Loading...
HomeMy WebLinkAboutWQ0040407_Application_20181114 (2)Central Files: APS _ SWP _ 11 /9/2018 Permit Number WQ0040407 Program Category Non -discharge Permit Type Gravity Sewer Extension, Pump Stations, & Pressure Sewer Extensions Primary Reviewer ori.tuvia Coastal SWRuIe Permitted Flow 107,520 Facility Facility Name Holcomb Woods - Phase 2 Location Address Owner Owner Name Town of Harrisburg Dates/Events Permit Tracking Slip Status Project Type Active New Project Version Permit Classification 1.00 Individual Permit Contact Affiliation Major/Minor Region Minor Mooresville County Cabarrus Facility Contact Affiliation Owner Type Government - Municipal Owner Affiliation Carl Palmer Administrator Town Scheduled Orig Issue App Received Draft Initiated Issuance Public Notice Issue Effective Expiration 11 /9/2018 11 /5/2018 11 /9/2018 11 /9/2018 Regulated Activities Requested /Received Events Subdivision Additional information requested Wastewater collection Additional information received Outfall Waterbody Name Streamindex Number Current Class Subbasin State of North Carolina DWR Department of Environmental Quality Division of Water Resources 15A NCAC 02T .0300 — FAST TRACK SEWER SYSTEM EXTENSION APPLICATION Dlvlslon of Water Resources FTA 04-16 & SUPPORTING DOCUMENTATION Application Number: I&OWH646CtobecompletedbyDWR) All items must be completed or the application will be returned I. APPLICANT INFORMATION: 1. Applicant's name: Town of Harrisburg. NC (company, municipality, HOA, utility, etc.) 2. Applicant type: ❑ Individual ❑ Corporation ❑ General Partnership ❑ Privately -Owned Public Utility ❑ Federal ❑ State/County ® Municipal ❑ Other 3. Signature authority's name: Tom Polito per 15A NCAC 02T .0106(b) Title: Public Works Director RECEIVED/NCDENR/DWR 4. Applicant's mailing address: PO Box 100 Harrisburg, NC 28075 City: Charlotte State: NC Zip: 28203.5927 NOV — 5 2018 5. Applicant's contact information: WOROS Phone number: (74 455-0727 Email Address: tnolito(rdharrisburgnc.org MOORESVILLE REGIONAL OFFICE II. PROJECT INFORMATION: 1. Project name: Holcomb Woods - Phase 2 2. Application/Project status: ® Proposed (New Permit) ❑ Existing Permit/Project If a modification, provide the existing permit number: W000 and issued date: If new construction but part of a master plan, provide the existing permit number: W000 3. County where project is located: Cabarrus 4. Approximate Coordinates (Decimal Degrees): Latitude: 35.267111' Longitude:-80.666083° 5. Parcel ID (if applicable): 5505-58-8624 (or Parcel ID to closest downstream sewer) III. CONSULTANT INFORMATION: 1. Professional Engineer: Dale C. Stewart, PE Firm: LandDesign, Inc License Number: 6988 Mailing address: 223 N. Graham St. City: Charlotte State: NC Zip: 28202-1431 Phone number: (704) 333-0325 Email Address: dstewartp_landdesign.com IV. WASTEWATER TREATMENT FACILITY (WWTF) INFORMATION: 1. Facility Name: Rocky River Regional W WTP Permit Number: NCO036269 Owner Name: Water & Sewer Authority of Cabarrus County V. RECEIVING DOWNSTREAM SEWER INFORMATION (if different than WWTF): 1. Permit Number(s): WQ_ Downstream (Receiving) Sewer Size: 36 inch System Wide Collection System Permit Number(s) (if applicable): WQCS00009 Owner Name(s): Water & Sewer Authority of Cabarrus County FORM: FTA 04-16 Page 1 of 5 VI. GENERAL REQUIREMENTS I. If the Applicant is a Privately -Owned Public Utility, has a Certificate of Public Convenience and Necessity been attached? ❑ Yes ❑No ®N/A 2. If the Applicant is a Developer of lots to be sold, has a Developer's Operational Agreement (FORM: DEV) been attached? ❑ Yes ❑No ®N/A 3. If the Applicant is a Home/Property Owners. Association, has an Operational Agreement (FORM: HOA) been attached? ❑ Yes ❑No ®N/A 4. Origin of wastewater: (check all that apply): ® Residential Owned ❑ Retail (stores, centers, malls) ❑ Car Wash ❑ Residential Leased ❑ Retail with food preparation/service ❑ Hotel and/or Motels ❑ School / preschool / day care ❑ Medical / dental / veterinary facilities ❑ Swimming Pool /Clubhouse ❑ Food and drink facilities ❑ Church ❑ Swimming Pool/Filter Backwash ❑ Businesses / offices / factories ❑ Nursing Home ❑ Other (Explain