HomeMy WebLinkAbout20141134 Ver 2_SR 1339 Application_20181121S�rr�-r� c�r I���Tr i �C.r�QL��r�r
17[;I'ART4IENT OP r�'12A'�ISPC�RTAT1()N
PA"[� MeCI�.C}R,`t` P. a. Box 25201, Radeigh, 1`�1C 27b l 1-52(l2
GC)4'1:F�VDR P� �4)N1-:: 9l'9-733-252{}
�Jctober 28, 2{714
I"+�r. 1'�ndy Willr�rn�
L1. S. 11nny Carps af En�incers
R�.lei��1 �egb�latQr•y Fielci Of�ice
�331 Heritage "I'rade Dri�ve, Suite lf}5
W'ake F��•e.st, NC 275�7
Sb�bjec�: I���tinn�.�°idc Pennit ##14
SR 133� (Rc�ar-ii�g E3rancl� I�oad)
Ashe C'ount}�, Ne�rth C:�irc��i��a
Project Numl�er. 11 C.(1051.4$ QI)'��2 �'ermi� �cc: �57fJ)
I)ear ��-. Williams:
TC)NY �TA"TA
S��CY�CT�t�Y
The N� �3epartmcnt c�f "� rans�ai-tabic�a� �s sc.hecfuled to grade, drain, b�se and p�vc �R 1339,
�oarin� Branc�z Rc�ad in As��e Cotiinty. Tatal prc�ject len��h is 0.76 rt�iles. The narrat�;� l i faon
wic�� �ra�e� way will he w�denec� tc� ]��ect anci th�.n pavec�. �m}�ervi�us sur�aee area wil� idicrc�s�
��� ab�ut �J.46 acres. This is very �-oc;ky �errain with spriil�ws enianating frotx� the c�l�l cut ir�
sl�imerc�us lc,cat�ans. T�le str�ean� cr�ssin�; �it statiQn 1+22 is really ttie c�i�ly €�r1� that loolr:s like a
crac�itrc�n�l streals�. Thc rcmainin� tivet �i�es ca�-r�r spr�n�s that Gtiter tl�� ditc�� line. "l'hi� prc�ject
w�ill rec�uip•e �l�e rs:��l�cement 4f seti�er► wet pipes as s�lr�wn helc���r:
Streatn impacts;
Sixti�n
Nur��ber
b �-�2
] 3�-0[}
1 C+(}S
27+39
28+Q7
29+SQ (L
33+35
Existin�
k'�nc :Site
18''x 4a'
� 4"x 3 0'
N�r�1e
1 �"x 40'
1$"x 40'
12"x � 5'
1'�"x 50'
�'roposecl'
Pipe Siz�
�4„x 65'
24"x 4Cl'
40'x 18"
18"x 5f�'
1 �":�c 6(1'
18"x 44'
18"x b5'
Per�n�rient �'il0'IRi��ra��� Im�acts � 1'�5 feet
Tera3�arar�• Dervate���Qi� Intpacts = 40 fcet
Ripra,,�
�n�n�cts (ft.
T �D
IU
l0
10
1(]
1 fl
1Q
fi�emporaly
I)ewa�eri��� fft.
Tntal ��raiect dmnacts =
1'. iC'l. C3ox 250. N. W'1�K�5�c�RD.'�fC 28Ci59
PFiUNF q33Gj GCi7-�I I 1 l�Ah {33G} iiCi7-��49
�'otal Ir�pac�s
�t this S�xtic�n
75
2p
5�
2[l
30
15
25
2�5 feet
Mr. Andy Williams
SR ] 339, Roaring Branch Road, Ashe
Page 2
Dctaber 28, 2014
The repiacernent wet pipe at station 1+22 will require temporaty dewatering. An imper�ious
sandbag dike will be constructed upstream of the existing pipe to create a srnall pool. Cleaxx
water will temporarily be puznped around the construction area and will be discharged
dowzlstream. Any dirty water located inside of the construction area will be pumped into a silt
bag if necessary. Qnce the new pipe is in piace, the iznper�ious dike will be removed and
preconstruction streambed ele�ations will be restored. Due ta the low flow nature at the
remaining wet pipe locations, the remaining construction areas will be dried by dropping sand
bags in the ditch line. �f flow starts to o�ertop the bags we can turn on the pump briefly.
