOUE1 7 I EXI T T SNOISIA3H X OOO a H M i i? W °o 2 x g 1 d I ? o iI q -° ?o Q U I? I F u -11 W N 1.____ / e /.V .._-_-926'-- ""'I", _ ""-- - 1 ----------- -- -- -..- ----- "-... - 1 ----! )/ " " " -- , ?? 1, t -- - ------ , - _ ' !_ _ - ?, \ ,"1 _, WQ Z . L" k.,? Li W 0 1• p 1, 1y y '•? `1 w\- V,-,- v ,1\.. ,w `v •,\ '1 ' '111'rly\? `1 `'1,'iil, k I'' 1'11,\`\ ' ,\\,a `` ,I 1 1 , ,I( 1?`9', 1 ` e \,`?,\ H`:l ILL 1 v °,I j,li?. i'1 I IIII'IIi ___ c' _ : i r I "I i I?'lin i ,,, r _?,; - I'I'i1,/;','iiii,'/ ii 1Il"T' , - nli 1, ''.71" 11,1 l \ ``;\\,-` ; _ Bill I ??ii? '„III'' _ `'2„\\?\, i!i(i'/iii %'ii'I ??1,'I --------- - J' "I'''ii(4I`_-_ 11 l±fi , ' i, _ o y!i !'i;i`i' 1,1 "llr'' _ IIII\ I°?\`'\P`,, . 11d i'\' _ 'V-,ll,i rll ,, -_'__1?(5?'?, i; ;``:\'•. ,,/ IIp11111111 / 1°\? 6,,,l p\????4 + W 1 --_ _-_- ' _ ',?_\\''-^: illi l/,' ? - _ 11 I I',4 II II , I' I I t\ 1. /k'F ''?iiu'i 4! i( -- I`i'' iii;'i'`1, ^\?\\?" '\ ----------- -77_ -? . i Dili; - _ ?I11 _ _ .?•? f''/ ' 41,,,1, IIII I r1, IIIh,\,, , - - '- _.= ____- -"_ IIII i _ \ µ 11i \F7 6 1; I . c1? I?1'(Ii;, i' 01 -'i/ -ill'1i'?"s""``` _ __ _ -- ''-1L -- Illgl l I'u - I\\ - :dAAi''' - 4d,.f'; `., _ - s - - --- o \ _ 2 ,l, l 11, - " i \ .-i I lllll,n l It q11`.... - -;'l , II I' ,1` '',\i1. t.! ` `= s'1, 6l ', \\----- ', 'j///', ,,i , / , '%iN' n'II r 'I llln "', -„I-_ -- 11 ,/ \dPS\ \\?'?`-";\ - i , 'o ,i",iil ll jl i , l % ,I,11'11I1 1i11^??` _ _ iIIIII'II `O,d``1 y ,, \,?, a, _ --: - ','?I ,?I,I'f,,/,, i,ii, 11'1 ni .'\ 1 1,` - 11 V '` \ ^???_ , / .,IIII,/ _ 'I,II ,11 _ 1 \ ` IIII -„-- ,; \ ? \.?`: ^.?`: - i i i• 1„11 \?: , _ ''1111, 1li- __ - - "",'I'll, Ir111 /,! , ' /,rf'' Fll K", - " 1 , c .., `•` --- ' ' ,111\,/,/ -'ll\ I,Id11i''\ \ _-` 11„I 11- --:X1111'11 1 • \ ,_', ,'II IIII\,,1 1, I I, Il , Ill111,1 1 \ ,,-?i.---- ___ ?\ ,rI/tT i I '1 =111 1 .- \I _ -. : •\ \ \ "'INN, -`•-`_ ' , 1l 11 IIII / I ` 11 ?, 1---- - _ _ ll/II 11 it ___ l M\ I 1, 'I I -1 \ :. c.,\, ?- ? , !1'111 11111 1, rl,\ I,,,,`,W"\ ` '\, ¦ 1' 1 1 1 "-- ,-, I ,11111' 'Ill„ , , I r', ' , , / 11 \ I ,III:' - - "-- ,Illl'1, 1 I,\ ^`I''11i 111 .\\<\\,,. ., 'II III' / , \ 111 I, II / - I l, 1 \ , ,y, . -,. III'` I _' -......-- ?'\`` ' ----- .-?. _ ____- 1, / I l\„\\? III,I', III `?w` , ` _ "'," Illl,ll'I /ill ``\I,1il?l,, ?,-?- . I 11 , - , 1111 '\11` , I I ", iIl 1 ''' -. :'. ,, II'I l iullI I`? l ,II I``\\\`,???,__//1,III ,II III f I / / I1 / ,I,\I„\,\`\` -._ - - _e-'- , 1 1 I I `\"\,•..?.. /,'I' 1111111 II / , \`, ?,: \`\, - ',"%'U' lil',;,,, , /.11 !%; , „ I ' ,,\` III ,,^+ I \\ ?, ,,Ill 11,,\\?,` `:, ,' I \ ` 11 ' - - ,I, ??, `?\?;-. / 1 11 11\` \`\`1\\?`, \, 1 ` - ,1`11,'\'?, l?l?l,l' Ili ll'\'?``_ - - ',I, \'I ':, _ _ \ :1 \ `\1 \II\ _ Il;Ill ,'ll??ll' __ , --1 __ _ !111\? ?j?/ 1 `,- , \\, 11 I 1 __" - 'Ill l'll?_C', I \,\_ __ . A, 1,11 `\?\\ \? \ I, 111 ' ? I ( ,I ' \11'j 111 ` --_.__ , --•.-.. _..- ? 1 1 ,111 111 V \'. \I , \ 1 I \ - -•____" -. -:' . .-_-.-, 1 I , \1, \\\\\ ??\` \ 'I' I'i I I , 11 " 'I J '''1 '1`11111'1 I? \:• _ \,` ,' ___-_ l- l It l \ \\\\\ 1 ?\`?\'.` , 1 ', j" ,111 '_"? ` I'I I •'111111 \11 \ \ I , I \ d ` I q` ''I'II 1 ' : tI, I 1 .-i11 i -- , e ---_-_- I I I I j, ?j, , ,11 i`\ ` , I l , F I 1 1 11, '-' _ 'l,"",,/ / IIII '''}'y 1\''. 'j / II r ? ,1 1 7 :i \ I1 I 1 `I 1 ,'7ii"/? / I", - I_\yyj ` , 1 I I, I ` I ril j ` i \I.: 3' 1 \ - / 'I r \\\ `" I ' \ ` \ \, II± 1, 'i ll\ °III?I?I'', I'll1' li ?, III \"",, ,I,.\ ------- ? ` IIII, IFI tl, 1\611 I ,1V,Iol i?llrl I' iril; r \ `...-_-•_-_?- - -?-__'_---' , \\ "I", \ , 1 I I , /, i 'M ` _ l, , ? ? I i ? 1 ,'IIII I ! i ? 1 ^? I I': •.. \ I . / i N _ .'1 ' I V \ f .-_ - ,,i/? ,,, `` lI III 5 ,\Ii7l \' 'i)1115 /IIF'lli 1;11 111 ? \< I 1 ,5'i, 1', ?1 t ??,': \ , ------- ---------------- _ ---- / '' '- -- ,I1 , I , _ i;?'; ?l 'II ;'???:° , ` ' • z ----- 0..__, ,11,, ;,1111 1 `-" -' -_ =- 6'- ',% \\ III ;?; ??`, \ - - --- 1l III; \ ?, J' 1 ,?,-,_ "`?` - ?1 = L? ; i'' h - - 1, -1 _ i)r' -- '?1 _ _ iii _,Y' w`\ ' J', , `1 1 1 I (, l7\ l,1 %A- • , _ ,,-,, _ ? - ' ? , - 'II'I, 1 - `- _ _ - _ JJ \ _ II 111 _ 1 • I'll __ ^\ - N II _ ?rr - ' r , _ - -I_:!_--- -- - --'--_- - _ ,, ' • I'I ) - 1 - „ - - ,I ' ¦ - -- If? --------- - •-,-__ •' , , , '` - _ `•,\ \, 1 11111 __ q _ -_ ? - „ \ .. / ' I 1: , I ?I ' 111 ''i ,,? 1'I?;'"; \ -. - iii , P r ',,'---:z- _ ' ' -.._------ ¦ /. , 1. ,•,_ ?___ _ _ ,,,, i? __ - __ - - 1 k _ 7'I , ^ , , ¦ - - - - - - , ij? ' ¦ , ':I. ? -?---____?.. -_ \I\ ^__- ,, -- _____- ____- _'- - ?-` /Illlll/ , ----- .._-_..--------- _. ------ ; 11 I -_ _ _ ` l , r :? / , , , , 1 1 _ ', F7 8 ', % ; 0 . '?9-`-` - , , / , ., _ -- - _ 1 111 _, /_ - II 1 '? , _ , _ 1-4 ._.. \--M' ' _ - - - -------- o _ _ __ _ -- __ -------, _ - _ _ vi ?1'' 'i - - ??•-?-t -'_ m , __ -__ \, I -- --- __ -_ _. 1 " ----- - -- - - - - -- - - \ - -- - -- - - ' - - -- -- _.. - v - - _ - - -- ------ - ,,, >s! -' - - c = -r- \\<.. , _ 1 1,_ - i ___ ---_-- __ - ---°------_" ------- '----------'"-.__ ----- , I II 11, 11 __ _ _ =fiffi????:` ^ I, I - -_ -..??. ?,- 11 - \ i - - - .. 'll, 111; l / ,( 1I " 1 \\\ \:, ,; , ,,rte \„ I „\. _ - - - ,.;NI , „i r'`- ?? ... „r jI,'' ' 2 l . , - 1 ." _ .i , \ C "I /' '' =----- - _ 1 - - , t III,, - -- -- . „ I - - - -,., _-_ - - :\` -- ! / ' ?, _ 'I ' - \ ,I - -. - - - --- 4 ?` , ,--`\I'I I ` ,, - _'_-' ?,\ ,` I Ay 1111111 - - - - 11 11 -\Y---" - --------- \ - -'L I i= ---- - - :, , ' ' ---- - - - - - _ /' 1 - - - 7 . - 1 „ , I ----- - - r, ,----------- / _ - --- _ I i _" . / - J ?/ , I N , ' -- i / , .- , , - - " " ------- I I ? ?, \ \j L t ' ( m 1 I NOh??H - ., 1 It ' m i -- I _ . ?, -- -- // --- ........ 1 I --I S ;, i ,: ' -IA ?. , ... ;, 1:1':.p'wrh:,o:ltFW"il1'a..w -p.og joiHNM,u....".,.,d1...sw9m6 loi,1 i,m,.h,41'x MILLS TRACT HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 1 Pre-development 1/17/2007 I. PRE-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off -site soils in Subbasin 1 are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN #l: PRE-DEVELOPMENT CALCULATIONS 1. Watershed Composition: Total Basin Area 36.91 Total On-site Basin Area 18.21 Total Off-site Basin Area 18.7 t-over uescrt tion Area Jacresi On-site Impervious 0.00 On-site Open 0.00 On-site Wooded 18.21 Off-site Impervious 3.42 Oft=site Open 0.00 Off-site Wooded 15.28 Total - 36.91 Acres 0.0577 Sq. Miles Composite SCS CN = 74 11. Time of Concentration Information: *** Tc was calculated using SCS TR-55 SEGMENT #7 -> OVERLAND FLOW Segment ID = I Surface Manning it (see below) = 0.4 Wooded (light underbrush) Flow Length, L (<=3001) = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL. Land Slope = 0.0200 ft/ft End EL.. Travel Time = 11.61 urinates SEGMENT #2 -> CONCENTRATED FLOW Segment ID a 2 Surface Description = (in ved (Paved or Unpaved) Flow Length, L = 513 ft Begin EL. Watercourse Slope= 0.034 ft/ft End EL. Average Velocity = 2.98 lt/s Travel Nate = 2.8' minutes SEGMENT #3 -> CHANNEL FLOW Length = 1855 ft Begin EL, Slope = 0.0291 Wit End EL. Manning's n = 0,045 natural stream Flow Area - 40t sf (Assume 3'x3' channel) Wetted Perimeter = 6.00 R (Assume 3'x3' channel) Channel Velocity= 4.31 ft/see Segment Time = 118 minutes TOTAL TRAVEL TIME = 27.66 MINUTES SCS LAG TIME = 13.00 MINUTES OK 352.Oft 351.Oft 351.Oft 333.5ft 333.5ft 279.6ft 1:0105060-HMS Inputs.xls MILLS TRACT - PHASE 2 HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 2 Pre-development 1/17/2007 I. PRE-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 2 are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN#2: PRE-DEVELOPMENTCALCULATIONS 1. Watershed Composition. Total Basin Area 61.58 Total On-site Basin Area 43.15 Total Off-site Basin Area 18.43 r vescrrption Area Jac e Impervious 0.00 e Open 0.00 e Wooded 43.15 le Impervious 2.18 le Open 0.00 le Wooded 16.25 61.58 0.0962 Composite SCS CN = 72 II . Time of Concentration Information: Acres OK Sq. Miles *** Tc was calculated using SCS TR-55 SEGMENT #1-> OVERLAND FLOW Segment 1 D = I Surface Manning n (see below) = 0.4 Wooded (light underbrush) Flow Length, L (<=3001) - 5o feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL.. Land Slope = 0.0120 11/ft End EL. Travel Time = 14.21 rninufes SEGMENT #2 -> CONCENTRATED FLOW Segment ID = Surface Description = 41 (Paved or Unpaved) Flow Length, L = ft Begin EL. Watercourse Slope= ftlft End EL. Average Velocity = 3.44 iUs Travel Time = 4128 minutes SEGMENT #3 -> CHANNEL FLOW Length = 2331 ft Begin EL. Slope = 0.0219 ft/ft End EL. Manning's n = 0.045 natural stream Flow Area = 3.00 sf (Assume YxY channel) Wetted Perimeter - 3.00 It (Assume Yx3' channel) Channel Velocity = 4.10 ft/sec Segment Time= .'. 93 minutes TOTAL TRAVEL TIME = 26.46 MINUTES SCS LAG TIME = IS.87 MINUTES 370.6ft 370.Oft 370.Oft 330.Oft 330.Oft 279.Oft tOIO5060-HMS Inputs.xls MILLS TRACT - PHASE 2 HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 3 Pre-development 1117/2007 L PRE-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and oft-site soils in Subbasin 3 are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN#3: PRE,-DEVELOPMENT CALCULATIONS 11. Watershed Composition: Total Basin Area 35.69 Total On-site Basin Area 6.71 Total Off-site Basin Area 28.98 %-over vescrt oon Area acres On-site Impervious 0.00 On-site Open 0.00 On-site Wooded 6.71 Off-site Impervious 0.00 Off=site Open 0.00 Ott-site Wooded 28.98 Total = 35.69 Aces 0.0558 Sq. Miles Composite SCS CN = 71 11. Time of Concentration Information: "• • Tc was calculated using SCS TR-55 SEGMENT #1--> OVERLAND FLOW Segment ID = I Surface Manning n (see below) = 0.4 Wooded (light underbrush) Flow Length, L (<=3001) - SO feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL. Land Slope= 0.0140 ft/ft End EL. Travel Time = 1339 minutes SEGMENT #2 --> CONCENTRATED FLOW Segment 1D = 2 Surface Description = Un aved (Paved or Unpaved) Flow Length, L = 2595 ft Begin EL. Watercourse Slope - 0.034 tuft End El Average Velocity = 2.96 ft/s Travel Time = 1.1.63 minutes TOTAL TRAVEL TIME= 28.02 MINUTES SCS LAG TIME = 16.81 MINUTES OK 370.6ft 369.9ft 369.9ft 282.8ft t0105060-HMS Inputs.xls HMS * Summary of Results Project : TOL-05060 Run Name : Pre 1 Start of Run : 29NOV06 0100 Basin Model : Predevelopment End of Run : 30NovO6 0100 Met. Model : lyr 24hr Execution Time : 17Jan07 1450 Control Specs : 24hr dtlmin Hydrologic Element Subbasin-1 Subbasin-3 Subbasin-2 Discharge Time of Volume Drainage Peak Peak (ac Area (cfs) ft) (sq mi) 34.553 29 Nov 06 1307 2.7767 0.058 22.685 29 Nov 06 1311 2.2423 0.056 44.021 29 Nov 06 1310 4.1111 0.096 0009-T9S (oTS) 90o*-6044Z dIZ 9004T X09 •0•d ON 'XHVd ZIONVIH,L HOHV3SHH snkamns/S H3NNV7d/saaamON8 'ONI `ANYMOD 6 SNV(IVDN *a NHOr alll 4T94Z YN110HYo H,LHON 'HJI3'IVu ON 'Ha HHaNVX97V Al 10£Z OUI ON 30 SZ1HH10HE1 1101 17 :SNOISIASH :Hzxko dVLH J.N:tIYIIdO'I'dA?Q-SSOd c a VNI'IOHVD HJ.HON `AHVO o a o tl SQNIVI0001A 2HZ I R d A d U \ ?vIli 1 1 I I '-vv ?`\ \ I r - ?.. \ ! 1?? l v A A ___ -_ \ r I Ewa .9 Olll //' i' ?' `,r 1 \ \ 1 S 1 r ! J •\ 1 '`` 1\ \ `__-`- ?\ \I ! l v 'Wig 1A t / r-1 _ ' • _ ' ------------ '\ • / l + 'T 1''i`1?°' \ \`I?