in Attachment) 5. Nature of wastewater: 100 %Domestic/Commercial % Commercial %Industrial (See 15A NCAC 02T .0103(20)) "Is there a Pretreatment Program in effect? ❑ Yes ® No 6. Hasa flow reduction been approved under 15A NCAC 02T .01 14(f)? ❑ Yes ®No ➢ If yes, provide a copy of flow reduction approval letter 7. Summarize wastewater generated by project: Establishment Type (see 02T.0114(f)) Daily Design Flow'" No. of Units Flow Single Family Lots (4 Bedroom House) 480 gal/Lot 224 107,520 GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD gal/ GPD Total 107,520 GPD a See 15A NCAC 02T .0114(b) (d). (e)(1) and (e)(2) for caveats to wastewater design flow rates (i.e., minimum flow per dwelling; proposed unknown non-residential development uses; public access facilities located near high public use areas; and residential property located south or east ofthe Atlantic Intracoastal Waterway to be used as vacation rentals as defined in G S 42A-4). b Per 15A NCAC 02T .0114(c), design flow rates for establishments not identified [in table I SA NCAC 02T.01141 shall be determined using available flow data, water using fixtures, occupancy or operation patterns, and other measured data. 8. Wastewater generated by project: 107,520 GPD (per 15A NCAC 02T .0114) ➢ Do not include future flows or previously permitted allocations If permitted flow is zero, indicate why: ❑ Pump Station or Gravity Sewer where flow will be permitted in subsequent permits that connect to this line ❑ Flow has already been allocated in Permit Number: ❑ Rehabilitation or replacement of existing sewer with no new flow expected ❑ Other (Explain): FORM: FTA 04-16 Page 2 of 5 VII. GRAVITY SEWER DESIGN CRITERIA (If Applicable) - 02T .0305 & MDC (Gravity Sewers): 1. Summarize gravity sewer to be permitted: Size (inches) Length (feet) Material 8 10,324 PVC, DIP ➢ Section II & III of the MDC for Permitting of Gravity Sewers contains information related to design criteria ➢ Section III contains information related to minimum slopes for gravity sewer(s) ➢ Oversizing lines to meet minimum slope requirement is not allowed and a violation of the MDC VIII. PUMP STATION DESIGN CRITERIA (If Applicable) — 02T .0305 & MDC (Pump Stations/Force Mains): COMPLETE FOR EACH PUMP STATION INCLUDED IN THIS PROJECT 1. Pump station number or name 2. Approximate Coordinates (Decimal Degrees): Latitude: Longitude: - 3. Design flow of the pump station: _ millions gallons per day (firm capacity) 4. Operational point(s) of the pump(s): z gallons per minute at _ feet total dynamic head (TDH) 5. Summarize the force main to be permitted (for this Pump Station): Size (inches) Length (feet) Material 6. Power reliability in accordance with 15A NCAC 02T .0305(h)(1): ❑ Standby power source or pump with automatic activation and telemetry - 15A NCAC 02T .0305(h)(1)(B). ➢ Required for all pump stations with an average daily flow greater than or equal to 15,000 gallons per day ➢ Must be permanent to facility Or if the pump station has an average daily flow less than 15,000 gallons per day: ❑ Portable power source with manual activation, quick -connection receptacle and telemetry - 15A NCAC 02T .0305(h)(1)(C) or ❑ Portable pumping unit with plugged emergency pump connection and telemetry - 15A NCAC 02T .0305(h)(1)(C): ➢ It shall be demonstrated to the Division that the portable source is owned or contracted by the applicant (draft agreement) and is compatible with the station. ➢ If the portable power source or pump is dedicated to multiple pump stations, an evaluation of all the pump stations' storage capacities and the rotation schedule of the portable power source or pump, including travel timeframes, shall be provided in the case of a multiple station power outage. FORM: FTA 04-16 Page 3 of 5 IX. SETBACKS & SEPARATIONS — (02B .0200 & 15A NCAC 02T.0305(f)): 1. Does the project comply with all separations found in 15A NCAC 02T.0305(f) & (e) ➢ 15A NCAC 02T.0305(f) contains minimum separations that shall be provided for sewer systems: ® Yes ❑ No Setback Parameter* Separation Required Storm sewers and other utilities not listed below vertical 24 inches Water mains vertical -water over sewer