Loading...
HomeMy WebLinkAboutBrightwater Science and Technology Campus Phase 2A - Wet Basin Supplemental FormPermit No.______________________ (to be provided by DWQ) I. PROJECT INFORMATION Project name Contact person Phone number Date Drainage area number II. DESIGN INFORMATION Site Characteristics Drainage area 1,668,348 ft2 Impervious area, post-development 943,074 ft2 % impervious 56.53 % Design rainfall depth 1.0 in Storage Volume: Non-SA Waters Minimum volume required 77,682 ft3 OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre-development 1-yr, 24-hr runoff ft3 Post-development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Peak Flow Calculations Is the pre/post control of the 1yr 24hr storm peak flow required?Y (Y or N) 1-yr, 24-hr rainfall depth 3.0 in Rational C, pre-development 62.00 (unitless) Rational C, post-development 77.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 3.02 in/hr OK Pre-development 1-yr, 24-hr peak flow 8.01 ft3/sec Post-development 1-yr, 24-hr peak flow 7.00 ft3/sec Pre/Post 1-yr, 24-hr peak flow control -1.01 ft3/sec Elevations Temporary pool elevation 297.50 fmsl Permanent pool elevation 169.50 fmsl SHWT elevation (approx. at the perm. pool elevation)fmsl Top of 10ft vegetated shelf elevation 170.00 fmsl Bottom of 10ft vegetated shelf elevation 169.00 fmsl Sediment cleanout, top elevation (bottom of pond)166.00 fmsl Sediment cleanout, bottom elevation 165.00 fmsl Sediment storage provided 1.00 ft Is there additional volume stored above the state-required temp. pool?Y (Y or N) Elevation of the top of the additional volume 297.5 fmsl OK 919.535.5139 8/14/2018 This form must be filled out, printed and submitted. WET DETENTION BASIN SUPPLEMENT Volume provided ft3 ft3 Brightwater Drive, Phase 2A Volume provided 112,123 STORMWATER MANAGEMENT PERMIT APPLICATION FORM Ken Jesneck, PE 401 CERTIFICATION APPLICATION FORM The Required Items Checklist (Part III) must be printed, filled out and submitted along with all of the required information. 5 Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 1 of 2 Permit No.______________________ (to be provided by DWQ) II. DESIGN INFORMATION Surface Areas Area, temporary pool 876 ft2 Area REQUIRED, permanent pool 30,577 ft2 SA/DA ratio 1.83 (unitless) Area PROVIDED, permanent pool, Aperm_pool 31,098 ft2 OK Area, bottom of 10ft vegetated shelf, Abot_shelf 28,990 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 23,646 ft2 Volumes Volume, temporary pool 112,123 ft3 OK Volume, permanent pool, Vperm_pool 105,116 ft3 Volume, forebay (sum of forebays if more than one forebay)18,979 ft3 Forebay % of permanent pool volume 18.1%%OK SA/DA Table Data Design TSS removal 85 % Coastal SA/DA Table Used?N (Y or N) Mountain/Piedmont SA/DA Table Used?Y (Y or N) SA/DA ratio 1.83 (unitless) Average depth (used in SA/DA table): Calculation option 1 used? (See Figure 10-2b)N (Y or N) Volume, permanent pool, Vperm_pool 105,116 ft3 Area provided, permanent pool, Aperm_pool 31,098 ft2 Average depth calculated 3.38 ft OK Average depth used in SA/DA, dav, (Round to nearest 0.5ft)3.5 ft OK Calculation option 2 used? (See Figure 10-2b)Y (Y or N) Area provided, permanent pool, Aperm_pool 31,098 ft2 Area, bottom of 10ft vegetated shelf, Abot_shelf 28,990 ft2 Area, sediment cleanout, top elevation (bottom of pond), Abot_pond 23,646 ft2 "Depth" (distance b/w bottom of 10ft shelf and top of sediment)3.00 ft Average depth calculated 3.66 ft OK Average depth used in SA/DA, dav, (Round to down to nearest 0.5ft)3.5 ft OK Drawdown Calculations Drawdown through orifice?Y (Y or N) Diameter of orifice (if circular)3.50 in Area of orifice (if-non-circular)in2 Coefficient of discharge (CD)0.60 (unitless) Driving head (Ho)0.63 ft Drawdown through weir?N (Y or N) Weir type (unitless) Coefficient of discharge (Cw)(unitless) Length of weir (L)ft Driving head (H)ft Pre-development 1-yr, 24-hr peak flow ?ft3/sec Post-development 1-yr, 24-hr peak flow ?ft3/sec Storage volume discharge rate (through discharge orifice or weir)0.26 ft3/sec OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length of flowpath to width ratio ?:1 OK Length to width ratio ?:1 OK Trash rack for overflow & orifice?Y (Y or N)OK Freeboard provided ?ft OK Vegetated filter provided?N (Y or N)Insufficient. Vegetated filter required. Recorded drainage easement provided?Y (Y or N)OK Capures all runoff at ultimate build-out?Y (Y or N)OK Drain mechanism for maintenance or emergencies is:4" drain Storage volume drawdown time 3.46 days Form SW401-Wet Detention Basin-Rev.9-4/18/12 Parts I. & II. Design Summary, Page 2 of 2