/ \ / ' / ----------- ---------------- ----------------- --------------- _ - ` -------------- ---------------------- $left \I -1- ?N \I \ n I? ?•? ?? \_ \? \v? ,'' _ 11 //ice I / // i i / / `?: n ? ,,?.? / 7 _ / \ ?/ rl z? \\ v n? \&? ??- I E it ?? ?A J I \ I ?• ? ? N I Iv+ I 1) \? I I I ?r?? ?\? I v \ \ ' '- ?M \ \ \ 1111 \\\\\? ?\VAA IN, I ice-- -?-? 1\I / )?I vi'/? /O ,L6--, i \ _ \ 1 1 a? / alp \ /?\ ?-?-' - -- - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - i l ', l / 1 \\ \\ I I 1 t 1 1 /-------- -/ I / I r I I P 1 i / I ORTH / / ! / \ \ \ \ 11 \ `ear 1 I / / / , ! i' \\ ?I I i j j ' j i I i 1 ,:,'.w'We oc:sas eoozrun'b^•P1z1-,o-mRtl-w4 xwasmou+zor,•..,a rvwma+-eye a-nw?a?mswsoso-roinoiw=af?+e\'> THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 1 Post-development 112512007 L POST-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin I are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN #I: POST-DEVELOPMENT CALCULATIONS I. Watershed Composition: Maximum allowable average per lot for basin = 5690 11. Time of Concentration information: *** Tc was calculated using SCS TR-55 Total Basin Area 22.13 Total On-site Basin Area 5.45 Total Off-site Basin Area 16.68 e impervious 0.97 e Open 4.48 e Wooded 0.00 o Impervious 2,52 'e Open 0,00 !e Wooded 14.16 = 22.13 Acres 0.0346 Sq. Miles Composite SCS CN = 76 SEGMENT #1-> OVERLAND FLOW Segment ID = i Surface Manning n (see below) - 0.24 Dense Grasses Flow Length, L (<=300') = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL Land Slope = 0.0040 ft/ft End EL. Travel Time = 14.69 mutates SEGMENT #1-> CHANNEL FLOW Length - 1660 It Begin EL. Slope = 0.0396 ft/ft End EL. Manning's n = 0.045 natural stream Flow Area - 4.00 sf (Assume 2'x2' channel) Wetted Perimeter= 6.00 ft (Assume2'x2'channel) Channel Velocity = j.0; ft/see Segment Time = 5.50 minutes TOTAL TRAVEL TIME - 20.19 MINUTES SCS LAG TIME = 12.11 MINUTES OK 347.Oft 346.8ft 346.8ft 281.Oft to105060 HMS Inputs.xls THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 2A Post-development 1/25/2007 1. POST-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 2A are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN 92A: POST-DEVELOPMENT CALCULATIONS 1. Watershed Composition: Total Basin Area 17.53 Total On-site Basin Area 15.62 Total Off site Basin Area 1.91 Maximum allowable average per lot for basin = 5650 it . Time of Concentration Information: On-site hnpervious 4.80 On-site Open 10.82 On-site Wooded 0.00 Oil-site Impervious 0.91 Off-site Open 1.00 Off-site Wooded 0.00 Total = 17.53 Acres OK 0.0274 Sq. Miles Composite SCS CN = 82 *Assume a conservative Te of 5 min. TOTAL TRAVEL TIME - 5.00 MINUTES SCS LAG TIME - 3.00 MINUTES t0105060 HMS Inputs.xls THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 2B Post-development 1/2512007 L POST-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 2B are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN Ii2B: POST-DEVELOPMENT CALCULATIONS I . Watershed Composition: Maximum allowable average per lot for basin = 5420 II . Time of Concentration Information: Total Basin Area 10.77 Total On-site Basin Area 10.69 Total Off-site Basin Area 0.08 On-site Impervious 2.99 On-site Open 7.70 On-site Wooded 0.00 Off-site Impervious 0.05 Off-site Open 0.03 Off-site Wooded 0.00 Total a 10.77 0.0168 Composite SCS CN = 81 *Assume a conservative Te of 5 min. TOTAL TRAVEL TIME = 5.00 MINUTES SCS LAG TIME = 3.00 MINUTES Acres OK Sq. Miles t0105060 HMS Inputs.xls THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 2C Post-development 112512007 L POST-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 2C are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN#2C: POST-DEVELOPMENT CALCULATIONS 1. Watershed Composition: Maximum allowable average per lot for basin = 5690 11. Time of Concentration Information: *** To was calculated using SCS TR-55 Total Basin Area 16.51 Total On-site Basin Area 11.91 Total Off-site Basin Area 4.6 On-site Impervious 3.68 On-site Open 8.23 On-site Wooded 0.00 Off-site Impervious 0.00 Off-site Open 0.00 Ofr-site Wooded 4.60 Total - 16.51 Acres OK 0.0258 Sq. Miles Composite SCS CN = 79 Use. TOTAL TRAVEL TIME= 5100 MINUTES SCS LAG TIME= 3.00 MINUTES 10105060 HMS Inputs.xls THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 2-Bypass Post-development 1/25/2007 L POST-DEVELOPMENT As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 2-Bypass are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in brood condition. Cover Description SCS CN Comments - Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN #2-Bypass: POST-DEVELOPMENT CALCULATIONS I. Watershed Composition: Maximum allowable average per lot for basin = _%90 Total Basin Area 31.96 Total On-site Basin Area 17.79 Total Off-site Basin Area 14.17 On-site Impervious 3.15 On-site Open 9.72 On-site Wooded 4.92 Off-site Impervious 2.26 Off-site Open 0.84 Oft site Wooded 11.07 Composite SCS CN - 77 II . Time of Concentration Information: "• Tc was calculated using SCS TR-55 Sq. Miles SEGMENT #1-> OVERLAND FLOW SegmentlD= 1 Surface Manning n (see below) = 0.4 Wooded (light underbrush) Flow Length, L (-=3001) = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL Land Slope = 0.0120 fUfl End EL Travel Time = 14.24 minutes SEGMENT #2 -> CONCENTRATED FLOW Segment ID 4 2 Surface Description = Un "ved (Paved or Unpaved) Flow Length, L = 882 It Begin EL. Watercourse Slope - 0.045 Will End EL. Average Velocity= 3,44 ft/s Travel Tame = 4.28 minutes SEGMENT #3 -> CIIANNF,L FLOW Length a 2331 tt Begin EL Slope= 0.0219 AM End EL Manning's n = 0.045 natural stream Flow Area - 9.00 sf (Assume 3x3' channel) Wetted Perimeter = 9,00 R (Assume 3'x3' channel) Average Velocity= 4.90 fUs Travel Time = 7, ?.2 minrtes TOTAL TRAVEL TIME= 26.46 MINUTES SCS LAG TIME= 15.87 MINUTES OK 370.6ft 370.0ft 370.08 330.011 330.0ft 279.Oft IOIO5060 HMS inputs.xls THE WOODLANDS HYDROLOGIC INPUTS TR McCormack TOL-05060 Basin 3 Post-development 1125/2007 I. POST-DEVELOPMENT ==> As shown in the soil information section (See Background Data), the on-site and off-site soils in Subbasin 3 are from Hydrologic Soil Groups C & D. Both wooded and open areas were assumed to be in good condition. Cover Description SCS CN Comments Impervious 98.0 Open/Grassy Areas 75.0 Assume good condition (> 75% grass) Wooded 71.0 SUBBASIN #3: POST-DEVELOPMENT CALCULATIONS I. Watershed Composition: Maximum allowable average per lot for basin = 5690 H . Time of Concentration Information: •'• Te was calculated using SCS TR-55 Total Basin Area 35.27 Total On-site Basin Area 6.32 Total Off-site Basin Area 28.95 On-site Impervious 0.67 On-site Open 2.23 On-site Wooded 3.42 Off-site Impervious 0.00 Off-site Open 0.00 Off-site Wooded 28.95 Total = 35.27 0.0551 Composite SCS CN = 72 Acres OK Sq. Miles SEGMENT #1--> OVERLAND FLOW Segment ID = i Surface Manning n (see below) = 0.4 Wooded (light underbrush) Flow Length, L (<=3001) = 50 feet 2-Year, 24 Hour Rainfall Depth = 3.61 inches Begin EL. Land Slope = 0.0140 Wit End EL. Travel Tinte = 1.3, 39 minutes SEGMENT #2 --> CONCENTRATED FLOW Segment ID = 2 Surface Description = Un raved (Paved or Unpaved) Flow Length, L - 2595 ft Begin EL. Watercourse Slope= 0.034 ft/11 End EL. Average Velocity - 2.96 fvs Travel Tine = 14.63 minutes TOTAL TRAVEL TIME = 28.02 MINUTES SCS LAG TIME = 16.81 MINUTES 370.6ft 369.9ft 369.9ft 282.8ft 110105060 HMS Inputs.xls HMS * Summary of Results Project : TOL-05060 Run Name : Post 1 Start of Run : 29Nov06 0100 Basin Model : Postdevelopment End of Run : 30NovO6 0100 Met. Model : iyr 24hr Execution Time : 19aan07 1715 Control Specs : 24hr dtimin Hydrologic Discharge Time of Volume Drainage Element Peak Peak (ac Area (cfs) ft) (sq mi) Subbasin 2A 40.159 29 Nov 06 1257 2.0126 0.027 Wetland 2A 14.041 29 Nov 06 1305 1.3509 0.027 Subbasin 2B 23.463 29 Nov 06 1257 1.1753 0.017 Wetland 2B 1.4513 29 Nov 06 1359 0.49974 0.017 Subbasin 2C 32.552 29 Nov 06 1257 1.6331 0.026 Wetland 2C 3.5317 29 Nov 06 1327 0.87100 0.026 Subbasin-2 Bypass 32.296 29 Nov 06 1310 2.8293 0.050 Subbasin 2 44.353 29 Nov 06 1307 5.5510 0.120 Subbasin 1 24.609 29 Nov 06 1306 1.8623 0.035 Subbasin 3 24.283 29 Nov 06 1311 2.3535 0.055 HMS * Summary of Results for Wetland 2A Project : TOL-05060 Start of Run : 29Nov06 0100 End of Run 30NovO6 0100 Execution Time 17Jan07 1448 Run Name : Post 100 Basin Model : Postdevelopment Met. Model 100yr 24hr Control Specs : 24hr dtlmin Computed Results Peak Inflow : 137.47 (cfs) Date/Time of Peak Inflow : 29 Nov 06 1304 Peak Outflow 106.52 (cfs) Date/Time of Peak Outflow : 29 Nov 06 1308 Total Inflow 5.85 (in) Peak Storage 1.4688(ac-ft) Total Outflow 5.39 (in) Peak Elevation 289.53(ft) HMS f Summary of Results for Wetland 2B Project : TOL-05060 Start of Run 29Nov06 0100 End of Run : 30NovO6 0100 Execution Time 17Jan07 1448 Run Name : Post 100 Basin Model Postdevelopment Met. Model : 100yr 24hr Control Specs : 24hr dtlmin Computed Results Peak Inflow s 82.909 (cfs) Date/Time of Peak Inflow : 29 Nov 06 1304 Peak Outflow 76.866 (cfs) Date/Time of Peak outflow 29 Nov 06 1306 Total Inflow 5.74 (in) Peak Storage : 1.0163(ac-ft) Total Outflow 4.98 (in) Peak Elevation : 298.98(ft) HMS * Summary of Results for Wetland 2C Project : TOL-05060 Start of Run : 29Nov06 0100 End of Run : 30NovO6 0100 Execution Time : 19Jan07 1715 Run Name : Post 100 Basin Model Postdevelopment Met. Model 100yr 24hr Control Specs : 24hr dtimin Computed Results Peak inflow : 122.93 (cfs) Date/Time of Peak Inflow : 29 Nov 06 1304 Peak Outflow : 113.33 (cfs) Date/Time of Peak Outflow : 29 Nov 06 1306 Total Inflow : 5.50 (in) Peak Storage : 1.2796(ac-ft) Total Outflow : 4.94 (in) Peak Elevation : 291.13(ft) WETLAND ZA DESIGN MILLS FARM- PHASE 1 TOL-05060 I? LEVEL SPREADER--\ / t Y U E U U m 0 N N m a z g LLI a 0 0 i \\" > 1 \l?. PA i 11 I 11 ma@ 90.3 i i i i i i 290.33 z 1 1 ' / OUTLET STRUCTURE ? 1 / ( I / 0.3 N \ \ ? I /J i (I 21 \\/ J ? fr- sT ? ..P ,?? 