Loading...
HomeMy WebLinkAboutNC0089702_Fact Sheet_20180124DENR / DWR / NPDES EXPIDITED FACT SHEET - NEW NPDES PERMIT DEVELOPMENT NPDES Permit NCO089702 Facility Information Applicant/Facility Name Terwilliger Pappas — Solis Brightleaf Apartments Groundwater Remediation (GW-REM) Applicant Address 510 Glenwood Avenue, Suite 317, Raleigh 27603 Facility Address 1001 West Main Street, Durham 27701 Permitted Flow (MGD) 0.027 Type of Waste Treated Groundwater excavation dewatering Facility Class Physical/Chemical I County Durham Facility Status Renewal I Regional Office I RRO Stream Characteristics Receiving Stream UT to Ellerbe Creek Stream Classification WS-V; NSW Stream Segment 27-5-(03) Drainage basin Neuse River Basin Summer 7Q10 (cfs) 0.0 Subbasin 03-04-01 Winter 7Q10 (cfs) 0.0 Use Supporting Yes 30Q2 (cfs) 0.0 303(d) Listed NSW Average Flow (cfs) 0.0 State Grid IWC (%) 100 % [storm -sewer discharge] USGS Topo Quad Pro-ject SurnmM — The Applicant proposes [via consultant Mid -Atlantic Engineering and Environmental Solutions] to develop several contiguous real estate parcels into a 1.45-acre apartment complex with subterranean parking. Proposed excavation dewatering will discharge to a local stormdrain under zero -flow receiving -stream conditions (7Q10/30Q2 = 0.0 cfs). The Division concurs that this discharge alternative is the most viable based on feasibility and cost, as outlined in your Engineers Alternatives Analysis (EAA) included with your application. The Applicant proposes to install a French -drain dewatering system to service the entire site. This gravity drain is an unlined gravel trench to a depth of 2 feet, fitted at its bottom with a per 2-inch-diameter PVC drainpipe [see application, Figure C5.10]. Because this trench and pipe are open to the environment, it will gather groundwater, but to a depth of two -feet only. The proposed skid -mounted wastewater -treatment system is portable. The Applicant intends to dewater by pumping the French drain closest to a given excavation. If preconstruction requires excavating deeper than two (2) feet, DWR assumes the Permittee will dewater directly from the excavation, as needed. Dischar-ee Conditions — A wastewater treatment system shall suffice to meet surface water quality (SWQ) stream standards. Wastewater design flow proposes to discharge 7 days/week, three (3) discharges per day, each for —30 minutes @ 0.55 gpm = 49.5 gpd [0.00005 MGD]. The proposed treatment system employs a bag filter, ion -exchange unit(s) [for metals removal] and two (2) each activated liquid phase carbon canisters (see PRM's schematic P&ID-2). All treated effluent will be routed to Durham County's Storm -Sewer System, via Outfall 001 (see Mid -Atlantic's Drawing No. 1); treated wastes to be conveyed by stormdrain to a UT to Ellerbe Creek (see City of Durham approval letter dated April 13, 2017). The Division understands that construction includes a proposed two -deck parking structure that will require permanent dewatering facilities below the natural water table. Prior to installing permanent dewatering Page 1 of 2 facilities, the Applicant must submit an updated treatment -system design with plans and specifications, and apply to modify this permit as needed (see Supplement to Permit Cover Sheet). Parameters Of COricern (POCS) — Because site -assessment analyses detected the present of chlorinated solvents, this site does not qualify for General Permit NCG510000. Parameters of Concern include a list of volatile and semi -volatile organic compounds, metals and other POCs identified during site assessment [see application Tables 1, 2, 3.1 and 3.3]. POCs include metals and compounds detected at concentrations exceeding their respective surface -water quality (SWQ) standards. Parameters exceeding their standard are permit -limited equal to the standard [as required under zero -flow receiving -stream conditions]. Others are included as "monitoring only" or limited in accord with applicable permitting strategies and secondary -treatment technologies [see permit section A. (1.)]