Loading...
HomeMy WebLinkAbout20181393 Ver 1_Request for more information_20181105NORTH CAROLINA ROY COOPED Erxlr�ronmantaf�e�aNty coves MICHAEL S. RECAN Ser 1-Y LINDA CULPE<PPLP, hrrerfrA &[rector November 5, 2018 DWR # 20181393 Stokes, Guilford, Rockingham Counties Piedmont Natural Gas Attn: Ned Dietrich 4720 Piedmont Row Dr Charlotte NC 28210 Subject: REQUEST FOR ADDITIONAL INFORMATION Line 446 Belews Creek Gas Line Project Dear Mr. Dietrich: On October 10,2 018, the Division of Water Resources — Water Quality Programs (Division) received your application dated September 28, 2018, requesting a 401 Water Quality Certification and Buffer Authorization from the Division for your project. The Division has determined that your application is incomplete and cannot be processed. The application is on -hold until all of the following information is received: 1. The application indicates that by citing the new Right of Way (ROW) adjacent to an existing Duke overhead line ROW the applicant has provided for Avoidance and Minimization. Please explain why the existing overhead line ROW cannot be utilized as a temporary construction corridor to further avoid and minimize impacts to streams, wetlands and buffers. For all streams that drain to the Jordan Lake Watershed please provide a detailed buffer impact table which includes impact site identifiers, impact amounts for Zone 1 and Zone 2, whether the impact is a perpendicular crossing (between 75 and 105 degrees angle) or non -perpendicular impact, the area of the buffer impact, the proposed permanent maintenance corridor width, whether mitigation is required and required mitigation amounts (after applying the appropriate EQ.:> � r North Carolina Department of Environmental Quality I Division of Water Resources 450 W. Hanes Mill Rd, Winston-Salem, NC 27107 336.776-9800 Piedmont Natural Gas DWR# 20181393 Request for Additional Information Page 2 of 3 Zone multiplier and subtracting any wetlands within the buffer). Please ensure that buffer impacts are accounted for in "line of site" clearings are included in the Buffer Impact table. 3. The plans provided include call outs stating: "Stream buffers to be provided per Jordan Lake Buffer Rules". Providing a call out is insufficient for review and approval of buffer impacts. Please add Zone 1 and Zone 2 buffers to the plan sheets where appropriate and identify buffer impact areas with shading/hatching similar to that shown for wetland locations and wetland impact areas. Please ensure that buffer impacts are shown in all "line of site" clearing areas as well as open cut areas. If preferred for clarify, you may submit buffer impact sheets separate from the stream/wetland plan sheets. It will be helpful to show the buffer impact areas using different colors or hatching for areas which will be permanently maintained versus areas proposed for buffer re-establishment upon construction completion. Please note that there may be some streams which are located adjacent to the proposed ROW but which may have buffers which are within the ROW and these streams should be included within the buffer impact table and shown on the plan sheets. 4. In an effort to avoid and minimize impacts to streams and wetlands you have avoided impacts within the temporary construction corridor in most locations of streams and wetlands. However, it appears that you have not provided the same avoidance and minimization measures to buffers. Please provide for avoidance and minimization of buffer impacts along streams that are subject to the Jordan Lake Buffer Rules or provide justification for why these areas cannot be avoided. Please show all buffers and temporary limits of disturbance on plan sheets. Pursuant to Title 15A NCAC 02H .0502(e) and 15A NCAC 02B .0267, the applicant shall furnish all of the above requested information for the proper consideration of the application. Please respond in writing within 30 calendar days of receipt of this letter by sending one (1) copy of all of the above requested information to the 401 & Buffer Permitting Branch, 1617 Mail Service Center, Raleigh, NC 27699-1617 OR by submitting all of the above requested information through this link: https://edocs.deg.nc.gov/Forms/Supplemental-Information-Form (note the DWR# requested on the link is referenced above). If all of the requested information is not received within 30 calendar days of receipt of this letter, the Division will be unable to approve the application and it will be returned. The return of this project will necessitate reapplication to the Division for approval, including a complete application package and the appropriate fee. Please be aware that you have no authorization under the Water Quality Certification Rules for this activity and any work done within waters of the state may be a violation of North Carolina General Statutes and Administrative Code. Piedmont Natural Gas DWR# 20181393 Request for Additional Information Page 3 of 3 Please contact me at 336-776-9693 or Sue. Homewood@ncdenr.gov if you have any questions or concerns. Sincerely, Sue Homewood Winston-Salem Regional Office cc: Suzanne Herron, Energy Land & Infrastructure PLLC (via email) David Bailey, USACE Raleigh Regulatory Field Office (via email) DWR WSRO 401 files DWR 401 & Buffer Permitting Unit