HomeMy WebLinkAbout20181555 Ver 1_e2018-00465 Pelican Walk Lot 4 Tearsheet_20181114U.S. ARMY CORPS OF ENGINEERS
WILMINGTON DISTRICT
Action Id.SAW-2018-00465 County:Pender U.S.G.S. Quad:NC-Holly Ridge
NOTIFICATION OF JURISDICTIONAL DETERMINATION
Property Owner:Houston Mears
Address: 301 Pelican Walk
Hampstead, NC 28443
Size (acres) 0.45 Nearest Town Hampstead
Nearest Waterway AIWW River Basin Onslow Bay
USGS HUC 03020302 Coordinates Latitude:34.4048
Longitude:-77.6095
Location description:Project area is located at Tract 3A/Lot 4 Pelican Walk in Hampstead, Pender County, North Carolina.
Parcel ID is 4214-91-5165-0000.
Indicate Which of the Following Apply:
A. Preliminary Determination
There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water
Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). The waters have been
delineated, and the delineation has been verified by the Corps to be sufficiently accurate and reliable. The approximate boundaries
of these waters are shown on the enclosed delineation map dated January 2018. Therefore this preliminary jurisdiction
determination may be used in the permit evaluation process, including determining compensatory mitigation. For purposes of
computation of impacts, compensatory mitigation requirements, and other resource protection measures, a permit decision made
on the basis of a preliminary JD will treat all waters and wetlands that would be affected in any way by the permitted activity on
the site as if they are jurisdictional waters of the U.S. This preliminary determination is not an appealable action under the
Regulatory Program Administrative Appeal Process (Reference 33 CFR Part 331). However, you may request an approved JD,
which is an appealable action, by contacting the Corps district for further instruction.
There appear to be waters on the above described project area/property, that may be subject to Section 404 of the Clean Water
Act (CWA)(33 USC § 1344) and/or Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403). However, since the waters
have not been properly delineated, this preliminary jurisdiction determination may not be used in the permit evaluation process.
Without a verified wetland delineation, this preliminary determination is merely an effective presumption of CWA/RHA
jurisdiction over all of the waters at the project area, which is not sufficiently accurate and reliable to support an enforceable
permit decision. We recommend that you have the waters on your project area/property delineated. As the Corps may not be able
to accomplish this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can
be verified by the Corps.
B. Approved Determination
There are Navigable Waters of the United States within the above described project area/property subject to the permit
requirements of Section 10 of the Rivers and Harbors Act (RHA) (33 USC § 403) and Section 404 of the Clean Water Act
(CWA)(33 USC § 1344). Unless there is a change in law or our published regulations, this determination may be relied upon for
a period not to exceed five years from the date of this notification.
There are waters on the above described project area/property subject to the permit requirements of Section 404 of the Clean
Water Act (CWA) (33 USC § 1344). Unless there is a change in the law or our published regulations, this determination may be
relied upon for a period not to exceed five years from the date of this notification.
We recommend you have the waters on your project area/property delineated. As the Corps may not be able to accomplish
this wetland delineation in a timely manner, you may wish to obtain a consultant to conduct a delineation that can be verified by
the Corps.
The waters on your project area/property have been delineated and the delineation has been verified by the Corps. The
approximate boundaries of these waters are shown on the enclosed delineation map dated MAP DATE. If you wish to have the
delineation surveyed, the Corps can review and verify the survey upon completion. Once verified, this survey will provide an
accurate depiction of all areas subject to CWA and/or RHA jurisdiction on your property which, provided there is no change in
the law or our published regulations, may be relied upon for a period not to exceed five years.
The waters have been delineated and surveyed and are accurately depicted on the plat signed by the Corps Regulatory Official
identified below on SURVEY SIGNED DATE. Unless there is a change in the law or our published regulations, this
determination may be relied upon for a period not to exceed five years from the date of this notification.
