Loading...
HomeMy WebLinkAbout20061061 Ver 1_COMPLETE FILE_20060717?1°Ml James R. Vannoy & Sons Construction Co., Inc. 631 McGEE ROAD -ANDERSON, SOUTH CAROLINA 29625 - PHONE (864) 261-8458 - FAX (864) 261-8431 February 2, 2007 NC Department of Environmental & Natural Resources Division of Water Quality 401 Oversight, Express Review Program 1650 Mail Service Center Raleigh, NC 27604 Attention: Cyndi Bell Karoly Dear Cyndi Bell Karoly, Program Manager: Subject: Construction Commencement- Lowe's of Belmont, NC This letter is to serve as notice that the commencement of construction will begin February 12, 2007 on the Lowe's of Belmont, NC, DWQ Project # EXP 06-1061. Should you have any questions, feel free to contact me. Regards, Philip nce Senior Project Manager James R. Vannoy & Sons Construction, Inc. PD/kk r, f ??# 4 - dE,1 N 1)UAUTf Y CF1 ?k.TLhNQe. License No. - NC 3810 VA 13278 SC 11154 TENN 28919 NCDENR North Carolina Department of Environment and Natural Resources Division of Water Quality Michael F. Easley, Governor July 26, 2006 Lowe's Home Centers, Inc. Attn: Mr. Nicky R. Wagoner REEC Dock 1605 Curtis Bridge Road Wilkesboro, NC 28697 Subject Property: Lowe's of Belmont, NC APPROVAL OF STORM WATER MANAGEMENT PLAN Dear Mr. Wagoner: William G. Ross, Jr., Secretary Alan W. Klimek, P.E., Director DWQ Project # EXP 06-1061 Gaston County The Division of Water Quality (DWQ) has reviewed the Storm Water Management Plan dated July 17, 2006 and subsequent revisions received July 24 and 25, 2006 prepared by your engineer, Mr. Todd Simmons, P.E., of Freeland and Kauffinan, Inc. This Plan satisfies the stormwater conditions required by the Water Quality Certification (GC 3404) issued. The storm water treatment system, which includes the extended detention wetlands, as approved by this Office, and the drainage patterns depicted on the plan sheets, must be maintained in perpetuity. No changes to the structural storm water practices shall be made without written authorization from the Division of Water Quality. The storm water easements shall allow for the ability to maintain the structures, perform corrective actions, and shall provide protection of the structures from potential alternations by future property owners. The applicant and/or authorized agent shall contact the DWQ Express Review Program in writing at the letterhead address within ten (10) days of the commencement of construction. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please contact Cyndi Karoly at 919.9721 or Cynthia Van Der Wiele, Ph.D. at 919.715.3473. Sincerely, C di Bell Karoly, Pr am Manager 401 Oversight, Express Review Program CBK/cvdw cc: USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office File Copy Central Files Todd Simmons, Freeland and Kauffman, Inc., 209 West Stone Avenue, Greenville, SC 29609 401 Wetlands Certification Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 One 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 North Carolina Phone: 919-733-17861 FAX 919-733-6893 / Internet: htta://h2o.enr.state.nc.us/ncwetlands Nationally An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper W AT E pG O?0F Michael F. Easley, Governor William G. Ross Jr., Secretary North Carolina Department of Environment and Natural Resources Alan W. Klimek, P.E. Director Division of Water Quality EXPRESS PERMIT REVIEW PROGRAM Division of Water Quality Department of Environmental and Natural Resources 401 Oversight/Express Review Permitting Unit Street Address: 2321 Crabtree Boulevard, Suite 250 Raleigh, NC 27604-2260 Mailing Address: 1650 Mail Service Center Raleigh, NC 27699-1650 Contact Information: Phone #: 919-733-0203 Fax #: 919-733-6893 Fax To: Todd Simmons Subject: Lowe's Belmont, NC Number of pages including cover sheet: 2 Fax #: 864-233-8915 Date: Jn , Notes or special instructions: The original will be sent in the mail. If you have questions, please contact Cynthia Van Der Wiele at 919-715-3473. N Carolina Naturally 401 Oversight/Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone (919) 733-1786 / Fax (919) 733-6893 Internet: http::%h2o.eni.state.nC.u5hicwetlancls An Equal Opportunity/Affirmative Action Employer - 50% Recycled/10% Post Consumer Paper FREELAND and KAUFFMAN, INC. ENmNEER5 • LANDBcAPE ARcHirwrs E.xp o(Q -to61 July 21, 2006 Ms. Cynthia Van DerWiele, PhD NCDENR 2321 Crabtree Boulevard Suite 250 Raleigh, North Carolina 27604 Re: Lowe's - Belmont, NC Dear Ms. Van DerWiele: Affiliate Freeland-Kauffman and Fredeen, Inc. Bentonville, Arkaneas FILE COFY In response to your letter, dated July 18 and received July 19, please find the following 1) Three copies of a revised landscape plan 2) Three revised stormwater reports 3) Three copies of the revised O & M (unsigned) (signed to follow early next week) I tried to get in touch with you to discuss, but got your voice mail that you were out all week. am submitting this without the benefit of discussion, but have addressed the comments as follows: 1) The SA/DA ratio for each pond was revised to utilize a 3' depth for calculation 2) Orifice sizing calculations were added to the report to show that the 2.5" orifice would release the design storm over a 48 hour period. 3) A revised landscape plan has been provided that includes the requested features as well as incorporating comments from a recent submittal on another engineer's project 4) A revised O & M has been submitted. I would like to get verification that this is acceptable and then provide the signed version. Thank you for your assistance and please let me know if you need any additional information. Sincerely, odd Simmons, t? 4 p?H,? zoos 209 West Stone Avenue • Greenville, South Carolina 29609. Telephone 864-233-5497. Fax 864-233-8915 FREELAND and KAUFFMAN, INC. ENGINEERS a LIWDSGAf E ARCH1lECT5 209 West Stone Avenue Greenville, South Carolina 29809 Telephone 884233-5497 Fax 884.233-8918 Job ? ?,) C- Job No. Computed By Checked Dy Date Date 7 5???• ! i , . t - , o l ? _! 1 . l i I i 14- 1 FI- = P, 0 3- Q ' , . C) 4. P14 . i r I ? r. . f j I i ( r 1 i _ ? .. { , -y r i . ` ' i he o FREELAND and KAUFFMAN, INC. ENGmms aLmosawEARCHfmas 209 west Stone Avenue Greenville, South Carolina 29609 Job _ Job No. Date Telephone 664-233-5497 Computed By Fax 864-233-8915 Checked Dy Date - --T _ _ - T - _ , .. -- c?cc?c?vlc , LL r- 4 A-" f r A 1 ,. , i L_ 14- V` : 1 I : -o ??• -or I I • i 1 I I I 1 { STORM WATER MANAGEMENT REPORT & CALCULATIONS FOR LOWES OF BELMONT, NC BELMONT, NORTH CAROLINA REVISED SUBMITTAL 07/20/06 FREELAND & KAUFFMAN, INC. ENGINEERS - LANDSCAPE ARCHITECTS 209 WEST STONE AVE. GREENVILLE, SOUTH CAROLINA 29609 Lowe's Caldwell Farm Road & I-85 Belmont, NC. Executive Summary The site is currently an approximate 16-acre commercially zoned property. The site is currently vacant. The property will be developed to contain Lowe's Home Improvement Center. Construction will include the building areas, and accompanying parking and landscape areas. One stormwater management pond will be located on the property to serve the Lowe's facility. In addition, the existing stormwater facility for the adjacent Wal-Mart Supercenter will be reconfigured as part of this development to allow for the construction of a parking area in the location of the existing Wal-Mart pond. The Lowe's Pond (Basin #l) will be located in the northwest portion of the site. The Wal-Mart Pond (Basin #2) will be located in the southern portion of the site. In accordance with the requirements of the Town of Belmont and NCDENR, both ponds will be designed to treat and release the first 1 " from a water quality standpoint. In addition, the ponds will limit the 10-yr and 100-yr discharge to predeveloped rates, in accordance with the Town of Belmont standards. The computer program Hydraflow Hydrographs will be used to generate hydrographs for each condition as depicted on the area maps. This program is based on the SCS (TR-55) calculation method. TR-55 was used to calculate the time of concentration for input into this program. The pre-developed flows were calculated using TR 55 to generate the runoff number and time of concentration for the flow areas. This information was input into the Hydraflow Hydrographs computer model to generate pre- developed flows. The hydrographs for each can be found in Appendix A, but the flows are summarized below: Predevelotaed Rainfall Event Area #I (cfs) Offsite Area # 1 (cfs) Combined Area # 1 (cfs) Area #2 (cfs) 1"Runoff N/A N/A N/A N/A I 0yr. 18.85 5.78 20.08 44.46 100 yr. 39.26 9.68 41.79 72.94 Development of the site will increase the runoff due to the increase in impervious area. Also, the time of concentration will be decreased as a result of this development. Again, TR55 was utilized to determine the runoff number and time of concentration for the contributing flow areas. The hydrographs can be found in Appendix B. The allowable discharge from Basin #1 is a combination of the predeveloped Area #1 and the Offsite Area #1. This hydrographs were combined to develop the combined hydrograph. In this analysis, it is assumed that the entire area # 1 drains to point A. As this is not truly correct, the areas 1 A and 1 B combine a few hundred feet downstream from this point, on property owned by the Abbey, so that this assumption is considered valid. The calculations for Area #2 closely model the original calculations for the original design of Basin #2 for the Wal- .1 r' r' r' r' r' r' 11 r' r' r' r' r' r' r? r> r' Mart Supercenter. The same Cn value and time of concentration was utilized to maintain consistency. The only revision was the reduction of 0.2 acres that now will be directed to the Basin # 1. Developed Rainfall Event Area #l (cfs) Area #2 (efs) III N/A N/A 10yr. 83.24 88.04 100 yr. 120.74 124.53 The pond will be sized to limit the discharge of the 10 yr, and 100 yr storms to pre-developed rates. In addition, the water quality benefits of an extended wetland detention will be utilized to provide treatment for the first 1 ". Again, the computer program Hydraflow Hydrographs was used to model the proposed pond. The hydrographs can be found in Appendix C, but the following tables summarize the results: Developed Pond Discharge Basin #1 POND Stage Storage Volume Allowable Release Actual Release 111 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 POND Stage Storage Volume Allowable Release Actual Release 1" 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1 " has been controlled in both basins to be released over a period of 2 - 5 days. Existing Conditions: The drainage area for the site consists of two separate areas (See Pre-developed Drainage Area Map). Area 1 A drains to the west to the existing drainage ditch. Area 1 B drains to the south toward Caldwell Farm Road. Since Areas 1 A and 1 B combine within a few hundred feet of the site boundary, it will be analyzed as one drainage area (Area #1). The soil type for this area is Type B according to the Soil Conservation Survey. In addition to Area #1, a small amount of offsite water will be directed to the site from the adjacent Interstate 85. This area is Offsite Area #1 and consists of Type B Soils. The drainage area for the reconfiguration of the Wal-Mart Pond (Basin #2) was taken from the approved stormwater report previously done by Freeland and Kauffman. The only deviation was the subtraction of 0.2 acres of drainage area that will not be directed to Basin #1. Area 1 is 13.8 acres of woods/grass combination in fair condition. Per the TR-55 Method, a curve number of 65 was determined. The time of concentration was derived from 100' of sheet flow at 9.0%, 65 of shallow concentrated flow @3.0%, 310' of open channel flow at 2.5% and 355 of open channel flow at 0.8% to Point A. This yields a time of concentration of 17 minutes. Area 1 (13.8 ac.) Woods/Grass Combo (Fair) A= 13.8 ac CN = 65 Offsite Area #1 is 1.00 acres of landscaped area in good condition and 0.50 acres of asphalt. Per the TR-55 Method, a curve number of 73 was determined. The time of concentration was derived from 30' of sheet flow at 2.0% and 825' of shallow concentrated flow at 2.5%. This yields a time of concentration of 6 minutes. Offsite Area 1 (1.50 ac.) Landscaped Area Impervious Area Good condition A = 0.50 ac A= 1.0 ac CN=61 CN=98 CN = 73 As stated Area 2 was derived from the previously approved Wal-Mart Supercenter Report by Freeland and Kauffman. The input data is summarized below. Area = 13.9 acres Cn = 76 Tc = 16.5 minutes Developed Conditions: In the developed condition, all of the Lowe's site + 0.2 acres from Wal-Mart will be directed to Basin # 1. The developed condition for Wal-Mart will be in accordance with the Wal-Mart drainage study by Freeland and Kauffman - 0.2 acres now directed to Basin # 1. Runoff Calculations for Developed Condition to Pond: Area #1 Runoff Curve Number Paved parking lots, Open space, good condition, roofs, and driveways grass cover> 75% A=10.5 ac A=3.3ac CN=98 CN=61 The total developed area is 13.8 acres and the weighted CN value is 89 (see TR-55 calculations for post- developed condition). Time of Concentration 100 ft. sheet flow @ 2.0% 188 ft. shallow conc. @ 1515 ft. open channel flow Paved Surface 3.0%, paved @ 4 fps Total Tc = 6 min Area #2 Again, Area #2 matches the Wal-Mart report - 0.2acres. The input data is summarized below. Area: 14.3 ac. Cn: 93 Tc: 8.2 min POND SIZING AND ROUTING Both ponds will be extended wetland detention facilities. Basin #1 will have a bottom elevation of 667.00, a permanent pool elevation of 67 1.00, and a top elevation of 678.50. This gives a total volume of 180,115 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and. 100-year storm events to be released at pre- developed rates. In addition, the outlet will be designed to discharge the first 1 " runoff within 2 - 5 days. The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1 " runoff will be released through an orifice at the top of the permanent pool elevation (el. 671.00), while all other storm events will be released through a weir at the el. 673.00. The outlets will be sized as follows: Orifice Equation - Q = 0.642gH Weir Equation - Q = 3.33LH312 From these equations it is determined that a 2.5-inch diameter orifice at elevation 671.00 will release the first 1" runoff. The 10 and 100-year storms will be passed through a 1' weir at elevation (673.00). A 5'x 5' concrete riser will extend to elevation 677.50. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: Basin #1 POND Stage Storage Volume Allowable Release Actual Release 111 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 will have a bottom elevation of 666.00, a permanent pool elevation of 670.00, and a top elevation of 676.50. This gives a total volume of 138,950 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and 100- year storm events to be released at pre-developed rates. In addition, the outlet will be designed to discharge the first 1" runoff within 2 - 5 days The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1 " runoff will be released through an orifice at the top of the permanent pool elevation (el. 670.00), while all other storm events will be released through a weir at the el. 672.00. It is determined that a 2.5-inch diameter orifice at elevation 670.00 will release the first 1 " runoff. The 10 and 100-year storms will be passed through a 3' weir at elevation (672.00). A 5'x 5' concrete riser will extend to elevation 675.00. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: Basin #2 POND Stage Storage Volume Allowable Release Actual Release 111 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1" has been controlled in both basins to be released over a period of 2 - 5 days. Both basins have been designed as extended wetland detention ponds per the NCDENR manual. Minimum surface areas have been met and the areas designed to provide approximately 15% area for the forebay, 35% area for the 0" -9" areas, 35% area for the 9" - 18" areas, and 15% area for the Micropool. Calculations for each basin can be found in Appendix C. Erosion & Sediment Control The following is the report of the sediment and erosion control devices to be used on this project. The erosion will be controlled via a series of temporary diversion ditches, temporary sediment basins, inlet protection, silt fence, and a stone construction entrance. These items will be implemented per the NCDENR Erosion and .i Sediment Control Planning and Design Manual requirements and maintained on a regular basis to insure their proper operation. We will also provide all calculations for the sediment basin and traps. The site to be graded will consist of approximately 20.0 acres. The site is currently vacant with a mix of vegetation. A majority of the site has been logged within the last 2 years. In its graded condition the site will drain from the north to the south and then piped to a basin on the west side. The extended wetland detention pond will also serve as a sediment basin during construction. Diversion ditches will be installed to direct runoff into the pond during construction. Silt fence will be used in areas with less than 1 acre of disturbance that cannot be directed to either the temporary sediment pond or the either one of the sediment traps. In the interim, the remaining areas, which cannot be incorporated to the pond, will be directed towards silt fence. These areas are small and consist mainly of the fill slopes for the stormwater basins and the sediment traps. When the stormwater system is installed, inlet protection will be installed at each catch basin to collect sediment. Sediment Basin Calculations: The on-site detention pond will also serve as a sediment basin during construction. The pond is sized to handle the majority of the runoff in the developed condition. Based on the NC Erosion Control Handbook the basin should be sized to handle sediment at a rate of 1800 cubic feet (c.f.) per disturbed acre per year. From the Soil Conservation Service Soil Survey the soil types on site consist mainly of clayey soils. From the chart provide by NCDENR (fig. 6.61) and based on a surface area to peak discharge ratio of 0.01, the efficiency should be 75%. For loamy sand the efficiency is 85%. In both cases this meets the state requirements. 9• 0 FREELAND and KAUFFMAN, INC. . ENGINEERS, • LANDSCAPE ARCH/TECTS - X209 West Stone Avenue Greenville, South Carolina 29609 ?elephone 864-233-5497 Fax 864233-8915 ,) Job t3C- Job No Computed By Checked By_ Date Date r R FEfZEN E Calculati gn For 1 o? I S Dis ipli i 1 ! j : ? Lo i.?t?Z ? bc?9 CC?iLp'?S - to At ?^p!a?JiT`? ? ? ± ? \sj (7 f , -j - ( ..._ .; .._. ..... _ .__., s -._ .... i i :.. . € _ ... ,.._-.. 1 1 35 0?-,? ct,7 p t } . ? } I I I .? , ,, ! S o ?w Pcs???c?S , t- i , € - ._.? _.() 111CLS ?-_. c?,? A- x ! •- ! S ? J 1€ # ii )) t jjj ! } ( + ! } € !i f i { s i l : ( F I : i t Qf i WinTR-55 Current Data Description --- Identification Data --- User: Date: 6/20/2006 Project: LOWES Units: English SubTitle: BELMONT Areal Units: Acres State: North Carolina County: Gaston Filename: P:\TSimmons\Dwg\Proj\LOWES\Belmont NC\STORMWATER CALC\PREDEVELOPED AREA 1.w55 --- Sub-Area Data --- Name Description -------------------------------- PREDEVELOP Offsite Total area: 15.30 (ac) Reach Area(ac) RCN Tc --------------------------------------- Outlet 13.8 65 0.285 Outlet 1.5 73 0.100 --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.5 4.4 5.0 5.5 6.5 6.9 3.0 Storm Data Source: Gaston County, NC (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 6/20/2006 3:28:55 PM HYdro9raph Plot 1 ? Hydraflow Hydrographs by Intelisolve i Hyd. No. 1 Area #1 (Predeve loped) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER } Total precip. = 1.50 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.01 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 204 cult Area #1 (Predeveloped) Q (cfs) Hyd. No. 1 --1 Yr 1} 0.10. 0.09 0.08 0.07-- 0.06 -- 0.05-- 0.04-- 0.031-- 0.02 0.01 0.001 0 2 Hyd No. 1 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 5 7 9 12 14 16 19 21 23 26 Time (hrs) HYdro9raph Plot 1o / 1 Hydraflow Hydrographs by Intelisolve / i Hyd. No. 1 OF 1 Area #1 (Predeveloped) 11 Hydrograph type = SCS Runoff / Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% 1 Tc method = USER Total precip. = 5.00 in 1 Storm duration = 24 hrs Q (cfs) 1 21.00 1 1 18.00 15.00 1 12.00 i' 9.00 1! 6.00 3.00 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 18.85 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 65,176 cuft Area #1 (Predeveloped) Hyd. No. 1 --10 Yr 0 2 5 Hyd No. 1 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 7 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 1g • • Hydraflow Hydrographs by Intelisolve • Hyd. No. 1 Area #1 (Predeve loped) Hydrograph type = SCS Runoff • Storm frequency = 100 yrs Drainage area = 13.80 ac Basin Slope = 0.0% . Tc method = USER Total precip. = 6.90 in } • Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 39.26 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Q (cfs) Hydrograph Volume = 126,891 cuft Area #1 (Predeveloped) Hyd. No. 1 -100 Yr Q (cfs) 40.00 30.00 20.00 10.00 - _--------V?I ?' I J 1 1 1 1 0 2 5 7 Hyd No. 1 9 12 14 16 19 21 23 0.00 26 Time (hrs) Hydrograph Plot 2 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 660 cuft ?i Offsite (Predeveloped) Q (cfs) Hyd. No. 2 --1 Yr 0 2 Hyd No. 2 0.50 0.45 0.40 0.35 0.30. 0.25 0.20 0.15 0.10 0.05 0 00 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 11 w Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 5.78 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 •? Q (cfs) •) c nn Hydrograph Volume = 11,641 cuft OfPsite (Predeveloped) Hyd. No. 2 - 10 Yr Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0 2 5 7 f? Hyd No. 2 9 12 14 16 19 21 23 0.00 26 Time (hrs) Hydrograph Plot 20 ? Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predeveloped) / Hydrograph type = SCS Runoff Storm frequency = 100 yrs 1 Drainage area = 1.50 ac Basin Slope = 0.0% / Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 9.68 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 r' Q (cfs) 10.00 1 Hydrograph Volume = 19,649 cuft Offsite (Predeveloped) Hyd. No. 2 --100 Yr Q (cfs) 10.00 8.00' 6.00 4.00 2.00 0.00 ' ' ' ' 0.0' 2.3 4.7 7.0 Hyd No. 2 8.00 6.00 4.00 2.00 y- 0.00 9.3 11.7 14.0 16.3 18.7 21.0 23.3 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 / Total Predeveloped to Basin #1 ?i Hydrograph type = Combine Storm frequency = 1 yrs / Inflow hyds. = 1, 2 11 Q (cfs) 0.50 0.45 0.40 0.35 'I 0.30 0.25 111 0.20 0.15 0.10 0.05 h 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min Hydrograph Volume = 864 cult Total Predeveloped to Basin #1 Hyd. No. 4 -1 Yr 0 2 5 7 9 II (I Hyd No. 4 Hyd No. 1 h II i F 12 14 16 - Hyd No. 2 19 21 23 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 26 Time (hrs) 3 Hydrograph Plot 1 Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Total Predeveloped to Basin #1 1 Hydrograph type = Combine 1 Storm frequency = 10 yrs Inflow hyds. = 1, 2 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 20.08 cfs Time interval = 2 min 11' 1} Q (cfs) 21.00 18.00 11 15.00 12.00 9.00 r 6.00 } } r r? 3.00 j -- - - - - ------ - ----------- --- - NI:: r --- -------- ----- - - - Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00. 0 00 r 0 2 5 7 r' Hyd No. 4 Hydrograph Volume = 76,817 cuft Total Predeveloped to Basin #1 Hyd. No. 4 -10 Yr 9 Hyd No. 1 12 14 16 - Hyd No. 2 19 21 23 26 Time (hrs) 12 Hydrograph Plot 21 / Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Total Predeveloped to Basin #1 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 1, 2 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 41.79 cfs Time interval = 2 min Q (cfs) 50.00 r 40.00 30.00 1' - Hydrograph Volume = 146,540 cuft Total Predeveloped to Basin #1 Hyd. No. 4 -100 Yr 20.00 10.00 J 0.00 L Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 HYdro9raph Plot ? Hydraflow Hydrographs by Intelisolve ?I Hyd. No. 14 i' ., Area #2 (Predeveloped WM) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs .i Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 2.08 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 i Q (cfs) n nn Hydrograph Volume= 9,211 cuft Area #2 (Predeveloped WM) Hyd. No. 14 -1 Yr Q (cfs) 3.00 2.00 1.00 vvv 0 2 5 7 Hyd No. 14 ?j 9 12 14 16 19 21 23 -1- 0.00 26 Time (hrs) 7 Hydrograph Plot 16 Hydraflow Hydrographs by Intelisolve Hyd. No. 14 . Area #2 (Predeve loped WM) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 44.46 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 ?I Q (cfs) Hydrograph Volume = 124,736 cult Area #2 (Predeveloped WM) Hyd. No. 14 -10 Yr Q (cfs) 50.00 fj 0 2 5 7 'j Hyd No. 14 1 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 25 Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Area #2 (Predeveloped WM) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs 11 1 1) a Q (cfs) 70.00 60.00 50.00 40.00 30.00 li 20.00 10.00 1 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 72.94 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 205,069 cuft Area #2 (Predeveloped WM) Hyd. No. 14 -100 Yr Q (cfs) V 0 2 5 7 ly I? j Hyd No. 14 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) ?}FREELAND and KAUFFM AN, INC. %Em;wEERS •LANDSc4PEARCHITEGT5 `,209 West Stone Avenue Greenville. South Carolina 29609 C JOb CTelephone 864233-5497 Fax 664-233-8915 ?I Job No. Date Computed By Checked By Date R FEK, EN E aiculati n For. ipli it, € i i i 1 € .. ; i t ? l 4 c 4 , v 1 : ,7 1 , i S I 10r ? ' ' ! € J (J 7!-+??L 1 F l ' ? Z - i , { E. } It , i ' - € . I _ j T? 1 € 1 s i ; i- 111 . , e } 4 3 S f 1 _ i : c t i {{ 11 + ? § , I f } : € E _ N € 1 iii Shc6 t Hydrograph Plot 1 Hydraflow Hydrographs by Intelisolve 1 Hyd. No. 6 Area* (Developed) r' Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER 1 Total precip. = 1.85 in Storm duration = 24 hrs r) r? 1 Q (cfs) nw nn Thursday, Jul 13 2006, 2:40 PM Peak discharge = 21.05 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 42,500 cult Area #1 (Developed) Hyd. No. 6 -- 1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 2 5 7 1) I) Hyd No. 6 I) 9 12 14 16 19 21 1_ 0.00 23 26 Time (hrs) 1 1' Hydrograph Plot Hydraflow Hydrographs by Intelisolve ' I Hyd. No. 6 r Area #1 (Developed) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% I? Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs 1} I? I} } Q (cfs) 1} 90.00 I? I} 80.00 70.00 I} 60.00 i} I? 50.00 ?j 40.00 I? 30.00 Ij 20.00 I} I j 10.00 I) 0 00 Thursday, Jul 13 2006, 2:40 PM Peak discharge = 83.24 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 177,142 cult Area #1 (Developed) Hyd. No. 6 -10 Yr Ij . 0.0 2.0 4.0 6.0 i} Hyd No. 6 8.0 10.0 12.0 14.0 16.0 18.0 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 -1 0.00 20.0 Time (hrs) 3 V ,; Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Area #1 (Developed) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER ?I Total precip. = 6.90 in Storm duration = 24 hrs 1) Thursday, Jul 13 2006, 2:40 PM Peak discharge = 120.74 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 11 h V h Area #1 (Developed) () Q (cfs) Hyd. No. 6 -100 Yr I) 140.00 h I) 120.00 I) II 100.00 I) I? 80.00 - I _ IJ 60.00 40.00 20.00 - - - -- ----_- 0 00 Hydrograph Volume = 263,486 cult J . 0.0 2.0 4.0 6.0 Hyd No. 6 J J ) Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) i Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Total Developed to Basin #1 Hydrograph type = Combine I, Storm frequency = 1 yrs Inflow hyds. = 2, 6 I) I' 1) 1) I? (I I) I) I) Q (cfs) !) 24.00 I) 20.00 1) 16.00 12.00 J 8.00 4.00 ------ -------- ---- - ----- ------ ------- -- -- -- 0 00 Thursday, Jul 13 2006, 2:40 PM Peak discharge = 21.52 cfs Time interval = 2 min Hydrograph Volume = 43,809 cult Total Developed to Basin #1 Hyd. No. 8 --1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 2 5 7 Hyd No. 8 9 12 14 16 19 21 Hyd No. 2 Hyd No. 6 ' 0.00 23 26 Time (hrs) 2 V 4 i} Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd': No. 8 I? Total. Developed to Basin #1 Hydrograph type = Combine I) Storm frequency = 10 yrs 1' Inflow hyds. = 2, 6 Peak discharge = 89.01 cfs Time interval = 2 min I' II 11 h I) I? Q (cfs) nn nn Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 ' 0 00 0.0 2.0 4.0 6.0 8.0 Hyd No. 8 Hyd No. 2 Hydrograph Volume = 188,783 cult Total Developed to Basin #1 Hyd. No. 8 -10 Yr Thursday, Jul 13 2006, 2:40 PM 10.0 12.0 Hyd No. 6 14.0 16.0 18.0 20.0 Time (hrs) V 6 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Thursday, Jul 13 2006, 2:40 PM Hyd. No. 8 Total Developed to Basin #1 Hydrograph type = Combine Peak discharge = 130.42 cfs Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 2, 6 1 Hydrograph Volume = 283,135 cult 1) 1) Total Developed to Basin #1 1) Q (cfs) Hyd. No. 8 -100 Yr Q (cfs) 11 140.00 120.00 1) 1) 100.00 1,) Ij 80.00 1-> I) 60.00 Ij Ij 40.00 Ij I) 20.00 I? 1) 0 00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 11 ! j Hyd No. 8 Hyd No. 2 Hyd No. 6 Time (hrs) I) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 14.30 ac V Basin Slope = 0.0% Tc method = USER Total p O n Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 1 V V 9.00 J 6.00 3.00 J J 0.00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 19.58 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 Hydrograph volume = 44,968 cult Area #2 (Developed) Hyd. No. 16 -1 Yr Q (cfs) 21.00 0 2 5 7 I? Hyd No. 16 J 18.00 15.00 12.00 9.00 6.00 3.00 -+- , 0.00 9 12 14 16 19 21 23 26 Time (hrs) 8 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 14.30 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 88.04 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 v v V V Q (cfs) V 90.00 80 00 v . 0 70. 0 0 60. 0 V _ V 50.00 0 V 0 40. 30.00 0 00 V 2 . 0 10.0 0.0 2.0 4.0 6.0 Hyd No. 16 V Hydrograph Volume = 217,909 cuft Area #2 (Developed) Hyd. No. 16 -10 Yr Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 n nn 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) 17 1 HYdro9raph Plot 26 ? Hydraflow Hydrographs by Intelisolve V Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 14.30 ac Basin Slope = 0.0% ?I Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 124.53 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 V V Q (cfs) Hydrograph Volume = 315,206 cult Area #2 (Developed) Hyd. No. 16 -100 Yr 0.0 2.0 4.0 6.0 Hyd No. 16 'j Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 -It- ' ' ' ` 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) 0 OFREELAND and KAUFFMAN, INC. ENGINEERS •L4NDSCAPEARCHITECTS 1209 West Stone Avenue Job Greenville, South Carolina 29609 'Telephone 864233-5497 Fax 864233-8915 1 Job No. Computed Dy Checked Dy _ R FEfZEN E ?Calculati n Fir i =tiZ- C? 4- ~ i a? A , i Dis inli ? - t . I i t f r ` _S4 P, e i 11 t S S r .. I! m i i i ?? _- s f ( © ? I t ? ? r/,?? -7E G I c> ?i I aC 1 Z I (D ` • i 111 11 4 if tE - 3 1 Ei 1 ? i E S (_ I f { ! 1 I i i} . i t {([ ! { { e f 1 E . i . [i { r ? i : 1 .' 1 i 4 y f ! + i e i { : ? > 1 . : _ he o I Date (2p1u. Date FREELAND and KAUFFMAN, INC. IE,vwNEERS • LANDscAPEARCHIrmE 5 - 1209 Weet Stone Avenue Greenville, South Carolina 29609 ITelephone 864-233-5497 Fax 864233-8915 I Job Job No. Date Z o o? Computed Dy Checked By Daze FEREN E CalcOilatio n For %C F f ` Dis inli I F . _ ----- - ?' --•t- V 1 tt x x V _- f { ? t k - 1 i t ' [ I E 1 I 3 k Q _ ? ._. ? I ? X I X _. ,. ... .. ... ? i S ?o .. __.___ e -___- ? f ? 1 .__ _ _ i l f ; 1 t _ 1 I tt ? F ? j [ t ?'f _ E , t , 15 117i, S ob') Qk- F ?_ Q b, Z 13 cis. { - t ??s ? I SS r t ! t I - ._.._.-...e....._.,-, ? s I 777 T s ? ? 7 ( 7 z I } ? F i i ff ••-- i t 3 F i F 1l ]3 f 1 SSS t f f ! i I I 4 FREELAND and KAUFFMAN, INC. IENGIN ms • LmD.5cvEARCHrmcr5 1209 West Stone Avenue Greenville, South Carolina 29609 Job Telephone 864233-5497 (Fax 864233-8915 Job No. Computed By Checked By _ r FE I 2EN E Calculati n Far , ? S i +-? ?Z-/ ipli M5 ' I t , I i x 7-1 I f t jl? Q, _..:....... !l-t% 4 + -2 ` i ` - .--- . •--- ? s > 1 I ' -- -- -------- s (S ?, k t I i i x 1 i 4 ff EfEf€€ ._ . t 3 I N t ?{ ( i 4-1 il E ' L cow f 1 t ! I S i I 1 t t E ! S f i i t i s 11 i f ( E VC r> Date 7 /Z?, 1 5. SS 7F Date 0 @FREELAND and KAUFFMAN, INC. IWNGINEERS • LANDSCAPE ARCHITECTS ,209 West Stone Avenue Greenville, South Carolina 29609 Pelephone 864233-5497 Fax 864233-8915 Jobs 1 S - ?MO?? , ?J C Job No. Computed by Checked by Date W(9 (o c- Date Ek 'EN E l alcUlati : n For { i { T T } { I nli Dis i , lei g . t ` { i y I ` F f f v ___f 1 __,. .._. _.._ . ...... ........ ' ? Ua S 2?\+ PLC X 1?1r. ' E l 1 .. _. _._ _ t f i ? .....?--... ---...-- tt r -_._._.. F-.. - b 44 ; .. .? ;. .. S ? ... i4 t f 1 ... t 4- a, __. O 1 _ ._ _ i _?} .... _ i _ ( f . { ` r c) -7 ? E I e ; ? {p f 4, S r I 1 t t f ! 4 4 . ®r! t 7 e ZA ? ? tt 3 Q 'l ? . G?'_ { Z _ ?ooa t i I ? 1 ? f f t { { ©. { v 1. ' 2 C._? 5 { E t i 1 { I { .. 3 t III t. t F f I O S13 L I. I i { . 4 i < I f i a 1 d r _? _.. ` f f E ! I s S I { i V ? { 1 i ? 3 i ? i 1 I#33 I [ 5 [[ t , f { i I , he t o-f t 0 r r r 3. General a. Basin shape should minimize dead storage areas and short circuiting. Length to width ratios should be 3:1 or greater. (Barfield, et al., 1981, pp. 426-429; Florida DEP, 1982, pg. 6-289). b. If the basin is used as a sediment trap during construction, all sediment deposited during construction must be removed before normal operation begins. c-. Aquatic vegetation should be included for a wetland type detention basin (Maryland DNR, March 1987; Schueler, 1987, Chapter 4 and 9). A minimum ten foot wide shallow sloped shelf is needed at the edge of the basin for safety and to provide appropriate conditions for aquatic vegetation (Schueler, 1987). This shelf should be sloped 6:1 or flatter and extend to a depth of 2 feet below the surface of the permanent pool (Shaver and Maxted, DNREC, 1994). A list of suitable wetland species and propagation techniques are provided in Schueler (1987) and Maryland DNR (1987). d. An emergency drain (with a pipe sized to drain the pond in less than 24 hours) should be installed in all ponds to allow.access for riser repairs and sediment removal (Schueler, 1987). Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Cover 3.0 4.0. 5.0 6.0 7.0 8.0 9.0 10 RIV) 0-49 0-43 0.15 0-31' 0.29 W26 20 0.97 0.79 0.70 0.59 0.51 0.46 0.44 30 1'34 1 08' 097 0-93- - 0 10 64- 40* 1.73. 1.43 1.25 _ 1.05 . 0.90 . -0.82 0.77 ' 50 2.06 1.73 1.50 1.30 1.09 1.00 .0.92 60 2.40 2.03 1.71 1.51 1.29. 1.18 1.10 70 2.88. 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 238 2.10 1.86 1.60 -1.42 90 3.74 3.10 166. 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. . Coastal SA/DA-ratios can be obtained from the local DWQ Regional Office. 5 •Hydrograph Plot Hydraflow Hydrographs by Intelisolve ?l Hyd. No. 10 ?i Basin #1 Routing Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) .i Storage Indication method used. •, _, Q (cfs) ne nn Thursday, Jul 13 2006, 2:43 PM Peak discharge = 0.20 cfs Time interval = 2 min Max. Elevation = 672.69 ft Max. Storage = 35,206 cuft Hydrograph Volume = 40,519 cuft Basin #1 Routing Hyd. No. 10 -1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 W 0 10 19 29 39 0 Hyd No. 10 Hyd No. 8 0.00 48 58 68 77 87 97 Time (hrs) 1 Hydrograph Plot Hydraflow Hydrographs by Intelisolve N Hyd. No. 10 ?; Basin #1 Routing ?? Hydrograph type = Reservoir ?) Storm frequency = 10 yrs Inflow hyd. No. = 8 ?' I' Reservoir name = Basin #1 (Lowe's) Ij Storage Indication method used. I! I> I> 1> ?? Q (cfs) h 90.00 h h 80.00 11 I? 70.00 11 I? 60.00 I) I? 50.00 11 I? 40.00 30.00 20.00 10.00 d 0 00 Thursday, Jul 13 2006, 2:43 PM Peak discharge = 12.33 cfs Time interval = 2 min Max. Elevation = 675.36 ft Max. Storage = 101,147 cuft Hydrograph Volume = 182,636 cuft Basin #1 Routing Hyd. No. 10 -10 Yr d 0 7 15 22 29 Hyd No. 10 Hyd No. 8 j Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 37 44 51 59 66 73 81 Time (hrs) 2 Hydrograph Plot 1 Hydraflow Hydrographs by Intelisolve 1+ Hyd. No. 10 1 Basin #1 Routing h Hydrograph type = Reservoir Storm frequency = 100 yrs Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) h hi Storage Indication method used. Thursday, Jul 13 2006, 2:43 PM Peak discharge = 25.78 cfs Time interval = 2 min Max. Elevation = 676.98 ft Max. Storage = 147,756 cuft Hydrograph Volume = 276,807 cult Basin #1 Routing Hyd. No. 10 -100 Yr I) 0.00 Ij 0 It - I? 1 3 Hyd No. 10 6 9 12 - Hyd No. 8 15 18 21 24 27 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 30 Time (hrs) 3 9 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 18 1 Basin #2 Routing 1 Hydrograph type = Reservoir 1 Storm frequency = 1 yrs Inflow hyd. No. = 16 Reservoir name = Basin #2(WM) li Storage Indication method used. 1! b 11 (N Q (cfs) Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.21 cfs Time interval = 2 min Max. Elevation = 671.78 ft Max. Storage = 35,947 cuft Hydrograph Volume = 41,644 cult Basin #2 Routing Hyd. No. 18 -1 Yr Q (cfs) 21.00 18.00 15.00 12.00 I II I I 9.00 6.00 3.00 y 0 10 19 29 39 } Hyd No. 18 Hyd No. 16 V J 0.00 48 58 68 77 87 97 Time (hrs) 18 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 18 Basin #2 Routing Il Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 16 Reservoir name = Basin #2(WM) Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 36.62 cfs Time interval = 2 min Max. Elevation = 674.61 ft Max. Storage = 101,146 cuft li Storage Indication method used. 11 II Lf I? Basin #2 Routing Q (cfs) Hyd. No. 18 --10 Yr 11 90.00 1} II 80.00 I) . I) 70.00 I) 60.00 I) 50.00 I) _ I) 40.00 I) 30.00 I) 20.00 10.00 0 00 Hydrograph Volume = 213,095 cuft 0 3 5 8 11 Hyd No. 18 Hyd No. 16 1 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 13 16 19 21 24 27 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 18 N 1 Basin #2 Routing Hydrograph type = Reservoir 11 Storm frequency = 100 yrs Inflow hyd. No. = 16 Reservoir name = Basin #2(WM) I1 Storage Indication method used. I 1! i? Q (cfs) h 140.00 h 120.00 I? 1) ?j 100.00 h li 80.00 ?? 60.00 u I) 40.00 20.00 I) I) 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 62.83 cfs Time interval = 2 min Max. Elevation = 675.63 ft Max. Storage = 128,783 cuft Hydrograph Volume = 310,320 cult Basin #2 Routing Hyd. No. 18 --100 Yr 0 2 5 7 9 Hyd No. 18 Hyd No. 16 Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 ' ' ' -1 1 0.00 12 14 16 19 21 23 26 Time (hrs) 27 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:37 PM Pond No. 1 - Basin #1 (Lowe's) Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cult) 0.00 671.00 19,213 0 0 1.00 672.00 20,973 20,093 20,093 2.00 673.00 22,780 21,877 41,970 3.00 674.00 24,650 23,715 65,685 4.00 675.00 26,580 25,615 91,300 5.00 676.00 28,575 27,578 118,877 6.00 677.00 30,600 29,588 148,465 7.00 678.00 32,700 31,650 180,115 Culvert / Orifice Structures Weir Structures [A] [B] [C] ID] IA] [B] [C] ID] Rise (in) = 36.00 2.50 0.00 0.00 Crest Len (ft) = 1.00 12.00 0.00 0.00 Span (in) = 36.00 2.50 0.00 0.00 Crest El. (ft) = 673.00 677.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 671.00 671.00 0.00 0.00 Weir Type = Rect Rect - - Length (ft) = 40.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No Slope (%u) = 1.00 0.00 0.00 0.00 N-Value = .015 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev . = 0.00 ft Note: Culverl/Orlfce outflows have been analyzed under inlet and outlet control. Stage I Storage I Discharg e Table Stage Storage Elevation Clv A Civ B Civ C Civ D Wr A Wr B Wr C Wr D EAU Total ft cult ft cfs CfS cfs cfs CfS CfS cfs CfS CfS CfS 0.00 0 671.00 0.00 0.00 - - 0.00 0.00 - - - 0.00 1.00 20,093 672.00 0.15 0.15 - - 0.00 0.00 - - - 0.15 2.00 41,970 673.00 0.23 0.22 - - 0.00 0.00 - - - 0.22 3.00 65,685 674.00 3.68 0.25 - - 3.33 0.00 - - - 3.58 4.00 91,300 675.00 9.77 0.27 - - 9.42 0.00 - - - 9.69 5.00 118,877 676.00 17.70 0.29 - - 17.30 0.00 - - - 17.59 6.00 148,465 677.00 26.00 0.29 - - 25.67 0.00 - - - 25.96 7.00 180,115 678.00 47.88 0.29 - - 33.46 14.13 - - - 47.88 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 2 - Basin #2(WM) Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) Contour area (sgft) 0.00 670.00 19,300 1.00 671.00 20,300 2.00 672.00 21,300 3.00 673.00 22,200 4.00 674.00 24,300 5.00 675.00 26,700 6.00 676.00 29,000 Culvert I Orifice Structures [A] [B] [C] Rise (in) = 36.00 2.50 0.00 Span (in) = 36.00 2.50 0.00 No. Barrels = 1 1 0 Invert El. (ft) = 670.00 670.00 0.00 Length (ft) = 60.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 N-Value = .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 Multistage = n/a Yes No Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cult ft cfs 0.00 0 670.00 0.00 1.00 19,800 671.00 0.15 2.00 40,600 672.00 0.23 3.00 62,350 673.00 10.39 4.00 85,600 674.00 27.64 5.00 111,100 675.00 43.67 6.00 138,950 676.00 68.99 Incr. Storage (cuft) Total storage (cuft) 0 0 19,800 19,800 20,800 40,600 21,750 62,350 23,250 85,600 25,500 111,100 27,850 138,950 Weir Structures Tuesday, Jun 20 2006, 3:38 PM [A] [B] [C] [D] Crest Len (ft) = 3.00 12.00 0.00 0.00 Crest El. (ft) = 672.00 675.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Rect Rect - - Multi-Stage = Yes Yes No No [D] EAltration = 0.000 inthr (Contour) Tailwater Elev. = 0.00 It Note: Culvert/Oririce outflows have been analyzed under inlet and outlet control. 