Loading...
HomeMy WebLinkAbout1-R-5824_ PJD Cover Letter-signedSTATE OF NORTH CAROLINA DEPARTMENT OF TRANSPORTATION ROY COOPER GOVERNOR October 5, 2018 U.S. Army Corps of Engineers, Div 8 3331 Heritage Trade Drive, Suite 105 Wake Forest, North Carolina 27587 ATTN: Mr. Andrew Williams, NCDOT Regulatory Coordinator JAMES H. TROGDON, III SECRETARY Subject: Request for a Preliminary Jurisdictional Determination for R-5824, NC 690 (Lobelia Road), widening and improvements from the US 1 Interchange in Vass to the Cumberland County Line, Moore County, North Carolina Dear Mr. Williams: The North Carolina Department of Transportation (NCDOT) proposes to widen and improve NC 690 from the interchange with US 1 in Vass to the Cumberland County line for approXimately 12 miles (R-5824 in Moore County, North Carolina), see Figures 1 and 2. The study area for this project contains nine streams, six ponds, five ditches, and 55 wetlands throughout the 12-mile corridor (Figures 5-1 to 5-14 and 6-1 to 6-14). Enclosed with this request is the Preliminary Jurisdictional Determination Form (PJD), vicinity map, United States Geological Survey (USGS) topographic map, wetland and stream delineation map, North Carolina Division of Water Quality (NCDWQ) Methodology for ldentification of Intermittent and Perennial Streams and Their Origins, Version 4.11 Forms, North Carolina Stream Assessment Methodology (NCSAM) Forms, North Carolina Stream Assessment Forms (NCSAM), and the USACE Wetland Determination Forms for the Atlantic Gulf and Coastal Plain Region. We would like to request a site visit to confirm potentially jurisdictiona States (WOTUS), including wetlands, for the purpose of obtaining a PJD. Scientist from VHB, will be coordinating the site visit meeting. Sincerely, G�eg s �avr;t Greg Davis, PE Proj ect Manager 121 DOT DRIVE CntzTHnGE, NC 28327 Telephone: (919) 707-6000 Customer Service: 1-877-368-4968 Website: www.ncdot.gov 1 Waters of the United Sean Murray, a Project