There are no waters of the U.S., to include wetlands, present on the above described project area/property which are subject to the
permit requirements of Section 404 of the Clean Water Act (33 USC 1344). Unless there is a change in the law or our published
regulations, this determination may be relied upon for a period not to exceed five years from the date of this notification.
The property is located in one of the 20 Coastal Counties subject to regulation under the Coastal Area Management Act (CAMA).
You should contact the Division of Coastal Management in in Wilmington, NC, at (910) 796-7215 to determine their
requirements.
Placement of dredged or fill material within waters of the US, including wetlands, without a Department of the Army permit may
constitute a violation of Section 301 of the Clean Water Act (33 USC § 1311). Placement of dredged or fill material, construction or
placement of structures, or work within navigable waters of the United States without a Department of the Army permit may
constitute a violation of Sections 9 and/or 10 of the Rivers and Harbors Act (33 USC § 401 and/or 403). If you have any questions
regarding this determination and/or the Corps regulatory program, please contact Ms. Emily Greer at (910) 251-4567 or
Emily.c.greer@usace.army.mil.
C. Basis For Determination: See the Preliminary jurisdictional determination form dated 3/30/2018.
D.Remarks: None.
E. Attention USDA Program Participants
This delineation/determination has been conducted to identify the limits of Corps’ Clean Water Act jurisdiction for the particular site
identified in this request. The delineation/determination may not be valid for the wetland conservation provisions of the Food Security
Act of 1985. If you or your tenant are USDA Program participants, or anticipate participation in USDA programs, you should request
a certified wetland determination from the local office of the Natural Resources Conservation Service, prior to starting work.
F. Appeals Information (This information applies only to approved jurisdictional determinations as indicated in B.
above)
This correspondence constitutes an approved jurisdictional determination for the above described site. If you object to this
determination, you may request an administrative appeal under Corps regulations at 33 CFR Part 331. Enclosed you will find a
Notification of Appeal Process (NAP) fact sheet and request for appeal (RFA) form. If you request to appeal this determination you
must submit a completed RFA form to the following address:
US Army Corps of Engineers
South Atlantic Division
Attn: Jason Steele, Review Officer
60 Forsyth Street SW, Room 10M15
Atlanta, Georgia 30303-8801
In order for an RFA to be accepted by the Corps, the Corps must determine that it is complete, that it meets the criteria for appeal
under 33 CFR part 331.5, and that it has been received by the Division Office within 60 days of the date of the NAP. Should you
decide to submit an RFA form, it must be received at the above address by NA.
**It is not necessary to submit an RFA form to the Division Office if you do not object to the determination in this correspondence.**
Corps Regulatory Official: ______________________________________________________
Date of JD:3/30/2018 Expiration Date of JD:NA
The Wilmington District is committed to providing the highest level of support to the public. To help us ensure we
continue to do so, please complete our Customer Satisfaction Survey, located online at
http://corpsmapu.usace.army.mil/cm_apex/f?p=136:4:0.
GREER.EMILY.C.1385325300
Digitally signed by GREER.EMILY.C.1385325300
DN: c=US, o=U.S. Government, ou=DoD, ou=PKI, ou=USA,
cn=GREER.EMILY.C.1385325300
Date: 2018.03.30 14:40:18 -04'00'
Copies Furnished: Needham Environmental, Inc.
Attn: Tom Gulley
PO Box 960
Wilmington, NC 28402
Electronically provided
NOTIFICATION OF ADMINISTRATIVE APPEAL OPTIONS AND PROCESS AND
REQUEST FOR APPEAL
Applicant:Houston Mears File Number: SAW-2018-00465 Date: 3/30/2018
Attached is: Houston Mears Div, Tract 3A, Lot 4, Wetland Delineation Sketch dated
January 2018
See Section below
INITIAL PROFFERED PERMIT (Standard Permit or Letter of permission) A
PROFFERED PERMIT (Standard Permit or Letter of permission) B
PERMIT DENIAL C
APPROVED JURISDICTIONAL DETERMINATION D
PRELIMINARY JURISDICTIONAL DETERMINATION E
SECTION I - The following identifies your rights and options regarding an administrative appeal of the above decision.
