HomeMy WebLinkAbout20141134 Ver 2_SR 1339, 401 Cert_20181120Pat McCrory
Governor
���
����
NCDENR
North Carolina Department of Environment and Natural Resources
John E. Skvarla, III
Secretary
November 5, 2014
Ashe County
NCDWR Project'No. 2014-1 134
SR 1339 Improvements
Proj ect No. 11 C.005148,
APPROVAL of 40l WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS
Mr. Heath Slaughter, Division Environmental Officer (e-copy only)
NCDOT, Division 11
801 Statesville Raod
North Wilkesboro, NC 28659 ,
Dear Mr. Slaughter:
You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of
improving SR 1339 to include replacing seven wet pipes as part of a grade, drain, base and pave project totaling 0.76
miles in Ashe County:
Stream Im acts in the New River Kasin '
Permanent Fill in Temporary Fill Stream Impacts
Total Stream
Perennial Stream (dewatering) in Requiring
Station Number linear feet Perennial Stream Impact Mitigation
Cuivert Riprap (linear feet) ���near feet) ���near feet)
1+22 25 10 � 40 75 0
13+00 10 10 - 20 0
16+05 40 10 - 50 0
27+39 10 ]0 - 20 0
2g+07 20 10 - 30 0
29+50 (Lt) 5 10 - � 15 0
33+35 15 10 - 25 0
Total 125 70 40 ' 235 0
Total Stream Impact for Project: 235 linear feet.
The project shall be constructed in accordance with your application dated received October 28, 2014. After
reviewing your application, we have decided that these impacts are covered by General Water Quality Certification
Number 3886. This certification corresponds to the Nationwide Permit 14 issued by the Corps of Engineers. In
addition, you should acquire any other federal, state or local permits before you proceed with your project including
(but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This
approval will expire with the accompanying 404 permit.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Oppoftunity 1 Affirmative Action Employer
This approval is valid solely for the purpose and design described in your application (unless modified below).
Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the
new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying
with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total
impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as
described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the
conditions listed in the attached certification(s) and any additional conditions listed below. -
Condition(s) of Certification:
Project Specific Conditions
1. For the 40 linear feet of streams being impacted due to site dewatering activities, the site shall be graded to
its preconstruction contours and revegetated with appropriate native species. Any sediment laden water
collected at Site 1+22 or any other site that is dewatered should be pumped into a silt bag prior to
discharging back to the stream if necessary.
2. NCDOT shall be in compliance with the NCS000250 issued to the NCDOT, including the applicable
requirements of the NCGO 10000. Please note the extra protections for the sensitive watersheds as the
impacted UTs to Roaring Branch are classified by the NC Environmental Management Commission as
Outstand Resource Waters (ORWs). In addition, stormwater shall be directed to vegetated buffer areas,
grass-lined ditches or other means appropriate to the site for the purpose of pre-treating storm water runoff
prior to discharging directly into streams. Mowing of existing vegetated buffers is strongly discouraged.
General Conditions -
1. Unless otherwise approved in this certification, placement of culverts and other structures in open waters and
streams shall be placed below the elevation of the streambed by one foot for all culverts with a diameter
greater than 48 inches, and 20 percent of the culvert diameter for culverts having a diameter less than 48
inches, to allow low flow passage of water and aquatic life. Design and placement of culverts and other
structures including temporary erosion control measures shall not be conducted in a manner that may result in
dis-equilibrium of wetlands or streambeds or banks, adjacent to or upstream and downstream of the above
structures. The applicant is required to provide evidence that the equilibrium is being maintained if requested
in writing by the NCDWR. If this condition is unable to be met due to bedrock or other limiting features
encountered during construction, please contact the NCDWR for guidance on how to proceed and to '
determine whether or not a permit modification will be required. -
2. If concrete is used during construction, a dry work area shall be maintained to prevent direct contact
between curing concrete and stream water. Water that inadvertently contacts uncured concrete shall not be
discharged to surface waters due to the potential for elevated pH and possible aquatic life and fish kills.
3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the
U.S., or protected riparian buffers.
4. The dimension, pattern and profile of the stream above and below the crossing shall not be modified.
Disturbed floodplains and streams shall be restored to natural geomorphic conditions.
5. The use of rip-rap above the Normal High Water Mark shall be minimized. Any rip-rap placed for stream
stabilization shall be placed in stream channels in such a manner that it does not impede aquatic life
passage. _ �
6. Riprap shall not be placed in the active thalweg channel or placed in the streambed in a manner that
precludes aquatic life passage. Bioengineering boulders or structures should be properly designed, sized
and installed
7. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings
submitted for approval. �
8. All work in or adjacent to stream waters shall be conducted in a dry work area. Approved BMP measures
from the most current version of the NCDOT Construction and Maintenance Activities manual such as
sandbags, rock berms, cofferdams and other diversion structures shall be used to prevent excavation in
flowing water.
9. Heavy equipment shall be operated from the banks rather than in the stream channel in order to minimize
sedimentation and reduce the introduction of other pollutants into the stream.
10. All mechanized equipment operated near surface waters must be regularly inspected and maintained to
prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials.
1 l. No rock, sand or other materials shall be dredged from the stream channel except where authorized by this
certification. �
l2. Discharging hydroseed mixtures and washing out hydroseeders and other equipment in or adjacent to surface
waters is prohibited.
13. The permittee and its authorized agents shall conduct its activities in a manner consistent with State water
quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water
Act) and any other appropriate requirements of State and Federal law. If the NCDWR determines that such
standards or laws are not being met (including the failure to sustain a designated or achieved use) or that State
or federal law is being violated, or that further conditions are necessary to assure compliance, the NCDWR
may reevaluate and modify this certification.