including in benched trenches 18 inches Water mains horizontal 10 feet Reclaimed water lines vertical - reclaimed over sewer 18 inches Reclaimed water lines horizontal - reclaimed over sewer 2 feet **Any private or public water supply source, including any wells, WS-I waters of Class I or Class II impounded reservoirs used as a source of drinking water 100 feet **Waters classified WS (except WS-I or WS-V), B, SA, ORW, HQW, or SB from normal high water or tide elevation and wetlands see item IX.2 50 feet **Any other stream, lake, impoundment, or ground water lowering and surface drainage ditches 10 feet Any building foundation 5 feet Any basement 10 feet Top slope of embankment or cuts of 2 feet or more vertical height 10 feet Drainage systems and interceptor drains 5 feet Any swimming pools 10 feet Final earth grade vertical 36 inches ➢ 15A NCAC 0210305(a) contains alternatives where separations in 02T.0305(fl cannot be achieved. ➢ **Stream classifications can be identified using the Division's NC Surface Water Classifications webpage ➢ If noncompliance with 02T.0305(f) or (g), see Section X of this application 2. Does the project comply with separation requirements for wetlands? (50 feet of separation) ® Yes ❑ No ➢ See the Division's draft separation requirements for situations where separation cannot be meet ➢ No variance is required if the alternative design criteria specified is utilized in design and construction ➢ As built documents should reference the location of areas effected 3. Does the project comply with all setbacks found in the river basin rules per 15A NCAC 0211.02007 ® Yes ❑ No ➢ This would include Trout Buffered Streams per 15A NCAC 2B.0202 4. Does the project comply with an individual 404 Permit or any 401 Certifications? ® Yes ❑ No ➢ Wetland -related permits shall be requested, obtained, and adhered to for projects that impact wetlands or surface waters ➢ Information can be obtained from the 401 & Buffer Permitting Branch 5. Does project comply with 15A NCAC 02T.0105(c)(6) (additional permits/certifications)? ® Yes ❑ No Per 15A NCAC 02T.0105(c)(6), directly related environmental permits or certification applications are being prepared, have been applied for, or have been obtained. Issuance of this permit is contingent on issuance of dependent permits (erosion and sedimentation control plans, stormwater management plans, etc.). 6. Does this project include any sewer collection lines that are deemed "high -priority?" Per 15A NCAC 02T.0402, "high -priority sewer" means "any aerial sewer, sewer contacting surface waters, siphon, or sewer positioned parallel to streambanks that is subject to erosion that undermines or deteriorates the sewer. [-]Yes ® No ➢ If yes, include an attachment with details for each line, including type (aerial line, size, material, and location). High priority lines shall be inspected by the permittee or its representative at least once every silo -months and inspections documented per 15A NCAC 02T.0403(a)(5) or the permitee's individual System -Wide Collection permit. FORM: FTA 04-16 Page 4 of 5 X. CERTIFICATIONS: 1. Does the submitted system comply with 15A NCAC 02T, the Minimum Design Criteria for the Permittingof f Pump Stations and Force Mains (latest version) and the Gravity Sewer Minimum Design Criteria (latest version) as applicable? ® Yes ❑ No If No, complete and submit the Variance/Altemative Design Request application (VADC 10-14) and supporting documents for review. Avoroval of the request is required prior to submittal of the Fast Track Application and su000rtine documents. 