Additional information may be found at or http://www.usace.army.mil/Missions/CivilWorks/RegulatoryProgramandPermits.aspx
or the Corps regulations at 33 CFR Part 331.
A: INITIAL PROFFERED PERMIT: You may accept or object to the permit.
x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
x OBJECT: If you object to the permit (Standard or LOP) because of certain terms and conditions therein, you may request
that the permit be modified accordingly. You must complete Section II of this form and return the form to the district
engineer. Your objections must be received by the district engineer within 60 days of the date of this notice, or you will
forfeit your right to appeal the permit in the future. Upon receipt of your letter, the district engineer will evaluate your
objections and may: (a) modify the permit to address all of your concerns, (b) modify the permit to address some of your
objections, or (c) not modify the permit having determined that the permit should be issued as previously written. After
evaluating your objections, the district engineer will send you a proffered permit for your reconsideration, as indicated in
Section B below.
B: PROFFERED PERMIT: You may accept or appeal the permit
x ACCEPT: If you received a Standard Permit, you may sign the permit document and return it to the district engineer for final
authorization. If you received a Letter of Permission (LOP), you may accept the LOP and your work is authorized. Your
signature on the Standard Permit or acceptance of the LOP means that you accept the permit in its entirety, and waive all
rights to appeal the permit, including its terms and conditions, and approved jurisdictional determinations associated with the
permit.
x APPEAL: If you choose to decline the proffered permit (Standard or LOP) because of certain terms and conditions therein,
you may appeal the declined permit under the Corps of Engineers Administrative Appeal Process by completing Section II of
this form and sending the form to the division engineer. This form must be received by the division engineer within 60 days
of the date of this notice.
C: PERMIT DENIAL: You may appeal the denial of a permit under the Corps of Engineers Administrative Appeal Process by
completing Section II of this form and sending the form to the division engineer. This form must be received by the division
engineer within 60 days of the date of this notice.
D: APPROVED JURISDICTIONAL DETERMINATION:You may accept or appeal the approved JD or provide new
information.
x ACCEPT: You do not need to notify the Corps to accept an approved JD. Failure to notify the Corps within 60 days of the
date of this notice, means that you accept the approved JD in its entirety, and waive all rights to appeal the approved JD.
x APPEAL: If you disagree with the approved JD, you may appeal the approved JD under the Corps of Engineers
Administrative Appeal Process by completing Section II of this form and sending the form to the district engineer. This form
must be received by the division engineer within 60 days of the date of this notice.
E: PRELIMINARY JURISDICTIONAL DETERMINATION: You do not need to respond to the Corps regarding the
preliminary JD. The Preliminary JD is not appealable. If you wish, you may request an approved JD (which may be appealed),
by contacting the Corps district for further instruction. Also you may provide new information for further consideration by the
Corps to reevaluate the JD.
SECTION II - REQUEST FOR APPEAL or OBJECTIONS TO AN INITIAL PROFFERED PERMIT
REASONS FOR APPEAL OR OBJECTIONS: (Describe your reasons for appealing the decision or your objections to an initial
proffered permit in clear concise statements. You may attach additional information to this form to clarify where your reasons or
objections are addressed in the administrative record.)
ADDITIONAL INFORMATION: The appeal is limited to a review of the administrative record, the Corps memorandum for the
record of the appeal conference or meeting, and any supplemental information that the review officer has determined is needed to
clarify the administrative record. Neither the appellant nor the Corps may add new information or analyses to the record.
However, you may provide additional information to clarify the location of information that is already in the administrative
record.