5a ft. \\?. ., Pealecr No. TOL-05060 THE WOODLANDS THE JOHN R. McADAMS PiLerrnMhTLAND GRADES DWG COMPANY, INC. . c t:j SCALE: N CARY NORTH CAROLINA ENGINEERS/PLANNERS/SURVEYORS -50 1 , RESEARCH TRIANGLE PARK, NC WE IMD 2A GRADING PLAN P.0. BOX 14005 ZIP 27700-4005 nnTe, -13-06 (910) 301-5000 E J O N 0 0. X i , ? / GhAP14 SCA o aio 25 - 5D MILLS FARM STAGE-STORAGE FUNCTION TR McCormack TOL-05060 WETLAND 2A 9/21/2006 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 287.0 0.0 22363 288.0 1.0 24509 23436 23436 23436 _ 1.00 289.0 2.0 26739 _ 25624 _ 25624 49060 1.98 290.0 3.0 29063 27901 27901 76961 3.00 290.3 3.3 29817 28278 37609 86669 3.35 100000 Storage vs. Stage --- - 90000 60000 y = 23339x1.066 70000 R2 = 0 9999 W 60000 . rn w 50000 0 40000 y 30000 20000 10000 0 0.0 0.5 1.0 1.5 2.0 2.5 3.0 1 5 Stage (feet) KS 23338 b = 1.086 Stage-Storage Functions.XLS WETLAND 2A MILLS FARM STAGE-STORAGE FUNCTION TR McCormack TOL-05060 WETLAND 2A CALC 9/2112006 > Stage - Storage Function Ks = 23339 b = 1.086 Zo = 287 Elevation Storage Outflow [feet] [cfl [acre-feet] [cfs] 287 0 0.0000 0 287.2 4064 0.0933 0 287.4 8628 0.1981 0 287.6 13402 0.3077 0 287.8 18316 0.4205 0 288 23339 0.5358 0 288.2 28449 0.6531 0 288.4 33634 0.7721 6.44 288.6 38883 0.8926 18.21 288.8 44188 1.0144 33.46 289 49545 1.1374 51.52 289.2 54948 1.2614 99.63 289.4 60394 1.3864 104.09 289.6 65878 1.5124 107.81 289.8 71400 1.6391 111.44 290 76955 1.7666 114.94 290.2 82542 1.8949 118.35 290.33 86190 1.9786 120,54 Stage-Storage Functions.XLS WETLAND 2A CALC MII.,LS FARM 1" RUNOFF TR McCormack TOL-05060 VOLUME CALCULATION 1/18/2007 Wetland 2A Calculation of Runoff Volume required for storage The runoff to the pond for the 1" storm detention requirement is calculated using the SCS curve number method. Impervious areas that directly enter the pond are counted as Directly Connected Impervious Areas (DCIAs). No infiltration calculation will be provided for these areas. Areas not directly connected will be accounted for in a composite curve number. Using basic SCS runoff methodology, with no adji to initial abstractions (0.2*S and 0.8*S). Impervious Area, directly connected (DCIA) _ @CN= Open areas draining to pond = @CN= Other areas draining to the pond= @CN= Composite CN = Runoff from DCIAs ==> istments made 5.71 acres Total Drainage : 17.53 acres 98 11.82 acres 75 0.00 acres 71 82 Precipitation amount = 1.0 inches S = 0.204 inches (calculated) Q* = 0.791 inches (calculated) Runoff volume = 16393 CF Runoff from non-connected areas ==> Precipitation amount = L0 inches S = 3.333 inches (calculated) Q* = 0.030 inches (calculated) Runoff volume = 1300 CF Runoff from non-connected areas ==> Precipitation amount = 1.0 inches S = 4.085 inches (calculated) Q* = 0.008 inches (calculated) Runoff volume = 0 CF Therefore, total runoff from precipitation in question = 17694 CF This amount of runoffmust be stored in the pond above normal pool elevation and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. to105060_1 in_runoffAs Page 1 of 6 Wetland 2A MILLS FARM I" RUNOFF TOL-05060 VOLUME CALCULATION Wetland 2A Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 17694 CF Pond Ks= 23339 Pond b= 1.0860 Invert Elevation= 287.00 Stage (above invert) asmciated with this storage = 0.77 feet Therefore, depth required above normal pool for storm storage = 0.77 feet 9.30 inches Therefore set crest of principal spillway at stage = 1.20 feet and EL = 288.20 feet At principal spillway crest, storm pool storage provided = 28449 CF OK TR McCormack 1/18/2007 t0105060_1in_runoff.xls Page 2 of 6 Wetland 2A MILLS PROPERTY TOL-05060 TR McCormack 1/18/2007 Impervious Area = 3,04 acres Drainage Area = 101.77 acres % Impervious = 28.2% Average Depth = 3.00 ft. From the NCDENR Stormwater BMP Handbook (4/99 ), the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: 3.0 3.00 4.0 Lower Boundary => 20.0 0.97 0.79 Site % impervious => 28.2 1.27 1.27 1.03 Upper Boundary => 30.0 1.34 1.08 Area Required = 5979 sq.ft. Area Provided = 8123 s .ft. OK WQ Dimension Check.XLS THE WOODLANDS Water Quality Orifice Desiyin Sheet TOL-05060 WETLAND 2A D siphon = No. siphons = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool _ Normal Pool Elevation = 2.5 inches 1 23339 1.086 0.60 287.00 feet 0 CF 287.00 feet WSEL (feet) Vol. Stored c Siphon Flow cfs) Avg. Flow cfs Incr. Vol. c Incr. Time sec 287.775 17696 0.134 287.707 16011 0.127 0.131 1685 12887 287.639 14340 0.120 0.124 1671 13526 287.570 12685 0.112 0.116 1655 14289 287.502 11047 0.103 0.108 1638 15220 287.434 9427 0.094 0.099 1619 16397 287.366 7830 0.084 0.089 1597 17955 287.298 6258 0.072 0.078 1572 20166 287.229 4717 0.058 0.065 1541 23695 287.161 3216 0.036 0.047 1501 31910 287.093 1770 0.016 0.026 1446 55688 Drawdown Time = 2.57 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.335 feet Orifice composite loss coefficient = 0.600 X-Sectional area of 1 - 3.0" orifice = 0.034 ft2 Q = 0.0951 cfs Drawdown Time = Volume / Flowrate / 86400 (sec/day) Drawdown Time = 2.15 da s TR McCormack 1/25/2007 Conclusion : Use 1 - 2.5" Diameter Water Quality Orifice to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 2.5 days. to105060_SIPHONS.XLS WETLAND 2A U W E O N 0 ? O U ? Q' F- 0 3 N C O -60 }- O v) J Q N U (6 fl. o a` N O m N O ui U •- 0 a f0 Q) U E ro o ? o rn ? C 00 'U ro m j y ? C 'L3 O U C Cl E O ? a) c ro C c o j N 0 v) A E o ? w 0) o o ? U V1 •? C ,? O j M F- a m t c 0 C O U N Q Q. _m O U 7 E 'c ar v O E E X co E ro U Cl to _ to ro m y U co O L U 3 N m ro N LO Q O ?Y aO rn . 4.a? 05, A € = M :Raw U N X • 5 m co m m d y H U Cr 0 U ? d C .2- et o Y py ? c y G +?? cfl .J E `v c6 0 0 _ A C'4 3 -o O m 3 V N o - a u O O U a? a 1 4) J L U ? I a o ro , cn `? = CL m co Cy ro k 1 (ri ro y < f6 co 1 N dy ? i c a j M 4 ? w ? . ZI h t 3 0 Q N C ro a? rn X N ro 0 U O. O Q co co O O 9 MILLS FARM TOL-05060 Input Data ==> Square Riser/Barrel Anti-Flotation Block Calculations TR McCormack Wetland 2A 10/26/2006 Inside length of riser = 8.00 feet Inside width of riser = 8.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8.00 inches Base length of riser = 7.00 feet Base width of riser = 7.00 feet inside height of Riser = 4.20 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 59.50 inches Size of drain pipe (if present) = 6.0 inches Trash Rack water displacement = 1.36.32 CF Concrete Present in Riser Structure =_> Total amount of concrete: Base of Riser = 32.667 CF Riser Walls = 71.400 CF Adjust for openings: vt . NC Products lists ui! t wt. of In,mh",la c mcn:tc st i 42 PCY. Opening for barrel = 9.655 CF Opening for drain pipe = 0.098 CF Total Concrete present, adjusted for openings = 94.314 CF Weight of concrete present. = 13393 lbs Amount of water displaced by Riser Structure =_> Displacement by concrete = 94.314 CF Displacement by open air in riser = 268.800 CF Displacement by trash rack = 136.320 CF Total water displaced by risertbarrel structure= 499.434 CF Weight of water displaced = 31165 lbs Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.15 (:-vAnnrrxxa: ; AS of hid;twi.) Must add = 22447 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete = 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 324.294 CF of concrete Standard based described above = 32.667 CF of concrete Therefore, base design must have = 356.961 CF of concrete to105060_conc riser flotation.xis I OF 2 Wetland 2A MULLS FARM Square Riser/Barrel Anti-Flotation Block Calculations TOL-05060 Wetland 2A Calculate size of base for riser assembly => Length = 10.000 feet Width = 10.000 feet Thickness = 48.0 inches Concrete Present = 400.000 CF OK Check validity of base as designed ==> Total Water Displaced = 866.767 CF Total Concrete Present = 461.647 CF Total Water Displaced = 54086 lbs Total Concrete Present = 65554 lbs Actual safetyfactor = 1.21 Results of design ==> OK TR McCormack 10/26/2006 Base length = 10.00 feet Base width = 10.00 feet Base Thickness = 48.00 inches CY of concrete total in base = 14.81 CY Concrete unit weight in added base >= 142 PCF to105060 wnc riser fiotation.xis 2 OF 2 Wetland 2A MILLS FARM TOL-05060 Wetland 2A Dissipator Calculations NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 82.37 Flow depth (R) = 2.73 slope S in %: 0.50% Outlet velocity (fps) = 9.001 pipe diameter D in in.: 48 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 4.00 Outlet velocity (fps) 9.00 Apron length (ft) 32.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 6 B 22 » 13 B or I 22 23 2 27 -- Dissipator, Pipe or Quit (D P or Q) - CALCULATION: Minimum TW Conditions: W = Do + La =4'+32' =36 ft TR McCormack 9/21/2006 CONCLUSION: USE NCDOT CLASS `2' RIP RAP 32'L x 36'W x 22" THK TOL05060-WETLAND2A-DI S SIPATOR.doc Job File: X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Rain Dir: X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\ JOB TITLE Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Outlet Input Data Page 2.01 Name.... WETLAND 2A File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 287.00 ft Increment = .20 ft Max. Elev.= 290.33 ft #+#+++#+++t+++t#ttt+t+t+t++#++++t#ttt#t+++++++ OUTLET CONNECTIVITY +t+++++++++#++++++#++++++t#tttt#+#tttt+t+ttttt ---> Forward Flow Only (UpStream to DnStream) c--- Reverse Flow Only (DnStream to UpStream) <---> Forward and Reverse Both Allowed Structure No. Outfall El, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box rl ---> BA 288.200 290.330 Culvert-Circular BA ---> TW 284.000 290.330 TW SETUP, DS Channel S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Outlet Input Data Name.... WETLAND 2A Page 2.02 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = rl Structure Type = Inlet Box ----------------- # of Openings ------------ = 1 ------- Invert Elev. 288.20 ft Orifice Area = 64.0000 sq.ft Orifice Coeff. _ .600 Weir Length - 24.00 ft Weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (Per ft of full flow) Barrel Length = .00 ft Mannings n = .0000 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Outlet Input Data Name.... WETLAND 2A Page 2.03 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type = Culvert-Circular ----------------- No. Barrels ------------ 1 ------- Barrel Diameter = 4.0000 ft Upstream Invert 284.00 ft Dnstream Invert = 283.70 ft Horiz. Length 59.40 ft Barrel Length 59.40 ft Barrel Slope = .00505 ft/ft OUTLET CONTROL DATA... Mannings n .0130 Ke = .5000 Kb .004925 Kr .5000 HW Convergence - .001 (forward entrance loss) (per ft of full flow) (reverse entrance loss) +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K - .0098 Inlet Control M 2.0000 Inlet Control c = .03980 Inlet Control Y .6700 Ti ratio (HW/D) = 1.158 T2 ratio (HW/D) = 1.304 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Ti elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 288.63 €t ---> Flow = 87.96 cfs At T2 Elev = 289.22 ft ---> Flow = 100.53 cfs SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Outlet input Data Name.... WETLAND 2A Page 2.04 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOLQ5060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. 0 tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... individual Outlet Curves Name.... WETLAND 2A Page 2.05 File.... X: \Proj ects\TOL\TOL- 05060\Storm\ Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = rl (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID - BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft £t +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 287.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 287.20 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 287.40 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 287.60 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 287.80 .00 ... Free Outfall WS below an invert; no flow. 288.00 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 288.20 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 288.40 6.44 288.40 Free 285.12 .000 .000 Free Outfall Weir: H =,20 288.60 18.21 288.60 Free 285.94 .000 .000 Free Outfall Weir: H =.40 268.80 33.46 288.80 Free 286.70 .000 .000 Free Outfall Weir: H =.60 289.00 51.52 289.00 Free 287.45 .000 .000 Free Outfall Weir: H =.80 289.20 99.63 289.20 289.20 289.20 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 289.40 104.09 289.40 289.40 289.40 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 289.60 107.81 289.60 289.60 289.60 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 289.80 111.44 289.80 289.80 289.80 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 290.00 114.94 290.00 290.00 290.00 .000 .000 Free Outfall IS HGL+Loss > crest: Flow set to Downstream outlet. SIN: 6217012070C3 The John R, McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Individual Outlet Curves Name.... WETLAND 2A Page 2.06 File.... X:\Projects\TOL\TOL-05060\Storm\Phase I\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = rl (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 290.20 118.35 290.20 290.20 290.20 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 290.33 120.50 290.33 290.33 290.33 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Individual Outlet Curves Page 2.07 Name.... WETLAND 2A File.... X.