. Because there are no effluent data to date, the permit provides the Permittee an option, after establishing a reasonable database, to petition the DWR to reconsider a given parameter's limits and/or monitoring frequency, as data may warrant [see permit section A. (1), Footnotes]. "A - Reasonable Potential Analysis (RPA) - RPA was not conducted because there are no data to date other than analyses of untreated samples collected for initial site assessment. WET Testing — Whole Effluent Toxicity (WET) - Acute, 24-hour Pass/Fail (Monthly) is required using sp Pimephales promelas [TGE3E]. WET test samples shall be collected concurrently weer samples to aid in diagnosing WET -Test failure, if any. Joe R. Corpor_ddr-1:-G., NPDES Unit. 24Jan2018 f Page 2 of 2 DENR / DWR / NPDES EXPIDITED FACT SHEET - NEW NPDES PERMIT DEVELOPMENT NPDES Permit NCO089702 Facility Information Applicant/Facility Name Terwilliger Pappas — Solis Brightleaf Apartments Groundwater Remediation (GW-REM) Applicant Address 510 Glenwood Avenue, Suite 317, Raleigh 27603 Facility Address 1001 West Main Street, Durham 27701 Permitted Flow (MGD) 0.027 Type of Waste Treated Groundwater excavation dewatering Facility Class Physical/Chemical County Durham Facility Status Renewal Regional Office RRO Stream Characteristics Receiving Stream UT to Ellerbe Creek Stream Classification WS-V; NSW Stream Segment 27-5-(03) Drainage basin Neuse River Basin Summer 7Q10 (cfs) 0.0 Subbasin 03-04-01 Winter 7Q10 (cfs) 0.0 Use Supporting Yes 30Q2 (cfs) 0.0 303(d) Listed NSW Average Flow (cfs) 0.0 State Grid IWC (%) 100 % [storm -sewer discharge] USGS Topo Quad Durham (71 Project SArilrilaI y — The Applicant proposes [via consultant Mid -Atlantic Engineering and Environmental Solutions] to develop several contiguous real estate parcels into a 1.45-acre apartment complex with subterranean parking. Proposed excavation dewatering will discharge to a local stormdrain under zero -flow receiving -stream conditions (7Q10/30Q2 = 0.0 cfs). The Division concurs that this discharge alternative is the most viable based on feasibility and cost, as outlined in your Engineers Alternatives Analysis (EAA) included with your application. The Applicant proposes to install a French -drain dewatering system to service the entire site. This gravity drain is an unlined gravel trench to a depth of 2 feet, fitted at its bottom with a perforated 2-inch-diameter PVC drainpipe [see application, Figure C5.10]. Because this trench and pipe are open to the environment, it will gather groundwater, but to a depth of two -feet only. The proposed skid -mounted wastewater -treatment system is portable. The Applicant intends to dewater by pumping the French drain closest to a given excavation. If preconstruction requires excavating deeper than two (2) feet, DWR assumes the Permittee will dewater directly from the excavation, as needed. DiSchgge Conditions — A wastewater treatment system shall suffice to meet surface water quality (SWQ) stream standards. Wastewater design flow proposes to discharge 7 days/week, three (3) discharges per day, each for —30 minutes @ 0.55 gpm = 49.5 gpd [0.00005 MGD]. The proposed treatment system employs a bag filter, ion -exchange unit(s) [for metals removal] and two (2) each activated liquid -phase carbon canisters (see PRM's schematic P&ID-2). All treated effluent will be routed to Durham County's Storm -Sewer System, via Outfall 001 (see Mid -Atlantic's Drawing No. 1); treated wastes to be conveyed by stormdrain to a UT to Ellerbe Creek (see City of Durham approval letter dated April 13, 2017). The Division understands that construction includes a proposed two -deck parking structure that will require permanent dewatering facilities below the natural water table. Prior to installing permanent dewatering Page 1 of 2 facilities, the Applicant must submit an updated treatment -system design with plans and specifications, and apply to modify this permit as needed (see Supplement to Permit Cover Sheet). Parameters of Concern (POCS) — Because site -assessment analyses detected the present of chlorinated solvents, this site does not qualify for General Permit NCG510000. Parameters of Concern include a list of volatile and semi -volatile organic compounds, metals and other POCs identified during site assessment [see application Tables 1, 2, 3.1 and 3.3]. POCs include metals and compounds detected at concentrations exceeding their respective surface -water quality (SWQ) standards. Parameters exceeding their standard are permit -limited equal to the standard [as required under zero -flow receiving -stream conditions]. Others are included as "monitoring only" or limited in accord with applicable permitting strategies and secondary -treatment technologies [see permit section A. (1.)]