Loading...
HomeMy WebLinkAboutNC0004774_Other Agency Documents_20181119 tDUKEDuke Energy ENERGY® Buck Combined Cycle 1385 Dukeville Road Salisbury,NC 28146 November 19, 2018 NC Department of Environmental Quality Division of Water Resources—WQ Permitting Section NPDES Attn: Julie Grzyb ��CE6 1617 Mail Service Center ®/[� �R/DWR Raleigh,NC 27699-1617 NO er V 2018 Subject: Commissioning of Outfall O1A Wat NPDES Permit Number NC0004774 Resources Permitting Section Duke Energy Carolinas,LLC—Buck Combined Cycle Rowan County Dear Ms. Grzyb, Duke Energy respectfully submits notification of commissioning of wastewater outfall O1A - CTCC Operations not later than seven days prior, as required by Part I., Section A.(2.) g. of the NPDES Wastewater Permit NC0004774. With the diversion of CTCC Plant flows to Outfall O1A, Duke Energy requests this outfall be made active in the eDMR system as of December 1, 2018. Should you have any questions regarding this submittal or require additional information, please contact Elizabeth Glenn at (980) 373-0530 or email Elizabeth.Glenn@duke-energy.com. "I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system design to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief true, accurate, and complete. I am aware there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations." Sincerely, Henry A. Botkins,Jr. General Manager Buck Combined Cycle