HomeMy WebLinkAboutNCG120101_Special Renewal COC Issuance_20181106ROY COOPER
Governor
MICHAEL S. REGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR.
Interim Director
Mr. Tom Copolo
Station Manager
Duke Energy Progress, LLC
10660 Boston Road
Roxboro, NC 27574
Dear Mr. Copolo:
NORTH CAROLINA
Environmental Quality
November 6, 2018
Subject: General Permit No. NCG120000 -Renewal
Mayo Steam Plant Monofill
COC No. NCG120101
Person County
Please see the attached new Certificate of Coverage (COC) No. NCG120101 for renewed coverage
under Stormwater General Permit NCG120000 for this facility. This permit is reissued pursuant to
the requirements of North Carolina General Statute 143-215.1 and the Memorandum of Agreement
between the state of North Carolina and the U.S. Environmental Protection Agency, dated October
15, 2007 (or as subsequently amended.)
We received the company's request for clarification on this COC renewal on September 13, 2018.
Renewed coverage under this General Permit is granted with the condition that the permittee
performs additional sampling requirements as outlined in the amended conditions to the COC. These
requirements are based on the material landfilled at this site. This COC requires you to sample each
SDO semi-annually for arsenic, selenium, boron, conductivity, and pH. This COC also does not
require fecal coliform monitoring. These monitoring parameters are based on the coal combustion
residual material stored, and on monitoring results from 2014 and 2017 that were submitted with the
request.
Duke Energy indicated it would request a modification to NPDES Industrial Permit No. NCS000580
for Mayo Electric Generating Plant to include stormwater discharges from the Mayo Monofill. The
Stormwater Program agrees a modification to that individual permit to include those discharges is
preferable to continued coverage under this General Permit. Because General Permit NCG120000
expires on May 31, 2021—six months prior to the expiration of Mayo Plant's individual permit—our
staff can coordinate a permit modification with the renewal of the individual permit.
NORTH CAROUNAD I
O�YO,ront a Fnrha,un W a� �{,�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
919.707.9200
The permittee is required to apply for renewal no later than 180 days (six months) before the
expiration of the Plant's individual permit NCS000580 (per Part III., Section B.): by July 1, 2021 in
this case. Because that date occurs after the General Permit expires, we advise the company to
request the modification and apply for renewal of NCS000580 by December 31, 2020. This date will
give Program staff the opportunity to renew and issue the permit before the COC for the Monofill
expires.
The General Permit authorizes discharges of stormwater, and it specifies your obligations with
respect to discharge controls, management, monitoring, and record keeping. Please review the new
permit to familiarize yourself with all changes in the reissued permit. Your facility has six (6) months
from receipt of the permit to update your Stormwater Pollution Prevention Plan (SPPP) to reflect any
new permit requirements. Enclosed is a copy of the NCG120000 General Permit.
When does electronic DMR (eDMR) reporting start, and does it affect this permit?
Because this COC requires analytical monitoring, eDMR will affect you. We are working toward on -
boarding permittees with NPDES stormwater permits into the DEQ's eDMR system next
year. Permittees will receive notification when our eDMR system is ready for permit -holders to
register and begin reporting monitoring data electronically.
Your coverage under the General Permit is transferable only through the specific action of
DEMLR. This permit does not affect the legal requirements to obtain other permits which may be
required by the N.C. Department of Environmental Quality (DEQ), nor does it relieve the permittee
from responsibility for compliance with any other applicable federal, state, or local law, rule,
standard, ordinance, order, judgment, or decree.
If you have any questions concerning this permit, please contact Bethany Georgoulias at telephone
number (919) 707-3641 or by email bethany.geor og uliaskncdenr.gov.