0.00 0.00 0 0.00 0.00 0.00 .000 0.00 No Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exfil Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 - - 0.00 0.00 - - - 0.00 0.15 - - 0.00 0.00 - - - 0.15 0.22 - - 0.00 0.00 - - -- 0.22 0.22 - - 9.99 0.00 - - - 10.21 0.21 - - 27.40 0.00 - - - 27.61 0.20 - - 43.47 0.00 - - - 43.66 0.10 - - 37.75 31.14 - - - 68.99 BELMONT (LOWE'S) BELMONT. NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE I POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 9.5 AC X 18000F per AC- 17,1000F INCREMENTAL INCREMENTAL TOTAL VOLUME TOTALVOLUME ELEVATION ELEV. DIFF. AREA SF AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 671 19,213.0 0.0 0.0 1 20,093.0 20,093.0 744.2 672 20,973.0 20,093.0 744.2 1 21,876.5 21,876.5 810.2 673 22,780.0 41,969.5 1,554.4 1 23,715.0 23,715.0 878.3 674 24,650.0 65,684.5 2,432.8 1 25,615.0 25,615.0 948.7 675 26,580.0 91,299.5 3,381.5 1 27,577.5 27,577.5 1,021.4 676 28,575.0 118,877.0 4,402.9 1 29,587.5 29,587.5 1,095.8 677 30,600.0 148,464.5 5,498.7 1 31,650.0 31,650.0 1,172.2 678 32,700.0 180,114.5 6,670.9 •1 w? i? i? i! BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE 11 POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 14.8 AC X 18000F Per AC - 26,640CF INCREMENTAL INCREMENTAL TOTALVOLUME TOTALVOLUME ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 671 19,213.0 0.0 0.0 1 20,093.0 20,093.0 744.2 672 20,973.0 20,093.0 744.2 1 21,876.5 21,876.5 810.2 673 22,780.0 41,969.5 1,554.4 1 23,715.0 23,715.0 878.3 674 24,650.0 65,684.5 2,432.8 1 25,615.0 25,615.0 948.7 675 26,580.0 91,299.5 3,381.5 1 27,577.5 27,577.5 1,021.4 676 28,575.0 118,877.0 4,402.9 1 29,587.5 29,587.5 1,095.8 677 30,600.0 148,464.5 5,498.7 1 31,650.0 31,650.0 1,172.2 678 32,700.0 180,114.5 6,670.9 BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE I POND AT SOUTHEAST CORNER STORAGE AREA IS APPROXIMATELY 7.0 AC X 18000F per AC o 12,600CF INCREMENTAL INCREMENTAL ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) 670 9,050.0 1 9,625.0 9,625.0 356.5 671 10,200.0 1 10,850.0 10,850.0 401.9 672 11,500.0 1 12,100.0 12,100.0 448.1 673 12,700.0 1 13,350.0 13,350.0 494.4 674 14,000.0 1 14,750.0 14,750.0 546.3 675 15,500.0 1 16,250.0 16,250.0 601.9 676 17,000.0 TOTAL VOLUME TOTAL VOLUME VOLUME (CF) VOLUME (CYD) 0.0 0.0 9,625.0 356.5 20,475.0 758.3 32,575.0 1,206.5 45,925.0 1,700.9 60,675.0 2,247.2 76,925.0 2,849.1 BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE 11 POND AT SOUTHEAST CORNER STORAGE AREA IS APPROXIMATELY 16.0 AC (FROM WAL-MART SITE) X 18000F per AC Q 28,8000F INCREMENTAL INCREMENTAL TOTAL VOLUME TOTAL VOLUME ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 670 19,300.0 0.0 0.0 1 19,800.0 19,800.0 733.3 671 20,300.0 19,800.0 733.3 1 20,800.0 20,800.0 770.4 672 21,300.0 40,600.0 1,503.7 1 21,750.0 21,750.0 805.6 673 22,200.0 62,350.0 2,309.3 1 23,250.0 23,250.0 861.1 674 24,300.0 85,600.0 3,170.4 1 25,500.0 25,500.0 944.4 675 26,700.0 111,100.0 4,114.8 1 27,850.0 27,850.0 1,031.5 676 29,000.0 138,950.0 5,146.3 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) No. 1 Str E1 to 21 2.50 18 c 94.0 661.03 661.50 0.500 661.70 662.10 0.27 End 2 Sir 21 to 22 2.65 18 c 151.1 661.60 662.35 0.496 662.38 662.97 0.34 1 3 Str 22 to 23 1.36 18 c 34.0 662.45 662.60 0.441 663.31 663.32 0.04 2 4 Strlto 2 35.48 36 c 76.0 672.66 673.04 0.500 674.56 675.03 1.18 End 5 Strlto 3 34.30 36 c 142.0 673.14 673.85 0.500 676.21 676.52 0.29 4 6 Str 3 to 4 31.94 36 c 154.0 673.95 674.72 0.500 676.81 677.03 0.51 5 7 Str4to 5 28.46 30 c 281.0 674.82 676.22 0.498 677.54* 678.89* 0.24 6 8 Str 5 to 6 29.09 30 c 213.0 676.32 677.39 0.502 679.13* 680.20* 0.68 7 9 Str 6 to 7 24.34 30 c 30.0 677.49 677.64 0.500 680.88* 680.99* 0.42 8 10 Str 7 to 8 19.68 30 c 70.0 677.74 678.09 0.500 681.41 * 681.57* 0.19 9 11 Str 8 to 9 20.18 30 c 164.0 678.19 679.01 0.500 681.76* 682.16* 0.29 10 12 Str 9 to 10 6.82 18 c 84.0 679.11 679.53 0.500 682.44* 682.80* 0.23 11 13 Str 9 to 11 6.82 18 c 74.0 679.11 679.48 0.500 682.44* 682.76* 0.23 11 14 Str 1 to 2 49.52 36 c 76.0 672.66 673.04 0.500 674.90 675.63 1.00 End 15 Sir 2 to 12 48.38 36 c 152.0 680.55 681.30 0.493 683.11 683.86 0.40 14 16 Sir 12 to 13 48.54 36 c 41.0 681.40 681.60 0.488 684.26 684.44 0.54 15 17 Str 13 to 14 39.06 36 c 183.0 681.70 682.65 0.519 684.97 685.55 0.24 16 18 Str 14 to 14A 30.02 30 c 52.0 682.75 683.00 0.481 685.80* 686.07* 0.58 17 ,19 Sir 14A to 15 22.86 30 c 100.0 683.10 683.55 0.450 686.66* 686.97* 0.17 18 20 Sir 15 to 16 16.22 24 c 168.0 683.65 684.40 0.446 687.13* 688.00* 0.62 19 21 Sir 16 to 17 6.30 24 c 276.0 684.50 685.85 0.489 688.62* 688.84* 0.03 20 22 Str 17 to 18 4.09 18 c 100.0 685.95 686.45 0.500 688.87* 689.02* 0.08 21 23 Str 14A to 14B 8.52 18 c 14.0 685.93 686.00 0.500 687.43 687.50 0.36 18 Project File: belmont pipe file -backup.stm Number of lines: 23 Run Date: 06-20-2006 NOTES: c = circular; e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. Hydraflow Storm Sewers 2003 d aO CL .1 ?I ii ?i ii i' •' Q Q. co i?•) E !) /0 ?j 0 c N N M - r - M - 14, v - w P .J 0 0 O N M V O CD P co O) N O O O w ? O O O O w O O O O ° O w Q O _ W N N r N M V O O P 00 O . -. 0) r N r r r r r O N 65 f/) (A U) (/) V) f/) (n co w w w 6 U) 6 (J) U5 u) u) U) U) N (D O _ W O O O O O O O O O O O O O O O O O O O O O E ' O O O O O O O O O M O P cD O N (n (o M Ui O 0 w - C m to co w tO w 0) 00 07 co 0) co O a) to co (D co r- O to co 00 CO co 0) co tV cn m O N 0) Q) O O O (0 Q to to 0 co co co to CO co to co t0 co co to CD to co to O CD N O O O O O O O O O O O O O O O O O O O O O Y N tl) O (C') P V' N P r O O r V' P O O O to O V r r r r O r O r r C ? r r r O O O r O r O d M M M M M M M M M M M M M M M M M M M M M Z C O O O O O O O O O O O O O O O O O O O O O ` C O O O O O C C C O O O O O C C C 0 0 0 O M N CL N (D co J U U U U U U U U U U U U U U U U U U U U U O ? a c N E J •y " co co o m 0 m o 0 0 0 o co co w m m m o o v It ? Z D. r r r M M M M M M M M r r M M M M M M N N t: C. O O O V• O N N 0) 0 M W V• O O O O O O O to M t0 O O P N M O O O O V: O M t0 O O O V' OD N N Cl) M V• to P P co rn rn 0) Cl) r N M M V O w` tD co to P P n n n n n P P P P co ao co co co co ao CD CD CO to cD O tD w tD CD co to to O co O co to to co to d d C. ^ O O IT O O O O O O O O O O O O) O N 00 O O O c o o O O V• O O O O O O O O O O O v v O V v v v J N` G C O O O O O O 6 O 6 O O 6 6 6 C O O O O {,. C M O O CO v O N N cn V' a) r r W O O O O O O O MO O t0 V' tp r O W M V' P r r r O O 'Y h P r (p q F C CN N M CO 9 CO t` CO O O CV P O 0 00 OD N co M co M co V' co W CO t0 COO co ttoo co 0 0 to f? 0 P to P CO P 0 to 0 0 to cD tD co CD co d d C E 0 0 0 0 0 o O o 0 0 0 0 0 0 o O O O O o 0 ? ?, cD 0 cD 0 co cD o tD cD o tO 0 co cD o cD tD o tD CD CD C C DU o m m ao m m o 00 0 0 o ao m ao o m o 0 0 0 0 O p) o) rn rn M o rn C) o 0) p1 CD C) o m C) C) C) m C) c ?° 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 ° L 0 ro ^ 0 0 0 0 0 0 o O O o 0 0 0 0 o to O o t() o O C . E ce m O N N M O r O P r O O O O M O n to q r t` M to -- 0 0 0 0 0 0 0 0 0 0 o .< o c 3 H o 0 0 0 0 0 0 0 0 0 0 0 o O O o o O C) O o a o 0 0 o O o 0 0 0 0 0 0 o Cl O O O o Cl 0 0 C v i 0 0 0 0 0 0 0 0 d 0 0 0 0 0 d 0 0 0 0 0 0 a a a a a a a a a a a a a a a a a c° C E E E E E E = E E _ E E E E = E E _ E E E . S -? ?` 0 U 0 U 0 U 0 U O U O U O U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U ? 0 0 o 0 0 0 0 0 0 0 '? E d C d d N a L M t D M 6 ? (V N C o O O O N c Q m 0 w r i r i O M i ? V• t M O C o co a Q) N • w w d tm o r 0 0 O O O O o O O o 0 0 O 0 O o O O O N a c C ' V' O aa?? CO V V) CO M O 0 t?D V' V' CO CN M aO N C3 O C6 to ? d v J d O) r M P r r N N M P r co P P r V' r to r r N O w = V N O a 0 C Z W r N W --t O tD P co a) . W N LL O M V O 0 P W O O O J Z r N M V' O W P c0 0 r r r r r r r r N N d co 2 N d LA A a ? r 0p W co ?E LM 0 acn m C O ? J ? O N O N co O C E R v Q O O H O O 0- 0 d M M M Z?C O O v O O M N d d c a L G J? U U c w 0 v ? ?. d C N C E d J to '?.. c0 CO Z d a LO 0 _ > 0 co to LU co co d C Oe Lq U? J N v O O' C LO m ... C LO LO W o co c ? d C c E -E o 0 (O co c c U 0 i c co cc v Ot o 0 0 9 LL 0) C d V C) LO O N C OU? O O c o 0 0 c o a E 3 --j U 2 N C c Is Q Y E a d d 13 cc -0 O M L6 ao c6 ? _ N Q t? i a C o 0 E I il N Z c ui U: C p N m m O J Z N N 4 y ?z b v` S d a W • ?r •l •1 •j O)o 0)75 m L E O) o 0) _ w w O _ N N 04 N O N ? v V - to I- w O O N M LO tD n co O) N O O O ' O O O O 0 O 0 O O 0 O O O O Q _ -? W N N N M V' O cD n ao O O N w V L L L L L CD N fA N N N N fn to fq to fA fA ? (O to fA fA fn fA !A lq N d > O O O O O O Cl O O O O O O O O O O N (D C O O O to to O O O M tt) O LO N O O M LO ?1 (D _ W O 0 0 O 0 W o o 0 m 0 N m O O E C t 0 (D ( 0 co 6 co to co c0 co O rn O a 0 0 CD 00 to c o t0 co 0 O a 0 tD t0 0 0 O co co 0 O O O O O O O O O O O O O O O O O O O O 0 O O O O O O O O O O M O n CO O N to Iq M tq w C ` M (D to M M M O M tD r- t0 v t0 M (N (V O 00 O O ' C7 co co co co co cD O co co co CC) co co co m t O (D ) to 0 O (O Q (D co co to co to co t0 t0 O to t0 t0 to t0 o to O O M CO N 0 M- O CD V' ?} O ) r - CD N n O) O W tD CD M N CD n M t0 a a O V: n V O . r - cV (M V M 0 N M O 0 O N N ? M v v to 0 r M W co to co co tD CD n (D n (D n 0 n 0 n O co 0 0 to C to ao co 0o (D n (D co (D co CO co O ao (D co CO co CD co (D J C7 O n N M N Cl) 0) O O n to O to Cl) to V• O n n O 'ct 2 CL •- O M O O O OR N O (n .-- W n (O O O O O O W N 0 N cM O (A r- to r- N r- co n O co O 0 N O N 0 N O O n M O V CC) O co to co to 0 CO 0 CO M ( 0 co G O (DD CD co c 0 (DD ( 0 to C O ( 0 ( D ( 0 C O co to CD t 0 t 0 D ( M N Cl) O O to V* O N N 0) V' 01 CO O O O O O O O y c o tD V co ? rn o c? v n = m tO V r? n to U O o i N N M M V' W n n 0 O O N C c o N M M It _ LU c (D D co co co n to n co n co n co n co n co n CD n CD n co n to n t0 co (0 o to c CD co (D co co co co 0o co O d O O O '[r O N N G) M O M M V O O O O O O ' O C c (n M CD O 0 n N M O O v O c? CD (O O O V CR E N N M M V' to n n 00 M O O M N M M It O 7 co CD co co to CD r- CD r- co (n0 (n0 w rl I%. (D r- co N t0 P- t0 (n0 r- 00 Go (O 00 (D 00 CD co (0 co (O Go co Go (D Z O O V' O O O 0 O O Cl O O O O O O N co O O O O O O "q: O O O O O O O O O O O V: V O llf sr V: V: a) rn O C O O O O 0 O C O O CD 0 O O O 0 O O O O a N C O O M M M M co co ? M N N v M M M M M M M M N t0 to N V, O M to (D CO O M O O N W to .... O Cl) M M ? M rl. O GD O C(> W t(7 0) to CT V O V V CO M O M r- CO O r- O r` O M r c0 CD V -: Gn O N CD O O O n O O O (D O m O ?-- ? N a- y M O ' n O O O O O m V m ` ?- o O O O r co V w v V: V ` W D r- ' r- r, ' 0 M m m M : : rn ' 6 ' 6 ' 0 ' m r,: 6 6 n f c V V V N N N N N n t- V V V V N N t 3 O ' O V' co ' 0) V' C0 co N O e; t0 t0 O N O 0 co N N O O Z O O O O to M V M ? V O M O r N O N co O M M C M O v O co M v- M O D M 0 C7 N t0 F' N N M M N N N r N C (O V V V M M N (O c C v c0 O O r- M O tD CD n 0) O O co (D 0 O W C O r t0 M M tD O CD (O CD t` N M tc') (n (D t0 C O (D j? c ,? V' n O .- C O CA r V• M O si O O n O m O o O O O O r? N W CD M M M CO h t ` n CO C (0 O M M W V ? w d C O O O O O O O O O O O O O O O O O O O O O E 0 0 0 co tD (0 o co co o m co 0 0 o 6 0 0 0 0 co U 0 a) a) CD CO C) O ? ? CO CO GO ' CO O ' O O M M N W ? O C q O7 V 7 7 V ) O 0 0) K to F- O O O LO O O V' V' Cl) CV cV O O co CO co O V Cl) (V O Q L O O O O c) m O V V O M CO CO 01 O N N O M n V' V O N N N V' CD O n n q O W O N O n Vt O (D M 5 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C O co co co co co O Co c0 O CO co co co O co co o O co rn co rn co D) d V o 0) 0) rn rn rn o o) o) o rn rn rn 0) o m o o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 co v o 0 0 0 0 0 0 0 O o 0 0 o O O O CD O Cl O O S tr N O n N O O n O O O O CD M M (O O m O m d Q F O O O C tf') tD of sf M M fM cC CO CO O tri M fV O w or C a E t u o 0 0 0 o O o O O o 0 0 0 0 0 t0 O o to o O n C t`6 O N N M O 1? O n n O O O O M O h t[) O r.: M 0 0 0 0 0 O 0 0 0 0 0 0 .- 0 .- - o o o O o 0 0 o 0 0 0 0 J v M 0 0 ? v v N ? M N o 0 6 n v 0) Lo v M CD n LO co N N M n ( co n 0 n t r V' m O o N O c c c c W O r r - n - - N j O j - W N W V' O w n M 0 .- ? W e - y d c ° - (O - 0 0 0 a . J .- N M V' O O n o W .- - - r - N N O_ 0 O 'C O CL E d co n 0 O M r d E N CD rn n u to N c W 0 Z S N r? E m N • O Q7 a • L •1 ?l ?j r}d •/ L .? A 0} to E sm O)-W 0) co m 0 r co 0 c ° Q J r` r r tD O N d 0 M O CV W p 0 a ? o E 0 ci 0 0 C? G _ uQ U? N c = 0 CD ? C r- ce) st y O co co LU o 0 J = a C*4 C) o Lq to t- oo co m CD cn N > c rn rn c S d O In LO to 00 = W to co 0 c v 0o E = co co z to co eu 0 C) 0 to -- 0 0 IL m N C N ? co co (h O tV v m v Cl) r t; p O w O LO I- v to E QM 0 0 N C O O rv °? c c o 0 o o t t p ? N x X R !- 0 Q V LO N C r C E d V co co a ? u o o t9 v .?. o to tD N N ? Q F- o w N d E p V .00. c tOD N a O r C O E J o Cl D 75 C V N O C M C H CO y O J N r a` N Cl) J } 0 r 11 v 0 C. E m c0 0 O M to E d C O to n 11 N C 15 to W 0 Z 0 N 0 ?a v` 2 d CA •' O IL •) .J .J •) C^ /ice.. CL a) O tt- O O O O M C Z 0 r N 0 Y r/ O n M O r --- --- 0 r r r N 0 0 0 0 0 0 0 0 0 0 0 0 0 O o 0 0 0 0 0 0 0 d o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CV N CV N CV N o N N o N CV N N o CV N O N N CV N CO O V 1 ' I :: co V O O N N d d m N N CO CO = O 4 t a r to O O st C .. " o th cn r` n o v v o o Sri ai 0 o tri a? r a o .- ..- tM to o co 0 o ai ai ci ci o v o N t O to O O CC') O t0 t0 O V st sT O O M a0 O CO N N a' c^ $ O .- .- N N M O M M O V a N - O t0 M O "I: CO N M R O O O o o o o o o o o o o o O O 0 o O O O O ICI 29 M N M N Cl) co n <- O O O O M O O 'ct' r- O O M C O C `? Oi r ? M CD o CO 0 o . 0 0 0 h o ui ? o 0 Ld n ? m p N N n to N O Cl) Cl) O n O O 0 O {o m m w C. ^ ?? Oi r O r O r O N O M O O O M O M O O O O st O O r O O O CO O 0 O O O V O Co O O N O M M M M M M M M M M M M M M M M M M M M M M C O O O O O O O O O O O O O O O O O O O O O O Cl) O O C C O O O O O C O C O C O o O C O O 0 O N O O O O O Cl O O O O O O O O O O O O O O O O 0 07 Cl) Cl) M co M M M Cl) co Cl) M Cl) M M M M co M M M M co C Cn O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O 0 O o O o p O O O O O O O O O O O O O O O O O Cl O O O O 0 3 0 0 0 0 0 0 0 0 0 0 0 0 ? 0 0 .- 0 .- 0 .- 0 .- 0 .- 0 ? 0 .- 0 ,- 0 .- E E ? ? z 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Z 0 0 0 0 0 0 0 0 O O C) O O O 0 0 0 O O 0 0 0 3 O O O O O O O O O O O O O O O O O O O O O O ` N CV CN N CN N N CV N N N N CV CV N CV N N N CV N N O 0) 0) m cm cm cm cm 0) M N tm tm t3) 0) m 0) 0) 0) 0) 0) m 0) N N t0 N (D m U) to U) m U) co Cn m co m U) U) co U) m U) CO Cl) ca U) CO co m w t0 U) co U) m w m U) m C/) m w O O O O O O O O O O O O O O O O O O O O O O 3 O O O O O O O O O O O O O O O O O O O O O O .+ CV N N N CV N N CN N N CV N CV N CN N CV CV N N CV N d C O O O O O O O O O O O O O O O O O O O O O O LL w J o o q O O O O O O O O O O o q o q o 0 0 0 o p ?C st ?t ?f '?t tf 't7 'V tt 'V' '7 '7 'cP V' ?}' V' V' mot' ?7' ?t LL C7 p O O O O O O O O O O O O O O O O O O O O O O Q' O O O O O O O O O O O O O O O O O O O O O O C CO v 6 6 M M ai M C'M CM CM CM CM 6 CM t" i vi tai vi CM 6 6 M CM „0 N t0 0 ++ W J O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O 0 O O O O O O O O O O O C tt tt ?t V v v v v v v tt '-t q 4 V' v v 'Ct v v c O a E V .+ C O O O O O O O O O O O O O O O O O O O O O O m 2 ' to to to w to to to Co t0 t0 Co co co co co tG t0 co co co to to ci d m m m a in -0 .O -0 .0 .O m .0 .t7 a m LL m a E E E E E E = E E = E E E E = E E = E E E E LL O U O U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U 0 U O U O U O U 0 U O U O U Q a y C7 O O O O O O O O 0 O O O O o O O 0 O 0 O 0 O 0 o 0 O 0 O 0 O 0 O o 0 v 0 o O o o O o o q q 0 o 0 O O C 0 O 0 0 0 0 0 0 o O o 0 O O O o r+ N a O (D to Lo n O - r O N N N Lo O ? Cn 0 ul m to C t f V O M M O 'qt C-? O .- .- O cq CO OO O O r. 0 O 00 r, M O V o CV Cl) v o Cn Lo o to to Co N o o C- N v w O O O O O O O O O O O O O O O O O O O O O O C7 v O O O O O O O O O O O O O Cl O O O O O O O O C) O O O O O O O O O O O O O O O O O O O O O O = N Cl) rl a) U O p a O co CO Co ` n O r O N N N to O l O el m O V v q cl M O ?t n q O 0 c0 0 O O 0 O CO M O O r fV C'M 'ct C to u7 O Co o CG CV O o T CV N lU a ' a p 0 m a) c ? hi LL a1 m .o C 0 O N co v ? to r- co CA O N J Z N Cl) 0 CO. n N O - r N N N d d ttf C 3 C Y y N U C O_ 1 0 O .C 0 C1 E N 00 O 0 ch N E m c to CA I .y C (C C t0 O 0 11 N d Z a? c H 0 Z S N d 0 N 2 • N d Of ?a ?i .,l .J 00 .i aC O m=Z ?' c O 0 o co 0 V 0 N d ` O O N C .. O N ? a N v O a ° ? o ? a o M C _ O M O N ` N M C (7 O N O N 3 ° (D E ?a co y :3 C7 CD z E ? °o 00 Y N to N U C t O E2 F N w O C d z O `- II ? + ? LL A N M CD r O E N = cc N CD J CD C7 R' C a 00 a ? o U _ .. c 2 ::, o cc co < o hi M c a 3 li .?- + E d w oo 5 0 v tN rn N M u .. I- 11 w O E v O y C u o a ? d Y U c 11 Q co C'1 U cc o ? d u N 0 E ca > m u, z y c U ? N ? LLI O JZ N a z M O 0 0 2 0 U) n a N O st CO N Q) M M M O O V• V• 0 n N M c U) N M O N N CD IT N N N O V O N O r CD O _ O - O O O .- O O O O O O O O O .- O O C O O C C trz o O O O O O u) to O CO O O O O O O O O O O O '2 C Y N LO O (n n N n Cl O V• n O O O Lq O V •- .- O O O O O O r O O O O st a N CO n V N n M N O M .: O V O N y .-. N co O to O n O CO CA O t? • cf CO 00 O n N M CD CD N O ?' t0 O O M M M M O .7 ? M M M V h ? N Y ? W c c o o 0 o 0 o 0 0 0 0 o 0 0 0 c o 0 co o m L ' N O O O O O N M N O N N N CO M 0) N CD ?-- O CO d () ?' a (.0 CO O O M 00 O O l M V N N CO O O N M l r n Q N V Cl) O O N N V O C ) N N O M O C ) O O O O O O O O O O O O O O O O O O O O O O O ? O V co CD O N M N O l N N N N O O M m O O O (D Cl) .- O CO n C > d' r- to a co V' m V' n O co V M N (D N co V' O O O M C ) N st N N V' 'V: O V V' M O M O O O O O O O O O O O O O O O O O O O O O O O J> N O CD N v O N O n N N Cl) O v v O V to O v O C9 d M N M co OA V V• n M OR V• O O O n N O CD M O a W y CN Cl) Cl) CO CO P, 0) O CV Cl) N to V tti (O CO n CO CO to CD co n n n n co co co co co co n co co 00 co co co co (D CD CD co (D co co CD t0 CD CD CO CD O 0 co 0 0 CO co co co Cl O O Ln M N co N 00 O O d N V' t L C N tT co t- v C O M V' t ` O C O O O ci C ci O O O O O C7 O O O O O C C7 M N N d7 t 0 M M N (D O O co (D r O CO M M O N O CD N ? n 00 tD ? ? V• m O m O r m 0 CD h O O O r (O ? - O C l0 M M n O O O O V• V• V• M M I n n O CD V O N - CL 2 n cm v co O M m O r n n O N N O V• V' N Q Q CO (D co 0) CD co ) CD r- 1` v v 01 0 a 0 0 0 V to tri V V V V v c0 6 6 r-? V V M CO E M s k k z a O N N O n O O O O O O O O O V• O O O O O d O CO n 0) to M O O O O O O O O O 00 O O O O O ? O O O CV N CV CV CV CV CV CV CV N N CV N CV CV J> O n N M N M O Cl 0) n co O co Cl) CO V O n n O v 01 O) M Cl O O CO N CD U) .- 00 n (D CO V O O O O co x lV CV N M L6 (D n co O O N CV N L6 M V O (D (D co co to co co n n n n cc co co co co co n 00 co co co co co co CD to CD CO CD CO CO CD co co co CD CO (D to to to CD to (D co O O O v O N N 0) It (A M CO V' O O O O O O O > d7 O M N CD N O M W M n V N M n (D ? O O O i O V• O M M tD CD N O CO O CO V• V Cv LO c d (o to to n n n O n n t n C n O n a) n (n n n co co co 00 co co co - CD t0 to to CD co t0 co (O co (D CO CD CO CD CO (O co CO CO to CO O O ? O O O N O M O 0 CO (D J V O V co C CO O CD CO V V M L r M N O to n O ?- M n N N M n co n n v O - N t0 O N V O O N M N O N N N 00 M O M CD ?-- O M ?. M N v M CO T co O O M v N N to m O It co n CA e Cl) N O O N V' O M N N V V: O V V M O CO Cn O -- 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 J > n i v v ao v m m n tD N o0 0o rn O rn ) N O )n ' m M rn O (n O w (O c0 C ) M V: O 7 O CO N CO O tD CO O V W tD N co M CO O n M n r n c0 n O n w 00 N co N O N O O n M co co O 00 O CO co M O co co c0 co O CD O (D CO to CD CD (O (O O to O (O O O O O to (D co a _ 4 n M O co M M c '4 L O M N N N N O ( o t O R M O d 0 ) . L0 L O a CO O P . U V• 'C O O O O O O O O O O O C C O O C C C C O co O O N O O O M W CD CD st M O M N CD n O E > N c0 N O W O 00 O O) O O O n to W O 7 CO R M N n v v O O a v v M M co n co O CD V O N d _ N d ' to Cl) O N n (O r n n n N V• n V• V• C Q n W O h o O m M W r- n to v a) O O O 3 0 a to o o v t-? (0 V V V V ui tD td t-: V V M M n co CD o o CD O o 0 0 0 o O `t iD (D Q O o 0 0 m to n co rn o 0 O O LO O O to to N (D co o CA LO 0 0 ? O O O - C`M N CV N N N N CV CV N M N N CV CV E J> O a0 O V' M CO O V' V' O O n O t0 M N in ? 6f ' n M M O N O O c0 r,? V: V: O N W CO O CD O. ? x a) - (? N (0 (M (D 9 n W n t0 n r- n M n O oo co co N co N co 9 n M co V co V co (Ci co f0 co h co M co O CO CD CD co co (D co co CD CD CO to to (D co t0 to (D O co CD U N .a Cl) O O CD V O N N O V' O) r (D O O O O O O O N > O CD v O -: O) OR M n .- (O CO V: t` n c0 O ? CV N CM Cl) V' M n h CO Oi 0) N O m o CN co M V C d " CD CO to n n n. n n n n n n n n co c co co co Co a - CO (D (D to co to to (D (D to co CD CO CD CD (D CO CO CO CD to .Q co O V' 0 0) V• c0 co N co v CD N (O N ' C C7 q) O O to V M 0) v O M CO .- N N O M O O O co N O M O v to Cq M tri v cO of V of o co OR .3 cO .6 Di o N c0 E N N - M Cl) M N N N - N CO CD V V V M M N CO N C N .ter 00 O co CD (D CD O O O O O co co t0 to (0 CD O O v v E ?- M M M M M M M M r M M M M M M N N U d C ° O N M V• CD (D - n - w O - O N N a _.I N M v O co n O M ? r r - r . . . . 9O N E 7 W cc s a c) a U N E N W L CL N a M O Z N W 0 Z S I N m N !V O L CL N O iii. E O ? J L 00 ?V L III- N O OD :0 C F O M O O 0 Y o 0 , C) O U 0 N IN CN O 0 C C 2 N Y v Lu. c o 0 m V m w a LO ? ai 0 o D N N U) Ln c N o J > O co W d of oo CD to L O M O C M N -y w N N M o N N ? M ?y N v O a Q L Z a ° d n. t O J > NO O S d Qi r CID co > Vo.' O C d "' O OD co CID O O ? J ... O o st w D W u r OD `-' O O J > U') 0) W d co W O O 'O ;5E O M C O E N > N N M o V M O v ` 3 _ ¢ c C e- ?- d LO L O E n M N 2 d (o r co co Y U O o CIO Li > > d In cn OA On a) d an L OD co y a OD O a f'1 w o L c E v CID aD A N C N N r. o o a? c N o Q J N E y N t9 L a a _v U U N E 7 N N N L n. d m 0 0 Z H Z O N ?n •'` ? `s c4-i.,?o. "? i£ ?..r..w???w' '•.'13;1• ? 'v:; .:' ? .?4??,p y -. r , , e yc ;J. zL ?C f B ?? - . =y tv?;? rye: r ?. { ?. n ?k6a ?. ?; ?' Bek?rnflrit: :?eB ?? ?`???;= Abbey,"`' kit "r- pa,k 2os College??1y =:: `J CfB GdU U r ", ' - • i a. ?CrF ?X ' _ 'C fB : _© c • ``. _ - ?i?l f Y. {• • ? ???? ? ` •ti 1. ?7'?k (fem. `'? r;. r. ? ? Satire eat' y" • >?; ??:_ 2525Olle ge , `?-? ••h?•-'?~.! `• of .2_T.t'\?. - Cf • ?CAL? I'?? fooa? • • 10 000 Feet • • 2 3 Kilometers • SOIL MAP • s • • • • • • • • ZTJ N fB` ?1.?i • C Ewe Side" 7 1 •-11w?, ,' i i t r' ,_ p 1 1 ? r I6 1VtS? 1 'p 1 1., II.A?11? INTERSTATE 85 VARIABLE ROJECT A 81631202) INTERSTATE 85 (V?fAS WIDTH - ----------- OV, '??J111 I 1 1 S ,'' k 1 ?'w ?A' ? ?Y WILKINSON BOULEVARD - U.S. 29-74 VARIABLE WIDTH RIGHT- p)V--WAY SPEED LIMIT 45 MPH-ASPHALT IN (500 CONDITION W 2 y! ------------ yyroTM Q/w) 48 r ? r 1 t \ ` U Q m N '4 m D Q_ _ 0 0 o _- ? U`aU g -a / a Z O, 10Q W 0 11t ?, - III OW'SNoNE CEIITERA mc_ -?i _ p I y . - -. _ - ....... i I NWY. 2U EAST, EAST DOCK t-] m li 1 N. WILIESSORO. NO LIW { Y?/yY, \I Q{ ft 1,',,,r,.4.0. 3e6e.779 (F) `9J {I • • _ 11 A`t VA --------- =-'? :I'll tlt ? ii) a m I I II ? ? ? w { J tt I J ? v 4 U m z 5 l F- Z D ?,1 1 a ?-- a t 0 0z I Z 50 G O ? W ' p 0 3 W J w ?ce ? 0 m c HAWLEY ' - o _j DR I ISSUE ,'.P C AVEN Q : GIADS -DATE: PERMIT SET = ?Jr 2 l ISSUE DATE CONSTRUCTION SET ISSUE DATE _: • "? DRAWING NUMBER :.. C ba 120 SP-5 ' t SCALE I' • 60' 1 1 1 ?11J INTERSTATE 85 VARIABLE YODTH RIGHT-CF-WAY (NC DOT PROJECT p 8,1631202) INTERSTATE 85 (VARIA61 < \'r -111 T- li r J I \ 11 1 t ?` f l - 'I ,;' 9s71 "E ?W a* II ?? (II ? r I ,L 111`\\\llll? 11 +, ?1l \`, '-.`.\ 1 ?\'. \ ? t I `, Tll'nll ) ? - 111111 Q,,`L7 Ill 1?` t.. 4? rt\`,• d I I ? ., , ? ti?\ ?0 1\ W !pp ?\ tot" <?- r 7, ?1 ??\ 1, X11 1na1 In S }?' V ` p ' 1 1 , 1I 1 1\ 1 III' Il'1'l 1\ \11 r 1 I 1 11 1?' 1 1 WILKINSON BOULEVARD - U.S. 29-74 VARIABLE WIDTH RIGHT-C WAY SPEED LIMIT 45 MPH-ASPHALT IN ROOD CONDITION W REVD OTE ? DESCaIRnon • WIDTH RIW) f jLbrA Pee-. ? --- ----------- r r I I{ _ 0 I m o i .--? •. <t _ - - ?. a WAL-MART SUPERCENTER a i? ! 1/ Ill (9 I XGMECENTERS INC LDWF f1 XWY: EAST EAST OODK I F N. WILKESBDRG, NC 7YA6 X 1' 1 itlt 1336.658.4000 M 31fi.S5B.3251(Fl :??' /`? F \ / A 1 11 5,5 s. N 0 1A l v - / ? tl O I• `?`?? L? ??.? _. __ _ -_ - tit 1 v v '? \\ - m 1 I Y?a. \,\??: Z 11Oyy 0 = ISIS - 2 m cn g z z °" I 0 F- 29- z 20. UnI w J m HAwI>=r r = _ _ _ •• AVENLE ORIGINA ISSUE DATE SL?L6 PERMIT SET _-V r' ISSUE DATE yL 1•? -\ A ISSUE CIACTK)INSET --- ? ISSUE DALE DRAWING NUMBER ??. _ 6?0 120 ? SP-5 r? " SCALE 1 60' STORM WATER MANAGEMENT REPORT & CALCULATIONS FOR LOWES OF BELMONT, NC BELMONT, NORTH CAROLINA REVISED SUBMITTAL 07/20/06 FREELAND & KAUFFMAN, INC. ENGINEERS - LANDSCAPE ARCHITECTS 209 WEST STONE AVE. GREENVILLE, SOUTH CAROLINA 29609 Lowe's Caldwell Farm Road & I.85 Belmont, NC. Executive Summary The site is currently an approximate 16-acre commercially zoned property. The site is currently vacant. The property will be developed to contain Lowe's Home Improvement Center. Construction will include the building areas, and accompanying parking and landscape areas. One stormwater management pond will be located on the property to serve the Lowe's facility. In addition, the existing stormwater facility for the adjacent Wal-Mart Supercenter will be reconfigured as part of this development to allow for the construction of a parking area in the location of the existing Wal-Mart pond. The Lowe's Pond (Basin #1) will be located in the northwest portion of the site. The Wal-Mart Pond (Basin #2) will be located in the southern portion of the site. In accordance with the requirements of the Town of Belmont and NCDENR, both ponds will be designed to treat and release the first 1 " from a water quality standpoint. In addition, the ponds will limit the 10-yr and 100-yr discharge to predeveloped rates, in accordance with the Town of Belmont standards. The computer program Hydraflow Hydrographs will be used to generate hydrographs for each condition as depicted on the area maps. This program is based on the SCS (TR-55) calculation method. TR-55 was used to calculate the time of concentration for input into this program. The pre-developed flows were calculated using TR 55 to generate the runoff number and time of concentration for the flow areas. This information was input into the Hydraflow Hydrographs computer model to generate pre- developed flows. The hydrographs for each can be found in Appendix A, but the flows are summarized below: Predeveloped Rainfall Event Area # 1 (cfs) Offsite Area #I (cfs) Combined Area # 1 (cfs) Area #2 (cfs) 1" Runoff N/A N/A N/A N/A I Oyr. 18.85 5.78 20.08 44.46 100 yr. 39.26 9.68 41.79 72.94 Development of the site will increase the runoff due to the increase in impervious area. Also, the time of concentration will be decreased as a result of this development. Again, TR55 was utilized to determine the runoff number and time of concentration for the contributing flow areas. The hydrographs can be found in Appendix B. !) The allowable discharge from Basin #1 is a combination of the predeveloped Area #1 and the Offsite Area #1. This hydrographs were combined to develop the combined hydrograph. In this analysis, it is assumed that the entire area #I drains to point A. As this is not truly correct, the areas 1 A and 1 B combine a few hundred feet downstream from this point, on property owned by the Abbey, so that this assumption is considered valid. The ,) calculations for Area #2 closely model the original calculations for the original design of Basin #2 for the Wal- r' r' r' r' r' r' r' r> r? r) ?l r) r' `I Mart Supercenter. The same Cn value and time of concentration was utilized to maintain consistency. The only revision was the reduction of 0.2 acres that now will be directed to the Basin # 1. Developed Rainfall Event Area #1 (cfs) Area #2 (cfs) III N/A N/A IOyr. 83.24 88.04 100 yr. 120.74 124.53 The pond will be sized to limit the discharge of the 10 yr, and 100 yr storms to pre-developed rates. In addition, the water quality benefits of an extended wetland detention will be utilized to provide treatment for the first 1 ". Again, the computer program Hydraflow Hydrographs was used to model the proposed pond. The hydrographs can be found in Appendix C, but the following tables summarize the results: Developed Pond Discharge Basin #1 POND Stage Storage Volume Allowable Release Actual Release 111 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 POND Stage Storage Volume Allowable Release Actual Release 1 " 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1 " has been controlled in both basins to be released over a period of 2 - 5 days. Existing Conditions: The drainage area for the site consists of two separate areas (See Pre-developed Drainage Area Map). Area 1 A drains to the west to the existing drainage ditch. Area 1 B drains to the south toward Caldwell Farm Road. Since Areas 1 A and 1 B combine within a few hundred feet of the site boundary, it will be analyzed as one drainage area (Area #I). The soil type for this area is Type B according to the Soil Conservation Survey. In addition to Area #1, a small amount of offsite water will be directed to the site from the adjacent Interstate 85: This area is Offsite Area #1 and consists of Type B Soils. The drainage area for the reconfiguration of the Wal-Mart Pond (Basin #2) was taken from the approved stormwater report previously done by Freeland and Kauffman. The only deviation was the subtraction of 0.2 acres of drainage area that will not be directed to Basin #1. Area 1 is 13.8 acres of woods/grass combination in fair condition. Per the TR-55 Method, a curve number of 65 was determined. The time of concentration was derived from 100' of sheet flow at 9.0%, 65' of shallow concentrated flow C3.0%, 310' of open channel flow at 2.5% and 355' of open channel flow at 0.8% to Point A. This yields a time of concentration of 17 minutes. Area 1 (13.8 ac.) Woods/Grass Combo (Fair) A 13.8 ac CN = 65 Offsite Area #1 is 1.00 acres of landscaped area in good condition and 0.50 acres of asphalt. Per the TR-55 Method, a curve number of 73 was determined. The time of concentration was derived from 30' of sheet flow at 2.0% and 825' of shallow concentrated flow at 2.5%. This yields a time of concentration of 6 minutes. Offsite Area 1 0.50 ac.) Landscaped Area Impervious Area Good condition A = 0.50 ac A= 1.0 ac CN=61 CN=98 CN = 73 As stated Area 2 was derived from the previously approved Wal-Mart Supercenter Report by Freeland and Kauffman. The input data is summarized below. Area = 13.9 acres Cn = 76 Tc = 16.5 minutes Developed Conditions: In the developed condition, all of the Lowe's site + 0.2 acres from Wal-Mart will be directed to Basin # 1. The developed condition for Wal-Mart will be in accordance with the Wal-Mart drainage study by Freeland and Kauffman - 0.2 acres now directed to Basin #I. Runoff Calculations for Developed Condition to Pond: Area #1 Runoff Curve Number Paved parking lots, Open space, good condition, roofs, and driveways grass cover >, 75% A=10.5 ac A=3.3ac CN=98 CN=61 The total developed area is 13.8 acres and the weighted CN value is 89 (see TR-55 calculations for post- developed condition). Time of Concentration 100 ft, sheet flow @ 2.0% 188 ft. shallow conc. @ 1515 ft. open channel flow Paved Surface 3.0%, paved @ 4 fps Total Tc = 6 min Area #2 Again, Area #2 matches the Wal-Mart report - 0.2acres. The input data is summarized below. Area: 14.3 ac. Cn: 93 Tc: 8.2 min POND SIZING AND ROUTING Both ponds will be extended wetland detention facilities. Basin #11 will have a bottom elevation of 667.00, a permanent pool elevation of 67 1.00, and a top elevation of 678.50. This gives a total volume of 180,115 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and. 100-year storm events to be released at pre- developed rates. In addition, the outlet will be designed to discharge the first 1 " runoff within 2 - 5 days. The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1" runoff will be released through an orifice at the top of the permanent pool elevation (el. 671.00), while all other storm events will be released through a weir at the el. 673.00. The outlets will be sized as follows: Orifice Equation - 0 = 0.6A 2gH Weir Equation - 0 = 3.33LH312 From these equations it is determined that a 2.5-inch diameter orifice at elevation 671.00 will release the first 1" runoff. The 10 and 100-year storms will be passed through a V weir at elevation (673.00). A 5'x 5' concrete riser will extend to elevation 677.50. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: Basin #1 POND Stage Storage Volume Allowable Release Actual Release 111 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 will have a bottom elevation of 666.00, a permanent pool elevation of 670.00, and a top elevation of 676.50. This gives a total volume of 138,950 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and 100- year storm events to be released at pre-developed rates. In addition, the outlet will be designed to discharge the first 1" runoff within 2 - 5 days The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1 " runoff will be released through an orifice at the top of the permanent pool elevation (el. 670.00), while all other storm events will be released through a weir at the el. 672.00. It is determined that a 2.5-inch diameter orifice at elevation 670.00 will release the first 1" runoff. The 10 and 100-year storms will be passed through a 3' weir at elevation (672.00). A 5'x 5' concrete riser will extend to elevation 675.00. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: Basin #2 POND Stage Storage Volume Allowable Release Actual Release 1" 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1" has been controlled in both basins to be released over a period of 2 - 5 days. Both basins have been designed as extended wetland detention ponds per the NCDENR manual. Minimum surface areas have been met and the areas designed to provide approximately 15% area for the forebay, 35% area for the 0" -9" areas, 35% area for the 9" - 18" areas, and 15% area for the Micropool. Calculations for each basin can be found in Appendix C. i?' r' r? r? r? r' r' r' Erosion & Sediment Control The following is the report of the sediment and erosion control devices to be used on this project. The erosion will be controlled via a series of temporary diversion ditches, temporary sediment basins, inlet protection, silt fence, and a stone construction entrance. These items will be implemented per the NCDENR Erosion and Sediment Control Planning and Design Manual requirements and maintained on a regular basis to insure their proper operation. We will also provide all calculations for the sediment basin and traps. The site to be graded will consist of approximately 20.0 acres. The site is currently vacant with a mix of vegetation. A majority of the site has been logged within the last 2 years. In its graded condition the site will drain from the north to the south and then piped to a basin on the west side. The extended wetland detention pond will also serve as a sediment basin during construction. Diversion ditches will be installed to direct runoff into the pond during construction. Silt fence will be used in areas with less than 1 acre of disturbance that cannot be directed to either the temporary sediment pond or the either one of the sediment traps. In the interim, the remaining areas, which cannot be incorporated to the pond, will be directed towards silt fence. These areas are small and consist mainly of the fill slopes for the stormwater basins and the sediment traps. When the stormwater system is installed, inlet protection will be installed at each catch basin to collect sediment. Sediment Basin Calculations: The on-site detention pond will also serve as a sediment basin during construction. The pond is sized to handle the majority of the runoff in the developed condition. Based on the NC Erosion Control Handbook the basin should be sized to handle sediment at a rate of 1800 cubic feet (c.f.) per disturbed acre per year. From the Soil Conservation Service Soil Survey the soil types on site consist mainly of clayey soils. From the chart provide by NCDENR (fig. 6.61) and based on a surface area to peak discharge ratio of 0.01, the efficiency should be 75%. For loamy sand the efficiency is 85%. In both cases this meets the state requirements. ?FREEL.AND and KAUFFMAN, INC. 0EN!sINEERS • Lmvsa1PEARCHITECT5 9209 West Stone Avenue Greenville, South Carolina 29609 Job Job Na P?relephone864-233-5497 Computed By Fax 864233-8915 P1 Checked By_ Date Date R FEIEN E alc}lalati n Far. f ?_ c? ' i o ?"? S Dis ipli f ,' I - - E I : L.o !.?n?Z bG9 ?7 tt CP S i -V -I 77 l 3 i t EI F 3 1 ?,.? A? 2 Qa S ?o _ ? t I X51 ? i E ? ? L i 1 Sc i T -5- 2S S j} f i i ..... .? j..._._._.. _.._?. ....,_,. r _. _ _........ _._t-..__ .»._.?_.,... ? --a--..,. l _.-._..?.._.._......---. ... .. _..._...... i f __r _ .....?._ .i ._.. _ a i t r i 1 ? t I 3 ?p { 1 -1 Shee t i' i t ?l i' i' WinTR-55 Current Data Description --- Identification Data --- User: Date: 6/20/2006 Project: LOWES Units: English SubTitle: BELMONT Areal Units: Acres State: North Carolina County: Gaston Filename: P:\TSimmons\Dwg\Proj\LOWES\Belmont NC\STORMWATER CALC\PREDEVELOPED AREA 1.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ PREDEVELOP Outlet 13.8 65 0.285 Offsite Outlet 1.5 73 0.100 Total area: 15.30 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.5 4.4 5.0 5.5 6.5 6.9 3.0 Storm Data Source: Gaston County, NC (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 6/20/2006 3:28:55 PM ,- HYdro9raph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Area #1 (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs ?I Q (cfs) A A A Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.01 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 204 cuft Area #1 (Predeveloped) Hyd. No. 1 -1 Yr 0 2 5 7 Hyd No. 1 9 12 14 16 19 21 23 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 26 Time (hrs) 1 Hydrograph Plot 10 Hydraflow Hydrographs by Intelisolve Hyd, No. 1 . Area #1 (Predeveloped) Hydrograph type = SCS Runoff r Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 18.85 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Q (cfs) • AA AA Area #1 (Predeveloped) Hyd. No. 1 --10 Yr Hydrograph Volume = 65,176 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 1 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 1 Area #1 (Predevel oped) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs 'l 'a Area #1 (Predeveloped) Q (cfs) Hyd. No. 1 -100 Yr 40.00 v 30.00 11 20.00 10.00 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 39.26 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 126,891 cult Q (cfs) 40.00 30.00 20.00 10.00 0 2 5 7 1} Hyd No. 1 r rl 9 12 14 16 19 21 23 0.00 26 Time (hrs) 19 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predevelo ped) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 ?l Offsite (Predeveloped) Q (cfs) Hyd. No. 2 --1 Yr 0.50 ?I 0.45 0.40 0.35 .! 0.30 ?I 0.25 0.20 ?I ?I 0.15 0.10 0.05 0.00 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 Hydrograph Volume = 660 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 26 Time (hrs) 2 Hydrograph Plot 11 Hydraflow Hydrographs by Intelisolve Hyd. No. 2 ., Offsite (Predeveloped) Hydrograph type = SCS Runoff ?I Storm frequency = 10 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total Precip• = 5.00 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 5.78 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 ?l ?l Q (cfs) Offsite (Predeveloped) Hyd. No. 2 - 10 Yr 6.00 5.00 4.00 3.00 ?j 2.00 1.00 0 00 Hydrograph Volume = 11,641 cuft 0 2 5 7 Hyd No. 2 Q (cfs) 6.00 5.00 4.00 3.00 2.00 1.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 2 . • Offsite (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 9.68 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 n nn Hydrograph Volume = 19,649 cult Offsite (Predeveloped) •, Q (cfs) Hyd. No. 2 -100 Yr 10.00 ?i 8.00 ?I .? 6.00 4.00 2.00 0.0' 2.3 4.7 7.0 Hyd No. 2 Q (cfs) 10.00 8.00 6.00 4.00 2.00 9.3 11.7 14.0 16.3 18.7 21.0 ?- 0.00 23.3 Time (hrs) 20 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 i ., Total Predeveloped to Basin #1 ?I Hydrograph type = Combine r Storm frequency = 1 yrs Inflow hyds. = 1, 2 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min } Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 .? 0.05 0 00 Hydrograph Volume = 864 cuft Total Predeveloped to Basin #1 Hyd. No. 4 -1 Yr 0 2 5 7 9 Hyd No. 4 Hyd No. 1 12 14 16 - Hyd No. 2 19 21 23 Q (cfs) 0.50 - 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 26 Time (hrs) 0 12 0' H d ro ra h Plot Y 9 p Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:30 PM Hyd. No. 4 Total Predeveloped to Basin #1 Hydrograph type = Combine Peak discharge = 20.08 cfs Storm frequency = 10 yrs Time interval = 2 min • Inflow hyds. = 1, 2 •? Hydrograph Volume = 76,817 cult •' ?I ?I ?I Total Predeveloped to Basin #1 •I Q (c) 21 00 Hyd. No. 4 -10 Yr Q (cfs) 21 . .00 18 00 . 18.00 ?l 1 00 •) 5. 15.00 12 0 .0 12.00 ?I 9 00 9 00 . . 6 00 r . 6.00 00 3 3 00 . . I ----------- --- -- -------- - ---- --- - -------- - - - -- I ------ .--_..- ----------------- ----- ------ _... _ 0 00 0 00 0 2 5 7 Hyd No. 4 ?I 9 Hyd No. 1 12 14 16 - Hyd No. 2 19 21 23 26 Time (hrs) HYd ro9raph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Total Predeveloped to Basin #1 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 1, 2 ?l ?l Q (cfs) 40.00 •1 30.00 20.00 10.00 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 41.79 cfs Time interval = 2 min Hydrograph Volume = 146,540 cult Total Predeveloped to Basin #1 Hyd. No. 4 -- 100 Yr 0 2 5 7 Hyd No. 4 9 12 14 16 Hyd No. 1 Hyd No. 2 Q (cfs) 50.00 40.00 30.00 20.00 10.00 0.00 19 21 23 26 Time (hrs) 21 HYdrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 14 •, Area #2 (Predeve loped WM) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs ?I Q (cfs) Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 2.08 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 9,211 cuft Area #2 (Predeveloped WM) Hyd. No. 14 -1 Yr Q (cfs) 3.00 2.00 1.00 0 2 5 7 ?I Hyd No. 14 ?I 9 12 14 16 19 21 23 0.00 26 Time (hrs) 7 0 HYdrograph Plot 16 ? Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Area:#2 (Predeve loped WM) * Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total reci = 5.00 in Storm duration = 24 hrs Q (cfs) Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 44.46 cfs Time interval = 2 min . Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 124,736 cult Area #2 (Predeveloped WM) Hyd. No. 14 -10 Yr Q (cfs) 50.00 0 2 5 7 fI .? Hyd No. 14 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot 25 Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Area #2 (Predeveloped WM) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 72.94 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 Q (cfs) 7 80.00 6 gj 70.00 60.00 } 50.00 40.00 30.00 1 20.00 10.00 0 00 Hydrograph Volume = 205,069 cult Area #2 (Predeveloped WM) Hyd. No. 14 -100 Yr Q (cfs) 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 0 2 5 7 Hyd No. 14 9 12 14 16 19 21 23 26 Time (hrs) FREELAND and KAUFFMAN, INC. ENGINEERS • LANDSG4PEARGHITECT5 209 West Stone Avenue Greenville, South Carolina 29609 Telephone 864233-5497 Fax 864233-8915 ?I Job Job No. Computed By Checked By Date Date R FEIZEN E alculati n Far u? 7 1, dom. oa S 3 Discipli ! 1 E i t n S ?I f I .. It t 1 t o c2b E f µ i - ---- ------- -- .. .. ! t t r ._._ € ._. , _.. ._ .. { . _ i} ... ...E _ .. _ - - I l - _ t # f 7 i I ? I I I E E . _ ? i I -€ .. . ? ! ._.. t ., t I I . ? € , $ t E $ ? € : , # f S 1 1 ..t 1 111 ?. f ? ? I t S i y b {{{ i i i I ? j( , E i I ( I ? E F i . i }q € i € f I : i I I E t j I ? € : ? . _... •.... __ - ._.-.....E _...., :.. __, .._. _ _.._.. ... ..._ E.-, «._.. . .._ _... x......._ . .._,..,._.s .., ........ __. _ ... ... .... _,. I ._.....i-'........._ ? i _... .._.. ._ : i l ; i t i ; i i WinTR-55 Current Data Description Identification Data --- User: Date: 7/13/2006 Project: LOWES Units: English SubTitle: BELMONT Areal Units: Acres State: North Carolina County: Gaston Filename: P:\TSimmons\Dwg\Proj\LOWES\Belmont NC\STORMWATER CALC\DEVELOPED AREA 1.w55 --- Sub-Area Data --- Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ DEVELOPED Outlet 13.8 89 0.100 Total area: 13.80 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.5 4.4 5.0 5.5 6.5 6.9 3.0 Storm Data Source: Gaston County, NC (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, version 1.00.00 Page 1 7/13/2006 2:12:28 PM i •t HYdroJraph Plot 1 ? Hydraflow Hydrographs by Intelisolve Hyd'. No. 6 •? Area #1 (Developed) Hydrograph type = SCS Runoff •, Storm frequency = 1 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER .? Total precip. = 1.85 in Storm duration = 24 hrs Thursday, Jul 13 2006, 2:40 PM Peak discharge = 21.05 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type 11 Shape factor = 484 Q (cfs) /1A AA Hydrograph Volume = 42,500 cult Area #1 (Developed) Hyd. No. 6 --1 Yr Q (cfs) 24.00 0 2 5 7 Hyd No. 6 20.00 16.00 12.00 8.00 4.