2. Professional Engineer's Certification: Dale C. Stewart, PE hngmeer-s name trom Application item ill.1.) attest that this application for has been reviewed by me and is accurate, complete and consistent with the information supplied in the plans, specifications, engineering calculations, and all other supporting documentation to the best of my knowledge. I further attest that to the best of my knowledge the proposed design has been prepared in accordance with the applicable regulations, Gravity Sewer Minimum Design Criteria for Gravity Sewers (latest version), and the Minimum Design Criteria for the Fast -Track Permitting of Pump Stations and Force Mains (latest version). Although other professionals may have developed certain portions of this submittal package, inclusion of these materials under my signature and seal signifies that I have reviewed this material and have judged it to be consistent with the proposed design. NOTE — In accordance with General Statutes 143-215.6A and 143-215.6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misd meanor, which may include a fine not to exceed $10,000, as well as civil penalties up to $25,000 per violation. n / r North Carolina Professional Engineer's seal, signature, and date: 3. Applicant's Certification per 15A NCAC 02T .0106(b): I, `i� th , VA-_ } n . Q. W . ity's name & title from Application Item I.3.) It attest that this application for has been reviewed by me and is accurate and complete to the best of my knowledge. I understand that if all required parts of this application are not completed and that if all required supporting documentation and attachments are not included, this application package is subject to being returned as incomplete. I understand that any discharge of wastewater from this non - discharge system to surface waters or the land will result in an immediate enforcement action that may include civil penalties, injunctive relief, and/or criminal prosecution. I will make no claim against the Division of Water Resources should a condition of this permit be violated. I also understand that if all required parts of this application package are not completed and that if all required supporting information and attachments are not included, this application package will be returned to me as incomplete. NOTE — In accordance with General Statutes 143-215 6A and 143-215 6B, any person who knowingly makes any false statement, representation, or certification in any application package shall be guilty of a Class 2 misdemeanor, which may include a fine not t x eed $10,000 as well as civil penalties up to $25,000 per violation. / Signature: �( Date: FORM: FTA 04-16 Page 5 of 5 PROPOSED SANITARY SEWER a r U..._...„, Q rn (f o 5 )r O PHASE 1 TIE-IN \ 1 LOCATIONS i EXISTING WSACC 1 MANHOLE TIE-IN - (MIT IDq-019108)� EXISTING N15ACC INTERCEPTOR LINE �1 l� L-- 1 EXISTING PHASE 1 SANITARY SEW ER \ (1 1 Lj n` .I LEN;01 IVICINITY MAP NOT TO SCALE 0 _ `EXISTINGWSACC- /� MANHOLE TIE-IN �1 J (MHID#-019087) - 1V I A it �I 1 EXISTING WSACC MANHOLE TIE-IN ( 1 EXISTING WSACC / INTERCEPTOR LINE tNOTE: \ PHASE 2 CONTRIBUTING -+ 4^ FLOW TO PHASE 1 TIE-IN \I `(ram' ----LOCATION, MHID#-019108 HOLCOMB WOODS - PHASE 2 FTSE MAP O SCALE: 1" = 1000' WASTEWATER FLOW ACCEPTANCE FORM FOR THE WATER AND SEWER AUTHORITY OF CABARRUS COUNTY Jurisdiction Requesting Flow Acceptance: Date: October 10, 2018 ❑City of Concord ❑City of Kannapolis OTown of Harrisburg ❑Town of Mt. Pleasant ❑Charlotte Mecklenburg Utilities Project Title, Description, and Number of Lots/Unit: Holcomb Woods — Phase 2 Project Title: Holcomb Woods — Phase 2 Description: The Holcomb Woods — Phase 2 engineering plans and specifications, as prepared and sealed by Dale C. Stewart, NCPE. with LandDesi fn. Inc. for the wastewater collection system extension consisting of approximately 10.324 linear feet of 8-inch sanitary sewer with 48 manholes and other appurtenances to serve 224 lots located off of *Number of Lots: 224 OR *Number of Units: n/a *Must be included in request. Where will the new line be connected: ® Directly into a WSACC Interceptor ❑ Into the Jurisdiction's existing collection system ❑ Into a private line Describe the location of the tie-in line to which the new sewer line will connect: The proposed 8-inch sanitary sewer system connect at 3 locations (MH-019108. MH-019090. and MH-019087) to the 36" WSACC Reedy Creek Interceptor. Which WSACC Interceptor will the Dow ultimately be discharged into: 36-inch Reedy Creek Interceptor What is the WSACC manhole number that the flow will be discharged into? MH-019108. MH-019090, MH-019087 What is the quantity of flow that will be discharged? 