POINT OF CONTACT FOR QUESTIONS OR INFORMATION:
If you have questions regarding this decision and/or the
appeal process you may contact:
District Engineer, Wilmington Regulatory Division
Attn: Ms. Emily Greer
Wilmington Regulatory Office
U.S Army Corps of Engineers
69 Darlington Avenue
Wilmington, North Carolina 28403
If you only have questions regarding the appeal process you may
also contact:
Mr. Jason Steele, Administrative Appeal Review Officer
CESAD-PDO
U.S. Army Corps of Engineers, South Atlantic Division
60 Forsyth Street, Room 10M15
Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
RIGHT OF ENTRY: Your signature below grants the right of entry to Corps of Engineers personnel, and any government
consultants, to conduct investigations of the project site during the course of the appeal process. You will be provided a 15 day
notice of any site investigation, and will have the opportunity to participate in all site investigations.
________________________________________
Signature of appellant or agent.
Date: Telephone number:
For appeals on Initial Proffered Permits send this form to:
District Engineer, Wilmington Regulatory Division,Attn: Ms. Emily Greer , 69 Darlington Avenue, Wilmington, North
Carolina 28403
For Permit denials, Proffered Permits and Approved Jurisdictional Determinations send this form to:
Division Engineer, Commander, U.S. Army Engineer Division, South Atlantic, Attn: Mr. Jason Steele, Administrative
Appeal Officer, CESAD-PDO, 60 Forsyth Street, Room 10M15, Atlanta, Georgia 30303-8801
Phone: (404) 562-5137
$SSHQGL[35(/,0,1$5<-85,6',&7,21$/ '(7(50,1$7,213-')250
%$&.*5281' ,1)250$7,21
$5(3257 &203/(7,21 '$7()25 3-'
%1$0( $1' $''5(66 2) 3(5621 5(48(67,1* 3-'
&',675,&7 2)),&( ),/( 1$0( $1' 180%(5
'352-(&7 /2&$7,216 $1' %$&.*5281' ,1)250$7,21
86( 7+( 7$%/( %(/2:72 '2&80(17 08/7,3/( $48$7,&5(6285&(6 $1'25
$48$7,&5(6285&(6$7',))(5(17 6,7(6
6WDWH&RXQW\SDULVKERURXJK &LW\
&HQWHUFRRUGLQDWHVRIVLWHODWORQJ LQ GHJUHH GHFLPDO IRUPDW
/DW/RQJ
8QLYHUVDO 7UDQVYHUVH 0HUFDWRU
1DPHRIQHDUHVWZDWHUERG\
(5(9,(: 3(5)250(' )25 6,7( (9$/8$7,21 &+(&. $// 7+$7 $33/<
2IILFH'HVN 'HWHUPLQDWLRQ'DWH
)LHOG'HWHUPLQDWLRQ 'DWHV
7$%/(2)$48$7,&5(6285&(6,15(9,(:$5($:+,&+³0$<%(´68%-(&7725(*8/$725<
-85,6',&7,21
6LWH
QXPEHU