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) HYdro9raph Plot Hydrallow Hydrographs by Intelisolve _ Hyd. No. 6 Area #1 (Developed) ! Hydrograph type = SCS Runoff . ; Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs Thursday, Jul 13 2006, 2:40 PM Peak discharge = 83.24 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Q (cfs) Area #1 (Developed) ? .) Hyd. No. 6 --10 Yr . 90.00 . ? 80.00 - 70.00 - . 60.00 - j 50.00 .y 40.00 30.00 - 20.00 10.00 ? 0.00 - - -- - --- - - - --- -- Hydrograph Volume = 177,142 cult 0.0 2.0 4.0 6.0 Hyd No. 6 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) V Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hy d. No. 6 / Area #1 (Developed) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs ?I ?J Q (cfs) • 1 0 00 4 . } 120 00 . ) 100 00 . . ?j ?i 80.00 60 00 . 40.00 20 00 . Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 00 0.0 2.0 4.0 6.0 Hyd No. 6 ?I Thursday, Jul 13 2006, 2:40 PM Peak discharge = 120.74 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 263,486 cult Area #1 (Developed) Hyd. No. 6 -100 Yr 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) c HYd rograph Plot r I? Hydraflow Hydrographs by Intelisolve Hyd. No. 8 r Total Developed to Basin #1 r' Hydrograph type = Combine Storm frequency = 1 yrs Inflow hyds. = 2, 6 r' Thursday, Jul 13 2006, 2:40 PM Peak discharge = 21.52 cfs Time interval = 2 min r' r' r r' r' r? rj Q (cfs) r rj 24.00 r' r' 20.00 r r' rj 16.00 r' rj 12.00 8.00 r' 4.00 -- - - -- -------- - r' 0 00 Hydrograph Volume = 43,809 cult Total Developed to Basin #1 Hyd. No. 8 --1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 0 2 5 7 9 r Hyd No. 8 Hyd No. 2 r 12 14 16 Hyd No. 6 0.00 19 21 23 26 Time (hrs) 2 •' Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 8 Total Developed to Basin #1 Hydrograph type = Combine •) Storm frequency = 10 yrs Inflow hyds. = 2, 6 Peak discharge = 89.01 cfs Time interval = 2 min ?I ?I 1 Q (cfs) 80 00 •? . 70 00 .? . ) 60 00 • . ) 50 00 O . 40 00 .) . - - 30 00 . ) 20 00 . . - -------- -- - 10 00 . - -- - -- - - - -- - - -- - ----- - - -- - - --- --- ----- Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 W1 0.00 0 00 0.0 2.0 4.0 6.0 8.0 .I Hyd No. 8 Hyd No. 2 v ?i Hydrograph Volume = 188,783 cult Total Developed to Basin #1 Hyd. No. 8 -10 Yr Thursday, Jul 13 2006, 2:40 PM 10.0 12.0 Hyd No. 6 14.0 16.0 18.0 20.0 Time (hrs) 4 HYdrograph Plot s • Hydraflow Hydrographs by Intelisolve Hyd'. No. 8 .; Total Developed to Basin #1 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 2, 6 ?I •' ?I Q (cfs) A Aft I1I1 Thursday, Jul 13 2006, 2:40 PM Peak discharge = 130.42 cfs Time interval = 2 min Hydrograph Volume = 283,135 cult Total Developed to Basin #1 Hyd. No. 8 - 100 Yr Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 r 0.0 2.0 4.0 6.0 8.0 ?I Hyd No. 8 Hyd No. 2 0.00 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 6 Time (hrs) AO Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 16 ., Area #2 (Developed) Hydrograph type = SCS Runoff ., Storm frequency = 1 yrs Drainage area = 14.30 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 19.58 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 r Area #2 (Developed) Q (cfs) Hyd. No. 16 - 1 Yr 21.00 18.00 ?I ,t 15.00 12.00 9.00 Hydrograph Volume = 44,968 cuft Q (cfs) 21.00 6.00 3.00 0 00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 8 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 16 ,,' Hydrograph Plot Hydraflow Hydrographs by Intelisolve 1 Hyd, No. 16 Area #2 (Developed) ,i Hydrograph type = SCS Runoff t Storm frequency = 10 yrs Drainage area = 14.30 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs t Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 88.04 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 Area #2 (Developed) Q (cfs) Hyd. No. 16 -10 Yr t 90.00 80.00 /t 70.00 60.00 50.00 40.00 30.00 -) 20.00 rl 10.00 0 00 Hydrograph Volume = 217,909 cult I 0.0 2.0 4.0 6.0 rt Hyd No. 16 8.0 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 -1 -1 -1 1 0.00 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) 17 Hydrograph Plot 26 Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 14.30 ac Basin Slope = 0.0% ?I Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 124.53 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 ?I :a Area #2 (Developed) .) Q (cfs) Hyd. No. 16 --100 Yr 140.00 120.00 .) 100.00 80.00 60.00 40.00 20.00 0 00 Hydrograph Volume = 315,206 cuft 120.00 100.00 Q (cfs) 140.00 80.00 60.00 40.00 0.0 2.0 4.0 6.0 Hyd No. 16 20.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) E •FREELAND and KAUFFMAN, INC. 6ENowEvc5 •LANDSCAPEARCHITECTS 209 west stone avenue *Greenville, South Carolina 29609 Telephone 864-233-5497 Fax 864233-8915 • Job Job No. Computed Dy Checked By Date Date -7 R FEfZEN 4 E W Far. Wt v -*a?< t ??N ??1 Discipli e,: i { f 1 • i ` 1 r. •, ? I ? ! S?-«?= ° _ .?-, ._ poi 3??-?L?? ? ? ??? ?w? 4 -.4 i s < P, .?-1 ( ) s 3 lr?> 5L c' 3 : f F e _ F I i 7 i J c) 0 C C- ? b ? : : ' • t t ?- ?. ? ... ? ?_ }.?..? _e.. .....E .; . ?. 1 t i t ? F 1 fi 11 F ---- - ------- t ' < i i ! : t ? ? l i < t I s he : t ff, _ _.. P *FREELAND and KAUFFMAN, INC. .ENGINEERS • LANDSCAPE ARCHITECTS 209 West Stone Avenue Job ?C_ Job NO. •Greemville, South Carolina 29609 telephone 864-233-5497 Computed 5y Fax 864233-8915 0 Checked Dy _ R 2 i { I t { I [ t f ? I f i i .. __. .-... .. t Date 'r. ??r.--? ? *.? ? 1 1 ?? ?? t Disciplirt e• ? f L tj` _ < E ! sE j I ! ?.. _. 111 f ; _... t ._ '', V f < (BSc .? %? t-K J:k S ! i s ' - c? ' 0 .16 // t I \\ 5G? mot" .-1 E ; .? . .. 44 t -- I 1 i e I i - ! s X4-01 4 o,5- 7z S i o j -._. ?a 1. 3 , z Q!w FJt 7i ?j CAS ?t ?'S - f ? } 4 ? -{ i ? I I 0 q D t i _L-6 f -FS i f t ... i ? F ? f d Z_ ( ! t . e ! _ -r ti [ t [ Date I (Z o CX. 0 OFREELAND and KAUFFMAN, INC. OENGINEERS • LAND.SCAPEARCHITEGTS •209 West Stone Avenue Job Groenville, South Carolina 29609 .Telephone 864233-5497 Fax 864233-8915 Job No. Date -7 Computed By Checked By Date K FEKEN E c alculati on Far. { : d; I( {j ? f i i I 1 lfl t f ' i _ 1 Y F ? i .?.. € _ is . F : _ € ! p ££ i E . t ` ¢ t3 t a t j 1 ? 3 i I ? i O ? ?2 + ? 3 ? I J : ' .5, A -? F ?/ t ! i ? F I ii ? 1 ? f{( ' 1 J i i e i ? : I t E I I ' t -------- --- - 4 c I _-I Q 9lF 1N. ? A S C. f 1? ? F C`t i I t 1 -i .. i i ee i t I ' *FREELAND and KAUFFMAN, INC. VNmeERS • LANDSCAPE ARCHITECTS 09 West Stone Avenue r ¢ S _ ?j? `p ?? tJ C? ob No. Sreenville. South Carolina 29609 J012 J elephons 864-233-5497 ax 864-233-8915 Computed By Checked Dy Date Date (a < <ot. FEf EN E ( ? f Calculati n For. i '4 1 ! is ipli. I Q- .? ( I 1 r J? i 1 - -- -- -------- 1 < . ? ¢ 1 e { r i I ?(V? (J /' k 1 C t s t i 1 ? ? t Q 1 7( 7Z °O t F Q - ioa 1 f i ? i 1 i t j _ i C F5? 1 i i I t 1 I ? t I ? ( ? 3 S ? O}? i? ? s w s ? i ? _ .. t 1 - .__. _ f ( \ ?=1 Cam! ..._._._. _ r CA, - ----- y/.--„ •{-.,_. - ------- _ g _.. _. E i 16I 4 i ( ? r ! j t ` ? f i ?` 1 C) 2_0 ? i ? f u I f f i i 3 ' < i f } a 1W c__ 4 i < i i ` z f E ( ? I t i i F t s } ij 1 : 1 < ` ! i I S ! ? f 1 1 Y' 1 1 ' j i i : F i I 5 r r r r' r' r' r' r' r• r' r' r' r r' vr' r' r' v r' v ?j 3. General a. Basin shape should minimize dead storage areas and short circuiting. Length to width ratios should be 3:1 or greater. (Barfield, et al., 1981, pp. 426-429; Florida DEP, 1982, pg. 6-289). b. If the basin is used as a sediment trap during construction, all sediment deposited during construction must be removed before normal operation begins. c-. Aquatic vegetation should be included for a wetland type detention basin (Maryland DNR, March 1987; Schueler, 1987, Chapter 4 and 9). A minimum ten foot wide shallow sloped shelf is needed at the edge of the basin for safety and to provide appropriate conditions for aquatic vegetation (Scheeler, 1987). This shelf should be sloped 6:1 or flatter and extend to a depth of 2 feet below the surface of the permanent pool (Shaver and Maxted, DNREC, 1994). A list of suitable wetland species and propagation techniques are provided in Schueler (1987) and Maryland DNR (1987). d. An emergency drain (with a pipe sized to drain the pond in less than 24 hours) should be installed in all ponds to allow.access for riser repairs and sediment removal (Scheeler, 1987). Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant Removal Efficiency in the Piedmont % Impervious Cover 3.0 4.0. 5.0 6.0 7.0 8.0 9.0 10 0.59 049 0.43 0.35 0 3 1' O29 0 26 20 0.97 0.79 0.70 .1159 . 0.51 0.46 - 0.44 40' 1.73. 1.43 1.25 _ 1.05 0.90 ;0.82 0.77 50 2.06 1.73 1.50 1.30 1.09 1.00 .0.92 60 2.40 2.03 1.71 1.51 1.29. 1.18 1.10 70 2.88. 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 .2.38 2.10 1.86 1.60 1.42 90 3.74 3.10 166. 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. . Coastal SA/DA-ratios can be obtained from the local DWQ Regional Office. 5 0, 0 HYdrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Basin #1 Routing Hydrograph type = Reservoir Storm frequency = 1 yrs r Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) Thursday, Jul 13 2006, 2:43 PM Peak discharge = 0.20 cfs Time interval = 2 min Max. Elevation = 672.69 ft Max. Storage = 35,206 cuft ,j Storage Indication method used. Q (cfs) /1 A AA Hydrograph Volume = 40,519 cult Basin #1 Routing Hyd. No. 10 -1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 r v v V 0 10 19 29 39 Hyd No. 10 Hyd No. 8 r 0.00 48 58 68 77 87 97 Time (hrs) 1 HYdro9raph Plot 2 • Hydraflow Hydrographs by Intelisolve ?I Hyd: No. 10 Basin #1 Routing Hydrograph type = Reservoir Storm frequency = 10 yrs Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) •j Storage Indication method used. ?I ?I I Q (cfs) .I 90.00 ?I .? 80.00 .? 70.00 a .j 60.00 .? 50.00 40.00 .? 30.00 20.00 10.00 0 00 Thursday, Jul 13 2006, 2:43 PM Peak discharge = 12.33 cfs Time interval = 2 min Max. Elevation = 675.36 ft Max. Storage = 101,147 cuft Hydrograph Volume = 182,636 cult Basin #1 Routing Hyd. No. 10 -10 Yr 0 7 15 22 29 V Hyd No. 10 Hyd No. 8 ?j Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 37 44 51 59 66 73 81 Time (hrs) 0: Hydrograph Plot 3 Hydraflow Hydrographs by Intelisolve Hyd. No. 10 •' Basin #1 Routing 0; Hydrograph type = Reservoir •, Storm frequency = 100 yrs Inflow hyd. No. = 8 40' Reservoir name = Basin #1 (Lowe's) •I Storage Indication method used. ?I ?I Q (cfs) •I A Afl All Basin #1 Routing Hyd. No. 10 -100 Yr Thursday, Jul 13 2006, 2:43 PM Peak discharge = 25.78 cfs Time interval = 2 min Max. Elevation = 676.98 ft Max. Storage = 147,756 cuft Hydrograph Volume = 276,807 cult Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 9` 0 3 6 9 12 15 18 21 24 27 30 ?l ,? Hyd No. 10 Hyd No. 8 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 18 Basin #2 Routing Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 16 Reservoir name = Basin #2(WM) Storage Indication method used. ?i Q (cfs) } 21.00 ?I 18.00 ?I .? 15.00 12.00 ?I ?I .i 9.00 6.00 ,I ?I 3.00 ?I 0 00 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.21 cfs Time interval = 2 min Max. Elevation = 671.78 ft Max. Storage = 35,947 cuft Hydrograph Volume = 41,644 cult Basin #2 Routing Hyd. No. 18 -1 Yr Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 10 19 29 39 Hyd No. 18 Hyd No. 16 ?I 0.00 48 58 68 77 87 97 Time (hrs) 9 18 HYdroJraph Plot ? Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:30 PM Hyd. No. 18 Basin #2 Routing Hydrograph type = Reservoir Peak discharge = 36.62 cfs Storm frequency = 10 yrs Time interval = 2 min Inflow hyd. No. = 16 Max. Elevation = 674.61 ft Reservoir name = Basin #2(WM) Max. Storage = 101,146 cuft •I Storage Indication method used. Hydrograph Volume = 213,095 cult ?t ?I ?l Basin #2 Routing .? Q cfs 90 001- Hyd. No. 18 -10 Yr Q (cfs) . 90.00 80 00 . 80.00 70 00 . 70.00 60 00 . 60.00 50 00 . 50.00 40 00 . - 40.00 30 00 . 30.00 20 00 . 20.00 10 00 . 10.00 000 o00 0 3 5 8 11 v Hyd No. 18 Hyd No. 16 13 16 19 21 24 27 Time (hrs) • Hydrograph Plot 27 • • Hydraflow Hydrographs by Intelisolve Hyd. No. 18 Basin #2 Routing Hydrograph type = Reservoir •' Storm frequency = 100 yrs Inflow hyd. No. = 16 •' Reservoir name = Basin #2(WM) Storage Indication method used. Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 62.83 cfs Time interval = 2 min Max. Elevation = 675.63 ft Max. Storage = 128,783 cuft Hydrograph Volume = 310,320 cult • •I •l •? Basin #2 Routing •? Q (c?) 140 00 Hyd. No. 18 -100 Yr Q (cfs) . 140.00 ? •? 120 00 . 120.00 100.00 .} 100.00 80 00 . 80.00 ? 60 0 . . 0 60.00 40 00 . 40.00 20 00 . 20.00 0.00 0.00 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 18 Hyd No. 16 Pond Report Hydraflow Hydrographs by Intelisolve Pond No. 1 - Basin #1 (Lowe's) Pond Data Pond storage is based on known contour areas. Average end area method used. Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) , Total storage (cuft) Tuesday, Jun 20 2006, 3:37 PM 0.00 671.00 19,213 0 0 1.00 672.00 20,973 20,093 20,093 2.00 673.00 22,780 21,877 41,970 3.00 674.00 24,650 23,715 65,685 4.00 675.00 26,580 25,615 91,300 5.00 676.00 28,575 27,578 118,877 6.00 677.00 30,600 29,588 148,465 7.00 678.00 32,700 31,650 180,115 Culvert / Orifice Structures Weir Structures [A] [Bl [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 2.50 0.00 0.00 Crest Len (ft) = 1.00 12.00 0.00 0.00 Span (in) = 36.00 2.50 0.00 0.00 Crest El. (ft) = 673.00 677.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 671.00 671.00 0.00 0.00 Weir Type = Rect Rect - - Length (ft) = 40.00 0.00 0.00 0.00 Multistage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .015 .013 .013 .000 Orit Coeff. = 0.60 0.60 0.60 0.00 Multistage = n/a Yes No No EA1Itration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cult ft cfs 0.00 0 671.00 0.00 1.00 20,093 672.00 0.15 2.00 41,970 673.00 0.23 3.00 65,685 674.00 3.68 4.00 91,300 675.00 9.77 5.00 118,877 676.00 17.70 6.00 148,465 677.00 26.00 7.00 180,115 678.00 47.88 Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D ELI Total cfs cis cfs cfs cfs cfs cfs cfs cfs 0.00 - - 0.00 0.00 - - - 0.00 0.15 - - 0.00 0.00 - - - 0.15 0.22 - - 0.00 0.00 - - - 0.22 0.25 - - 3.33 0.00 - - - 3.58 0.27 - - 9.42 0.00 - - -- 9.69 0.29 - - 17.30 0.00 - - - 17.59 0.29 - - 25.67 0.00 - - - 25.96 0.29 - - 33.46 14.13 - - - 47.88 Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:38 PM Pond No. 2 - Basin #2(WM) Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) 0.00 670.00 1.00 671.00 2.00 672.00 3.00 673.00 4.00 674.00 5.00 675.00 6.00 676.00 Culvert I Orifice Structures Contour area (sqft) 19,300 20,300 21,300 22,200 24,300 26,700 29,000 [A] [B] [C] Rise (in) = 36.00 2.50 0.00 Span (in) = 36.00 2.50 0.00 No. Barrels = 1 1 0 Invert El. (ft) = 670.00 670.00 0.00 Length (ft) = 60.00 0.00 0.00 Slope (%) = 1.00 0.00 0.00 N-Value = .013 .013 .013 Orif. Coeff. = 0.60 0.60 0.60 Multistage = n/a Yes No Stage I Storage I Discharge Table Stage Storage Elevation Clv A ft cuft ft cfs 0.00 0 670.00 0.00 1.00 19,800 671.00 0.15 2.00 40,600 672.00 0.23 3.00 62,350 673.00 10.39 4.00 85,600 674.00 27.64 5.00 111,100 675.00 43.67 6.00 138,950 676.00 68.99 [D] 0.00 0.00 0 0.00 0.00 0.00 .000 0.00 No Incr. Storage (cuft) Total storage (cuft) 0 0 19,800 19,800 20,800 40,600 21,750 62,350 23,250 85,600 25,500 111,100 27,850 138,950 Weir Structures [A] [B] [C] [D] Crest Len (ft) = 3.00 12.00 0.00 0.00 Crest El. (ft) = 672.00 675.00 0.00 0.00 Weir Coeff. = 3.33 3.33 0.00 0.00 Weir Type = Rect Rect - - Multistage = Yes Yes No No EAltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Clv B Clv C Clv D Wr A Wr B Wr C Wr D EAl Total cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 - - 0.00 0.00 - - - 0.00 0.15 - - 0.00 0.00 - - - 0.15 0.22 - - 0.00 0.00 - - - 0.22 0.22 - - 9.99 0.00 - - - 10.21 0.21 - - 27.40 0.00 - - - 27.61 0.20 - - 43.47 0.00 - - - 43.66 0.10 - - 37.75 31.14 - - - 68.99 • i • i' i} i' i` i i} i' i' i' i i' • BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE I POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 9.5 AC X 18000F per AC - 17 ,1 OOCF INCREMENTAL INCREMENTAL TOTALVOLUME TOTALVOLUME ELEVATION ELEV. DIFF. AREA SF AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD)_ 671 19,213.0 0.0 0.0 1 20,093.0 20,093.0 744.2 672 20,973.0 20,093.0 744.2 1 21,876.5 21,876.5 810.2 673 22,780.0 41,969.5 1,554.4 1 23,715.0 23,715.0 878.3 674 24,650.0 65,684.5 2,432.8 1 25,615.0 25,615.0 948.7 675 26,580.0 91,299.5 3,381.5 1 27,577.5 27,577.5 1,021.4 676 28,575.0 118,877.0 4,402.9 1 29,587.5 29,587.5 1,095.8 677 30,600.0 148,464.5 5,498.7 1 31,650.0 31,650.0 1,172.2 678 32,700.0 180,114.5 6,670.9 1} 1) BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE 11 POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 14.8 AC X 18000F per AC = 26,640CF INCREMENTAL INCREMENTAL ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) 671 19,213.0 1 20,093.0 20,093.0 744.2 672 20,973.0 1 21,876.5 21,876.5 810.2 673 22,780.0 1 23,715.0 23,715.0 878.3 674 24,650.0 1 25,615.0 25,615.0 948.7 675 26,580.0 1 27,577.5 27,577.5 1,021.4 676 28,575.0 1 29,587.5 29,587.5 1,095.8 677 30,600.0 1 31,650.0 31,650.0 1,172.2 678 32,700.0 TOTAL VOLUME TOTAL VOLUME VOLUME (CF) VOLUME (CYD) 0.0 0.0 20,093.0 744.2 41,969.5 1,554.4 65,684.5 2,432.8 91,299.5 3,381.5 118,877.0 4,402.9 148,464.5 5,498.7 180,114.5 6,670.9 BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE I POND AT SOUTHEAST CORNER STORAGE AREA IS APPROXIMATELY 7.0 AC X 18000F per AC = 12,6000F INCREMENTAL INCREMENTAL TOTAL VOLUME TOTALVOLUME ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 670 9,050.0 0.0 0.0 1 9,625.0 9,625.0 356.5 671 10,200.0 9,625.0 356.5 1 10,850.0 10,850.0 401.9 672 11,500.0 20,475.0 758.3 1 12,100.0 12,100.0 448.1 673 12,700.0 32,575.0 1,206.5 1 13,350.0 13,350.0 494.4 674 14,000.0 45,925.0 1,700.9 1 14,750.0 14,750.0 546.3 675 15,500.0 60,675.0 2,247.2 1 16,250.0 16,250.0 601.9 676 17,000.0 76,925.0 2,849.1 i 1 BELMONT (LOWE'S) BELMONT, NC 7-Jun-O6 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE II POND AT SOUTHEAST CORNER STORAGE AREA IS APPROXIMATELY 16.0 AC (FROM WAL-MART SITE) X 1800CF per AC - 28,8000F INCREMENTAL INCREMENTAL TOTAL VOLUME TOTAL VOLUME ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 670 19,300.0 0.0 0.0 1 19,800.0 19,800.0 733.3 671 20,300.0 19,800.0 733.3 1 20,800.0 20,800.0 770.4 672 21,300.0 40,600.0 1,503.7 1 21,750.0 21,750.0 805.6 673 22,200.0 62,350.0 2,309.3 1 23,250.0 23,250.0 861.1 674 24,300.0 85,600.0 3,170.4 1 25,500.0 25,500.0 944.4 675 26,700.0 111,100.0 4,114.8 1 27,850.0 27,850.0 1,031.5 676 29,000.0 138,950.0 5,146.3 Storm Sewer Summary Report Page 1 Line Line ID Flow Line Line Invert Invert Line HGL HGL Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) (%) (ft) (ft) (ft) No. 1 Str E1 to 21 2.50 18 c 94.0 661.03 661.50 0.500 661.70 662.10 0.27 End 2 Str 21 to 22 2.65 18 c 151.1 661.60 662.35 0.496 662.38 662.97 0.34 1 3 Str 22 to 23 1.36 18 c 34.0 - 662.45 662.60 0.441 663.31 663.32 0.04 2 4 Str 1 to 2 35.48 36 c 76.0 672.66 673.04 0.500 674.56 675.03 1.18 End 5 Str 2 to 3 34.30 36 c 142.0 673.14 673.85 0.500 676.21 676.52 0.29 4 6 Sir 3 to 4 31.94 36 c 154.0 673.95 674.72 0.500 676.81 677.03 0.51 5 7 Str 4 to 5 28.46 30 c 281.0 674.82 676.22 0.498 677.54* 678.89* 0.24 6 8 Str 5 to 6 29.09 30 c 213.0 676.32 677.39 0.502 679.13* 680.20* 0.68 7 9 Str 6 to 7 24.34 30 c 30.0 677.49 677.64 0.500 680.88* 680.99* 0.42 8 10 Sir 7 to 8 19.68 30 c 70.0 677.74 678.09 0.500 681.41 * 681.57' 0.19 9 11 Str 8 to 9 20.18 30 c 164.0 678.19 679.01 0.500 681.76* 682.16* 0.29 10 12 Str 9 to 10 6.82 18 c 84.0 679.11 679.53 0.500 682.44* 682.80* 0.23 11 13 Str 9 to 11 6.82 18 c 74.0 679.11 679.48 0.500 682.44* 682.76* 0.23 11 14 Str 1 to 2 49.52 36 c 76.0 672.66 673.04 0.500 674.90 675.63 1.00 End 15 Sir 2 to 12 48.38 36 c 152.0 680.55 681.30 0.493 683.11 683.86 0.40 14 16 Str 12 to 13 48.54 36 c 41.0 681.40 681.60 0.488 684.26 684.44 0.54 15 17 Sir 13 to 14 39.06 36 c 183.0 681.70 682.65 0.519 684.97 685.55 0.24 16 18 Str 14 to 14A 30.02 30 c 52.0 682.75 683.00 0.481 685.80* 686.07* 0.58 17 19 Str 14A to 15 22.86 30 c 100.0 683.10 683.55 0.450 686.66* 686.97* 0.17 18 20 Str 15 to 16 16.22 24 c 168.0 683.65 684.40 0.446 687.13* 688.00* 0.62 19 21 Str 16 to 17 6.30 24 c 276.0 684.50 685.85 0.489 688.62* 688.84* 0.03 20 22 Sir 17 to 18 4.09 18 c 100.0 685.95 686.45 0.500 688.87* 689.02* 0.08 21 23 Sir 14A to 14B 8.52 18 c 14.0 685.93 686.00 0.500 687.43 687.50 0.36 18 Project File: belmont pipe file -backup.stm Number of lines: 23 Run Date: 06-20-2006 NOTES: c = circular, e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. Hydraflow Storm Sewers 2003 . d to a ,i ?'t O CL I t? I) W I co I E p co 0 ¢ C N O M r ?! r V r t0 r J p C N M V to f0 r` M O ? N ? O O 0 ?O 0 p _ O O O O O O w O O O O O r + Q w .. + -. O O W N N r N M V to 0 r- M O W r N ? r r r r ? (3 6 Cn fn Co Co U U 6 U) 0 6 U 0 to N 6 Co N to fA U N c6 0 W C) O o 0 0 0 0 0 0 to o to o 0 0 0 0 0 0 0 d O O O to to to tr) tC) In M tf) n tD N to to M tD co ui C to O to O co co co co O 0 to co M M co O to 9 co co 0) co CN rn (D w rn 0) ° C) 0 co (D co (D w to t0 O t0 t0 <0 to co t0 to to (0 tD co O tD N C Y to N O W) O O O ( O O () 0 O 0 O O O O tt) O O O O O O 0 n n r N h O O r st n u7 O 0 LO to . .7 C) r r r r O r O r r O r r r r O O O r O r O d M M M M M M M M M M M M M M M M M M co M M Z m C O O O O O O O O O O O O O O O O O O O O O > `r O O C O C C 6 O C O C O O C O 0 o c; o a O Cl) N 0 0) c a L y C 0 1 L` U U U C) U U CU U U U CU CU U CU U U CU U U U CU w L; CNC E J y '?. W O 00 CD 0 0 O O O O O Co Co co 0 0 0 O O v --r p a r r r M M M M M M M M r r M M M M M M N N Z L C. O t LO M O t0 v O to w N r N N O) M 0) O Cl) co O `' O LO O to O to o V V `') M ? ? n O o f LO i v O t ) to (0 O LO 't co W `? co C CO ( to ( n, P 9 O n r n r, C r- o r, D ti a) r, co r- Co m cV o ri 0 cM 0 0 co to to to (o CD co co co (D to co tD to to co co (D to (D co tD d d CL :z C O o O to O to '[)' v O to O to O t O t O t O O O O O O O O N 00 ' to to CD .J N ` O O C O O o 0 o O o O to O to C to O to O t() O to C v O v O to O V O V O v O C *.' C co O U) to v to N N O W r r CO 0 O O In O to O O CO th (D r O 00 M V: [` ?-- r r (0 to CD to C W " CD tD co fD h M f? th r n t0 ^ N ^ ^ [O CA N CV O tD O t0 w 0 tO - 0 CO CD t0 w 0 (D 0 O ^ CD N 0 (D t- 0 CO co O CD O O CO co O (D co O (D co 0 co O CD d d C ? ?'E o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 .... W CD 0 0 0 0 o CD co o co w 0 CD o co co o CD co co U o co co co co co o co co o co Co co co 0 co co o Co co Co O 0 o 0 a) 0 0) 0 0) 0 a) 0 0) 0 o 0 C) 0 rn 0 Co 0 a) 0 (n 0 rn 0 M 0 0 0 a) 0 rn o 0) C) m to 0 0 0 0 0 p W C A^ E o O o 0 0 0 o to to o 0 0 0 o O LO to o to o to ; O N N M to r` O r t` O O O O M O rl? to q r? M O to 0 0 0 0 o 0 o 0 0 0 r .= .= o o r - C) r r o C 3 o ('J 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Y .. o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o c o a a a a a a a a a a a a a a a a a a 0 0 0 0 0 0 = 0 0 = 0 0 0 0 S 0 0 0 0 0 = E U U U U U U U U 2 U U U U 2 U U 2 U U U to o rn C) 00 o o ° cD o ° o o v c c d C t0 00 O O N v tri roi n M O 0 N i N O M 0 O 0 O O O O C i m a t 0 r , t t to M t v i M o R N Q t ?= C ^ O r a O O V O ' O O O O O O O O O O ° O O O N O' C J d n ` t? `r to C v ti to r m cl) o 0 (D `r `r Co CV a M m N O o CO m (D r` a O r CO r- r r N N CO h r c0 ti h r V r to r r N C O E w C Z p W r N fl W to co r- Co C) W co N Q) a r hi LL U C p O r N M ? tq (0 r 00 O O O J Z r N M 7 to O I? o W r r a -- r r r N N a S d 0 m a ?i i' i' .f .f r It Q. ??0/ Li i. L d co E L O ,&a c/ m C V CO a J ? 0 co ? N . . N N O N co W C0 0 E $ LO C 0 to co Cog o 0 _ ^ M M Z A c O O > O O M N I)w C d if N w u s c N c E a J co co 7 z c ° v 03 >>> o 6 6 cw` t co co ( m C o o ? Uo J N ` O O C ? q >p C W ? co ? d C C E O O w CO fC C co C) ?, ? U O O p LL C Ed° tOD N c CJ Y .. 0 0 U CL .n U 2 E N C N y ^ O S r` . 7 U c O cco 9 O M ? 00 W ? o a ? a) 0.•. cc o o n a _ o E H d CO N m p =Z ci d U N J z N N a N N N d a? ?o CL 'I ,i ,I 1 1 ,r 1) ?1 }i I } co E I co t(7 ? _ N N N M N r r co ?- r r 0 r d1 w p 0 N M V O O O M N O 0 a ? O O C ,gy ,, O O O O O O O O O O p O . . Q J _ W N N N M V O O ? O O O . - N ? r r r LO CO Cn (5 N f!) cn (n co co V) w in (o co in co N N In N (/) V7 O N > O O O O O O O O O O O O O O O O Cl N d C O O LO O O O LO to M LO (O to N to to M to W ? M O m CD a m O O O O O O O O m O n O 6 O CO co 0 m O N M O O N m to O O to O O tp fD fD O co to CO CO co O co O co to CO O O (0 O O O O O O O O O O O O O O O O O O O O ? CL O O O to O O O O O M to tl? O 9 N O O co LO O Co C C ?' ? $ CP co (D O CD m O to to t- CD V CO O CV (V O C C9 co CD co (D co CO co O co co co t0 m (D 00 to co 0 co O co O co O co O co Co M CD O M CD 0 M CO CD O to co c0 O t- O M M O O N r O ? O M O O O ' O r O n O O M N C : ` r h d: M r N m O O r O ? G N M V co CD 1 m a o o N N tt 0 Nr v LO w t` m LU O co to co O O h O h 0 h 0 t` O co to c O a (D co co co (D N (D t0 to co CD co CO co t0 co t0 co co co co J O N N M N Cl) O O O Il- co O co co to V O t- r- O V _ a r' m M O O O O N M to r OR n O O tt O O M O m :3 N N M O co t- co O O N N N O M V O O (0 w w co t0 t0 h N t- N m co O m co co t- co 00 co co co co co co CD CD CO CD CO CO CO co co (0 to co CO CD to to co co CO O M N Cl) O O co V O N N M M r W O O O O O O O v) C O CO tt CD r M O M V n r r r CD O V t` n r (D O tU d ? CV (V C") M V W I- 1- 00 (n CA CV 0 r N M c'7 tt C W O CD O co co CD t- Co I, (D t- co to r co t- co n w N O r CO t` n O co (0 co co co co w O O 0 to co CO O co co p p O O O V O N N M V m O M O V O O O O O O O C a LO M 0 N O O i t- N co co O 0 i O v O Cl) (O CD O LO v CO E ? co N O O M h c h V r m n n t- f` h h p ^ m t- m t, M t- co Co N co M co M co 4 co O co Z to O co co CD co co to CO co co O O O (0 CD co co co co co m a ?. O 0 7 O o O O O O O Cl a O O M M N w 0 O m o a to d O O C0 O (C) O Lq UC O O O V' tY O st "I: V: a co o 0 0 o c o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N U) C v co co co co M co O O O O co O co co O M O O O r r r CO M M M CO M M co r r M M M M M M N N N N N O O Cl) CO v N Cl) O O co M M 0 m O r r O co O co M r M O O O O O N r O C0 0 r O () CM r h t() (C) L6 CC) V V V M CM CD r- 1? to (D t1' Lo N m y M O n O 10 r (D O m t- O O O O O O O M M CO O c0 co O O O O r r N O U w v tY n tt ? M r h CO Oi to Cn ^ O to co co N tri tri t t0 V V N N N N N r- Ih V V V V N N Z N O O co co V O M V to V m O V M co (D co r N N N O 00 M V O to O N O O 00 N N O 00 y O fD M O V co m V- M O O O M M CO M O N 6 M F- CV N r M M M N N N r N O (D V V V M M N r (D C v C O O O r M O (D O h q O O O M M O r r N O CO O r O tD (D (O CD CO tD CD n ti to to tri (O tD CD tD fD y C E h O r0 O M r M O V O O O O O m O O h m co (D CD r 0) 00 co h t- 1, CD co (a r r r r of m 0 W ? 0 0 0 Cl 0 o O o 0 0 0 0 0 0 0 o O o 0 o O 5 CD cD (D cD (D co 0 co cD 0 co 0 0 (D 0 (D co 0 cD cD co V M M O t0 m O m V V O N O M ao O N O M p M M N O O r V O M M M M V r r tt CT t CO M x m F" O O O LO LO LO V It M N CV O O co co co (D V . Cl) CV 0 Q ?- O O O M C) M O V tF O co CO co M O N N O M t` V C O N N N V O O n t? O M M M N O h O O r W M O O O O O O C O O O O O O O O O r r O i p O co co co co co O co _ co O t0 co co co O 00 co O c0 O (0 C p ( j O M M M m m q M M O M M M M O M m O M M M CO. U O O O O O O O O O O O O O O O O O O O O O Y (C p v 0 0 0 0 0 o O 0 to 0 0 0 0 LO to LO o O 0 LO LO d .p.. V V N O h N O O t` O O O O O M Cl O O O CD m N Q F- 0 0 0 CD LO LO It v m Cl) m r r CO 00 00 CD LO CO N O t? CA N a ` 0 0 0 o O O 0 O O o 0 0 0 0 0 O O o O o O U ? C v O N N M O h a h n O O O O M O t- (D O r h M - O O O O O O O O O O r r r O O r r O r r O 0 O O O O N O O O ) O O O O O O O O O O O O O N W J 'v v LC) v cD V v O 0 ? r O O W v v 0 N O r 6 M N 6 O 0 W (D I - m a) M 1, r r N N M t- r CO h t- r V r O r r N o d O t" ° r - - N LL J W r N W tr O co r- co m r r W - - - aa) ? o N o C O N M V 0 O T m m O r n _j r N M V O CO r W M r r - - a - r N N O_ v 0 p M E a? c0 C O M r N N C M M 11 N C C fn H O Z N 12 1 N 0 co 2 m 00 - C 0 w \ J ?n L V. CD U) N d COO M N W p 0 ? O E o to m o a o o Iq I O c E c? co p ono v 4) CO r co co W to ID J C9 N O O IO O r co O O O M N > C LO M O O ' iA C d f' U ) LO °0 o W c o c o p 0 If) o m c = v o z co co m 0 o Iq Cl a' ? 0 0 III. N C ? O co .7 N 04 I ) CO V t 'r w u a v w t` r 00 w o LO F- v C6 c ?^ ? 0 0 H C ? O O V fA fD ID I"n Y _ d c c E Cl 0 d 6 c C V 0 0)) N x ?o I- o m Q C W) N O N 0 V co co O) O) y C. O O Y? U V 0 O LO N ?i v IO N S? Q H O ? Ii- t E _ "0 ? O In N a a ? C .?.. O N O r C 0 E J $ o CD C) C D v ai 0 IV iT. O f. J N N u? d C N Cl) a j N 04 } 0 II 0 CL E a? co r 0 O Ih tt t N E N G rn Cn n u rn c d c N W O Z tl! y O c x 0 co O CA M C Z 0 r N 0 ?' O ti o O r ?- 0 - - -- N O O O O O O Cl O O O O O O O O O O O O O O O W.- C O O O O O O O O O O O O O O O O O O O O O O G tV N N N N N O CV N O N CN CN N 0 N N O tV cli CV N to O O m O CA N N O co O V' V O r r CD O rl O of et r v co N N C .' O Cl) Cl) I` n O V' V' O r r r r- O ?i ? (M O O to 0P I,, C v O r r r 6 to O co (a C of m of r O r r C r r r V' co m ^ O - O o In a co O O ss{{ ' v O O M m ' a O ' N N bi N a O r . N N M O M M O et V. N O co IC ) O V to N M O O O O ci O O C C O C O O O O O O O C C C C t0 ' co M N M N M h tp h O O V V' s? '?t O O r r r r r r M I O O O O M A O n a" ° ? In Cl) O ui N r r c7 CO o CO CO o CA CA CD r o r r o r r r v w N0 N N I,- In N O M Cl) O h O O to O In M Q M 0. ^ ° r 0 r 0 r 0 N 0 M 0 O 0 M 0 M 0 O 0 V' 0 It 0 It o r a O 0 (D 0 In 0 O 0 V' 0 to 0 r 0 N 0 M M M M M M M M M M M M M M M M M M M M M M C O O O O O O O O O O O O O O O O O O O O O O M C7 C O O O C O 0 0 0 O O 0 O O O O O O 0 C7 0 N O O O O O O O O O O O O O O O O O O O O O O N x Cl) O M M O M M O M l CO Cl) M M M M M M M M M M M M Cl) co C _ O O C O O O O O O O O O O O O O O O O O O C O O O O O O O O O C O O O C C G C O O p 0 0 0 0 0 0 0 0 o O O o 0 0 0 0 0 0 0 0 0 0 3 N? 0 r 0 ?- 0 ?- 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 r 0 ?- 0 r 0 r o r E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 z ? 0 0 0 0 C3 CD O O O O O O O 0 0 0 0 ? 00 0 o 0 0 0 0 0 0 0 00 0 Cl 0 0 0 0 0 N N N CV N CV CV N CV CV N CV CV N CV CV N N N N CV N O m 01 tr cm (a cm CA O to to Cl to CA to 01 tT tT 0) 0) CA m cm m o m m m Cc cc m m m cc (c m cc co to tc m cc cc co co Cf) In U) CO cn U) N In U) U) w tq co 0 U) w w w 0 0 N 0 O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O a+ CV 014 CN LV CV CV N N N N N CV N N N CV N CN CN CV N N d C O O O O O O O O O O O O O O O O O O O O O O U. O O O O O O O O O O O O O ' O ' O ' O O O O O O O V V V It V' v q' V' V' V' t7! p Q O o o O o o O O CD O o 0 0 0 0 o O o O O o o c 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o m cli cli cei cli 6 cli of 6 cli of ri vi C6 cli cli C6 of vi vi 6 cli C-i $ y co .. 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 C9 d J' O 0 O 0 0 0 O 0 O O O O O O O O O O O O O O a E 3 .N C O O O O O O O O O O O O O O O O O O O O O O N m V S L.. CO co (D to to CD w t0 co (O CO CO to Cti 0 0 0 0 co O t0 to N a a n a a .O .0 a .0 .D m a a m a a LL r (D E E E E E E E E E E E E E E E E E E LL U U U U U U U U 0 0 0 U U U 0 U 0 0 o y C7 O O O O O O O O O O O O O O O O O O O O O O > v O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O ar N Q CJ O to O In r I- O r O N N N to O M N O V' 0 O M c l v O M in O It n O _ O co Co Co O O O O Co r M O V "' O N M V' O In Iri O 0 0 0 CV 6 r O h N v w O O O O O O O O O O O O O O O O O O O O O O E O v q O O O O O O O O O O O O O O O O O O O O O y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C7 a il' Q N O to (D LO t- O O N N N M O co Itl O V' In m CA v tc d V q M M O ? O r r q CO 0 CC) O O 0 O O N r M O ' ? O r <- CV M V' O Mi In O CO w to N 0 r O I r N V N IC- N C. ' a O o E m m C ? ei LL d N .O C O O N ? tn CD O O O N J Z r N M V In O I` Co m r e - . - . - r N N 04 d a d a v m CI 00 Y y ?dtp U a G t } O it 0 CL E Nab LL 0 O M V' 0 E al C rn CA r I C m c O O O II y a? Z m c w 0 Z S y 0 y m 2 a= O co m_z me °O O " o co O O 0 'O O N N C N .. ° O O C 7 R ^ a0. ?' O U) ci •?.a O a ^ o M C O O M N 7 x $ W Cl) C Ur C ?O o E Z ? o .. N CO O O N d C! w' _ J ° Q 2 V, A 2 O' m O i C r o N d J ° O C7 C ... a 0 E E U c ° co ui O a LL ? CJ CL w ° 0 C7 ,? w ? C7 ° .9 o o a V v co N 4. U7 a ' a E m c ? a ci LL 1 d c O M 6 O JZ N a N v m C7 0 c c Y N _d 'O C M } O_ II O .C N CL E a N m W O Z 0 v 2 • W •, a .I ,i ?l .l CL E ,\ W D 'a L 1j C N 3 ' n N V' M 11 O co O V O N M M M M O O V ' tt O n N M r D N O N to V, r N N N O V U ) N O r tD O - O O O ?- O O O O O O O O O r O O O O O O O a) J Y 04 o 0 0 0 0 O o O o 0 0 0 o 0 0 0 0 0 - 3 p N o Lr) n V tt N n o o tt n O o u) U? o t1 r r r r C O r r C r r r .-- O O O r G r C O O O O V• N CD n V' N n M M M Q r N N c c c t C N O oo M O M M O M n O O r t0 r , M M M " n ii O - p n M O N p V Q W- ` C \ c 0 0 0 0 r r O o O O 0 O o ! o O o N O O co C O N Cp u Z () d '? o N O W O C O O O N M N O N N N 00 M CA N (D r O W p N .°?.. r V. M D O O (C) O N M N CO V O O O M M N V N N V' N V CO O D) V' LO V' N M M O M LC). n O 0 0 0 0 0 0 0 0 0 0 o O O o 0 0 0 0 0 o Q G) V' co to to N M N O N N N 00 M O (D r O co :3 ??. co C) n to M fD 00 O O M V N N O O O O M r r n fr N a tY O 'V N N V• O M N N at O M O M O O "' O C O C O C C C O O G O C O O C O C O C O ,.J > N O (D N V m N O n N N Cl) (T V V to O O Ur 4f M N M c0 W V` V, rl? (h c0 lo: O O O n N O cD M tt O W d N m M to 0 h m O N (M CV 0 V' ui 0 CD n 00 M co to co n n n n co M M co co co n co co O co O O co (D (D (D (O co co O (D co tD (D co (D to CD co co to (D (D to v M (D N N M N V• O O n v n V N O O O tO M O to M M r CO Co CO CO '0' l :w (0 O O O C o d o 6 0 N 6 N 6 N 6 N 0 O 6 co 0 n ci V o O O C ) o o O o Cl) N _ N CD n Cl) O Cl) O N ?- CO r 00 tt O O Cl) (A co O O r r CD O co O CO CD Cl) O O co N to O O r tD r O C Cl) Cl) n in O O O V V V M M n n n O CO V O (V w CL Q Q, n O co O M rn rn O O r r co m co m m m ? rn rn rn tt V' O W a 0 0 o v o 16 i 4 v V v r o o cD r; IT V Cl) M E W N A m Z ///Y O N N O n O O O O O O O M O V' O O O O O ^W, ? O O (D O n C r (D N M (V O N O N O N O N O N to O O N O N o N O N O N O N O N O N J> O n N Cl) N (n D) O O n co O (D M (D It X) n n O st?t Ur 61 r O M O O O CO N D) O O n to o V; O O O O CO = d CV CD N to Cl) to LO n CO P. 00 n 0 co o co 00 CV N N LO CO LO t0 CD 00 Co to to (D CD to co co to (D co co (D co co co to n co co to c to co CD co (D co to co to co (o > O O O V' O N N O I O) O M CO V' O O O O O O O to M N tD N O O M h ' N D M - O 0 O n V' O M M to CD N O O V• o c d (o co (D M n n V n ( n t n n n 0 n 0) n ( n 0 n n M M co M co M co V' co to 00 - (D co to cD to CD to (D (D tD CD (D CD to to to co to CD to to c. lU , p O O N M O O V, O O O N O M O O M W J V LO V to V LO co M n M V V 0 O (D N O W N N ? O O N V• O O N M N O N N N co M O Cl) CD r O co r. N Cl) N V Cl) to Q) co O O M V• N N to D) O V M r n e M N O O N r O co N N V' V' (D V V' co O M () O 0 0 0 0 0 0 6 6 6 6 0 6 6 0 6 o c o c o 0 J > n It It CO V (D CO Fl- co N CO CO O O N O 00 O O CO 00 O M V: O r O O N tD O O O O p q V' M O) O O W y o N M O CD n CO O 0 0 N N N (O M O W) tO CO n 00 t (D to to to (D n to n co n (D n to n co a co a co co CO co cD co O n co tD co ao to co (D co (D co co co (D co co m O l l O O N a M O O O O co O C ) O C ) O L O L O O Cl) O N O N O O N o 00 O t-- O ' O C D O O O O .d co co O) N O m a Cl) W r O CD V• co O M N CO n E > N W N O O ' O ' O O O O a-- o co n O W O r lD r p Cl) N r n V V ((7 0 V' V" Cl) Cl) Co !N (D (0 (D V Ui N d N _ m 47 ` E (D M O N n O r r n n N ' n m tt V' c N Q n O O n O o) D) O p r CD v, o O O a C O V h c0 V V a V V r M tD (D n V V M M ? .c C n co m O O tD o o o a O o o V' m ro O O O O o ? cD 0 n Cl OD o O O M OR N O N O N O N O N O N O O N N O N Go (V O M O CV O N O CV O N E J> O co M c (D O N c0 V' O M 0D O CD t} O CD n O Co m N N n l ' r tt t` tY tt r N O O (D r O a _ o N M V CO CO Ih Q) o 0 0 N (V V M V' V' (ti co n co 7 c CD (D co co to n to n co n co n (D n to co tD c CO a CO co to co co n (D co (D co (D co to co co co (D co to co to a > M O O to V' O N N (D V' O r r O O O O O O O O O (D V' O r p O M V' n r r O tD n r to t[) > ' c d" m ca co o CV n fM n tM n V' n O n n n ~ M 0 o N o co o N M o to N - o (o o co m (D o o tD n o n (D n o n tD n m co m co m 0 o co o co cD c o (o co tD CL .Q CO O V• tD O V 00 00 N CO V CD N CD N ' C a O LO (D ' V M m V O Cl) CO r N N O Cl) O O O co N O p V O q ' ? O a o of 4 6 o O 00 Di o o D) o CV (D M E N N M M M N N N r N M W V V V M M N CO .D ? ^ N _- N N . o co co CO m m O O O O O co co co co to co O O V- V' E r r M M M M M M M M -r M M M M M M N N V c O 04 Cl) V- O co r- M M O OL J r N M V' O Co n CO O r r r r r N N d N E 7 U) W L CL N 'O U m N fA c? L cl CO 0 Z 0 Z 0 0 N 1 0 m S c 0 U) O co O co _ O 'u v O T C p N N 0 O N N .be 0 W - " o o co d = V d w e N °? N CO r tO o Q . ., D O C p r. N N Lc) r c N o fo O O J > 0 W a i of ti co co ?_. O Cl) O O Cl) N d H > M C N I-r 0 CL w v D v E w Z a o ° i c i n ? O . .- J > O L S d o co to to (D > IV a) F LO v o0 c d f co co - to to J 0 O st r r M- N e {04 LO fo O O J > LO 0) W G7 co t` co Go _v d .. ? O co t O O E N N M co n! 04 v U) Q r 3 0 a p m LO O p_ Ce) co It o. S d co r- c o co Y O a d' CY! LP > C d `? LO LO co c o ) 0 O CL I c N O ? 0 co a N v N U) W co r r V N d C Cl) .J N a v 07 E N N N CL N v m U N E N N l4 L CL a? .p m 0 Z s W O Z C14 ?a T 2 i s.sd• y?-?1- -. .\"..»o ???7?-.?,-?-•1411:4 i1 S?!'a `0" _ _ ?.,,? `'??r ?/' Gaw??-? ??'y;.; ?-•L? } .r ? ! is - r: _. ?Lyn.?tT' '' •• 5' as, ? e_ i F ?1!`;' ? ?•."i.S',?? X.?S i ? 1. ? ? :?t btanum t Y 2 •r.n. N t Y w. a )t n;;. ?3 :- • Ali ei- mot,. r 2os College X`? h.? •F-,. .. `J CfB ? • _ ?,.??.. a ?' ? ' r r M a r '?? "CfB : x ? . `'- •,?,?;. ?` c Bahr; Sage east -d: ..tip ??•. Y : •?.?.?a r/ =L.. ?Q' Iti 1'47 {taT[^..•"_T ? i.n. ? :riB:?:. ? ? •?:?' F25251: - =s v. olleg a- ? >?;: ?•. mss;- a ... _ 6? ??_? ? CfB Oj ? ?CAL? /'?= fooa? 10 000 Feet 2 3 Kilometers ? SOIL Plop f v v r.•' fl3yf? .__ cJ ?B•row 74 1 ?I r 1d?1 1\YY'T'1l\?? I I ?'i 111111 Ip? INTERSTATE 85 VARIABLE ROJECT S 8.1631202) INTERSTATE 85 (VARI WIDTH 12A ,Y l Ilrl •' ?"I 1l 1 1 \ \ti ?? ',1 \ ill l 1? a A" ? i•?I'1 ? N IA I l l y 1 WILKINSON BOULEVARD - U.S. 29-74 VARIABLE WIDTH RIGHT-O?_-WAv SPEED LIMIT 45 MPH-ASPHALT IN(JOD CONDITION W 2 I REVIS a r:„ lht., v 29- q7 WIDTH \ 0?P - • Uc? l 9-- QQo z l - ---- ---- (b i5 ER .,-' - --- 6 - - / i ? O w ? Il! 4% o, m / W !ilil /4 • -._-.....-_? ? 1t ? . LOWE'S NOME CENTEPE.NC NWY.1U EAST, EAST DOGS 1 \I M. MILRESS0110, NC ASU yt Itlt 133B.M8.4000M 33E®.7257tP7 999 } vt?, VIA 0 ;tlt II If II E2 Q Zw i tlt J 1 0o I 1. 1 U? I I d zzo Cl g o I'; 1 0 z Z N 5Q ?rtD ? C? m t c , 5 m a HA W L E Y _ p . ? ? AVENLE r ATE, L ORIGI ISSUE oarE: ermo; ^ PERMIT SEt -- ISSUE DATE f CONSTRUCTIONSEf ISSUE DATE ` DRAWNG NUMBER, rr = ; °-=0 120 SP-5 e\ 1 SCALE f 60' 1 1 I N ?, 1•I, )? 11 II ? ? W l 1 ?1 \ INTERSTATE 85 VARIABLE WIDTH RIGHT-CF-WAY (NC DOT PROJECT p B 10}1202) IM62STATE 85 (V 1 OI ?,??i1u1....511...... I \I'° ??11rPPP. 10 ' 11'J )III T i ' f ll?l i I WIDTH RIM Ali, - W 1 V ? I 4 w. ??: W - m WILKINSON BOULEVARD - U.S. 29-74 VARIABLE WIDTH RIGHT-OgWAY SPEED LIMIT 45 MPH-ASPHALT IN QOOD CONDITION Wc REVISIONS DATE =X DESC ATE RIPTION NIL- -------------- _ - `\ U 0 a 0 ;? ------------- lk? WAL-MART SUPERCENTER a D n I ! j ? 0' 7 n ? I r I - - _ I I LOWES LXONE OdTE1S.INC. T. EAST DOCK N. W ILKEASEBBORO, , NC NC ]BfEB I y?4 Itlt 3 .BEB.? M BTfi.HB.mTIF) .,, ? X ? ? 1\\?t1 qV 0? 