Loading...
HomeMy WebLinkAbout20160938 Ver 3_Shoreline Stabilization along NC HWY 94 on the Lake Mattamuskeet Causewa..._20181119£n vironmen tuf Quality ROY COOPER Gorernw� MICHAEL S. REGAN Sr<'re��n�r S. JAY ZIMMERMAN ir„�,=���o�� June 30, 2017 Hyde County NCDWR Project No. 20160938 v.2 Shoreline S[abilization NC 94 APPROVAL of 401 WATER QUALITY CERTIFICATION with ADDITIONAL CONDITIONS Mr. Paul Williams NCDOT, Division One 113 Airport Drive. Suite 100 Edenton, NC 27932 Dear Mr. Williams: You have our approval, in accordance with the conditions listed below, for the following impacts for the purpose of shoreline stabilization along the portion of NC 94 on the Lake Mattamuskeet causeway in Hyde County: O en Water Im acts in the Tar-Pamlico River . Site West Ba�lc O en Water(ac) Shoreline Q� A 0.019 220 B 0.014 100 C 0.018 I60 D 0.021 190 E 0.028 120 F 0.005 50 G 0.01 60 H 0.031 220 I 0.018 200 J 0.008 175 K 0.005 55 L 0.085 540 M 0.005 140 N O.OI2 130 O 0.007 70 P 0.022 395 Q 0.018 250 To�a! 0326 3,075 East Bank O en Water(ac) Shoreline Q A 0.006 45 B 0.01 I 70 D 0.009 80 E 0 25 F 0.024 120 G 0955 255 H 0.010 70 I 0.017 85 tasin ' �Noihing Compares — �. Stace ofNonh Carolina I F.nvironmental Qualiry 1617 Mail Service Center I Raluigh. North Carolina 27699-1617 East Bank O en Water(ac) Shoreline (1 fl J 0.026 350 Total 0.158 1,100 Net Total 0.484 4,175 Total Open Water Impact for Project: 0.484 acres. The project shall be constructed in accordance with your application dated received May 22, 2107. After reviewing your application, we have decided that these impacts are covered by General Water Quality Certification Number 4087. This certification corresponds to the Nationwide Permit 13 issued by the Corps of Engineers. In addition, you should acquire any other federal, state or local permits before you proceed with your project including (but not limited to) Sediment and Erosion Control, Non-Discharge and Water Supply Watershed regulations. This approval will expire with the accompanying 404 permit. This approval is valid solely for the purpose and design described in your application (unless modified below). Should your project change, you must notify the NCDWR and submit a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter, and is thereby responsible for complying with all the conditions. If total wetland fills for this project (now or in the future) exceed one acre, or of total impacts to streams (now or in the future) exceed 150 linear feet, compensatory mitigation may be required as described in 15A NCAC 2H .0506 (h) (6) and (7). For this approval to remain valid, you must adhere to the conditions listed in the attached certification(s) and any additional conditions listed below. Condition(s) of Certification: 1. The issuance of this certification does not exempt the Permittee from complying with any and all statutes, rules, regulations, or ordinances that may be imposed by other government agencies (i.e. local, state, and federal) having jurisdiction, including but not limited to applicable buffer rules, stormwater management rules, soil erosion and sedimentation control requirements, etc. 2. The Permittee shall ensure that the final design drawings adhere to the permit and to the permit drawings submitted for approval. [15A NCAC 02H .0507(c) and 15A NCAC 02H .0506 (b)(2) and (c)(2)] 3. During the construction of the project, no staging of equipment of any kind is permitted in waters of the U.S., or protected riparian buffers. [15A NCAC 02H.0506(b)(2)] 4. All mechanized equipment operated near surface waters must be regularly inspected and maintained to prevent contamination of stream waters from fuels, lubricants, hydraulic fluids, or other toxic materials. [15A NCAC 02H.0506(b)(3)] , 5. Erosion and sediment control practices must be in full compliance with all specifications governing the proper design, installation and operation and maintenance of such Best Management Practices in order to protect surface waters standards [15A NCAC 02H.0506(b)(3) and (c)(3): a. The erosion and sediment control measures for the project must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Sediment and Erosion Contr-ol Planning and Design Manual. b. The design, installation, operation, and maintenance of the sediment and erosion control measures must be such that they equal, or exceed, the requirements specified in the most recent version of the North Carolina Sediment and Erosion Control Manual. The devices shall be maintained on all construction sites, borrow sites, and waste pile (spoil) projects, including contractor-owned or leased borrow pits associated with the project. c. For borrow pit sites, the erosion and sediment control measures must be designed, installed, operated, and maintained in accordance with the most recent version of the North Carolina Surface Mining Manual. � • d. The reclamation measures and implementation must comply with the reclamation in accordance with the requirements of the Sedimentation Pollution Control Act. 6. Where placement of sediment and erosion control devices in wetlands and/or waters is unavoidable, they shall be removed and the natural grade restored upon completion of the project. [15A N�AC 02H.0506(b)(3) and (�)(3) 7. Erosion control matting in riparian areas shall not contain a nylon mesh grid which can impinge and entrap small animals. Matting should be secured in place by staples, stakes, or wherever possible live stakes of native trees. Riparian