\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 109.80 cfs UPstream ID = rl (Inlet Box) DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 287.00 .00 284.00 Free Free .000 .000 Free Outfall 287.20 .00 284.00 Free Free 000 .000 Free Outfall 287.40 .00 284.00 Free Free .000 .000 Free Outfall 287.60 .00 284.00 Free Free .000 .000 Free Outfall 287.80 .00 284.00 Free Free .000 .000 Free Outfall 288.00 .00 284.00 Free Free .000 .000 Free Outfall 288.20 .00 284.00 Free Free .000 .000 Free Outfall 288.40 6.44 285.12 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .256ft Dcr= .736ft CRIT.DEPTH 288.60 18.21 285.94 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .454ft Dcr= 1.254ft CRIT.DEPTH 288.80 33.46 286.70 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .652ft Dcr= 1.720ft CRIT.DEPTH 289.00 51.52 287.45 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .866ft Dcr= 2.155ft CRIT.DEPTH 289.20 99.63 289.20 Free Free .000 .000 Free Outfall BACKWATER CONTROL.. Vh= 1.355ft hwDi= 3.166ft Lbw= 59.4ft 289.40 104.09 289.40 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =5.40 269.60 107.81 289.60 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =5.60 289.80 111.44 289.80 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =5.80 290.00 114.94 290.00 Free Free .000 .000 Free Outfall INLET CONTROL... Submerged: HW =6.00 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Individual Outlet Curves Name.... WETLAND 2A Page 2.08 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 109.80 cfs UPstream ID = rl (Inlet Box) DNStream ID = TW (Pond Outfall) Pond WS. Elev. ft 290.20 290.33 Device (into) Converge Q HW HGL DS HGL cfs ft ft ------- ------- -------- 118.35 290.20 Free INLET CONTROL... 120.50 290.33 Free INLET CONTROL... Next DS HGL Q SUM DS Chan. TW DS HGL Error Error TW Error ft +/-ft +/-cfs ft +/-ft ------- ------ ------ ------- ------- Free .000 .000 Free Outfall Submerged: HW =6.20 Free .000 .000 Free Outfall Submerged: HW =6.33 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 2:35 PM Date: 10/23/2006 Type.... Composite Rating Curve Name.... WETLAND 2A Page 2.09 File.... %:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1-REV.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. 0 ft - cfs ------- 287.00 ------- .00 287.20 .00 287.40 .00 287.60 .00 287.80 .00 288.00 .00 288.20 .00 288.40 6.44 288.60 18.21 288.80 33.46 289.00 51.52 289.20 99.63 289.40 104.09 289.60 107.81 289.80 111.44 290.00 114.94 290.20 118.35 290.33 120.50 SIN: 6217012070C3 PondPack Ver. 8.0058 Notes -------- Converge ------- ------------------ TW Elev Error ft +/-ft Contributing Structures ----- Free --- ----- Outfall -------- (no Q: ------------------ rl,BA) Free Outfall (no Q: r1,BA) Free Outfall (no Q: rl,BA) Free Outfall (no Q: rl,BA) Free Outfall (no Q: rl,BA) Free Outfall (no Q: r1,BA) Free Outfall (no Q: r1,BA) Free Outfall rl,BA Free Outfall rl,BA Free Outfall r1,BA Free Outfall rl,BA Free Outfall rl,BA Free Outfall rl,BA Free Outfall rl,BA Free Outfall rl,BA Free Outfall r1,BA Free Outfall rl,BA Free Outfall rl,BA The John R. McAdams Company Time: 2:35 PM Date: 10/23/2006 WETLAND 2B DESIGN MILLS FARM- PHASE I TOL-05060 296 - / / f_ 294 RIPRAP APRON / + 8.2 7< 1a' WIDE / y rBENCT jIN BERM / 298 29q, / ?\ co N oLrn T STRUCTU E \ \ O Z W 248.2 N/ ? / i8.2 / / / / X00 / / 10, WID TOP OF BERM r ? ?l 1 / 33 _ \GRAPHM SALE \ 50? 0 25 50 10C? is: PROJF,CT N0. TOL-05060 McADAMS THE WOODLANDS MCOMPANY, THEJOHN R. INC. PnENnNWETLAND GRADES.DWG CARP> NORTH CAROLINA ENGINEERS/PLANNERS/SURVEYORS SCALP: "=50' RESEARCH TRIANGLE PARK. NC ®R" DATE: 9-15_06 WETLAND 2B GRADING PLAN P.O. BOX 14005 ZIP 27709-e005 (919) 361-5000 MILLS FARM STAGE-STORAGE FUNCTION TOL-05060 WETLAND 2B Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF) (CF) (feet) 295.0 0.0 8139 296.0 1.0 9486 8813 8813 8813 1.01 298.0 3.0 12501 10994 21987 30800 2.92 300.0 5.0 15934 14218 28435 59235 5.09 Storage vs. Stage 70000 60000 50000 y = $725x1.1767 aoooo R2 = 0.9992 m c 30000 M 20000 10000 ol - i i 4 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) KS = 8725 b = 1.1767 Stage-Storage Functions.XLS TR McCormack 9/2112006 WETLAND 2B MILLS FARM STAGE-STORAGE FUNCTION TR McCormack TOL-05060 WETLAND 28 CALC 9/21/2006 ==> Stage - Storage Function Ks = 8725 b = 1.1767 Zo = 295 Stage-Storage Functions.XLS Elevation Storage Outflow tfeett OW-OW-feetl Fcfsl 295 0 0.0000 0 295.2 1313 0.0301 0 295.4 2968 0.0681 0 295.6 4783 0.1098 0 295.8 6710 0.1540 0 296 8725 0.2003 0 296.2 10813 0.2482 0 296A 12963 0.2976 0 296.6 15169 0.3482 0 296.8 17424 0.4000 0 297 19724 0.4528 0 297.2 22065 0.5065 0 297.4 24443 0.5611 0 297.6 26857 0.6166 0 297.8 29305 0.6727 0 298 31783 0.7296 5.37 298.2 34291 0.7872 15.18 298.4 36826 0.8454 27.89 298.6 39388 0.9042 42.93 298.8 41976 0.9636 60 299 44587 1.0236 79.2 299.2 47222 1.0841 80.78 299.4 49879 1.1451 82.3 299.6 52557 1.2065 83.82 299.8 55256 1.2685 85.31 300 57975 1.3309 86.76 WETLAND 2B CALC MILLS FARM 1" RUNOFF TRMcCormack TOL-05060 VOLUME CALCULATION 1/18/2007 Wetland 2B Calculation of Runoff Volume required for storage The runoff to the pond for the 1" storm detention requirement is calculated using the SCS curve number method. Impervious areas that directly enter the pond are counted as Directly Connected Impervious Areas (DCIAs). No infiltration calculation will be provided for these areas. Areas not directly connected will be accounted for in a composite curve number. Using basic SCS runoff methodology, with no adit to initial abstractions (0.2*S and 0.8*S). Impervious Area, directly connected (DCIA) _ @CN= Open areas draining to pond = @CN= Other areas draining to the pond= @CN= Composite CN = Runoff from DCIAs ==> istments made 3.04 acres Total Drainage : 10.77 acres 98 7.73 acres 75 0.00 acres 71 81 Precipitation amount = 1.0 inches S = 0.204 inches (calculated) Q* = 0.791 inches (calculated) Runoff volume = 8728 CF Runoff from non-connected areas ==> Precipitation amount = 1.0 inches S = 3.333 inches (calculated) Q* = 0.030 inches (calculated) Runoff volume= 850 CF Runoff from non-connected areas ==> Precipitation amount = 1.0 inches S = 4.085 inches (calculated) Q* = 0.008 inches (calculated) Runoff volume = 0 CF Therefore, total runoff from precipitation in question = 9578 CF This amount of runoff must be stored in the pond above normal pool elevation and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at permanent pool elevation. to105060_1 in_runoff.xls Page 3 of 6 Wetland 2B MIUS FARM 1" RUNOFF TOL-05060 VOLUME CALCULATION Wetland 2B Calculation of depth required for runoff storage pool (above normal pool) Normal pool depth (above invert) = 0.00 feet Storage provided at permanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 9578 CF Pond Ks = 8725.0 Pond b= 1.1767 Invert Elevation= 295.00 Stage (above invert) associated with this storage = 1.08 feet Therefore, depth required above nonnal pool for stonn storage = 1.0825 feet 12.99 inches Therefore set crest of principal spillway at stage = 2.80 feet and EL = 297.80 feet At principal spillway crest, stonn pool storage provided = 29305 CF OK TR McCormack 1/18/2007 to105060_1 in_runoffAs Page 4 of 6 Wetland 28 MILLS PROPERTY TOL-05060 TR McCormack 1/18/2007 Impervious Area = 5.71 acres Drainage Area = 17.53 acres % Impervious = 32.6% Average Depth = 3.00 ft. From the NCDENR Stormwater BMP Handbook (4/99), the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: 3.0 3.00 4.0 Lower Boundary => 30.0 1.34 1.08 Site % impervious => 32.6 1.44 1.44 1.12 Upper Boundary => 40.0 1.73 1.25 Area Required = 10999 sq.ft. Area Provided = 22363 s .ft. OK WQ Dimension Check.XLS WETLAND 2A SA THE WOODLANDS Water Quality- Orifice Design Sheet TOL-05060 WETLAND 2113 D siphon = No. siphons = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Normal Pool Elevation = 1.5 inches 1 8725 1.1767 0.60 295.00 feet 0 CF 295.00 feet WSEL (feet) Vol. Stored (c Siphon Flow cfs Avg. Flow cfs Incr. Vol, cf) Incr. Time (sec) 296.083 9583 0.060 295.990 8622 0.057 0.058 961 16507 295.897 7677 0.054 0.055 945 17072 295.804 6750 0.051 0.052 928 17724 295.711 5841 0.048 0.049 909 18493 295.618 4952 0.044 0.046 888 19418 295.525 4088 0.040 0.042 865 20568 295.432 3250 0.036 0.038 838 22058 295.339 2443 0.031 0.033 807 24117 295.246 1675 0.025 0.028 768 27283 295.153 958 0.018 0.022 717 33343 Drawdown Time = 2.51 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.510 feet Orifice composite loss coefficient = 0.600 X-Sectional area of 1 - 3.0" orifice = 0.012 fe Q = 0.0422 cfs Drawdown Time = Volume / Flowrate / 86400 (see/day) Drawdown Time = 2.63 da TR McCormack 1/25/2007 Conclusion : Use 1 - 1.5" Diameter Water Quality Orifice to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 2.5 days. to105060 SIPHONS.XLS WETLAND 2B Co -Y co °o E N 0 D rn F- r- v 0 /-- N 0 V a 0 0 C a O U CU 0 !- o U J O 0 .C V c- y 0 L O Nu; N c O U R v d m ` ? n e At N '- c a - a . U O 03 a U) \ U (D a) r E C,4 in >1 :3 :3 V E U co E 10 O' :3 0 o ? c U p L _ O U c o A E o C 0 c - M ? CD d d EE C, a _ 0 w 0) ?' ` . GOv T 0, r L C tin N 'U C O v- O a (6 (d E y E C1 c a 4 a) a t E ++ d Y 6 O .C U x 01 C 4) U O) O E C d Q M x C E O Y J E w M A? E 3 ? 0 0 O U C 0 i (D ro m ro ti CL w w o m a> o - (D N O c U Z O C N O N N ?C w to > 'a i U 3 C D C : h d d N C O 0 O y • a O mow N O ? U ? N N v? L O rn L O 0 N ? y ? y y w ? Q C ? 3 'i O ? z? C C Q C c 5 0 3 m N a C co N X N U Q. N O y C (DI O O O O 2 MILLS FARM TOL-05060 Input Data ==> Square RisedBarrel Anti-Flotation Block Calculations TR McCormack Wetland 2B 4/13/2006 Inside length of riser = 5.00 feet Inside width of riser = 5.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8,00 inches Base length of riser = 6.00 feet Base width of riser = 6.00 feet Inside height of Riser = 5.80 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 45.50 inches Size of drain pipe (if present) = 6.0 inches Trash Rack water displacement = 61.74 CF Concrete Present In Riser Structure ?