Loading...
HomeMy WebLinkAboutKewaunee Scientific - 2016-090 C4.2 082718C4.2 GRADING AND EROSION CONTROL DETAILS PSB ISSUES/REVISIONS ISSUED DATE : DESIGN NO. :DRAWN BY :2016-090 REV DATE DESCRIPTION BY 190 WILSON PARK ROAD : STATESVILLE, NC 28625-8506 TM G.L. WILSON BUILDING COMPANY PHONE 704.872.2411 FAX 704.872.8281 EMAIL build@glwilson.com Commercial and Industrial Construction Since 1945 2340 West Front Street Statesville, North Carolina 28677 A PROPOSED EXPANSION FOR: C COPYRIGHT 2018 KEWAUNEE THIS DRAWING IS THE PROPERTY OF THE CONTRACTOR. REPRODUCTION OR REUSE IN PART OR IN WHOLE, WITHOUT WRITTEN PERMISSION IS FORBIDDEN. SCIENTIFIC ISFESRO NSEAL 26975 P. SC GNE TONPRO LR B EENIE LO N A L ACTHAR LO I T GENERAL NOTES: 1.All work to meet town or city, state and federal codes, regulations and standards as applicable. 2.Discrepancies in the plans shall be brought to the attention of the engineer immediately for resolution. 3.All permits shall be obtained prior to construction. 4.Contractor shall be responsible for securing required permits and notifying the town or city departments and the engineer for inspections. 5.All materials and methods of construction shall meet North Carolina D.O.T. Standards. 6.All catch basins, manholes, piping and other utility components within traffic areas shall be capable of supporting H-20 loading. 7.It is the contractors responsibility to verify all on-site and off-site field conditions and verify that no changes have occurred since the issuance of this plan. The design engineer is to be notified of any changes which conflict with this plan. 8.The erosion control line (SF) is to be considered as the limit of disturbance unless otherwise noted hereon (LOD). 9.The contractor shall verify all dimensions, elevations and quantities shown on these plans prior to proceeding with construction and any discrepancies shall be reported to the engineer whom shall have final say as to the actual dimensions to construct by. 10.Strict adherence to all OSHA, Town or City and State of North Carolina regulations regarding construction is required at all times. 11.Contractor shall notify call-before-you-dig (811) for utility markout prior to construction. 12.The contractor shall be fully responsible for job safety. 13.All utilities to be installed underground. 14.Utility locations will be as determined by the utility companies. 15.The location and elevation of underground utilities is unknown. if they are indicated at all on these plans, they are approximate and G.L. Wilson Building Company, it's principals or employees, shall not be responsible for any damages and/or additional costs which might result from the existence of said utilities. 16.The contractor shall determine the exact location of all existing utilities before commencing any work and agrees to be fully responsible for any and all damages which might occur by his failure to exactly locate and preserve any and all underground utilities. 17.All grading shall be performed to eliminate low points and depressions which would trap surface water. contact the design engineer if changes are warranted. 18.Grading to be to all applicable regulations and normal standards of good practice. 19.Minor grading changes are permitted to meet field conditions provided prior approval is obtained from the engineer. 20.Grading shall maintain existing runoff conditions. 21.All backfill for buildings, trenches, structures, parking, driveway and sidewalk etc. shall be adequately compacted to prevent excessive settlement. Contact the engineer should additional clarification be necessary. 22.Contractor to match into existing conditions at all points where construction must match such existing conditions. 23.Soil type consists of sandy clay loam. 24.All erosion control measures employed on the project site shall be constructed, installed, utilized and maintained in accordance with the NCDENR Erosion and Sediment Control Planning and Design Manual and shall be inspected and maintained on a monthly basis and as needed following peak rainfall events. 25.Clean topsoil encountered in the grading process shall be incorporated into the surfaces of slopes, used for embankment and berms in non-structural areas and/or stored in designated topsoil storage areas as shown on the project plans. 26.The owner shall be responsible for all permanent measures following completion of construction. During the construction phase, contact the engineer should problems occur with any measures. 27.The project is subject to self-inspection and monitoring for each phase of the grading and measures must be inspected at least once per 7 calendar days and within 24 hours of a rainfall event greater than 0.5 inches per 24 hour period, reference NCDEMLR Monioring Form. 28.The project site is located in a Phase II MSI or UA area, as designated by the North Carolina Division of Energy, Mineral and Land Quality as appears on the Stormwater Permitting Interactive Map; Local Permitting Authority. 29.Grading Note: Temporary diversions are to be moved and maintained during the grading process in a manner which directs runoff away from silt fences, when possible, and toward sediment traps/basins at all times. 30.Concerns with erosion control issues during construction are to be directed to: Robert Palmes G. L. Wilson Building Co. 190 Wilson Park Road Statesville, NC 28625 Phone: 704 872 2411 Ext. 233 PROFILE VIEW FILTER FABRIC OR DITCH LINER DITCHLINE WOODEN STAKE WITH WATTLE ANCHORED TO THE TOP FLOW DITCHLINE FILTER FABRIC OR DITCH LINER WOODEN STAKE 8" FABRIC STAPLE 12" DIAMETER STRAW FILLED WATTLE FASTENED TO WOODEN STAKE BY NAIL OR STAPLE 18" 18" 6" COVER 12" DIAMETER STRAW FILLED WATTLE NOTES: 1.WATTLES SHALL BE FILLED WITH STRAW OR OTHER APPROVED MATERIAL 2.SPACING FOR WATTLES SHALL BE 75' MAXIMUM. 3.WATTLES MAY BE USED FOR PROTECTION OF CATCH BASINS AND DROP INLETS WITH APPROVAL BY THE STORMWATER UTILITY MANAGER OR DESIGNEE. SILT FENCE STONE OUTLET SIDE VIEW FRONT VIEW PLAN VIEWFLOW FLOWFLOWN.T.S. SLOPE INSTALLATION DETAIL 1.Prepare soil before installing rolled erosion control products (RECPs), including any necessary application of lime, fertilizer, and seed. 2.Begin at the top of the slope by anchoring the RECPs in a 6"(15cm) deep X 6"(15cm) wide trench with approximately 12" (30cm) of RECPs extended beyond the up-slope portion of the trench. Anchor the RECPs with a row of staples/stakes approximately 12" (30cm) apart in the bottom of the trench. Backfill and compact the trench after stapling. Apply seed to the compacted soil and fold the remaining 12"(30cm) portion of RECPs back over the seed and compacted soil. Secure RECPs over compacted soil with a row of staples/stakes spaced approximately 12"(30cm) apart across the width of the RECPs. 3.Roll the RECPs (A) down or (B) horizontally across the slope. RECPs will unroll with appropriate side against the soil surface. All RECPs must be securely fastened to soil surface by placing staples/stakes in appropriate locations as shown in the staple pattern guide. 4.The edges of parallel RECPs must be stapled with approximately 2" - 5" (5-12.5cm) overlap depending on the RECPs type. 5.Consecutive RECPs spliced down the slope must be end over end (Shingle style) with an approximate 3"(7.5cm) overlap. Staple through overlapped area, approximately 12"(30cm) apart across entire RECPs width. 2"-5" (5-12.5cm) 3B 4 2 5 1 3A 12"(30cm) 6" (15cm) 6" (15cm) 3"(7.5cm) USE NORTH AMERICAN GREEN S75 BLANKET OR EQUIVALENT 8/27/18 8/27/18