HomeMy WebLinkAboutNC0004774_Other Agency Documents_20181119 tDUKEDuke Energy
ENERGY® Buck Combined Cycle
1385 Dukeville Road
Salisbury,NC 28146
November 19, 2018
NC Department of Environmental Quality
Division of Water Resources—WQ Permitting Section NPDES
Attn: Julie Grzyb ��CE6
1617 Mail Service Center ®/[� �R/DWR
Raleigh,NC 27699-1617
NO er V 2018
Subject: Commissioning of Outfall O1A Wat
NPDES Permit Number NC0004774 Resources
Permitting Section
Duke Energy Carolinas,LLC—Buck Combined Cycle
Rowan County
Dear Ms. Grzyb,
Duke Energy respectfully submits notification of commissioning of wastewater outfall O1A - CTCC
Operations not later than seven days prior, as required by Part I., Section A.(2.) g. of the NPDES
Wastewater Permit NC0004774.
With the diversion of CTCC Plant flows to Outfall O1A, Duke Energy requests this outfall be made active
in the eDMR system as of December 1, 2018. Should you have any questions regarding this submittal or
require additional information, please contact Elizabeth Glenn at (980) 373-0530 or email
Elizabeth.Glenn@duke-energy.com.
"I certify, under penalty of law, that this document and all attachments were prepared under my
direction or supervision in accordance with a system design to assure that qualified personnel properly
gather and evaluate the information submitted. Based on my inquiry of the person or persons who
manage the system, or those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware there are
significant penalties for submitting false information, including the possibility of fines and imprisonment
for knowing violations."
Sincerely,
Henry A. Botkins,Jr.
General Manager
Buck Combined Cycle