Loading...
HomeMy WebLinkAboutKewaunee Scientific - 2016-090 C1.0 11051840.0' 35.0' 55.0' 10.0' 35.0' 5.0' 75.0' 7.5' 19 TRAILER SPACES @ 12' = 228.0' 15.0' 40' ±SSSSSSSSSSSSSS SS SS SS SS SS SS SS SS SS SS SS SS S S CO CO CO CO CO CO CO CO 40' SCM ACCESS ROUTE WWWWWWWWWWWWW W W W W W W FH WV C1.0 SITE PLAN PSB 8/27/18 40 0 40 80 16020 SITE DATA PARCEL ID:4724-88-6592 ACREAGE:9.98 ACRES Owner:WILSON FAMILY LIMITED PARTNERSHIP DB. 1344 PG. 1739 190 WILSON PARK ROAD STATESVILLE, NC 28625 704-872-2411 Contact:TOM WILSON 190 WILSON PARK ROAD STATESVILLE, NC 28625 PROPERTY ZONING: LI REQUIRED PARKING:0.5 SPACE PER EMPLOYEE X 26 EMPLOYEES = 13 SPACES REQUIRED TOTAL = 13 SPACES PARKING PROVIDED:25 SPACES & 1 ACCESSIBLE SPACE NUMBER OF PROPOSED NEW EMPLOYEES 0 NUMBER OF PROPOSED NEW BATHROOMS 2 PROJECT COMPLETION TIME 240 DAYS IMPERVIOUS SURFACE (1994) 0.0 SF IMPERVIOUS SURFACE CREATED (POST 1994) 179,228.6 SF PROPOSED ADDITIONAL IMPERVIOUS AREA 83.180.0 SF AREA TO BE DISTURBED:171,610 SF ( 3.93 AC) NO NEW PARKING WILL BE PROVIDED. SCREENING/LANDSCAPING/BUFFERING NOT REQUIRED SETBACKS:FRONT - 30' SIDE - N/A REAR - 20' CORNER - N/A MAXIMUM BUILDING HEIGHT: 80' PROPERTY IS NOT LOCATED IN A WATERSHED. PL PL X X X X X X X X W W W SS SS SS E E E E C C C C E E E C C C X X X X X X X X SIGN SIGN FH FH PPPP W W C FO G G CO 11/5/18 W-6 C1.2 PROPOSED HYDRANT W-7 C1.2 6" VALVE W-6 C1.2 & DEAD END THRUST COLLAR 1 10/22/18 EXTEND FIRE LINE PSB ISSUES/REVISIONS ISSUED DATE : DESIGN NO. :DRAWN BY :2016-090 REV DATE DESCRIPTION BY 190 WILSON PARK ROAD : STATESVILLE, NC 28625-8506 TM G.L. WILSON BUILDING COMPANY PHONE 704.872.2411 FAX 704.872.8281 EMAIL build@glwilson.com Commercial and Industrial Construction Since 1945 2340 West Front Street Statesville, North Carolina 28677 A PROPOSED EXPANSION FOR: C COPYRIGHT 2018 KEWAUNEE THIS DRAWING IS THE PROPERTY OF THE CONTRACTOR. REPRODUCTION OR REUSE IN PART OR IN WHOLE, WITHOUT WRITTEN PERMISSION IS FORBIDDEN. SCIENTIFIC ISFESRO NSEAL 26975 P. SC GNE TONPRO LR B EENIE LO N A L ACTHAR LO I T 2 11/5/18 NCDEQ-DEMLR COMMENTS PSB PROPOSED MAINTENANCE ACCESS SCM #1 PROPOSED MAINTENANCE ACCESS SCM #1 PROPOSED MAINTENANCE ACCESS SCM #1 G:\CURRENT\2016-090 Kewaunee Warehouse Expansion\2016-090 Current\2016-090 Civil\KW1CSN_SP01.dwg, 11/6/2018 3:12:31 PM, DWG To PDF.pc3, 1:1