107,520 GPD (224 lots * 480 GPD/Lot) *(4 bedrooms @120 GPD / bedroom) Flow type: 0 Domestic 100 % ❑ Commercial % ❑ Industrial % Name of wastewater treatment facility (WWTF) receiving wastewater: Q Rocky River Wastewater Treatment Facility — Permit #NC0036269 Muddy Creek Wastewater Treatment Facility — Permit #NC0081621 Design drawings of new lines will be submitted to WSACC with the request for acceptance. Drawings can be submitted as a digital file (DWG) or distance and bearing starting with the tap on existing infrastructure. If the new line is to connect directly into a WSACC interceptor, detailed drawings including specification of the tap, will be required before flow acceptance will be provided. Mark Lomax at 704-786-1783, ext. 231, must be notified 48 hours in advance of a connection into a WSACC interceptor. WSACC will inspect connection before, during, and after completion. /f construction is not started within two (2) year from the date of approval of the flow acceptance for this project, the approval is rescinded and a second request and approval will be required for the project. WSACC USE ONLY: ■ ■ ■ DATE: Current sewer model shows an Interceptor as being surcharged south of the manhole in question. Approved ❑ Not Approved Current Sewer Model shows: DWRState of North Carolina Department of Environmental Quality Division of Water Resnurces Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—01/14) (JURISDICTION USE ONLY) Jurisdiction Requesting Flow Acceptance for Collection System: ❑City of Concord ❑City of Kannapolis Q Town of Harrisburg ❑Town of Mt. Pleasant ❑Charlotte Mecklenburg Utilities Project Title, Description, and Number of LotstUnit: Holcomb Woods — Phase 2 Project Title: Holcomb Woods — Phase 2 Description: The Holcomb Woods — Phase 2 engineering plans and specifications as prepared and sealed by Dale C. Stewart. NCPE. with LandDesign. Inc. for the wastewater collection system extension consisting of approximately 10,324 linear feet of 8-inch sanitary sewer with 48 manholes and other appurtenances to serve 224 lots located off of Plaza Rd Ext near Mock/Cab Co line, with a wastewater discharge of 107,520 GPD What is the quantity of flow that will be discharged? 107.520 GPD Flow type: Q Domestic 100 % ❑ Commercial % ❑ Industrial % Section I - List the Jurisdiction's pump stations located between the project connection point and the WSACC Interceptor connection point. Pump Station (Name or Number) Firm Capacity * MGD (A) Design Average Daily Flow ** (Firrdp0 MGD (B) Approx. Current Average Daily Flow MGD (C) Obligated, Not Yet Tributary Daily Flow MGD (D)=(B+C) Total Concerti Flow Plus Obligated Flow MGD (F)—(A-D) Available Capacity*** MGD * The Firm Capacity of any pump station Is defined as the maximum pumped Dow that can be achieved with the largest pump taken out of service. **Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the W WTP where Available Capacitv is < 0. Section II. Jurisdiction's Certification Statement: I, Lao Q# certify that, to the best of my knowledge, the addition of the volume of wastewater to be permitted in this project has been evaluated along the route to the receiving WSACC interceptor; and the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden on any downstream pump station in route to the receiving WSACC interceptor normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I plus all attached planning assessment addendums for which, to the best of my knowledge, will not adversely affect the downstream sewer cKacity. Signature of this farm indicates acceptance of this wastewater flow. Jurisdiction's Signing Official Signature Date Revision Date: 08/09/13 WSACC MOW ISO 14 0UN4 • NCShrPublic Sulor • ONSGS180012007 Mr. Haynes Brigman Town Manager Town of Harrisburg P.O. Box 100 Harrisburg, NC 28075 October 18, 2018 Subject: Flow Acceptance Request - Town of Harrisburg Holcomb Woods — Phase 2 Dear Mr. Brigman: WATER & SEWER AUTHORITY OF CABARRUS COUNTY 232 Davidson Hwy. Concord, NC 28027 704.786.1783 ♦ 704.795.1564 Fax www.wsacc.org This is a notice of capacity for the flow acceptance request received by the Water and Sewer Authority of Cabarrus County (WSACC) from the Town of Harrisburg on October 17, 2018. WSACC has or will have capacity at