Stormwater Management Plan
Duke Energy
Document # 17757514-CR001-002
November 13, 2018
Contact Information
10604 Murdock Drive
Knoxville, TN 37932
Tel: 865.671.5400
Fax: 865.671.5403
www.mesainc.com
William Deichert
Mesa Civil Engineer
865.671.5459
wdeichert@mesainc.com
Ruth Neely
Duke Project Mananger
(704) 382-7820
ruth.neely@duke-energy.com
Orchard Tie
Substation
Engineers and Consultants
November 13, 2018
Page 1
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Revision Log
REV.DATE PAGE DESCRIPTION APPROVAL
A 07/27/2018 ALL Issued for Review PCC
B 11/13/2018 ALL Issued for Review PCC
November 13, 2018
Page 2
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Table of Contents
1 PROJECT DESCRIPTION...................................................................................................................3
2 SITE DESCRIPTION............................................................................................................................3
3 ADJACENT PROPERTY.....................................................................................................................4
4 SOILS ..................................................................................................................................................4
5 STORMWATER MANAGEMENT........................................................................................................4
6 STORMWATER CALCULATIONS......................................................................................................5
Appendix A – USGS Vicinity Map and NRCS Soil Map
Appendix B – Stormwater Calculations
November 13, 2018
Page 3
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
1 PROJECT DESCRIPTION
The purpose of the project is to construct a new 230-100 kV substation in Catawba
County, North Carolina. The project is located north and south of Elbow Road and west
of US Highway 321. The project is situated on property being purchased by Duke Energy
and totals approximately 134.79 acres. The substation yard will be approximately 13.48
acres in size and approximately 24 acres will be disturbed during construction of the
substation.
Additionally, approximately 19.48 acres will be cleared of vegetation for the installation of
electrical transmission lines and associated towers. Minimal grading will occur only in the
vicinity of line support structures and access to those structures. Clearing techniques will
vary along transmission right-of-way corridors depending upon terrain features and
vegetation types. Normally, topsoil shall not be graded, removed, or redistributed on
rights-of-way, nor shall contours be altered (except around structure foundations and to
construct diversions and roads). Root systems shall be left intact as much as possible.
Where transmission right-of-way corridors cross open land (pastures, fields, etc.), no land
disturbance will occur except as required for access roads and diversions. Where
feasible, required cut and fill slopes required on rights-of-way shall be no steeper than
2:1, stabilized the same day, and permanently seeded within 7 working days.
As part of a lease agreement between Duke Energy and the previous land owner, select
portions of the remaining property will be cleared to turn the wooded land into pasture.
After construction of the substation yard is completed, access drives and the fenced yard
will be surfaced with stone. The yard area will not receive vehicular traffic and the access
drive around the perimeter of the yard and the middle of the yard (east to west) will only
receive minimal traffic. Therefore, the yard area with the exception of the access drives
will be considered as pervious; however, for the purpose of the calculations the yard is
concerned impervious.
2 SITE DESCRIPTION
The site is currently undeveloped and consists wooded areas, both deciduous and
evergreen and grassy areas. A hill is located near the center of the property and has an
approximate elevation of 898.0. The hill slopes away in all directions. The site is located
in a watershed that drains to the South Fork Catawba River. The South Fork Catawba
River is not listed on the North Carolina impaired waters (303d) list.
The substation yard area will be graded to final elevations of approximately 877.0’ to
880.63’, requiring cuts of approximately 25 feet and fills of approximately 40 feet. The
yard area will have a high point near the center of the yard and extending north and south
the length of the yard and will have a stone surfacing. An access drive approximately 750
feet long will provide access to the station from Elbow Road. Existing trees and vegetation
will be protected as much as possible and will only be cleared within the limits of grading
and where necessary for the transmission lines and towers.
November 13, 2018
Page 4
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
3 ADJACENT PROPERTY
Land use in the vicinity of the project site consists of undeveloped land covered by woods
or grasses for agricultural uses. There are some residential structures located along
Elbow Road southeast and southwest of the property.
4 SOILS
The NRCS Soils Survey map for the project area identified seven different soil types
summarized in the table below.