1 ? Y I O i tlt L? z w \?? f y it ?Itlt ! ?. J wb.M R/W).??1 Um Z 0 C] a Z z - CD z oz V) MID Lu _j HAWLEY ORIGINAL 1 5511E AVENUE DATE: 612101 PERMIT BET ISSUE DATE: CONSTRUCTIONSET s - ISSUE DATE DRAWING NUMBER: 60 120 SCALE I? 60' FILE COPY EXTENDED DETENTION WETLAND MAINTENANCE REQUIREMENTS Proiect Name: Lowe's - Belmont, NC Permittee: Lowe's Home Centers, Inc. Address: 1605 Curtis Bridge Road, REEC Dock Wilkesboro, NC 28697 Phone No: 336-658-4000 1. Maintenance of Embankments A. Vegetation The embankment has a ground cover of fescue, which if properly maintained will prevent erosion of the embankment and provide an easy surface for inspection. The grass will be most difficult to obtain in the area subject to water level fluctuation below the top of the riser. Grass should be fertilized every October and April. Re-Seeding - periodically re-seeding may be required to establish grass on areas where seed did not take or has been destroyed. Before seeding, fertilizer (12-12-12) should be applied at a minimum rate of 12 to 15 pounds per 1,000 SF. The seed should be evenly sewn at a rate of three pounds per 1,000 SF. The seed should be covered with soil to the depth of approximately'/.". Immediately following the planting , the area should be mulched with straw. ¦ Trees & Shrubs - trees, shrubs, and other landscape vegetation should be permitted only as shown on the approved planting plan. ¦ Mowing - grass mowing, brush cutting and removal of weed vegetation will be necessary for the proper maintenance of the embankment. All embankment slopes and vegetation of spillways should be mowed when the grass exceeds 8° in height. Acceptable methods include the use of weed ships or power brush cutters and mowers. ¦ The soil in vegetated areas should be tested every other year and adjustments to the soil amendments be made to sustain vigorous plant growth with deep, well developed rooted systems. Aeration is recommended, particularly where sediment accumulation is likely. Use of fertilizer should be limited to the initial establishment phase for ground cover. LL1 ¦ Control of invasive, exotic plants (cattails, etc.) that would hinder the reestablishment of woody vegetation or native wetland grasses and planting should be controlled by a licensed pesticide operator in conjunction with all applicable regulations. • If algae blooms begin to occur, installation of floating aerators may be required in both the main pond/constructed wetlands and forebay. (Algae blooms have not been a problem to date with the existing wet pond) • "Do not mow" signs shall be placed and maintained around the perimeter of the pond/constructed wetlands surface to prevent indiscriminate mowing of the aquatic vegetation on the littoral shelf. B. Erosion Erosion occurs when the water concentrates causing failure of the vegetation or when vegetation dies and sets up the environment for rill erosion and eventually gullies from the stormwater runoff. The berm should be inspected for these areas. Proper care of vegetative areas that develop erosion is required to prevent more serious damage to the embankment. Rills and gullies should be filled with suitable soil compacted and then seeded. Methods approved by NCDENR should be used to properly establish the grass surface. Where eroded areas are detected, the cause of the erosion should be addressed to prevent a continued maintenance problem. Frequently problems result from the concentration of runoff to one point of the embankment crest instead of a uniform distribution of runoff. This can be corrected by reshaping the crest to more evenly distribute the runoff to areas, which are not experiencing erosion problems. The top of the berm should not be allowed to be used for pedestrian or bicycle traffic. Abutment Areas - the abutment is the line formed where the embankment fill comes into contact with the existing slope. Runoff from rainfall concentrates in these gutter areas and can reach erosive velocities because of the steep slopes. If a normal stand of grass cannot be maintained on the abutments, additional measures may be needed such as jute matting to provide for the establishment of a good ground cover. • Upstream Embankment Slope - Erosion problems can develop on the upstream face of the berm due to the fluctuation of water level in the pond. This is a result of a combination of wave actions and ground saturation, which occurs from the elevated water levels. The erosion generally occurs as the water level falls and the saturated ground becomes subjected to the wave action. If erosion becomes a problem, it may necessitate the installation of a stone armoring along the zone subject to fluctuating water level. This would consist of 18" of NCDOT Class B stone for erosion control underlain with Mirifi 140 geotextile fabric. It should be centered at the point of the erosion problem and covering an area 2' above and below the approximate center of the eroded area. q C. Seepage Detection - Seepage may vary in appearance from a soft wet area to a flowing spring. It may show up first as only an area where the vegetation is more lush and darker green. Cattails, reeds, mosses and other marsh vegetation often become established in a seepage area. The downstream abutment areas where the embankment fill and natural ground interface are very common locations for seepage. Also the contact between the embankment and the spillway conduit is a very common location, which is generally attributed to poor compaction around the conduit. Due to the way in which conduits are put in, this is generally most evident on the embankment slopes. The natural foundation area immediately downstream of the dam abutment should also be inspected to ensure that "piping" is not occurring underneath the embankment. "Piping" may appear as a "boil" evident as spring carries soil. The soil usually deposits around the boil area and is evident by the sedimentary deposits accompanying it. Seepage can also occur into the spillway conduit through cracks in the pipe or improperly sealed joints. These can be seen by observing the conduit when the water level is high. The movement of the water itself is not dangerous, but if soil particles are being carried with it, then it can create a shortcut for the piping of soil. This might show up on the upstream face of the embankment roughly along the line of the conduit itself. D. Cracks, Slides, Sloughing and Settlement Cracks - then entire embankment should be inspected for cracks. Short, isolated cracks are usually not significant, but larger cracks {wider than '/4"}, well-defined cracks indicate a serious problem. There are two types of cracks: transverse and longitudinal: Traverse cracks appear crossing the embankment and indicated difference of settlement within the embankment. These cracks provide avenues for seepage and piping could develop. Longitudinal cracks run parallel to the embankment and may signal the early stages of slide. In recently built structures, these cracks may be indicative of poor compaction or poor foundation preparation resulting in consolidation after construction. • Slides - Slides and slumps are serious threats to the safety of an embankment. Slides can be detected easily unless obscured by vegetation. Arch shaped cracks are indications that slides are slipping or beginning to slip. These cracks soon develop into large scarps in the slope at the top of the slide. ¦ Settlement- settlement occurs both during construction and after the embankment has been completed and places in service. To a certain degree this is normal and should be experienced. It is usually the most pronounced at the location of the maximum foundation depth or embankment height. Excessive settlement will reduce the free board R (elevation between the water surface and the top of the dam). Any are of excessive settlement should be restored to original elevation and condition to reduce the risk of overtopping. A relatively large amount of settlement (more than 6") within a small area could indicate serious problems in the foundation or perhaps the lower part of the embankment. Settlement accompanied by cracking often precedes failure. What to do if seepage, cracks, slides or settlement are detected: If any of the above items are detected there may be signs of significant problems, which could lead, to failure of the structure. A geotechnical or civil engineer should be consulted regarding the origin of these problems and for the assessment of the appropriate solutions for the correcting item. If the professional is not immediately able to inspect the berm, then the bottom drain should be opened and the water level lowered to remove the risk of failure until a professional can observe these problems. A. Rodent Control Generally in this urban environment, rodents are not a problem. Rodents such as groundhogs, muskrats, and beavers are attracted to dams and reservoirs and can be quite dangerous to structural integrity and proper performance of the embankment and spillway. Groundhog and muskrats thrive on burrowing in the manmade earth embankments, which become pathways for seepage. In the event that burrows are detected within the berm, then the rodents should be dealt with by removal. Maintenance of Spillways and Control Structures A. Inspection of Spillway Conduits Conduits should be inspected thoroughly twice a year. Conduits should be visually inspected by actually entering the conduit a sufficient distance between the riser structure and the outlet to check all the joints. Because the outlet works tie into street storm sewer system, catch basins and pipes. Conduit should be inspected for proper alignment (sagging), elongation and displacement at joints, cracks, leaks, surface water, surface wear, loss of protective coating, corrosion and blocking. Problems with conduits most often occur at joints and special attention should be given to them during inspection. Joints should be checked for gaps caused by elongation or settlement and loss of joint filler material. Open joints can permit erosion of the embankment material and possibly the piping of soil material through the joints. Catch basins should be checked for signs that water is seeping along the exterior surface of the pipe where it enters the catch basin. A depression in the soil surface over the pipe may be signs that soil is being removed from around the pipe. ¦ What to do if problems are detected with the spillway: retain the assistance of a civil engineer or geotechnical engineer qualified the design of embankments to perform an inspection of the berm. If in doubt, lower the water surface elevation of the pond/constructed wetlands until such time as a qualified professional can perform an inspection. B. Trashracks on Outlet Structure The riser structure for this pond(constructed wetlands is the only outlet structure. The intake structure has been fitted with a trashrack to prevent debris from entering the spillway structure. Most of the runoff entering the pond/constructed wetlands comes in through grated inlets, which have essentially provided filtration of the runoff and should limit the size of the debris that enters the basin to floating debris, which will most likely pass through the trashrack. The opening between the trashrack and riser is smaller than the opening of the outlet pipe. The intent is that any debris, which passes through the trashrack, will be easily passed by the pipe outlet. Maintenance should include periodically checking the rack for rusted or broken sections and repairing as needed. The trashrack should be checked frequently during and after storm events to ensure that it is properly functioning and to remove accumulated debris. 111. Operation A. Drains/Pumps Due to the elevations on for this pond/constructed wetland area, it will need to be drained via a portable pump that is to be kept on site. The pump should be easily accessible in case of an emergency or for repairs or maintenance. Generally, when draining the pond, it should be drained slowly. Turn on the pump to a level where a good flow of water is present but not a torrent, so that the water level can be drained over a period of 48 hours or more. Rapidly lowering the water level in the pond can cause permanent damage to the embankment and must be avoided. The pump should be tested periodically to ensure it is in good working condition. B. Record Keeping Operation of the berms and constructed wetlands should include recording of the following: • Semi Annual Inspection - Inspections are to be performed by a qualified registered North Carolina professional engineer, landscape architect, or surveyor. ¦ Semi Annual Inspection Reports - a collection of written inspection reports should be kept on record. Inspection should be conducted semi-annually. Copies should be provided to the owner. ¦ Observations - all observations should be recorded. Where periodic inspections are performed following significant rainfall events, these inspections should be logged into a Periodic Inspection, Operation & Maintenance Form. ¦ Other Operation Procedures - the owner should maintain a complete and up-to-date set of plans (as-built drawings) and all changes made to the berms and constructed wetlands over time should be recorded on the as- builts. C. Sedimentation and Dredging Sedimentation from establishing areas tributary to the pond/constructed wetlands will eventually result in the reduction of the retention pool and eventually will have to be removed. The frequency of this sediment removal can be reduced by ensuring that the site areas around the building be stabilized with a vegetative ground cover such that it restrains erosion. This would include a periodic application of fertilizer and other treatments necessary to promote a stable groundcover and minimize sedimentation to the pond/constructed wetlands. The maintenance on this pond/constructed wetlands requires that when the sediment level (as measured from the top of the riser to the sediment pool) is within 5-feet of the top of the riser that the sediment must be removed and the original pond restored. For aesthetic purposes it may be desirable to maintain it prior to this point. Generally, the dredging process begins with the removal of as much water as possible from the deposited silt and so the material can be excavated with conventional equipment for trucking offsite. The removed material should be hauled offsite to a suitable landfill site or mounded somewhere on site and stabilized with a groundcover sufficient to restrain erosion. ,,eS_, hereby acknowledge that I am the financially I, R I,45" responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. K Signature: 7UQ?,? Date: 712_?_10(ell POND MAINTENANCE REQUIREMENTS Project Name: Lowe's - Belmont, NC._ Permitter : Lowe's Home Centers, Inc. Address : _REEC Dock, 1605 Curtis Bridge Rd, Wilkesboro, NC 28697 Phone No. 336-6584000 1. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair / replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. H. Quarterly (Four times a year): A. Inspect the collection system (i.e. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleaned from the basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlets will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. Ill. Semi-annually (twice a year): A- Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75% of the original forebay design depth of 4.0 feet for the pond. C. Grassed swales, including the vegetated filter if applicable, will be re-seeded twice a year as necessary. POND NIALti-TENANCE REQUIREMENTS PAGE 2 IV. Annually (Once a year): A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75% of the original design depth or 3 feet, whichever is greater. The design depth for the pond is 4.0 feet therefore the 3.00 foot minimum would apply. The depth is measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth V. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the perimeter, however they will be removed when they cover more than 1/2 the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice is designed to draw down the pond in the 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond systems (2) will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component must be redesigned and/or replaced. VI. Special Requirements: I, MIKE HAKt-E55 , hereby acknowledge that I am the financially responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: Date: 711Zlb v VP - 6W4MJrEg1uy t cor?St?vcTt a.J 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number 04- 0619, and its issue date (if known) 3. Specify the type of project (check one): Low Density y/High Density Redevelopment General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major Sedimentation /Erosion Control _404/401 Permit -ZNPDES Stormwater -Other Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. 2. Stormwater runoff from this project drains to the aT Gi mi 9 ex River basin. 3. Total Project Area: / S _/9 acres 4. Project Built Upon Area: 70 % 5. How many drainage areas does the project have? Z 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin Information Drainage Area 1 Drainage Area 2 Receiving Stream Name `??! ?sv - , U ?/ lCvtG{ Receiving Stream Class Drainage Area C 1 Ae. Fwktina TmnPrvi?nc* Araa l1 li /_, A t'7_ I 119 Proposed Impervious*Area 6 U. b % Impervious* Area (total) 79, 7 46 76, z.7 6 Impervious` Surface Area Drainage Area 1 Drainage Area 2 On-site Buildings Z/. 00 A G ,t G On-site Streets ?. A6 Pn.t i On-site Parking lyt, 146 04_ 061 On-site Sidewalks IL: AG Other on-site QC Off-site 0,00 AG Total: 10. Total: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. $401 ^ t5ve,W;-, Q/')AAA V-c;nn t o P.- 7 of A III. PROJECT INFORMATION 1. In the space provided below, summarize how stormwater will be treated- Also attach a detailed narrative (one to two pages) describing stormwater management for the project. " a 7. How was the off-site impervious area listed above derived? N/ A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. L The following covenants are intended to ensure ongoing compliance with stale riparian buffer authorization or General Certification numbers as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the Slate. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, brit!; stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. Swales shall not be filled in, piped or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a modified water quality certification prior to construction. 5. All permitted runoff from outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted . without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The forms are located on the 401/wetlands unit website. Bioretention Worksheet Dry Detention Worksheet Level Spreader Worksheet Grassed Swale Worksheet Extended Detention Wetland / Pocket Wetland Worksheet Wet Detention Worksheet 9/2004 Version 1.0 Page 3 of 4 t VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. 1. Please indicate that you have provided the following required information by initialing in the space provided next to each item. initals • Original and two copies of the Express Review Stormwater Management Application • Signed and notarized Operation and Maintenance Agreement • Three copies of the applicable Supplement Form(s) for each BMP • Application processing fee (payable to NCDENR) • Detailed narrative description of stormwater treatment/management t"+ • Three copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands and streams delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or Mailing Address: City: Phone: State: Fax: ( VIII. APPLICANT'S CERTIFICATION I, (print or type name ofperson listed in General Information, item 2) certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000 Signature: Kevin D. Bennett Vice President 9/2004 Version 1.0 Page 4 of 4 DWQ Project No. DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET) WETLAND WORKSHEET 1. PROJECT INFO(tMATION (please complete the following information): Project Name : w4;- S - aCL01%VA'r% %J C. Contact Person: -"[;6o0 5 Phone Number: -1 T -- 547-to For projects with multiple basins, specify which basin this worksheet applies to: T? % hJ 4 t Permanent Pool Elevation 0101 ft. (elevation of the orifice invert out) Temporary Pool Elevation "1 l ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area Q -l t Z 3 sq. ft. (water surface area at permanent pool elevation) Drainage Area ??) 8 ac. (on-site and off-site drainage to the basin) Impervious Area 10915 ac. (on-site and off-site drainage to the basin) Forebay Surface Area -L2 So sq. ft. (at permanent pool elevation approximately 15%)* Marsh W-9" Surface Area ? T- sq. ft. (at permanent pool elevation approximately 35%)* Marsh 97-18" Surface Area 725 sq. ft. (at permanent pool elevation approximately 35%)* Micro Pool Surface Area ZS S O sq. ft. (at permanent pool elevation approximately 15%)* Temporary Pool Volume Lk S cu. ft. (volume detained on top of the permanent pool) SAIDA used Z.. (p3 (surface area to drainage area ratio)* Diameter of Orifice Z. 5 - in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project A licants Initials The temporary pool controls runoff from the 1 inch rain. S The basin side slopes are no steeper than 3:1. c3-tS A planting plan for the marsh areas with plant species and densities is provided. VA"s Vegetation above the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The temporary pool draws down in 2 to 5 days. _ WS Sediment storage is provided in the permanent pool. b A sediment disposal area is provided. Q Access is provided for maintenance. STS A site specific, signed and notarized operation and maintenance agreement is provided. 'iS The drainage area (including any offsite area) is delineated on a site plan. Access is provided for maintenance. Plan details for the wetland are provided. Q) Plan details for the inlet and outlet are provided. 5315 A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http://h2o.ehnr.state.nc.us/ncwefands/oandm.doc). * Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS - See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999.10% open water, 50% high marsh, 40% low marsh. DWQ Project DIVISION OF WATER QUALITY • 401 EXTENDED DETENTION (and POCKET) WETLAND WORKSHEET 1. PROJECT INFORMATION (please complete the foil information): Project Name : e.aES - 1?ri?T 1?C• Contact Person: Tove, S. wtw*S 41 Phone Number. -64-!L(- For projects with multiple basins, specify which basin this worksheet applies to: 5?S ??? ri 2. Permanent Pool Elevation Lo V ft. (elevation of the orifice invert out) Temporary Pool Elevation 1,0010 ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area IQ -t t sq. ft. (water surface area at permanent pool elevation) Drainage Area __L A__1 3 ac. (on-site and off-site drainage to the basin) Impervious Area t o .-I ac. (on-site and off-site drainage to the basin) Forebay Surface Area 7-IM S" sq. ft. (at permanent pool elevation approximately 15%a)* Marsh 07-9" Surface Area M h 97 18" S f A V 1 S'S sq. ft. 7 (at permanent pool elevation approximately 351/o)* ars - ace ur rea Micro Pool Surface Area • sq. ft. 1 ft (at permanent pool elevation approximately 35%)* * - sq. . (at permanent pool elevation approximately 15%) Temporary Pool Volume V?Ati Q5-0 cu. ft. (volume detained on top of the permanent pool) ' SAIDA used Z • 5q (surface area to drainage area ratio)* Diameter of Orifice ??• 5- in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project 1SV5_The temporary pool controls runoff from the 1 inch rain. aTy The basin side slopes are no steeper than 3:1. A planting plan for the marsh areas with plant species and densities is provided. 643 Vegetation above the permanent pool elevation is specified. BO An emergency drain is provided to drain the basin. P-OS The temporary pool draws down in 2 to 5 days. Sediment storage is provided in the permanent pool. I &f5 sediment disposal area is provided. Access is provided for maintenance. Airs A site specific, signed and notarized operation and maintenance agreement is provided. The drainage area (including any offsite area) is delineated on a site plan. Access is provided for maintenance. Plan details for the wetland are provided. ig 11"S Plan details for the inlet and outlet are provided. !b, A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http://h2o.ehnr.state.nc.us/ncweflands/oandm.doc). ' Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS - See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999.10% open water, 50% high marsh, 40% low marsh. 0? W A rFRQG Michael F. Easley, Governor William G. Ross Jr., Secretary r North Carolina Department of Environment and Natural Resources O Alan W. Klimek, P.E. Director Division of Water Quality July 18, 2006 DWQ EXP No. 06-1061 Gaston County CERTIFIED MAIL: RETURN RECEIPT REQUESTED Lowe's Home Centers, Inc. Attn.: Nicky R. Wagoner REEC Dock 1605 Curtis Bridge Road Wilkesboro, NC 28697 Subject Property: Lowe's of Belmont, NC REQUEST FOR MORE INFORMATION-EXPRESS REVIEW PROGRAM On July 17, 2006, the Division of Water Quality Express Review Program received your stormwater management application package. The DWQ has determined that this information is incomplete and/or contains incorrect information. Please provide the additional information requested below: Extended Detention Wetland Design Issues: • The SA/DA ratio appears to be incorrect for the amount of impervious surface area for both extended detention wetlands. • The orifice diameter seems to be sized slightly too small for optimum drawdown. • Please prepare a planting plan that includes the deep water (micropool) planting zone as well as woody plants for the littoral shelf area (slope planting zone). 2. The operation and maintenance agreement you have submitted is for a stormwater pond. Please develop an operation and maintenance agreement suitable for maintaining extended detention wetlands.. Please respond within three (3) days of the date of this letter by sending three (3) copies of the above information in writing. This letter only addresses the stormwater management application review and does not authorize any impacts to wetlands,. waters or protected buffers. Please contact Cynthia Van Der Wiele at (919) 715-3473 if you wish to discuss these issues. Sincerely, t C di Karol , 401 Oversight/Express Review Permitting Unit CBK/cvdw cc: USACE Asheville Regulatory Field Office DWQ Mooresville Regional Office File Copy Central Files Todd Simmons, Freeland and Kauffman, Inc., 209 West Stone Ave., Greenville, SC 29609 401 Oversight / Express Review Permitting Unit 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-17861 PAX 919-733-6893 / Internet: htto://h2o.enr.state.nc.us/ncvvetlands od` N Carolina Naturally An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper Project Name: Belmont Lc W/L 1 Project No. DWQ 061061 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 667 3 Temporary Pool (ft) 671 4 ft. depth ok areas Permanent Pool SA (sq ft) 19213 19069 sq. ft. ok Drainage Area (ac) 13.8 Impervious Area (ac) 10.5 76.1 % - Forebay (ft2) 2880 14.989851 % ok High Marsh (ft2) 6725 35.0% ok Low Marsh (ft2) 6725 35.0% ok Micropool (ft2) 2880 14.989851 % ok 99.98439% volumes Temporary Pool (cu ft) 180115 36808 cu. ft. ok other parameters SA/DA 2.63 3.17 - Orifice Diameter (in) 2.5 0.23 cfs drawdown - Design Rainfall (in) 1 9.0 day drawdown check draw6 Linear Interpolation of Correct SAIDA * * * % Im ervious Next Lowest 70 Project Impervious 76.1 Next Highest 80 3 ft. Permanent Pool Depth SAIDA from Table 2.88 3.17 3.36 c.C60 7 .17. 06 • Project Name: Belmont Lc W/L 2 Project No. DWQ 061061 SUBMITTED DESIGN: REQUIRED DESIGN: elevations Permanent Pool (ft) 666 3 Temporary Pool (ft) 670 4 ft. depth ok areas Permanent Pool SA (sq ft) 19300 19382 sq. ft. check surfac Drainage Area (ac) 14.3 Impervious Area (ac) 10.7 74.8 % - Forebay (ft2) 2895 15 % ok High Marsh (ft2) 6755 35.0 % ok Low Marsh (ft2) 675 35.0 % ok Micropool (ft2) 2895 15 % ok 100% volumes Temporary Pool (cu ft) 138950 37552 cu. ft. ok other parameters SA/DA 2.59 3.11 - Orifice Diameter (in) 2.5 0.23 cfs drawdown - Design Rainfall (in) 1 6.9 day drawdown check drawc, Linear Interpolation of Correct SAIDA * * * 3 ft. Permanent Pool Depth % Impervious SA/DA from Table Next Lowest 70 2.88 Project Impervious 74.8 3.11 Next Highest 80' `' 3.36 FREELAN D and KAU FFMAN, INC. Freeland flute „ ENGwm_-, • LANO5CAPE /gpmm crs and Fredcan, Inc. Bentonville, Arkansas July 13, 2006 Ms. Cynthia Van DerWiele, PhD NCDENR 2321 Crabtree Boulevard Suite 250 Raleigh, North Carolina 27604 Re: Lowe's - Belmont, NC Dear Ms. Van DerWiele: Please find attached our submission for the Express Water Quality Review of this project. This submission includes: 1) Three-signed application forms (One original) 2) Three sets of plans 3) Three copies of the O & M (One original) 4) Check # 13157 ($2000) 5) Three stormwater management reports (Serves as the stormwater narrative) Please let me know if you need any additional information. Sincerely, Todd Simmons, PE k-% 17:13 Jul... 4 2006 rr TER:.+!? Gt-1 209 West Stone Avenue • Greenville, South Carolina 29609. Telephone 864-233-5497 • Fax 864-233-8915 FREELAND and KAUFFMAN, INC. Freeland-IlKauffnan and Fredeen, Inc. ENGINEER5 • LAND5C/1PE aRCHI1ECT5 Bentonville, Arkansas July 13, 2006 Ms. Cynthia Van DerWiele, PhD NCDENR ,2321 Crabtree Boulevard Suite 250 Raleigh, North Carolina 27604 Re: Lowe's - Belmont, NC 1 Dear Ms. Van DerWiele: Please find attached our submission for the Express Water Quality Review of this project. This submission includes: 1) Three signed application forms (One original) 2) Three sets of plans 3) Three copies of the O & M (One original) 4) Check # 13157 ($2000) 5) Three stormwater management reports (Serves as the stormwater narrative) Please let me know if you need any additional information. Sincerely, Todd Simmons, PE 971, t,•f?..' -8' L QUAL17y 209 Weet Stone Avenue • Greenville, South Carolina 29609. Telephone 864-233-5497• Fax 864-253-8915 E-)c-p o 6` 1 o b t OFFICE USE ONLY Date Received Fee Paid PermitNumber(s) State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/ Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form may be photocopied for use as an original I. GENERAL INFORMATION 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): 2. Owner/Signing Official's name and title (person legally responsible for facility and compliance):, 3. Owner Mailing Address for person listed in item 2 above: City:. Gy,d F' A0tn State: Ale Zip: Z 5S 6Q 7 Phone Number. (z?36_}6$?+1/Q? ax Number:( ) mail Address: 444V.,r. v/4 ?gA , COaa 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): -Z'O'Wes dc 5. Location of Project (street address): 1,1.11.- _ ..rr. I City: O&iA !; .4 County: 6. Directions to project (from nearest major intersection): moo,,., ?- ?S 74o, - &A 2rI-? Z 7 To wA_ _ 1 t.._/I- __ I7. _ I 1_f_ _ i we _, t 7. Latitude: 7 Longitude: T11 O Z I D Zu of project 8. Contact person who can answer questions about the project: Name: T6Ig" I-- A AA/1.< Telephone Number Fax Number: 6 44 - z 9 ?I 29Email Address : II. PERMIT INFORMATION: 1. Specify whether project is (check one): _t/ New Renewal 912004 Version 1.0 Page I of 4 Modification E?'k r'r? ll?' 7 ?flG?t.n+?vUaS rv3U tJ{l ,. k?'.1 ., 2. If this application is being submitted as the result of a renewal or modification to an existing permit, list the existing permit number 04p- e9619 and its issue date (if known) 3. Specify the type of project (check one): Low Density ? High Density Redevelopment General Permit Other 4. Additional Project Requirements (check applicable blanks): _CAMA Major -Sedimentation/Erosion Control _404/401 Permit -ZNPDES Stormwater -Other Information on required state permits can be obtained by contacting the Customer Service Center at 1-877-623-6748. III. PROJECT INFORMATION r - teIPG ?" !"-r/S.L fw j, cry fialC Ae d -4-4ge ;( tI/1- 4-I60ye 1 2. Stormwater runoff from this project drains to the 60l_ui.W b Cis River basin. Ve'"rS' 3. Total Project Area: acres 4. Project Built Upon Area: -/0 % 5. How many drainage areas does the project have? Z 6. Complete the following information for each drainage area. If there are more than two drainage areas in the project, attach an additional sheet with the information for each area provided in the same format as below. Basin,Iriformation Drainage Area 1 Drainage'Area 2 Receiving Stream Name 14, ed `'.-tL , Ufg a, ea W &4d Receiving Stream Class Drainage Area ?- f AG F.xictina TmnPrviniia` Araa 02 r1 / A ( - Proposed Impervious`Area /p, a, d % Impervious" Area (total) 79, 7 46 76, Z.7 & Impervious* Surface Area Drainage Area 1 - ,::Drainage Area 2 On-site Buildings Z/. Q A G On-site Streets 0. AG 1?>e Pit.e i On-site Parking q-6-S7 .46 046- a6i On-site Sidewalks Q. IS7 AG Other on-site L, Qrz AG Off-site 0,00 A6 Total: 10.5 41- Total: Impervious area is defined as the built upon area including, but not limited to, buildings, roads, parking areas, sidewalks, gravel areas, etc. QMAAA Vorcinn 1 A Pa- 1 of d 1. In the space provided below, summarize how Stormwater will be treated. Also attach a detailed narrative (one to two pages) describing stormwater management for the aroiect. 7. How was the off-site impervious area listed above derived? N A IV. DEED RESTRICTIONS AND PROTECTIVE COVENANTS The following italicized deed restrictions and protective covenants are required to be recorded for all subdivisions, outparcels and future development prior to the sale of any lot. If lot sizes vary significantly, a table listing each lot number, size and the allowable built-upon area for each lot must be provided as an attachment. 1. The following covenants are intended to ensure ongoing compliance with state riparian buffer authorization or General Certification numbers as issued by the Division of Water Quality. These covenants may not be changed or deleted without the consent of the State. 2. No more than square feet of any lot shall be covered by structures or impervious materials. Impervious materials include asphalt, gravel, concrete, bric/y stone, slate or similar material but do not include wood decking or the water surface of swimming pools. 3. S wales shall not be filled in, piped, or altered except as necessary to provide driveway crossings. 4. Built-upon area in excess of the permitted amount requires a modified water quality certification prior to construction. 5. All permitted runofffrom outparcels or future development shall be directed into the permitted stormwater control system. These connections to the stormwater control system shall be performed in a manner that maintains the integrity and performance of the system as permitted. By your signature below, you certify that the recorded deed restrictions and protective covenants for this project shall include all the applicable items required above, that the covenants will be binding on all parties and persons claiming under them, that they will run with the land, that the required covenants cannot be changed or deleted without concurrence from the State, and that they will be recorded prior to the sale of any lot. V. SUPPLEMENT FORMS The applicable stormwater management supplement form(s) listed below must be submitted for each BMP specified for this project. The forms are located on the 401 /wetlands unit website. Bioretention Worksheet Dry Detention Worksheet Level Spreader Worksheet Grassed Swale Worksheet Extended Detention Wetland / Pocket Wetland Worksheet Wet Detention Worksheet 9/2004 Version 1.0 Page 3 of 4 VI. SUBMITTAL REQUIREMENTS Only complete application packages will be accepted and reviewed by the Division of Water Quality (DWQ). A complete package includes all of the items listed below. The complete application package should be submitted to the DWQ Central Office. I. Please indicate that you have provided the following required information by initialing in the space provided next to each item. initals • Original and two copies of the Express Review Stormwater Management Application • Signed and notarized Operation and Maintenance Agreement VtO • Three copies of the applicable Supplement Form(s) for each BMP t'a • Application processing fee (payable to NCDENR) • Detailed narrative description of stormwater treatment/management • Three copies of plans and specifications, including: - Development/Project name - Engineer and firm - Legend - North arrow - Scale - Revision number & date - Mean high water line - Dimensioned property/project boundary - Location map with named streets or NCSR numbers - Original contours, proposed contours, spot elevations, finished floor elevations - Details of roads, drainage features, collection systems, and stormwater control measures - Wetlands and streams delineated, or a note on plans that none exist - Existing drainage (including off-site), drainage easements, pipe sizes, runoff calculations - Drainage areas delineated - Vegetated buffers (where required) VII. AGENT AUTHORIZATION If you wish to designate authority to another individual or firm so that they may provide information on your behalf, please complete this section. Designated agent (individual or firm): Mailing Address: City: State: Zip: Phone: ( ) Fax: ( ) VIII. APPLICANT'S CERTIFICATION I, (print or type name of person listed in General Information, item 2) certify that the information included on this application form is, to the best of my knowledge, correct and that the project will be constructed in conformance with the approved plans, that the required deed restrictions and protective covenants will be recorded, and that the proposed project complies with the requirements of 15A NCAC 2H .1000 Kevin D. Bennett Vice President Date: 9/2004 Version 1.0 Page 4 of 4 DWQ Project DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET) WETLAND WORKSHEET 1. PROJECT INFOEMATION (please complete the following information): q r., Project Name : WS. S - C _ L.K%fta a C. Contact Person: vyy 5 vK*A s%O S Phone Number: For projects with multiple basins, specify which basin this worksheet applies to: -, &J 6 t Permanent Pool Elevation ft. (elevation of the orifice invert out) Temporary Pool Elevation ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area -t I Z? 3 sq. ft. Drainage Area 0 3 . ac. Impervious Area l4 5 ac. Forebay Surface Area Z $o sq, ft. Marsh 0"-9" Surface Area 'i sq. ft. Marsh 9"-18" Surface Area 1?-S sq. ft. Micro Pool Surface Area zap. O sq. ft. (water surface area at permanent pool elevation) (on-site and off-site drainage to the basin) (on-site and off-site drainage to the basin) (at permanent pool elevation approximately 15%)* (at permanent pool elevation approximately 35%)* (at permanent pool elevation approximately 351/o)* (at permanent pool elevation approximately 15%)* Temporary Pool Volume (2) 0 4Lk S cu. ft. SA/DA used Z . (p3 Diameter of Orifice in II. REQUIRED ITEMS CHECKLIST (volume detained on top of the permanent pool) (surface area to drainage area ratio)* (draw down orifice diameter) Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project -zo The temporary pool controls runoff from the 1 inch rain. 9615 The basin side slopes are no steeper than 3:1. V-51T S A planting plan for the marsh areas with plant species and densities is provided. ?A"% Vegetation above the permanent pool elevation is specified. 15's An emergency drain is provided to drain the basin. WTS The temporary pool draws down in 2 to 5 days. F3's Sediment storage is provided in the permanent pool. e' A sediment disposal area is provided. r_ Access is provided for maintenance. SAS A site specific, signed and notarized operation and maintenance agreement is provided. 1S The drainage area (including any offsite area) is delineated on a site plan. Access is provided for maintenance. V?, Vs Plan details for the wetland are provided. R5 Plan details for the inlet and outlet are provided. ?>Ti > A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http://h2o.ehnr.state.nc.us/ncwegandsloandm.doc). * Pocket Wetlands have different design parameters and are only assumed to remove 35%TSS - See pp. 19 and 20 of the NC DENR Stommwater BMP Manual, April 1999.10% open water, 50% high marsh, 40% low marsh. DWQ Project No. DIVISION OF WATER QUALITY - 401 EXTENDED DETENTION (and POCKET) WETLAND WORKSHEET 1. PROJECT Project Name : TION (please complete the follow``in?? information): q u3fc.S - Contact Person: ?ovc7 Wb%. +.1191) Phone Number. f s LJd fo'ZZ - 34-Z-V For projects with multiple basins, specify which basin this worksheet applies to: 53P %-a a z Permanent Pool Elevation ((A (! ft. (elevation of the orifice invert out) Temporary Pool Elevation _(6'1 b ft. (elevation of the outlet structure invert in) Permanent Pool Surface Area (q t '6010 sq. ft. (water surface area at permanent pool elevation) Drainage Area 14-3 ac. (on-site and off-site drainage to the basin) Impervious Area 10.1 ac. (on-site and off-site drainage to the basin) Forebay Surface Area Zags sq, ft. (at permanent pool elevation approximately 15%)* Marsh 0°-9° Surface Area (a -1 SS sq. ft. (at permanent pool elevation approximately 35%a)* Marsh 9'-18" Surface Area Micro Pool Surface Area 7 sq. ft. Z ft (at permanent pool elevation approximately 35%)* t * sq. . (a permanent pool elevation approximately 15%) Temporary Pool Volume to?& 95-0 cu, ft. (volume detained on top of the permanent pool) SAIDA used Z • ?J? (surface area to drainage area ratio)* Diameter of Orifice in. (draw down orifice diameter) II. REQUIRED ITEMS CHECKLIST Initial in the space provided to indicate the following design requirements have been met and supporting documentation is attached. If a requirement has not been met, attach an explanation of why. At a minimum, a complete stormwater management plan submittal includes a worksheet for each BMP, design calculations, plans and specifications showing all BMPs and outlet structure details, a detailed drainage plan and a fully executed operation and maintenance agreement. An incomplete submittal package will result in a request for additional information and will substantially delay final review and approval of the project The temporary pool controls runoff from the 1 inch rain. The basin side slopes are no steeper than 3:1. A planting plan for the marsh areas with plant species and densities is provided. Vegetation above the permanent pool elevation is specified. An emergency drain is provided to drain the basin. The temporary pool draws down in 2 to 5 days. Sediment storage is provided in the permanent pool. A sediment disposal area is provided. Access is provided for maintenance. A site specific, signed and notarized operation and maintenance agreement is provided. The drainage area (including any offsite area) is delineated on a site plan. Access is provided for maintenance. Plan details for the wetland are provided. Plan details for the inlet and outlet are provided. A, A site specific operation and maintenance agreement, signed and notarized by the responsible party is provided (see http://h2o.ehnr.state.nc.uslncwetiandsloandm.doc). * Pocket Wetlands have different design parameters and are only assumed to remove 35% TSS - See pp. 19 and 20 of the NC DENR Stormwater BMP Manual, April 1999. 10% open water, 50% high marsh, 40% low marsh. r-; Epp O CO- lolp POND MAINTENANCE REQUIREMENTS Project Name: Lowe's - Belmont, NC. Permittee: Lowe's Home Centers, Inc. Address : REEC Dock, 1605 Curtis Bridge Rd, Wilkesboro, NC 28697 Phone No. 336-658-4000 I. Monthly, or after every runoff producing rainfall event, whichever comes first: A. Inspect the trash rack; remove accumulated debris, repair / replace if it is not functioning. B. Inspect and clear the orifice of any obstructions. If a pump is used as the drawdown mechanism, pump operation will be checked. A log of test runs of the pump will be kept on site and made available to DWQ personnel upon request. C. Inspect the pond side slopes and grassed inlet swales; remove trash, and repair eroded areas before the next rainfall event. D. If the pond is operated with a vegetated filter, the filter will be checked for sediment accumulation, trash accumulation, erosion and proper operation of the flow spreader mechanism. Repairs/cleaning will be done as necessary. II. Quarterly (Four times a year): A. Inspect the collection system (i.e. catch basins, piping, grassed swales) for proper functioning. Accumulated trash will be cleaned from the basin grates, basin bottoms, and piping will be checked for obstructions and cleared as required. B. Pond inlets will be checked for undercutting. Riprap or other energy dissipation structures will be replaced, and broken pipes will be repaired. III. Semi-annually (twice a year): A. Accumulated sediment from the bottom of the outlet structure will be removed. B. The forebay depth will be checked at various points. Sediment removal is required when the depth is reduced to 75% of the original forebay design depth of 4.0 feet for the pond. C. Grassed swales, including the vegetated filter if applicable, will be re-seeded twice a year as necessary. POND MAINTENANCE REQUIREMENTS PAGE 2 -- - ----------------------------------------------- IV. Annually (Once a year): A. The pond depth will be checked at various points. Sediment removal is required when the depth is reduced to 75% of the original design depth or 3 feet, whichever is greater. The design depth for the pond is 4.0 feet, therefore the 3.00 foot minimum would VTly. The depth is measured vertically from the orifice down to the pond's bottom. Sediment must be removed to at least the original design depth. V. General: A. Mowing of the side slopes will be accomplished according to the season. Maximum grass height will be 6". B. Cattails are encouraged along the perimeter, however they will be removed when they cover more than %z the surface area of the pond. The best time to cut them is at the end of the growing season, in November. Environmentally sensitive chemicals for use in killing cattails can also be used. Contact your nearest Agricultural Extension Agent. C. The orifice is designed to draw down the pond in the 2-5 days. If drawdown is not accomplished in that time, the orifice will be replaced with a larger or smaller orifice. Slow drawdown may be attributed to a clogged system. The source of the clogging will be found and eliminated. D. All components of the detention pond systems (2) will be kept in good working order. Repair or replacement components will meet the original design specifications as per the approved stormwater plan. If previously approved components are determined to be ineffective, the component must be redesigned and/or replaced. VI. Special Requirements: I, Mir-c NAPLESS , hereby acknowledge that I am the financially responsible party for maintenance of this detention pond. I will be responsible for the performance of the maintenance as outlined above, as part of the Stormwater Management Permit received for this project. Signature: Date: 711Z-lb VP - FNyINfERIiJy 3 CoNSTrue-non) E- x.P o LP - 1 0 tp I OFFICE USE ONLY Date Received Fee Paid Permit Number(s) State of North Carolina Department of Environment and Natural Resources Division of Water Quality 401/ Wetlands Unit EXPRESS REVIEW PROGRAM STORMWATER MANAGEMENT APPLICATION FORM This form maybe photocopied for use as an original 1. GENERAL INFORMATION 1. Applicant's name (specify the name of the corporation, individual, etc. who owns the project): 6owe, 's 110,64 A 6o ' J?eLrS , -T" G 2. Owner/Signing Official's name and title (person legally responsible for facility and compliance): 3. Owner Mailing Address for person listed in item 2 above: City: Gtli /k? orG State: NG Zip: Z 5?.9 7 Phone Number: (7,L?