-> Total amount of concrete: dots; NC Products lists unit WL Of nu?ntxilc ixitlCtieC St ; 42 PC:F. Base of Riser = 24.000 CF Riser Walls = 63.800 CF Adjust for openings: Opening for barrel = 5.646 CF Opening for drain pipe = 0.098 CF Total Concrete present, adjusted for openings = 82.056 CF Weight of concrete present = 11652 lbs Amount of water displaced by Riser Structure ==> Displacement by concrete = 82.056 CF Displacement by open air in riser = 145.000 CF Displacement by trash rack = 61.740 CF Total water displaced by riser/barrel structure = 288.796 CF Weight of water displaced = 18021 lbs Calculate amount of concrete to be added to riser ==> Safety factor to use = 1.15 (rixomm mi 1.11 r or lul?l:er) Must add = 9072 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 131.066 CF of concrete Standard based described above = 24.000 CF of concrete Therefore, base design must have = 155.066 CF of concrete to105060 conc riser flotation.xls l OF 2 Wetland 2B MILLS FARM Square Riser/Barrel Anti-Flotation Block Calculations TOL-05060 Wetiand 2B Calculate size of base for riser assembly => Length = 8.000 fed Width = 8.000 feet Thickness = 32.0 inches Concrete Present = 170.667 CF O.K. Check validity of base as designed ==> Total Water Displaced = 435.463 CF Total Concrete Present = 228.723 CF Total Water Displaced = 27173 lbs Total Concrete Present = 32479 lbs Actual safety factor = 1.20 Results of design => OK TR McCormack 4/13/2006 Base length = 8.00 feet Base width = 8.00 feet Base Thickness = 32.00 inches CY of concrete total in base = 6.32 CY Concrete unit weight in added base >= 142 PCF to105060 cone riser flotation.xls 2 OF 2 Wetland 2B MILLS FARM TOL-05060 Wetland 2B Dissipator Calculations NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 48.43 Flow depth (ft) = 2.54 slope S in % : 0.50% Outlet velocity (fps) = 7.593 pipe diameter D in in.: 36 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.00 Outlet velocity (fps) 7.59 Apron length (ft) 18.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 » 6 B 22 13 B or 1 22 23 2 27 -- Dissipator, Pipe or Quit (D P or Q) -- CALCULATION: Minimum TW Conditions: W = Do + La = 3'+ 18' =21 ft TR McCormack 9/21/2006 CONCLUSION: USE NCDOT CLASS `B' RIP RAP 18'L x 21'W x 22" THK TOL05060-W ETLAND2B-DISS IPATOR.doc Job File: X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Rain Dir: X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\ JOB TITLE =S==Y==Qa Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type..:. Outlet Input Data Page 1.01 Name.... WETLAND 2B File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 295.00 ft Increment = .20 ft Max. Elev.= 300.00 ft OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) *--- Reverse Flow Only (DnStream to UpStream) c --- > Forward and Reverse Both Allowed Structure No. outfall El, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RI ---> BA 297.800 300.000 Culvert-Circular BA ---> TW 292.000 300.000 TW SETUP, DS Channel SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Outlet Input Data Page 1.02 Name.... WETLAND 2B File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type ----------------- = Inlet Box ------------- ------ # of openings = I Invert Elev. 297.80 ft Orifice Area = 25.0000 sq.ft Orifice Coeff. _ .600 Weir Length 20.00 ft Weir Coeff. = 3.000 K, Submerged .000 K, Reverse = 1.000 Kb,Barrel .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n .0000 SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Outlet Input Data Name.... WETLAND 2B Page 1.03 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments : OUTLET STRUCTURE INPUT DATA Structure ID = BA Structure Type ----------------- = Culvert-Circular ------------------- No. Barrels = 1 Barrel Diameter = 3.0000 ft Upstream Invert = 292.00 ft Dnstream Invert = 291.70 ft Horiz. Length = 70.00 ft Barrel Length 70.00 ft Barrel Slope = .00429 ft/ft OUTLET CONTROL DATA... Mannings n = .0130 Ke .5000 (forward entrance loss) Kb = .007228 (per ft of full flow) Kr .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form = 1 Inlet Control K = 0098 Inlet Control M 2.0000 Inlet Control c = .03980 Inlet Control Y = .6700 T1 ratio (HW/D) 1.158 T2 ratio (HW/D) = 1.305 Slope Factor -.500 Use unsubmerged inlet control Form 1 equ. below T1 elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at T1 & T2... At T1 Elev = 295.47 ft ---> Flow = 42.85 cfs At T2 Elev = 295.91 ft ---> Flow = 48.97 cfs SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Outlet Input Data Name.... WETLAND 2B Page 1.04 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 ft Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance - .10 cfs SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Individual Outlet Curves Page 1.05 Name.... WETLAND 2B File.... X;\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID - RI (Inlet Box) -------------------------------------- Upstream ID = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-c€s ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 295.00 .00 ... .. ... ... Free Outfall WS below an invert; no flow. 295.20 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 295.40 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 295.60 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 295.80 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 296.00 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 296.20 .00 ... ... ... Free Outfall WS below an invert; no flow. 296.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 296.60 .00 ... ... ... ... Free outfall WS below an invert; no flow. 296.80 .00 ... ... Free Outfall WS below an invert; no flow. 297.00 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 297.20 .00 ... ... ... Free Outfall WS below an invert; no flow. 297.40 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 297.60 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 297.80 .00 ... ... Free Outfall WS below an invert; no flow, 298.00 5.37 298.00 Free 293.11 .000 .000 Free outfall Weir: H =.20 SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... individual Outlet Curves Page 1.06 Name.... WETLAND 2B File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) -------------------------------------- Upstream ID (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 298.20 15.18 298.20 Free 293.94 .000 .000 Free Outfall Weir: H =.40 298.40 27.89 298.40 Free 294.75 .000 .000 Free Outfall Weir: H =.60 298.60 42.93 298.60 Free 295.57 .000 .000 Free Outfall Weir: H =.80 298.80 60.00 298.80 Free 296.87 .000 .000 Free Outfall Weir: H =1.00 299.00 79.20 299.00 299.00 299.00 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 299.20 80.78 299.20 299.20 299.20 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 299.40 82.30 299.40 299.40 299.40 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 299.60 83.82 299.60 299.60 299.60 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 299.80 85.31 299.80 299.80 299.80 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. 300.00 86.76 300.00 300.00 300.00 .000 .000 Free Outfall DS HGL+Loss > crest: Flow set to Downstream outlet. SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Individual Outlet Curves Page 1.07 Name.... WETLAND 2B File.... X:\Projects\TOL\TOL-05060\Storm\Phase i\Design Files V3\TOL05060PHl.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 y Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 46.97 cfs UPstream ID - RI (Inlet Box) DNstream ID = TW (Pond Outfail) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-c£s ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 295.00 .00 292.00 Free Free .000 .000 Free Outfall• 295.20 .00 292.00 Free Free .000 .000 Free Outfall 295.40 .00 292.00 Free Free .000 .000 Free Outfall 295.60 .00 292.00 Free Free .000 .000 Free Outfall 295.80 .00 292.00 Free Free .000 .000 Free Outfall 296.00 .00 292.00 Free Free .000 .000 Free Outfall 296.20 .00 292.00 Free Free .000 .000 Free Outfall 296.40 .00 292.00 Free Free .000 .000 Free Outfall 296.60 .00 292.00 Free Free .000 .000 Free Outfall 296.80 .00 292.00 Free Free .000 .000 Free outfall 297.00 .00 292.00 Free Free .000 .000 Free outfall 297.20 .00 292.00 Free Free .000 .000 Free Outfall 297.40 .00 292.00 Free Free .000 .000 Free Outfall 297.60 .00 292.00 Free Free .000 .000 Free outfall 297.80 .00 292.00 Free Free .000 .000 Free Outfall 298.00 5.37 293.11 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .257ft Dcr= .726ft CRIT.DEPTH SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Individual Outlet Curves Name.... WETLAND 2B Page 1.08 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PH1.PPW Title... Project Date: 4/7/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID - BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 46.97 cfs UPstream ID = RI (Inlet Box) DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Elev. Q HW HGL DS HGL ft cfs ft ft -------- -------- ------- -------- 298.20 15.18 293.94 Free CRIT.DEPTH CONTROL 298.40 27.89 294.75 Free BACKWATER CONTROL. 298.60 42.93 295.57 Free BACKWATER CONTROL. 298.80 60.00 296.87 Free INLET CONTROL... 299.00 79.20 299.00 Free INLET CONTROL... 299.20 80.78 299.20 Free INLET CONTROL... 299.40 82.30 299.40 Free INLET CONTROL... 299.60 83.82 299.60 Free INLET CONTROL... 299.80 85.31 299.80 Free INLET CONTROL... 300.00 86.76 300.00 Free INLET CONTROL... Next DS HGL Q SUM DS Chan. TW DS HGL Error Error TW Error ft +/-ft +/-cfs ft +/-ft ------- ------ Free .000 .000 Free Outfall Vh= .468ft Dcr= 1.243ft CRIT.DEPTH Free .000 .000 Free Outfall Vh- .680ft hwDi- 1.729ft Lbw- 70.Oft Free .000 .000 Free Outfall Vh= .813ft hwDi= 2.347ft Lbw= 70.Oft Free .000 .000 Free Outfall Submerged: HW =4.87 Free .000 .000 Free Outfall Submerged: HW =7.00 Free .000 .000 Free Outfall Submerged: HW =7.20 Free .000 .000 Free Outfall Submerged: HW =7.40 Free .000 .000 Free Outfall Submerged: HW =7.60 Free .000 .000 Free Outfall Submerged: HW =7.80 Free .000 .000 Free Outfall Submerged: HW =8.00 SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 Type.... Composite Rating Curve Name.... WETLAND 2B Page 1.09 File.... X:\Projects\TOL\TOL-05060\Storm\Phase 1\Design Files V3\TOL05060PS1.PPW Title... Project Date: 4/7/2006 Project Engineer; James Caldwell Project Title: TOL05060 Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes ---------------- -------- Converge ------------------------- Elev. Q TW Elev Error ft cfs ft +/-ft Contributing Structures -------- ------- -------- ----- -------------------------- 295.00 .00 Free Outfall (no Q: RIBA) 295.20 .00 Free Outfall (no Q: RIBA) 295.40 .00 Free Outfall (no Q: RIBA) 295.60 .00 Free Out€all (no Q: RIBA) 295.80 .00 Free Out€all (no Q: RIBA) 296.00 .00 Free Outfall (no Q: RIBA) 296.20 .00 Free Outfall (no Q: RIBA) 296.40 .00 Free Outfall (no Q: RIBA) 296.60 .00 Free Outfall (no Q: RIBA) 296.80 .00 Free Outfall (no Q: RIBA) 297.00 .00 Free Outfall (no Q: RIBA) 297.20 .00 Free Outfall (no Q: RIBA) 297.40 .00 Free Outfall (no Q: RIBA) 297.60 .00 Free Outfall (no Q: RIBA) 297.80 .00 Free Outfall (no Q: RIBA) 298.00 5.37 Free Outfall RIBA 298.20 15.18 Free Outfall RI BA 298.40 27.89 Free Outfall RIBA 298.60 42.93 Free Outfall RIBA 298.80 60.00 Free Outfall RIBA 299.00 79.20 Free Outfall RI BA 299.20 80.78 Free Outfall RIBA 299.40 82.30 Free Outfall RIBA 299.60 83.82 Free Outfall RIBA 299.80 85.31 Free Outfall RIBA 300.00 86.76 Free Outfall RIBA SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 11:36 AM Date: 9/21/2006 WETLAND 2C DESIGN MILLS FARM- PHASE 2 TOL-05060 n h r } } \ I. 1 1\ }? 