/DWLWXGH
GHFLPDO
GHJUHHV
/RQJLWXGH
GHFLPDO
GHJUHHV
(VWLPDWHGDPRXQW
RIDTXDWLF UHVRXUFH
LQ UHYLHZ DUHD
DFUHDJHDQGOLQHDU
IHHWLIDSSOLFDEOH
7\SH RI DTXDWLF
UHVRXUFHLHZHWODQG
YVQRQZHWODQG
ZDWHUV
*HRJUDSKLFDXWKRULW\
WRZKLFKWKHDTXDWLF
UHVRXUFH“PD\EH”
VXEMHFWLH6HFWLRQ
RU6HFWLRQ
■
ZHWODQG FRDVWDO
ZHWDOQG 6HFWLRQ
0DUFK
7RP *XOOH\ 32 %R[ :LOPLQJWRQ 1&
:LOPLQJWRQ )2 7UDFW $/RW 3HOLFDQ :DON 6$:
1& 3HQGHU +DPSVWHDG
$,&::
0DUFK
7KH &RUSV RI (QJLQHHUV EHOLHYHV WKDW WKHUH PD\ EH MXULVGLFWLRQDODTXDWLFUHVRXUFHVLQ
WKHUHYLHZDUHDDQGWKHUHTXHVWRURIWKLV3-'LV KHUHE\ DGYLVHG RI KLV RU KHU RSWLRQ
WR UHTXHVW DQG REWDLQ DQ DSSURYHG-'$-' IRUWKDWUHYLHZDUHD EDVHGRQDQ
LQIRUPHGGHFLVLRQDIWHUKDYLQJGLVFXVVHGWKHYDULRXVW\SHVRI-'VDQGWKHLU
FKDUDFWHULVWLFVDQGFLUFXPVWDQFHVZKHQWKH\PD\EHDSSURSULDWH
,Q DQ\FLUFXPVWDQFHZKHUH D SHUPLW DSSOLFDQW REWDLQV DQ LQGLYLGXDO SHUPLW RU D
1DWLRQZLGH*HQHUDO3HUPLW1:3 RURWKHU JHQHUDO SHUPLW YHULILFDWLRQ UHTXLULQJ ³SUH
FRQVWUXFWLRQQRWLILFDWLRQ´3&1RUUHTXHVWV YHULILFDWLRQ IRU DQRQUHSRUWLQJ 1:3 RU
RWKHU JHQHUDO SHUPLW DQG WKHSHUPLW DSSOLFDQW KDV QRW UHTXHVWHG DQ$-'IRUWKH
DFWLYLW\WKHSHUPLW DSSOLFDQW LV KHUHE\ PDGH DZDUH WKDW WKH SHUPLW DSSOLFDQW KDV
HOHFWHG WRVHHNDSHUPLWDXWKRUL]DWLRQ EDVHG RQ D 3-' ZKLFK GRHV QRWPDNH DQ
RIILFLDO GHWHUPLQDWLRQ RI MXULVGLFWLRQDO DTXDWLFUHVRXUFHV WKH DSSOLFDQW KDV WKH
RSWLRQ WR UHTXHVW DQ$-'EHIRUH DFFHSWLQJ WKH WHUPV DQG FRQGLWLRQV RI WKH SHUPLW
DXWKRUL]DWLRQ DQGWKDW EDVLQJ DSHUPLW DXWKRUL]DWLRQ RQ DQ$-'FRXOG SRVVLEO\ UHVXOW
LQ OHVV FRPSHQVDWRU\ PLWLJDWLRQ EHLQJ UHTXLUHG RU GLIIHUHQW VSHFLDO FRQGLWLRQV WKH
DSSOLFDQW KDV WKH ULJKW WR UHTXHVW DQ LQGLYLGXDO SHUPLW UDWKHU WKDQ DFFHSWLQJ WKH WHUPV
DQG FRQGLWLRQV RI WKH 1:3 RU RWKHUJHQHUDOSHUPLW DXWKRUL]DWLRQ WKH DSSOLFDQW FDQ
DFFHSW D SHUPLW DXWKRUL]DWLRQ DQG WKHUHE\ DJUHH WR FRPSO\ ZLWK DOO WKH WHUPVDQG
FRQGLWLRQV RI WKDW SHUPLW LQFOXGLQJ ZKDWHYHU PLWLJDWLRQ UHTXLUHPHQWV WKH &RUSV KDV
GHWHUPLQHG WR EH QHFHVVDU\ XQGHUWDNLQJDQ\ DFWLYLW\ LQ UHOLDQFH XSRQ WKH VXEMHFW
SHUPLW DXWKRUL]DWLRQ ZLWKRXW UHTXHVWLQJDQ$-'FRQVWLWXWHV WKH DSSOLFDQW¶V DFFHSWDQFH
RI WKH XVH RI WKH3-' DFFHSWLQJ DSHUPLW DXWKRUL]DWLRQ HJ VLJQLQJ DSURIIHUHG
LQGLYLGXDO SHUPLWRU XQGHUWDNLQJ DQ\ DFWLYLW\ LQ UHOLDQFH RQ DQ\ IRUP RI &RUSVSHUPLW
DXWKRUL]DWLRQ EDVHG RQ D 3-'FRQVWLWXWHV DJUHHPHQW WKDW DOODTXDWLFUHVRXUFHV LQWKH
