Loading...
HomeMy WebLinkAboutNCG210099_Powell Lumber Closure Plan Approval_20181105ROY COOPER coves [MICHAEL S. REGAN Ser 1-Y LINDA CULPEPPER lrtrfrfm a'recw Carl B. Powell Powell Industries, Inc. P.O. Box 65 Waynesville, NC 28786 NCq'rH CAROLINA Errlrironmeretal Quality November 5, 2018 Subject: Closed -Loop Recycle Permit (WQ0015487) Approval of Industrial Wastewater Pond Closure Plan Powell Industries, Inc. Suncrest Chip Mill Haywood County Dear Mr. Powell, On August 16, 2018, the Division of Water Resource's Asheville Regional Office (DWR ARO) received an Industrial Wastewater Closure Plan from your consultant Martin & Slagle Geosciences, PA. The closure plan is a requirement for the recession of your Closed -Loop Recycle System Permit (WQ0015487). According to the closure plan, a temporary bypass will be installed to reroute stormwater around the wastewater recycle pond so that impounded wastewater and residual sediments can be tested, evaluated, and removed. The temporary bypass will discharge to a 0.3 -acre stromwater retention pond referred to as the lower pond. An outfall will be installed on the lower pond to allow for the discharge of stormwater to Jonathan Creek. During closure proceedings, quarterly stormwater samples will be collected at the lower pond outfall and reported to DWR ARO and the Division of Energy, Mineral and Land Resources (DEMLR). Once the temporary bypass and stormwater outfall are in place, impounded water in the wastewater recycle pond will be tested, evaluated, and removed. Once the pond is dewatered, a composite sediment and a composite soil sample will be collected from the bottom of the pond to evaluate the underlying materials for removal. DWR ARO will begin the process of rescinding the Closed -Loop Recycle Permit (WQ0015487) after the final closure report has been submitted and approved. North Carolina Department of Environmental Quality I Division of Water Resources 2090 US 70 Highway, Swannanoa, NC 28778 828.296.4500 Carl B. Powell November 5, 2018 Page 2 of 2 The DWR ARO will be working closely with the DEMLR Stormwater Program to ensure a seamless transition from a non -discharge wastewater pond to permitted stormwater retention basin. You are encouraged to develop and implement site-specific Best Management Practices (BMP's) aimed at improving the overall quality of your stormwater discharge. DWR ARO approves the Industrial Wastewater Closure Plan apart from the added requirements and notifications provided in the bulleted items below: • DWR ARO and DEMLR ARO will conduct a joint site inspection upon completion of the temporary bypass and the lower pond outfall. Please provide notification once these components are in place. • DWR ARO would like to split samples during the sediment/soil assessment phase. Please provide sufficient notification prior to sampling. • DWR ARO may conduct additional site inspections and/or stormwater sampling during the closure proceedings. • Powell Lumber will be required to remove the temporary bypass at the end of the closure proceedings. • Powell Lumber will be required to install a stormwater outfall on the wastewater recycle pond before the Closed -Loop Recycle Permit (WQ0015487) can be rescinded. Should you have any questions regarding these matters, please contact me at (828) 296-4500 or at brett.laverty@ncdenr.gov. Sincerely, DocuSigned by: 22��AWP�[Z, 8F6E55D512AE438... Brett Laverty Water Quality Regional Operations Asheville Regional Office cc: ARO files ec: Isaiah Reed — DMLR ARO Stan Aiken - DMLR ARO Bethany Georgoulias — DMLR Central Office Bev Price — DWR ARO Robert Martin - Martin & Slagle Geosciences, PA.