Map Unit Symbol Map Unit Name Hydrologic Soil Group
CoA Congaree loam, 0 to 2 percent slopes, frequently
flooded
C
LcB Lloyd loam 2 to 6 percent slopes B
LcE Lloyd loam 15 to 25 percent slopes B
LdB2 Lloyd loam 2 to 6 percent slopes, moderately
eroded
B
LdC2 Lloyd loam 6 to 10 percent slopes, moderately
eroded
B
MkF4 Madison-Udorthents complex, 25 to 45 percent
slopes, gullied
B
PaE3 Pacolet clay loam, 10 to 25 percent slopes,
severely eroded
B
5 STORMWATER MANAGEMENT
The proposed substation development will be considered high density development. The
total proposed site area is approximately 134.79 acres and much of this will remain
undeveloped. The substation yard and associated access drives will consist of
approximately 13.48 acres. During construction and rough grading of the project site
sediment basins will be installed on the east and west side of the substation. The
substation yard will be graded with a high point or ridge running generally north to south
and dividing the substation yard in half. The substation yard will have approximately a 1%
cross slope.
A gravel access drive will be constructed from Elbow Road (SR 2114) to the substation.
The access drive will continue inside the substation around the perimeter of the substation
fence. Two access drives will run generally east and west across the center of the
substation yard. The access drives will be constructed of crushed stone with a crown
along the centerline. The substation yard area will have a stone surface. Since the
substation is unmanned there will be minimal vehicular traffic on the access roads and
the majority of the yard area will rarely see vehicular traffic after construction is complete.
November 13, 2018
Page 5
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
As discussed above, the substation will be graded with a high point running generally
north to south and dividing the substation in half east to west. Stormwater runoff will sheet
flow across the yard area towards the east and west sides. The access drive along the
east and west sides will create a high point for the stormwater runoff that sheet flows
across the yard and the stormwater will be collected in a series of catch basins and drain
pipes inside the access drive along the east and west sides to collect stormwater runoff
that may collect along the access drives. The stormwater drains will convey stormwater
to the wet ponds on the east and west side. Two oil water separators (40,000 gallons
each) will be installed and tied to the storm drain system. The oil water separators will
collect runoff and/or any spills or leaks from electrical equipment containing oil.
After construction is complete and the site is stabilized the the sediment basins will be
converted to wet ponds, the sediment basin skimmers will be removed and the outfall
structures will be modified or replaced to serve as a permanent outlet structure, and
maintain post-construction peak flows below pre-construction peak flows.
6 STORMWATER CALCULATIONS
Stormwater calculations are included in Appendix B. These calculations include pre-
construction runoff calculations, post construction runoff calculations, calculations for
sediment basins, calculations for culverts, and selection of energy dissipaters.
HydroCAD version 10.0 was used to develop the stormwater runoff peak flows.
As discussed previously the project will construct a new approximately 13.48 acre
substation. The NCDEQ Stormwater Design Manual was used as guidance for the design
of the wet ponds. The Simple Method for Runoff Volume was used with a 1-inch storm to
determine the design volume. The Hydraulic Retention Time (HRT) Method was used to
size the main pool of the wet ponds. The forebay of the wet pond was sized to have 15%
of the volume of the main pool. The outlet structures are equipped with low flow orifices
sized to drawdown the temporary pool in a time period of 2 to 5 days. The outfall
structures in each wet pond will attenuate stormwater runoff peak flows so the substation
post development peak flows will be less than the predevelopment runoff peak flows. The
stormwater basins and outfall structures were designed conservatively considering the
yard surface as impervious.