Sincerely,
for William . (Toby) Vinson, Jr., P.E., CPM, Interim Director
Division of Energy, Mineral, and Land Resources
cc: Raleigh Regional Office/ Bill Denton
Stormwater Program Files
Lori Tollie / Duke Energy (via e-mail)
DWR Central Files
nio�ni ca.aa�r�aD � Q��
D.P.b M & bllk Mel UwNq�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612
919.707.9200
STATE OF NORTH CAROLINA
DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES
GENERAL PERMIT NO. NCG120000
CERTIFICATE OF COVERAGE No. NCG120101
STORMWATER DISCHARGES
NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM
In compliance with the provision of North Carolina General Statute 143-215.1, other lawful
standards and regulations promulgated and adopted by the North Carolina Environmental
Management Commission, and the Federal Water Pollution Control Act, and the North
Carolina Administrative Code in NCAC 15A 02H .0114(b)(1), as amended,
Duke Energy Progress, Inc.
is hereby authorized to discharge stormwater from a facility located at
Mayo Steam Electric Plant Monofill
10660 Boston Road
Roxboro
Person County
to receiving waters designated as Bowes Branch, a class C water in the Roanoke River
Basin, in accordance with the effluent limitations, monitoring requirements, and other
conditions set forth in Parts I, II, III, and IV of General Permit No. NCG120000 as attached,
and as amended in pages 2-3 of this Certificate of Coverage.
Amended conditions
1. This Certificate of Coverage is an enforceable part of the permit.
2. In accordance with 15A NCAC 02H .0114(b)(1), the monitoring program in Part II
Section B Table 1 Analytical Monitoring Requirements of this permit is amended
as follows:
Table 1 Analvtical Monitoring Requirements
Discharge
Characteristics
Units
Measurement Frequencyl
Sample
Type2
Sample
Location3
Chemical Oxygen Demand
mg/1
semi-annual
Grab
SDO
Fecal Coliform
# per 100 ml
not required
N/A
N/A
Total Suspended Solids
mg/1
semi-annual
Grab
SDO
Arsenic As 5
mg/1
semi-annual
Grab
SDO
Selenium (Se)5
mg/1
semi-annual
Grab
SDO
Boron (13)5
mg/1
semi-annual
Grab
SDO
H5
S.U.
semi-annual
Grab
SDO
Conductivity
S m
semi-annual
Grab
SDO
Total Rainfa114
inches
semi-annual
Rain gauge
Footnotes:
1 Measurement Frequency: Twice per year, during a measureable storm event.
2 Sample collection must begin within the first 30 minutes of discharge and continue to all outfalls until
completed.
3 Sample Location: Samples shall be collected at each stormwater discharge outfall (SDO) unless
representative outfall status (ROS) has been granted by NC Division of Energy, Mineral, and Land
Resources (DEMLR). A copy of the DEMLR letter granting ROS must be kept on site. DEMLR's ROS letter
remains in effect through the subsequent reissuance of this permit and as long as the pertinent site
conditions and operations remain unchanged, unless the ROS letter provides for other conditions or
duration.
4 For each sampled measureable storm event the total precipitation must be recorded from an on-site rain
gauge. (Where isolated sites are unmanned for extended periods, a local rain gauge reading may be
substituted for an on-site gauge, upon prior DEMLR written approval.)
5 No benchmark applies for these parameters. However, levels above 0.34 mg/l As, 0.056 mg/1 Se, or
outside a pH range of 6.0-9.0 S.0 should be noted on the Stormwater Data Monitoring Report (SDMR)
submitted to NC DEQ.
This Certificate of Coverage shall become effective November 1, 2018.
This Certificate of Coverage shall remain . effect for the duration of the General Permit.
for William E. (Toby) Vinson, Jr., P.E., CPM
Interim Director, Division of Energy, Mineral, and Land Resources
By the Authority of the Environmental Management Commission
2 1 COC No. NCG120101 A
effective November 1, 2018
LOCATION MAP:
NCG12O1O1
Map Scale 1:24,000
Duke Energy Progress, Inc.
Mayo Steam Electric Plant Monofill
Latitude: 360 32'00" N
Longitude: 780 55' 21" W
County: Person
Receiving Stream: Bowes Branch
Stream Class: C
Sub -basin: 03-02-05 (Roanoke River Basin)
Facility Location