1 8i1 ACCESS RAMP 7 iF li` *!,t?tPi°., ,.J'' '3 y YM1it . \ 1 1 m N 1 1 ? A 1 L ?EM j ?T7 v / ?i 1 \ t \ \ -ourLET-St UCTURE d RIPR? aRON --? `4 L ?P *NOTE: BLOW. 0 MAL ; .0 L - ,_ GAD1N-,_ I '. NOT ON EVEN GRAPHI SCALE S CO?lTOU ; SEE pNRTQUR LABELS -$- o no ao E ` F,OR EL" -? A IONS s n ` i inch; = 40 f . 0 rr ;PROJECT NO. TOL-05060 `?'"" 0 THE WOODLANDS ©THE JOHN R. McADAMS " WETLAND GaADES.DWG COMPANY, INC. CS SCALP,: 1 „a40' ?j + , NORM CAROLINA ENGINEERS/PLANNERS/SURVEYORS RESEARCH j co DATE: 6-OH-OF) WETi.AND 2C GRADING PLAN TRIAXGEE PARK, NC P.O. DOX 14005 ZIP 27709-4005 L _ (DID) 361-5000 MILLS FARM - PHASE 2 STAGE-STORAGE FUNCTION TR McCormack TOL-05060 WETLAND 2C 1/18/2007 Average Incremental Accumulated Estimated Contour Contour Contour Contour Stage Contour Stage Area Area Volume Volume w/ S-S Fxn (feet) (feet) (SF) (SF) (CF1 IM rfpptl 287.0 0.0 288.0 _ 1.0 ' 10600 12011 11305 11305 _ 11305 1.02 289.0_ 2.0 _ 290.0 ?- - Y6__ 291.0 _I 4.0 292...0 _ 1 5.0 13477 028 166 T, 18269 12391 14253 _ 174394^ 12391 14253 15818 - 17439 ^ 23696 37949 _ _63_76T_ f - 71206 _ 1.95 __ 2.95 _ 4.00 5.12 4 Storage vs. Stage 80000 - - - - - . 70000 ___? Y = 11052X1.1413 60000 9989 R2 = 0 50000 . 40000 h 30000 20000 10000 0 0.0 1.0 2.0 3.0 4.0 5.0 6.0 Stage (feet) Ks = 11052 b = 1.1413 Stage-Storage Functions.XLS WETLAND 2C MILLS FARM - PHASE 2 STAGE-STORAGE FUNCTION TR McCormack TOL-05060 WETLAND 2C CALC 1118/2007 Stage - Storage Function Ks = 11052 b = 1.1413 Zo = 287 Elevation Storage ee Outflow [feet] ----- [cf] - [acre-feet] [cfs] _ 287 0 _ 0.0000 0 287.1 798 0.0183 0 287.2 1761 _ 0.0404 0 287.3 27_97 0.0642 0 287.4 - 3884 j 0.0892 - - 0 _ 287.5 _ 5010 0.11500 -_ 0 287.6 6i697 0.1416 0 287.7 -287.8 - -- 7356 8567? t 0.1689 I 0.1967 0 0 287.9 9800 _ 0.2250- _ ?- 0 288 288.1 - -- 11052 12322 0.2537 - 0.2829 0 0 288-2 _ - - 13609 I 0.3124 _ - 0 ?- -^_ 288.3 - ' 14910 0.3423 0 _288.4_ 16226 0.3725 -6- 288.5 - 17556 0.40 3 0 _ - 0 288.6 - 18897 _ _ _ - _288.7 - 2_02_51 0.4649 ' I - 0 _ 288.8 -288 9 - 21616 22992 0.4962 0 5278 0 ?? --? 0 ._ - 28_9.1- 25774 _ . 0.5597 - 0.5917 ? --- - ----? 0 289.2 - 27180 0.6240 ~ - 0 289.3 _ - 28594 _ 0.6564 -- _ 0 _289.4 - 30018 0.6891 -- - --- ' 0 289.5 31449 0.7220 0 _ 289.6 - 32889 0.7550 1 0 289.7 _ -- 34337 0.7883 -_ 1.9 289.8 - 35792 0.8217 5.37 289.9 37254 ; 0.8552 9.86 - _290_ _ -. 38724 ? -- 0.8890 15.18 290.1 40201 0.9229 _ -21.21 290.2 _ 41684 0.9569 27.89 - 290.3 J290.4 43174 44_6_70 0.9911 1.0255 35.14 42.93 290.5 _ - 4_61_73 1.0600 - 51.23 29_0.6 _ - _ 47681 1.0946 60 290.7 ? 49196 1.1294 -? 69.22 _ 290.8 50716 1 1.1643 78.87 290.9 a- 52242 __ 1.1993 88.93 _ _291 291.1_ 53774 55311_f _ 1.2345 1.2_698 _ 99.39 110.2_3 -_291.2 291 3 56_853 58401 1 1.3052 - 1 3407 _ 121.43 -132 99 . 29 1.4 59953 . 1.3763 . 144.9 _ _ - 291.5 61511 1.4121 157.14 291.6 _ 63073 1 1.4480 169.71 291.7 64641 i -- 1.4839 174.37 29_1.8 66213 1.5200 178.47 291.9 292 67789 69371 1.5562 1.5925 ! .182.48 186,41 Stage-Storage Functions.XLS WETLAND 2C CALC THE WOODLANDS - PHASE 2 1 " RUNOFF TR McCormack TOL05060 VOLUME CALCULATION 1/18/2007 Wetland 2C Calculation of Runoff Volume required for storage The runoff to the pond for the 1" storm detention requirement is calculated using the SCS curve number method. Impervious areas that directly enter the pond are counted as Directly Connected Impervious Areas (DC1As). No infiltration calculation will be provided for these areas. Areas not directly connected will be accounted for in a composite curve number. Using basic SCS runoff methodology, with no adji: to initial abstractions (0.2*S and 0.8*S). hnpervious Area, directly connected (DCIA) _ @CN= Open areas draining to pond = @CN= Other areas draining to the pond= @CN= Composite CN = Runoff from DCIAs ==> stments made 3.73 acres Total Drainage : 16.51 acres 98 8.18 acres 75 4.60 acres 71 79 Precipitation amount = 1.0 inches S = 0.204 inches (calculated) Q* = 0.791 inches (calculated) Runoff volume = 10709 CF Runoff from non-connected areas ==> Precipitation amount = 1.0 inches S = 3,333 inches (calculated) Q* = 0.030 inches (calculated) Runoff volume = 900 CF Runoff from non-connected areas ==> Precipitation amount = 1.0 inches S = 4.085 inches (calculated) Q* = 0.008 inches (calculated) Runoff volume = 131 CF Therefore, total runoff from precipitation in question = 11740 CF This amount ofrunoff must be stored in the pond above normal pool elevation and be released in a period of two (2) to five (5) days, by an inverted PVC siphon, the invert end of which is set at pennanent pool elevation. to105060_1in_runoff.xls Page 5 of 6 Wetland 2C THE WOODLANDS - PHASE 2 1" RUNOFF TOL-05060 VOLUME CALCULATION Wetland 20 Calculation of depth required for runoff storage pool (above normal pool) Nonnal pool depth (above invert) = 0.00 feet Storage provided at pennanent pool depth = 0 CF (calculated) Total storage required for normal + storage pool = 11740 CF Pond Ks= 11052 Pond b = 1.1413 Invert Elevation= 287.00 Stage (above invert) associated with this storage = 1.05 feet 1 Therefore, depth required above nonnal pool for stonn storage = 1.05 feet 12.65 inches Therefore set crest of principal spillway at stage = 2.60 feet and EL = 289.60 feet At principal spillway crest, storm pool storage provided = 32889 CF OK TR McConnack 1/18/2007 to105060_1 in runoff.xls Page 6 of 6 Wetland 2C THE WOODLANDS - PHASE 2 TOL-05060 TR McCormack 1/18/2007 Impervious Area = 3.71 acres Drainage Area = It 6.51 acres % Impervious = 22.6% Average Depth = 3,00 ft. From the NCDENR Stormwater BMP Handbook (4/99) , the required SA/DA ratio for 85% TSS Removal in the Piedmont is as follows: 3.0 3.00 4.0 Lower Boundary=> 20.0 0.97 0.79 Site % impervious => 22.6 1.07 9.07 0.87 Upper Boundary => 30.0 1.34 1.08 Area Required = 7666 sq.ft. Area Provided = 10600 s .ft. OK WQ Dimension Check.XLS THE WOODLANDS Water Quality Orifice Design Sheet TOL-05060 WETLAND 2C D siphon = No. siphons = Ks = b= Cd siphon = Normal Pool Elevation = Volume @ Normal Pool = Normal Pool Elevation = 1.75 inches 1 11052 1.1413 0.60 287.00 feet 0 CF 287.00 feet WSEL (feet) Vol. Stored c Siphon Flow (cfs Avg. Flow (cfs) Incr. Vol. Incr. Time (sec) 288.054 11736 0.080 287.963 10582 0.076 0.078 1154 14866 287.871 9443 0.072 0.074 1139 15443 287.780 8321 0.068 0.070 1122 16114 287.688 7217 0.063 0.065 1104 16911 287.597 6134 0.058 0.061 1083 17881 287.506 5075 0.053 0.055 1060 19102 287.414 4042 0.047 0.050 1033 20713 287.323 3041 0,040 0.044 1001 22996 287.231 2080 0.032 0.036 961 26659 287.140 1172 0.020 0.026 908 34626 Drawdown Time = 2.38 days By comparison, if calculated by the average head over the orifice (assuming average head is half the total depth), the result would be: Average driving head on orifice = 0.491 feet Orifice composite loss coefficient = 0.600 X-Sectional area of 1 - 1.75" orifice = 0.017 ft2 Q = 0.0563 cfs Drawdown Time = Volume / Flowrate / 86400 (seelday) Drawdown Time = 2.41 da s TR McCormack 1/2512007 3onclusion : Use 1 - 1.75" Diameter Water Quality Orifice to drawdown the accumulated volume from the 1.0 " storm runoff, with a required time of about 2.50 days. tol05060_SIPHONS.XLS WETLAND 2C c°v o° E: N F- C 3 O N -0 L ?U cv ? ro N U y L O U O .`J 0 U L CL U s y T 00?i U E (D U C r D E »- f0 4O m O CD CD . U crs m _ C 0 CL N E L m 7F D 4) a.C.+ Co 'UU C - m U N w L O o U a) U N ?L N A L U 2 m C w U rz w _o U s o o F-- a Ta ? rr C U Q C 0 vY ? Q, O N v fl CL U :m a a i,o? E ip V rr F= V p 41 E C O O V N X Q1 C 4) t, ? O L O. .. E ? m :5 x m C E: d i2 (tf -1 E U o o C _ E N !n O • L L C ? C U y N w L N N L 0 Q o U d d h w Q V m ? .?00 M ro ° o a2i v ? p ro a (o ro q 3 h z U C Q h ro k w ? E ` m E b Q. w ? j E •? ? N N l0 N Q b y' o ? ro h• 0) co O Qtr) V b N m h y C h Q C Ri `" `Z coo Gj 0 2I ? a 0 U N a c c? 0 x 01 ig 0 U a U U wN C (tf` O (D O U) O O TBE WOODLANDS Square Riser/Barrel TOL-05060 Anti-Flotation Block Calculations Wetland 2C Input Data =_> Inside length of riser = 5.00 feet Inside width of riser = 5.00 feet Wall thickness of riser = 6.00 inches Base thickness of riser = 8.00 inches Base length of riser = 6.00 feet Base width of riser = 6.00 feet Inside height of Riser = 5.10 feet Concrete unit weight = 142.0 PCF OD of barrel exiting manhole = 44.00 inches Size of drain pipe (if present) = 6.0 inches Trash Rack water displacement = 61.74 CF Concrete Present in Riser Structure =_> Total amount of concrete: Base of Riser = 24.000 CF Riser Walls = 56.100 CF Adjust for openings: TR McCormack 1/25/2007 NC' P:-rlu0s l:sis uid, wi. o manhok coiemtc 31. 142 Opening for barrel = 5.280 CF Opening for drain pipe = 0.098 CF Total Concrete present, adjusted for openings = 74.722 CF Weight of concrete present = 10611 lbs Amount of water displaced by Riser Structure => Displacement by concrete = 74,722 CF Displacement by open air in riser = 127.500 CF Displacement by trash rack = 61.740 CF Total water displaced by riser/barrel structure = 263.962 CF Weight of water displaced = 16471 Ibs Calculate amount of concrete to be added to riser =_> Safety factor to use = 1.15 (mex,mrr,mti is cm highcxn Must add = 8331 lbs concrete for buoyancy Concrete unit weight for use = 142 PCF (note above observation for NCP concrete) Buoyant weight of this concrete= 79.60 PCF Buoyant, with safety factor applied = 69.22 PCF Therefore, must add = 120.365 CF of concrete Standard based described above = 24.000 CF of concrete Therefore, base design must have = 144.365 CF of concrete to105060 cone riser flotation.As 1 OF 2 Wetland 2C THE WOODLANDS Square Riser/Barrel TOL-05060 Anti-Flotation Block Calculations Wetland 2C Calculate size of base for riser assembly = > Length = 8.000 feet Width = 8.000 feet Thickness = 32.0 inches Concrete Present = 170.667 CF OK Check validity of base as designed =_> Total Water Displaced = 410.629 CF Total Concrete Present = 221.389 CF Total Water Displaced = 25623 lbs Total Concrete Present = 31437 lbs Actual safety factor = 1.23 Results of design =_> OK TR McConnack 1/25/2007 Base length = 8.00 feet Base width = 8.00 feet Base Thickness = 32.00 inches CY of concrete total in base = 6.32 CY Concrete unit weight in added base >= 142 PCF to105060 conc riser flotation.xls 2 OF 2 Wetland 2C THE WOODLANDS - Phase 2 TOL-05060 Wetland 2C Dissipator Calculations NRCD Land Quality Section Pipe Design Entering the following values will provide you with the expected outlet velocity and depth of flow in a pipe, assuming the Mannings roughness number is constant over the entire length of the pipe. flow Q in cfs : 68.41 Flow depth (ft) = 2.53 slope Sin % : 1.00% Outlet velocity (fps) = 10.74 pipe diameter D in in.: 36 Manning number n : 0.013 NRCD Land Quality Section NYDOT Dissipator Design Results Pipe diameter (ft) 3.00 Outlet velocity (fps) 10.74 Apron length (ft) 24.00 AVG DIAM STONE THICKNESS (inches) CLASS (inches) 3 A 9 6 s 22 » 13 I3 or 1 22 23 2 27 -- Dissipator, Pipe or Quit (D P or Q) -- CALCULATION: Minimum TW Conditions: W = Do + La = 3'+ 24' = 25 ft CONCLUSION: USE NCDOT CLASS'2' RIP RAP 24%x 27'W x 22" THK TR McCormack 9/28/2006 "I'OL05060- WETLAND2 C-DI S SIPATOIt.doc Job File: X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Rain Dir: X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\ JOB TITLE -------------------------- Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Table of Contents Table of Contents i ++xxx++++x+xxxx+xx+x OUTLET STRUCTURES ++xxxxxxxx+xx+++x+xxx WETLAND 2C...... Outlet Input Data .................. 