UHYLHZDUHD DIIHFWHG LQ DQ\ ZD\ E\ WKDW DFWLYLW\ZLOOEHWUHDWHGDVMXULVGLFWLRQDODQG
ZDLYHV DQ\ FKDOOHQJH WRVXFK MXULVGLFWLRQ LQ DQ\ DGPLQLVWUDWLYH RUMXGLFLDOFRPSOLDQFH
RUHQIRUFHPHQWDFWLRQ RU LQ DQ\ DGPLQLVWUDWLYH DSSHDO RULQDQ\)HGHUDOFRXUW DQG
ZKHWKHU WKH DSSOLFDQW HOHFWV WR XVH HLWKHU DQ$-' RU D 3-' WKH -'ZLOO EH SURFHVVHG
DV VRRQ DV SUDFWLFDEOH)XUWKHU DQ$-' D SURIIHUHG LQGLYLGXDO SHUPLW DQG DOO WHUPV
DQG FRQGLWLRQV FRQWDLQHGWKHUHLQRULQGLYLGXDO SHUPLW GHQLDO FDQ EH DGPLQLVWUDWLYHO\
DSSHDOHG SXUVXDQWWR&)53DUW,I GXULQJ DQ DGPLQLVWUDWLYH DSSHDO LW
EHFRPHV DSSURSULDWH WRPDNHDQ RIILFLDOGHWHUPLQDWLRQ ZKHWKHU JHRJUDSKLF
MXULVGLFWLRQ H[LVWV RYHU DTXDWLFUHVRXUFHVLQWKHUHYLHZDUHDRU WR SURYLGH DQ RIILFLDO
GHOLQHDWLRQ RI MXULVGLFWLRQDODTXDWLFUHVRXUFHVLQWKH UHYLHZDUHDWKH &RUSV ZLOO
SURYLGH DQ$-'WR DFFRPSOLVK WKDWUHVXOWDVVRRQDVLVSUDFWLFDEOH7KLV 3-'ILQGV
WKDWWKHUH“may be” ZDWHUV RI WKH 86 DQGRUWKDWWKHUH“may be”QDYLJDEOHZDWHUVRI
WKH86RQ WKH VXEMHFW UHYLHZDUHDDQG LGHQWLILHV DOO DTXDWLF IHDWXUHVLQWKH UHYLHZ
DUHD WKDW FRXOG EH DIIHFWHG E\ WKH SURSRVHG DFWLYLW\ EDVHG RQ WKH IROORZLQJ
LQIRUPDWLRQ
6833257,1* '$7$ 'DWD UHYLHZHG IRU3-'FKHFNDOOWKDWDSSO\
&KHFNHG LWHPV VKRXOG EH LQFOXGHG LQ VXEMHFW ILOH$SSURSULDWHO\UHIHUHQFHVRXUFHV
EHORZ ZKHUH LQGLFDWHGIRUDOOFKHFNHG LWHPV
0DSV SODQV SORWV RU SODW VXEPLWWHG E\ RU RQ EHKDOI RI WKH 3-'UHTXHVWRU
0DS BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
'DWD VKHHWV SUHSDUHGVXEPLWWHG E\RURQEHKDOIRIWKH 3-'UHTXHVWRU
2IILFH FRQFXUV ZLWK GDWDVKHHWVGHOLQHDWLRQ UHSRUW
2IILFH GRHV QRW FRQFXU ZLWK GDWD VKHHWVGHOLQHDWLRQ UHSRUW 5DWLRQDOHBBBBBBBBBBBBBBBBBBB
'DWD VKHHWV SUHSDUHG E\ WKH &RUSVBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
&RUSV QDYLJDEOH ZDWHUV¶ VWXG\ BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
86 *HRORJLFDO 6XUYH\ +\GURORJLF $WODV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
86*61+'GDWD
86*6 DQG GLJLW +8& PDSV
86 *HRORJLFDO 6XUYH\ PDSV &LWH VFDOH TXDG QDPH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
1DWXUDO 5HVRXUFHV &RQVHUYDWLRQ 6HUYLFH 6RLO 6XUYH\ &LWDWLRQBBBBBBBBBBBBBBBBBBBBBBBBBBB
1DWLRQDO ZHWODQGV LQYHQWRU\ PDSV &LWH QDPH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
6WDWHORFDO ZHWODQG LQYHQWRU\PDSV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
