MEMORANDUM
Katie Merritt From: Andrea Eckardt
DWR Date: October 29, 2018
Bethel Branch (DWR 2017-0887v2) Summary of Edits
Below is a summary of the edits that were made to the Bethel Branch Bank Parcel Development
Package, per the DWR comments from September 2018. DWR comments are in black,
Wildlands update is in red.
Page 1 (of PDF)
• Crossed out - Nutrient Offset reference in title. Done
Page 2
• Add something that confirms that the watershed draining to the ephemeral channel
(ut3) meets the rule (see 15A NCAC 02B .0295(0)(7). The DWR Site Determination
demonstrates that the ephemeral channel is directly connected to an intermittent
stream. A watershed map has been added to the appendix to show that the entire area
proposed for mitigation is within the contributing drainage area to the ephemeral
stream. Section 6.0 includes details demonstrating that the area of mitigation on the
ephemeral channel comprises no more than 25% of total area of mitigation.
• Add an Existing Conditions Map. There is one from the Stream Mitigation Plan (Figure 7)
but shows UT3 as an intermittent stream all the way to the pond. I'm fine with Figure 7
from the Stream Plan as long as it accurately depicts the channels from our stream
determination. Figure 3 has been modified to show the existing stream alignment and
DWR 2017 stream determinations.
Page 3
• Remove all references to this site being a nutrient offset bank. Done
• Cross -out "Nutrient Offset and' in title. Done
• Cross -out "will be". Done
• Insert "Approximately". Done
• Insert "are proposed to be". Done
• After looking at Figures 6-7, 1 added some clarification to this paragraph that provides
more detail of the type of project you are constructing. All requested edits have been
made to this section.
• Insert "are proposed as". Done
• Insert "are proposed as" Done
• Insert "are proposed as" Done
IW Wildlands Engineering, Inc. (P) 704.332.7754 • 1430 South Mint Street, Suite 104 • Charlotte, NC 28203
• Insert "However, a majority of the mitigated riparian areas will extend to just 50'
perpendicular to the top of stream banks. Any areas that are less than 30' from the top
of stream banks were removed from the creditable acreage for this bank." Done
Page 4
• Insert "Haw River Sub -watershed of Jordan Lake". Done
• Please identify what tributary onsite or offsite that stormwater runoff drains towards.
"The Site includes unnamed tributaries that flow to South Fork Cane Creek." was added
to the paragraph.
• 3 calls were made on UT3, please add clarity here. Done
1. UT3 Upstream of pond and pond (which was ephemeral)
2. Pond outfall to UT3 intermittent flag (which was ephemeral)
3. Intermittent flag to UT2 confluence (which was intermittent)
• Note: The reach upstream of the pond and the reach downstream of the pond were
both determined to be Ephemeral. Therefore, at most, the reach restored through this
pond would carry the same designation as its upstream and downstream reaches... and
would be ephemeral as well.
For this BPDP, we need to describe the projects assets based on the stream calls that
were made prior to the BPDP submittal. If a request is made to re-evaluate the
ephemeral channel UT3 stream reaches after construction, we may entertain that
request. If the designation changes from Ephemeral to Intermittent at a later date, we
will work it out and the assets at the time.
Wildlands can get buffer credit on ephemeral channels under 0295 (o)(7). However it is
up to Wildlands to make sure their buffer credits on the ephemeral channels comply
with all of Rule .0295 9(o)(7). Therefore, Wildland needs to show how the credits don't
exceed the 25% cap written out in the rule. Understood. See credit table in Section 6
for documentation of this rule.
Page 5
• Do you mean UT2? Yes. That has ben corrected.
Page 6
Use this section to describe how the ephemeral reaches being mitigated for buffer
mitigation comply with all the .0295 (o)(7), including the pond as well, with regards to
1. Drainage area and the mitigation area of the whole site. This documentation is now
referenced in Section 2.1 and a figure added to the appendix.
2. 25% cap This cap is documented in Section 6.0 now
• Pond comments (may want to add a Section within 3.0 just for the ponds). Excluding
pond preparation which will be mentioned in 3.1, both ponds needs to be discussed in
detail in this section. Done
• Has Wildlands requested a 401 for pond removal and stream restoration through the
pond? If not, please stat the following: "A 401 will be required for all stream restoration
work, including work within the pond on UT3 and will be obtained prior to any work in
waters." Done
2
Include pond preparation here. Nothing is mentioned about how the pond on UT3 will
be breached, drained, what the draw -down time is, etc. Additional information on the
pond removal was added to this section.