1.01 Individual Outlet Curves ........... 1.05 Composite Rating Curve ............. 1.13 SIN: 6217012070C3 The John R. McAdams Company POndPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Outlet Input Data Page 1.01 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: REQUESTED POND WS ELEVATIONS: Min. Elev.= 287.00 ft Increment = .10 ft Max. Elev.= 292.00 ft *#tt44tt*tt*##**tt*#t*+*t**t#*#*####44ttt*#ttt OUTLET CONNECTIVITY ---> Forward Flow Only (UpStream to DnStream) *--- Reverse Flow Only (DnStream to UpStream) * --- > Forward and Reverse Both Allowed Structure No. Outfall E1, ft E2, ft ----------------- ---- ------- --------- --------- Inlet Box RI ---> BA 289.600 292.000 Culvert-Circular BA ---> TW 284.500 292.000 TW SETUP, DS Channel SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Outlet Input Data Name.... WETLAND 2C Page 1.02 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = RI Structure Type = Inlet Box -- - ---- ----------------- # of openings ----------- = 1 - Invert Elev. = 289.60 £t Orifice Area = 25.0000 sq.ft Orifice Coeff. - .600 Weir Length = 20.00 ft weir Coeff. = 3.000 K, Submerged = .000 K, Reverse = 1.000 Kb,Barrel = .000000 (per ft of full flow) Barrel Length = .00 ft Mannings n - .0000 SIN; 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Outlet Input Data Name.... WETLAND 2C Page 1.03 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID - BA Structure Type = ------------------- Culvert-Circular ----------------- No. Barrels = 1 Barrel Diameter = 36.0000 ft Upstream Invert = 284.50 ft Dnstream Invert 284.00 ft Horiz. Length = 38.00 ft Barrel Length - 38.00 ft Barrel Slope .01316 ft/ft OUTLET CONTROL DATA ... Mannings n = .0130 Ke = .5000 (forward entrance loss) Kb = .000263 (per ft of full flow) Kr = .5000 (reverse entrance loss) HW Convergence = .001 +/- ft INLET CONTROL DATA... Equation form 1 Inlet Control K = 0098 Inlet Control M = 2.0000 Inlet Control c = .03980 Inlet Control Y - .6700 T1 ratio (HW/D) = 1.154 T2 ratio (HW/D) = 1.300 Slope Factor = -.500 Use unsubmerged inlet control Form 1 equ. below Ti elev. Use submerged inlet control Form 1 equ. above T2 elev. In transition zone between unsubmerged and submerged inlet control, interpolate between flows at Ti & T2... At T1 Elev = 326.03 ft ---> Flow = 21375.40 cfs At T2 Elev = 331.31 ft ---> Flow = 24429.03 cfs SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Outlet Input Data Name.... WETLAND 2C Page 1.04 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: OUTLET STRUCTURE INPUT DATA Structure ID = TW Structure Type = TW SETUP, DS Channel ------------------------------------ FREE OUTFALL CONDITIONS SPECIFIED CONVERGENCE TOLERANCES... Maximum Iterations= 30 Min. TW tolerance = .01 ft Max. TW tolerance = .01 ft Min. HW tolerance = .01 £t Max. HW tolerance = .01 ft Min. Q tolerance = .10 cfs Max. Q tolerance = .10 cfs SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.05 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\COmbined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box) --- Ups ------ tream ---- ID ------- = ( ------------------ Pond Water Surface) DNS tream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- 287.00 ------- .00 - ------- ... -- ------ ... ------- ------ ... ... ------ ... ----- Free -- ------- Outfall WS below an invert; no flow. 287.10 .00 ... ... .. ... ... Free Outfall WS below an invert; no flow. 287.20 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 287.30 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 287.40 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 287.50 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 287.60 .00 ... ... ... Free Outfall WS below an invert; no flow. 287.70 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 287.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 287.90 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 288.00 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 288.10 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 288.20 .00 ... ... ... ... ... Free Outfall WS below an invert; no-flow. 268.30 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 288.40 .00 ... ... ... Free Outfall WS below an invert; no flow. 288.50 .00 ... ... Free Outfall WS below an invert; no flow. SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.06 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID - RI (Inlet Box) ------------- Upstream ID ------------------------- = (Pond Water Surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs €t ft ft +/-ft +/-cfs ft +/-ft -------- 288.60 ------- .00 - ------- -- ... ------ ... ------- ... ------ ------ ... ---- Free --- ------- Outfall WS below an invert; no flow. 288.70 .00 ... ... Free Outfall WS below an invert; no flow. 288.80 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 288.90 .00 ... ... ... ... ... Free Outfall WS below an invert; no flow. 289.00 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 289.10 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 289.20 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 289.30 .00 ... Free Outfall WS below an invert; no flow. 289.40 .00 ... ... ... ... Free Outfall WS below an invert; no flow. 289.50 .00 ... ... ... Free Outfall WS below an invert; no flow. 289.60 .00 ... ... ... Free Outfall WS below an invert; no flow. 289.70 1.90 289.70 Free 284.84 .000 .000 Free Outfall Weir: H =.10 289.80 5.37 289.80 Free 285.07 .000 .000 Free Outfall Weir: H =.20 289.90 9.86 289.90 Free 285.28 .000 .000 Free Outfall Weir: H =.30 290.00 15.18 290.00 Free 285.46 .000 .000 Free Outfall Weir: H =.40 290.10 21.21 290.10 Free 285.64 .000 .000 Free Outfall Weir: H =.50 SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.07 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\COmbined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (Inlet Box ) ------------------- Upstream ID ----------- (Pond Water -------- Surface) DNstream ID = BA (Culvert-C ircular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- 290.20 ------- 27.89 - ------- -------- 290.20 Free ------- 285.81 ------ .000 ------ .000 ---- Free --- ------- Outfall Weir: H =.60 290.30 35.14 290.30 Free 285.97 .000 .000 Free Outfall Weir: H =.70 290.40 42.93 290.40 Free 286.12 .000 .000 Free Outfall Weir: H =.80 290.50 51.23 290.50 Free 286.27 .000 .000 Free Outfall Weir: H =.90 290.60 60.00 290.60 Free 286.42 .000 .000 Free Outfall Weir: H =1.00 290.70 69.22 290.70 Free 286.56 .000 .000 Free Outfall Weir: H =1.10 290.80 78.87 290.80 Free 286.70 .000 .000 Free Outfall Weir: H =1.20 290.90 88.93 290.90 Free 286.84 .000 .000 Free Outfall Weir: H =1.30 291.00 99.39 291.00 Free 286.98 .000 .000 Free Outfall Weir: H -1.40 291.10 110.23 291.10 Free 287.11 .000 .000 Free Outfall Weir: H =1.50 291.20 121.43 291.20 Free 287.24 .000 .000 Free Outfall Weir: H =1.60 291.30 132.99 291.30 Free 287.37 .000 .000 Free outfall Weir: H =1.70 291.40 144.90 291.40 Free 287.49 .000 .000 Free Outfall Weir: H =1.80 291.50 157.14 291.50 Free 287.62 .000 .000 Free Outfall Weir: H =1.90 291.60 169.71 291.60 Free 287.74 .000 .000 Free Outfall Weir: H =2.00 291.70 174.37 291.70 Free 287.79 .000 .000 Free Outfall Orifice: H =2.10 SIX: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.08 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = RI (inlet Box) -------------------------------------- Upstream ID = (Pond water surface) DNstream ID = BA (Culvert-Circular) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 291.80 178.47 291.80 Free 287.83 .000 .000 Free Outfall Orifice: H =2.20 291.90 182.48 291.90 Free 287.86 .000 .000 Free Outfall Orifice: H =2.30 292.00 186.41 292.00 Free 287.90 .000 .000 Free Outfall Orifice: H =2.40 S/N: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.09 Name.... WETLAND 2C File.... R:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 62114.81 cfs UPstream ID = RI (Inlet Box) DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs ------- ft - --- ft ft +/-ft +/-cfs ft +/-ft 287.00 .00 ---- 284.50 -------- Free ------- Free ------ --- .000 --- .000 ----- Free -- ------- Outfall 287.10 .00 284.50 Free Free .000 .000 Free Outfall 287.20 .00 284.50 Free Free .000 .000 Free Outfall 287.30 .00 284.50 Free Free .000 .000 Free Outfall 287.40 .00 284.50 Free Free .000 .000 Free Outfall 287.50 .00 284.50 Free Free .000 .000 Free Outfall 287.60 .00 284.50 Free Free .000 .000 Free Outfall 287.70 .00 284.50 Free Free .000 .000 Free Outfall 287.80 .00 284.50 Free Free .000 .000 Free Outfall 287.90 .00 284.50 Free Free .000 .000 Free Outfall 288.00 .00 284.50 Free Free .000 .000 Free Outfall 288.10 .00 284.50 Free Free .000 .000 Free Outfall 288.20 .00 284.50 Free Free .000 .000 Free Outfall 288.30 .00 284.50 Free Free .000 .000 Free Outfall 288.40 .00 284.50 Free Free .000 .000 Free Outfall 288.50 .00 284.50 Free Free .000 .000 Free Outfall SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.10 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) ------------------- Mannings open chann ------------------- el maximum capacity: 62114.81 cfs Upstream I D = RI (Inlet Box) DNstream I D = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft -------- cfs ------- ft - - ft ft +/-ft + /-cfs ft +/-ft 288.60 .00 ------ 284.50 -------- Free ------- -- Free ---- - .000 ----- .000 ------- ------- Free Outfall 288.70 .00 284.50 Free Free .000 .000 Free Outfall 288.80 .00 284.50 Free Free .000 .000 Free Outfali 288.90 .00 284.50 Free Free .000 .000 Free Outfall 289.00 .00 284.50 Free Free .000 .000 Free Outfall 289.10 .00 284.50 Free Free .000 .000 Free Outfall 289.20 .00 284.50 Free Free .000 .000 Free Outfall 289.30 .00 284.50 Free Free .000 .000 Free Outfall 289.40 .00 284.50 Free Free ,000 .000 Free Outfall 289.50 .00 284.50 Free Free .000 .000 Free Outfall 289.60 .00 284.50 Free Free .000 .000 Free Outfall 289.70 1.90 284.84 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .076ft Dcr= .226ft CRIT.DEPTH 289.80 5.37 285.07 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .127ft Dcr= .381ft CRIT.DEPTH 289.90 9.86 285.28 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .173ft Dcr= .517ft CRIT.DEPTH 290.00 15.18 285.46 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .214ft Dcr= .641ft CRIT.DEPTH 290.10 21.21 285.64 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .254ft Dcr= .758ft CRIT.DEPTH SIN: 6217012070C3 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet curves Name.... WETLAND 2C Page 1.11 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) Mannings