> )6 SIZ 1/4K??axNumber: ( ) Email Address: 4i?4y..-. %A/4!5'901 8te/buAfr?, 4+AM 4. Project Name (subdivision, facility, or establishment name - should be consistent with project name on plans, specifications, letters, operation and maintenance agreements, etc.): 5. Location of Project (street address): City: County:. 6. Directions to project (from nearest major intersection): os 4q k- e? 2: 7. Latitude: ] "` 1y Longitude: 9'' /? OZ ' Cps= a of project 8. Contact person who can answer questions about the project: Name: Tn-S1:,,q AAr-) t Telephone Number: 6.7 Fax Number : Email Address : ; b /3it S 47 G . 60,-- ii. PERMIT INFORMATION: 1. Specify whether project is (check one): New Renewal Modification 912004 Version 1.0 Page 1 of 4 u" JUL. 4 "N06 i W,'R f1'.fit;t Y tWTLAI:JlS STORkT ?<:{ri ri BWr ,C; l E Y-Q o co - 1 b b ? STORM WATER MANAGEMENT REPORT & CALCULATIONS FOR LOWES OF BELMONT, NC BELMONT, NORTH CAROLINA REVISED SUBMITTAL 07/13/06 . ?y SEAL 10W5 b V,tFIE?¢•'.• O O hw`•e•• C i `? FREELAND & KAUFFMAN, INC. ENGINEERS - LANDSCAPE ARCHITECTS 209 WEST STONE AVE. GREENVILLE, SOUTH CAROLINA 29609 ?.?;'? i : , dLJ JUIL -71 WEI Lowe's Caldwell Farm Road & I-85 Belmont, NC Executive Summary The site is currently an approximate 16-acre commercially zoned property. The site is currently vacant. The property will be developed to contain Lowe's Home Improvement Center. Construction will include the building areas, and accompanying parking and landscape areas. One stormwater management pond will be located on the property to serve the Lowe's facility. In addition, the existing stormwater facility for the adjacent Wal-Mart Supercenter will be reconfigured as part of this development to allow for the construction of a parking area in the location of the existing Wal-Mart pond. The Lowe's Pond (Basin #I) will be located in the northwest portion of the site. The Wal-Mart Pond (Basin #2) will be located in the southern portion of the site. In accordance with the requirements of the Town of Belmont and NCDENR, both ponds will be designed to treat and release the first 1 " from a water quality standpoint. In addition, the ponds will limit the 10-yr and 100-yr discharge to predeveloped rates, in accordance with the Town of Belmont standards. The computer program Hydraflow Hydrographs will be used to generate hydrographs for each condition as depicted on the area maps. This program is based on the SCS (TR-55) calculation method. TR-55 was used to calculate the time of concentration for input into this program. The pre-developed flows were calculated using TR 55 to generate the runoff number and time of concentration for the flow areas. This information was input into the Hydraflow Hydrographs computer model to generate pre- developed flows. The hydrographs for each can be found in Appendix A, but the flows are summarized below: Predeveloped Rainfall Event Area # 1 (cfs) Offsite'Area #I (cfs) Combined Area #1 (cfs) Area #2 (cfs) 1"Runoff N/A N/A N/A N/A I Oyr. 18.85 5.78 20.08 44.46 100 yr. 39.26 9.68 41.79 72.94 Development of the site will increase the runoff due to the increase in impervious area. Also, the time of concentration will be decreased as a result of this development. Again, TR55 was utilized to determine the runoff number and time of concentration for the contributing flow areas. The hydrographs can be found in Appendix B. The allowable discharge from Basin #1 is a combination of the predeveloped Area #1 and the Offsite Area #1. This hydrographs were combined to develop the combined hydrograph. In this analysis, it is assumed that the entire area # 1 drains to point A. As this is not truly correct, the areas 1 A and 1 B combine a few hundred feet downstream from this point, on property owned by the Abbey, so that this assumption is considered valid. The calculations for Area #2 closely model the original calculations for the original design of Basin #2 for the Wal- Mart Supercenter. The same Cn value and time of concentration was utilized to maintain consistency. The only revision was the reduction of 0.2 acres that now will be directed to the Basin # 1. Developed Rainfall Event: - Area #1 (cfs) Area #2 (cfs) III N/A N/A IOyr. 83.24 88.04 100 yr. 120.74 124.53 The pond will be sized to limit the discharge of the 10 yr, and 100 yr storms to pre-developed rates. In addition, the water quality benefits of an extended wetland detention will be utilized to provide treatment for the first 1 ". Again, the computer program Hydraflow Hydrographs was used to model the proposed pond. The hydrographs can be found in Appendix C, but the following tables summarize the results: Developed Pond Discharge Basin #1 POND Stage Storage Volume Allowable Release Actual Release 1" 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 POND Stage Storage'Volume Allowable Release Actual Release 111 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1" has been controlled in both basins to be released over a period of 2 - 5 days. Existing Conditions: . The drainage area for the site consists of two separate areas (See Pre-developed Drainage Area Map). Area 1 A . drains to the west to the existing drainage ditch. Area 1 B drains to the south toward Caldwell Farm Road. Since Areas 1 A and 1 B combine within a few hundred feet of the site boundary, it will be analyzed as one drainage area (Area #11). The soil type for this area is Type B according to the Soil Conservation Survey. In addition to Area #1, a small amount of offsite water will be directed to the site from the adjacent Interstate 85. This area is Offsite Area #1 and consists of Type B Soils. The drainage area for the reconfiguration of the Wal-Mart Pond (Basin #2) was taken from the approved stormwater report previously done by Freeland and Kauffman. The only deviation was the subtraction of 0.2 acres of drainage area that will not be directed to Basin # 1. Area 1 is 13.8 acres of woods/grass combination in fair conditiion. Per the TR-55 Method, a curve number of 65 was determined. The time of concentration was derived from 100' of sheet flow at 9.0%, 65' of shallow concentrated flow 93.0%, 310' of open channel flow at 2.5% and 355' of open channel flow at 0.8% to Point A. This yields a time of concentration of 17 minutes. Area 1 (13.8 ac.) Woods/Grass Combo (Fair) A.=. 13.8 ac CN = 65 Offsite Area #I is 1.00 acres of landscaped area in good condition and 0.50 acres of asphalt. Per the TR-55 Method, a curve number of 73 was determined. The time of concentration was derived from 30' of sheet flow at 2.0% and 825' of shallow concentrated flow at 2.5%. This yields a time of concentration of 6 minutes. Offsite Area 1 (1.50 ac.) Landscaped Area Impervious Area Good condition A = 0.50 ac A =1.0 ac CN=61 CN=98 CN=73 As stated Area 2 was derived from the previously approved Wal-Mart Supercenter Report by Freeland and Kauffman. The input data is summarized below. Area = 13.9 acres Cn = 76 Tc = 16.5 minutes Developed Conditions: • In the developed condition, all of the Lowe's site + 0.2 acres from Wal-Mart will be directed to Basin # 1. The • developed condition for Wal-Mart will be in accordance with the Wal-Mart drainage study by Freeland and Kauffman - 0.2 acres now directed to Basin # 1. Runoff Calculations for Developed Condition to Pond: Area #1 Runoff Curve Number Paved parking lots, Open space, good condition, roofs, and driveways grass cover> 75% A= 10.5 ac - A=3.3 ac CN=98 CN=61 0 The total developed area is 13.8 acres and the weighted CN value is 89 (see TR-55 calculations for post- s developed condition). Time of Concentration 1 100 ft. sheet flow @ 2.0% 1 188 ft. shallow conc. @ 11515 ft. open channel flow I • Paved Surface 3.0%, paved @ 4 fps • Total Tc = 6 min Area #2 • Again, Area #2 matches the Wal-Mart report - 0.2acres. The input data is summarized below. Area: 14.3 ac. Cn: 93 Tc: 8.2 min POND SIZING AND ROUTING Both ponds will be extended wetland detention facilities. Basin #1 will have a bottom elevation of 667.00, a r permanent pool elevation of 67 1.00, and a top elevation of 678.50. This gives a total volume of 180,115 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and. 100-year storm events to be released at pre- developed rates. In addition, the outlet will be designed to discharge the first 1" runoff within 2 - 5 days. The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1 " runoff will be released through an orifice at the top of the permanent pool elevation (el. 671.00), while all other storm events will be released through a weir at the el. 673.00. The outlets will be sized as follows: Orifice Equation - 0 = 0.6A 2gH Weir Equation - 0 = 3.33LH312 From these equations it is determined that a 2.5-inch diameter orifice at elevation 671.00 will release the first 1" runoff. The 10 and 100-year storms will be passed through a 1' weir at elevation (673.00). A 5'x 5' concrete riser will extend to elevation 677.50. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: Basin #1 POND Stage Storage Volume Allowable Release Actual Release 672.69 35,206 0.23 0.20 10 yr. 675.36 101,147 20.08 12.33 100 yr. 676.98 147,756 41.79 25.78 Basin #2 will have a bottom elevation of 666.00, a permanent pool elevation of 670.00, and a top elevation of 676.50. This gives a total volume of 138,950 cubic feet. The Stage/Discharge and Stage/Storage charts are included in this report. Once the pond volume is known, an outlet structure must be designed to limit outflow from the pond to a pre-determined amount. The outlet structure is designed to limit flow of the 10-year and 100- year storm events to be released at pre-developed rates. In addition, the outlet will be designed to discharge the first 1" runoff within 2 - 5 days The outlet structure will consist of an outlet structure being placed with a series of release points at various elevations. The first 1" runoff will be released through an orifice at the top of the permanent pool elevation (el. 670.00), while all other storm events will be released through a weir at the el. 672.00. It is determined that a 2.5-inch diameter orifice at elevation 670.00 will release the first 1" runoff. The 10 and 100-year storms will be passed through a 3' weir at elevation (672.00). A 5'x 5' concrete riser will extend to elevation 675.00. All release from the orifice, slot, and riser will be released through a 36-inch outlet pipe. At each stage the flow through the lower outlets (i.e. the release through the 2-yr . storm orifice during the 10-year storm, etc.) is subtracted from the allowable to determine the required size of the next outlet. Refer to the hydrographs for reservoir routing showing storage elevations, release rates, etc. The results are as follows: • Basin #2 POND Stage Storage Volume Allowable Release Actual Release 1" 671.78 35,947 0.22 0.21 10 yr. 674.61 101,146 44.46 36.62 100 yr. 675.63 128,783 72.94 62.83 As can be seen in the above table, the post-developed discharge is equal or below the pre-developed for the 10 yr, and 100 yr storms. Also, the 1" has been controlled in both basins to be released over a period of 2 - 5 days. • Both basins have been designed as extended wetland detention ponds per the NCDENR manual. Minimum surface areas have been met and the areas designed to provide approximately 15% area for the forebay, 35% area for the 0" -9" areas, 35% area for the 9" - 18" areas, and 15% area for the Micropool. Calculations for each basin can be found in Appendix C. Erosion & Sediment Control The following is the report of the sediment and erosion control devices to be used on this project. The erosion will be controlled via a series of temporary diversion ditches, temporary sediment basins, inlet protection, silt fence, and a stone construction entrance. These items will be implemented per the NCDENR Erosion and Sediment Control Planning and Design Manual requirements and maintained on a regular basis to insure their proper operation. We will also provide all calculations for the sediment basin and traps. The site to be graded will consist of approximately 20.0 acres. The site is currently vacant with a mix of vegetation. A majority of the site has been logged within the last 2 years. In its graded condition the site will drain from the north to the south and then piped to a basin on the west side. The extended wetland detention pond will also serve as a sediment basin during construction. Diversion ditches will be installed to direct runoff into the pond during construction. Silt fence will be used in areas with less than 1 acre of disturbance that cannot be directed to either the temporary sediment pond or the either one of the sediment traps. In the interim, the remaining areas, which cannot be incorporated to the pond, will be directed towards silt fence. These areas are small and consist mainly of the fill slopes for the stormwater basins and the sediment traps. When the stormwater system is installed, inlet protection will be installed at each catch basin to collect sediment. Sediment Basin Calculations: The on-site detention pond will also serve as a sediment basin during construction. The pond is sized to handle the majority of the runoff in the developed condition. Based on the NC Erosion Control Handbook the basin should be sized to handle sediment at a rate of 1800 cubic feet (c.f.) per disturbed acre per year. From the Soil Conservation Service Soil Survey the soil types on site consist mainly of clayey soils. From the chart provide by NCDENR (fig. 6.61) and based on a surface area to peak discharge ratio of 0.0 1, the efficiency should be 75%. For loamy sand the efficiency is 85%. In both cases this meets the state requirements. 4 *FREELAND and KAUFFMAN, INC. 4ENG/NEEKS • LwDSG4PE ARLHrmcrs 0209WestStoneAvenue OC Greenville, South Carolina 29609 Job Job No. Telephone 864-233-5497 9 Fax L364-233-8915 Computed by Checked By_ R?FEiZEN ? E Calculation For. :?P c ?o.a?.'Z o s 5 I Date Date • • • • • WinTR-55 Current Data Description --- Identification Data --- User: Date: 6/20/2006 Project: LOWES Units: English SubTitle: BELMONT Areal Units: Acres State: North Carolina County: Gaston Filename: P:\TSimmons\Dwg\Proj\LOWES\Belmont NC\STORMWATER CALC\PREDEVELOPED AREA 1.w55 • • --- Sub-Area Data --- Name - - ----RCN -- ----- • PREDEVELOP Outlet 13.8 65 0.285 Offsite Outlet 1.5 73 0.100 • Total area: 15.30 (ac) • • --- Storm Data -- Rainfall Depth by Rainfall Return Period • 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr • ---(in)---- ---- ---- (in)-------- ---- (in)-------- (in)------- ---- ---- - (in)------- ---- - (in)---- ---- ---- (in)- ---- i 3.5 4.4 5.0 5.5 6.5 6.9 3.0 • Storm Data Source: Gaston County, NC (NRCS) • Rainfall Di stribution Type: Type II Dimensionle ss Unit Hydrograph: <standard> i • • • • • • • • • • • WinTR-55, Version 1.00.00 Page 1 6/20/2006 3:28:55 PM • • • • • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve • Hyd. No. 1 • Area #1 (Predeveloped) • Hydrograph type = SCS Runoff Storm frequency = 1 yrs • Drainage area = 13.80 ac Basin Slope = 0.0% • Tc method = USER Total precip. = 1.50 in • Storm duration = 24 hrs • • • • • • Q (cfs) A AA 1 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.01 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 204 cult Area #1 (Predeveloped) Hyd. No. 1 -1 Yr • --- 0 2 5 7 Hyd No. 1 9 12 14 16 19 21 Q (cfs) 0.10 0.09 0.08 0.07 0.06 0.05 0.04 0.03 0.02 0.01 0.00 23 26 Time (hrs) 0 0 Hydrograph Plot Hydraflow Hydrographs by Intelisolve r Hyd. No. 1 Area #1 (Predeve loped) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs 10 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 18.85 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 Area #1 (Predeveloped) Q (cfs) Hyd. No. 1 -10 Yr i 21.00 18.00 15.00 . 12.00 9.00 r . 6.00 3.00 0 00 Hydrograph Volume = 65,176 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 i 0 2 5 7 Hyd No. 1 Fill r 0.00 9 12 14 16 19 21 23 26 Time (hrs) • Hydrograph Plot . Hydraflow Hydrographs by Intelisolve ! Hyd. No. 1 Area #1 (Predeveloped) • Hydrograph type = SCS Runoff # Storm frequency = 100 yrs Drainage area = 13.80 ac Basin Slope = 0.0% • Tc method = USER Total precip. = 6.90 in * Storm duration = 24 hrs 19 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 39.26 cfs Time interval = 2 min Curve number = 60 Hydraulic length = 0 ft Time of conc. (Tc) = 17 min Distribution = Type II Shape factor = 484 • • Q (cfs) AML A^ f1 f1 Hydrograph Volume = 126,891 cult Area #1 (Predeveloped) Hyd. No. 1 -100 Yr Q (cfs) 40.00 0 2 5 7 • Hyd No. 1 30.00 20.00 10.00 -L ? 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot Hydratlow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs 2 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 • i • Q (cfs) ? n cn Offsite (Predeveloped) Hyd. No. 2 -1 Yr . 0 2 5 7 Hyd No. 2 9 12 14 16 19 21 23 Hydrograph Volume = 660 cuft Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 26 Time (hrs) 11 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:30 PM Hyd. No. 2 Offsite (Predevelop ed) • Hydrograph type = SCS Runoff Peak discharge = 5.78 cfs Storm frequency = 10 yrs Time interval = 2 min Drainage area = 1.50 ac Curve number = 73 Basin Slope = 0.0% Hydraulic length = 0 ft • Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 5.00 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 11,641 cult • • • Offsite (Predeveloped) • Q (cfs) Hyd. No. 2 -10 Yr Q (cfs) 6.00 6.00 • 5.00 5.00 • 4.00 4.00 3.00 3.00 • 2.00 2.00 1.00 1.00 0.00 0.00 • 0 2 5 7 9 12 14 16 19 21 23 26 Hyd No. 2 Time (hrs) • • 0 • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve Hyd. No. 2 Offsite (Predeveloped) Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 1.50 ac Basin Slope = 0.0% Tc method = USER Total precip. = 6.90 in Storm duration = 24 hrs 20 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 9.68 cfs Time interval = 2 min Curve number = 73 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 • Offsite (Predeveloped) Q (cfs) ? Hyd. No. 2 -100 Yr 10.00 • 8.00 6.00 • 4.00 2.00 0 00 Hydrograph Volume = 19,649 cult • 0.0' 2.3 4.7 7.0 Hyd No. 2 Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 9.3 11.7 14.0 16.3 18.7 21.0 23.3 Time (hrs) • • Hydrograph Plot • • Hydraflow Hydrographs by Intellsolve • Hyd. No. 4 Total Predeveloped to Basin #1 • Hydrograph type = Combine • Storm frequency = 1 yrs • Inflow hyds. = 1, 2 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 0.19 cfs Time interval = 2 min • • • • • • • Q (cfs) AM A Cf% Hydrograph Volume = 864 cult Total Predeveloped to Basin #1 Hyd. No. 4 -1 Yr vvv 0 2 5 7 9 Hyd No. 4 Hyd No. 1 12 14 16 - Hyd No. 2 19 21 23 Q (cfs) 0.50 0.45 0.40 0.35 0.30 0.25 0.20 0.15 0.10 0.05 0.00 26 Time (hrs) 3 • • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve Hyd. No. 4 • Total Predeveloped to Basin #1 • Hydrograph type = Combine • Storm frequency = 10 yrs • Inflow hyds. = 1, 2 12 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 20.08 cfs Time interval = 2 min • • • • • • • Q (cfs) • 21.00 • . 18.00 15.00 . 12.00 9.00 6.00 • 3.00 0 00 Total Predeveloped to Basin #1 Hyd. No. 4 -10 Yr Hydrograph Volume = 76,817 cult Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 . 0 2 5 7 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 4 Hyd No. 1 Hyd No. 2 Hydrograph Plot • Hydraflow Hydrographs by Intelisolve Hyd. No. 4 Total Predeveloped to Basin #1 Hydrograph type = Combine Storm frequency = 100 yrs Inflow hyds. = 1, 2 21 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 41.79 cfs Time interval = 2 min s Q (cfs) 50.00 r • 40.00 30.00 r _ r . 20.00 r - - 10.00 i - n nn Hydrograph Volume = 146,540 cult Total Predeveloped to Basin #1 Hyd. No. 4 -100 Yr Q (cfs) 50.00 i 0 2 5 7 Hyd No. 4 r i 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hyd No. 1 Hyd No. 2 • Hydrograph Plot a Hydraflow Hydrographs by Intellsolve Hyd. No. 14 Area #2 (Predeveloped WM) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.90 ac Basin Slope = 0.0% a Tc method = USER Total precip. = 1.50 in Storm duration = 24 hrs r 0 Area #2 (Predeveloped WM) 0 Q (cfs) Hyd. No. 14 -1 Yr 3.00 • • • • • 2.00 • r r 0 0 1.00 a 0 00 Hydrograph Volume= 9,211 cuft Q (cfs) 3.00 2.00 1.00 . 0 2 5 7 9 Hyd No. 14 7 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 2.08 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 III ? I J 12 14 16 19 21 ' ` ' 0.00 23 26 Time (hrs) Hydrograph Plot . Hydraflow Hydrographs by Intelisolve Hyd. No. 14 Area #2 (Predeveloped WM) Hydrograph type = SCS Runoff Storm frequency = 10 yrs . Drainage area = 13.90 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in . Storm duration = 24 hrs . Q (cfs) 16 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 44.46 cfs Time interval = 2 min Curve number = 76 Hydraulic length = 0 ft Time of conc. (Tc) = 16.5 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 124,736 cuff Area #2 (Predeveloped WM) Hyd. No. 14 -10 Yr Q (cfs) 50.00 40.00 30.00 20.00 10.00 . 0 2 5 7 Hyd No. 14 I I I I I --- -T---II 1 0.00 9 12 14 16 19 21 23 26 Time (hrs) • • Hydrograph Plot • Hydraflow Hydrographs by In telisolve Hyd. No. 14 • Area #2 (Predeveloped WM) • Hydrograph type = SCS Runoff Storm frequency = 100 yrs Drainage area = 13.90 ac Basin Slope = 0.0% • Tc method = USER Total precip. = 6.90 in • Storm duration = 24 hrs • • • • • • Q (cfs) 80.00 • 70.00 • 60.00 • • • 50.00 • 40.00 • 30.00 • 20.00 • • . 10.00 0 00 25 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 72.94 cfs Time interval Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Hydrogra = 2 min = 76 = Oft = 16.5 min = Type II = 484 ph Volume = 205,069 cult Area #2 (Predeveloped WM) Hyd. No. 14 -100 Yr Q (cfs) . 0 2 5 7 Hyd No. 14 • 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 9 12 14 16 19 21 23 26 Time (hrs) ! FREELAND and KAUFFMAN, INC. 0 ENGINEERS • L.wDSCAPEARcN?EcrS - - • 209 West Stone Avenue Greenville, South Carolina 29609 JOb Job NO. • Telephone 864-233-5497 Computed 13y • Fax 864-233-5915 Checked By . RFEIZENCE Calculation For.??P? t o Discipline: .. Aa-C---A 13 . C- ` ` Can . ? , C) «Q -D i C? gq -TZ S .¢.FPS_ _ ( t-- k,.? Date Date • e • e • e • e • O • • • • • e e • • • • e • • • • • e • • • • • • • • • • • • • • WinTR-55 Current Data Description --- Identification Data --- User: Date: 7/13/2006 Project: LOWES Units: English SubTitle: BELMONT Areal Units: Acres State: North Carolina County: Gaston Filename: P:\TSimmons\Dwg\Proj\LOWES\Belmont NC\STORMWATER CALC\DEVELOPED AREA 1.w55 --- Sub-Area Data Name Description Reach Area(ac) RCN Tc ------------------------------------------------------------------------------ DEVELOPED Outlet 13.8 89 0.100 Total area: 13.80 (ac) --- Storm Data -- Rainfall Depth by Rainfall Return Period 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr 1-Yr (in) (in) (in) (in) (in) (in) (in) -------------------------------------------------------------------------------- 3.5 4.4 5.0 5.5 6.5 6.9 3.0 Storm Data Source: Gaston County, NC (NRCS) Rainfall Distribution Type: Type II Dimensionless Unit Hydrograph: <standard> WinTR-55, Version 1.00.00 Page 1 7/13/2006 2:12:28 PM • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve + Hyd. No. 6 Area #1 (Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.85 in Storm duration = 24 hrs Q (cfs) 24.00 20.00 16.00 • 12.00 8.00 4.00 0.00 1 Thursday, Jul 13 2006, 2:40 PM Peak discharge = 21.05 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 42,500 cult Area #1 (Developed) Hyd. No. 6 -1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 . 0 2 5 7 Hyd No. 6 0.00 9 12 14 16 19 21 23 26 Time (hrs) Hydrograph Plot e-- . Hydraflow Hydrographs by Intelisolve Hyd. No. 6 Area #1 (Developed) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 13.80 ac Basin Slope = 0.0% Tc method = USER Total precip. = 5.00 in . Storm duration = 24 hrs Q (cfs) r 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 3 Thursday, Jul 13 2006, 2:40 PM Peak discharge = 83.24 cfs Time interval = 2 min Curve number = 89 Hydraulic length = 0 ft Time of conc. (Tc) = 6 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 177,142 cult Area #1 (Developed) Hyd. No. 6 -10 Yr Q (cfs) 0.0 2.0 4.0 6.0 Hyd No. 6 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 - - - - - - - 10.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) • Hydrograph Plot s • Hydraflow Hydrographs by Intelisolve Thursday, Jul 13 2006, 2:40 PM Hyd. No. 6 Area #1 (Developed) Hydrograph type = SCS Runoff Peak discharge = 120.74 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 13.80 ac Curve number = 89 • Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 6 min Total precip. = 6.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Hydrograph Volume = 263,486 cult Area #1 (Developed) Q (cfs) Hyd. No. 6 -100 Yr Q (cfs) 140.00 140.00 • 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 ? 20.00 - -- - - - - 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) ? Hyd No. 6 • • Hydrograph Plot 2 • Hydraflow Hydrographs by Intelisolve Thursday, Jul 13 2006, 2:40 PM Hyd. No. 8 • Total Developed to Basin #1 • Hydrograph type = Combine Peak discharge = 21.52 cfs • Storm frequency = 1 yrs Time interval = 2 min Inflow hyds. = 2, 6 • Hydrograph Volume = 43,809 cuft • • • • • • • Total Developed to Basin #1 • Q (cfs) Hyd. No. 8 -1 Yr Q (cfs) 24.00 • • • 20.00 • • • 16.00 • • 12.00 • • 8.00 • • • 4.00 • • • 0.00 24.00 20.00 16.00 12.00 8.00 4.00 0 00 • 0 2 5 7 9 12 14 16 19 21 23 26 • Hyd No. 8 Hyd No. 2 Hyd No. 6 Time (hrs) • • • • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve • Hyd. No. 8 Total Developed to Basin #1 • Hydrograph type = Combine • Storm frequency = 10 yrs • Inflow hyds. = 2, 6 • • • • • • • Thursday, Jul 13 2006, 2:40 PM Peak discharge = 89.01 cfs Time interval = 2 min Hydrograph Volume = 188,783 cult • Total Developed to Basin #1 • Q (cfs) Hyd. No. 8 -10 Yr Q (cfs) • 90.00 • 80.00 • • 70.00 • 60.00 • 50.00 • 40.00 • 30.00 20.00 • 10.00 • 0 00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 . 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Hyd No. 8 Hyd No. 2 Hyd No. 6 Time (hrs) • • • 4 6 e Hydrograph Plot . Hydraflow Hydrographs by Intelisolve Thursday, Jul 13 2006, 2:40 PM Hyd. No. 8 Total Developed to Basin #1 Hydrograph type = Combine Peak discharge = 130.42 cfs 0 Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 2, 6 • Hydrograph Volume = 283,135 cuft Total Developed to Basin #1 Q (cfs ? ) Hyd. No. 8 -100 Yr Q (cfs) 140.00 140.00 • 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 - - - - • 20.00 0.00 - 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 Time (hrs) ? Hyd No. 8 Hyd No. 2 Hyd No. 6 Hydrograph Plot . Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 1 yrs Drainage area = 14.30 ac Basin Slope = 0.0% Tc method = USER Total precip. = 1.50 in S Storm duration = 24 hrs Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0 00 8 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 19.58 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 Hydrograph Volume = 44,968 cuft Area #2 (Developed) Hyd. No. 16 -1 Yr Q (cfs) 21.00 0 2 5 7 Hyd No. 16 18.00 15.00 12.00 9.00 6.00 3.00 ?- ' 0.00 9 12 14 16 19 21 23 26 Time (hrs) • Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Storm frequency = 10 yrs Drainage area = 14.30 ac Basin Slope = 0.0% • Tc method = USER Total precip. = 5.00 in Storm duration = 24 hrs 17 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 88.04 cfs Time interval = 2 min Curve number = 93 Hydraulic length = 0 ft Time of conc. (Tc) = 8 min Distribution = Type II Shape factor = 484 • Area #2 (Developed) Q (cfs) Hyd. No. 16 -10 Yr 90.00 80.00 • • 70.00 60.00 50.00 40.00 30.00 20.00 • 10.00 S 0 00 Hydrograph Volume = 217,909 cult 0.0 2.0 4.0 6.0 Hyd No. 16 • Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Time (hrs) • Hydrograph Plot 26 Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:30 PM Hyd. No. 16 Area #2 (Developed) Hydrograph type = SCS Runoff Peak discharge = 124.53 cfs Storm frequency = 100 yrs Time interval = 2 min Drainage area = 14.30 ac Curve number = 93 Basin Slope = 0.0% Hydraulic length = 0 ft Tc method = USER Time of conc. (Tc) = 8 min Total precip. = 6.90 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 • Hydrograph Volume = 315,206 cult Area #2 (Developed) • Q WS) Hyd. No. 16 -100 Yr Q (cfs) 140.00 140.00 • 120.00 120.00 100.00 100.00 80.00 80.00 60.00 60.00 40.00 40.00 20.00 20.00 0.00 0.00 • 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 22.0 Hyd No. 16 Time (hrs) • vFREELAND a nd KAUFFMAN, INC. ENGINEERS • L NDSCAPEARCH/TECTS _ • 209 West Stone Avenue Greenville, South Carolina 29609 Job Job No. Date Telephone 664-233-5497 Computed By • Fax 864-233-8915 Checked By Date R FEREN E Calculation For 1, t?r?st-' u?c '? t-? ( as , •? ?l Discipline ! t . i f _._ ' i V. Jl L\ 7 .. i. 5 4 n 4 - - 2- to'Jj_ ..._? o ¢.-_ 4-1 1q, Z ?3 fT3 • ... ?J ecri?•- ?ryo 1. ' CO C91 O _ _ _ ' • _. _ - ??, Sty= 19, Z? 3 x o. S . Zgia?,o h? r- _ ,I -7 -Z'57- 5 P • _. _ . : E 1 f - ? T 1 1 i i i E C 1 , ' I _. ._ • .. _. .... '. ._.. .... . t ..... ... .. .__._ _..._ _. _ . f heet ? ' 0 *FREELAND and KAUFFMAN, INC. .ENGINEERS • L 4mDSCAPEARCH/TECTS .209 West Stone Avenue Green-If- a Le- I: a296O9 Job QC- Job No. Telephone 864233-5497 . Fax 664-233-5915 . R FEIZENC Calculation For. Computed By Checked by _ Date Q = 0? Z3 ci=S 0,09 Date 0 * FREELAND and KAUFFMAN, INC. EN!i/NEERS • LANDSCAPE ARCHITECTS 209 West Stone Avenue . Greenville, South Carolina 29609 Job Job No. Date Telephone 864233-5497 . Computed by Fax864-233-8915 Checked By Date r .' R, FEIZEN E -Calculation For. ?Z.,?? • t?. ?? ' Discipline ? i D, L 1 G S : N? S. CSC ??.5 rIZED t Zee cL n `fa 1! f (a. s S t 7e t"S -J, S ... i , r w ? 5Pr = I c?, ?, 3 3 ?r ? 1?Cs . f C?Z-C-A KAV.DL? O G°? (O-7O of 0 *FREELAND and KAUFFMAN, INC. • ENGINEERS i LANDSGIPE ARCHITECTS.- _ 209 West Stone Avenue Job Job No, Greenville South Carolina 29609 r Telephone,864233-5497 • Fax 864233-8915 Computed By Checked By_ Date r REFEPENgE Calculation For '? *3 y- ?"?) ` f Discipline: V i S f -' i -73 r_ Vu?. OI Z' x 0.7-3 Y 1¢ 3 x ? 3sc?? r r_ . Q- m. LZ cFS _ 'n a9 c-Fs r ' .-._ ... _.- .. ._. ?.._.. r._....._ -.?..... ..._.... .. _..- .. .. .. _. ... _..? .. .. .._ 4 I { ._. r _ , . i ' ._. i ..... h t of ! 5 ee Date (c l t o (? 3. General r . a. Basin shape should minimize dead storage areas and short circuiting. Length to width ratios should be 3:1 or greater. (Barfield, et al., 1981, pp. 426-429; Florida DEP, 1982, pg. 6-289). b. If the basin is used as a sediment trap during construction, all sediment deposited during construction must be removed before normal operation begins. c-. Aquatic vegetation should be included for a wetland type detention basin (Maryland DNR, March 1987; Schueler, 1987, Chapter 4 and 9). A minimum ten foot wide shallow . sloped shelf is needed at the edge of the basin for safety and to provide appropriate conditions for aquatic vegetation (Schueler, 1987). This shelf should be sloped 6:1 or ?. flatter and extend to a depth of 2 feet below the surface of the permanent pool (Shaver . and Maxted, DNREC, 1994). A list of suitable wetland species and propagation techniques are provided in Schueler (1987) and Maryland DNR (1987). r . d. An emergency drain (with a pipe sized to drain the pond in less than 24 hours) should be installed in all ponds to allow.access for riser repairs and sediment removal (Schueler, 1987). r . Table 1.1 Surface Area to Drainage Area Ratio For Permanent Pool Sizing For 85% Pollutant r Removal Efficiency in the Piedmont r r r r r r r r r r rr r r r r r r % Impervious Cover 3.0 4.0. 5.0 6.0 7.0 8.0 9.0 10 0-49 043 0-35 026 0.79 0.70 0.59 0.51 0.46 0.44 30 1 08' 097 () 7 -0- 64- 0 6 2 M 1.43 1.25. 1.05 . 0.90 . -0.82 . 6 0.77 ' 1.73 1.50 1.30 1.09 1.00 .0.92' 2.03 1.71 1.51 1.29. 1.18 1.10 70 2.88 2.40 2.07 1.79 1.54 1.35 1.26 80 3.36 2.78 2.38 2.10 1.86 1.60 1.42 90 3174 3.10 2.66. 2.34 2.11 1.83 1.67 Notes: Numbers given in the body of the table are given in percentages. . Coastal SA/DA- ratios can be obtained from the local DWQ Regional Office. 5 Hydrograph Plot Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Basin #1 Routing Hydrograph type = Reservoir Storm frequency = 1 yrs Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) Thursday, Jul 13 2006, 2:43 PM Peak discharge = 0.20 cfs Time interval = 2 min Max. Elevation = 672.69 ft Max. Storage = 35,206 cuft Storage indication method used. 1 1 Q (cfs) IN A f%f% ' Hydrograph Volume = 40,519 cult Basin #1 Routing Hyd. No. 10 -1 Yr Q (cfs) 24.00 20.00 16.00 12.00 8.00 4.00 P 0.00 -' ' 0.00 ' 0 10 19 29 39 48 58 68 77 87 97 Hyd No. 10 Hyd No. 8 Time (hrs) 1 Hydrograph Plot r Hydraflow Hydrographs by Intelisolve r Hyd. No. 10 r Basin #1 Routing r Hydrograph type = Reservoir r Storm frequency = 10 yrs r Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) r 2 Thursday, Jul 13 2006, 2:43 PM Peak discharge = 12.33 cfs Time interval = 2 min Max. Elevation = 675.36 ft Max. Storage = 101,147 cuft r Storage Indication method used. r r r r r Hydrograph Volume = 182,636 cult r Basin #1 Routing r Q (cfs) Hyd. No. 10 -10 Yr Q (cfs) r 90.00 r r 80.00 r r 70.00 r r 60.00 r r 50.00 r r 40.00 r r 30.00 r r 20.00 r r 10.00 r r 0.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0 00 r 0 7 15 22 29 37 44 51 59 66 73 81 r Hyd No. 10 Hyd No. 8 Time (hrs) r r r • • Hydrograph Plot . Hydraflow Hydrographs by Intelisolve Hyd. No. 10 Basin #1 Routing • Hydrograph type = Reservoir Storm frequency = 100 yrs . Inflow hyd. No. = 8 Reservoir name = Basin #1 (Lowe's) . Storage indication method used. 3 Thursday, Jul 13 2006,2:43 PM Peak discharge = 25.78 cfs Time interval = 2 min Max. Elevation = 676.98 ft Max. Storage = 147,756 cuft Hydrograph Volume = 276,807 cult W Basin #1 Routing Q (cfs) Hyd. No. 10 -100 Yr Q (cfs) 140.00 . 120.00 100.00 . 80.00 60.00 . 40.00 20.00 0.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 0 3 6 9 12 15 18 21 24 27 30 Hyd No. 10 Hyd No. 8 Time (hrs) Hydrograph Plot Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:30 PM Hyd. No. 18 Basin #2 Routing Hydrograph type = Reservoir Peak discharge = 0.21 cfs Storm frequency = 1 yrs Time interval = 2 min . Inflow hyd. No. = 16 Max. Elevation = 671.78 ft Reservoir name = Basin #2(WM) Max. Storage = 35,947 cuft . Storage Indication method used. Hydrograph Volume = 41,644 cuft Basin #2 Routing . Q (cfs) Hyd. No. 18 -1 Yr Q (cfs) 21.00 21.00 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 10 19 29 39 48 58 68 77 87 97 Hyd No. 18 Hyd No. 16 Time (hrs) 9 • • Hydrograph Plot • Hydraflow Hydrographs by Intelisolve Hyd. No. 18 • Basin #2 Routing • Hydrograph type = Reservoir • Storm frequency = 10 yrs • Inflow hyd. No. = 16 • Reservoir name = Basin #2(WM) 18 Tuesday, Jun 20 2006, 3:30 PM Peak discharge = 36.62 cfs Time interval = 2 min Max. Elevation = 674.61 ft Max. Storage = 101,146 cuft Storage indication method used. • • • • • Hydrograph Volume = 213,095 cuft • Basin #2 Routing • Q (cfs) Hyd. No. 18 --10 Yr Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 a 0 00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 . 0 3 5 8 11 13 16 19 21 24 27 Time (hrs) Hyd No. 18 Hyd No. 16 Hydrograph Plot 1 Hydraflow Hydrographs by Intelisolve / Hyd No. 18 r Basin #2 Routing / Hydrograph type = Reservoir / Storm frequency = 100 yrs r Inflow hyd. No. = 16 Reservoir name = Basin #2(WM) r r Storage Indication method used. r r r r r r Basin #2 Routing r Q (cfs) Hyd. No. 18 -100 Yr r 140.00 r r 120.00 r r r 100.00 r r r 80.00 r r 60.00 r r r 40.00 r 20.00: r r IL 0 00 27 Tuesday, Jun 202006, 3:30 PM Peak discharge = 62.83 cfs Time interval = 2 min Max. Elevation = 675.63 ft Max. Storage = 128,783 cuft Hydrograph Volume = 310,320 cult Q (cfs) 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0.00 r 0 2 5 7 9 12 14 16 19 21 23 26 r Hyd No. 18 Hyd No. 16 Time (hrs) r r 1 r r r_ r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r Pond Report Hydraflow Hydrographs by Intelisolve Tuesday, Jun 20 2006, 3:37 PM Pond No. 1 - Basin #1 (Lowe's) Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table Stage (ft) Elevation (ft) 0.00 671.00 1.00 672.00 2.00 673.00 3.00 674.00 4.00 675.00 5.00 676.00 6.00 677.00 7.00 678.00 Contour area (sgft) 19,213 20,973 22,780 24,650 26,580 28,575 30,600 32,700 Incr. Storage (cult) 0 20,093 21,877 23,715 25,615 27,578 29,588 31,650 Total storage (cuft) 0 20,093 41,970 65,685 91,300 118,877 148,465 180,115 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 2.50 0.00 0.00 Crest Len (ft) = 1.00 12.00 0.00 0.00 Span (in) = 36.00 2.50 0.00 0.00 Crest El. (ft) = 673.00 677.50 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 671.00 671.00 0.00 0.00 Weir Type = Rect Rect - - Length (ft) = 40.00 0.00 0.00 0.00 Multistage = Yes Yes No No Slope (%) = 1.00 0.00 0.00 0.00 N-Value = .015 .013 .013 .000 Orif. Coeff. = 0.60 0.60 0.60 0.00 Multi-Stage = n/a Yes No No Exfiltration = 0.000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: CulveNOrifice outflows have been analyzed under inlet and outlet control. Stage I Storage I Discharge Table Stage Storage Elevation CIv A Clv B Clv C Clv D Wr A Wr B Wr C Wr D Exffl Total ft cuft ft cfs cfs cis efs cfs cfs cfs cfs cfs cfs 0.00 0 671.00 0.00 0.00 - - 0.00 0.00 - - - 0.00 1.00 20,093 672.00 0.15 0.15 - - 0.00 0.00 - - - 0.15 2.00 41,970 673.00 0.23 0.22 - - 0.00 0.00 - - - 0.22 3.00 65,685 674.00 3.68 0.25 - - 3.33 0.00 - - - 3.58 4.00 91,300 675.00 9.77 0.27 - - 9.42 0.00 - - - 9.69 5.00 118,877 676.00 17.70 0.29 - - 17.30 0.00 - - - 17.59 6.00 148,465 677.00 26.00 0.29 - - 25.67 0.00 - - - 25.96 7.00 180,115 678.00 47.88 0.29 - - 33.46 14.13 - - - 47.88 Pond Report Hydraflow Hydrographs by.lntelisolve Tuesday, Jun 20 2006,_3:38 PM Pond No. 2 - Basin #2(WM) ' Pond Data Pond storage is based on known contour areas. Average end area method used. Stage I Storage Table stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 670.00 1.00 671.00 19,300 20,300 0 19,800 0 19,800 2.00 672.00 21,300 20,800 40,600 1 3.00 673.00 22,200 21,750 62,350 4.00 674.00 5.00 675.00 24,300 26,700 23,250 25,500 85,600 111,100 6.00 676.00 29,000 27,850 138,950 Culvert I Orifice Structures Weir Structures [A] [B] [C] [D] [A] [B] [C] [D] Rise (in) = 36.00 2.50 0.00 0.00 Crest Len (ft) = 3.00 12.00 0.00 0.00 Span (in) = 36.00 2.50 0.00 0.00 Crest El. (ft) = 672.00 675.00 0.00 0.00 No. Barrels = 1 1 0 0 Weir Coeff. = 3.33 3.33 0.00 0.00 Invert El. (ft) = 670.00 670.00 0.00 0.00 Weir Type = Rect Rect - - Length (ft) = 60.00 0.00 0.00 0.00 Multi-Stage = Yes Yes No No ' Slope (%) = 1.00 0.00 0.00 0.00 ' N-Value = .013 .013 .013 .000 ONE Coeff. = 0.60 0.60 0.60 0.00 ' Multistage = n/a Yes No No Exfiltration = 0 .000 in/hr (Contour) Tailwater Elev. = 0.00 ft Note: Culvert/Orifice outflows have been analyzed under inlet and outlet control. Stage / Storage I Discharge Table Stage Storage Elevation Clv A Civ B Clv C Clv D Wr A Wr B Wr C ft cuft ft cfs CfS cfs CfS CfS CfS CfS 0.00 0 670.00 0.00 0.00 - - 0.00 0.00 - 1.00 19,800 671.00 0.15 0.15 - - 0.00 0.00 - 2.00 40,600 672.00 0.23 0.22 - - 0.00 0.00 - 3.00 62,350 673.00 10.39 0.22 - - 9.99 0.00 - 4.00 85,600 674.00 27.64 0.21 - - 27.40 0.00 - 5.00 111,100 675.00 43.67 0.20 - - 43.47 0.00 - 6.00 138,950 676.00 68.99 0.10 - - 37.75 31.14 - 1 1 1 1 1 Wr D Ex£I Total CfS CfS CfS 0.00 0.15 0.22 10.21 - - 27.61 43.66 - - 68.99 BELMONT (LOWE'S) BELMONT, NC 7-Junes STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE I POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 9.5 AC X 18000F per AC- 17.1000F INCREMENTAL INCREMENTAL ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) 671 19,213.0 1 20,093.0 20,093.0 744.2 672 20,973.0 1 21,876.5 21,876.5 810.2 673 22,780.0 1 23,715.0 23,715.0 878.3 674 24,650.0 1 25,615.0 25,615.0 948.7 675 26,580.0 1 27,577.5 27,577.5 1,021.4 676 28,575.0 1 29,587.5 29,587.5 1,095.8 677 30,600.0 1 31,650.0 31,650.0 1,172.2 678 32,700.0 TOTAL VOLUME TOTAL VOLUME VOLUME (CF) VOLUME (CYD) 0.0 0.0 20,093.0 744.2 41,969.5 1,554.4 65,684.5 2,432.8 91,299.5 3,381.5 118,877.0 4,402.9 148,464.5 5,498.7 180,114.5 6,670.9 r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r r BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE II POND AT SOUTHWEST CORNER STORAGE AREA IS APPROXIMATELY 14.8 AC X 18000F per AC - 26,640CF INCREMENTAL INCREMENTAL ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) 671 19,213.0 1 20,093.0 20,093.0 744.2 672 20,973.0 1 21,876.5 21,876.5 810.2 673 22,780.0 1 23,715.0 23,715.0 878.3 674 24,650.0 1 25,615.0 25,615.0 948.7 675 26, 580.0 1 27,577.5 27,577.5 1,021.4 676 28,575.0 1 29,587.5 29,587.5 1,095.8 677 30,600.0 1 31,650.0 31,650.0 1,172.2 678 32,700.0 TOTAL VOLUME TOTAL VOLUME VOLUME (CF) VOLUME (CYD) 0.0 0.0 20,093.0 744.2 41,969.5 1,554.4 65,684.5 2,432.8 91,299.5 3,381.5 118,877.0 4,402.9 148,464.5 5,498.7 180,114.5 6,670.9 1 / 1 BELMONT (LOWE'S) 1 BELMONT, NC 1 1 7-Jun-06 1 STORM WATER POND VOLUME CALCULATIONS 1 EROSION CONTROL PHASE I POND AT SOUTHEAST CORNER 1 STORAGE AREA IS APPROXIMATELY 7.0 AC X 1800CF per AC a 12,600CF 1 - 1 INCREMENTAL INCREMENTAL TOTAL VOLUME TOTAL VOLUME 1 ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 670 9,050.0 0.0 0.0 1 1 9,625.0 9,625.0 356.5 671 10,200.0 9,625.0 356.5 1 1 10,850.0 10,850.0 401.9 1 672 11,500.0 20,475.0 758.3 1 12,100.0 12,100.0 448.1 1 673 12,700.0 32,575.0 1,206.5 1 1 13,350.0 13,350.0 494.4 674 14,000.0 45,925.0 1,700.9 1 1 14,750.0 14,750.0 546.3 1 675 15,500.0 60,675.0 2,247.2 1 16,250.0 16,250.0 601.9 1 676 17,000.0 76,925.0 2,849.1 1 r r r r r r r r r r r - r r BELMONT (LOWE'S) BELMONT, NC 7-Jun-06 STORM WATER POND VOLUME CALCULATIONS EROSION CONTROL PHASE Il POND AT SOUTHEAST CORNER STORAGE AREA IS APPROXIMATELY 16.0 AC (FROM WAL-MART SITE) X 18000F per AC v 28,8000F 1 r INCREMENTAL INCREMENTAL TOTAL VOLUME TOTAL VOLUME ELEVATION ELEV. DIFF. AREA (SF) AVG. AREA (SF) VOLUME (CF) VOLUME (CYD) VOLUME (CF) VOLUME (CYD) 670 19,300.0 0.0 0.0 1 19,800.0 19,800.0 733.3 671 20,300.0 19,800.0 733.3 r 1 20,800.0 20,800.0 770.4 r 672 21,300.0 40,600.0 1,503.7 1 21,750.0 21,750.0 805.6 r 673 22,200.0 62,350.0 2,309.3 r 1 23,250.0 23,250.0 861.1 674 24,300.0 85,600.0 3,170.4 r 1 25,500.0 25,500.0 944.4 r 675 26,700.0 111,100.0 4,114.8 1 27,850.0 27,850.0 1,031.5 r 676 29,000.0 138,950.0 5,146.3 r r r r r r 1 r r 1 r r r 1 1 1 1 1 1 Storm Sewer Summary Report Page 1 Line-- - Line ID-- - Flow-- - Line - Line -- Invert Invert -- Line - - HGL - HGL- Minor Dns No. rate size length EL Dn EL Up slope down up loss line (cfs) (in) (ft) (ft) (ft) N (ft) (ft) (ft) No. 1 Str E1 to 21 2.50 18 c 94.0 661.03 661.50 0.500 661.70 662.10 0.27 End 2 Str 21 to 22 2.65 18 c 151.1 661.60 662.35 0.496 662.38 662.97 0.34 1 3 Str 22 to 23 1.36 18 c 34.0 662.45 662.60 0.441 663.31 663.32 0.04 2 4 Str 1 to 2 35.48 36 c 76.0 672.66 673.04 0.500 674.56 675.03 1.18 End 5 Str 2 to 3 34.30 36 c 142.0 673.14 673.85 0.500 676.21 676.52 0.29 4 6 Str 3 to 4 31.94 36 c 154.0 673.95 674.72 0.500 676.81 677.03 0.51 5 7 Str 4 to 5 28.46 30 c 281.0 674.82 676.22 0.498 677.54* 678.89* 0.24 6 8 Str 5 to 6 29.09 30 c 213.0 676.32 677.39 0.502 679.13* 680.20* 0.68 7 9 Str 6 to 7 24.34 30 c 30.0 677.49 677.64 0.500 680.88* 680.99* 0.42 8 10 Str 7 to 8 19.68 30 c 70.0 677.74 678.09 0.500 681.41 * 681.57* 0.19 9 11 Str 8 to 9 20.18 30 c 164.0 678.19 679.01 0.500 681.76* 682.16* 0.29 10 12 Str 9 to 10 6.82 18 c 84.0 679.11 679.53 0.500 682.44* 682.80* 0.23 11 13 Str 9 to 11 6.82 18 c 74.0 679.11 679.48 0.500 682.44* 682.76* 0.23 11 14 Str 1 to 2 49.52 36 c 76.0 672.66 673.04 0.500 674.90 675.63 1.00 End 15 Str 2 to 12 48.38 36 c 152.0 680.55 681.30 0.493 683.11 683.86 0.40 14 16 Str 12 to 13 48.54 36 c 41.0 681.40 681.60 0.488 684.26 684.44 0.54 15 17 Str 13 to 14 39.06 36 c 183.0 681.70 682.65 0.519 684.97 685.55 0.24 16 18 Str 14 to 14A 30.02 30 c 52.0 682.75 683.00 0.481 685.80* 686.07* 0.58 17 19 Str 14A to 15 22.86 30 c 100.0 683.10 683.55 0.450 686.66* 686.97* 0.17 18 20 Str 15 to 16 16.22 24 c 168.0 683.65 684.40 0.446 687.13* 688.00* 0.62 19 21 Str 16 to 17 6.30 24 c 276.0 684.50 685.85 0.489 688.62* 688.84* 0.03 20 22 Str 17 to 18 4.09 18 c 100.0 685.95 686.45 0.500 688.87* 689.02* 0.08 21 23 Str 14A to 14B 8.52 18 c 14.0 685.93 686.00 0.500 687.43 687.50 0.36 18 Project File: belmont pipe file -backup.stm Number of lines: 23 Run Date: 06-20-2006 NOTES: c = circular, e = elliptical; b = box; Return period = 10 Yrs.; * Indicates surcharge condition. Hydraflow Storm Sewers 2003 L CL 1 Q 1 0 3 1 co E 0 Co 0 L C N N M - N J w O O N M V to CD n cD o) - . - N . ?