Loading...
HomeMy WebLinkAboutWQ0019256_Other Agency Documents_20180622 � ENGINEERS <4,,Ar Mi/1@.CK/l�llVl l�&CREED RECEIVEDINCDEOJNIR 2 q q SURVEYORS JUN8 2018 PLANNERS Non-Discharge Permitting Unit June 22,2018 M&C 0784-0069(13) N.0 Department of Environment&Natural Resources Division of Water Quality-Water Quality Section Non-Discharge Permitting Unit 1617 Mail Service Center Raleigh,NC 27699-1617 Re: Bald Head Island Pressure Sewer Extension Engineer's Partial Certification Permit No.WQ0019256 To Whom It May Concern: Testing and completion for a BHI Pressure Sewer extension along Clapper Rail Court is complete for the above referenced project located in Brunswick County on Bald Head Island.The following components have constructed: • An extension of 260 LF of 2"PVC Forcemain(SDR 21)was installed along Clapper Rail Court located on Bald Head Island. The 2" PVC(SDR 21) Forcemain was pressure tested for 2 hour period and held pressure for entire length of testing parameters. McKim&Creed has determined that this sewer force main installation located in Brunswick County,Bald Head Island is complete based upon the results of periodic site observations and pressure testing. Please find enclosed the Engineer's Certification (Partial)for this project. If you have any questions or comments,please do not hesitate to contact my office at (910)343-1048. Sincerely, McKIM&CRE ,INC. 243 North Front Street 'T2 Tony Boahn,PE Vice-President Wilmington,NC 28401 910 343 1048 cc: Ken Bowling,Village of Bald Head Island,Utilities Director , , , David Mintz,Village of Bald Head Island , Fax 910 251 8282 www.mckimcreed com S:\0784\0069\60-ConAdm\68-Certificates(Subst\Final completion,Eng Cert\06192018 Clapper Rail Sewer EngCertDWQ.doc Village of Bald Head Island Stage One Pressure Sewer Extension Permit No.WQ0019256 I, Anthony W.Boahn, as a duly registered Professional Engineer in the State of North Carolina, having been authorized to observe (periodically) the construction of the pressure sewer collection system serving the Village of Bald Head Island,located in Brunswick County,herby state to the best of my abilities, due care and diligence was used in the observation of the following construction: • An extension of 260 LF of 2"PVC Forcemain(SDR 21)was installed along Clapper Rail Court located on Bald Head Island. I certify that the construction of the above referenced project was observed to be built within substantial compliance and the intent of the approved plans and specifications. Signature Registration No. 025512 Date 2 -` G 0011144041� OtSSiCie SEAL 025512 ♦. 3 `Y tltite 4 'Ny w-��,,,, MCKIM&CREED