the Rocky River Regional Wastewater Treatment Plant and appropriate sewer interceptors to transport and treat the domestic wastewater from the proposed project entitled Holcomb Woods — Phase 2, located off Plaza Road Extension. The referenced project will serve a residential subdivision with 224 single-family homes, with a projected wastewater flow of 107,520 gallons per day (gpd). The wastewater generated by this project will be conveyed through a proposed gravity system and then enter WSACC's system through three connections at the existing 12 / 36 -inch Reedy Creek Interceptor. WSACC acknowledges it has or will have capacity for wastewater from the proposed development based on infonnation provided by LandDesign, Inc. (Civil Engineer for the project) using North Carolina Department of Environmental Quality (NCDEQ) wastewater flow guidelines. The WSACC Capital Improvement Program (CIP) has been on pay as you go since Fiscal Year 2005 — 2006, funding Capital Projects entirely from Capital Reserves, and WSACC expects to continue this policy into the future. Projects on the CIP are subject to approval by WSACC's Board of Directors, support from local governing bodies, regulatory approval, and funding availability. The list and schedule of CIP projects are tentative and are revised periodically to reflect changing conditions and needs. If construction of this project does not commence within two (2) years of the date of this notice, the notice is rescinded and a second request and notice will be required before flow capacity is accepted. Please notify WSACC, in writing, when construction of this project is initiated. This sewer capacity allocation may also be cancelled pursuant to the conditions set forth in the WSACC Sewer Allocation and Commitment Policy. Please note that the final commitment to service to provide wastewater treatment services shall occur upon application for a building permit for the project and when system development fees are paid pursuant to N.C.G.S. §162A, Article 8. If you have any questions, please call me at (704) 788-4164, extension 104. Sincerely, J J. Thomas Hahn, PE Utility Systems Engineer cc: Tom Polito/Harrisburg Dale C. Stewart, PE/LandDesign, Inc. Michael Wilson/WSACC Tim Kiser, PE/WSACC Chad VonCannon, PE/WSACC Mark Lomax/WSACC State of North Carolina DWR Department of Environmental Quality Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Applications Division of Water Resources (FTSE-04/16) (WSACC USE ONLY) Holcomb Woods — Phase 2 Section I. Name of wastewater treatment facility (W WTF) receiving wastewater: ® Rocky River Wastewater Treatment Facility — Permit #NC0036269 ❑ Muddy Creek Wastewater Treatment Facility —Permit #NC0081621 WWTP facility's permitted flow, MGD 26.500 Estimated obligated flow not yet tributary to the WWTP, MGD 2.681 WWTP facility's actual avg. daily flow, MGD 17.040 (64.30% of permit) Total flow for this specific request, MGD 0.108 Total actual and obligated flows to the facility, MGD 19.829 Percent of permitted flow used 74.83% Section II. Pump stations along the route from the Jurisdiction's connection point to the WWTP. (A) (B) (C) (D)— (D+C) (E)=(A-D) Pump Station Finn Capacity * Design Average Daily Flow *" Approx. Current Obligated, Not Yet Total Current Flow Available (Name or Number) MGD (FirMpt) Average Daily Flow Tributary Daily Flow Plus Obligated Flow Capacity*** MGD MGD MGD MGD MGD Reedy Creek PS 16.500 6.600 1.506 0.545 2.051 4.549 Lower Rocky River PS 37.000 14.800 8.290 2.106 10.396 4.404 " The Firm Capacity of any pump station is defined as the maximum pumped flow that can be achieved with the largest pump taken out of service. ""Design Average Daily Flow is the firm capacity of the pump station divided by a peaking factor not less than 2.5. ***A Planning Assessment Addendum shall be attached for each pump station located between the project connection point and the WWTP where Available Capacity is <0. Section III. WSACC Certification Statement: 1, J. Thomas Hahn. PE, certify to the best of my knowledge that the addition of the volume of wastewater to be permitted in this project has been evaluated along the route from the