)(0$),50PDSV BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
\HDU )ORRGSODLQ (OHYDWLRQ LV BBBBBBBBBBBBBBBB1DWLRQDO *HRGHWLF 9HUWLFDO 'DWXP RI
3KRWRJUDSKV $HULDO 1DPH 'DWH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
RU2WKHU 1DPH 'DWH BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
3UHYLRXVGHWHUPLQDWLRQV )LOH QR DQG GDWH RI UHVSRQVH OHWWHUBBBBBBBBBBBBBBBBBBBBBBBBBB
2WKHU LQIRUPDWLRQ SOHDVH VSHFLI\BBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBBB
,03257$17 127( 7KH LQIRUPDWLRQ UHFRUGHG RQ WKLV IRUP KDV QRW QHFHVVDULO\
EHHQ YHULILHG E\ WKH &RUSV DQG VKRXOG QRW EH UHOLHG XSRQ IRU ODWHUMXULVGLFWLRQDO
GHWHUPLQDWLRQV
6LJQDWXUH DQG GDWH RI 6LJQDWXUH DQG GDWH RI
5HJXODWRU\VWDIIPHPEHU SHUVRQ UHTXHVWLQJ3-'
FRPSOHWLQJ3-'5(48,5(' XQOHVV REWDLQLQJ
WKH VLJQDWXUH LV LPSUDFWLFDEOH
'LVWULFWVPD\HVWDEOLVKWLPHIUDPHVIRUUHTXHVWRUWRUHWXUQVLJQHG3-'IRUPV,IWKHUHTXHVWRU GRHVQRWUHVSRQG
ZLWKLQWKHHVWDEOLVKHGWLPHIUDPHWKHGLVWULFWPD\SUHVXPHFRQFXUUHQFHDQGQRDGGLWLRQDOIROORZXSLV
QHFHVVDU\SULRUWRILQDOL]LQJDQDFWLRQ
3HQGHU *,6 :HWODQG 6NHWFK
■
+DPSVWHDG 4XDG
3HQGHU &RXQW\
86) :6
3HQGHU *,6 &2ORU
*5((5(0,/<&
'LJLWDOO\VLJQHGE\*5((5(0,/<&
'1F 86R 86*RYHUQPHQWRX 'R'RX 3.,
RX 86$FQ *5((5(0,/<&
'DWH
-DPHV7*XOOH\-U'LJLWDOO\VLJQHGE\-DPHV7*XOOH\-U
'DWH
N
Wetland Delineation Sketch
Needham Environmental, Inc.
Environmental Consultants
1” ~ 100’
Uplands - Area of planned disturbance and imperveous areas may
require stormwater and sediment/erosion control permitting approval
Potential 404 Wetlands as regulated by the U.S. Army Corps of Engineers
- no development, soil disturbance or fill activities without prior 404/401
permitting approval. Delineated in the field with numbered, orange pin
flags and pink, numbered ribbons. Flag numbers shown in Red.
LEGEND
U
H
D
E
D
NS
A
The information contained on this map
has been paced in the field and interpreted
on the map using an aerial photograph.
The distances and acreages shown are
approximate and not meant to be absolute.
W#/U#W#/U#Data Point Location
Houston Mears Div
Tract 3A, Lot 4
Hampstead, NC
Map Source: Pender County Online GIS
03-17-112/COE Package.cdr
Wilmington, NC
January 2018
#1#1
#3#3
#13#13
#10#10
U1U1
W1W1
1
2
A
o
i
m
at
e
N
pp rx
H
W
L
3