14. All fill slopes located in jurisdictional wetlands shall be placed at slopes no flatter than 3:1, unless otherwise
authorized by this certification.
15. A copy of this Water Quality Certification shall be maintained on the construction site at all times. In
addition, the Water Quality Certification and all subsequent modifications, if any, shall be maintained with
the Division Engineer and the on-site project manager.
16. The outside buffer, wetland or water boundary located within the construction corridor approved by this
authorization shall be clearly marked by highly visible fencing prior to any larid disturbing activities. Impacts
to areas within the fencing are prohibited unless otherwise authorized by this certification. '
17. The issuance of this certification does not exempt the Permittee from complying with any and all statutes,
rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and
federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management
rules, soil erosion and sedimentation control requirements, etc.
18. The Permittee shall report any violations of this certification to the Division of Water Resources within 24
hours of discovery.
19. Upon completion of the project (including any impacts at associated borrow or waste sites), the NCDOT
Division Engineer or assignee shall complete and return the enclosed "Certification of Completion Form" to
notify the NCDWR when all work included in the 401 Certification has been completed.
20. Native riparian vegetation must be reestablished in the riparian areas within the construction limits of the
project by the end of the growing season following completion of construction.
21. There shall be no excavation from, or waste disposal into, jurisdictional wetlands or waters associated with
this permit without appropriate modification. Should waste or borrow sites, or access roads to waste or
borrow sites, be located in wetlands or streams, compensatory mitigation will be required since that is a direct
'impact from road construction activities.
22. Erosion and sediment control practices must be in full compliance with all specifications governing the
proper design, installation and operation and maintenance of such Best Management Practices in order to
protect surface waters standards:
a. The erosion and sediment control measures for the project must be designed, installed, operated, and
maintained in accordance with the most recent version of the North Carolina Sediment and Erosion
Control Planning ancl Design Manual. •
b. The design, installation, operation, and maintenance of the sediment and erosion control measures
must be such that they equal, or exceed, the requirements specified in the most recent version of the
North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all
construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased
borrow pits associated with the project. � .
c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated,
and maintained in accordance with the most recent version of the North Carolina Surface Mining
Manual.
d. The reclamation measures and implementation must comply with the reclamation in accordance with
the requirements of the Sedimentation Pollution Control Act.
23. ,Sediment and erosion control measures shall not be placed in wetlands or waters unless otherwise approved
by this Certification.
If you wish to contest any statement in the attached Certification you must file a petition for an administrative
hearing. You may obtain the petition form from the office of Administrative hearings. You must file the petition
with the office of Administrative Hearings within sixty (60) days of receipt of this notice. A petition is considered
filed when it is received in the office of Administrative Hearings during normal office hours. The Office of
Administrative Hearings accepts filings Monday through Friday between the hours of 8:OOam and S:OOpm, except
for official state holidays. The original and one (1) copy ofthe petition must be filed with the Office of
Administrative Hearings.
The petition may be faxed-provided the original and one copy of the document is received by the Office of
Administrative Hearings within five (5) business days following the faxed transmission.
The mailing address for the Office of Administrative Hearings is:
Office of Administrative Hearings
6714 Mail Service Center
Raleigh, NC 27699-6714
Telephone: (919)-431-3000, Facsimile: (919)-431-3100
A copy of the petition must also be served on DENR as follows:
Mr. John Evans, General Counsel
Department of Environment and Natural Resources
1601 Mail Service Center
This letter completes the review of the Division of Water Resources under Section 401 of the Clean Water Act. If you
have any questions, please contact Dave Wanucha at (336) 766-9703 or dave.wanucha@ncdenr.gov.
Sincerely,
C� ��,
�.°�
Thomas A Reeder, Director
Division of Water Resources
Electronic copy only distribution:
Andy Williams, US Army Corps of Engineers, Raleigh Field Office
Marla Chambers, NC Wildlife Resources Commission
Dave Wanucha, NC Division of Water Resource's Winston Salem Regional Office
File Copy
����r
i +�"�
PICDENR
North Carolina Department of Environment and Natural Resources
Pat McCrory
Governor
NCDWR Project No.:
Applicant:
Project Name:
Date of Issuance of 401 Water Quality Certification:
County:
John E. Skvarla, III
Secretary
Certificate of Completion
Upon completion of all work approved within the 401 Water Quality Certification or applicable Buffer Rules, and
any subsequent modifications, the applicant is required to return this certificate to the 401 Transportation Permitting
Unit, North Carolina Division of Water Resources, 1650 Mail Service Center, Raleigh, NC, 27699-1650. This form
may be returned to NCDWR by the applicant, the applicant's authorized agent, or the project engineer. It is not
necessary to send certificates from all of these.
ApplicanYs Certifrcation ,
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials. ,
Signature: Date:
Agent's Certification
I, , hereby state that, to the best of my abilities, due care and diligence
was used in the observation of the construction such that the construction was observed to be built within substantial
compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and
specifications, and other supporting materials.
Signature: Date:
Engineer's Certifieation
Partial Final
I, , as a duly registered Professional Engineer in the State ofNorth
Carolina, having been authorized to observe (periodically, weekly, full time) the construction of the project for the
Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observation of the
construction such that the construction was observed to be built within substantial compliance and intent of the 401
Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials.
Signature
Date
Registration No.
1617 Mail Service Center, Raleigh, North Carolina 27699-1617
Phone: 919-807-63001 Internet: www.ncdenr.gov
An Equal Opportunity 1 Affirmative Action Employer