The stream crassings all carry different UTs to Roa�-ing Branch (Class: C; �RV�. This project
was reviewed for the pres�nce of threatened and endan.gered species on February 2G, 2014. This
project will ha�e no effect on any federa�ly listed endangered plant vr animal species. Historic
compiiance work has heen completed and no surveys were required.
The project impacts are nat significant in nature and should not remo�e ar degrade existing water
quality uses. Stormwater will be routed thraugh grass or rock Iined ditches, depending on the
ditch line slope. Pipe sizes used will k�e the minimum necessary to create a safe roadway. Wet
pipes exceeding 6% grade will not be buried. By utilizing the erosivn control measures outlined
in the attachments to this application, downstream water quality standards will be protected.
��erall water quality in the area will be innpro�ed by pa�ing the ASC tra�eI lanes. AIl
apprapriate BMPs will be used during constructzon.
Attached is a Preconstruction N�tificatian Form, plan s�aeets with proposed erosion cont�rol
measures, a marked county map and a marked topography map.
By cvpy af tlus electronic letter, it is requested that Mrs. Marla Chambers with the North
Carolina Wildlife Resources Commission comment directly to you concerning the 4Q4
Nationwide Permit application with a cvpy sent to me.
By copy of this electronic letter, it is requested that the Division of Water Resources,
4�11Wetlands Unit, zssue the appropriate permit for construction of this project. It is requested
that any comments related ta the 4Q 1 certification be electronically farwarded directly to me with
a capy sent to the US Arrny Corps of Engineers.
We wauld like ta begin construction as soon as possible. If further infarmatian is required,
please let me know. Your early review ax►d consideration will be appreciated.
Sincerely,
Heath Slaughter
Divisian Environmental O�icer
Mr. Andy Williams
5R 1339, Roaring Bran�h Road, Ashe
Page 3
October 28, 2014
Enclosures
cc: Mar1a Chambers, NC WRC
Amy Chapman, Di�ision of Water Resources
Da�e Wanucha, Di�ision vf Water Resources
Mike Pettyjohn, PE, Divisi�n Engineer
Doug Tet�Iaff, Distri�t Engineer
Randall Miles, County Maintenance Engineex
Heath Slaughter, Division En�ironmental4fficer
Zack Souther, Roadside En�iurvnmental Field �perations Technician
o�QF wAr�A°�
� r
7 y
P �c
Offioe Use Only:
Cvrps action ID no.
OWQ project no.
Form Version 1.3 aec 1 D 2008
Pre-Construction Nv�ification PC Farm
A. A licant Infarmativn
1. Processing
1 a. Type{s} pf approval sought from the
Carps: � Section 404 Permit ❑ Section 10 Permit
1 b. Specify Natianwide Permif (MWP} number: 14 or General Permit (GP} number:
1 c. Has the NWP or GP number been �erified by the Corps? ❑ Yes � No
1 d. Type(s) Q# appro�al sought from the DWC� (check all ffi�at applyJ:
� 401 Water Quality Certification — Regular ❑ Nan-404 Jurisdictional General Permit
❑ 4D1 Wafer Quality Certifi�atian — Express ❑ Riparian Buffer Authorization
1 e. Is this notification solely for the record For the record only for DWQ 4Q1 For the record only for Corps Permit:
because written approval is nat required? Certification:
❑ Yes � Na ❑ Yes � No
1f. Is payment into a mitigation bank or in-lieu fee program proposed f4r mitigation � Yes ❑ No
of impa�ts? lf so, attach the acceptance letter from mitigation bank or in-lieu
fee program.
1 g. Is fhe project located in any of NC's twenty coastal caunties. If yes, answer 1 h ❑ Yes � No
below.