connection to the WSACC interceptor to the receiving wastewater treatment facility and that the flow from this project is not anticipated to cause any capacity related sanitary sewer overflows or overburden any downstream pump station en route to the receiving treatment plant under normal circumstances, given the implementation of the planned improvements identified in the planning assessment where applicable. This analysis has been performed in accordance with local established policies and procedures using the best available data. This certification applies to those items listed above in Section I and Section 11 plus all attached planning assessment addendums for which I am the responsible party. Signature of this form indicates WSACC's guarantee of capacity for this wastewater flow. Notwithstanding the guarantee of capacity, WSACC does not make a commitment to service this wastewater flow until a building permit is requested through the Cabarrus County Building Inspections Department and WSACC receives payment of the System Development Fee. 's Signing Official Signature DWRState of North Carolina Department of Environmental Quality nivlclnn of Water Recnnrce% Division of Water Resources Flow Tracking/Acceptance for Sewer Extension Permit Applications (FTSE—01/14) FTSE PLANNING ASSESSMENT ADDENDUM (PAA) Submit a Planning Assessment Addendum for each pump station located between the project connection point and the WWTP listed in section 1 or 2 where Available Capacity is < 0.: Pump Station Name (Number): Pump Station Address: Given that: a. The proportion and amount of Obligated, Not Yet Tributary Daily Flow (C) accounts for and MGD of the Available Capacity (E) in Pump Station name and that; b. The rate of activation of this obligated, not yet tributary capacity is currently approximately MGD per year; and that c. A funded Capital Project that will provide the required planned capacity, through CIP project (name) is in design or under construction with a planned completion date of ; and/or d. The following applies: Therefore: Given reasonably expected conditions and planning information, there is sufficient justification to allow this flow to be permitted, without a significant likelihood of over -allocating capacity in the system infrastructure. I understand that this does not relieve the collection system owner from complying with G.S. 143-215.67(a), which prohibits the introduction of any waste in excess of the capacity of the waste disposal system. Signing Official Signature Date Revision Date: O8/09/13 III C' 7J no� Dti{ n v C D O Y % ym M,mZ tx m Oi w n O ru O Ln F O O O O w O I Ln w ru w r i C 03 O X D 1 0 1 m O e 4 0-1 0 T.1 r n � o W LandDesigm,urban design planning civil engineering branding landscape architecture October 10, 2018 Mooresville Regional NCDEQ Office Water Quality Section 610 E. Center Ave. Mooresville, NC 28115 RE: Holcomb Woods Phase 2 LandDesign PN: 1015120 Dear Sir/Madam, 1111Y�7M MOORFSV14E REG!OX_ OFFICC. i' ECEIVEDINCDENR/DWF' NOV - 5 201H WQROS ;,SOORESVILLF RFGIONu1 OFFICE TAC Holcomb, LLC is proposing to develop a 224 lot single-family development on approximately 165.49 acre tract in Harrisburg, NC. We are estimating 107,520 gallons per day of gravity sewage. Attached is a letter from The Water & Sewer Authority of Cabarrus County (WSACC) agreeing to accept our flows to the Rocky River Regional WWTP. The sewer system contains approximately 10,324 L.F. of 8" Sanitary Sewer. The public 8" sewer extension will connect to an existing WSACC interceptor line. Included in this submittal is 2 copies of the Fast -Track Application form, $480 Application fee check, Downstream Sewer WWTF Capacity and Flow Tracking/Acceptance forms, Color Site Map and Certifications. Thank you for your assistance with this project and please feel free to contact me at 704.333.0325 or NKhan(a)landdesion.com should you have any questions and/or comments. Respectfully Submitted, Nadeem Khan, El, LandDesign, Inc. PO Box 36959 Charlotte, NC 28236-6959 223 North Graham Street Charlotte, NC 28202 V: 704.333.0325 R 704,376.8235 N:\_2015\1015120\Docs\Permitting\Permit ForrmiThase 2\FTSE\FTSE Cover Lettecdocx