So no grading of soil, ripping, etc is intended to occur as part of the parcel preparation?
I usually see this when the project is planned for stream restoration. Please confirm.
Language has been added to clarify that grading will occur as part of the stream
restoration project. Additional Sheets from the Stream and Wetland Mitigation Project
were added to the Appendix as well.
Pond Comments (may want to add a Section within 3.0 just for the Pond)
1. Excluding pond preparation which will be mentioned in 3.1 the pond needs to
be discussed in detail in this section. In order to approve restoration credit
within the footprint of pond #1, I'll need to see a draft Plan Sheet showing
where the proposed stream channel will go and what is being done to "make"
the stream channel. In our rules, only streams that are restored through pond
bottoms can get buffer credits adjacent to them. There for, without any details
provide here in the BPDP I can't confirm that Wildlands is actually doing a
stream restoration in the pond or is allowing it to naturally regenerate. The
natural regeneration of streams in ponds does not generate buffer mitigation
credits. Understood. Plan sheet showing the proposed stream alignment,
existing pond footprint, and conservation easement boundary was added to the
Appendix.
Page 7
• Insert "15A" Done
Page 8
• Please add another plot and have it proposed to be placed within the pond footprint.
Done
• Insert "UMBI" Done
Page 10
• Insert "When including the restoration proposed within the existing pond footprint"
Done
• Insert "but no wider than 100' from top of stream banks." Done
• Add another row for "UT3 Intermittent Origin" Done
• This area was determined to be "Ephemeral" at the pond outlet down to the DWR
intermittent flag. Therefore, since I need to make sure your buffer credits along
Ephemeral reaches don't exceed 25% of your total mitigation area (see .0295)0)(7)
please give me the acreage along the ephemeral reach separate from the intermittent
reach. If at As -built things change and DWR entertains another stream determination
request, we can handle it then. Done
• Insert "Ephemeral Reach" Done
• This acreage should be included with the calculation used to determine if the mitigation
credits along ephemeral reaches fall less than 25%. Done
3
• Insert "ephemeral reach" Done
• Insert "within the existing pond footprint along UT3" Done
• A complete survey showing tops of banks on all mitigated streams will be provided with
the As -built Report. Any adjustments to mitigation credits will be based on the As -built
survey and submitted with the As -Built Report. Done
Page 11
• Add a column to the right of "Total Acreage" column and title it "Eligible Acreage" The
"*" should be there to reference the rule citations below the table. Then, for the
ephemeral restoration rows, determine what acreage is actually eligible to be used for
credits using the 25% cap and enter that number in the field. Then do the same thing
for Preservation. Done
• Add a row for "Ephemeral" restoration and for Feature ID column use "UT3 reach" and
"pond" for description. Done
• 1 don't think the "*' is appropriate here. More appropriate on the "Eligible acreage"
column Done
• Cross -out Done
• Deduct the ephemeral acreages from this total, including the pond acreages, which are
ephemeral Done
• After you make the "Eligible Acreage" column you will put max allowable acreage here.
Done
• Continue the column for acreage Totals here as well Done
• Add a row "Total Ephemeral Restoration Credits" Done
• You won't need this statement once you include the "Eligible Acreage" column
requested above. Removed
• Add another footnote here referencing the 25% verbiage on Ephemeral channels (see
0295(o)(7)) Done
Page 12
• Delete this table. With the additional columns and rows requested in the previous
table, I don't think you will need this one. Done
• Cross out Done
Page 13
• Add "Stream and Wetland Mitigation As -Built Report submitted to the IRT Done
• Insert "DWR" Done
• Insert "Buffer Mitigation" Done
Page 15
• If Wildlands wants to use this bank for nutrient offsets, it needs to be written up to
address that part. Currently it appears that the BPDP is only proposing buffer
mitigation. Nutrient reference has been removed
Page 21
• Add one more veg plot to your monitoring plan and put it within the pond footprint.
Done
4
Page 23
• Would prefer a plan sheet of just the pond footprint showing the draft design. Plan
sheet depicting the existing pond footprint, new stream alignment, and easement area
was added to the Appendix.
• Planting areas have been updated per earlier comment. Done
5