1 h. ls the project located within a NC ❑CM Area of Environmen#al Concern (AEC}? ❑ Yes � No
2. Project Information
2a. Name of project: SR 1339, Roaring Branch Road
2b. County: Ashe
2c. Nearest municipal9ty 1 town: Lansing
2d. Subdi�ision name:
2e. NC�OT only, T.I.P. or state �� C.005148
projec# no:
3. Owner Inlormation
3a. Name{s) on Recorded beed: NCD�T
3b. Deed Boak and Page No.
3c. Respvnsit�le Party (for LLC i f
applicable}:
3d. Street address: 801 S#atesr►ilke Road
3e. City, state, zip: North Willcesboro, NC 28659
3f. Telephone no.: 336-903-9202
3g. Fax no.: 336-687-0549
3h. Email address: hslaughter�ncdot.goU
Page 1 of 10
PCN Farm — Version 1.3 December 10, 2�48 Vei-sian
4. Applicant lnformation (if different irom awner}
4a. Applicant is: ❑ Agent ❑ �ther, specify:
4b. I�ame:
4c. Busines s name
(if appficable):
4d. 5tree# address:
4e. Ci#y, sta#e, zip:
4f. Telephone no.:
�Fg. Fax no.:
4h. Email address:
5. AgentlConsultant fniormation (if applicat�lej
5a. IVame:
5b. Business name
(if applicabEe}:
5c. Street address:
5d. City, s#ate, xip:
5e. Telephane no.:
5f. Fax no.:
�g. Email address:
Page 2 of '! 0
PCN Farm — Version 1.3 December 1 U, 2QD8 Versivn
B. Project lnformation and Priar Project Histary
1. Property ldentiflcation
1a. Property identification na. {tax PIN or parcef ID):
1 b. Site coordinates (in decimal degrees): Latitude: 36.5D351 Longitude: - 81.58953
(aD.D�DDDDJ (-DD.D�DDDD)
'I c. Property size: 4.8 acres
2. Surface Waters
2a. Name of nearest body af water (stream, river, etc.j to UTs fo Roaring Branch
proposed project:
2b. Water Quality Classification of nearest recei�ing water: C; ORW
2c. River basin: New
3. Project Oescription
3a. Describe the existing conditions on the site and the general land use in the �icinity of the project at the time of this
application:
Unpar►ed road in a rura! area.
3b. List the total estimated acreage of all exisfing wetlands on the property:
0 acres
3c. List the total estimated linear feet of all existing streams (intermittent and perennial} on #he property:
360 finear feet
3d. Explain the purpose af the proposed project:
Upgrade roadway.
3e. Describe the overall project in detail, induding the type of equipment to be used:
5ee attached cover letter.
4. Jurisdictional Determinations
4a. Ha�e jurisdictional wetland or stream determinations by the
Corps or State been requested or obtained for this property 1
p�oject (including all prior phasesj in the past? ❑ Yes � No ❑ Unknown
Comments:
4b. lf the Corps made the jurisdictional determination, what type
of determination was made? ❑ Preliminary ❑ Final
4c. If yes, who delineated the jurisdic#ional areas? Agen�ylConsultant Company:
Name (if known): Other:
4d. If yes, list the dates of the Corps jurisdiGtional determinations or 5tate determinations and attach documentation.
5. Praject History
5a. Ha�e permits or certifications been requssted nr obtained for � Yes � iVo ❑ Unknown
this project (including ail priar phases} in the past?
5b. If yes, expEain in detail aocording to "help file' instructions.
6. Future Project Plans
6a. Is this a phased project? ❑ Yes � No
Gt�. I# yes, explain.
