Loading...
HomeMy WebLinkAbout20170730 Ver 1_U-2579C additional temporary impacts_20181009Carpenter,Kristi From: Sent: To: Cc: Subject: Follow Up Flag: Flag Status: Wanucha, Dave Tuesday, October 09, 2018 10:48 AM Euliss, Amy; nicholle.m.braspenn@usace.army.mil Panek, Lindsey F; Carpenter,Kristi RE: U-2579C additiona) temporary impacts Follow up Flagged Amy, This email will suffice. The impacts are temporary and minimal, no mitigation is required and you provided notification when the issue was encountered. We authorize this activity and certify that it will not result in a violation of applicable Water Quality Standards. However, DOT must conduct the additional temporary work as described in your email dated October 4, 2018; and, in compliance with the existing conditions of WQC004123 issued to DOT dated July 26, 2017. If you need any further assistance or have any questions, please let me know. Dave W Dave Wanucha Division of Water Resources Transportation Permitting Unit NC Department of Environmental Quality 336-776-9703 office 336-403-5655 mobile Dave.Wanucha@ncdenr.gov NC DEQ Winston Salem Regional Office 450 West Hanes Mill Road, Suite 300 Winston Salem, NC 27105 a������ �������,��s���������� �� ����� ������ ��`��,� ��������,�,� �,� ,��.������ �� ��`�� �'J����`� �°��������� ��.����� �������:�,� ��W�r ����� ���.� �� ���,����,���� �� �������� �:s�����,�. From: Euliss, Amy Sent: Thursday, October 04, 2018 12:44 PM To: nicholle.m.braspenn@usace.army.mil; Wanucha, Dave <dave.wanucha@ncdenr.gov> Cc: Panek, Lindsey F<Ifpanek@ncdot.gov>; Carpenter,Kristi <kristilynn.carpenter@ncdenr.gov> Subject: U-2579C additional temporary impacts We had an oversight between our utility plans and our permit plans on the U-2579C project. We have to open cut a small jurisdictional channel for a 16" water line. Its shown on the attached plan sheet in green near permit site 6. We will need to place temporary fill up and downstream of the crossing to install a pump around while the line is being laid. This will result in 25' of temporary stream impact. The material from the channel will be stockpiled and placed back in the channel. The banks will be laid at 2:1 or flatter, lined with coir fiber matting, and revegetated with native riparian seed mix. Will this email suffice for the additional impacts? If not I can submit a cover letter along with the attached plan sheet. Nicholle, This project was permitted with 2 separate IPs. One IP is for only U-2579C and the other is part of the phased IP. The permit that this one refers to can be found at the link below. James Lastinger did the permit for this project. Bryan has visited it in the field for compliance and he was present (along with Monte) at the preconstruction meeting. htt s: xfer.services.ncdcrt. crv dea I�errrr�llssued V�-257�C%2�11�crrs th%2�1Au ust%2�1�7%2�12�1�7. df .............�?........�/...........................................................................................�............/.�?..................�......................................................�.............................................................................._Y...........................................�............................................................................................�?.......... Amy Euliss Division 9 Environmental Officer North Carolina Department of Transportation 336 747 7802 office aeuliss .ncdot.qov 375 Silas Creek Parkway Winston Salem, NC 27127-7167 I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U•ii� �e,i�dcr i� �ul�j��;� �u �C�h•ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h•ih�rl I�artie,�,