- o o O O o _ ? . -. 0 0 0 0 0 o w o 0 o w o Q to C, W N N N M M CD n 0 D1 T N .2 O w L L L a CA fA fn fA fn (n fA fA to (n l'q ? fn fA N In fA to (n to (A N O W o Cl Cl 0 0 0 o O Cl to o 0 O o 0 0 0 0 0 0 m O O O to to to M M to n O to N to M co N E C 0) co to O 0) to O co to n co e} 0 m N N ° ° O t0 tD (D to co co co rn co co co 00 00 co co (D O O CD O O p (D tD O O O O to to to co W co co CD tD co co CD co O to to O O O O O to to O Lo O O O O to a O O O O O 4 C Y N tt) O to n v N n O O <t n to q Iq to to -? L1 - - r- C , 0 - O - 0 m Cl) M M M M M M Cl) Cl) Cl) M Cl) Cl M M M Cl) M M M Cl) Z C O O O O O O O O O O O O O O O O O O O O O > V C d O C t:i O C O O O C O C O C O O O C O O Cl) N m m tli a C. .. L L L L L L L L L h L L L L .. L L L L L C o J? U U U U U U v v v U U U U v U U U v U U U w 0 to Q a m C N C a E Z IL J •N :.. co - co co CD co to O O O O O co 00 co to to co O O v 'r 7 . r M M M M M M Co cn M M M M M M N N Z C, 0 to O v to N N 0) ee{? O M 0 V O O to O to Cl to > Lq M tD O c0 n N M tD O O O d' O M O O O to lo' O 5 W" cD C to o to tD M n M n tt n CO n n n n n OC7 n CA n N n to n M n ° ao N co co 0 co 0 ? co co (D tD CD CD CD CD tD CD O O (D 0 w 0 tD 0 0 0 0 o to m m f o 0 0 0 0 0 0 0 0 0 0 0 0 o a 0) N 0 to 0 m c o e to 0 to Lq 0 to 0 a W? to to U? to ? v to v v v It J U) •' O 0 O 0 O 0 0 O 0 O C O O 0 a O 0 0 O O O 'C C Cl) O to co to N N to at O .- to to O O to O to O in O tD v to '- rn co Cl) v n .- co to v 1, n .- co to 5W to to tV co V n M n M n 'cf n CD n n OD A O N O o o N M M 4 to co CD to (D co co n (D n tD n co n CD n to n co n tD co 0 a to c (D co CD co co co tD 00 to m m c £ E 0 0 0 0 0 0 0 0 0 0 0. o 0 0 0 0 0 0 0 0 0 .. r. 0 0 co (0 0 w 0 0 0 o 0 0 co 0 0 0 cc o to co co c V o m 0 0 o w o 0 O o w o w 0 0 0 co o co co co c o o o 0 m 0 m 0 m 0 CD 0 CD 0 0 0 0) 0 rn 0 o 0 CD 0 C) 0 rn 0 rn 0 o 0 rn 0 0 o O d 0 o CD rn G ? 0 0 °? ca 13- 0 0 0 0 0 0 o to M o 0 0 0 0 0 to to o a 0 to LL cc O N N M to n 0 n n O O O O M O r to O n M D t0 v O C O C C C C O C CO .- O 0 r .- O .- C C >+ C7 O o O 0 O 0 o O O o O O O O O O O O O O O O O O Y y 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 d o o c o 0 0 0 0 o c o 0 o 0 0 0 0 0 0 0 a a a a a a o z D D D M M .0 a a a a o 0 0 0 0 0 = o o = 0 0 0 0 = o o = E E E U U U U U U 2 U U 2 U U U U 2 U U 2 U U U ° o) o o ° o 0 0 ° tO o ° o o v E m m c O 0 O to to to C o m N Lo o O o O O O N CO C O 10 .V... 9 O N O ? r ? tt') M i N t1 Ci M O C C W ? 2 m a ? w w m ^ O ?- O O o N 0 , : 0 0 O O 0 O O O 0 O 0 O 0 0 o n c C C V to .a. O d' a to M O O to q V' /? to N to r 6 M N O O 6?/? 0 to n t1 J d M M n - r N N M n - o n n . er W to .- N O E +, c v W C - v a W 0 = v Lo CD r- CO 0) N m C Z . N V to O n co CA ° . W ui LL m ) C C r r r r M N .z r N M t} to O n O O .- - N a S 0- m S m C r ? J T' O co ? o N r cA tq N co W o a $ C R (D O fD co c C Y °o o , Q .- .' d _M M Z 1a C O O > ... C O Cl) N c a m 6i aa) 0 JZ? U U 0 c t m C N C a? E L co co m Z O LO O 4D >> CW.. co ccoo CD CD d C O F Iq ? J H c o V 3 >O ? ? co co o W c o c o to (D D d C SEE o 0 co w r- t: r. °c0V co co ? ? v 0 0 O 3 0 LL E C) O Cl N O R- o C C cy V O O Y .. 0 0 d CL a U S N r+ O. C E m ? d ? U c mi D co v o cl ui °D a o Q t w c c iF O O d J O O I CL C O E w ar-6 C CO N a O Z N L l O J Z N N ` a S N m O N N v` T r a r r r r r r r r r r? r,0 rw r? r? rL r3 r cn r? ro r ? c n r N N r r r n N O r N r O e - tU O O O N M v t0 t0 n w O r N 0 w 2 _ w O O - O - O O O O- -.O - . O - O O - O . . - . Q - J W N N r N M t0 O n o m O r N N M r i tp Co ? ? ? ? co U) V) (? U) V) U) U) U) . ". V) U) U) U) . . f/) . . f!) .. . U) U) U) cn U) cn U) CD N > O O O O O O O O LO O O O O O O O O N d C O O t0 0 t0 LO t0 t0 M t0 t0 t0 N t0 t0 M LO I1) C N o co 00 m W o to Co t` o 0 0 0 cV tV O (D O co co co a) co co co co 00 w O Of m O to CO C O co CO co co co tD CO (O o to w co co t0 CO o ? fc O O O O O O O O O LO O LO O O O O O O O O O Q O O O 40 t0 t0 t0 t0 t0 M t0 h CO U? N Ut U0 M t0 co C C O) co to M m O) o co to r- co V' o a) N fV O O C7 to co co 00 co w m co co co co co co co O O Of O O m co co co to to CO co to to co co co co to to w co t0 t0 0 co ^ O h CO M CD t0 N w '0' t0 M w w fD h ?{ t? ' O r O n O 0 M N > C ? + M ` r s} cr O r N m w CO r (O d o N M Co o r o o O N N ?! M o co M (o co c0 L ( to co to co to n co n O n co n co n O o to C t0 w CD co co to O n co co CD co c co co Cp 00 co co co co CO co CO J 0 O n N M N M m O m n W O co M CD v t0 n n O = Q r O M O O O OR N O t0 r w F? c0 w .0: m q O O N N Cl) t0 co n co o O N N N U') M v t0 co to co co co to to n n n n co co co co co w n co w co co co co co co co w w w CD co CD O CD to to to to co O co CD CO co CD M N Cl) O t0 w v t0 N N m V• m r r co to O O LO O LO O rn C O CD `ct O r O w M q: I? r r r t0 0 V r r cD m to d C o m fV N M M st to Ih n CO CA o N o o o N M CM st c W t m CO m co n co n tD n co n to n co n 0 n co n 0 n (O n co n CD co w a w c co co co co CO co w co t0 p ? d 41 O LO O v t0 N N O v m M co v a O LO O 0 O t0 m C Q M tD O w t,: N M O O O t0 O M tD to O t0 a w E N N M Cl) v co n I: c0 m m m m c N M M v LO CO co co n n n n n n n n n n n o ao w w w co co Z 0 W O W 0 c0 W O t0 O 0 m c0 tD tD CO CO CO CO CO CO Q O O V• O O O O O O O Cl Cl O O C) O N w LO t0 m p o t0 t0 d' t0 t0 t0 UO WO t0 t0 t0 UO i0 U) c0 v: V' sf G o C C C O C O O C o 0 0 0 0 o O o 0 o O O •a N v co co co co to to O O O O O co co co co co co O O et r r r M M M M M M M M r r M M M M M M M M M M N N N N to O N v a M to r O w O M O t0 N 0 0 t0 M M O O w O m O r w w r t0 O t0 r CO r O ' M M I,. in LO LO to v 7 V M Cl) co I,. r- to w v tci N CL CO O O 0 n O O O co t0 co t0 V r N = m y M O v n m r r r m O O O O M 'Q M a r co t0 O V to r w U w v v t? I? I? co Di of Di Di ? r; o co cti w n ui 6 n n tO v v ? N N N N N I ? v v v ? N N ^ co O at tD m It co co N co CD N co N y C. t0 co v M O v q M t0 r N N LO M in O O co N O 0 0 0 ?V to co M LO v M m v rn o w w D) c0 c0 tT o N o M I-' . .. N N M M M N N N N to Co v v V M M N r to C _ 2 C v co O O r M 0 co cO n m O O w q O O r r N w .. 1 . 0 cD n tp to O co O 6 t0 to n th tri t0 td c0 O O CO CO } O •' C ' T E v n o c u? m r v to o v o 0 0 0 o m ? o n II N ri co to ni o o r; n cc to co D) tri o co 0 0 °-' ? 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 v 5 co co co 0 o Co o to to o 0 0 Co (o o Co Co c co co w . E M M N 0 0 N N 0 n N N M a) O 0 0 d' t D V ' ' 7 q f O X X IV F O o C 0 M in v v m N N C C co co co co v m N O r Q O O O O m O O s}' v O 0 co co O O N N O M n o C O N N N v tD O n n O O O O N O n to O to M O O O C C O O C O C C C O O O r r C r r C 0 O w co w w w O w co O co co co co O co co O co co co E N M O O m m O m m O m m O m m m O O O O O m m D> = U O C O O O O C C C C C C C G O C O C O C O t m N E V O O O O O O O O O O O O O LO Ln O O O O LO M N O t` N 4 t0 n O O O O o M M t0 O OR tD m N N Q 1" C o C to O tc') er V' M M m r r co CO co w W) M N o tP C to d ? V V O O O O O O O tc') t0 O O O O O O to to O to O LO 'p• m C f`0 O N N M 0 h O n n O O O O Cl) O I? to O f- M O d 6 O O O O C O C C O C r C r G C n E 1 1 LO N O• C) 0 CD 0 d O O . O O O O O fV ? M O o o m .2:- J LO It co It LO N t:7 O c0 co sT o t0 _ w N O tD n a M n N M n w n n v r t0 N ? C N C C C U- C C O O H W r N W v t0 w n co O C W - - - - - - N y 6 .? J O r r d W a O N r ' r r ? r r co m N z J r N M V O tO n w m r . -- N 0 O N v 2 m r p ao 0 m + + o J n cam.. r co ° fn cA Cl N CD M O co d W p 0 ? co E co m ui ca o O O c CL Iq Lq CM c co co D: c ,?+ CR v 4 p co co w ° co J C7 N O 2 a o W? 0) t.- 0 c0 co Cl) N > c 41 M O O N C m p Lc) LO co co = W CO CD O t: d LO O C CL F ll? O co CD :3 co co z a1 O e LO to 0 N o c a d N C N _ CO CD > N (14 M N V I C t CL= m 'u v v r r c0 o Lq I- v co c o .. c T E ° n U) c o 0 o o a o m E V 40'1 N a? 10 O d n Q V m Cl) o < C - O O " C ` co co E H c 1 C (? ? o 0 0 c o + ? m E v p ° N a c C c O a1 Q F- . C y. c O N C. p `u V c (DD N a rn o o o n E u c J ° ° O v y N C N O Q1 _ LL C .2 ~ J N O W O N d c N C Z J N 0 N 0 c v` 2 CL a) C O O O o m Z o N 0 v O m n w m O 0 -- -- - N a O O O C l O O O O O O O O O O O O O O O O O c o- - o_ -o -- o o- - -o -o- - -o o. - _o_ o 0 0 _ o . o. __o 0 0 0 - . o- 0 fV N N N N N CD (V N o N N N N o N N o N CV N N (D O O p N O N N co co O v v O r co O pl? O of r v CO O C C O M M r- n O v v O r- CD (f> c., i O O ui Cn n N H rM o 0 0 (o 0 M o C) r o r r o - r O •'C.. tt) M O w (A O to co n v at a O M w c, w N N O N N Cl) O M M O v tt v N O to N O v to N M 0 • O O o c; O O O O O O O o O O O O O O O O O O 0 C 7 W n P r . •- M N M N M f O n r O O at a O r M O O st O O M Q O n `•? O -- ? M O O ? D O o o O lp M O O (f) 7 N . r r C ( t .- r r r r r p N N n tD N O co M O n O O to O (A O M 0 0 '- N M O M M O V V, tt O co LO O -' Lo .- N • 0 i O O O O O O O O O C O O O O O O O O O O O Q M M M M M M M M M M M M M M M M M M M M M M C O O O _ O _ O _ O O O O _ O O _ O O O O O O _ O _ O O _ O _ O M O O C O O C O o 0 0 0 0 0 0 0 0 0 0 0 0 0 o N O O O O O O O O O O O O O O O O O O O O O O N >< O O O O O O O O M C- O O O O C,) Cn O C 7 O O O O O O O O O (7 i 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 O N 0 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 o a o a co o_ 112 o_ _o o_ o o_ o_ o_ o_ E Cy 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 :3 z 0 O o 0 0 0 o O Cl 0 0 o O o 0 0 0 0 0 0 Cl Cl 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Y ` N N CN N CV N CV (V N cV (V N CV (V fV CV N N N CV CV N ? ? pQQ a Q 07 m 0) 01 CD CT O tm cm CA CA O a CT CT 0) m O CT 0) Df 0) y f f f f f f f ( ? U) N n n U) U) n n co U) V) n n n w w 0 w w w n 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 O 0 o 0 O 0 o 0 0 0 o 0 a 0 o 0 O 0 o 0 0 0 0 0 o 0 O 0 o 0 a.+ (V CV CV CN N N N N N N N N N N N N N N N CV CV (V N O C r- J O O O O O O O Cl O O O O O O o O O O O O Cl O O O O O Cl O O r O C O O O O O O O O O O O O O O 0 it -i 4 .4 4 - O y Q 0 0 0 0 0 Cl O O o o O O Cl o O o 0 0 0 0 Cl O a ?.. O o 0 Cl 0 0 0 o a o 0 0 0 0 o O O o 0 0 0 o c E (v M M M ri M M M M M M M M M M M M M M M M M M $ w ? m a? O o 0 0 0 0 0 0 0 0 0 0 0 0 o O o 0 0 o O O U m .? 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 o O o - c ' v v er v v v v v v v v v of v v v v v v sf v v o ao n a E 0 0 0 0 0 0 0 0 o O o 0 0 0 0 0 0 0 0 0 0 0 m < V = t : (o 0 cC 0 0 ro 0 to co (o 0 0 0 0 0 co co co (D co co co C? y M c a a a a a a a a a .0 a a a a a a a a LL r d a E E E E E E = E E = E E E E = E E = E E E E LL + ?` 0 U 0 U 0 U 0 U 0 U 0 U 2 0 U 0 U 2 0 U 0 U 0 U 0 U 2 0 U 0 U 2 0 U 0 U 0 U 0 U 0 CL H C7 o 0 0 0 0 0 0 0 0 0 0 0 0 0 o Cl o 0 0 0 0 o d a v o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o Cl o 0 0 0 o 0 o 0 o 0 0 0 0 0 0 CL W O CD CD O I- O ?•- O N N N LO O 0 LO O V cOD O O W v O O h O O CO co co O O - 0 O m M O N O ?-- N M v o o (ci o o (D (d CV O o n CV v n 0 0 0 0 0 0 0 0 0 0 0 0 o O CD O o 0 0 0 0 0 E II N C7 v O O O O O O O O O O O O O O O O O O O O O O w 0 O 0 0 0 O C O 0 O O O 0 0 0 0 O O 0 0 0 o 0 rL C N l c II Q N O CD co O n O ?-- O N N N 0 O C ) 0 O at (0n O O (p CY () r V O r) c'7 O •V n q .•- .- ' O o ao o q O 0 O o M O o r N M v 0 0 (C i o CD CD CD CV o o h .- N It m o ja o a u • n a? O 0 E d z c a ? ui c LL ? U C i ? W O j Z r N M V' o (D n O O O r - N - M - V r ? 0 n e- o - O - O N N N N d z M 0 N `w N co 2 0 N l9 a r 1 1 O/? 1 CL / N / W T C O co m_Z CL -0 .5-- o -- c - - v m Cl .? O N y 2 .-. C O N C y v O O 40 O N 00 O 0 7 cl: N .. O p• $ O .i O M C O Cl) C N a. d _ C07 iii C (; O O m 3 ° a E N ° d CD Z CD 0 c Y .. CV rn N c_ p N N a r_ } w+ fV O O C J 0 WO II LL. 0 0 M CL E O N 7 U` ? d J ? O C' 0 a E c V y C v O m < o Qj M CL U. u ?` = d 0 o N c d o 0 ? O N ? 0 Vr co r- 11 'v ° d ? o in ? 0 O = d C Y _ n Q LQ u -9 co CY co 0 0 ° a n rn G c E m 7 d y Z y c LL N O ° ` W O j Z N a z 0 N o -- N 0 S 1 ? / o a 1 1 1 = 1.0 Q. E 0 0 1 1C ¦_ IJ 110 Ii 1(' IrC? IL 1= I C y n v W Q) V• W N O O) M M O O v w n N M _ N O N CA N CD V r N N N O V: Cn N CC') r CO O O - O C C r a O O O O O O C O r O O O O C O O (D J iu " Y t() V O ? O O t O O U) ' Lf) O LO O O O O to O O O O O O . ..'O_.. - ?! ` . -- C . - p r - O r - n O r. V C N r. r .. n- O r r O r O r r It C n C Cn C O. to C W. r . to C W T O) y _ O CO V N W n V N n 01 W 01 M r In V O CV V y c C N CO N O W M CO M W M M n O O r CD r O) M LO M M V n 00 r CO to P- N M CO W N p N . 0 W- C Z c o c c o 0 o c c O o 0 o c o c c to m t V " N O Co O W O O O O N M N O N N N co M W N CO r to W o U e C0 V' M O V) W N M N W v O CO CO M M N V N N V N V Co LO O V CO v N M M LO M Lc) n O f a : is o C C O O C O O O O O O O C O O O O 6 C C Q G 0) v co co LO N M N O N N N W M CO CO r CO W O w co a) n co M W co O In Cl) V N N O O tt') O Cl) n (/) e V V O N N V' M M N N V W M W M to O C7 C O O O 0 O O C O O O O O O G 0 0 O C 0 -J> N O CD N V M N CO n N N M 0) S V O V W O - o (D 0) M N M W 0) V V n M W V- O O n N O W M W F W -y N M Cl) to co m O N M N CO V tD tD tD h M 00 CO W W n n n n co W W co co CD n co co N co co co W W W W W CD tD t0 W CD W W W (0 CO W CO CD W (D CD tD d V ?_ Ctv' N N M N W n ? N V• N CO W CO W M W N W N M N M N Q) W co CO n W v W o W O O O O O O O O O O O O O O O O O O O O O O M N d N W M M N co co O M W o r co W M M o w N to (D o W E > n W (a r r o rn rn ' .- ' W W W r (q r G t0 M Cl) r n CA 0 tt'i 0 V V V M M r` N N W W V Lo N n a) V W LO Cl) n n O N N O V V N Q r co (0 W m W W W W 01 W Q7 1` r` v v CD O O Q) r r 6 6 o v 0 tri v v v v v (? co co n v v vi M E Z CL O N N 0) n O O O o o O O M W l O O O O O d co co n rn t0 M u) U') LO CO LO (O Cn to C0 c 0) CO to O O O O O O r CV N N N N CV N r r CV CV N tV N N fV N J> O n N M N M 0) O a) n CD O CD M to v CO n n O v UC d r O M O CO O W N CA CO r W n CD W V' CO O 0) O W = y CV N M tt'i CD t'- co O O CV CV N LO M V' LO (D M CO CO co W 0 n n n n co c0 OD co co W n W W co W W co co CD to CD co co W CO CO CO W CO co co (0 CD co W 0 (D CD W O CO O V CO N N 0) V• W M CO V' O O CO O CO O CO y> 1 Cn M t0 O W r N M CO O O CO V_ O M CO CO o CO tt W > 4 N N M M V' 0 r- n 00 M M C) CM N M M V' LO c d Co CD co n n n n n n n n n n n ao 00 W co co W co - CD W co W W W O co (D W to Co to Co Co CD CO CD CD CD CD d O V CO O V O co N I 0 M O O O O V. O O O N O M p N a co (D J a) M n T c N N M n co v CO V n co n CO V W CO O r to n N W CO N V (O a) N Cl) N O N N N co M m M W r to 00 Cn e M M N N . M CO CD N 0) W V O CO CO M Cl) N v N N V: N ll? CD (0 0) V CO V M CO M t!') n O O O O O O O O O O O Cl O O O O C O O O O O J> n v v W V co co n (0 N W W O 0) N CO W m CO W 0 2 F W CO M V CO r O W N (D O (D CD O 0) O V M 0) CO W . W d N M LO (D t: M M o N N N (D M C[) M (D (D P, 00 CO CD co (D CD co n co n CO n W n 0 n W O (D W CD co CD 00 (D co W n co co (D W (D co CO co W co CO co CD co CD d t0 n M M O W co n M M l) N (O CO CO W M U, W M M 0) 00 W n W C V W _ r O r C C O O C O O O O N C N O N C N C r r W C n C v O O C. M O V: O O O y N co CD 0) N CO 0) O Cl) W r CO W V M O) M N W n O E > N W N tO W CO W rn a) O r W W n tO 0) CO r W ' r -6 c0 v Cl) N r V v to LO V V v m Cl) Go rn co tD CD V LO N N o i CS co M CO N n CO a rn rn rn n n n N V N rn rn V V E y C a n 0) o n o a) ) rn N n (D v a1 o c o c r v r: 0 v v v v v r tt•i (D t0 r,4 v v M M = CL o n CD co n W W o o W o o a o 0 0 o rv to co o o 0 0 o v d O O C O rn o M W CV (D CV (n CV (o fV to CV Lq N (n t0 N CV 9 N W CV 0 M 0 N 9 CV 0 CV 0 N J> O co CO D V M W CO V• V O r W n O W M N iA U ^ 1 M M CO N O CO r W n V V 0) r N 0) W CO r W _ (o N co CM W V n CD n CD n P- n Oi n O co ao 0o N W CV co V' n M co V' W V W LO co (D W n co CO co (D (D W W co to co (D (D co (D W (D CD CO W W co to CD to cc •D a O E > M O W W V W N N O V O r r CO W O O W O CO O N 7 6 O CD V N (D r M O M co M D 'V: n ` r 6 r i r f CO N CO O V: n V .- M to M Cn ZE ca cn 6 c " (o W W N n n n V n ( n n n t n C n a n o n n co co co f co W C co t - co (D co co W W W W (D W co (D co co W W W W W W a a L O CO to co o V W O) W W N W e? W N W N C N CY w Lo co r V M ' 0) V O CO r N co N c LO M CO O O c0 N O M O v . tri V co of v a) O 4 6 c0 w of O CV m E f0 N N r M M M N N N N to co V V V M M N CD N m O N C Z N co co co co to to O O O O O co co co CO co W O O U r r M M M M M M M M r M M M M M M N N - v f/1 W C F O J ?-' N M V CO CO N W d) o r - - r - - o - W O O N N 0. Z CN 0 S I • N m a Y .O ¦ E O W W L V 075 L T\ T C N co to O co 2 O O -- J y o O -r 0 - - Y -o- -o - -- - - - - -- - 0 .= co cm _ cm 0 C C N N - O N f o c ip W t U, Quo N co o ui f6 0 o D c w N N (n o "' O O J > W (D of n cco cODo d F co m C C M N y N N M O N C N v O CL Q U a r- r- a`) m E w z a ° ui Iq D J > N Cp 2 0- m co (O (D LO O C d O O O C co - co co O N o 04 CO O O O O J > LU! w co r` co co CD M >L SV Go O M O O y (? N N C7 CO V N t0 f ?t C r N a v N o r d (Lq I ? r r E C J > C^O 'It N _ co fl- co 7 S co to w 0 CD E d a) .. > O Cl) W W LO W) S N C a) - CO co O (o d m n L n. C? '? (D N o tf) p E "O v co 4) m € O N C Z CO zr_l CO a0 LL W m C Cl) d J 04 n. 0 z N 0 N i5 .? 4 ,..??4C °y. .??,] Sr l?•.4-y?'?•. '?•a>ti q ?kiy`. :.CfB-F '...,'.t..••• Lam, ,. _? .r ? b .a- ^ ra,'.5'- tlf`t+i S?.• B61 nu .? 209College do CE ...... A y t• jet .c=_.? t . ; ~:-?`Y. F--'T aa« r. 1 ? ;?X . ?• - •CfB= - ;. ,yep,,. a; ?.? ? ? ,u r Sacre eart =s B";.Y. -? ?Co lege 2525 I - - Cf O7 / 1 ??AL? /'?? /ooa? 1 1 10 000 Feet 1 2 3 Kilometers 1 SOIL MOP I - 1 1 I 1 1 U1, v f E ?" C# ,BI'OVN 14 1 • 11 1 , 1 -i r 1?`II ? r ?Ay11 / I \ \ u` 111 c 1,?,,1??T11\III %A'l 1 JI ,?1" , ?. 1 tl 11 i 1IIIIj INTERSTATE 85 ? - VARIABLE W! ROJECT If 81671202) INTERSTATE 85 (VARI WIDTH R/M 4 2-1 7 I ', , i WAL-MART PERCENTER \\ ? 1 mot, 1 44'`1` ??? R R i _•) /// -? /}` IAIUIIQ? .T. iii _, /?)l?l?A• ?'•:??"?.: ?I ? I -11 ;I?Iyi \ ` 1`\• \ ?` 1 1 I 1 M, i 1 1 `0A1),\<`??? Ate/ `tl ( 1)I I? ?'?II?I 11 ?i 1? 1?- aAV ???.? y _?. <" ?E.` ?. -?. ?__? ?•?? ?. ate- _ ?«,%e of Z? WILKINSON BOULEVARD - U.S. 29-74 `, " '•?? ??' VARIABLE WIDTH RIGHT-UgWAY SPEED LIMIT 45 MPH-ASPHALT IN rq OD CONDITION v. yE STN R- :r w HAWLEY AVENUE REVISIONS DATE DESCRIPTION I P m 0 '0 m ` P Uc? Q>D c . . _ Q c ?/ - - - a m? _- N `Iw0 _m m09 W (D t \ LOWE7 ROME CENTER! NG XWT 711 EAST, FASTLpCI( M WI.I?S•ORO NC L/f1 33..6W..4000M 33SfHS3257(F) W a O { rlr Il • I ? II I Z e m L o tt 0 1, u I U m Z a ?z (D Oz Z co 0 j M _ 0 m m a a •.. 1 f ORIGINAL ISSUE DATE:Il. 1?r PERMIT SET ISSUE DATE: i •;'J?' \' CONSTRUCTION SEr r• \` ISSUE DATE DRAWING NUMBER C 6C 120 SP-5 SCALE- f 60 ' 1 1 1 1 r "*• '?? =>„ate ...? AL., 1? e1 ''I 'i ?:?I , 1 REVISIONS I INTERSTATE 85 VARIABLE WIDTH RIGHT-CF-WAY (NC DCT PROJECT d 81671202) ??`' INTERSTATE 85 NARI WIDTH R/W) »,,.? ,ate ,;,?, ??,;;;; ?;;, . . , ? - -'r'te ? ?t? Ac-, 1 ... ra ? - WAL-MART SUPERCENTER \ m \ 0 ? ? C P `clN __ LET ? -- ___ _ 00 'Z; 0 w ?1? m0a) C, a) X16 \ •l _. ?IJ / d1 1 s, t 3? ? (I 1 ` .? ? _ \\( .,_ ?\(Z ? 1 \ ?,/y %) ? ? I r I I 11 ? Il r?r oM PWT7 EAST. EAST COCK I Itt ;A ?\,'., ,Q?Q! , ti' ?, `' ` ? _ ? N. WILIOISBORO, NC x8.55E.M1 M 33&WS.3257(F) 999 _ 1 k? 0 •`l \? \? _ 1?1\11 'r/ I I -way a?wn? •-m 11+1 _i? /, l A' !? ??I?? 1?( •? i .'?Illlul?•'?11?111tQ -I`1 1..... AP ' ?•. '. ? • _ •'', ? • III E 55 . c I, A a - r. I \ ?, - -% \ W - ------------------ Q' ?$ 11 `3 ru Cr ? I? I I I Z a y NtIt to a..," o - - - En ? a H z WILK;NSON BOULEVARD - U.S. 29-74 W VARIABLE M WIDTH RIGHT-C7 ed` I s?` ?,(?. Q W O z SPEED uMli 45 M1S MPH-ASPHALT IN OD CONDITION ?FJ 29 ?U? CCCC O W ICE WIDTH o W w g HAWLEY - - - ORIGINAL ISSUE r r PERMIT SET ISSUE DATE CONSTRUCTION SET ' ISSUE OATS - DRAWING NUMBER: 0 60 12C SP-5 `' scaLe eo ?0F WATF?Q Michael F. Easley, Governor ?G? G William G. Ross Jr., Secretary 64 North Carolina Department of Environment and Natural Resources ? -i J Alan W. Klimek, P.E. Director Division of Water Quality June 29, 2006 EXPRESS REVIEW ACCEPTANCE LETTER Lowe's Home Centers, Inc. Attn: Nicky R. Wagoner REEC Dock 1605 Curtis Bridge Road Wilkesboro, NC 28697 Subject Property: Lowe's-Belmont, NC Gaston County On June 28, 2006, the Wetlands/401 Unit of the Division of Water Quality received a Fax/email request from Todd Simmons of Freeland and Kauffman, Inc., regarding a project known as "Lowe's-Belmont, NC" for acceptance into the Express Review Program. This letter advises you that your project will be accepted into the Express Review Program once the following items are received: a. The application fee of $2,000.00 made payable to the North Carolina Division of Water Quality; b. Three (3) complete and collated copies of the Express Review Stormwater Management Plan Application rhttp://h2o.enr.state.nc.uslncwetlands/documents/Exp Rev SWMA.pdfl; c. Three (3) copies of all supporting information pertaining to this project (site development plans, stormwater management plans, worksheets, etc.); d. One (1) original and two (2) copies of an Operation & Maintenance Agreement for the stormwater management facilities. Details of the Express Review Program requirements can be found at: http://h2o.enr.state.ne.us/ncwetlands/express review.htm. Thank you for your attention to this matter. Please note that we cannot accept your application package until July S, 2006 due to a lack of staff availability. The clock for this project will not start until receipt of the completed application package and required fee are received. Please contact Cynthia Van Der Wiele at 919.715.3473 with any questions. Sincerely, U Gee hJ a,A?,Cyndi B. Karoly, Manager 401 Oversite/ Express Review Program CBK/asc cc: Alan Johnson, DWQ Mooresville Regional Office File copy Central Files Todd Simmons, Freeland and Kauffman, Inc., 209 West Stone Avenue, Greenville, SC 29609 N?o°?0t hCarolina 401401 Oversight/ Express Review Permitting Unit ?/Vllflltll??t, 1650 Mail Service Center, Raleigh, North Carolina 27699-1650 2321 Crabtree Boulevard, Suite 250, Raleigh, North Carolina 27604 Phone: 919-733-1786 /FAX 919-733-6893 / Internet: http;%%h2u_cnrstate nc_i sinw:ctlands An Equal Opportunity/Affirmative Action Employer- 50% Recycled/10% Post Consumer Paper 3• Lp -- t o i INITIAL INTEREST IN PARTICIPATION IN THE EXPRESS REVIEW PROGRAM WITHIN THE 401 OVERSITE/EXPRESS PERMITTING UNIT September 1, 2004 Version 3 Applicant Name: LouE-S t WKE+?T£-?-5, (sc-. Applicant Address: 'f V-C Doc-y_ k (po 5 1& L\oc,E. Rogo ??,?.t..?c?r'3on-off IS+L Z8lo91 Applicant's phone number: 3'3la- Ce SS - 444#1 Fax number. Applicant's email address: t-L?L?,y. Iz..4?ALeNFJt. L.o..?Eb.?o«1 Consultant Name (if applicable): Consultant address (if applicable): Zcq l? • Vs r, poi; Gxztr-c «-c SL z9 09 Consultant's phone number: f?(c4 • (0-112.- 34-Z? L. Fax number. g(p ?' Z•"33 - '89 15- Consultant's email address: _S% 0% v c. Co +-? Type of action requested under the Express Review Program (check all that apply): ? 401 Water Quality Certification ? Stream Origin Determination ? Isolated Wetland Permit # of Determinations Requested ? Riparian Buffer Approval ? Intermittent/Perennial Determination Stormwater Management Plan Zk--• # of Determinations Requested ? Mitigation Plan ? Stream ? Wetland ? Buffers (check all appropriate) Name of Project: tx t S - ?ow?T 14c County: G?STC?.t Total project acreage: 15.19 (acres) Total built out impervious area:- ?, o \ (acres) Nearest named stream (from USGS topo map): _ uA'Cw?a,4 RwE ?t Please provide a brief description of this project (attach site plan if available): _ ???iT+Crc,.'ctn?? D? A L+oc.,?tzS ?e??E ? ?1L. M+4 i?ScC?l4TEQ 'PA2?tuG? ??`S butte Ef. lv AODcnaN% 't-kNZ uAt` r\i?.2T 'mu,%w?rFuL ors,0 LZ.1Q 04 W11) l5 t e?Pob£p 'ire f3E- t-?o0 C??? 'tv Cc•A spa c.h 6WA arF 714E L> w E ?S g2` Please attach a map of site location using USGS 1:24,000 map and county soil survey. i Location of project site - please include reference to the county, nearest name town and highway number: j a*XFA-'T LS L r-pr ck w1tT?c+J TNF 1'ec.?s? Q? 5E--L*ie,a'T tkJ 6Rb-(%*S CbUQ CS4 NC ?T ?S L?u+t1? renr+•?.E?z 't?+ a ?? rt?F-T 5?,a6it.+cLa'?fL C?.?oc?. ca??sra??e.s) ? ors Cj,l.D?.?ets- V#.2#- KDAD -I,*- -6,.Tr- tS Tubes NOiZTK bF OtL?cIti .+ tI-ta.%to 6£tu1E5N Proposed impacts: e. ?-tNtJ 4>r. Acres of 404 wetlands: Acres of isolated wetlands: _ Linear feet of streams: IBC Linear feet of isolated streams: Square feet of protected stream buffers: Has consultant or applicant attended any DWQ-sponsored training sessions in the past two years? If so, please list which ones. Oo Has any DWQ staff visited the site? 00 - if yes, please provide DWQ staff name, and date of visit: Which other environmental permits from other agencies will be needed for this project? Please list the permits and issuing agencies below: ci?E•+`I' ? Ea,?.o? ?Q ova` - C?.zo? ?i,.??y Does this project require approval under the State Environmental Policy Act or National Environmental Policy Act? 00 Is this project an After-the-fact application or has this project received a previous Notice of Violation from DWQ? Does this project require approval of a Variance from the NC Environmental Management Commission? NO Are you aware of any local controversy concerning this project? If so, please describe the controversy and any measures that have been taken with respect to public involvement. Pr:. oPPoS.'Roa P?T %ArC .O-%OCaS Fo1? S.Te P?PM3Ac. This form must be submitted via email (Go 401exoressCv7ncmail net), faxed (919-733-6893) or hand-delivered to the Parkview Building, 2321 Crabtree Blvd., Raleigh, NC 27604. Applicants who are selected to participate in the Express Review Program will be notified via email or fax within 2 days. Successful applicants will then be instructed regarding detailed procedures for full application (Please Note: Submittals of the review packages on Friday after 12:00 pm will be stamped as received on the next business day). i Please contact Cynthia Van Der Wiele at 919-715-3473 if you have any questions regarding this form. we 8? yi?? dNrIONVO MSON'1NOYMB Z! ?t 6096Z a.twoaJ YWS 'w?nwary Y ;1 t 4 IA 1 .? s I.m Got ? tt !1 1NOW138 im JN N71'`kd:fT9)I DLD NYId 3116 1a II ?I I i d ? BI ? t{yyt ?944?4 aa99e?i dig 0,11,111 m? ? ? ??s? ass . $ . 6aao?p * ^'r3iab 3: J w.' m 1. (A 1 0 ? ? § i i > e i 111111e R1\\ / D? COO 11 "J tl' i s W yy I I ? / ° ?• oc 'i I , -? u LL, I- I'? j1 nsw urom.oou j z Ib i y ? IlI 1 ?! I ,?? ? X• ?? Ili ; i T ??? •?' gs `?, e 6 I 3bb u I U?1 ? •111 ?T1 1 as s s I e a K ml 11 ? ! i i ?-A u m r . ?'f?,rSYlLt al ? ? ? ?? Y ? s ? !'1•??Fi?l { I ?t1??r J. lOL I n I / I - _-- 3 .Klt.ta { NPI 9 y pip Q g Y F ?. I yyy iy- t m r tl. .. 'r J GP?,O 0 P p mg / (5 ?i R I 1 a ? ? ?•??? ? ? I I ? ? ? I / 8m gee 11 / II I ?Ei? I I ?v 7 } -TI h m ? ? , 1 tal' a _ k t r t1 da"?I? I II ? t,a; 56 Tp A N ??• 3 Oi tE ••'W •• ?\? Ii-I 100 ' V ?•?? l• •? , 1 Ce ?•rJ?:Y` ? j"/I • f •7 is .••'• ? . • '? •• "•'•' f }Stowe mean r ? IhG ersr••. v •j• th 0 33 ?' -.i ••• l •. •r s•• Tr ? es Psr i :. .`•k ` ?,? ? Re 90 Ay"J y' f rt.. ,? ?? 1 l;?? ?'.. \ ;?. - ?,. goo ,? ?_ ? ,? . ? ?-? ? oar 01999 uel.orte Yarmouth 091, Source Datu• USGS 30 ft Scale. l . 24,000,Detwl:13-0 Datum: NAD27 ITIE tg9cF}noN !? -1? CLOSEST Sy2FAcJ--- ?.JAYW,?c • i Cf U Sept-E Px / 0061 10 000 Feet 2 3 Kilometers SOIL 1"110P v aD2 ti .r•K . r .?•: mo't' `.? 14 DRAWING LIST _ COVER SHEET Q TOPOGRAPHIC SURVEY DEMOLITION PLAN SP-I ~ EASMENT PLAN SP-2 - SITE PLAN SP_3 LAYOUT PLAN SP-4 GRADING PLANS SP-5 - - - MERCY DRIVE Pf2OFILE SP-5A - _ _ UTILITY PLAN SP-6 LANDSCAPE PLAN SP-7 - - E20SION CONTROL PHASE I SP-8 Ef2OSION CONTROL PHASE 2 SP-9 Ef2OSION CONTf2OL DETAILS SP-10-12 - - - SITE DETAILS SP-13-14 STORM DRAIN PROFILES SP-15-I6 SWM PROFILES AND DETAILS SP 17-18 STORM _DRAIN DETAILS SP-19-20 1 SANIT4RY SEWER PROFILES SP-21 ISM LOAD WATERLINE PROFILES SP-22-23 LANDSCAPE DETAi~S SP-2~ -I C A I~ O L I N A - ~TILITY DETAILS SP-24 26 ~~JTY ~ ENGINEER-LANDSCAPE ARCHITECT FREELAND E KAUFFMAN, INC. ?NMENT CONTACTS 209 W. STONE AVENUE GREENVILLE, SC 29609 R AND FIELD CONDITIONS WHEN PLANNING ~ INING ~ ZONING I, INFORMATION CONCERNING UNDERGROUND UTILITIES WAS OBTAINED FROM AVAILABLE RECO DS GAS PO ISLE, BUT THE CONTRACTOR MUST DETERMINE THE EXACT LOCATION AND ELEVATION OF ALL EXISTING UTILITIES BY CITY OF BEL ss PSNC ENERGY OF BELMONT (864) 672-3426 IGGING TEST PITS BY HAND AT ALL UTILITY CROSSINGS WELL N ADVANCE OF TRENCHING, IF TI-E CLEARANCES ARE LESS ~ D 115 N, MAIN MAIN STREET ATTN TODD SIMMONS THAN SPECIFIED ON TI-E PLANS OR 12", WHICHEVER 'S LESS, CONTACT FREELAND AND KAUFFMAN, NC. (864 233 5497) AND 800 B, GASTON ROAD OWNER PRIOR TO PROCEEDING WITH CONSTRUCTION. BELMONT, NC GASTONIA, NC 28056 IONT, NC 28012 TRA TOR SHALL INCLUDE IN HIS CONTRACT PRICE THE REMOVAL AND DISPOSAL OF ANY EXCESS TOPSOIL I-E CONTACT 2, THE coN c CONTACT ~ BOB CADDIS FACT BRAD PRIEST DETERMINES IS NOT REQUIRED TO PERFORM THE FINAL GRADNG AND LANDSCAPING OPERATION. PHONE ~ 0 JET (704) 825-5586 OWNER ~ ARY HEFTING, SHORING, PHONE ~ (704) 810-3240 3, THE CONTRACTOR IS RESPONSIBLE FOR TI-E DESIGN A1~U IMPLEMENTATION OF AL,. REQUIREDIr`ECESS S AND SPECIAL EXCAVATION MEASURES REQUIRED ON THE PROJECT TO MEET OSHA, FEDERAL, STATE AND LOCAL RMWATER QUALITY SOUTHERN BENEDICTINE SOCIETY OF NC T CATION OF THE WORK INDICATED ON THE DRAWINGS. OWNER AND FREELAND AND STORMWATEG REGULATIONS PURSUANT TO THE INS AL N T IN TALL SAID ITEMS. PI-TONE' KAUFFMAN, INC, ACCEPT NO RESPONSIBILITY FOR THE DESIG 0 S CITY OF BEI OF BELMONT IN ADVA E OF DIGGING AT I-800-632-4949, BELLSOUTH 4, CALL NC ONE-CALL LOCATION SERVICE UTILITY LOCATOR SERVICE 72 HOURS NC 115 N. MAIN 1520 SHANNON BRADLEY ROAD J. MAIN STREET 100 BELMONT - MT. HOLLY ROAD MEET OR EXCEED TI-E CLRRENT LOWE'S slrE wORK sPECIFICATIoNs, BELMONT, NC 5, ALL SITE WORK FOR THIS PROJECT SHALL ROOM IO4 v1ONT, NC 28012 BELMONT, NC 28012 I TTY E wHIcHEVER Is CONTACT JTACT ~ BRAD PRIEST 6, ALL CURB/HANDICAP RAMP DESIGNS SHALL CONFORM TO ADA STANDARDS OR NC ACCESSIBL COD , GASTONIA, NC 28052 TRI TIVE, PHONE ~ (7C MORE RES C ~NE~ (704) 825-5586 (704) 825-6675 CONTACT ~ DARIN ESTES 7 PRECAST DRAINAGE AND SANITARY SEWER STRUCTURES HAVE BEAN SPECIFIED ON THE PLANS. OWNER AND FREELAND AND - ' H TRUCTURES AS FIELD CONDITIONS DURING CONSTRUCTION PHONE ~ (704) 861 6105 KAUFFMAN, INC„ HOWEVER, ASSUME NO RESPONSIBILITY FOR T ESE S TY XPEN E FOR OFTEN DICTATE MINOR ELEVATION ADJUSTMENTS, THE CONTRACTOR ASSUMES ALL RESPONSBBIE AND E S T CTURES TO ACCOMMODATE THESE FIELD ADJUSTMENTS. NCDOT' MODIFYING THESE S RU POWER DEVELOPER RECORD KEEPNG OF THE AS-BU~.T CONDITION OF ALL NCDOT 8, THE CONTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE DAILY TIN F THE DUKE POWER SOT OF THE UNDERGROUND UTILITIES, CONSTRUCTION STAKEOUT ASSOCIATED WITH THE PROJECT, PREPARA 0 0 4009 DISTRI >9 DISTRICT DRIVE LOWE'S NOME CENTE2S, INC. NECESSARY/REQUIRED AS-BUILT WATER AND SEWER PLANS TO BE SIAMITTED TO THe CITY OF BELMONT AND/OR NCDENR, AND 120 DUKE POWER ROAD IN ONNECTION WITH OB?AINING PERMITS TO OPERATE AND RELEASE OF BONDS. RALEIGH, NC EIGH, NC 27607 "'"c~a` ° HIGHWAY 268 EAST, EAST DOCK ALL OTHER INFORMATION REQUIRED c DALLA NC 28034 S, JTACT~ Bf2ANDON JONES ~~H ~ ,~~~k, NORTH WILKESBORO, NC 28656 TH TANDARD AND DETAILS OF THE CITY OF CONTACT 9, ALL WATER LINE AND SEWER LINE INSTALLATION SHALL CONFORM TO E S s NTACT ~ WCARL SANDBERG CO BELMONT AND NCDENR, PHONE ~ (9I PHONE (704) 866-5106 ENE ~ (919) 733-2814 10, A COPY OF THE FINANCIAL RESPONSIBLITY FORM AND TI-E STORM WATER POLLUTION PREVENTION PLAN MUST BE KEPT ~ ` ~ (336> 658-4000 ON THE WORK SITE AND SHOWN UPON REQUEST, WATER AND SEWER= STORMWATEI ~RMWATER/LAND DISTURBANCES ~ NTRACTOR SHALL INCLUDE IN THE CONTRACT PRICE ALL MATERIAL AND LABOR ASSOCIATED WITH TI-E TESTING OF CITY OF BELMONT NCDENR Il, THE CO ~ENR ~MQINE~Af2~'~ nJ~ ATTN MR. DAVID DEAL THE WATER AND SEWER LIKES REQUIRED BY THE CITY OF BELMONT AND/OR NCDENR. T 115 N, MAIN STREE MOORESVILLE ~RESVILLE REGIONAL OFFICE A F~~~`'P'%\o I THE CONTRACTOR SHALL NCLUDE IN THE CONTRACT PRICE ANY DE-WATERING NECESSARY TO CONSTRUCT THE PROJECT BELMONT NC 28012 IN 2, 919 N. MA As sNowN oN THE PLANs. TA T ~ DAVID ISENHOUR N. MAIN STREET CON C MOORESVILLE ~f2ESVILLE, NC 28115 THE CONTRACTOR SHALL INCLUDE IN THE PRICE ALL COSTS ASSOCIATED WITH PROVIDING A PROFESSIONAL ENGNEER ON - 13, WATER AND SEWER SYSTEMS, ETC„ AS PHONE (704) 825 0506 PHONE ~ (7( SITE DURING THE CONSTRUCTION OF THE STORM WATER MANAGEMENT FACILITIES, )NE ~ (704> 633-1699 REQUIRED FOR AS-BUILT CERTIFICATION. DATE REVISIONS MEA uRES MUST BE INSPECTED AND MAINTAINED REGULARLY TO INStRE THAT THE GASTON NRI iTON Nf2D 14, EROSION ~ SEDIMENT CONTROL S INTENDED PURPOSES ARE ACCOMPLISHED. 1303 CHERR` 3 CNE2RYVILLE HIGHWAY 15, ALL DRAINAGE STRUCTURES MUST MEET NCDOT SPECIFICATIONS. DALLAS, NC .LAS, NC 28034 *••CAUTION*** (704) 663-Ib~ 663-1699 UTIL171E5 PROTECPON SERNCE 3 OA15 BEFORE pCQNG WLL BUILDING CC .DING CODE ~ T~ ~'~~-849 GASTON CC 3TON COUNTY CODE ENFOf2CEMENT + 212 WEST M WEST MAIN STREET 3TONIA, NC 28052 GASTONIA, ~ C`nNTAC;T ~T~C'T: D. GAf212ETT TIE J CT LOCADON NDICATEC ALTI- f NE IDDES CERRTY THAT PHONE (7 )NE: (704) 866-3155 THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM INFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES ISSUF DATE: JUNE 19, 2006 • • FDIC DOT DDOJDCT " 1631D02 EVISIONS EXISTING ~ LOWE'S SITE NOTES , ~x , x TELEPHONE R PRE-BID SET POST BID SET - x ~ ~ ~ EASEMENT O ISSUE DATE ~ ISSUE DATE I, REFER TO STANDARD - ~ x - x UPLMKR - / + 6' BLACK TUBE STEEL DATE DESCRIPTION FENCE ON TOP OF ALL SPECIFICATIONS FOR ~4 - x x x _ o ~ i ; ~ 8 ~9 RETAINING WALLS (TYP,) TRAFFIC STRIPING - ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ X - x - - 87 3217 E 636.50 TO TAB / , ~ x 50' _ x _ ~ - - _ x-x- - X x - - x- - INFORMATION, LAND5CAf~ ~ . ~~M.v. _ 5a~.: x.68 ACR~S ~b SUFFER ° / THE 50' LANDSCAPE BUFFER IS TO 50` BE TRANSFERRED 4lP~IN~ Va1~LL...';A' ~~NpSGAP FROM WAL-MART EXIT 26 2, ALL DIMENSIONS ARE - ~ANDS~AF'E RETAIP~IN~ WILY 1. \ ~ 1..... REMAIN COMPLETELY UNDISTURBED FACE OF CURB UNLESS ~C'~--~ , BUFFER . ~ RET;AINNNG :~:VyALL ,';C' DURING CONSTRUCTION TIE INTO; ~XIS~II INTO; . ;t=XiS~ING:::::::.::: ~UEEER ::::.::::1 LEASE OTHERWISE NOTED, ~ 1 - _ _:.A :WAL;MART, WAt :;MART;;WAL~ : EXIT 27 ~1--- i ~ \ 3, ALL RADII SHALL BE 4' U~:1 ..:.::1 ~ ~ ~ X ~ ~ v p a _ ~ p a a v NEAVYaDI~TY 24 CURB. RETAINI POINT WHERE OLD WALL ENDS INTERSTATE 85 ° UNLESS OTHERWISE NOTED. ' ` ~ ~ d uG J--- u ~ ~ ° o a CONCRETE 8 GUTTER v I~JALL B w o ~ ~ J~N~ ° ~ ~ AND NEW WALL BEGINS _ UPLMkP , a o UPLMKR a ~ a D B REMOVE p ~ ~ ~ ~ o ~ o N ~ SITE v 4, ALL WORK SHALL BE ~c ~ o uc 1... .....s.. i X \ ~ NE IN TRICT -e :..uc.. - uc~UPL ~ . l- - EXISTING .CUR v ° ~ TIE TO EXISTING CURB AND GUTTER Z ND ~ GUT ER / ~°a ~ ~ DO S P h ~ A ~ o a _ - - ACC RDANCE WITH DIVISION a FMK 1 __J EXISTING G S _ - - ~ j TRASH 0 ~ i 1 a _ ~L - - - - STAGING ~ 2 OF LOWE'S STANDARD Z ~ €~'SEMENfi~ --CC~MPAEiO~ _ - LfNG ~ - 7aRE:A- _ - _ - ~ ~ vii ~i0~ _ v , ~ ~ T ~ _ LKINSON VD, Q _ I N ~ ° ~ Q uNE ~ - - ~ - STORAGE SITE SPECIFICATIONS, b l ~D. - - o RECEIVING ~ TRUCKWELL ~ ° ~ p ZING ~ o ~ ~ - - --d ~ EXISTING _ ° ~P ° ~ ~ a 1 U 5, ALL WORK MUST COMPLY 'E ZONING NC ~Ai N ~ r~- a 0 a! w ~ ~ • • WITH LATE T NC STATE ~ SEWER S , ...1 I EASEMENT T ° AWCUT EXISTING PAVEMENT I IN AN A CESSIBILITY GUARD RAIL I 0 ALL SKYLIGHTS TC BULD G D C ~ENERATO ~.....I ~ BE ABANDONED CYLIGHTS TO ° S I _ WHEEL N ° ~ ~ 8 LLAR N BUBBLE ~ i 0 D CODE. VOL, IC. 50 W I PAD BE NON-BUBBLE Z I ~ EXISTING STOP ~ _ N ~ d 0.5.~~~;= - \ TYPE N A LAMENT IN ~ J x L WE' I TRANSFORMER WATER 6, NO E CRO C ~~~~F~~;~... 0 S ~ {TYP•) a ° TIE TO EXIST, 18" (i 'a, I C RB GUTTER (TYPJ ~a`~ I PAD \ ~ EASEMENT TO EXSITNG BUFFER AREA IS :::.1;..~ C9 STORIuNVAT~ ~ ~ U ~ yti , Z Q Q ~ \ BE ABANDONED PERMITTED„ I - AREA ~ ~ ~ I I N TR K I N _ _ ~ l~ o o uc s s G VI CINI TY MAP 1 1200 , s~~ COVERED I PINE STRAW „ _ z ~ ~ ~n ¦ AREA ~ r I I TRAILER r ~ 7 G ARDRAIL TO BE I N d ~ U I.. ~ Q ~ - - ENCLOSURE ABBEY ACREAGE SUMMARY . ~ ~"QlNE~.• n BROKEN FOR ALL FIRE 24" CURB 19 s N 4' BLACK TUBE I WHEEL STOP ~ Fs P,. HYDRANT LOCATIONS IN 6 GUTTER ~ F ~ STEEL FENCE (TYPJ ~ S 8 , ~ 9a ~ (RE ~ ARCH) + - 9• f R'E~~•' ~ ~ LOWE' S 15J9 AC / ~ ~ CON LICT, ~ . , , . ~ (SEE DETAILS) I c ~ - WAL-MART 23,25 AC. r r I ~ - 8, A ZONING PERMIT WILL ~ ~I: 2 - 8' ~ ° EXISTING 18" ~,~1~.w~~~..,1.~.~.~.~.~:.~.~. DIRECTION ~ NOT BE ISSUED BY THE ~ WIDE p ~ SAINTED - CURB ~ GUTTER ROAD EASEMENTS 9,81 AC. 1 ARROW ~ ~ J I ROOFTOP UNITS ITY F BELMONT UNTIL A ; : ACCESS p FFE ~ b93.00 C 0 ~ sC...~". ~ Q )FTOP UNITS SOLID a TI N MEETING ~ ~ ~ ~ ~ ~ ~ ~ GATES (TYPJ ~ Z TO BE PRECONSTRUC 0 , , k TAI Q ~ SALES A,PEA TO BE I v° BOLLARD WELCOME CENTER 2,0 AC. +l- YELLOW - U :ENED FROM LINE m 4' I ~ T TI +l- Z ~ INNING ~ ~ I SCREENED FROG HAS BEEN HELD, BEG / o ~ WM GAS S A ON 0,95 AC _ U O PUBLIC O.C• m 45° I PRI R ` 1 ~ ~ ALL Z Q I REFER TO ARCHITECTURAL PUBLIC WORK ON THE SITE 0 ~ s' Q ROADWAYS t STOP I PLANS FOR EXACT BUILDING o ~ ~ ~ ~ ~ OADWAYS I ~ ~ REMAINING 75.68 AC. ~ m 0~ TO THE ISSUANCE OF A ~ ~ ~ I N ~ I DIMEN I N EXIT P R N I Q W~ PR PERTY Z ~ ~ N i ~ - ~ ~ Q ` ~ ZONING PERMIT WILL ~ ~ ~ - ~ X S G S O S, 0 C ~ ~ _ ~ I PAINTED SOLID LOCATIONS, SIDEWALKS, ETC, - U 17 0) SUBJECT THE CONTRACTOR ~ ~ ~ A~ ~ ~~k ~ WHITE LINE m 4 BIKE RACKS TO BE TO FINES AND OTHER SUCH \ ~ pis L I O.C, 0 45° PROVIDED ON FROf aCKS TO BE 19 > Z i ~ Q > 6 PENALTIES PRESCRIBED IN ~ - . ~ ~ m°--~ ~ NC I SIDEWALK (RE ~ AR( :D ON FRONT I Q 0 ~ Q I ~ U _ ZONING HC N 0 _K (RE ~ ARCH) 1 SI TE DA TA ( Y Q m 1~~..55. THE BELMONT AND GASTON _ _ I PAINTED SOLID \ ~ - _ _ AMP ~ U ~ ~ V COUNTY ORDINANCES AND ~ ~ - R I YELLOW LINE " - ~ I PAINTED 2 48 PAINTED YELLOW I m Q U p ° YELLOW ° ~ w ACreage•' ~L ~ CODES, ` - _ ~ - - 6 WHITE SKIP PAINTED YELLOW CROSSWALK ~R A ~ I LINE "LOADING ZONE" ~ PAINTED SOLID I ~ ~ _ ~ Lowe s Tract 15.79 ~ 0 ~ ~ N J } 9. ALL RETAINING WALLS TO ~ ~ ~ NAVE 4' TUBE STEEL FENCE ~ ~ RETA(NIN 100' O.C. MAX„ 24" YELLOW LINE o 4' I c v, 0 4' ~ ° ~ ~ Total Disturbed 16.50 a ~ U) ~ N 18 C A ~ ~ NIGH o ON TOP OF WALL, ~ R T ) ~ WALL 'E' . ~ O,C. 45 * Main Building: D - ~ m - ~ TIE TO Z ~ ~ 485' ~ CUSTOIvER ~ ~ ~ - -L-OA9N~Cr - Sales Floor 119,400 S f. a~ ° EXIST• 18" Q ~ ~ > 0 c L WE ITE ATA GUARD CANOPY Once Area 3 937S.F. (V TT C CURB GU ER ~ 0) ZONING N-C (HIGHWAY COMMERCIAU \ RAIL w~ I-{EAVY-DUT ~T l {TYP,) Receivin /Story a 13 307,5 F. ~ m WILKIN ON BOULEVARD \ \ - ADDRESS S w RAM BUILDING SETBACKS ~ 10' FRONT, 4' SIDE, 30' REAR ~ ~ '9f~ 1 ~ 1 _ ~ 9 9 ~ W c - RAMP ~ HC T Utddy Rooms 1,362 S.F. pC W sroa RAMP l 1 PARKING SETBACKS ~ 10' MAXIMUM BUILDING I-IEIGNT ~ 60' ~ ~ ~ l 1 Garden Center.• - - - PB 8-II PARCEL 15-023-020 ~ 1~ - 1 X I ' LOT N/A DB 265 55/848 243/1995 955 \ \ _ l - TRACT AREA ~ 687,813 SF (+15.79 ACRES) ~ ~ ~ ND1C Shade Structures 7996 S.F. ,~~29" ~ ~ - _ ~ ~ ~ LOWE'S HOME CENTERS, INC• IMPERVIOU AREA 479,599 SF (+11,01 ACRES 70~) \ \ AMP ACE S ~ ~ - ~ - - - Coved Area 10 799 3,F• ~ , - - HWY. 268 EAST, EA T D K PERVIOUS AREA 208,213 SF (±4J8 ACRES = 30~) \ ` 6 4 9 ~ W/SIGN WATER NED DISTRICT WS-IV-PA (PROTECTED AREA) ~ ~ ~ ~ S ~ ~ ~ o~ ~ _ T--~ ~ - - - Open Area 12,812 S.F• N, WILKESBORO NC 28659 a 4 I , ~ , EWA UTT ~ I I Garo'en Center Total 31,607S.F. ~ S L WE PARKIN DATA _ ~ ~ ~ J ~ ~ ~ - ~ 24 10' WIDE ~ ~ Q ~ p CA / ~ 336.658,4000 )336.658.3257 (F) ~ N TYP, SIZE REO'D NC SIZE REQ'D TYP SIZE PROV, HC SIZE PROV, CONTRACTOR 1 ~ _ ~ ~ ~ 1 ~ Q~ ~ pQ 25' RET TYPJ ~ , / r ' ~ - ~i: VI~ Staging.' • ~ I ~ • 9' X 19' 8' X 19' 9' X 19' 8' X 19' SPACES 1 1 p ~ ~ ~ z F ,FJ REQUIREMENT REQUIRED PROVIDED RATIO ADJACENT PROPERTY ~ ~ Z Q Q ~ ~ r (FG SHED ~ ~ I ; ~ Non-CoveredAnsa 7,338S.F. TMIg~A,~HG~,~PR~RnoFlo~s C (TYP,) ~C ~ , ~ t ' ~ ' ~ I ~ HONE CENTERS, INC. ANY l1SE OR REPRODUCTION G A(S ADDRE E 1 ~ ` ~ Q ~ o ~ ~ C ~ IN~7T L~ BY 7 q IN WHOLE OR PART IS PROHIBIIEO WfTHOUT THE ,C-: ~ Staging Area Total 7,338 S.F. EXPRESSED WRITTEN CONSENT OF LOWE'S HOME J LOW ) V ~ CEN7ER5, INC. COPTRIGHf 2003 ALL RIGHTS I SEE CALCS, 624 624 3,68/1000 SF RN ITY ' ~ 1 ~ Z Q ~ F LOWE S 169,6 3 SOUTNE BENEDICTINE SOC E ~ 1~ ~ Q o~ ~ ~ RESERVED Q Parking Requirements: • • P E WILL BE PAVED WITH PERVIOUS CONCRETE OF NORTH CAROLINA ~ ~ ~ ~ SITE ~ 29 PARKING S AC S ~ ~ ~ } 100 BELMONT-MT, HOLLY ROAD ~ ~ ~ ~ ~ LIGN ~ 4 ~z ACCESSIBLE SPACE REQUIREMENTS 1 u 'SIRED PROVIDED BELMONT, NC 28012 ~ 1 ' (TYP, Q < > ~ - ~ Retail Uses 1/250 S.f. Q Q - ~ EXI TOTAL SPACES REQUIREMENT REOL W 2~ F TOTAL 12 (2 VAN) 12 (4 VAN) ~ Ali t 1 564 0 1 NCR w S JN~ Sales Area 119, 400 S• F. 478 ~ SI ALK ~ ~ 0 enArea LOADING SPACE REQUIREMENTS SISTERS OF MERCY 1 1 ~ ~ P 12,812 S.F. 51 GROSS AREA REQUIREMENT PROVIDED 101 MERCY DRIVE ~ ~ EWA AR OW 1 ~ Shade Stru ~ ctures 7,996 S.F. 32 r 169 613 N/A 3 BELMONT, NC 28012 ~ ~ ~ Covered Area 10799 S.F. 43 ~ ~E~ous C~Ndf~ETf ~ ~ % , U L t ILDING LIMIT t o ~`a,~- 0 AL, ~ 151,007S.F. 604 ~ ~ ~ I . / .II ~ ¦ NC 3 DQ ~'A~E) ~ I \._'t. ~ ~ 1 ~ j OffiQe Uses (1/250 S.F.) ~ 1 5. RAMP Q o_ o ~ r, Oflrae 3,937 S.F. 16 00 \ 24• CURB ONCRETE I~~ m z Q ~ I ; 1 ~ ~ GUTTE S W LK NC Q ~ ~ ~ ~ ~ ~ Wharehouse/Story e/Utili 1/4000 S.F. ~ ~ ~ - ~ ~ 9 tY~ a ~ 1 7 . F. 3 AMP ~ Recei~in /Story e ~P g g 3,30 S I. 2,~A S TO ~ ' Utili Rooms 1362 S.F. 1 SWSL/ LINE TABLE ,TED ; ~ tY , ST BE . SFERR ~ ~ ~ A DYSL/4" STO LINE LENGTH BEARING ~ ~ SIGH GROS~VALK <; F WAL-MAR ~ ~ i i' ~ 14669 S•F. 4 IN S G ~ ~ \ L1 7' 8 29 W ~ ~ ~ ~ 1 20.25 S 8 2 117K SC~UARE LE~i~E ~ \ Total Re aired Parkin t f t a g 624 ~ ~ L2 28,22 S 87°28 29 W ZONING NC , 24" CUR ~C HC ~ , HC wEAVY-DUTY - ~ ~ / \ ~ Total Provided Parking on Lowe s Tract.' 