Page 3 of 1 Q
PCN Form — Versifln 1.3 December 1 Q, 2Q08 Version
C. Proposed Impacts fnventory
1. Impacts 5ummary
1 a. Which sections were completed belnw fnr your proje�t (�heck all that apply]:
❑ Wetlands � Streams - tributaries ❑ Buffers
❑ Open Waters ❑ Pond Canstruction
2. Wetland Impacts
If there are wetland impacts propased an the site, then complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type �f jurisdiction
number — Type of impact Type of wetland Forested {Corps - 444, 1 D Area of impact
Permanent {P} or {if known} DWQ — non-4D4, ofher) (acres]
Tem ara
W1 ❑ P❑ T ❑ Yes ❑ Corps
❑ Na ❑ DWQ
W2 ❑ P❑ T ❑ Yes ❑ Corps
❑ Na ❑ DWQ
�� � P ❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W4 ❑ P � T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W6 ❑ P � 7 ❑ Yes ❑ Corps
❑ No ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. Stream Impacts
lf there are perennial or intermittent stream impacts {including temporary impacts} proposed on the site, then camplete this
question for all stream sites impacted.
3a. 3b. 3c. 3d. 3e. 3f. 3g.
Stream impact Type af impact Stream name Perennial Type of jurisdiction Ar►erage Impact
numher - (PER) or (Corps - 4�4, 1 a stream length
Permanent (P} ar intermittent DWQ — non-4D4, wid#h (linear
Temporary {T) {INT)? ather} {feetj #eet)
S1 � P� r Piping, Riprap & UT #1 to Roaring � PER � Carps 2 ��
Dewatering Branch ❑ !NT � DWQ
S2 � P❑ T Piping & Riprap UT #2 to Raaring ❑ PER � Cnrps 1 2D
Branch � INT � DWQ
UT #3 to Roaring ❑ PER ❑ Corps
53 � P❑ T Piping & ftiprap Branch � INT ❑ DWQ � �4
S4 � P❑ T Piping & Riprap UT #4 ta Roaring � PER ❑ Corps � 2Q
Branch ❑ iNT ❑ DWQ
55 � P❑ T Piping 8� Riprap UT #5 to Roaring � PER ❑ Corps 1 3a
Brancn ❑ !NT ❑ DWQ
S6 � P❑ T Piping & Rtprap U7 #fi ta Roaring � PER ❑ Corps ,� ,� 5
Branch ❑ iNT ❑ �WQ
3h. Total stream and tributary impacts
3i. Comments: 5ee next sheet for tatals
Page � of 1 D
PCN Form — Version 1.3 ❑ecember 1 Q, 2008 Version
C. Proposed Impacts Inventory
1. Impacts Summary
1 a. Which sections were c�mpleted below for your project (�heck all tha# apply}:
❑ Wetlands � Streams - #ributaries ❑ Buffers
❑ Open Waters ❑ Pond Construcfion
2. Wetland Impa�ts
ii there are wetland impacts proposed on the site, th�n complete this question for each wetland area impacted.
2a. 2b. 2c. 2d. 2e. 2f.
Wetland impact Type of jurisdi�tion
number — Type o# impact Type of wetland Forested (Corps - 404, 1 a Area of impact
Permanent {P) or �if knowny DWQ — non-404, other) {acresJ
Tem ora
W1 ❑ P[] T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W� � P� T ❑ Yes ❑ Corps
❑ No ❑ DWQ
W3 ❑ P � T ❑ Yes ❑ Corps
❑ IVo ❑ �WQ
W4 ❑ P❑ T ❑ Yes ❑ Corps
❑ Na ❑ DW�
W5 ❑ P❑ T ❑ Yes ❑ Corps
❑ Na ❑ aWQ
W6 ❑ P❑ T ❑ Yes ❑ Corps
❑ Nn ❑ DWQ
2g. Total wetland impacts
2h. Comments:
3. 5tream Impacts
If there are perennial er in#ermittent stream impacts (incfuding temparary impacts} proposed an the site, then complete this
question for aiI stream sites impacted.
3a. 3b. 3�. 3d. 3e. 3f. 3g.