open channel maximum capacity: 62114.81 cfs UPstream ID = RI (Inlet Box) DNStream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft ft +/-£t +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 290.20 27.89 285.81 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .291ft Dcr= .870ft CRIT.DEPTH 290.30 35.14 285.97 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .327ft Dcr= .976ft CRIT.DEPTH 290.40 42.93 286.12 Free Free .000 .000 Free outfall CRIT.DEPTH CONTROL Vh= .362ft Dcr= 1.080ft CRIT.DEPTH 290.50 51.23 286.27 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .396ft Dcr= 1.180ft CRIT.DEPTH 290.60 60.00 286.42 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .429ft Dcr= 1.277ft CRIT.DEPTH 290.70 69.22 286.56 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .461ft Dcr= 1.372ft CRIT.DEPTH 290.80 78.87 286.70 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .492ft Dcr= 1.465ft CRIT.DEPTH 290.90 88.93 286.84 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .523ft Dcr= 1.556ft CRIT.DEPTH 291.00 99.39 286.98 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh- .554ft Dcr= 1.645ft CRIT.DEPTH 291.10 110.23 287.11 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .584ft Dcr= 1.733ft CRIT.DEPTH 291.20 121.43 287.24 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .613ft Dcr= 1.820ft CRIT.DEPTH 291.30 132.99 287.37 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .642ft Dcr= 1.905ft CRIT.DEPTH 291.40 144.90 287.49 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .671ft Dcr= 1.989ft CRIT.DEPTH 291.50 157.14 287.62 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .699ft Dcr= 2.071ft CRIT.DEPTH 291.60 169.71 287.74 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .727ft Dcr= 2.153ft CRIT.DEPTH 291.70 174.37 287.79 Free Free .000 .000 Free outfall CRIT.DEPTH CONTROL Vh= .737ft Dcr= 2.163ft CRIT.DEPTH SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Individual Outlet Curves Page 1.12 Name.... WETLAND 2C File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: RATING TABLE FOR ONE OUTLET TYPE Structure ID = BA (Culvert-Circular) -------------------------------------- Mannings open channel maximum capacity: 62114.81 cfs Upstream ID = RI (Inlet Box) DNstream ID = TW (Pond Outfall) Pond WS. Device (into) Converge Next DS HGL Q SUM DS Chan. TW Elev. Q HW HGL DS HGL DS HGL Error Error TW Error ft cfs ft ft £t +/-ft +/-cfs ft +/-ft -------- -------- ------- -------- ------- ------ ------ ------- ------- 291.80 178.47 287.83 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .746ft Dcr= 2.208ft CRIT.DEPTH 291.90 182.48 287.86 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .754ft Dcr= 2.233ft CRIT.DEPTH 292.00 186.41 287.90 Free Free .000 .000 Free Outfall CRIT.DEPTH CONTROL Vh= .762ft Dcr= 2.257ft CRIT.DEPTH SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Composite Rating Curve Name.... WETLAND 2C Page 1.13 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engine er: James Caldwell Project Tit le: TOL05060 Project Commen ts: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Notes -------- -------- ----- --- Converge ------- ----- ------------- Elev. Q TW E lev Error ft -------- cfs ------- f ----- t +/-ft Contrib uting Structures 287.00 .00 Free --- ----- outfall -------- (no Q: ------------------ RIBA) 287.10 .00 Free Outfall (no Q: RIBA) 287.20 .00 Free Outfall (no Q: RIBA) 287.30 .00 Free Outfall (no Q: RIBA) 287.40 .00 Free Outfall (no Q: RIBA) 287.50 .00 Free Outfall (no Q: RIBA) 287.60 .00 Free Outfall (no Q: RIBA) 287.70 .00 Free Outfall (no Q: RIBA) 287.80 .00 Free Out€all (no 0: RIBA) 287.90 100 Free Outfall (no Q: RIBA) 288.00 .00 Free Outfall (no Q: RIBA) 288.10 .00 Free Outfall (no Q: RIBA) 288.20 .00 Free Outfall (no Q: RI,BA) 288.30 .00 Free Outfall (no Q: RIBA) 288.40 .00 Free Outfall (no Q: RI,BA) 288.50 .00 Free Outfall (no Q: RIBA) 288.60 .00 Free Outfall (no Q: RIBA) 288.70 .00 Free outfall (no Q: RIBA) 288.80 .00 Free Outfall (no 0: RIBA) 288.90 .00 Free Outfall (no Q: RIBA) 289.00 .00 Free Outfall (no Q: RIBA) 289.10 .00 Free Outfall (no Q: RIBA) 289.20 .00 Free outfall (no Q: RI BA) 289.30 .00 Free outfall (no Q: RIBA) 289.40 .00 Free Outfall (no Q: RIBA) 289.50 .00 Free Outfall (no Q: RIBA) 289.60 .00 Free Outfall (no Q: RI,BA) 289.70 1.90 Free Outfall RIBA 289.80 5.37 Free Outfall RI, BA 289.90 9.86 Free Outfall RIBA 290.00 15.18 Free Outfall RIBA 290.10 21.21 Free Outfall RIBA 290.20 27.89 Free Outfall RI,BA 290.30 35.14 Free Outfall RI,BA SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 Type.... Composite Rating Curve Name.... WETLAND 2C Page 1.14 File.... X:\Projects\TOL\TOL-05060\Storm\Combined Phases\Design Files\WETLAND 2C.PPW Title... Project Date: 6/6/2006 Project Engineer: James Caldwell Project Title: TOL05060 Project Comments: ***** COMPOSITE OUTFLOW SUMMARY **** WS Elev, Total Q Elev. Q ft ---- cfs - --- 290.40 ------- 42.93 290.50 51.23 290.60 60.00 290.70 69.22 290.80 78.87 290.90 88.93 291.00 99.39 291.10 110.23 291.20 121.43 291.30 132.99 291.40 144.90 291.50 157.14 291.60 169.71 291.70 174.37 291.80 178.47 291.90 182.48 292.00 186.41 -------- Converge TW Elev Error ft +/-ft Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Free Outfall Notes ------------------------- Contributing Structures RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA RI, BA SIN: 621701207003 The John R. McAdams Company PondPack Ver. 8.0058 Time: 3:17 PM Date: 1/18/2007 THE WOODLANDS Proiect Information JW Caldwell, PE TOL-05060 Total Project 1/2512007 Total Project Total Area = Total Roadway Impervious Area = Total Number of Lots = Total Lot Impervious Area = Total Impervious Area = Total Impervious = 67.81 ac 4.91 ac 88 11.35 ac 16.26 ac 23.98 % Wetland 2A Total On-Site Drainage Area = 15.62 ac total on-Site Roadway/ Greenway Impervious = 1.82 ac Total Number of Lots = 23 Impervious Area per Lot = 5650 sf Total Lot Impervious Area = 2.98 ac Total On-Site Impervious Area = 4.80 ac Wetland 2B Total On-Site Drainage Area = Total On-Site Roadway/ Greenway Impervious = Total Number of Lots = Impervious Area per Lot = ........... Total Lot Impervious Area = Total On-Site Impervious Area = Sub-Basin 2 Bypass 10.69 ac 0.75 ac 18 5420 sf 2.24 ac 2.99 ac Total On-Site Drainage Area = 17.79 ac total on-Site Roadway/ Greenway Impervious = 0.93 ac Total Number of Lots = 17 Impervious Area per Lot = 5690 sf Total Lot Impervious Area = 2.22 ac Total On-Site Impervious Area _ 3.1 . . 5 ac Sub-Basin 1 Total On-Site Drainage Area = Total On-Site Roadway/ Greenway Impervious = Total Number of Lots Impervious Area per Lot = Total Lot Impervious Area = Total On-Site Impervious Area = Wetland 2C 5.45 ac 0.19 ac 6- 5690 sf 0.78 ac 0.97 ac Total On -Site Drainage Area = 11.91 ac Total On-Site Roadway/ Greenway Impervious = 1.20 ac Total Number of Lots = 19 Impervious Area per Lot = 5690 sf Total Lot Impervious Area = 2.48 ac Total On-Site Impervious Area = 3.68 ac Sub-Basin 3 Total On-Site Drainage Area = Total On-Site Roadway/ Greenway Impervious = Total Number of Lots= Impervious Area per Lot = Total Lot Impervious Area = Total On-Site Impervious Area = TOTAL NITROGEN EXPORT CALCULATIONS. As 6.32 ac 0.02 ac 5 5690 sf ............. 0.65 ac 0.67 ac INFORMATION w^ p O O = N N ? m U N CA 0 y O N v P?l o ti ? ? o V o i ? o o? o o - V ? U i ?C ti C N V p a \- V . st 0 •a 7 h C [r ? U Q ?- U U O U U aCi .? O `pti o o Q, o i g o) rz t4 ?\j o ? p? N V C w co t3 0 0 0 ?o F z aaaaa w'i 0 W [W?EWHFEW-- ? CA .o ?I II ? N W m L1. F? o J O H m X z O Q J U J U 0 a x w z w 0 z J O H wCD ?o 0 N _ r (B U ? ? 0 o> ? o C y C ? c > c?i o U ti o ? o ? 0 0 -o s N w O O f- C CL bo Q '?` r. O O ? TS a lbi Y .y h ? O ? ti .p N ?O 3 C '' ? N Z S L o .? o t?O ? ?O pOj Q. py,tj O o f46) O O ? -o v. Q N N Q Q d p Qs v O N °o xw M e1 a4,aa,a, w 0 W Ol F F E* Eo E? V1rnV?(A V) 0 `T, C .yQ N ?10 00 d Ey d o ? n L e? ?O N N ? ? H N b p N o C i Q o ? N 31 ? ? ` ? bpl V O v V5 d h S G , O o R y 4 0 g o? w ti ° ? £ L U `N ? O ? M YUi ? O a ? W H w w u.. LL. D m b D z Q O z Q F - w O F- o X z O Q U U I- w O CL x w z w 0 O Q' z H 0 w O O N N U ? .? r N U ? 0 ? o C d i o ? o o V ? o `o, o WC) w v ,? y ?z co o o p L k, o O `, p C j a "Q C .r+ ? v o ? q ti o h N " o o?? ? V V ." a .•Q 4 i r '? C ? m U o ° V c .o w Q N ? N 4E°??°Q c a 0 0 A s NM?r? ?o H? W W W W W wJ ? ? W? ?` 01 FFFFH vs v? rn vi v? 0 ( H j 1 h 0 W 1 w v ? a, ? z H y v it V ? ? j •--? ? _ I v{ to t-5 q T 0 .0 00 7 u n U ? Q o rs, O w } J z O x w lL w m 0 O H N X z O U J U w O tL x w z w O z 0 w ti E O O = N 3 v? co ? 0 o o .' ?c ? U o ? ? o d U o o o w Z o z At v ° O ? c ??U o 2 +. 41 O ' r U „°p .? + .a ? p ?' ,? v tl V -T,3; -t3 ° 4 O' Z! o? i 'sv U o ? U y O t3 13 t3 h i U) k4 Q N h N ? ? ? .,' ? q?? ? A r. Q c c ' O o x N M ! iti ?" ?o H r aa.waa, w-i ?0 W CA FhEW- (W-?F . &6 C6 V C. ) U? y ~ C) ti CN C) z w °u L .-, ice.. C? ?p N N i `+ ? ? p ri N i z H I L ? 0 w ? b0 Ica ?? ?? y? m H w w o w ? v °o H 1?1 C 00 M U 0 N a O ?. o w } J Z O x w LL U - :D m 0 O O F- N X z 0 Q U U of 0 0- x w Z w 0 0 w t z 0 Wr- CL o 0 C'j f6 U ? O Q O co? (.1) I m V ? o O -o LLI C LL :? 4 M O p o U i `6 a c) ry U 4?i U Z f? O a? y? R ) Y \ ch d Q: Z? d U ? ? V i tj m a W .C r?s' ti ti Q o A ., .. ?1??Q tj o o C) ?p .-+ N M O x LO H? 0 W W W W W i o? C> ol N l 00 .a v O r- 0 0 ? z ? H o yy v ? ?-. ? C? ?p N N t z e ; 1. O N I ? ~ 06 M 31 ?. o? o, cs o ? t U ? ? ? ? "a o s 3 ' ? w O w ? O Q ? 5 O "? if! v O 1 O I(I t) 4> a 0 0? ao, ??? U en 'g M ? tz M Fem. ? Q O 0 ?• o w H W W U m n o_ A z Q A z Q N w O F- (1) X (n z O Q Z) U U O 4. X W z w 0 O Of H Z J 0 THE WOODLANDS Project Information JW Caldwell, PE TOL-05060 Total Project 1/2512007 SUMMARY .OF TOTAL NITROGEN EXPORT Total TN Export - (Before Treatment) = 6.00 Ibs/ac/yr Total Area = 67.81 acres Total TN Export = 406.57 Ibs/yr Total TN Export To WU50' Buffer = 7.12 Ibs/ac/yr Total Area - To WU50' Buffer = 26.31 acres Total TN Export - To Wetland/50' Buffer = 187.43 Ibs/yr WU50'Buffer Nitrogen Removal Efficiency = 58% TN Export from WU50' Buffer Outflow = 78.72 Ibs/yr Total Nitrogen Removed by WU50' Suffer = 108.71 Ibs/yr Total TN Export To 50' Buffer = 4.74 Ibs/ac/yr Total Area - To 50' Buffer = 17.79 acres Total TN Export - To 50' Buffer = 84.36 Ibs/yr 50' Buffer Nitrogen Removal Efficiency = 30% TN Export from 50' Buffer Outflow = 59.05 lbs/yr Total Nitrogen Removed by 50' Buffer = 25.31 Ibs/yr Total TN Export To 100' Buffer = 4.00 Ibs/ac/yr Total Area - To 100' Buffer = 11.77 acres Total TN Export - To 100' Buffer = 47.06 Ibs/yr 100' Buffer Nitrogen Removal Efficiency = 44% TN Export from 100' Buffer Outflow = 26.35 Ibs/yr Total Nitrogen Removed by 100' Buffer = 20.71 Ibs/yr Total TN Export To WU100' Buffer = 7.38 Ibs/ac/yr Total Area - To WU100' Buffer = 11.91 acres Total TN Export - To Wetland/100' Buffer = 87.93 Ibs/yr WU100' Buffer Nitrogen Removal Efficiency = 66.4% TN Export from WU100' Buffer Outflow = 29.54 Ibs/yr Total Nitrogen Removed by WU100' Buffer = 58.39 Ibs/yr Total TN Export -After Treatment = 193.46 Ibs/yr TOTAL NITROGEN EXPORT CALCULATIONS.As SUMMARY