564 ~ RA 57~P RAMS A j ASPHALT S{GN ~ ~ \ ' , ~ ~ Total Shared Parking on Wal--Mart Tract.• 60 L3 89,28' N 08'30'25" W `~jG ~0 8 GUTTER RA ~ \ ~ ~ ~ i ' Total Parkin Prvyided.• 624 L4 53.16' N 16'37'28" W 6', ,P N . ~ MARKER 10' SET-BAGI~ LINE- _ C~ A _ _ _ I T EXI I ~ ' ~ _ _ L5 97,99 N 25 03 09 W o ~ _ ~ ~ _T99 A _ ~ ~ TJ9. A A ~ - - / L6 63.61' N 30'13'43" W ~ , n ~ ~ -r E (TYP• ~ ~ \ ~ ~ / ~ ~ NOTES LIMITS OF DETAILED FLOOD STUDY STOP 5 L7 24.42 N 65'5710 W RETAININ( RETAINING CONCRETE ~ SOUTH OF WILKINSON BLVD, NO FLOOD PLAIN - w ~ WALL F L8 34.32 S 02°31'31 E s 0,38 AC. TO BE WALL F ~ W SIDEWALK SHOWN ON PROPOSED SITE ON FEMA MAPPING • • 18' CURB 6 ~ ~ ~ , AC. TO BE W ~ ~ CURVE TABLE ~ ~ GUTTER s 5~~°~ TRAN FERRED TC ,.5>. S ;FERRED TO ~ . ~ / i Wal-MartParki R uin?n~ents: m ~ wa.-~ r ~ SITE LEGEND TAN NT CHORD BEARING DELTA ~ WAL-MART LEASE CURVE RADIUS LENGTH GE ? , ~ r HART LEASE / F ST WAT6? AREA i Retail Uses (1%150 S) Q m TI S 71'42 45 E 11'31 08 ~ ~TI~ C1 E 465,00 93.49 46,90 93,33 N ~ ~ EXIT PROPOSED DESCRIPTION o N ~ Sales Area 147,525S.F. 590 Z o ~ T TIN I ' ~ E~1S. 8 ~ C2 315,00 245,54 129,39 239.37 S 43°3718 E 44°39 44 SIGN ~ ~ Gallen Center 9522 S.F. 39 - w c~ Y 20 NUMBER OF SPACES J C3 385.00' 478,66' 275,81' 448.42' N 56°54 29 W 71 °14'05 ~ ~ (~l'P., U i P W 157047S.F. 829 ER RO w Q z ' 1°21'32" C4 74 7.47' N 88°0915 E BL K 315, 00 7, 47 3. ~ Ohfce Uses 1250 S.F. ART RRAL r ~ C C c co ~ C5 2994,79 473,47 237.23 472.97 S 87'54 33 E 9°03 30 18 CURB 8 ~ ~ ~ ~ ~ , ~ ~ Oi9rae/Restrooom/ ~035S.F. 28 v~ _ Auto Service Area _ _a__ _.CL_ Q ~ ~ E S) ~ - SIGN m S 5' CONC. SIDEWALK GUTTER ~ ~ NLAR ED C T MER ANOPY ~ E E 5' PLANTING ~ I Wharehouse/5torage/Utility(1/4000 S.F.) _ P I K } ' Receivrng/Storage CONC. ARK NG BLOC m RETAINING 34,079 S f. 9 = 1----- ~ Mechanlca/Rooms ~ HANDICAP SYIV~OL z LOWS S STRIP (EACH SIDE) dOlS WALL G ~ ~ ~ ~ ~ _ =--=-a _ ~ - _ 198,181 S,F. 888 BUILDING ZONING LINE N-C SWSL/4" ~ BC-D RETAINING DYSL/4" ~ ~ :a;: °1~ CONCRETE PAVEMENT o Tota/R aired Pan~i 888 WALL 'N' s_ ~ _ - J Total Prov/a'ed Parking: 898 Z _ HEAVY DUTY PAVNG Z w Z U N E f . A\ Total Parking rn Excess ofCode: 230 Z SWSL/4" ~ ~ _ ~ OUTSIDE SALES AREA Q PAINTED YELLOW \ Z ~ J ~ _ {n RR W ZONING ~ BC-D A 0 S END _ Q. ~ o LANDSCAPE BUFFER W z . 18" CURBS _ 5' CONC. SIDEWALK ZONING BC _ PROJECT SCHEDULE ~ ~ _ONING ~ BC W PAINTED YELLOW GUTTER PAINTED Wk~ITE 10' SKIP ~ 5' PLANTING ***CAUTION*** J w START DATE AUGUST 2006 ~ W 0 W o STS AND STOP STRIP (EACH SIDE) CONCRETE PAVEMENT 1,32 AC. TO BE ~C, TO BE WEEKS ~ J W m ~ BAR - - - - - _ - END SIDEWALK RE ARCIa PLANS ~ END SIDEWALK e ROW, TRANSFERRED TC SFERRED TO UTILITIES PROTECTION SERVICE TASK DESCRIPTION a 369 125 82l 427 0 • • f2d-79 (I$` x 447 R7-6 (18' x 14') \ j WAL-MART LEASE MART LEASE 3 DAYS 6EF6RE DIGGING CALL TOLL FREE I-606-632-4949 EROSION CONTROL MEASURES X X X X X X X X X X ORIGINAL ISSUE ~r~tv Mom ~ g~ s~cN MouvrE~ oN ~ TIE ROADWAY FF $ caun~N ~ PROPOSED TRA IC (EXACT AREA T( °tJ cam`' TO EXISTING _ ~ _ _ SIGNAL PER RF ~FTFf~MINFfI) ,T AREA TO IN X DATE: 6120106 ,~nr, n r nrrinn i IFTFf~MINFfI) CLEARING ~ GRUBB G i~\ rAINICU IM-L..M F~IIVILCI HVKIN J VCJIVIV ROUGH GRADING X X LOADING ON.r MONOLITNLE ~NN 24 PIGN MAX ISLAND I ~ PROPOSED SEE OFFSITE PLAT ISSUE DATE: IFFSITE PLANS m7m TEMPORARY STABILIZATION (GRASSING) X X CONSTRUCTION 24' CONC~RETE CU CANE~Y t " 247 EMAIN ~ MONUMENT SIGN FOR IMPROVEMENT E GU CN BY SITE ABOVE CONCRETE FH.LE _117-6 WOJNTEO ON SET PROVEMENTS THE NIOEROM D UTILITIES SHOWN HAVE KEN LOCATED FROM MLLD SURVEY MORRATATN AND EROTNO ORAWDIDR FINAL GRADING X X ISSUE DATE: CONTRACTOF2 ISLANDS BY BLDG. N J-osTop - - (RE ARCH) TO WILKINSON BL1 PAINTED wwrrE CONTRACTOR _KINSON BLVD THE MMEYM MAKES NO GUARANTEE THAT THE UNDERCROUND COM nTMiRIM g SHOWN DR AB NDDONNEED M SURYE OUR FURTHEERREDOES BUILDING CONSTRUCTION X X X X X X '.X DRAWING NUMBER; No, AWRANT THAT THE UEERCROIM uaHTl[S SHOWN ARE HH THE EXACT LOCATION INDICATED. ALTM )OH HE DOES CERTIFY THAT UTILITIES X X X X - STOP THEY ARE LOCATED AS ACCURATELY AS POSMILE FROM (FORMATION AVAILABLE, THE SURVEYOR HAS NOT PHYSICALLY LOCATED rHE PAVING X X O 60 120 UNDERGROUND ununEs STOP - - - _ _ FINAL STABILIZATION (LANDSCAPING) ' X SP-3 SCALE = I 30 COMPLETION DATE; APRIL 2007 SCALE 1" 60' 0 0 • • I NS VI 0 RE I ~ ~ 50 LANDSCAPE 50 LANDSCAPE BUFFER (TYP), PRE-BID SET POST BID SET ~ , X BUFFER ('rYP), TO BE COMPLETELY O ISSUE DATE ~ ISSUE DAIS TO BE COMPLETELY , ~ k _ UNDISTURBED DURING CONSTRUCTION 1 1~.~.~:.~~.....~....... ~ - , ~ UPLMhR - ~~1 ~ UNDISTURBED DURING DATE DESCRIPTION CONSTRUCTION i ~ .~.t.~.' a ~ i~ ~ r _ ~ N 8 !°3217 E 636.50 TO TAB ~ ~~1111~ , x~ ~ a,-.~ X ~ x x x x r. x ~ x~- x - - - ~ / ~J , ~ 11 f1~" 03) r~ -r,_ -X~-.k X.=-X- =X= r--X X _ X- I J .a..l , _ .c , -_~S~ LF..36.,.. a 5~~..r+~ ...83 :LF~.~.36 . {4' .LF I ' r i. ~ , ~ . ~ ~ ~ ~v. M,:~~ 1 i . , . . _ . m W ~~695,50 ~ 41~ LF 3.. TUB 6g~.5~0 ~ ~ ~ ! 3~..~ . ~ 1 ~ . ! 0 ~ r 168. Lf 2~4 , ~ I i ~ I 4~ 1 ~ ~ ~ ~ ~ . ~ , ~ ~ ~ a. p RCP/C' F'P. . ~ ~ ~a.~.~. r ..b 1 ~ , ~ , . ~ ; ~ ~ _ _ , ~~~PJ~PP ~;@ L, CP/Cf?~P.. f~CP~/OPP~ ~ ~...p ~.m W. i . ~ 1.1 , ~ ~ , > ...0;5~3X . : , ~93,d RCPICPP >'BW .693., 0 r.ry9 . , . ~ . r r i~ /~~.,P Im,~~.~~ :V ~ ~:~2 ~~:~~~:R~C>~l P~~:~m~:~;C7,~0~ l ii i~ r ~..6~g . ~ ~ „ i i ~ i . ~ ~ ~ t... . , ~ ~ ~ ~ vaD7NG - 0.50% L a .L...... ~ ~ ; EXIT 26 ~..T ~ 95~,~ ~ 1 ~ ~.~.11~ 0 , ' i ~ ~ ~ ; ~w. I ' 1 1 1 , ~ . ~~Mll`S~: ~ ~ ~ ~ ~ ~ ;LW ~>~4,50~ ~ ~ , : , 1~..~1 1,~ ~ ~ ~ ~ - 6 . ~ 7 y 2.T0 y~.. ~ r.. I'. j f . I L . i .8~ ~ I; .i. / ~ EXIT 27 1......P I..., ..L... ~ ~ ~ ~111E~~'~ ~ ' ~ 1_ ~ 1 ~ ~ ~ y OE - 1 - 1 r a~ ~S+ ~ ~ 1 1 ~ ~ ~ - - _ - ~ INTERSTATE B5 I 1 ~ ~ 1 „ o ~ X11 ~\y..~. 1.~., A A ~ ~ ~ ~ ~ _ „ 1 ~ ~ a i err N ~ ~ ~ _ ~ 1 1 ~ .1 1 , ~ 1~PLMk;~ ~ ~ ~ - I i ,,S~i CIO' 17 ~0' Q IO' 1 IT) , y ~ ~ ~ 9; Ir ~ ~ ' ' ~ - _ _ SITE ~ ~ ~9279~ I ~ _ is I UPI_M 1~,\ ,.I . 1 ~ , I ~ ' ~ I I _ _ ~ -u~rMK ~ . ~ ~ J ~ ~ ~ / 92,37 _9300 ; ~ , I - ~1 I ~ _ i ''8, i ~ ~ I ~ _ _ LKINSON VD, Q a , ~ 1 ~ ~ ~ [ o I ~ ~ ~ ~ ~ - 52 L~ ..10" P~ICIHDPE u ~ 9 ,5 , , Vii, ~ ~ ~ ~ - - ~ , % , / PP o DOWNSPOUT I ~ ~ C 89, I 39, ~ ~ I~ 85:5. , ~ U RAN E TREE - - T P R Y , C LECO ~ 0 0.5,0 T , RO ECTIOf~ ~ ~ ~ ~ \ - J ~ ~ - - ~ I I i ~ ~ i~ ~ ~ i ~ ~ ~ r ~ 142 LF 36" - ~ ~ F TYP, I' ~ ( ~ ,00 3,00 ~ ~ ~ s~rT ~ ENCE r Kira. ~ '1~~.~ ~ i ' ,RCP/CPP ~ r ~ / / / ~ ~ ~ ~ 9 I slur E cE ~ ,j ~ RIM ADJUSTED , ~,00~ ~ ~i ~ ~ ~ ~ i ~ / MIC'6, ~ I' ~4 1 ' TO 691J0 SEE ~ POND' I~~, ,i. ~ ~ ~ ~ ( p , / 0`b~ ~ ~ ~ - ~ ' ~ ~ I ; ~ ~at. ~ s.~. ~ ~ I I I I ~ ~ ; 0,5 _ y ~ y - ' ~ _ ALL_ DOWNSP~T COLL CTOR PIPES '1• % ~ ~ I ~ i i SE TION ~,~i / 7/ ~ ~ ~ ~ ~ r S I ~ ~.~1~.~ ~ I i ~ ~ ~1 ~ ~ - - - HDPE3 OR PVC, ,SIZE AS /NOTED, PI~F~ r TO I ISE~ .678,5 7 ~ ~ ~ ~`y / I ~ ~ I I ~ ' ~ ~ - 1 J WM TRUCK TURNAROUND AREA H SRO ~ ~ ~ ~ ~ I , TO BE REGRADED AS PART .y I ~ w~'~ ~n ~ ~ ~ ~.~..~.t ~ i ~ I N ~ i r l~' ~ ,QO ~ ~ ~ MAINTAIN M1N I,00~ SLOPE, ~ I i ~ i EXISTING M" .I I.~. I I I N ~ ~ ~ ~ ~ 6 ~ ~ ~ ~ I r iP ~ - - ~ I i ' ~ ~ - 1~1 ' , OF LOWES CONSTRUCTION _ " _ ' 9ti4 r WATERCOURSE a~~~ .bi~ ~ ~ ~ u~ ~ ~ ~ i ~ ~ i / ~ r ~ , ~ ~6 F 2 _ VICINITY MAP 1 1200 ~ X ~ - ~i' J ~ ~ ~ ~ ° s LAND CAP I ~ ~ ~ ~ ~ ~ ~ I ~ l ~ RCP/CPP p r7 SAWCUT LINE " I i l ~,50~ ~ ~ ~ , , F~UFF~R (TYP), , ~1~ ...1... ~ . L i I R ~ ~ , = , 1 ~ ~ / I 1I ~LL ~ L~ ~,~Vi l ` TO ®E I ~ ~ I ~ ~ ~ ~ ~ r i _ i ~ 51 ~ I I~,~, 1 1 ~ / , ~ ~ , ~ ~ , , I I I I~ I ~ - ~ I. e' I ~ R ~ ~ i ~ Y r ~,~C1 ~.I , ~ ~ I ~ ~ ~ ~ r i ~ ~ J ~ i I COM LET~L r, ~ I ~ ~ ~ ~ ~ 1 I I 1 I _ _ _ ° _ z UNDI TUR ED ~ ~ ~ 1 ~ ~ ~ BW 685.5 ~ ~ , / / , ~ ~ \ ~ ~ ~ ~ ~ ~ ~ 91,35 ~ ~ ~ ~ r >J ~ / i ,J ~ I I ~ - N~nrl i ~ J ~ ~ o ~ ~ EXISTING WALMART r r DURIf~G 1 1 ~ ~ . ~ " ' ~ 691 ~ / ~ ~ ~ ~ . i..`n.~~~.. ~ ~ / i ' ' , , ~ ~ ~ ~ ~ ~ ~ ~ ` % , FFE 694.0 LINE TABLE N 1 y~.~.1~.i ~.1.~ I ~ ~ / ~ r ~ ~ ~ , ~ CON~TRUC 1Q 1 Q ~ , - 5 i F 3b" ~ ~ ~ r ~ ~ / ~1 , ~ INV. , ~ ~ ~ ~ _ i t ~ ~ i _ _ Ir - - 1 ~"-671,00 ~i ~ ~ ~ ~ 9 5_-- - ' i ~ ' i ~ I ~ ' ~ , ~ ~ ~ ~ \;k LINE LENGTH BEARING ~ I ( L1 20,25 S 87°28 29 W U ~ ~ ~ i T - _ ~ i l r ~ ~ ~ 1 ~ ~b78.50 ~ ~ W 6 - _ ~ ~ ~ i 1 ~ ~ ~ I ~ ~ ~ I _ 28,22 S 87'2829 W _ ~ ~ ~ i ~ - ~i - , l ~ ~ " ~ - ~ L3 89,28' N 08°30'25" W ~ ~0 ~ , ~ INV=6$ .25 (I TBM m ~ , A ~ _ ~ ~ / 9 ~ ~ ~ ~ ~ ~ I ~ TOP REBAR L4 Z ~ ~ i ( ~ ~ 53.16 N 16 37 28 W ~ ~ N _ - ~ 6826. ~ ~ ~ , , ( ~ Q ~ m ~ ~ ~ I o, _ ELEV: 704,20 L5 97.99 N 25°03 09 W ~ GRADING, STORM DRAINAGE, - ~ ~ ~ v~ - ti ~ - ~ i ~ BW 681.0, - r~\~ ALIGNMENT, ETC, FOR ~ I - _ _ _ ~ b ~ ~ ~ Q 0 I ~ ' ~ ~ ~ L6 63,61' N 30°13 43 W ll.. Q CALDWELL FARM ROAD ~ ~ % I 281 LF 30" ~ - =-=rte 1 r ~ ~ I ~ - ; i - L 7 IL o F M PR PO ED PLANS ~ ~ . ~ RCP/CPP m`~ ~ ~ ~ TAKEN RO 0 S i i -i%' li; ~ 'x' 1 ~ 10" P 24,42 N 65 5710 W ~ Q N ,r. ~ , ~ u ~ d ' ~ ~ ~ _.00~ L8 34,32 S 02°31 31 E Q ~ ~ ~ 'V ~ I FOR WAL-MART SUPERCENTER ~ " ~ l5 ;0.50 ~ ~ ~ ~ (if,~ I -MIN, Y ~ } - C - ~ CURVE TABLE ~ p ~ ;i'~,~,+ - _ ~ - - -,9300 ~ 9~Q~ - ~ - _ ~ '1 J~' ' ~ a J - - - ~ v ~ ~ ~ - - ~V 1 ~ _ , - ~ ~ ~ - - - - _ - - ~ ~ ~ ~ ~ r - - ~ ~ ~ ~ 92, - J) ~ ~ : _ CURVE RADIUS LENGTH TANGENT CHORD BEARING DELTA ~ ~ 0 m ~ ~ ~ ~ ~ ~ ~ i ~ r C1 TIE 465,00 93.49 46.90 93,33 S 71°42 45 E 11°31 08 ~ r - ~ X277 - i 2 ~ ~ `~~.77 ~ C 315,00 245,54 129.39 239,37 S 43 3718 E 44 39 44 m I y~ ' ~ - _ IO~,~.F 18 ~ C3 385,00 478,66 275.81' ~ 448,42 N 56'54 29 W 71'14 05 ~ > ~ Q ~ ~ ~ ~ ~ ~ ~92,25 -928 92,5 X2.25-~ ~ 4 ~ ~ 9 J7 1 ~ 92,40 I ~ ' ~ \ , ~ ~ 2,60` 92:09 ~ ~ I' RCf~`/~F?P ° ~ C4 7 47' 3,74' 7 47' N 88'C9'15" E 1°21'32" J "c N m 315.00 - I W TE ( ~ ~1~1 N I 1. E N , INA ~A ~ A IN R ~ TW 69 ,0~~, ~ ~ I - ~ , ~ A ' ~ ~ ~ ~ > ~ ~ m C5 L __~I,$5 X1.7 14 ~ I C - 473,47 237,23 47297 S 87 54 33 E 9 03 30 LL,J C I ` BW 6820. ~ ~ lilt i ~ 1 ~ W t~ ~ ~ ~ ; ~ 92.20-'-- I ( ~ ` ~ I, ALL EXISTING STRUCTURES, UNLESS OTHERWISE NOTED TO REMAIN, FENCING, TREES, ~ ~ r ; ~ ~ Ili - ; \,a~ ~ 9 ~ g ETC„ WITHIN CONSTRUCTION AREA SHALL BE REMOVED ~ DISPOSED OF OFF SITE, ANY ~ ~ 9. 1 _ EX _ - , - _ T T LOCAL ORDINANCES ~ LOWE'S SPECIFICATIONS, i ~ ~ \ I ~-,91,9 -91,75 , q 5 2~,00~ 92,40 BURNING ON SITE SHALL BE SUBJEC 0 ~ ~ ~ ~ - I 91, , 4 ~ --~'E 92"40 ~ ~ ---~~0 ~ ' _ LOWE'S HOME CENTERS INC. ~ E L1 - - i ~ ~ ~ ~ 1 Mk~X . r_ _ - - 7. ~I TING PIPE ~ ~ ~ ` ~ EX ~ - ~ 0 ~ _ _ _ _ HVVI', 268 EAST, EAST DOCK R - A T, ~ ~ ~ 91,OOQa,,~ ~ ~ 0 2, ALL DRAINAGE STRUCTURES SHALL BE P E C S _ ~ 90,50 ~ < ~ ~ ~ 9(~~5 ,T( T ~ ~ ~ N, WILKESB0R0, NC 28659 ~0 _ E , ~ , , ~ 61 ~ _ ~ \ - ~ 213 LF 30" ~ 3, ALL DRAINAGE STRUCTURES AND STORM SEWER PIPES SHALL MEET HEAVY DUTY TRAFFIC ~ ~ T ~ I ~ ~ ~ 90.76 ~ i I _ ~ ' ~ i i RIM JUl~TED 336.658,4000 (V) 336.658.3257 (F) ~ I ~ w I LY, ~ ~ W 69 0 RCP/CPP e - - (H20) LOADING AND BE INSTALLED ACCORD NG 8JV 6 5 ~ \ ~ 1 ~ gyp, 0. , 9~ ~ ~ ~ '0,50, ~1~ \ y • • ~ I9 0 € . ~ . ~ ~ n~ ~ / ~ ~ THIS IXtAWINO IS 7HE PROPERTY OF LONE9 1 i ~ , 1 ~ 8~ - ~ 1 ~ ~ R R UND TILITIE ~ 1 ~ ~ '`90. ~ _ 90, ~ NEGO U S 0~ PANIES HAVING U D e ' ~ 4, GENERAL CONTRACTOR SHALL NOTIFY ALL UTILITY GOM ~ 1 ~ 1 I ~ ~ I _ NA'~_ _ I I 84.39 Honw aeNreRe inc A~ ueE oR~~eooucTioN 'li IE UT 7~4,79~ ~ ~ iNVmoLEaRPARTisPROeie~owmlouTTME - I R T EXCAVATION CONTRACTOR SHALL CONTACT UTILITY ~ 1 ~ ~ ~ SITE OR IN RIGHT-OF WAY PR 0 0 - _ a I~'C R ~ i ~ E7~RESSEDWRITIENCONSENiOFLOWE'SHONE 1 - ~ ~ ' ~ V CENTERS, INC. CCPYRIOHf 2W3 ALL RIGHTS TI PRIOR TO GRADING START, ~ ` 11 1 1 ~ ~ 1 ~ ~ ' i ; LOCATING COMPANY AND LOCATE ALL UTILI ES -66,,~ 1 1 V 1 ~ 1 ~ ~ 89,96 ~ _ ~ ~ ii f~~ I ~ _ ~ A ~ RESERVED - ~9,96 91,10 ~ • • I ~ ~ ~ ~ ~ ~ , ' ~ ~ 164 LF 30' I N AND SEDIMENT C,ONTROL~66 ~ ~ ~ ~ - ~ 9P~,( 9P~, I1, '~'~I F I~' 91,35 I 5, SITE GRADING SHALL NOT PROCEED UNTIL APPROPRIATE EROS 0 ~ 6_ \ ~ ~ TW 6 ~ -70 LF~ ~ i ~ ~ - \ \ 1 ~ ~ - ~ 1 ~ ~ 1 ~ ~ A RCPICPP o MEASURES NAVE BEEN INSTALLED, ~ ~ , ~ 1 BW 678,5 _ ~ RCPICPP . ~ 1 ~ ~ ~ ~ ,0.50 88 - ~ - ~k ' R ~ ,Ljl, ~ i ~ . - .50 ~ 1 ~ 8 88 ~ ~ el~i l' I _ o ~ I II ~ - ~ , R IN TALLED, THE ~ ~ ~ ~ l r ~ r 6. AFTER PERMITS HAVE BEEN OBTAINED ~ EROSION CONTROL MEASU ES S ~ ~ , ~ , ~ / , T R APR N TO 0" -Ill" OF ~ 1 _ 89 8,4 I ~I r , ~ - ~ o ~ I CONTRACTOR SHALL GRADE BUILDING PAD, GARDEN CEN E ~ 0 S ~ ~ O LF 30 IT PECIFICATION , ~ 8 05 SUBGRADE AS PER SECTION 02300, DIVISION 2 OF LOWE S STANDARD S E S S ~ ~ ~ RCP/CPP • see, I ~ ~ 1 TW 689,0 _ _ ~ ~ ~ 0,50gg' ~ ~ 88.25 = 88,50 l 88,50 I I ' 89,50 ~ % ~ \ ~,~II;~' _ i'~ F I IN PAD TO I/2" PRIOR TO ~ , BW 676,5 5 s 7, IMMEDIATELY APPLY ~ COMPACT STONE BASE OR BU LD G ~ 87,70, ~ r < < ~5 ~ EXCAVATING INTERIOR ~ PERIMETER FOOTINGS, ~ ~ I ~ r 1 ~ ~ ~ 88: ~ / 8'~hc ~ ~ e T BY THE GEOTECI~-INICAL ENGINEER ~ ~ ~ ~ ~ ~ i I 87,85 ~ 8. FRENCH DRAIN SHALL BE INSTALLED IF DIREC ED ~ ~ 1 ,il ~ 8 2,2 ~ ~ OR AS SHOWN ON PLANS, ~ ~ ~ ~ 87: 5 84 LF 18' - ~ B X1,0 \ \ I ~ RCPICPP ~ t _ ~ x I 9, GENERAL CONTRACTOR SHALL PROVIDE 2' x 2' x b" THICK CONCRETE APRON AT ALL ~ ~ ~ ~ V ,r ~ g ~ ~ LEANOUT OUTSIDE OF BUILDING, ~ I I ~ 9 ,50`d ~ ~ \ ~ VIA ~ 9 , 0 8 ~ ~ ~ C S ~ ~ . ~ ~ 6~ 7 I - TRI T A RDANCE WITH DIVISION 2 OF LOWE'S STANDARD _ ~ ~ ~ " 10, ALL WORK SHALL BE DONE INS C CCO ~ ~ ~ ~ ; ~ ~ ~ - ~ ~ - 87,50 ~ ~ I ~ y - ~ ~ SITE SPECIFICATIONS, ~ ~ ~ - 89,1 ~ ~ ~ IN LIMIT AS SHOWN ON ~ - ~ ~ ~ OUTSIDE THE BU LD G S ~ ~ ~ - II. ALL ROOF DRAINS TO BUILDING SHALL END 5 _ _ _ 74 LF , ~ ~ , 8, ~ ~ ~ ~ EPROVIDED WITH A TEMPORARY PLUG AT THE END, ~ ~ ~ ~ ~ Cb ~ ~ PLAN AND SHALL B _ ~ ~ _ 1 I CP/CPP o ,I, I I 0,50`6 i I \ y: 12, CROSS SLOPE ON ALL NEW SIDEWALKS SHALL NOT EXCEED 2 . - r-~ ~ _ _ ~ ~ \ i 8 8 / ~ I ~ ,i My ~ ~ ~ '1 _ - b.SQ 1 ~ MARKER - I ~ j ~ _ _ A ~ ~ I 1 ~ V V ~ ~ - ~ V ~ ~~'~'N - ~ I I ~ ~ ~ - ~ . . - - - nl ~ I \ ~ v T T T - ~ ~ _ ~ ~ ~ RIM INV, IN INV, OUT TYPE ~ ~ ~ . _ _ ~ ~ I ~ ~ ~ 2 ~ 'i I ~ I 67266 672,66 HEADWALL I ~ ~ ~ ~ ~ ~ , \ • • ,,I, - ~ \1. A 2 689,50 673,14 (3) 673,04 DOUBLE COMB, INLET ~ 1 I `~~o ~ ~ ~ \ I ~ +'n ~ p1 \ ~ ~ r ' , , ~ 680.55 (12) ~ ~ ~ ; ~ ~ ss ~ ~ ~ - d" ~ / m ~ ~ EI ~ o - ~ Q ) c r~~ - ~R m 3 689.50 673,95 673.85 COMBINATION INLET ` ~ ~ _ ~ I i ~ ~ I ~ ~ ~ 1 ~ - ( i K - ~ ~ ~ 6 \ ~ A 4 74,72 COMBINATION INLET ~ ~ ~ ' ~ N, e`- ~ ~ Z o ~ W I 4 689,50 674,82 6 ~ ~ ? I V~ ~ ~ 1 ~ ~ ~ , , ~ ~ , J Y . ~ P-IP~ UT,L 5 690,50 676.32 676.22 JUNCTION BOX ~ . h R I W T R s u~ u 0 - 4 77, 9 MBINATION INLET ~ ~ ~ 6 686,50 677.9 6 3 CO ~?4 LF_ I \ U x 7 74 77,64 COMBINATION INLET ~ 5a-' 18" RCP ~ ~ ' ~ ' ' ~ 7 686,50 67 . b ,,K r ~ , ~ ~ ~ , ~ ~ _ ~M VED ~ ~ ~ _ I m 8 687,35 678.19 678,09 JUNCTION BOX ~ ~ ~ ~ ~ m 0,50 ~ ~ ~ ~ ~ , ~ ~ ~ - ~ ~ , ,TW" -665, l ! 6, _ _EGEND U _ - - _ - ~ . - ~ 15 LF~ ~ 9 686,50 679,11 679,01 DOUBLE COMB, INLE ~ ~ ; BW 7, ~ i ~ i ~ ~ _ EXI TING P40P0SED DESCRIPTION = INATI N INLET s ~ ~ -6 ~ _6 . ~ I~ f ~ ~~7~5 ~ ,~r~~~ 10 b84J5 679,63 679,53 COMB 0 ~ 1 ~ , ~abs-~ 1 ~ ,1~ ~ ~ ~ ~ ~ , - ~ ~ 1~ 86 ' ~ I ~ ~ ~ 679,97 COMBINATION INLET II 686,60 ` \ ~ I IE 6~ ~ ~ r~~~: 1 ~ ~ ~ r . ~ ~ i ~ . BW ~ S~T~N E ~ „ ~ A ~ ~ - 8 CONTOUR LINE Z _ - ~ ~ 1 ~ 12 692,20 681,40 68L30 JUNCTION BOX ~ ~ ~ ~ ~ ~ ~ 984.5• SPOT ELEVATION _ p , ~ , - - J 13 691,50 681,70 681,60 COMBINATION INLET ~ ` ~ 1 ~ 1 , ~ y ~ ' _ ~ - STORM DRAIN INLET ~ z ¦ IN ET c ~ ~ MBINATION L r ~ _ 14 91,50 682,75 682,65 CO ~ ~ ~ \ ~ ~ r 14A 692,30 683.00 682,90 JUNCTION BOX ` ` ) ~ ~ ~ I rife l ~ IMI ~Ea V -~~a, 1 ~ / .:~Z z ~ - m STORM DRAIN PIPE E" 6,00 PIPE INLET , , ~ , 1 i/~ ~ ~ 1 1 ~ , ~r 14B 68 ~ ~ , l l ~i / ~ , SE~~ MAY ~ s~s ~ A 4 ~F i 1 e. ~ Z ~ Z `~V~ ~ ~ RETAINING WALL (f) I I ~ ~a~wa~~ , iii%r irfIIG~AD~vG 1 ~r \ 15 691,50 683,60 683,50 COMBINATION INLET , , ~ , ~ ~i , ~ _ 1 'DRIVE I~OFi E ~ ~ ~ ~ y" ~ Rr ~-r - ( i 81 s ~ 6, ~ 6s> I ~ ~P ss~ 20 (~i. LIMfTS P , s - 0 0 V0 _ O W z 16 691,50 684,45 684,35 COMBINATION INLET ' _ q ~ f ~il~ ` ~ ~ ~ ~ 1m ,50~ ~ > ~ ~ ~ ~ ~ ~ 55.53 ~ ~ ~ ~ ~ s WETLAND J 17 690,80 685,95 68585 COMBINATION NLE ,,1 ~ aRE~ ~o" RcP I I Irr j ~ A ~ ' AUTION*** J w C i W 18 690.80 68655 686,45 COMBINATION INLET / ~ i~, ~ 3' 65g~ 0 W o , ~ , ~ MM UTILITIES PROTECTION SER41CE -J W 2, 674,72 674,62 JUNCTION BOX ) ; I ~ ~ - 19 69 50 , ~ , A V 1 ` ` ss, S <I ~ `~`l~~ d . ~ • ~ 673.22 DRAIN OU _ A ~ ~ Y~ 3 GAYS BffORE OICCMC CALL ORIGINAL ISSUE ~ TOLL FREE i-8DD-632-4e~e DATE: 6120!06 MBINATION INLET ~ ~ ~ ~ ~ ~ 1 ~ ~ , i ) 1 ~ ~ ~ 21 669,0 661,60 661,50 CO _ . ~ ~ _ ~ 1 ~ ~ } [ ~ ~ + ..n i.~ ~1~~1r'11\IA TI/~~1 IA II rT i/ ~ 1 I ~ 'b / / ` \ SEE OFFSITE ~ ~ 66s A one au sTSmA wa ea?uNrY ANO roe sArtTr, i ,~~1 ~ DCDAAIT CCT 1"L 666.U 66"L 45 6613 ~,,U VWIINAA i iUV i vL-= i b e ~ ~ s 5c y e PLANS F01? ISSUE DATE: I CBDI s 23666.0 662,60 COMBINATION INLET s 5,z _ - V~JLKINSON BLVD NEB 4 TOP 665.7 HEADWALL--: ION 4 7 668.70 668,60 JUNCTION BOX 1 " I , t < _ 2 6 8,50 sa, ` ROVEMENTS dT ~i _ 1 l A I~Ihk~61.44' ~l E <~E-655.91' THE ua GRO UTILITIES s~ HAW era w~ao CONSTRUCTION SET El 666,50 661,03 660.93 COMBINATION INLET - 1C THE FROM SWIG MAKES NO INFORMATION EXISIM u~DRCUMD ISSUE DATE: UTILITIES Rgwl COMPRISE ALL SUCH UTILITIES N THE AREA, 1 \ / EITHER N ySRMCE OR ABANDONED. THE SURWYOR FURTHER DOES DRAWING NUMBER: E2 692,65 684,39 674,80 COMBINATION INLET 6AL49, NOT WAAIUII THAT THE UNDERGROUND UTILITIES SHOWN ARE IN k \ ( THE EXACT LOCATION INDICATED. ALTHOUGH HE DOES CERTIFY THAT \ THEY ARE LOCATED AS ACCURATELY AS PGS9BLE FROM INFORMATION O 6~ ILO son -18 P NOTE RIM ELEVATIONS SNOWN FOR CURB AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE UNDERGROUND UTILITIES ~ 62.9 INLETS ARE THROAT ELEVATIONS. VA` SP-5'v,1.~ \1 y SCALE I 60 o ~ 4 ~ ~~1?02 • • II tf ~ REVISION S X - PRE-BID SET POST BID SET ISSUE DATE ~ ISSUE DATE V x x _ UPPMKR - . t..... / i . - - X - x - x x 87'32 17 E 636.50' TOTAL / ~ DATE DESCRIPTION x - _ - ,,,x ~ ,.c ~ ~ (108,09 .x,.R~..,.c- x - x x x x x- x x x x ~~J.MkR. f (52$..4:1) . ~ s'.. EXISTING: VEGETATION: •TO .REMAIN . . I ~ ~ ~o°.: UNf~I~~'UC?BE17: B1~EEi=R): . EXIT 26 1 _ EXIT 27 ~ ~ - OE ~ ~ ; i , ~ X . ~ ~ , ~ I_RM uc - u~ -~i / / I- - INTERSTATE 85 M ~ ~ UPLMKR ~c ~ ~ ~ - ~ N o ~ D SITE uc ~ ~ / • 2- u~; Pi~P ~_M Jj 3~ov ~ z --uP~MKR ~ ~ _ I-RM ~ ~ \ ~ N ~ ~ r7 / I RM I-R ZONING ' ~ ~ WI ~ LKWSON vD, v LI - !vE ~ . ......1 3 M i-RM Y • .oo ~ I-RM - 15 CH N r U 2-C ~ V w • • N I-M ~I 2-C ;~a 1-M I ~ ~ . l I-RM . 3-S I ~ ,kai ii I N p'i°•. IRM I ~ w ~ { A ~ I A~ ° ..1 ~ ~ 1 .,..L.,,. 'C 11 - i Q ~1,'Y~ VICINI TY MAP - 7 - 1200 y~, ; 4-M I C ~ , 3-M I I RM , 4 ..a I SEAL o~ - - - n - - - 1 ~ -R _ ~ 2 0 I .I . IRM 2. I . ~ 15-CH I S8 F~ `r ~ sR W... , 2_C 2 C I 4~` . fi RE ~ ~~.w ~ I-M I ilii1li1111111` Q I-RM X,` k I I ~ c I-R I ~ ~ ; ~ I-RM ~ 2-C 3 M WB _ I ALL ISLANDS TO BE SODE~cD 2R I I ~ U _ 1-RM WITH BERM DA 2 C S I U SOD I I Z U ~ - 0 ~ ~ Z ~ m 0~ a Q `~N 5? 3-GA I d? I ~ Q > p _ ~ I I Q I -CH I ~ I i Y ~ p e I 4 ~ o Q U p - . e I I N ~ ~ ~ ° ~ ~ 0 _ ~ ~ 24-WB 2 RO I I ~ ~ C J~,p I ' ~ m~ ~ ~ ~ ~ Q~ Z \ I CH ~ Q a~ > a~ 0 ~ Z I_Z .C N N W ~ PLANT LIST 5-WB 2-z W ~ ~ ~ l ~ W U QUANTITY SYMBOL CODE SCIENTI IC NAME COMMON NAME SIZE REQUIREMENTS ,.PACING \ + + ~ ! \ ~ + lL \ 1 + ~ ~ ACER AUTUMN FLAME 4' CALIPER, _ _ _ i PONDSCAPING SEQUENCE AND • • 30 RM RUBRUM 10' MIN. HT, AS F RED MAPLE SHOWN I_Z 15-W ~ 29" E , AUTUMN LAME gEg - - - - - SPECIFICATIONS FOR WETPNDS PANTS LOWESHOMEGENTERS,INC, - _ - p r . n ~ HWY. 268 EAST, EAST DOCK _ _ _ PONDSCA IN,; S_~~_N~,E. 4' CALIPER, - 2 - - QUERCUS WILLOW , AS 2 G - 14 WO PHELLOS 10' MIN. HT. SHOWN ~ ~ ` N, WILKESBORO, NC 28659 OAK BEB - r n ~ - b b I 1. ~EMP„RaR S =~SILIZATION OF ALL DISTURBED AREAS 1 _ ACER - 2-R 2-RM 2-RO - TO BE PER~CRMEU THI 336.658,4000 (V)336.658.3257(F) - -RM ~ I , N 72 HOURS OF FINAL GRADE 2 RO 2. THE AQUAT~„ -~_aNTING WINDOW IS FROM APRI 1 T • • 4' CALIPER, AS I-N 22 SM SACCHARUM SUGAR 10' MIN. HT, O - L O THIS DRAWING IS THE PROPEiiTY OF LOWES D ~ U N E ~ 5, NOME CENTERS, INC. ANY USE DR REPRODUCTION 'LEGACY' MAPLE SHOWN gig I-NO I-NO IN WHOLE DR PART IS PROHISiTEO WRHOUT THE - ti q 3. RECONFIRM PLANTING ELEVATIONS ONE WEEK PRIOR EXPRESSED wAITIEN CONSENT OP LOWFS HOME a , -0 CENTERS, INC. COPYRIGHT 2093 ALL RIGHTS - TO PLANTING. RESERVED 4' CALIPER, AS _ QUERCUS -e 4_ 15- 15 - 7 NO NUTTALL OAK 10' MIN. HT, SHOWN I-NO - 2-R • • I-NO 4. THE PLANTING PLAN SHOULD BE REVISED AS NUTTALLI BEB - B - o NECESSARY, AND THE SITE SHOULD BE TAK S ED AND I-NO 15-WB - X15-WB FLAGGEC. % 4' CALIPER, AS 1 - I' + ~ Z ZELKOVA SERRATA GREEN VASE ~ 15-C - w S, DE-WATERrHE 1t ETLANDS 24 HOURS PRIOR TO S ZELKOVA 10 MIN, HT, SHOWN 1 - 'GREEN VASE' BEB ~ PLANTIN 0 G, e -2-R - 6. PLANT WETLAND. -CH s I-NO - QUERCUS RED 4' CALIPER, AS - ~I-NO ~ 7. M H TF w I ULC AND WA ~R STOCK AS NEEDED, 26 RO 10' MIN, HT, SHOWN f ' RUBRA OAK ~ t -CH - 8, INSPECT LANDSCAPE TWICE PER YEAR. ~ ~15-CN BEB -WB 2-RO - - IRM ~ 9. REINFORCE PANTING AT END OF FIRST AND SECOND - ! GROWING SEASON. 4' CALIPER, AS _ N m 2-RO iv 10. RESTRICT MOWING TO DESIGNATED AREAS. GA FRAXINUS GREEN RM - I 5 W 11 10 MIN, HT, SHOWN ~ 15 I-RO • PENNSYLVANICA ASH ~ ~ ° 11. SUPRESS WEEDS, AND VINES ON TREES AND HR o ~ S UBS BEB _ I-N ~ i - I-G -RM DURING YEARS 2 ANC 3. CRYPTOMERIA Y HIN FULL 20' I-RM' C JAPONICA OS 0 4'- ' MIN HT • 19 CRYPTOMERIA 6 O.C. _ 8 SM 'YOSHINO' gEB ' WETLANDS PLANTS BY PONDSCAPING ZONE PLANTS ~ SHOULD BE PLANTED IN THE PONDSCAPIN N sf GZOEAS MAGNOLIA BRACKENS FULL - GRANDIFLORA BR, BEAUTY AS FOLLOWS: 21 M 'BRA K N R WN UTHERN 6'-8' MIN, HT. \ I CH C E S B O SO BEB SHOWN I GA I-GA 2-RO POOL DEPTH: 0'-9' HIGH MA RSH BEAUTY' MAGNOLIA \ ~4 I-GA _ _ SPECIES (COMMON NAME) QUANTITY SIZE ~U. p H ILEX CORNUTA CARISSA 15" MIN, HT, 4' a 224 o C 'CARISSA' HOLLY 5 GAL, O.C. - _ _ ~ _ _ - COMMON THREE-SQUARE 1/10 SQ. FT. CONTAINER OR PEAT POT 1 ~ ~ LIZARD'S TAIL / 0 SQ. FT. CONTAINER OR PEAT POT BUXUS WINTER GEM 18" MIN. HT. 3.5' I 11 8. 7 189 o WB MICROPHYLLA AL. O.C. ~~.I ~ 3-GA 'WINTER GEM' BOXWOOD 3 G ~ 3 15-C aim ~ RICE CUTGRASS 1 /10 SQ, FT. CONTAINER OR P AT ~~r~! E POT ~ NANDINA ~ ~ s a 9 ftlA13 "Fitt ° DN D ME TICA HARBOUR DWAR 8" MIN. HT, 2' \ \ s 174 0 S NANDINA 3 GAL, O.C. N 1 k~ F! r , • • - POOL DEPTH: 9 -18 LOW MARSH I ~ 0 ~ 7-WO 'HARBOUR DWARF' r SPECIES COMMON NAME QUANTITY SIZE rn ( ) F ~ J ':I~~ ~ui~ m ~ DUCK POTATO 1/10 SQ. FT. CONTAINER OR PEAT POT } '"~E+,~ ~ o ~~e; N . ~ ~ Cfl I Q PICKEREL WEED 1/10 SO. FT, CONTAINER OR PEAT POT ss U WILD RICE 1 /10 SQ. FT. CONTAINER OR PEAT POT Lu 7 W0 ~ • ~ J ~ LCJWE S STANDARD LANDSCAPE NOTES d w O = ~ v ~ ~ l~ U e I. ALL PLANTED AREAS SHALL RECEIVE A 3 LAYER OF SHREDDED PINE ~ c ~ _ ~ BARK MULCH OVER A 10 MIL WEED MAT EQUAL TO WEEDBLOCK" BY ~ `f `J U EASY GARDENER OR DEWITT WEED BARRIER. ~ ~ Z m 2 2 ALL DISTURBED AREAS NOT RECEIVING PLANTINGS (INCLUDING ~ Q Z , ~ RIGHT-OF-WAYS) SHALL BE SEEDED. J a o 3, ALL WORK SHALL ~ DONE IN STRICT ACCORDANCE WITH DIVISION 2 ~ - W Z OF LOWE'S STANDARD SITE SPECIFICATIONS, WETLAND AREA ~ Z ~ 4. THE OWNER OF THE PROPERTY IS RESPONSIBLE FOR THE Q ~ CONTINUED PROPER MAINTENANCE OF ALL LANSCAPING MATERIALS AND \ U Z ~ ~ SHALL KEEP THEM IN A PROPER, NEAT AND ORDERLY APPEARANCE, Oa p W Z FREE FROM REFUSE AND DEBRIS, ALL DEAD OR UNHEALTHY PLANT WETLAN AREA J ~ CAUTION Z ~ MATERIAL SHALL BE REPLACED WITHIN 180 DAYS TO MAINTAIN THE QUALITY OF THE LANDSCAPING, IN NO INSTANCE WILL THE CITY OF w W Q W o BELMONT BE RESPONSIBLE FOR THE MAINTENANCE OF ANY VEGETATION UTILITIES PROTECTION SERVICE J J m ~ m a UNLESS SUCH VEGETATION IS WITHIN THE PUBLIC RIGHT-OF-WAY OF A J DAIS BEFORE DIGGING CAII • • i~ CITY MAINTAINED STREET OR IS LOCATED ON PROPERTY OWNED BY THE TOLL FREE 1-800-632-4949 ORIGINAL ISSUE CITY n~ nnntiT _ - - \ ~ nnrF•annm~ 680 77 F=l A ONE CALL SYSTEM FOR COMMUNITY AND JOB SAFETY, I ' . PERMIT . ~.S 5. SEE LANDSCAPE DETAILS SHEET FOR ADDITIONAL LANDSCAPE F s' ~~I J SET CAUTION ISSUE DATE: NOTES. 681ss THE LIDEROROUD U7IUMES SHOM HAW KEN LOCATED CONSTRUCTION SET FROM FIELD SURVEY (FORMATION AND EXISTING DRAWINGS. THE SJRVEYCR MAKES NO GUARANTEE THAT THE UNDERGROUND ISSUE DATE: UTU7ES 940M COMPRISE ALL SUCH UTILITIES NNE AREA, OTHER N SERVICE M ABANDONED, THE SURVEYOR FURTHER DOS NOT NANRAN7 THAT THE UNDERGROUND UTILITIES SHORN ARE IM DRAWING NUMBER: THE EXACT LOCATION INDICATED, ALTHOUGH HE DOS CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM NiORMATIM AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE O 6O In UNDERGROUND UTILITIES LO - 76 662.93 s n 6,5 SP-7 SCALE 1' 60' • • _ k ~ j VI IONS RE PRE-BID SET POST BID SET EXISTING TREES WITH IN THE 50 x ~ . ~ k - , ~ x LANDSCAPE BUFFER TO REMAIN ISSUE DATE ~ ISSUE DATE i.... X _ ~~P~ti~~~;R ~ i r DATE DESCRIPTION ~ ~ ~ r ~ e i v,.:~:~ t. i..~, I~ I .I. ~ , . - (J X7.52'17" E 636.50 TOTAL_ ~i~nvIv~ - - x ~ 1.. 1. ~ ' ~ ~ ~ - x --~-==x- x - x ~ x x,- x - - _ _ ~ / I ` 11 i 108.091 ;~x r ~ x ~-x x-xxx x--X- ~...~r. ~ ~ - - ~~v _ ~ 1. ~ ~ ~ ~ ~ ~ i Irll}r~~ a i~ ~ r _ .i I ~ ~ ~ ~ I , rn Y, ~ ~ ~,50 LANDSCAPE ~T ~ ~ ~ THE 50 LANDSCAPE BUFFER IS TO ~a , , r.~s~s~v,, t~ . ! a. ~ r l , , ~ ~ , , , ~MP~R-a~Y ~ sLO~E , , r ~ ~ . ~ ~ r ;.~~,.~,r+.. ...l.a..... ..L........i...~...., , i ~l , Q ~:a ~ t ~ ` ~ " BUFFER~~ r REMAIN COMPLETELY UND S URBED ; ~J \ ~ 6 ~ ~ LI .ITS , ~ I T IT ~ ~ . ~ _QR~,f~l,, &24.,~ D1A, ~~~3~,p0~, ~ ~ ~ ~ 1~ ~ ; / ; ~ ~ ~ E~(IT 26 I i ...~.~.1.~.~: ~ ~ G i ~ ~ ~ MINT, LD..E) DI T... -NC1E~. DURING CONSTRUCTION STi,~~BA~~CE : < v , A X ~ x. , / r...... ~CE..} a .....~.~.~.~.~I~.~.~r.~.~ .~.~.~1~.~.~:~~ . i ~.....~..f.. i EXIT 27 `1~ ~ . \ EXISTING TREES ~ ~ ,r-/ I - ~ ~o ~ ~ ~ I ~ " ~ ~h l . A . ~ k~~ €1~1 ; ~,m ,s1c.,, tna\ i v . ~ ; v WITH IN THE 5C' ~ - ~ ~ ~ ~ i I I i b ~ I ~ T R TATE 85 i I IN E S ~ ~ i ~ , C~ ~ `I i - LAN APE B FFE ~ ~ 1 I vv~ ~ v. OSC U - 1 ~ i I~ ~ i i~ ! Q _ ~ , i uc ~ \ ~ i 'f~ n ~ ~v I Geo. , - ' V 1 i ~ _ ` ~ ; ;TOE R~M,AIN'~~~ ~ ~ _ v. ,1 v ~ ~ ~ ~ i ~ - - _ _ _ _ ~ SITE ~ ~ ~ _ - ( ~ S -f-~,~ i, ) z ~ I / j ~ ~ ~ ~ ~ ~ ~ ~ - ~ ~ ~ ~ ~ STONE CNEC~ ~ ~ _ ~ y ~ ~ i T I w ~ ~ , --t~RO SCI . - - ` ~ / ~ DAM SPA ' ~ I ~ ~ ~ ~ ~ I~ I~ ~ ~ ; / , I~ ~ LKINSON VD. Q ,rl ~ y v ~ ~ \ ~ I r - - ~ ~ SILT FEN~E 1,~ ~ v b= i ~ In Q . ~ ~ --Q / ~ ~ r~ I ~ _ PRIOR ~0 ANY ~ r ~ f ~ ~ ~ ~ _ ' ' RADIN(~ OR L G. ~ , ~ TQ~SOIL-__ ~ , i / Ef~T BA IN 'I~~ .~~T~ ~ ~ , ~ , ~ IL -7~y~~~ ~ >=~FISTIN~~'REES WITH i ' ~ / -gyp S j.. ~ f.,, ~ ~ 1 ~ { .i ~ ST~~' r~_ --i - ~ / ~ ~ ~ i / ~ % / ~ r_ BEz C NSTRI.J~TE ~ ~ ~ " - - r'CIMITS OF_ DIET BANCE ; i - tt I . ' i ~ i t ' 1 r ~ ~ / / ~ , ~ TQ BE REMOVED r i ~ i ~ ~ r i J Z M~~ ~ ~ f~ I ~ ~ _ , i / ~ / ri~i ~~~~Nyebq LIMIT, OF ~ .tt ~ _ \ ~ ~ , / , ~ - SILT,F~NCE ~ ~ i ~ i ~ 1 ~ I I ~ I N "i i ~ I~ H CAR •a i ~ i ~ l i ~ ~ ~ yli . I ~ € x 1 ~ i ~~F ~ y , ~ ~ ! , ~ • y; I ~ ~ ~ i ~ - _ rr _ i • ~ y i PIPEIRISER INLET ~ ~ , ! ( I . ~fE~'4~ X r"~ , ~ ~ ~ ~ ~ ~ i ~ ~ ~ ~ VICINITY MAP 7 7200 J ~ i ~ ~ ROTECTION r k ~ I , ~ . ~ ; I ~ ~EDIp4Oj TRACK ~ ' ~ i J ~ ~ / ~ N ~ r ~I~ i ~ ~ v i ~ i r l B ~ ~ I Q ~'I ~ IN1E T ( ~ ~ ~ ~ ~ j~ ~ SEf~ dVAL ,%,~OSION ~ r ~ ~ = r 4 i ~ ~ I ~ i= ~ ~ ~ ~ i -RAP AP ON ~ ~ ~ ~ v iv ~ ~ ~ ~ i a t i tt r ~ ~ ~ i h i A ~ , I f ~ i r ~ ~ r 0.' ~ i ~ ~ ~ ~N ~ LEVEL i SPREADS ~ , v.. i ~ I ~ O'SEE~INC~ ~ - v ~ i v y~..... s;~ I ~ ~ . _ ~ ~ r ~ I I~. ~ ~ ~ ~ ~ ~ ~ ~ ~ s . ~ ~ ~ i ~ ~ i IOR.O~^' ~ FRE~,,,, 1 ~ ~?rit?rr~~~"' < ~ ~ ~ ~ ~ % / DIM ,~A3 , ~ ul~, ~ , / ~ i i ~ WATE COU SE ~ ~~a. ~ e~ ~ ~ ~ ~ i a.. ~ i i ( ~ _ I, EROSION DISTURBING ACTIVITIES SHALL NOT COMMENCE \ ~ , r) - i PREDEVELO~M~f~T N ~ ~ / ~ i ~ ~ ~ ` t~ _ Y ~ORARY SLOP ~ 1 ~~A ~ 9,g A~Cv ~ ' ~ ~ ~ ~ ~ ~ I ~ ~ ~ ~ ~I ~ _ / , ~ ~ ~ ~ , ~ i I UNTIL APPROVAL TO DO SO HAS BEEN RECEIVED BY ~ _ _ _ l , r ~ ~ / , I v ~ ~ a.~; '~R,~IN (24 DIA, 33.~J~ _ _ ~ 'UME RlsQUI i • 17,100 CF r / ~ , ~ , T GOVERNING AUTHORITIES (INCLUDING STORMWATER ~ I EXISTING WALMAR Q ~ ~~:rs: ~ MI,~1, ~ ~ _ - Vk?trME~ PR~VtD~ ~ 180,11,5 C~ ~ , V 'v ~ ~ - q ~ ~ ~ ~ FFE 694,00 POLLUTION PREVENTION PLAN PER SECTION 800 OF _ ~ , A -v'~ ~ ~ STOP CHEG'iC _ BO~TbM--BLE~. r '11, 0 ~ r r 1 ~ 1..~, f~IVEf~S10N ~ - I - ~ ~ _ ~ i ~ LOWE S DEVELOPMENT CRITERIA), THE GENERAL 0~ ~ - U 0 ~ ~ ~ ~ i ~ CONTRACTOR SHALL STRICTLY ADHERE TO THE ~ \ + ' T --[~Afvl ~ FACED- - , ~OFf ELE~V: _ ;~7 0 / r r~ ' ~ ~ I APPROVED NPDES SWPP DRAWINGS DURING ~ m'~ ~ / , n i PFD, C~ETAIL tTYP~',, _ E~" ELE~I; 67 0,~ / i LIMITS OF Z .C ~ ~ I, AFTER PERMITS HAVE BEEN OBTAINED AND ~r I ~ ~ ~ r ( ~ ~ DISTURBANCE CONSTRUCTION OPERATIONS. ~ ~ N ~ j Q ~ ~ 1 i ~ SILT ~ Q> p SF ~ ~ ` I - - ~ ~ ~ - \ ~ ~ ` ~ EROSION CONTROL MEASURES INSTALLED, THE , ~ ~ _ ~ i ~ ~ , ~ ~ _ _ , , . ~ ~ ~ ~ ~ _ ~ F 2, NO LAND CLEARING OR GRADING SHALL BEGIN UNTIL ~ Q ~ i ~ ~ ~ ENCE ALL EROSION CONTROL MEASURES HAVE BEEN INSTALLED, - CONTRACTOR SHALL GRADE BUILDING PAD, GARDEN ~ ~ ~ , - ~ ~ ~ ~ - ~ _ _ -'-s ~ L 1 - - - - ~i, ~ ' I ~ ~ p ~ CENTER AND APRONS TO 0,5" OF 5UBGRADE AS ~ , ~ ~ , ~ ~ ~ _ ~ ~ EMP ARY ~ - = i ~ ~~,'i/~ 1~1 m m Q , , ~ ~ ~ p D PER DIVISION 2 COMPACTION SPECIFICATIONS, y ~ ~ ~ ~ TABA IZED I 'I 1 r `~i ~ „ ~ 3, ALL EXPOSED AREAS SHALL BE SEEDED AS SPECIFIED Q ~ p U ~ ~1~,T,' " Il - WITHIN l4 DAYS OF FINAL GRADING, ~L ~ } ~ ONST~ CTI01 ' ~ BARRICA ` ~~i i r ~ ~ C ~ 2. IMMEDIATELY APPLY AND COMPACT STONE BASE ~ ~ - E(JTRANC~'~ v BARRICA F R BUILDING PAD TO ± 0 - 0.5" OF CONCRETE ~i h~;>~~, ~ ~ ~ ~ ~ ' VIDE GRA EL DRIV i` ~ ~ - 4 SHOULD CONSTRUCTION STOP FOR LONGER THAN 14 SUBGRADE AS PER DIVISION 2 SPECIFICATIONS. - ~ ~ ` ~ ~ ~ ~ - ~ ` FOR AD ACC STONE rHECK" ~ / ~ - C J ~ 0 aNE ~ HECK / ~ DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED, d ~ ~ 1 ~ ~ ~ ~ ~ i I DAM SPACED PRI R T EXCAVATING ~ ~ ~~1. ~ ~ ~ ~v r'~ i ~ I STONE SHALL BE APPLED 0 0 ' 1~ ~ ~ ~ ~ tii PACED ' / _ ~ s , ~ ~ ~ - ~ ~ ~ ~ I INTERIOR AND PERIMETER FOOTINGS. ~ ~ ~ S WIDE ~ - 1 i ( PEA DETAIL (T ~ ~ ( I ~ ~ ~ D TAL (TYF~,~ ~ ~ ~ ~ ~ - 5, MAINTAIN EROSION CONTROL MEASURES AFTER EACH ~ ~ i ~ ~ I GRAVEL IVE ~ ~ ~ i ` ~ - ~ - ~ r'~ ~ -I- l-, r ~ _ ~ ~ - ~ ~ ~ ' ~ ~ ~ ~ ~ ~ ~ I ~ RAIN EVENT AND AT LEAST ONCE A WEEK. Z ~ a` i _ Q ~ > r ~ ~ \ ~ ~ I ~ _ ~ ~ ~ I ~ ~ ~ CON RE~TE I ~ ~ ~ - _ I J .C N d) - - lL ~ 6. THIS PLAN SHALL NOT BE CONSIDERED ALL INCLUSIVE W < ~ y. ~ ~ ; ~ Iii ~ - - ~ ~ iWASNOUT ARE v ::a~~ _ ~ N - i~ ~ AS THE CONTRACTOR SHALL TAKE ALL NECESSARY W C - T TIN WPP 1 ~ ~ ~ ii r ~ , I, OBTAIN ALL NECESSARY PERMITS ~ APPROVALS. CALL FOR PRE CONS RUC 0 S i i li ~ I ~ , ~ - -PRECAUTIONS TO PREVENT I EDIMENT FR M EA IN ~ ~ ~ I SOL S 0 L V G 1 ~ CONTRACT R ~0 ENURE, ~ l MEETING BEFORE ANY LAND DISTURBING ACTIVITY OCCURS, ~ \ - ~ , THE SITE. ~ 1 \ ~ ~ DIVERSION ~I~CI~ DRAINS ~ ` ~ - v \ ~i ~ ~ ~ ~ ~ - TO 61ME ~ A IN. ' • • ~ 2, INSTALL TEMPORARY CONSTRUCTION ENTRANCE AT THE LOCATION SHOWN, i ~ ~ ~ . \ I/ ~ \ t ~ _ ~ _--7, CONTRACTOR SHALL COMPLY WITH ALL STATE AND LOWE'S HOME CENTERS INC. N 8,2q~, ~ ~ _ I - _ ~ _ _ ~ ; ~ < ~ ~ / LOCAL ORDINANCES TEAT APPLY. -~~--~----~r - - - i F --~---~~F _ _ - HWY. 268 EAST, EAST DOCK 3, INSTALL INLET PROTECTION ON ALL EXISTING INLETS AS SHOWN, - ~ ; 4' \ ~ .r -r•, ~ agx ' ~ ~ ~ , r.~ _ --r- --T ~ S ~ Ti ~ I KESBORO NC 28659 (VERSION 1 ~ I ~ ~ 8. ADDi ~ ONAL ~RO~I~N AND SEDIMENT CONTROL N, W L , ~ . 4, ESTABLISH LIMITS OF DISTURBANCE AND INSTALL SILT FENCE WHERE SHOWN, ~ . ~ ~ ~ - _ ~ y nITCH I ~ ~ ~~~~a.~ ~ MEASURES W'~_'_ BE I\STALLED IF DEEMED NECESSARY BY ' ~ ~ ~ i~ ~ ON-SITE INS=CONS 336.fi58.4000 (V) 336.658.3257 (F) _ , -EXISTING STORM ~ , ~ ~ ~ ~a,l ~ 5, CLEAR FOR EROSION CONTROL MEASURES, DIVERSION DITCHES AND TEMPORARY ~ ~ STRUCTURE ~ ° ~ ~ ~ THIS ~RAIMNG IS TFiE PROPERTY OF LOWER I 1 1 "1 ~ T SEDIMENT BASIN. - ~ ` ~ i 1 ~ i _ , sT~JN1E cH~~~ 1 ,RIM= 692.53 ~ $ 9. IF INSTALLATION Or STORM DRAINAGE SYSTEM SHOULD Ha,~ECENTERS,INC.ANYUSeoRRePRaoucroN - ' ~ I ~ ~ ~ IN WHOLE OR PAR7IS PROHIBITED WRHOUT THE a FUTURE HOME ~ DAM ~PA~ED , 1 IE IN= 684,39 ~ Lm,~, ~ BE INTERRUPTED BY WEATHER OR NIGHTFALL, THE PIPE owRESSeon~RI7rENCOnsErrtoFLOwesHOn~ 6. EXCAVATE FOR THE SEDIMENT BASIN, INSTALL RISER STRUCTURE AND OUTLET PIPE o 1 _66j OF COWES SIGN 1 ~_~~TAIL' QTII'P) ~ ~~~~:~L-A`~ER ~OM~?AC~TE=D - TALL LEVEL PREADER AT THE OUTFACE OF THE OUTLET PIPE FOR ~ ` ~ 1 "D~ SUPER ~ ~ IE OUT= 674,79 ~ ~ ' / ~ ENDS SHALL BE COVERED WITH FILTER FABRIC, RES R~oNO'00PTR1G"`z°°aALLRIGHTS - - . • FROM THE BASIN. INS S ~ ~ ~ ;GRI~i~IS ,STONE T TIN IN TALL A HORSESHOE SHAPED STONE FILTER RING AT THE RISER ~~b v ~ ; - ~IVERSION 1 ~ ~ . ~ _ OUTLET PRO EC 0 , S I ~ ~ _ _ _ _ ~ , ~ SILT FENCE , ~ %1 - ~ ~ ' . ~ 10. COMPACT i~ MAINTAIN 30 000 F OF 6" THICK ~ S F I T PR TECTION AS SHOWN, SEE POND SECTION iJ RISER DRAWING ~ ~ ~ ~ v ITCH 1 1 ~ ~ ~ ~ ~ ~ ~ STRUCTURE OR NLE 0 ~ ~ ~ \ , 1 ,1 ~ ~ ~ ~ T STONE '~1A ERIAL FQR LAYDOWN AREA ~ 25' WIDE T R D RIN EDIMENT CONDITIONS. APPLY TEMPORARY ~ ~ 1 1 FOR TREATMENT OF RISER STRUC U E U G S I v ~ 1~ ~ ~ ~ ~ ~ ~ , / N . SANITATION I ACCESS RCAD TO SU~LDING, COORDINATE LOCATION OF - ~ ~ SEEDING ON DISTURBED AREAS AS REQUIRED, ~ v ~ ~ / ~ ~ ~ ~ • - FACILITIES i - LAYDOWN AREA VVI?H WE' PR JECT MANAGER, J S 0 ~ - - V I i ~ ~ . ~ \ i - ~ SOLID WASTE - Il T A T ELEVATION IN THE SEDIMENT BASIN. SEDIMENT MUST BE REMOVED ~ ~ ~ ~ ~ - ~ ~ ~ '~~p 7. STAKE CLE NOU v ~ ~ C ~ . RECEPTACLES ~ II. GENERAL CONTRAC OR SHALL BE RESPONSIBLE TO A H THE CLEANOUT ELEVATION IN ORDER FOR THE BASIN TO FUNCTION ~ v ~II , ~ ` ' ~~P ~ : ONCE IT RE C ES ~ \ ; ~ , v y, ~ ~ 1 F T RAGE ~ ~ ~ ~ i ' ~ ~ ~ ~ ~ ' r~, ~iy TAKE WHATEVER MEANS NECESSARY TO ESTABLISH UEL S 0 i ~ 1 ~ ~ / I PERMANENT SOIL STAB!~IZATION, PROPERLY, v ~ ~ 1 ~ 1 1 ~ ,i- AREA, BERM ~ i - ~ ~ ~ ~ H W T DIRECT RUN-OFF TO THE TEMPORARY ~ \ ~ ~ v, ~ ~ ~ ~ ~ 'V ~ ~ ~ ` ` ~ I ~ ~ 8. INSTALL DIVERSION DITCHES ASS 0 N 0 \ R i, AROUND STORAGE ~ ~ ~ ~ ~ ~ 12. SEDIMENT SHALL BE REMOVED FROM THE SEDIMENT ~ ~ , 1, LIMITS OF ~ SEDIMENT BASIN. APPLY TEMPORARY SEEDING AS REQUIRED. , ~ ~ ' ' D1S~ URBANCF= I TANKS AND LINE ~ J 1 'r ~ BASIN BEFORE IT IS 25~ FULL AND FROM SILT FENCE WITH APPROVED ~ l_, ~ ~ ~ - ~ ~ t A ~ TEMPORARY SLR to ~ ~ \ WHEN SEDIMENT REACuES I/3 THE HEIGHT OF THE SILT o MATERIAL ~ 1~ I N DIT HE ARE DIRECTING ~ ~ ~ ~ ~ ~ ~ ,~SIJPER'~~ 9, ONCE SEDIMENT BASIN HAS BEEN INSTALLED AND DIVERS 0 C S ~ FENCE, N- FF T WARD EDIMENT BASIN, BEGIN MASS CLEARING ~ GRUBBING (INCLUDING ~ ~ ~ \ I SILT FENCE RU 0 0 S S A ~ i! ~ ~ 3, `b MII<l,_ COPE) ~ EXISTING WAL-MART \ ~ :OPE) - TEMPORARY ~ % ~ , A K ~ 'POND TO REMAIN ~ ; ~ 13, ALL WORK TO BE DONE IN STRICT ACCORDANCE DEMOLITION) AND MASS GRADING OPERATIONS. APPLY TEMPORARY SEEDING ON DISTURBED y \ ~ ~ i ~ ~ SEEDING TRAC AREAS AS REQUIRED, ~ _ - - ONI~ ~ ~ ~ A A ~ R ION ~AS LONG AS ~ ~ ~ ~ WITH DIVISION 2 OF THE SITEWORK SPECIFICATIONS. WALKING, E OS I AR A NCE GRADES ALLOW. ~ ~ i ~ ~ ~ 10, INSTALL 30,000 SF STONE LAYDOWN E 0 CONTROL BLANKET ~ PRACTICAL. ~ ' ~ CONTRACTOR TO ~ 14, CONTRACTOR SHALL INSPECT, REPAIR AND ADD - ~ HYDROSEEDING ~ ~ ENSURE BASIN 2 ~ STONE TO TEMPORARY CONSTRUCTION ENTRANCES ONCE II, COMMENCE WITH PHASE II, ~ ~v ~ ~ SED MEf~ , V\ ~ - ~ ~ TEMPORARY SLOPE iINCOMPLETE PRIOR ~ THEY BECOME SATURATED WITH MUD 70 ENSURE THEY ' DRAIN (24" DIA. TO FILLING OF ~ ~ ' NT Y F I ~ / CO INUALL UNCTION AS INTENDED, 1-- I ~ I A ~ ~ - ~~Ska~PE~-- - ~ EXISTING WM, BASIN " - - / ~ ~ 15, TOPSOIL STOCKPILE SHALL BE GRADED TO DRAIN AND f ~ - I ~ A, y ' ~ S.W.P,P. LEGEND Q ~ ~ ~ I ~ ~ PRIOR 1 MANY MASS ~ ' I ~ / / SEED WITH TEMPORARY SEED MIXTURE. Y u~~ GRADING OR L I ~ ~ Ex6SIIC;f PROPOSED DESCRIPTION _ ~ \~I ~ ~ ~ 1 ~ ~ ~ I, T - p~- COr1T0UR L~I~ ~ ~ 1 ~ ' - EDIMENT BASIN MUST ~ ~ s::' S 16. SILT REMOVED FROM THE TEMPORARY SEDIMENT ~ ~ STORM DRAIN L~ ~l \ ,1 ~ v ) > ~ ~E CONSTRUCTED AS i ~ BASIN AND FROM BEHIND THE SILT FENCE SHALL BE ~ ~ ~ ~ > ~ ~ ~ ~ V1A V~ ~ I SHOWN i I , ' ~ PLACED ON THE TOPSOIL STOCKPILE. ~ ~ i I~ m - R lT FENCF ~ \ P, 1~ ~ I ~ ~ ssF s~ s ~ ~ ~ ~ 1 ss ~ ~ ~ ~ IPE/RISER INLET I I / Q 1 ~ i ~ s DIVERSION DITCH ~ ~,-659-~~ ~ I I i' ~ PRO TION I ",I 17. ALL SLOPES 3~1 AND STEEPER SHALL RECEIVE CURLEX m c~ ~ Z o ' SUPER '~I EROSION CONTROL MATTING OR APPROVED EQUAL AND W u~ ~ TRACK WALKING, J Y LIMITS OF DISTLRBANCE ~)j '~I J ~ ~ Ir ~ ~ /6 ~ V -1' III ~ ,A. ~ I ~ / ; , 662' ~ 6 ~ ~ ~ - ~ j4~ ~ 1LT FENCE ~ / w 1N.ET PROTECTION I ~ ~ ~ ~ , ~ ~ ~ F I ~ ~ - ~ ~ ~ Q z E LIMITS OF, ~I 'I / ~ 18. SEDIMENT AND EROSION CONTROL MEASURES SHALL Z ~ i - - ~ LINE TABLE y ~ v v i ~ DISTURBAf~CE ~ BE INSPECTED AT LEAST ONCE EVERY 7 DAYS AND Q ~ ® STONE CHECK DAM ` ~ ~ I ~ ~ ~ ~ \y ~ ~ ~ ~ LINE LENGTH BEARING ~ ~ ~ , ~ r~ ~ ~ ~ F F IN J ~ WITHIN 24 HOURS 0 A RAIN ALL EVENT EXCEED G 05" m U > STONE RLTER RNG - ~ ~ ~ , l;/ ~ ~ I ~ ~ 0. P I FR ENTLY IF _ ~ ALL WORK SHALL BE DURING A 24 HOUR ER OD OR MORE EQU ~ L1 20,25 S 87 28 29 W ~ ~ ,y~~ ~ ~ r ! ~ ~ A ~ ~ -66~ ~ '.r a I, ~ v ~ X665 - ~ V V \ REQUIRED BY GOVERNING NPDES GENERAL PERMIT, ALL = m NE IN TRI T z -easlN 2 - - DO S C L2 28.22 S 87'28 29 W carvsmucnoN e~mA>ucE v ~ ~ ' \ v ~ ~ ~ ' ,~_';r ~~1~ ~ ~ ~ Q v ~ ~ MAINTENANCE REQUIRED BY INSPECTION SHALL Q. ~ ~ - ACCORDANCE WITH COMMMENCE WITHIN 24 HOURS AND COMPLETED WITHIN L3 N 08'30 25 W ` ~ ~ ",,i ~ ~ ~ ~ ~ ~~r , 89,28 v v~ ~ - v v v v , ~ = OI~IN~I ~ v vV % ~ - ~ v v I~~I~I v iy -~-d.~ CL o ~ DIVISION 2 OF LOWS S 48 HOURS OF REPORT, DAMAGED OR INEFFECTIVE L4 53,16 N 16'37 28 W ~AYOOwN aeeA v v ~ v , , ~ ~ ~ ~ ~ DEVICE HALL BE RE AIRED OR REPLACED A„ STANDARD SITEWORK S S Z 1 ~ I 1 ; ~ ~ ~ ~ ,-z 1 L5 97.99 N 25'03 09 W i ~ ~ ~ ~ I I _ _ ~ ,v SPECIFICATIONS NECESSARY, w ~ ~ PERMANENT SEEDS ~ ~ ~ ! ~ ~ i I ~ ~lE TLA~D , , ~ L6 63.61 N 30'13 43 W v v , ~ ~ / ~ v ~ REa ~ 1, ~ L7 24.42 N 65'57'10 W ~ ; i ~ ~ i l ~ v ~ ~ ,v ~ , TEMPORARY 5~ ~r 19, ALL WORK SHALL BE DONE IN STRICT ACCORDANCE Z L8 34.32 S 02'31 31 E %F ~ h-LIMITS ~ ~ ~ ~ ~ I I i A ~ c ~ W WITH THE SITEWORK SPECIFICATIONS, (n c W UP Rv - '~~i ss \ ~ e~,,~, 65, a ~ ~ ; I ii i ~ DISTURBANCE ~ ~ ~ tt W z u ~ ~ ~ BASIN 2 ILA FENCE ~ ~ r v v 1 ~ ~ wEr~AN~ ~ ~ ~ SEDIMENT BASIN 2 I ~ ~ ~ ` ~ ~ ~ ~ ' I ~ I I ~ ~ ` ~6s~, ~ PR EVELOPMENT DRA CURVE TABLE ~ ;:,,,~~I ~ ~ i ~ ~ `aUPfsR ~ r ~ AREA v ED AIN E ~**CAUTION*** NOTE= TEMPORARY UTILITIES (WATER, Q J W >PMENT DR AG W I r r r. ti.~ A ~ F ~ V AREA• 7.0 AC CURVE RADIUS LENGTH TANGENT CHORD BEARING DELTA I ; I ~ 1SILT ~E ~ AC = Q W o ELECTRIC ~ PHONE) SHALL BE EXTENDED TO I ~ l( ~ 1 , ' ~ ~ ; ~ ; , ~ _ .s - _ _ ~ ~ A v a ~ , \6 VOLUME REQUIRED ~ i ~ \ v s C1 TIE 465.00 93.49 46.90 93,33 S 71'42 45 E 11 31 08 i I ~ ~ _ _v~ " ii v V v ~ \ ~ VOLUME PROVIDED J ~m _GIUIRED 12,600 UTILITIES PROTECTION SERwCE a. d a - ~I~ r > A ~ 1 C2 4 ' 7 18" E 44'39 44 - _ I v \ ~ LOWS S LAYDOWN AREA BY CONTRACTOR • • ROVIDED 76,925 ORIGINAL ISSUE 315,00 245,54 129.39 239.37' S 33 ~ 1 ~ TT M ELEV. - 670.E -=Y=--~ ~ ~ ~ I ~ > v ~ ~ a ~ BO 0 LEV. - 670.00 tai ~~0-8pp-632-4949 676.00 _ - _ _ _ DATE: 6120/06 C3 3A5.(l0 478.66 275.81 448,42' N 56°54 29 W 71'14 05 ~ , ~ ~ ? ~ I. ~ ! ~ ~ ~ TOP ELEV. - 676.00 I - Sic N f I\, I C.O. ELEV, 672.00 C4 47' 74' 7,47' N 88°09'15" E 1'21'32" O" e ~-UWCS • 672.00 A ONE CAFE SYSTIN FOR COWAUMTT AMU JW Wt IT, PERMIT ET 315,00 7. 3, ,s o. y N LOC4716N L ISSUE DATE: CAUTION MAINTENANCE STATEMENT \ THE UNDERCROUD UTILITIES SNOW HAVE BEEN LOCATED EROSION CONTROL MEASURES WILL BE MAINTAINED CONSTRUCTION SET C5 2994,79 473.47 237,23 472,97 S 87-54'33" E 9'03 30 ~ az ~ ICI 3 I ~ 1 s i 1 AA FROM rIEED aAIVEV NroaNAnw AND EXISTING DRAWINGS. V' THE SURVEYOR NUKES NO GUARANTEE THAT THE UNDERGROUND AT ALL TIMES. IF FULL IMPLEMENTATION OF THE ISSUE DATE: l UTUIES SHOM CONPRA L SUCH UTILITIES IN TMER~. EITHER N SERVICE OR ABANDONED. THE SURVEYOR rU DOES APPROVED PLAN DOES NOT PROVIDE FOR DRAWING NUMBER: NOT WARRANT THAT THE UNDERGROUND UTILITIES SHORN ARE IN 67.49 s~45' t' ( THE EXACT LOCATION IDICATEED ALTHOUGH POSSIBLE ES CERTI" THAT EFFECTIVE EROSION CONTROL, ADDITIONAL EROSION MET ARE LOCATED As ACCU m ~ ~ AVAILABLE. THE SURVEYOR HAS NOT EHIYSDALEY LOCATED THE UNDERGROUND UTILITIES CONTROL MEASURES SHALL BE IMPLEMENTED TO 0 60 120 / / - - E?F~ 4 662.93 CONTROL OR TREAT THE SEDIMENT SOURCE, SP-8 SCALE I" 60' a / • ~ r ~ ~I ~ (I J,~ UJT E i' 1 ~ , ~ I~~ ~ x _ ~ I I ~U~ , t • • ~ EXISTING TREES WITH IN THE 50' REVISION S . ~ x ~ x - LANDSCAPE BUFFER TO REMAIN PRE-BID SET POST BID SET ISSUE DATE ~ ISSUE DATE ~ ~ - ~ ~ ~ ~r~~.~ ~ ~t x ~ ~ ~a.~, ~ ~ _ _ N ~I',5~ 1 i E 6.IE~.50 TOiA~ ±,r~ ~~~~r~~°,~ DATE DESCRIPTION : _ ~ ~ ~ v. I.. n _ - { k.~x_~x x x-x-x-x - x -x= - r ~ m ; 50 LANDSCA E - ~ ~ i~.i!.t~ , J / I f . I . f ..C ~ 1.. ~ ~ 1 l N r i i i , 1.. ~ ~ f \ E 50' LANDSCAPE BUFFER IS TO - ~ `sgs~f _l.:r...~. Q ~;a\~.~ ~ s..a r.~.BUFFER~~, ~ ~ ~ LI IT l 1 t..r:..... ~ I:...~....~, 1/ ~ !l.'.'.'~~.','!.'.1.'.'.. ~ - i I ~~1 1 I ~ . ~ . a ~ i~t ti~ ~ _ _ ~ ~ ~ ~ b~~, ~ ~ ...1.. ~ ~ S ! REMAIN COMPLETELY UNDISTURBED i` ~~;11~!IITS~ ~ ~ ~ ~ ~ DI~T ~NC~ DURING CONSTRUCTION f T 1 ~ i ~ ~ ~ . ( EXIT 26 r..S f .'.1..:.,''.'. i.'.'.'~.. ~ i ~ 1..... ...C.~..,. ~ , N TR - ~ • ~ S G EES ~ ~ r~~ l !...l...L..:, ..~.m ..1..~.1.~..~~!~ ~ ~ ~ EXIT 27 ~ ~ - J ,G ~ ~ WITH IN THE 5 ~ ~ ~ i I ~r x' a ~ ~ r ~ F~ ~ ~ 2. ~ Y i / ~ - / e , LANDSCAPE BUFFS : _ ~ ~ y T 5 A 8 T E TR INES IPA I;; ~ N ~ -O~'ANGE- ~ . ~ ' Q r a` ; i IP ~ _ _ _ ~ ~ i a ' L D ' - SITE r , ~ROT€QII ~ ~ ~ ~ ~ ~ > 1 t - - - / ~ I~, ~ ~ ~ - ~WI~ ~I~rn ~ ~ ~ ~ _ ~ ~ ~ ~ ~ 3' S46 STRIP TYP, ~ ~ , SI T FENOE ~ • ~ ~ ~ , ~ WILK ,.v - - WSON BLVD. Q BEWIND-..ALL CURB LIf~ES`~ ~ ~ ~ , E~iPQ A Y / ~ ~ _ i - ~ Q ~ i h ~ ~ ~ . ~ r~ - ~ II - - o-~ ii ~ ~ ~ ~ ~ ~ ' ~ ~ ~ _ T~E'~ _ ~ - ~ ~ I~ r JIII IP r ~ ~ ~ Ul ~ ~ _ r t~ STO~~' 1 ~ _ ~ ~ ~ ~ , r ~ ~ u - - ~ - r ~ u ~ ~ • ~ S - ' ~ ~ ~ „ ~ ~ i r ~~~i ~ , p ~ I r i ~ / r ~ / s ~ , ~ ~ ~ ~~~n - _ 0 ~i ~ i - ,i _ S ~ ~ ~ / i ~ ~ ~I DISTURBANCE ; ~i , I / _ ~ ~ I ~.o, r ~ i+ ~ ~~~nN~ i i ~ - r I ~'"rr i PIPE/RISER INLET ~ ~ / ~ i i r l RoTECTION ~ ' ~ ~ ~ / r i rr J r~ ~ , ~ ~ , VICINITY MAP - 7 - 7200 ~ f s~op•,~9 Q v I l5~ ~ / ~ r~ r l / i \ , ~ ~ ~ - , i i r . - ~ ~ r ~ i ~ t i ~ r , ~ ~ ~ ' ~ 1 i ~ ~ , SEAL L EL ~ SPREADER ~ ~..i ~ , ~ ~ ~'~l ` ( ` r r ~ ~ ~ f I I i i ~ ~ ~ ~ ~ ~ rl - e r r ~ i ~ I i ~1 ._r_ ~ 1 C ~ ~.e~ I ~ ; ) i r r ~ ~ ~ rfj. COU~SE ~ i i I FS yP. _ , i ~ ~ ~ ~ I~ ~ 691 ~ / i , ~ ~ ~.i ~ ~ ~ r r i~ I, ER i N I T r r 1 ~ _ i ~ i ~ / i / I ~ ~ ~ ~ I OS 0 D S UUBING ACTIVITIES SHALL NOT COMMENCE ~ ~ ~ ~ ~i " ' UNTIL APPROVAL TO DO SO NA BEEN ` ~ , a _ - _ , - ~ ~ ~ >1 - - r ~ r - S RECEIVED BY ; EXISTING WALMART GOVERNING AUTHORITIES (INCLUDING STORMWATER ~ ~ l 70 ~ ~ ISL~ND~ _ TO r ' ~ ~ - _ r i ~ l r . ~ ~ ~ ~ ~ , ~Ef;EIVE,SOD T~PI ~ l r r ~ ~ ~ - i r ~ _ _ _ FFE 694,00 POLLUTION PREVENTION PLAN PER SECTION 800 OF ~1 ' ` - - / ~ r 1 ~ ~ .p~,~ _ - _ - ~ ~ ~ ~ - _ - ~ ~ ~ - - _ - ~ ~ LOWE' S DEVEL P U ~ _ ~ 0 MENT CRITERIA). THE GENERAL ~ 0~ ~ ~ ~ ~ it ~ ~ _ NT Z ~ li CO RACTOR SHALL STRICTLY ADHERE TO THE - , li ----~,1~ ~ _ _ ~ ~ ~ \ ~ ~ ~ - _ ,r ~ 9 , - _ ; - ~ ~ i APPROVED NPDES SWPP DRAWINGS DURIN ~ ~ `0 ~ LIMITS OF G ~ 0 ~ - ~ ~ ~ . ~ ~ _ ~ , , _ ~ i ~ DISTURBANCE CONSTRUCTION OPERATIONS. Z ~ ~ N - - i ~ ~ N ~ Q ~ ~ _ i ~ ~ , ~ SILT Q > 2, NO LAND CLEARING OR GRADIN NA ~ 0 ~ ` ~ , i ~ I , _ _ , - _ - ~ ~ ~ ~ ~ A_ N T~ , ~ - 1,~ ' ' ~ i FENCE G S LL BEGIN UNTIL ~ ~~i ' ~ ~ - ALL EROSION C NT ~ Q = 0 120E MEASURES NAVE BEEN INSTALLED, v ~ ~ L ' ~ ~ y f I I . ~ LL o I Ni L ~ Q~ o ~ - ~ _ o - . _ ~ i ~ U _ 3, ALL EXPO ~ c ~ SED AREAS SHALL BE SEEDED AS SPECIFIED Q ~ ~ ~ BARRICA WITHIN 14 DAYS OF FINAL GRADING, ~ RICA ~ ~ ~ ~~~r=-_ ~ - ~ ~ ~5, ~IIDE GRAVEL DRIV i ~ ~~s l FOR f~AD A~C~ ' ! 