Stream impact Type of impact Stream name Perennial Type of jurisdiction A�erage Impact
number - (PER) ar �Corps - 404, 10 stream length
Permanent (P} or intermittent pW4 — non-404, widfh {linear
Temporary (T) (IN�? other) (feetj feet}
51 � P❑ T Riping, Riprap UT #7 to Roaring � PER � Corps 1 2�
Branch ❑ INT � DWQ
S2 ❑ P � T ❑ PER � Cnrps
� 1 NT � DWQ
53 ❑ P❑ T ❑ PER ❑ Corps
� IPdT ❑ DWQ
54 ❑ P❑ T � PER ❑ Corps
❑ INT ❑ �WQ
S5 ❑ P❑ T � PER ❑ Corps
❑ INT ❑ �WC�
S6 ❑ P❑ T � PE� ❑ Cnrps
❑ fNT ❑ DWQ
3h. Total stream and tributary impacts 235
3i. Comments: 125 Pi�e, 70 riprap, 40 dewatering
Page 4 of 10
PCN Farm — Versian 1.3 December 1 fl, 2�08 Versian
4. Open Water Empacts
If there are propnsed impacts to lakes, ponds, estuaries, tributaries, saunds, the Atlarrtic Ocean, or any other apen water of
the U.S. then individual�y list all apen water impac#s below.
4a. 4b. 4c. 4d. 4e.
Open water Name of waferbody
impac# number— �i€ applicable} Type of impact Waterbody #ype Area of impact (a�res}
Permanent (P} ar
Tem ora
D1 ❑P❑T
02 ❑P❑T
�3 ❑P�T
04 ❑P❑T
4f. Tota1 open water impacts
4g. Comments:
5. Pond ar Lake Construction
If ond or lake constnaction ro osed then com lete the chart belaw.
5a. 5b. 5c. 5d. 5e.
Wetland ]mpacts (acres) 5trea�n Impa�ts {feetJ Upland
Pond ID propased use or �urpose (acres)
number af pond
Flooded Fillec! Excavated Flooded Filled Exca�ated Floaded
P1
P2
5f. Tntal
5g. Comments: lVIA
5h. Is a dam high hazard permit required?
❑ Yes � No If yes, permit ID no:
5i. Expected pond surFace area {acres):
5j. Size of pond watershed (acres):
5k. Method af construc#i�n:
6. Buffer Impacts (for DWQ]
If proje�t will impact a protected riparian buffer, then complete the chart bekow. If yes, then indi�idually list all bufFer impac#s
beiow. ff an im acts re uire miti ation, the� ou MUST filf out Section D of this form.
8a.
❑ Neuse ❑ Tar-Pamiico ❑ Other:
Project is in which protected basin? ❑ Catawba ❑ Randleman
Bb. Bc. 6d. 6e. 6f. 6g.
Buffer impact
numE�er— Reason 6uffer Zane 1 impact Zone 2 impa�t
Permanent {P) or for 5tream name mitigation {square feet} (square feet)
Tem of a im act re uired?
81 ❑P❑T ❑Yes
❑ Na
�2 ❑ P ❑ T ❑ Yes
❑ No
B3 ❑ P ❑ T ❑ Yes
❑ No
dh. Total huffer impacts
6i. Comments:
Page 5 of 10
PCN Form — Version 1.3 I]ecember 1 a, 2Q08 Version
D. Impact Justifi�ation and Mitigation
1. A�oidance and Minimization
1a. Specifically describe measures taken td a�aid or minimiae the propased impacts in designing project.
The pipe lengths are the minimum needed t� irr�prove roadway.
1 b. Specifically describe measures taken to avoid ar minimize the proposed impac#s through c�nstruction techniques.
