Loading...
HomeMy WebLinkAbout20181733_Email_20181031Carpenter,Kristi From: Ward, Garcy Sent: Wednesday, October 31, 2018 10:43 AM To: Whitley, Casey K Subject: RE: B-4926 Deck Drains Deck drains are allowed on the overflow structure. �c�r�y "�4lc�rc� Envirc�nrrir�n��l Sr�nic�r Spr�ci�lis� �Jc�r�h G�'�rc�lin� C�ivisic�n c�� W��r�r Rr�sc�aar�r�s ��3 W�shin�;�c�n Sqaa�rr� Mi�ll W�shin�;�c�n, f�JG�'??�SSS� ph: ?�?...�4E�...E�4��. From: Whitley, Casey K Sent: Tuesday, October 30, 2018 3:37 PM To: Ward, Garcy <garcy.ward@ncdenr.gov> Subject: B-4926 Deck Drains Garcy, We just had a meeting in regards to B-4926 (Replacement of Bridge 20 and 34 on NC 55 over Neuse River in Lenoir Co.). The consultant asked if we could clarification on if deck drains would be allowed for the overflow bridge on this project? He said if we could have deck drains on this bridge it would reduce the spread on the bridge which would reduce the bridge width (bridge width is 39' with deck drains). Let me know if you have any additional questions before you answer. Thanks, Casey Whitley, PE, PLS Division 2 Project Engineer (252) 439-2811 (office) � k w_h. i t I_e.`�...,C`„"�,.._n_c d ca.t.:.� cr v 1037 W.H. Smith Blvd Greenville, NC 27835 I rr�7all �:urrc,�l�ui�dci��;e, �C�u ai�d ��rurr�7 �U•ii� �e,i�dcr i� �ul�j��;� �u �C�h•ie, I"J � I�'�"ul�li�; I ta�:ur�:;� I..aw ai�d ir�7ay I�c rli��;lu�e,rl �u �C�h•ih�rl I�artie,�,