HomeMy WebLinkAbout20181521 Ver 1_Sheet 2.0 (Impacts)_20181105NWL
NW
LNWL NWLNWLNWLNWLNWLNWLNWLNWLNWLNorth
NORTH CAROLINA WILDLIFE RESOURCES COMMISSION
DIVISION OF ENGINEERING & LANDS MANAGEMENT
1720 MAIL SERVICE CENTER
RALEIGH, NORTH CAROLINA 27699
Phone:919.707.0150
Fax:919.707.0162
www.ncwildlife.orgDate:File Name:Surveyed:Designed:Drawn:Approved:Sheet No.2.0MWLMWLMRLSunsetCD.dwg11/01/2018Proposed Site Plan
Sunset Park BAA
Site Renovation
R
i
v
e
r
D
r
i
v
e Existing GravelParking AreaProposed Concrete RampEx. Chainlink FenceRemove/Replace Sections As NecessaryE
x
.
A
s
p
h
a
l
t
G
r
e
e
n
w
a
yEx. ConcreteSidewalk RampEx. Sidewalk50' Ta
r
/Pam
Bu
f
fe
rClass B Rip Rap w/ Filter FabricClass B Rip Rap w/ Filter FabricProp. GravelProp. GravelProp. Concrete ADAParkingTar River Impacts (O1)Shoreline Impacted: 32 LFArea Below NWL: 375 SF (.01 Acres)Fill Below NWL: 30 CYBuffer ImpactsB4 = Zone 1: 277 SF (P)B4 = Zone 2: 33 SF (P)B5 = Zone 1: 392 SF (T)B5 = Zone 2: 355 SF (T)Buffer Impacts (B1)B1 = Zone 1: 274 SF (P)B1 = Zone 2: 323 SF (P)Buffer ImpactsB2 = Zone 1: 227 SF (P)B2 = Zone 2: 47 SF (P)B3 = Zone 1: 350 SF (T)B3 = Zone 2: 323 SF (T)0402020Scale 1" = 20'Prop. 5' Sidewalk toEx. GreenwayNormal Water LevelWRC 2 Panel KioskWRC Entry PanelTar
R
ive
r
(B
;NSW
)ADA SignagePRELIMINARY PLANSFOR REVIEW ONLYDO NOT USE FOR CONSTRUCTIONSite Plan Notes:1.See sheet 2.1 and 3.0 for additional details related to ramp and grading. See sheet 6.0 for proposed ramp profile.2.See sheet 8.0 and 8.1 for details related to ADA parking and sidewalk route to existing greenway.3.Additional proposed gravel shall be 6" of compacted ABC Stone. Existing concrete sidewalk ramp shall remain in place.AE (
F
l
o
o
dw
a
y
)
B
o
u
n
d
a
r
y
A
p
p
r
o
x
im
a
t
e
L
o
c
a
t
i
o
n
o
f
E
x
.
W
a
t
e
r
M
a
i
n Buffer Impacts Limits