All apprnpriate BMPs will �e used during constructian
2. Compensatory Mitigation for Impacts ta Watets of the U.S. �r Waters of the State
2a. Does the project require Compensatory Mitigation for � Yes ❑ No
impacts to Waters of the U.S. or Waters nf the State7
2b. If yes, mitigation is required by (check all that apply}: ❑ DWQ � Corps
❑ Mitigafian bank
2c. If yes, which mitigat ion option will be used far this
project? � Payme�t to in-lieu fee program
❑ Permittee Responsible Mitigation
3. Complete if Using a Mitigation Bank
3a. Name af Mitigation Bank:
3b. Credits Purchased (attach receipt and letter] Type Quantity
3c. Comments:
4. Complete if Making a Payment ta In-lieu Fee Pragram
4a. Appro�al letter from in-lieu fee program is attached. � Yes
4b. Stream mitigation requested: 50 linear feet
4c. If using stream mifigation, stream temperature: ❑ warm ❑ coo! �cold
4d. 8uffer mitigation requested (DWQ only}: square feet
4e. Riparian wetland mitigation requested: acres
df. IVon-riparian wetland mitigation requested: acres
ag. Coastal (tidaf) wetland mitigation requested: acres
4h. Camments:
5. Complete if Using a Permittee Respansible Mitigatinn Plan
5a. If using a permittee responsible mitigation plan, pro�ide a description of the proposed mitigatian p[an.
Page 6 of 1 �
PCN Form — Version 1.3 December 10, 2Q08 Version
fi. Buffer Mitigation (State Regn{ated Riparlan Buffer Rulesj — required by DWQ
6a. Will the project result in an impact within a protected riparian buffer that requires ❑ Yes � No
bufFer mitigation?
5b. If yes, then identify the square feet of impact to each zone of the riparian buffer that requires mitiga#ion. Cafcula#e the
amount of mitigation required.
sc. sd. se.
Zan� Reasan for impact Total im�act Multiplier Required mitigation
{square feet} {square feet}
Zone 9 3(2 for Catawba}
�orse 2 1.5
6f. Tntal bufFer mitigaiian required:
6g. If buffer mitigation is required, discuss what type of mitigation is proposed (e.g., payment to private mitigation bank,
permiftee respansib�e riparian buffer restoration, payment into an appro�ed in-lieu fee fundj.
6h. Camments:
Page 7 of 1 D
PCN Farm — Version 1.3 December 1 Q, 2Qfl8 Version
E, 5tormwater Management and �iffuse Flow Plan {required by DWQ)
1. Diffuse Ffow Plan
1 a. Does the project include ar is it adjacent to protected riparian buffers identified � YE5 � No
within one of the �EC Riparian Buffer Pratection Rules?
1b. If yes, then is a diffuse flow plan included? If no, explain why.
Comments: ❑ Yes ❑ No
2. 5tormwater Mana ement Plan
2a. What is the overall percent imperviousness of this praject? °/o
2b. Does this project require a Stormwater Managemen# Plan? � Yes ❑ No
2c. lf this project DDES NOT require a 5tormwater Management Plan> explain why:
2d. If fhis project D�ES require a Stormwater Management Plan, ihen provide a brief, na�rative descriptian of the plan:
Falfs under D�T NPDES Permit
❑ Certified Local Go�ernment
2e. Who wiil be respansible for the re�iew of the Stormwater Management PIan7 ❑ �WQ Stormwater Program
❑ DWQ 401 Unit
3. Certified Local GQ�ernment 5tormwater Re�iew
3a. In which local govemment's jurisdictian is this project?
❑ Phase II
3b. Which of the following localiy-implemented stormwater management programs ❑ NSW
apply {check all that apply): ❑ L1SMP
❑ Water Supply Watershed
❑ Other:
3�. Has the approved Stormwater Management Plan with praof of approval been ❑ Yes ❑ Ato
attached?
4. DWQ 5tormwater Pro ram Revlew
❑ Caastal caunties
❑ HQW
4a. Which of the foliowing state-implemented stormwater management programs apply � pRW
(checic afl that apply): ❑ Session Law 20D6-246
❑ Other:
4b. Has the approved Stormwater Management Pfan with proof of approval been
attached? ❑ Yes ❑ Ho
5. DWQ 4D�t Unit Stormwater Rerriew
5a. Does the Stormwater Management Plan meet the appropriate requirements? ❑ Yes ❑ Ho
5b. Ha�e ail of the 4a1 Unit submitta! requirements been met? ❑ Yes ❑ No
Page 8 of 10
PCN Form — Versian 1.3 December 1 �, 20D8 Version
F. Supplementary Informatinn
1. En�ironmental Documentation [DWQ Requirement]
1 a. Does the project involve an expenditure of public {federallstatello�alj funds or the � Yes ❑ Na
use �f public [federallstate) [and?
