HomeMy WebLinkAboutWQ0019256_Other Agency Documents_20180622 � ENGINEERS
<4,,Ar Mi/1@.CK/l�llVl l�&CREED
RECEIVEDINCDEOJNIR
2 q q SURVEYORS
JUN8 2018 PLANNERS
Non-Discharge
Permitting Unit
June 22,2018 M&C 0784-0069(13)
N.0 Department of Environment&Natural Resources
Division of Water Quality-Water Quality Section
Non-Discharge Permitting Unit
1617 Mail Service Center
Raleigh,NC 27699-1617
Re: Bald Head Island Pressure Sewer Extension
Engineer's Partial Certification
Permit No.WQ0019256
To Whom It May Concern:
Testing and completion for a BHI Pressure Sewer extension along Clapper Rail Court is
complete for the above referenced project located in Brunswick County on Bald Head
Island.The following components have constructed:
• An extension of 260 LF of 2"PVC Forcemain(SDR 21)was installed along
Clapper Rail Court located on Bald Head Island. The 2" PVC(SDR 21)
Forcemain was pressure tested for 2 hour period and held pressure for entire
length of testing parameters.
McKim&Creed has determined that this sewer force main installation located in
Brunswick County,Bald Head Island is complete based upon the results of periodic site
observations and pressure testing. Please find enclosed the Engineer's Certification
(Partial)for this project.
If you have any questions or comments,please do not hesitate to contact my office at
(910)343-1048.
Sincerely,
McKIM&CRE ,INC.
243 North Front Street 'T2
Tony Boahn,PE
Vice-President
Wilmington,NC 28401
910 343 1048 cc: Ken Bowling,Village of Bald Head Island,Utilities Director , , ,
David Mintz,Village of Bald Head Island ,
Fax 910 251 8282
www.mckimcreed com
S:\0784\0069\60-ConAdm\68-Certificates(Subst\Final completion,Eng Cert\06192018 Clapper Rail Sewer
EngCertDWQ.doc
Village of Bald Head Island
Stage One Pressure Sewer Extension
Permit No.WQ0019256
I, Anthony W.Boahn, as a duly registered Professional Engineer in the State of North Carolina,
having been authorized to observe (periodically) the construction of the pressure sewer collection
system serving the Village of Bald Head Island,located in Brunswick County,herby state to the best
of my abilities, due care and diligence was used in the observation of the following construction:
• An extension of 260 LF of 2"PVC Forcemain(SDR 21)was installed along Clapper Rail Court
located on Bald Head Island.
I certify that the construction of the above referenced project was observed to be built within
substantial compliance and the intent of the approved plans and specifications.
Signature Registration No. 025512
Date 2 -` G
0011144041�
OtSSiCie
SEAL
025512
♦. 3 `Y
tltite
4 'Ny w-��,,,,
MCKIM&CREED