Loading...
HomeMy WebLinkAboutNCG020828_Rescission Inspection Report_20181113Compliance Inspection Report Permit: NCG020828 Effective: 10/01/15 Expiration: 09/30/20 owner: Commanding Officer Marine Corps Base Camp Lejeune SOC: Effective: Expiration: Facility: Borrow Pit 7 County: Onslow 1005 Michael Rd Region: Wilmington Camp Lejeune NC 285472521 Contact Person: Carl H Baker Title: Phone: 910-451-9607 Directions to Facility: take Hwy 17 N from Wilmington to Jacksonville - exit Rt 24 headed east - turn rt onto Holcomb Blvd - go thru main gate - turn rt @ first light onto Brewster Blvd - turn left onto Stone St System Classifications: Primary ORC: Certification: Phone: Secondary ORC(s): On -Site Representative(s): Related Permits: Inspection Date: 11/13/2018 Entry Time: 09:OOAM Exit Time: 09:30AM Primary Inspector: Holley A Snider Phone: 919-796-7315 Secondary Inspector(s): Reason for Inspection: Routine Inspection Type: Compliance Evaluation Permit Inspection Type: Mining Activities Stormwater Discharge COC Facility Status: Compliant ❑ Not Compliant Question Areas: Storm Water (See attachment summary) Page: 1 Permit: NCG020828 Owner - Facility: Commanding Officer Marine Corps Base Camp Lejeune Inspection Date: 11/13/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Inspection Summary: Holley Snider evaluated the site for compliance and release of mining permit and NPDES 020000 permit. The mine site is sufficiently reclaimed. Page: 2 Permit: NCG020828 Owner - Facility: Commanding Officer Marine Corps Base Camp Lejeune Inspection Date: 11/13/2018 Inspection Type : Compliance Evaluation Reason for Visit: Routine Stormwater Pollution Prevention Plan Yes No NA NE Does the site have a Stormwater Pollution Prevention Plan? ❑ ❑ ❑ # Does the Plan include a General Location (USGS) map? ❑ ❑ ❑ # Does the Plan include a "Narrative Description of Practices"? ❑ ❑ ❑ # Does the Plan include a detailed site map including outfall locations and drainage areas? ❑ ❑ ❑ # Does the Plan include a list of significant spills occurring during the past 3 years? ❑ ❑ ❑ # Has the facility evaluated feasible alternatives to current practices? ❑ ❑ ❑ # Does the facility provide all necessary secondary containment? ❑ ❑ ❑ # Does the Plan include a BMP summary? ❑ ❑ ❑ # Does the Plan include a Spill Prevention and Response Plan (SPRP)? ❑ ❑ ❑ # Does the Plan include a Preventative Maintenance and Good Housekeeping Plan? ❑ ❑ ❑ # Does the facility provide and document Employee Training? ❑ ❑ ❑ # Does the Plan include a list of Responsible Party(s)? ❑ ❑ ❑ # Is the Plan reviewed and updated annually? ❑ ❑ ❑ # Does the Plan include a Stormwater Facility Inspection Program? ❑ ❑ ❑ Has the Stormwater Pollution Prevention Plan been implemented? ❑ ❑ ❑ Comment: Qualitative Monitoring Yes No NA NE Has the facility conducted its Qualitative Monitoring semi-annually? ❑ ❑ ❑ Comment: Analytical Monitorinq Yes No NA NE Has the facility conducted its Analytical monitoring? ❑ ❑ ❑ # Has the facility conducted its Analytical monitoring from Vehicle Maintenance areas? ❑ ❑ ❑ Comment: Permit and Outfalls Yes No NA NE # Is a copy of the Permit and the Certificate of Coverage available at the site? ❑ ❑ ❑ # Were all outfalls observed during the inspection? ❑ ❑ ❑ # If the facility has representative outfall status, is it properly documented by the Division? ❑ ❑ ❑ # Has the facility evaluated all illicit (non stormwater) discharges? ❑ ❑ ❑ Comment: Page: 3