1 b. if yau answered "yes' fo the above, does the project require preparation of an
environmental do�ument pursuant to the requirements of the National or State ❑ Yes � IVo
{North Carolina) Enviranmental Policy Ac# �NEPAISEPA)?
1c. If you answered "yes" to the above, has the do�ument re�iew been frnafized by the
State CEearing House? ([f sa, attach a copy of the IYEPA ar SEPA final appro�al
letter.) ❑ Yes ❑ Na
Comments:
2. Violations (DWQ Requirement)
2a. Is the site in violation of QWq Wetland Rufes (15A NCAC 2H .0500), IsoEated
Wetland Rules [75A NCAC 2H .1300y, DWC�.. Surface Water or Wetiand Standards, ❑ Yes � No
or Riparian Buffer Rules (15A NCAC 2B .Q20�)?
2h. Is this an after-the-fact permit applica#ion? ❑ Yes � Na
2c. li you answered "yes" to one or both of the abvve ques#ions, provide an explanation of the violati�n{sj:
3. Cumulatf�e Impacts (DWQ Requirement]
3a. Wi{I this project {based on past and reasnnably anticipated future impacis) result in � Yes � No
additianal development, which could impact nearby downstream water quality?
3b. If you answered "yes" to the abo�e, submit a qualitati�e or quantitative cumulative impaci analysis in accordance wi#h the
most recent DWQ policy. if you answered "no," provide a short narr'ati�e description.
4. 5ewage Disposal {�WQ Requirementj
4a. Clearly detail the ultimate treatmenf inethods and disposition [non-discFtarge nr dischargej of wastewater generated from
the propnsed project, or a�ailable capacity �f the subject facility.
N!A
Page 9 of 10
PCN Fvrm — Version 1.3 December 1 a, 2afl8 Version
5. Endangered Species and Designated Critical Habitat �Carps Requiremen#)
5a. Will this project occur in �r near an area with federally protec#ed spe�ies or (� Yes � No
habitat?
5b. Have you checked with the USFWS conceming Endangered 5pecies A�t � Yes � N❑
impacts?
❑ Raleigh
5c. lf yes, ind icate the USFWS Field �ffice you ha�e cantacted.
❑ Asheville
5d. What data saurces did you use to determine whether your site wauld impact Endangered 5pecies ar �esignated Critical
Habitat?
GI5 and visual observation
6. �ssential �ish Hahitat (Carps Requirementj
6a. Will this prQject occur in or near an area designated as essential fish habitat? ❑ Yes � No
6b. What data sources did you use te determine whether your site woufd impact Essen#ial Fish Fiabitat?
WRC will comment
7. Historic or Prehistoric Cuitural Resaurces (Corps Requirementj
7a. Vlfill this praject occur in ar near an area that the state, federal or tribal
govemmerrts have designated as ha►ring hist�ric or cultural preservatian [� Yes Q� Na
�tatus (e.g., National Historic �rust designation or properties significant in
North Carfllina history and archaeology]?
7b. What data sources did you use to determine whether yaur site w�uld impact historic or archenlogical resources?
Project submitted to SHPO
8. Flood Zane Designation {Carps Requirement)
8a. Will this project occur in a FEMA-designated 100-year floodplain? ❑ Yes � No
86. If yes, explain how project meets FEMA requirements:
8c. What sour�e(s} did you use ta make the fl�odplain defermination? nc#loodmaps
�. Heath Slaughter i���� 10128l�4
rC .�i�iLH.+
ApplicantlAgent's Printed Name Applicar►UAgent's S� ature Date
(AgenYs s nature is valid anly if an authn z ian letier fram the applicant
is ro�id
P�ge 10 �fi 10