. Because there are no effluent data to date, the permit provides the Permittee an option, after establishing a reasonable database, to petition the DWR to reconsider a given parameter's limits and/or monitoring frequency, as data may warrant [see permit section A. (1.), Footnotes]. RPA - Reasonable Potential Analysis (RPA) - RPA was not conducted because there are no data to date other than analyses of untreated samples collected for initial site assessment. WET TeStin - Whole Effluent Toxicity (WET) - Acute, 24-hour Pass/Fail (Monthly) is required using sp e Pimephales promelas [TGE3E]. WET test samples shall be collected concurrently WIA o ier samples to aid in diagnosing WET -Test failure, if any. Joe R. , NPDES Unit. 24Jan2018 Page 2 of 2 Quote 321 Issue Date: 2017-05-10 Estimated Ship Date: 2017-WIO Sold To Mid -Atlantic Associates 409 Roger View Ct. Raleigh, NO 27610 (919) 250-9918 Sales Mel Ship To Mid -Atlantic Associates Attn: 409 Rogers View Ct. Raleigh, NO 27610 1 Custom Remediation System PRM W11 manufacture and install a customized remedlation package for peT�ggroundwater collected form fhe French Drain System at Ow zefersnced facility. The system will consists of.- 1/2HP sump pump with automated level control float - 120VAC 300 gallon vertical equalization tank with HL switch and Pump Ore/Off float switch 1 HP Centrifugal Transfer pump, 206-23a240V 3phase (1) 304 SS - 2"Wo bag fllterhousing. .. (2) LP55 RGAC low pressure carbon filtration vessels with camlock connections and hose. (1) System plumbing integration with Sch 80 PVC piping and PRV valve for carbon pressure control (1) High pressure alarm switch (1) System ,ntrol panel - Nema 3R, UL Listed for 1201230V 3phase operailn -Includes HOA switches for pumps -includes Omni -beacon alarm telemetry monitor with 1 year of service -IS circuitry Package is fully integrated, wired and tested on a common process skid. includes all required valves, gauges and sample ports Package is heat traced for unclassirled zones. Page 1 l2 Generated 2017-05-1014.02.48 Mel PWdpe Phone;919-246-4506 Phone:919-451-2635 Email: mel.phillps@prm-net.00m Continued on next page Mel Phillips Phone: 919-246-4596 Phone: 916 451-2635 Email: mel.phigips@prm-net.com Quote 321 I Ln # ] Quantity] Description I Unit Price] Total I K 4 61 7 Upon placement of an order, an engineering submittal will be generated for the project for system approval prior to the build. Option 1 System installation and electrical terminations indudrng pemutting. Includes delivery of the packaged system Option 2 Upgrade control system to include Web600 Telemetry monitor with active pressure monlioring, taint to email and remote log in capabiff es. Also provides totalization from Effluent ToWIzer. Unit allows for remote staWremote stop and also provides data logging for event based actions as well as analog data. Option 3 Provide (1) HP200 IX Filter prechaiged with Resin -Tech CG-B universal ion exchange resin. Used typically for the removal of iron and other inorganic minerals in the streamthis adder includes backwash piping for the IX Tiber. For a low f ow application, this option may not be required. The unit will also be ,provided with b ss,pRing in the event levels are found to be safe and the unit be easily bypassed Option 4 Provide a UL Certification of Meer entire packaged Treatment Skid Option 5 PRM will provide a 3 sided chain linkfence, S'tap with black out screens for security purposes. 1, SALES TAX To be determined at time of ordder. Price is not included in the base pricing above. The below signed authorizes Product Recovery Management to prowrokonshuct aafior rent the items as Noted. Terms for this job are payment due Net 90 days from receipt of invoice unless oBrorwise noted. Service Charges of i Z% per month will he duged on all overdue invoices. N legal action is required to collect debts. rent egress to pay PFhM reasonable attorney fees. This agreement Shall he govemed by and conshued in accordance with the laws of the State of North Carorma and verve shall be proper and personal jurisdiction had in Durham Canty. North CaroNna. Sales and Use Taxes are wed in the fo&w4 g States: FL. NC. and NY unless exempted. Sales A Use Tax In all other states Is the responsibility of the purchaser. PRM given notice that it may use the tradeneme of PRMFLTRATION and recipients are duly, informed of such. Authorized And Accepted By (Signature) Date Of Acceptance Page 212 Generated: 2017-05-10 14:02A8 C�1(5r 5 ttil c� r �M eq Vf NY, Subtotal: Tax: Shipping: Total: Purchase Orderlf Or Project Reference