November 13, 2018
Page 6
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Summary Table
Pre-Construction Peak Discharge (cfs)
Drainage
Area
1-yr, 24-hr 2-yr, 24-hr 10-yr, 24-hr 25-yr, 24-hr 100-yr, 24-hr
Area 1 12.38 20.28 47.46 60.62 83.89
Area 2 6.73 11.47 28.72 37.32 52.78
Area 3 10.17 18.14 47.02 61.35 87.04
Area 4 30.81 50.41 119.14 152.4 211.28
Area 5 1.40 2.29 5.38 6.89 9.55
Post-Construction Peak Discharge (cfs)
Drainage
Area
1-yr, 24-hr 2-yr, 24-hr 10-yr, 24-hr 25-yr, 24-hr 100-yr, 24-hr
Area 1 5.72 10.84 36.0 51.26 80.12
Area 2 5.41 9.75 26.55 35.12 50.54
Area 3 5.55 9.33 25.93 37.23 56.10
Area 4 23.79 42.26 110.47 144.95 206.51
Area 5 1.11 1.90 4.81 6.25 8.81
November 13, 2018
Page 7
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Appendix A
USGS Vicinity Map & NRCS Soils
Map
November 13, 2018
Page 8
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Project Vicinity Map
Source: USGS Reepsville, NC Quadrangle 2016
PROJECT SITE
November 13, 2018
Page 9
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 10
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 11
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Appendix C
Stormwater Calculations
Design Volume, HRT Method Pond Sizing, Pre-construction Stormwater
Runoff Calculations, Post-construction Stormwater Runoff Calculations,
Yard Drain System, and Access Drive Culverts
November 13, 2018
Page 12
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Design Volume and HRT Method Pond Sizing Calculations:
November 13, 2018
Page 13
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 14
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations:
November 13, 2018
Page 15
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations: 1-year, 24-hour event
November 13, 2018
Page 16
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 17
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 18
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 19
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 20
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 21
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations: 2-year, 24-hour event
November 13, 2018
Page 22
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 23
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 24
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 25
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 26
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 27
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations: 10-year, 24-hour event
November 13, 2018
Page 28
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 29
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 30
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 31
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 32
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 33
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations: 25-year, 24-hour event
November 13, 2018
Page 34
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 35
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 36
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 37
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 38
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 39
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Pre-construction Stormwater Runoff Calculations: 100-year, 24-hour event
November 13, 2018
Page 40
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 41
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 42
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 43
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 44
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 45
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations:
November 13, 2018
Page 46
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations: 1-year, 24-hour event
November 13, 2018
Page 47
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 48
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 49
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 50
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 51
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 52
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 53
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 54
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 55
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 56
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 57
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 58
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 59
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 60
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 61
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 62
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations: 2-year, 24-hour event
November 13, 2018
Page 63
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 64
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 65
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 66
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 67
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 68
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 69
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 70
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 71
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 72
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 73
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 74
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 75
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 76
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 77
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 78
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 79
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations: 10-year, 24-hour event
November 13, 2018
Page 80
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 81
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 82
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 83
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 84
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 85
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 86
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 87
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 88
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 89
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 90
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 91
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 92
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 93
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 94
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 95
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 96
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations: 25-year, 24-hour event
November 13, 2018
Page 97
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 98
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 99
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 100
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 101
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 102
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 103
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 104
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 105
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 106
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 107
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 108
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 109
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 110
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 111
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 112
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 113
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 114
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Post-construction Stormwater Runoff Calculations: 100-year, 24-hour event
November 13, 2018
Page 115
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 116
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 117
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 118
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 119
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 120
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 121
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 122
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 123
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 124
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 125
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 126
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 127
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 128
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 129
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 130
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 131
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Yard Drain System – West Side Drainage System:
November 13, 2018
Page 132
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 133
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 134
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 135
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 136
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 137
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 138
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 139
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 140
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 141
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 142
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 143
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 144
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 145
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 146
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 147
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Yard Drain System – East Side Yard Drain System:
November 13, 2018
Page 148
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 149
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 150
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 151
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 152
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 153
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 154
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 155
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 156
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 157
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 158
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 159
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 160
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 161
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 162
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 163
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
Access Drive Culverts:
November 13, 2018
Page 164
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 165
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 166
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 167
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 168
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 169
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 170
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
November 13, 2018
Page 171
Orchard Tie Substation | Stormwater Management Plan
Document Number 177575148-CR001-002 Rev. B
THIS PAGE INTENTIONALLY LEFT BLANK