areas are defined as a distance 25 feet from top of stream bank [ 1 SA NCAC 02B.0224,.0225] 8. The permittee and its au[horized agents shall conduc[ its activities in a manner consisten[ wi[h State water quality standards (including any requirements resulting from compliance with §303(d) of the Clean Water Act) and any other appropriate requirements of State and Federal law. If the NCDWR de[ermines [hat such standards or Iaws are not being met (including the failure to sustain a desi�nated or achieved use) or that State or federal law is being violated, or that further conditions are necessary m assure compliance, the NCDWR may reevalua[e and modify this certification. [I SA NCAC 02B.0200] 9. The Permittee shall report any violations of this certification to the Division of Water Resources within 24 hours of discovery. [ I SA NCAC 02B.0506(b)(2)] 10. A copy of[his Water Quality Certifica[ion shall be main[ained on [he construction site at all [imes. In addition, the Water Quality Certification and all subsequent modifications, ifany, shall be maintained with the Division Engineer and the on-site project managec [ISA NCAC 02H .0507(c) and ISA NCAC 02H .0506 (b)(2) and (�)(Z)] I I. Upon completion of the project (including any impacts at associated borzow or waste sites), the NCDOT Division Engineer shall comple[e and remrn the enclosed °Certitication of Comple[ion Form° to no[ify [he NCDWR when all work included in the 40I Certification has been completed. [15A NCAC 02H.0502(�] If you wish to contest any statement in the attached Certification you must tile a petition for an administrative hearin�. You may obtain the pe[ition form from the oftice of Administrative hearin,s. You must file [he peti[ion wi[h the oftice of Administra[ive Hearin�s within sixty (60) days of receipt of this no[ice. A pe[ition is considered tiled when it is received in the otlice of Administrative Hearings during normal office hours. The Office of Administrative Hearings accep[s tilin�s Monday [hroueh Friday be[ween the hours of S:OOam and S:OOpm, except for official state holidays. The original and one ( I) copy oY the petition must be filed with [he Office of Administrative Hearings. The petition may be faxed-provided the original and one copy of the document is received by the Office of Administrative Hearings within five (5) business days following the faxed transmission. The mailing address for [he Office of Administrative Hearings is: Office of Administrative Hearines 6714 Mail Service Center Raleigh, NC 27699-6714 Telephone:(919) 431-3000,Facsimile:(919) 431-3100 A copy of the petition must also be served on DEQ as follows: Mr. Sam M.Hayes, General Counsel Department of Environmental Quality 1601 Mail Service Cen[er This let[er completes the review ofthe Division of Water Resources under Section 401 ofthe Clean Wa[er Act. If you have any questions, please contact Garcy Ward at (252)946-6481 or garcy.ward@nedenr.gov. Sincerely, � ����� --�� S. Jay Zimmerman, Director Division of Water Resources Hlectronic copy only distribution: Kyle Bames, US Army Corps of Engineers. Washington Field Unice Cla}� Willis, Division I I:nvironmental Officer Greg Daisey. NC Division of Coastal Management Garcy� Ward. NC Division of Water Resources Washington Regional Office Fil� Copt• Envlronmental Quality NCDWR Projec[ No.: Applicant: Project Name: Date of Issuance of 401 Water Qualih� CertiPcation: County: ROY COOPER c�����•,�,z��, MICHAEL S. REGAN Sr� rrn�rr S.1AY ZIMMERMAN i�;,�«r��� Certificate oP Completion Upon completion of all work approved wi[hin the 401 Wa[er Quality Certification or applicable Buffer Rules, and am subsequent modifications, the applicant is required to return [his certificate to the 401 Transportation Permittino Unit, North Carolina Division of Water ftesources, 1617 Mail Service Center. Raleigh, NC. 27699-1617. This form may be returned to NCDW R by the :�pplicant, the applicant"s authorized agent, or the project engineer. It is not necessary to send certificates from all of these. 4pplicanYs Cerlificnlinw I, , hereby state that, to the best of my abilities, due care and diligence was used in the observation of the construction such that the construction was observed to be built within substantial compliance and intent of the 401 Water Qualiry Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Date: AgenYs Cer[ificatioii 1, , hereby state [hat, to [he best of my abili[ies, due care and dilieence was used in the observation of [he construction such that the construction was observed ro be built within substantial compliance and intent of the 401 Water Quality Certification and Buffer Rules, the approved plans and specifications, and other supporting materials. Signature: Dare: Engineer's Cer�ifrcatim� Partial Final I, , as a duly registered Professional En�ineer in [he State of North Caroiina, having been authorized to observe (periodically, weekly, full time) the construction of die project for [he Permittee hereby state that, to the best of my abilities, due care and diligence was used in the observa[ion of [he construction such that the construction was observed to be built within substantial compliance and intent of the 401 Wa[er Quality Certification and But%r Rules, the approved plans and specifications, and other supporting materials. Signature Date Regis[ration No. '"Nothinq Compare� — , S�a[e o(Nonh Carolina � Envimnmzn[al Quality 1617 Mail Servire Cennr I Ralcigh. Nonh Carolina 27699-IbU