4. SHOULD CONSTRUCTION STOP FOR LONGER TN ~ ~ ~ I _ AN 14 C ~~0 / ~ _ DAYS, THE SITE SHALL BE SEEDED AS SPECIFIED. p m ~ ~ : ~ ~ ~ f~ - y ( ~ ~ ~ ,1 5, MAINTAIN EROSION CONTROL MEASURES AFTER EACH ~ o ~ ~ ~ A ~ - - i~ RAIN EVENT AND AT T Z ~ ~ LEAS ONCE A WEEK. ~ 0~ ~ Q ~ ~ ~ ~ , ~ ~ ~ ISLANDS TO ~ AN T~ ~ ~O DS 0~ J c I, MAINTAIN ALL EROSION CONTROL MEASURES AND DEVICES AND REPAIR AS NECESSARY, ~ N ~ i i ~ ~ `RECIEVE~,SOD - ~ b. THIS PLAN SHALL NOT BE .C N N ,IEVE~,SOD TYP, CONSIDL~RED ALL INCLUSIVE LU A TN ~ (D S E CONTRACTOR SHALL TAKE ALL NECESSARY W C _ . l~ _ PRECAUTIONS TO PREVENT SOIL SEDIMENT FROM LEAVING ~ ~ ~ ~ V ~ ( ~ ~ 2. COMMENCE CONSTRUCTION OF RETAINING WALLS A',B',C', AND 'E'• CONTRACTOR.. TO ~ ~ ~ iii' ~ _ - ~ ,THE IT - ~ S E, LL ENSURE POSITIVE DRAINAGE AWAY FROM THE WALLS AT ALL TIMES, TO ALLOW i ~ ~ - ! ~ 9 ~ e~,, _ - i ~ ` i ~ I' \ ~ CONSTRUCTION OF BUILDING PAD. ; ~ ~ , ~ rr l l , _ ~ ~ ~ ~ _ 728 2~ ~ ~ ~ - _ 7, CONTRACTOR SHALL COMPLY WITH ALL T T - ~ SAE AND LOWE S HOME CENTERS, INC. ~ ~ 3, BUILDING PAD TO BE CONSTRUCTED AS GRADING WILL ALLOW, STONE PAD UPON ~ - A ~ , ~ ' , ~ ~ • . ~ = y' ~ ~ - _ = L AL I OC ORD NANCES THAT APPLY. y ~ REACHING GRADE: ~ ~ ~ ~ l ~ \ s i / ' ~ ~ - ~--_~~-----r - HWY. 268 EAST, EAST DOCK 69 ~ L. _ 8. ADDITIONA;_ ER I^ ~ S~ SOD ~ ~ ~ ',y r , OS ~N A'~~ SEDIMENT CONTROL N. WILKESBORO, NC 28659 4, CONTINUE GRADING SITE AS NEEDED (INCLUDING REMAINING RETAINING WALLS) TO I ~ ~ STRIP ~TY,• Al ~ ~ ~ ~ I / ~ , ,b , ~ MEASURES NJ~- BE IN„ A__`D I DEEMED NECESSARY BY ~ ~ ~ ~ " ~ ' ! CN-SITE INSp`_C~'CNS. 336,658,4000 336.658.3257 F ACHIEVE FINAL GRADES FOR THE PARKING LOT AND ACCESS ROADS• HYDROSEED ALL , ` 1 ! ~ ` ~E_ _ LLB ~ ~ r ~ ~ ~ SLOPES WITH PERMANENT SEED MIXTURE, USE APPROPRIATE SLOPE PROTECTION. _ ` i \ ' . ; I ~ ~ , N) ( ) ~ ~ ~ • ~ ~ ~ ~ ~ ~ ~ ~ I 1 - ~ - li 9. IF IN T T ~ THis oRAwlNC Ls rHE PROPERrv of LowEs y / \ S ALLA ION OF STORM DRAINAGE SYSTEM SHOULD HOME CENTERS, INC. ANY USEOR REPROOUCTIDN 5, INSTALL TORMDRAIN Y TEM, IN TALL PR TE TI N AT ALL INLET AND OUTLET AT ~ ~ ~ ! S S S S O C O S S ~ ~ _ i~ ~ BE INTERRUPTED BY WEATN ~NWHCLEaRPARTISPROHISITEOWfTNOUTTHE S~ I 5~ ~ ErG OR NIG'-ITFALL+ T~"E PIPE EXPRESSED WRITTEN CONSENT OF LOWE'S HOME THE TIME OF INSTALLATION• CONTRACTOR TO INSPECT PIPES FOR ANY ACCUMILATION ~ 1 1 ` 1 , , ~ ~ _ 1J ENDS SHALL BE COVERED WITH FILTER FABRIC, °EN~~~'"D~O~~'D~~'~LR'D"TS RESERVED SILT F CE ` OF SEDIMENT, IF ENCOUNTERED, SEDIMENT IS TO BE REMOVED. ; 66< ~~s ~r ~ ~ ~ ~ ~ , ~ Y~•r ~ 1~ ~ ~J 1 ~ ~ i - j ~ y I ~ I n ~ ~ I ~ ~ \ \ V ~ ~ ~ i ~ I - I~ ~ ~ 1 ~ ~ _ 0, COMPACT ~ MAINTAIN X0,000 SF OF 6" THICK 6: PERFORM EARTHWORK ACTIVITY FOR MERCY DRIVE EXTENSION ~ WILINSON BLVD. ` I ~ ' ~ 1~ 1 ~ ~ ~ ~ ~ ~ ~ ~ ~ g ~ ~ i TONE M T~ ~ ~ S A ~RIAL FOR LAYDOWN AREA ~ 25' WIDE - ~ ~ \ \ ~ ACCESS RCAD TO BUILDING, IMPROVEMENTS, ~ l ~ ~ ~ ~ ~ ~ ~ ~ ~ / ~ - ~ , ~ ~ ~ / PER' ~ ' ' - ~U r ~ COORDINATE LOCATION OF ~ LAYDOWN AREA WITH LOWE'S PROJECT MANAGER, 7, CURB ~ GUTTER PARKING LOT DRIVEWAYS AND LANDSCAPED ISLANDS, BEGIN PAVING \ , ,SILT FE Ct` ~ , _ ~ 0 OPERATION ~ ~ ~ ~ ,r _ S ~ ~1 ~ i ~ ~ II, GENERAL CONTRACTOR SHALL BE RESPONSIBLE TO ~ i ~ ~ i ~ ~ 1 1 1 ~ ~ 1, TAKE WHATEVER MEANS NECESSARY TO E TABU N ' % S S / ~ ~ ~ ~ wl 8. HYDROSEED ALL DISTURBED AREAS WITH PERMANENT SEED MIXTURE AND STRAW ~ ` ~ ~ ~ ~ l ~ ' ~ ~ 11 ~ ~ PERMA T T r NEN SO L S ABILI A~ ~ Z ON. i i MULCH WITH TACKIFIER, r~~ ~ TEMPORARY STdBALI ED r _ ~ ~ ~ ~ ~ ~ ~ 1 ~ i ~ i CONSTRUCTION ENTRANCE 8. INSTALL TREES AND SHRUBS PER LANDSCAPE PLAN AND MULCN• ~ ~ \ ~ ~ ~ ~ ~ ~ ~ ~ ~ • ~ ~ ~ . 12, E I T ~ S D MEN SHALL BE R~MOVED FROM THE SEDIMENT ~ ~ BASIN BEFORE IT IS 25~ FULL AN F _ ~ i ~ ~ _ , ~ - \ \ 8 I D ROM SILT FENCE y ~ A WHEN SEDIMENT REACHES li3 THE HEIGHT OF THE I T 10. REMOVE SILT FROM THE BASIN AND STORMDRAIN PIPES AS SOON AS VEGETATION ~ ~ ~ I ~ IP _ FENCE, NA ~ ~ _IP S BEEN ESTABLISHED ON ALL DISTURBED AREAS CONVERT RISER STRUCTURE TO ~ ~ ~ ~ ~ EXI TIN ~ ~ ~ 8 S G WAL-MART , i PERMANENT NDITI N AN RA E W T T TI N T FI F ~ ' ~ CO 0 D G D E DE EN ON POD 0 ITS NAL CON IGURATION. Y. ~ A s POND TO REMAIN / 13, ALL WORK TO BE DONE IN STRICT ACCORDANCE AS LONG AS ~ ~ WITH DIVISION 2 OF THE h ~ ~ ~ 1~V I - ~ S EWORK SPECIFICATI N , 0 S PRACTICAL. ~ II, REMOVE ALL ILT FEN E AN TH R T MP MP' ~ ~ ~ S C D 0 E E ORARY B S ONCE VEGETATION HAS BEEN _ ; ~ ~ ~ ~ _ CONTRACT R T ~ 0 0 ~ 14. CONTRACTOR SHALL INSPECT, REPAIR AND A ESTABLISHED, PERFORM GENERAL CLEANUP OF SITE, ` ~ ~ ~ ~ ~ ~ ENSURE BASIN u 2 DD \ ; / STONE TO TEMPORARY CONSTRUCTION ENTRANCES ONCE -J ~ ~ _ ~ ; INCOMPLETE PRIOR ~ ~ ~ ~ ~ THEY BECOME SATURATED WITH M T U D 0 EN R T _ _ - ~ _ MV b ~ ~ .~MAI FP~,. ~ - v _ _ _ I SUE NEY 8 68 i T FI 0 LUNG OF ~ CONTINUALLY FUNCTION AS INTENDED, ,Y"t ~ - - r•4~ V ~ ~ ~ A b~ i _ EXISTING WM, BASIN ~ / ~ S,W,P.P. LEGEND ~ ~ b ~ I - ~ ~ ~ ~ ~ ~~i 15, TOPSOIL STOCKPIL H ~ ~ 1 ~ li, ~ E S ALL BE GRADED TO DRAIN AND ~ A ~ F.XISIId~ PROPOSED DESCRIPTI ~ _ ~ _ 99 ~ ;t. ~ ~ I i ~ ~ ~ SEED WITH TEMPORARY SEED MIXT R U E, CIX~ITOUR LIME ~ ~ _ ~ ~ I ~ ~ ~ W' ~ _ ~ 1~ I ~ I 1 6 ~ STORM DRAIN LIt`E °~1 ~~"y" ; ~ ~ ~ b x I ' ~ _ I ~ Ib. SILT REMOVED FROM TN ~ I • ~ P ( ; ~ E TEMPORARY SEDIMENT ~ i T~ , , E A T BASIN AND FROM BEHIND THE ILT F -SSF- SUPER SLT FENCE ~ ~ ~ S : ~ 'a" ~ ~ ' SEEDING ~ 1 S ENCE SHALL BE PLACED ON THE T P IL ~ 0 SO S OCKPILE, ~ 'I ~ m DIVERSION 017CH ~ ' -~s9-- ~ t ~ ~ ~ i .1 ~ b ~ ~ ~ ` _''I ,I 17. ALL SLOPES 3' I AND STEEPER SHALL RECEIVE CURLEX Q m ~ ~ ~ ~ ~ \ l LIMITS OF DISTURBANCE ~ ~~r~~~l r l - 6 '~I ER I OS ON CONTROL MATTING OR APPROVED EQUAL AND Z o _ , ~ / 1r., - ~ ~ ~ ~ TRACK WALKIN - w G, Y J ~ I T TI ~I ~ ~ ~ - ~ ~ ~ - ~ w 0 Z _ it - 18, SEDIMENT AND EROSION „ONTROL MEASURES SHALL ~ LINE TABLE TONE NECK AM - ~ ~ ~ ~ ~ i BE INSPECTED AT LEA T N Q LINE LENGTH ARI ® s c o ~ PERMAN NT BE NG ~ - ~ I E ~ ~ - ~ L s - _ ~ ~ ~ S 0 CE EVERY 7 DAYS AND ~ ~ , ~ ~ - I ~ WITNI J Q ~ N 24 HOURS OF A RA NFALL EVENT EXCEEDING 0.5" m , ~ L1 ~ sroNE Fi~rER RW ~ ~i , I ~ / ~ EEDING s ~ ~ 20.25 S 87 28 29 W - \ ~ 6 ~ ~ ~ _ U I~ DURING A 24 HO R P ~ ~ U ERI ~ ~ OD OR MORE FREQUENTLY IF } L2 28.22 S 87°28 29 W- ~ ~ 665 ~ ,i ~ , ~ , _ A ; cavsraucna~ ENTRANCE r ~ ~ r i ~ ~ ~ ,,r~~ ~ ~ tt REQUIRED BY GOVERNING NPDES GENERAL PERMIT, ALL m BASIN 2 = _ ~ t ~ ~ x ~ 89, 28 N 08'30 25 W ~ ~ , . , , ~ - ~ ~ i ~ ~ ~ ~ a ~ ~ ~ . _ _ MAINTENANCE REQUIRED BY INSPECTION NA ~ Z ~ L4 53.16 N 16'37 28 W ~ ~AroowN ,er~EA ` ~ ~ - P ~ ~ ~ _ _ ~ ~ ~ ~ _ COMMMENCE WITHIN 24 HOURS AND MP T ~ ~A_ CO LE ED WITHIN Q. L5 ' 1 yP ~ ~ ~ ~ 9 w _ _ 48 HOURS OF REPORT. DAMAGED OR INEFFECTIVE o PERMANENT SING ~ ~ ' ~ l _ _ ~ i ~ L6 63.61 N 30'13 43 W r A ~ ~ ~ I I r~~~ ~~A~~o _ _ ~ - _ _ _ DEVICES SHALL BE REPAIRED OR REPLACED, AS ` NECE ARY, Z SS ` ` i ~ i ~ ~,~Ea ~ } ~ A~JE T L7 24.42' N 65'57'1 " W i ,r ~ -~'m_~';` cn Z TEMP ARY ~ ' ; l ~ ~ ~ ~ ~ > OR 5gD?~ ~ ~ r h ~ ~ ~ 1. ~ \ L8 , ~ ~ ~ I ~ N ~ 1 ~r ~ ~ 34.32 S 02'31 31 E , , ~ s ~ Q > ~ i 1~ sse. 19. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE ~ ~ !~-LIMITS 0 ~ ~ ~ ~ 5UP R ~ ~ Z WITH THE SITEWORK SPECIFICATIONS, (f~ ~ DISTURBANC ss , 5 , i' > _ , ILA F _ n ~ S ONCE ~ i nn N "1 RV W ~ o W C Z CU TA E BLE ( - 1 ~ i ~ ~ ~ ~ ~ ~~6s6 ~ ~ r ~ ~ SUPER ~ ~ _ , CAUTION NOTE" TEMPORARY UTILITIE (WAT ~ CURVE RADIUS LENGTH TANGENT CHORD BEARING DELTA I ~ i ! - -~-_l ~ ~ ' ~ ~ ~ l~( 1SILT F~1~E ~ ~ ~ S S ER, Q ~ W W 'J _ 1 _ A ~ C TIE _ 465.00 93.49 46.90 93,33 S 71'42 45 E 11'31 08 J I ~ , - ~ a ~ A6 , ELECTRIC PN N) = O W o TI ITI PR T tl ~ 0 E SI-IALL BE EXTENDED TO ~Y~1 U L ES 0 EC ON SERwCE O. ...I W m ~ C2 315,00 245.54 129.39 239,37 S 43'37'18" E 44°3 '44" - ~ ~ \ ~ ,5, 9 ~ ~ - - _ ~ LOWS' S LAYDOWN AREA BY CONTRA~`T D a 3 GAYS BffGRE DIGGING CALL v O^ ~ ~ 385.00 478,66 275.81 448.42 N 56°54 29 W 71'14 05 ~ _ ~ _ - ) ~ ~ ~ ~ ' ~ toll FEE I-aDO-s~2-4a4s ORIGINAL ISSUE (~A tae nn~ e-r~ ~ ~ .>>.,n ~ ~ I!: I ~ ~e (1lA1GC~ CII~`nl ~ ~ ~ ~ - ; . naTF• Rr~nm~ - % LOCATIdN 80.7 A DIE CALL SYMM MR COMWNRY AND JOB SAFETY. C5 2994.79 473,47 237,23 472,97 S 87 54 33 E 9 03 30 V I~1I „%Nit PERMIT SET ei ~U CAUTM ISSUE DATE: TO[ FROM a;"D A"S01'O SHOYM ""W BEEN LOCATED CONSTRUCTION SET ti VE AND EXISTING DR WINDS, THE SIAVETCN MAKES NO aNUNTEE THAT THE UNDERGROUND ISSUE DATE: UTUTES 94TRN COiRISE ALL SUCH UTILITIES IN THE AREA, EITHER N SERVICE OR ARAMDCNED. THE SURVEYOR FURTHER DOES i MDT .I THAT THE UNDERGROUND UTILITIES SNOVIN ARE IN DRAWING NUMBER: ~ I THE EXACT LOCATION INDICATED. ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS Y AVAILABLE. THE SURYSYOR HAS NOT PHYSICALLY FROM LOCATED ~ AW* I UNDERGROUND UTILITIES 0 60 120 I - N sp-9 SCALE 1" 60' • • • REVI IONS S PRE-BID SET POST BID SET ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION PERMANENT SEEDING 6.11 Def IYlItIOn Controlling runoff and erosion on disturbed areas by establishing perennial MO.IntenO,nCe Generally, a stand of vegetation cannot be determined to be fully established vegetative cover with seed, until soil cover has been maintained far one full year from planting, Inspect Tebk8.1Oc 615 RIP-RAP seeded areas for failure and make necessary repairs and resealings within the Temporery8Ee(i~ Table 8.10c mbthre ~Y$~~A Ala er of stone desi ned to rotect and stabilize areas subject to Purpose To reduce erosion and decrease sediment yield from disturbed areas, and to per- same season, if possible. manently stabilize such areas In a manner that Is economical, adapts to site con- RecoffMnettdatiolletw Species Rate (blacre) D E F I N I T I O N Y 9 p ~ oIfM11at1dalbfl! tOf erosion, Rye (grain) 120 ditions, and allows selection of the most appropriate plant materials, Reeeedng- If a stand has inadequate cover, re-evaluate choice of plant mate- rials and quantities of lime and fertilizer, Re-establish the stand after seedbed PURPOSE To protect the soil surface from erosive forces and/or improve stability Mountains-Aug. 15- Dec. l5 of soil slopes that are subject to seepage ar have poor soil structure, SpeCIflCCttI0n5 SEEDE~REOUFi~IENTS preparation or over-seed the stand, Consider seeding temporary, annual species Establishment of vegetation should not be attempted on sites that are unsuitable if the time of year is not appropriate for permanent seeding (Practice 6.10, Tem- Coastal Plain and Piedmont-Aug. 15- Dec. 30 due to inappropriate soil texture, poor drainage, concentrated porary Seeding -refer to Erosion and Sediment Control Planning and SdamendnaMs C~NSTRUCTIDN SUBGRADE PREPARATION -Prepare the subgrade for riprap and filter to overland flow, or steepness of slope until measures have been taken to correct Design Manual), these problems. Follow soil tests or apply 2,000 Ib/acre ground agricultural limestone and SPECIFICATIONS the required lines and grades shown on the plans, Compact any fill 1,000 lb/acre 10-10-10 fertilizer. required in the subgrade to a density approximating that of the To maintain a good stand of vegetation, the sail must meet certain minimum re- ]f vegetation fails to grow, sail be must tested to determine if acidity or nutrient quirements as a growth medium The existing soil should have these criteria Imbalance is responsible IMICl1 surrounding undisturbed material or overfill depressions with riprap, Remove brush, trees, stumps, and other objectionable material, Cut the Apply 4,000 lb/acre straw, Anchor straw by tacking with asphalt, netting, subgrade sufficiently deep that the finished grade of the riprap will be or a mulch anchoring tool, A disk with blades set nearly straight can be at the elevation of the surrounding area, Channels should be excavated Enou h fine- rained (silt and clay) material to maintain adequate mois- Fert~atlon- Cn the typical disturbed site, full establishment usually requires- 9 9 refertilization in the second growing season. Fine turf requires nnnual main ture and nutrient supply (available water capacity of at least .05 inches tenance fertilization Use soil tests if possible or follow the guidelines used as a mulch anchoring tool. sufficiently to allow placement of the riprap in a manner such that the ~ finished Inside dimensions and grade of the riprap meet the design water to 1 inch of soiU. given for the specific seeding mixture, Repair and refertilized damaged areas immediately, Topdress with 50 specifications Sufficient pore space to permit root penetration, lb/acre of nitrogen in March, If it is necessary to extend temporary cover beyond June 15, overseed with 50 lb/acre Kobe (Piedmont and Coastal SAND AND GRAVEL FILTER BLANKET -Place the filter blanket immediately • • Plain) or Korean (Mountains) lespedeza in late February or early March. after the ground foundation is prepared For gravel, spread filter stone ~A Sufficient depth of soil to provide an adequate root zone The depth to in a uniform layer to the specified depth. Where more than one layer of ~ H Q~ ' filter material is used, spread the layers with minimal mixing $ rock or Impermeable layers such as hardpans should be 1~ inches ar more, except on slopes steeper than 2~1 where the addition of soil Is not feasible, Q~ ~9 SYNTHETIC FILTER FABRIC -Place the cloth filter directly on the prepared Q <ti foundation, CJverlay the edges by at least iP inches, and space anchor ~ h A favorable pH range for plant growth, usually 6.0-6.5. +c~~~ f1111ltUre Table 6.iiP ~ L ws: pins every 3 ft along the overlay Bury the upstream end of the cloth a ~ Freedom from large roots, branches, stones, large clods of earth, or trash (V0. ~ tOR t3peCleel Rate (IbinCre) minimum of 12 inches below ground and where necessary, bury the lower end W p a ~ ~ of the cloth or overlap with the next section as required Take care P 1 d; of any kind, Clods and stones may be left on slopes steeper than 3~1 if W tO~~pr~Qr~edSoie 80 they are to be hydroseeded. not to dama e the cloth when Latin ri ra If dama e occurs remove ~0'I'NE~.• with a fleteatyolass so 6.06 NSTRUCTION ENTRANCE EXIT g p g p p g Fs ~P,,. 6,06 TEMPORARY GRAVEL CO the riprap and repair the sheet by addin another layer of filter material g " FRE~~~~ with minimum overlay of 12 inches around the damaged area, If extensive Nw++~' U If any of the above criteria are not met - i.e., if the existing soil is too coarse, ~ ~ sericea lespedeza 20 dense, shallow or acidic to foster vegetation-special amendments are required. Kobe lespedeza 10 damage is suspected, remove and replace the entire sheet, Where large The soil conditioners described below may be beneficial or, preferably, topsoil Definition r l led at oints where vehicles enter and leave acon- stones are used ar machine placement is difficult, a 4-inch layer of fine )eflnition A graveled area o pad oca p ma be applied in accordance with Practice 6.04, Topsoiling, ~OtM - Y 1, From Sept, 1 Mar, 1, use unscarifled sericea seed. structlon site gravel or sand bay be needed to protect the filter cloth, 2, Dn poorly drained sites omit sericea and increass Kobe to 30 tb./acre, PUnpOSe t3OLCONDIT1ON6i.4 3, Where a neat apperance is desired, omit sericea and increase Kobe to PUn OSe To provide a buffer area where vehicles can drop their mud and sediment to STONE PLACEMENT -Placement of riprap should follow immediately after • • P avoid transporting it onto public roods, to control erosion from surface runoff, placement of the filter, Place riprap so that it forms a dense, In order to improve the structure or drainage characteristics of a soil, the fol- 40 lb/acre. and to help control dust. well-graded mass of stone with a minimum of voids. The desired distribution U (owing materials may be added These amendments should only be necessary where soils have limitations that make them poor for plant growth or for fine of stones throughout the mass may be obtained by selective loading at Z 15 Where Wherever traffic will be leaving a construction site and moving directly onto a the quarry and controlled dumping during final placement, Place riprap to - ua h ter 3 Ve etative Considerations -refer to N.C. COndltiOns Where turf establishment (see C ap g Between April 15 and Aug. 15, add 10 lb/acre German millet or 15 lb/acre PY'QCtICe Applies e Applle5 Public road ar other paved off-site area, Construction plans should limit traffic its full thickness in one operation Do not place riprap by dumping ~ Sediment and Erosion Control Planning and Design Manual) Sudangrass. Prior to May 1 or after Aug. 15 add 40 lb/acre rye (grain). to properly constructed entrances. through chutes or other methods that cause segregation of stone sizes, U Take care oat to dislod e the under) in base or filter when Latin the Z ~ ~ Pelt- Appropriate types are sphagnum moss peat, hypnum moss peat, reed- sedge peat, or peat humus, all from fresh-water sources. Peat should be shredded 8eed11Q dates 9 Y 9 P 9 stones The toe of the riprap slope should be keyed to a stable -C ~ ~ Q N and conditioned in storage piles for at least 6 months after excavation, Beat POAB~Ie foundation at its base c ~ C L ~ - clean and free of toxic materials, Early Spring Feb, 15 _ Mar, 20 Feb. 15 _ Apr, 30 Bend Fall Sept, 1 Sept, 30 Sept, 1 Dct~ 31 The toe should be excavated to a de th about 1.5 times the desi n Q ~ O ~ 9~ P 9 u- c thickness of the ri ra and should extend horizontal) from the slo e, Q = ~ ~o N~TE~ LINE WITH FILTER FABRIC p p y p ~ a~ ~~R ~ o ~ Vermlcdle -horticultural grade and free of toxic substances. $pp 8 Apply lime and fertilizer according to soil tests, or apply 3,000 - 5,000 1a The finished slope should be free of pockets of small stone or clusters Q ~ O ~ Rottedmen<re- stable or cattle manure not containing undue amounts of Ib/acre ground agricultural limestone (use lower rate on sandy soils) of lar e stones Hnnd lacln ma be necessar to achieve the ro er Q ~ C I Sp, 9 P 9 Y Y P P ~ Q Miry distribution of stone sizes to produce a relatively smooth, uniform ~ ~ straw or other bedding materials and 1,000 lb/acre 10-10-10 fertilizer, surface, The finished grade of the riprap should blend with the ~ ~ r N ltarougNy rolled sawdust -free of stones and debris Add 6 lb of nitrogen ~Ch ~ surrounding area. No overfall or protrusion of riprap should be apparent, ~ } MAINTENANCE ~ J ~ p ^ to each cubic yard, Apply 4,000 Ib/acre grain straw or equivalent cover of another suitable mulch Anchor straw by tacking with asphalt, roving, or netting or by ~o ~ In general, once a riprap installation has been properly designed and C ~ (f~ ~ Shldpe-Treated sewage and industrial sludges are available In various forms; crimping with a mulch anchoring tool A disk with blades set nearly 6' MW `)v installed it requires ver little maintenance, Riprap should be Inspected ~ ~ ~ R Y ~ , c0 periodically for scour ar dislodged stones Control of weed and brush ~ ~ these should be used only in accordance with local, State, and Federal regula- straight can be used as a mulch anchoring tool. tions. ~1~• growth may be needed in some locations, ~ ` _ ~ IYtaIlltef1911Ce gp~g~~ If growth is less than fully adequate, refertilize in the second year, 2`' z ~ > AR A RELATE ~ ~ ~ CD SE GG Use the Key to Permanent Seeding Mixtures (Table 6.ltb) to select the most according to soil test or topdress with 500 lb/acre 10-10-10 fertilizer, 2-3' .C N ~ J ~ ~ appropriate seeding mixture based on the general site and maintenance factors Mow as needed when sericea is omitted from mixture, Reseed, fertilize, and W I~1 A listing of species, including scientific names and characteristics, is given in mulch damaged areas immediately. Appendix 8.02 (refer to N.C. Erosion and Sediment Control Planning and Design NOTES APPLICABLE AT ALL POINTS OF W ]NGRESS & EGRESS UNT]L SITE IS Manual,) 1Refer to Appendix 8.02 for botanical names STABILIZED, FREQUENT CHECKS OF THE DEVICE AND TIMELY 8ff~ PREPARATION MAINTENANCE MUST BE PROVIDED. Install necessary mechanical erosion and sedimentation control practices before • • ]1~5~ O Q seeding, and complete grading according to the approved plan. NOTES; a. GRAVEL PAD P GRAVEL PAD TD BE 25'x 50' AND 6' THICK MINIMUM d, MUST BE MAINTAINED IN A CONDITION LOWE S HOME CENTERS, INC. Llneendlertlzer needs should be determined by soil tests Sail testing is per- formed free of charge by the North Carolina Department of Agriculture soil test- b TURN]NG RAD[U' WHICH WILL PREVENT TRACKING OR TURN]NG RADIUS SUFFICIENT TO DIRECT FLOW OF MUD ONTO STREETS. in l r or Directi ns sam le cartons and 'information sheets are available 6,10 TEMPORARY SEEDING ACCOMMODATE g abo at y o p PROVIDED. ACCOMMODATE LARGE TRUCKS IS TD BE PERIOD]C TOPDRESSING WITH STONE HWY. 268 EAST, EAST DOCK PROVIDED. SILL BE NECESSARY; KEEP SOME HANDY. o 0 o O O N. WILKESBORO, NC 28659 through county Agricultural Extension offices or From NCDA. Because the NCDA soil testing lab requires 1-6 weeks for sample turn-around, sampling c. ENTRANCE(S) SI must be planned well in advance of final grading Testing Is also done by cam- Def inltlOn Planting rapid-growing nnnual grasses, small groins, or legumes to provide in- PROVIDE FOR f ENTRANCE(S) SHOULD BE LOCATED TO e, ANY MATERIAL WHICH STILL MAKES IT PROVIDE FOR MAXIMUM UTILITY BY ALL DNTD THE ROAD MUST BE CLEANED UP inertial laboratories, itial, temporary cover Far erosion control an disturbed areas. CIJNSTRUCTII)N CONSTRUCTION VEHICLES, IMMEDIATELY 336.658.4004 (V) 336.658.3257 (F) A o 0 0 0 o C • • When soil tests are not available, fallow rates suggested on the individual PUrpOSe To temporarily stabilize denuded areas that will not be brought to finol grade Fi ure 6.06a Grav THIS DRAWMG IS THE PROPERTY OF LOWE'S gure 6.06a Gravel entrance/exit keeps sediment from leaving the construction site (modified from Va SWCC). HOME CENTERS, INC. MYUSE OR REPRODUCTION IN WHOLE OR PMT IS PROHIBITED WITHOUT THE specification sheet for the seeding mix chosen, for a period of more than 15 working days, g Application rates usually fall into the following ranges' EXPRESSED WRITTEN CONSENT OF LOWE'S HOME O ~ O D O CENTERS,MC.COPYRIGNT20a1ALLRIGHT9 Temporary seeding controls runoff and erosion until permanent vegetation or f ICQt10n5 wM~+hp- If conditions nt the site are such that most of the mud and sediment RESERvED ne other erosion control measures can be established In addition, it provides Specifications Ground agricultural llmesto Light-textured, sandy soils 1-1 1/2 tons/acre residue for soil protection and seedbed preparation and reduces problems of mud ore not removed by vehicles traveling over the grovel, the tires should be • ~ washed. Washing should be done on an area stabilized with crushed stone that Heavy-textured, clayey sots 2-3 tons/acre and dust production from bare soil surfaces during construction. drains into a sediment trap or other Suitable disposal area, A wash rack may also O O , COndIt1On5 Where On any cleared, unvegetnted, or sparsely vegetated soil surface where vegeta- Fertilizer PY'QCtICe A lies tive cover is needed for less than 1 year. Applications of this practice include be used to make washing more convenient and effective. Grasses 800-1200 lb/acre of 10-10-10 (or the equivalent) pp diversions, dams, temporary sediment basins, temporary road banks, and top- COnstrUCtlOn StrUCtlOn 1, Clear the entrance and exit area of all vegetation, roots, and other obje~- tionoble material and properly grade it, Grass-legume mixtures 800 100 lb/acre of 5-10-10 (or the equivalent) soli stockpiles. AppfyhieendferNlzer evenly and incorporate into the top 4-6 Inches of soil SpeCIfIC0.t1On5 Complete grading before preparing seedbeds and install all necessary erosion 2, Place the grovel to the specific grade and dimensions shown on the plans, and smooth it. E3 by disking or other suitable means operate machinery an the contour, When control practices, such as dikes, waterways and basins, Minimize steep slopes using a hydroseeder, apply lime and fertilizer to a rough, loose surface, because they make seedbed preparation difficult and Increase the erosion 3. Provide drainage to carry water to a sediment trap ar other suitable outlet hazard IF soils become compacted during grading, loosen them to n depth of 6- TYPICAL RIP-RAP APRON Roughenattecae according to Practice 603, Surface Roughening a inches using a ripper, harrow, or chisel plow, 4. Use geotextile fabrics because they improve stnbllity of the foundation in locations subject to seepage or high water table. RIP-RAP APRONS Coin fete seedbed preparation by breaking up large clods and raking into a , P Good seedbed preparation Is essential to successful plant establishment, A good smooth, uniform surface (slopes less than 3'1) Fill in or level depressions that seedbed Is well-pulverized, loose, and uniform, Where hydroseeding methods Maintenance tan collect water, Broadcast seed into a freshly loosened seedbed that has not are used, the surface may be left with a more irregular surface of large clods and ltenance Maintain the gravel pad in a condition to prevent mud ar sediment from leav- MINIMUM DIMENSIONS ing the construction site, This may require periodic topdressing with 2-inch been sealed by rainfall, stones, stone, After each rainfall, inspect any structure used to trap sediment and clean it out as necessary. Immediately remove all objectionable materials spilled, washed, or tracked onto public roadways ~NdO LMT-Apply lime according to soil test recommendations. If the pH (acidity) Seedngdetee given in the sealing mixture specifications are designated of the soil is not known, an application of ground agricultural limestone at the STRUCTI.RE n A WIDTH B LENGTH C WIDTH d5o SIZE THICKNESS MAX as 'best' or 'possible', Seedings properly carried out within the rate of 1 to t 1/2 tons/acre on coarse-textured soils and 2-3 tons/acre on fine- I 14,5' 13' 9' 6' 9' 14" 'best' dates have a high probability of success, It is also possible to textured soils is usually sufficient. Apply limestone uniformly and Incorporate have satisfactory establishment when seeding outside these dates. However, as into the top 4 6 inches of soil Soils with a pH of 6 or higher need not be limed. 8 14,5' 13' 9' 6' 9' 14" you deviate from them, the probability of failure 'increases rapidly. Seeding on FI 12' II' 7.5' 6' 9' 14" the last date shown under 'possible' may reduce chances of success by 30-50% Alwn s take this Into account in scheduling land-disturbing activities Ferijter- Bnse application rates on soil tests, When these are not possible, Y apply a 10 10 10 grade fertilizer at 700 1,000 lb/acre. Both fertilizer and lime 23 8' 8' 4,5' 6' 9' 14" R2 14.5' 13' 9' 6' 9' 14" tleecertllbdeeed for ermanent seedin whenever ossible, Certified seed is should be incorporated into the top 4-6 Inches of solL [f a hydraulic seeder is P 9 P used, do not mix seed and Fertilizer more than 30 minutes before application. Inspected by the North Carolina Crop Improvement Association. It meets published North Carolina Standards and should bear an official "Certified Seed' BuAecsraug'~eri~p- If recent tillage operations have resulted in a loose sur- lnbel (Figure 611b), face, additional roughening may not be required except to break up large clods. !f rainfall causes the surface to become sealed or crusted, loosen It Just prior to Labeling of non-certified seed is also required by law Labels contain Important seeding by disking, raking, harrowing, or o+her suitable methods, Groove or fur- Information on seed purity, germination, and presence of weed seeds, Seed must raw slopes steeper than 3Q on the contour before seeding (Practice 6,03, Sur- ALL CONCRETE • ~ • meet State standards for content of noxious weeds, Do not accept seed contain- face Roughening) TRUCKS gLACI( LETTERS 0 o a o 0 0 0 o SHALL ON WHITE ing 'prohibited noxious weed seed o o " ANCHOR BAIE$ WITH WASHOUT HERE BACKGROUND (2) 2'X2"x4' PLArR ELECTION Maalntelepuneeeedwith the Rhizobium bacteria appropriate to the species Select an appropriate species or species mixture from Table 6.IOa, for seeding STAKES PER BALE Q OD of legume (Chapter 3, Vegetative Considerations -refer to N.C. Erosion in late winter and early spring, Table 6IOb for summer, and Table 6dOc for fall. GALVANIZED 'U" Q 0 0 ~ Z 10 NIL POLYETHYLENE CHANNEL POST W and Sediment Control Planning and Design Manual) [n the Mountains, December and January seedings have poor chances of suc- SHEETING J Y 0 o U ceed uniforml with n c clone seeder, drop-type spreader, drill, cul- cess. When it is necessary to plant at these times, use recommendations for fall ApPIY Y Y and n securely tacked mulch. 0 o W FINISFI CRADE BALES TO BUTT T tipacker seeder, or hydroseeder on a firm, friable seedbed. ~EDfq U When using a drill or cultipacker seeder, plant small grains na more than 1 Inch Evenly apply seed using n cyclone seeder (broadcast), drill, cultipacker seeder, - 0 0 o e o o e o 0 0 SIGN $HALI BE PLACED 4 deep, grasses and legumes no more than 1/2 Inch, Equipment should be call- or hydroseeder Use seeding rates given In Tables 6.lOn-6lOc. Broadcast seed- brated in the field for the desired seeding rate, ing and hydroseeding are appropriate far steep slopes where equipment cannot IN A PROMMENT LOCATION r ~ V l(GGREGATE:'~ AT WASHOUT AREA m be driven. Hand broadcasting is not recommended because of the difficulty in When usin broadcast-sealin methods, subdivide the area into workable sec- achieving a uniform distribution, 9 9 Z tions and determine the amount of seed needed for each section Apply one-half Small grains should be planted no more than 1 inch deep, and grasses and the seed while moving back and forth across the area, making a uniform pat- legumes no more than 1/2 Inch. Broadcast seed must be covered by raking or PLAN WASHOUT SIGN tern, then apply the second half In the same way, but moving at right angles to chain dragging, and then lightly firmed with a roller ar cultipacker. Hydroseeded the first pass (Figure 6.llc)~ mixtures should Include a wood fiber (cellulose) mulch. 6" MIN IMBEDNENT BINDING WIRE (TYPICAL) Z AIJLCFNO Cover broedc;eet seed by reldnp or cheh dreggMp then hm M'Ie surface The use of an appropriate mulch will help ensure establishment under normal In': w>th a ruler or cdtlped(er to provide good seed content conditions and Is essential to seeding success under harsh site conditions (Prac- tice 6.14, Mulching) Harsh site conditions Include STRAW BALE (TYPICAL) EXISTING GRADE I _ J 10 MIL ~ ~ Z , POLYETHYLENE hllkA all plantings Immediately after seeding (Practice 6,14, Mulching - ,seeding In fau for winter cover (woad fiber mulches are not considered SHEETING = Z W 0 F. refer to N.C. Sediment and Erosion Control Planning and Design Manual) adequate for this use), J WOOD STAKE (IYPICAI) ~ ~ U SHGWT 3 FIl'DROBEEC>AVfI .slopes steeper than 3~1, T _ _ J 6 NIN ADEP H NOTES: uJ 0 Surface roughening is particularly important when hydroseeding, as a rough- ened slope will provide some natural coverage for lime, Fertilizer, and seed. The ,excessively hot or dry weather, AGCREG N 1, WASHOUT AREA $ SHALL BE INSTALLED IN A ~ ALL aROU D O J m ~ surface should not be compacted or smooth, Fine seedbed preparation is not .adverse soils (shallow, rocky, or high In tiny or sand), and necessary for hydroseeding operations; large clods, stones, and irregularities TYPICAL SECTION LOCATION EASILY ACCESSIBLE BY CONCRETE TRUCKS, provide cavities In which seeds can lodge ,areas receiving concentrated flow, 1, CONTAINMENT MUST BE STRUCTURALLY SOUND AND • ~ Rate of wood fiber (cellulose) application should be at least 2,000 lb/acre. If the area to be mulched is subject to concentrated wnterflow, ns in channels, LEAK FREE AND CONTAIN ALL LIQUID WASTES, Z• ONE OR MORE AREAS MAY BE INSTALLED ON THE ORIGINAL 2. CONTAINMENT DEVICES MUST BE OF SUFFICIENT CONSTRUCTION SITE AND NAY BE RELOCATED AS anchor mulch with netting (Practice 6,14, Mulching) CONSTRUCTION PROGRESSES. ISSUE DATE: 319106 QUANTITY OR VOLUME TO COMPLETELY CONTAIN THE e,,,,i„ ~on„mo Innri,lnn+c n+ Fnur +imaG tha rarnmmandad rate when nddino in- LIQUID WASTES GENERATED, z eT IrecT Wrrvly xurnrc erronnnetlnu nr ceun PERMIT SET oculant to a hydroseeder slurry, 3. WASHOUT MUST BE CLEANED OR NEW FACILITIES AND AGGREGATE AND DISPOSEVOFVPROPERLY, ISSUE DATE: Maintenance Reseed and mulch areas where seedling emergence is poor, or where erosion CONSTRUCTED AND READY TO USE ONCE WASHOUT IS 759 FULL. CONSTRUCTION SET If a machinery breakdown of 112 to 2 hours occurs, add 50% more seed to the occurs, as soon as possible, Do not mow, Protect from traffic as much as pos- tank, based on the proportion of the slurry remaining. This should compensate sible. for damage to seed, Beyond 2 hours, a full rate of new seed maybe necessary, CONCRETE WASHOUT AREA DETAIL ISSUE DATE: Lime Is not normally applied with a hydraulic seeder because it is abrasive. It NOT TO SCALE DRAWING NUMBER: can be blown onto steep slopes in dry form. SP-1 0 +1 • • REVISIONS PRE-BID SET POST BID SET ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION SEDIMENT FENCE (SILT FENCE) 6,5z BLOCK AND GRAVEL INLET PROTECTION Tem ra ) 6,6~ DEFINITION A temporary sediment barrier consisting of filter fabric buried at the DEFINITION A sediment control barrier formed around a storm drain inlet by the use bottom, stretched, and supported by posts of standard concrete block and gravel PURPOSE To retain sediment from small disturbed areas by reducing the velocity of PURPOSE To help prevent sediment front entering storm drains during construction sheet flows to allow sediment deposition. operations, This practice allows early use of the storm drain system, DESIGN CRITERIA Ensure that the drainage area is no greater than 1/4 acre per 100 ft of CONDITIONS WHERE Where storm drain inlets are to be made operational before permanent W1R£ SCREEN CONCRETE BLOCK fence, PRACTICE APPLIES stabilize- Lion of the disturbed drainage aren. This method of inlet protection applies to both drop inlets and curb inlets where heavy flows Make the fence stable for the 10-yr peak storm runoff, are expected and an overflow capacity is necessary to prevent excessive c ~-,---J~ ponding around the structure Shallow temporary flooding after rainfall 000 Where all runoff is to be stored behind the fence, ensure that the should be expected, however. maximum slope length behind a sediment fence does not exceed the 00 specifications shown in Table 6,62a This practice must not be used near the edge of fill En ur that the de th of im ounded venter does not exceed L5 ft at an Material and r1USt not divert Water away frOrn the stOret s e p p y ° ° point along the fence, If nonerosive outlets are provided, slope length drain rJ maybe increased beyond that shown in Table 6,62a, but runoff from the area should be determined and by- pass capacity and erosion potential ~ alon the fence must be checked. The velocit of the flow at the outlet 1. La one block on each side of the structure on Its side fn the bottom row SEE RIP-~ g y CONSTRUCTION y SEE RIP-f~AP C~ or along the fence should be in keeping with Table 8.05d, Appendix 8.05. to allow pool drainage, The foundation should be excavated at least 2 inches APRON DE SPECIFICATIONS below the crest of the storm drain. Place the bottom row of block against the ~,PRON DETAIL ° ° edge of the storm drain for lateral support and to avoid washouts when overflow occurs. [f needed, give lateral support to subsequent rows by placing ~ ref r, ~ _ , GRA IiEL F1L IER • • 2 x 4 wood studs through block openings, ~ ~ ~i~ngry~ Vim,- V~ ~V~ Vo ~ A° o ° ° N CARP Table 6.629 L~Ih 2. Carefully fit hardware cloth or comparable wire mesh with t/2 inch openings WIRE SCREEN ~/y ~ ~0 ~ 1 Maximum Slope Length and ~ 2~ 100 over all block openings to hold gravel in place. FILTERED WATER Slope for which SedMent 2 to 5% 75 RI RIP-RAP LEVEL SPREADED TO RUNOFF 4 ! ~ " Fence ~ Ieable 3, Use clean gravel, 3/4 to 1/2 inch in diameter, placed 2 inches below the top 5 to 10% 50 of the block on a 24 slope or flatter and smooth it to an even grade DOT 10 to 20% 25 #57 washed stone is recommended. WATER OVERFLOW ` " = MAX=1 µ7TH ~ r NAVE D50 10 , D 5 SEDIMENT 1~ >20% 15 ~ 4 f Q: 4. If only stone and gravel are used, keep the slope toward the inlet no steeper than 3~1. Leave a minimum 1-ft wide level stone area between the o ~ ~ P p Provide a riprap splash pad or other outlet protection device far any structure and around the inlet to prevent gravel from entering inlet, On the _ ~ ~ R• F R~ , ~ point where flow may overtop the sediment fence, such as natural slope toward the inlet, use stone 3 Inches in diameter or larger. On the slope i depressions or swales, En- sure that the maximum height of the fence at away from the inlet use 1/2 - 3/4 inch gravel (NCDOT #57 washed stone) at a SEDIMENT Oo DROP INLET ` N1NN o ~ WITH GRA 7E a protected, reinforced outlet does not exceed 1 ft and that support minimum thickness of 1 ft, post spacing does not exceed 4 ft, 4" PERFORATED PIiC • • PIPE W/l CY, C1fAN N The design life of a synthetic sediment fence should be 6 months. Burlap MAINTENANCE Inspect the barrier after each rain and make repairs as needed STONE FILTER SEE B~LO~CK ~i GRAt'fL TO ENCLOSE is only acceptable for periods up to 60 days Remove sediment as necessary to provide adequate storage volume for N,T,S. DRAIN INLET DETAILS FOR OPENING ON CURB INLETS U DUANT/7Y, subsequent rains, h ~ ~ CONSTRUCTION MATERIALS 1, Use a synthetic filter fabric or a pervious sheet of When the contributing drainage aren has been adequately stabilized, remove all „ U 0 SPECIFICATIONS polypropylene, nylon, polyester, or polyethylene yarn, which is certified by materials and any unstable soil, and either salvage or dispose of it properly. the manufacturer or sup- plier as conforming to the requirements shown Bring disturbed area to proper grade, then smooth and compact it, Z ~ ~ BLOCK AND GRA I/EL INLET SEDIMENT FILTER ~ ~ ~ in Table 6,62b. Synthetic filter fabric should contain ultraviolet ray Appropriately stabilize all bare areas around the Inlet. inhibitors and stabilizers to provide a minimum of 6 months of expected Q N /P ` ~ usable construction life at a temperature range of 0 to 1200 F. ~ o Q>or ~ ~ 2, Ensure that posts for sediment fences are either 4-inch diameter pine, Q-rn NorE N 2-Inch diameter oak, or 1.33 Ib/linear ft steel with a minimum length of 4 ft. Make sure that steel posts have projections to facilitate fastening /4 "WIRE MESH ~ ~ ~ 1. SEDIMENTCONTROLSTDNE Q ~ ~ ls7 the fabric, SHALLBEN0.50RN0.57. Q ~ ~ I ~oU~ 3, For reinforcement of standard strength filter fabric, use wire fence MAX/MUMPOST SPAC/NG4FT. 2. WIREMESHSHALL BE ~ y } ~ ~(nL N with a minimum 14 gauge and a maximum mesh spacing of 6 inches. HARDWARECLOTH23GAUGEM/N. ~ } AND SHALL HAVE 1/4 /NCHMESH J ~ ~ " OPENINGS. C ~ 2 Q I~ ~ ~ 12' A A 3. TOP Of tMRE MESHSHALL BE > • CQ Physical Property Requirements A M/N/MUMOFONEFOOTBELOW ~ " 2' THESHOULDERORANY ~ ~ Tabb 6.62b DI~ERSIONPOINT ~ ~ > Z SpeCifleatione For Fllterin Eff{clenc 85% (min> NOc Q .c N o SEDIMENT 4. STEEL POST SHALL 8E5FT Sedknent Fence Fabric g y Tensile Stren th at Standard Strength- gip, ,Q INH ~ ~ ~ CONTROL STONE p EIGHT, BE/NSTALLED ~ ` 9 20%'. (max) Elongation 30 lb/lin in (min) a~ f 1.5 FT. DEEP MINIMUM-1, AND W (I~ W ,t BE OF THESELF-FASTENER W Extra Strength- ANGLESTEEL TYPE. 50 lb/lin In (min) 5. WOOD POST SHALL BE 6 FT. min (min) 4"X4"X12' Slurry Flow Rate 0.3 gal/sq ft/ AVERAGEBOX INHE/GHT, BE/NSTALLED DIMENSION BAR/ABLE TO i.SFT DEEPM/N/MUM, • • LONG P r, FILTERED ANDBE3INCHESINDIAMETER. LOWE'S HOME CENTERS, INC. POST (TYP.) WATER 6, POST SPACING SHALL 8E 0~ SECTIONA•A A MgX/MUMOF4FL HWY. 268 EAST, EAST DOCK CONSTRUCTION b~ N, WILKESBORO, NC 28659 1. Construct the sediment barrier of standard strength or extra stren~+.h MULTI-D/RECTlONA1 FLOW REFERENCE sECrioNO2o20 336.658.4000 (V) 336.658.3257 (F) synthetic falter fabrics, OFCOWES DMSION2 STANDARD SITE SPECIf1CATIONS AND • • 2, Ensure that the height of the sediment fence does not exceed 18 ind°~es 3/4"EXTERIORGRADEPLYWOOD 'PLYWOOD PROJECT SPECIAL PROI/IS/ONS THIS DaAVnNC Is Tff PaoPEan of Lowt='s HOME CENTERS, INC. ANY USE OR REPRODUCTION above the ground surface. (Higher fences may inpound volumes of water sufficient to cause failure of the structure) IN WHOLE OR PART IS PROHIBITED Y,TTF10llf THE EXPRESSED WRITTEN CONSENT OF LOWE'3 HOME CENTERS, NC. COPYRIGHT 2004 ALL RIGHTS RESERVED 3, Construct the filter fabric from a continuous roll cut to the length of the bar- rier to avoid joints, When joints are necessary, securely fasten • • the filter cloth only nt n support post with overlap to the next post. 4, Support standard strength filter fabric by were mesh fastened securely st , PLAN to the upslope side of the posts us ng heavy duty wire staples at lea inch long, ar tie wires Extend the wire mesh support to the bottom of the trench, 8~-0" 0 5. When a wire mesh support Fence Is used, space posts a maximum of 8 ft apart, Support posts should be driven securely Into the ground to a NOTEI FENCE POST SPACING SHALL NOT EXCEED 10' 10' MAXIMUM minimum of 18 in- Ches. CEN1H2 TO CB~T~ ~ 6. Extra strength filter fabric with 6-ft post spacing does not require ~ ; ; ~ WH/TELETTERS :RS ~ wire mesh support fence. Staple or wire the filter fabric directly to posts 34' MINIMUM 7, Excavate a trench approximately 4 inches wide and 8 inches deep along ~ { I I the proposed line of posts and upslope from the barrier (Figure 662a), i GROMD O ~ i i t 8, Backflll the trench with compacted soli or gravel placed over the filter ~ SURFACE fabric 9, Do not attach filter fabric to existing trees, ~ i~ ~ ~ e RO 36" MINIMUM N ~ l~.ow O ~ 21/Z' DIAMETER Inspect sediment fences at least once a week and after each rainfall, ~ MAINTENANCE ~ ~ ' Make any required repairs immediately , GALVANZED CHAIN LINK PENILE OR ALUMINUM WITH I LAYER OF MINIMUM , ~ ~ ~ ~ POSTS FILTER CLOTH Should the fabric of a sediment fence collapse, tear, decompose or become I I in-effective, replace it promptly, Replace burlap every 60 days. ~ ~ ~ ~ ~ REDSTR/PES(PMS2OOk i (PMS200 REDJ 4 ~ ' CHAIN LINK FENCING Remove sediment deposits as necessary to provide adequate storage volume ry ~ for the next rain and to reduce pressure on the fence, Take care to ~ ~ WI-IITELETTER$ :RS FLOW FILTER CLOTI-a 34" MINIMUM avoid undermin- in the fence during cleanout ~ g Remove all fencing materials and unstable sediment deposits and bring the 16" MIN, IST LAYER OF FILTER CLOTH • • area to grade and stabilize it after the contributing drainage area has BLUEBACKGROUND been properly stabilized. 4"X4"X12 ROUND EMBED FILTER CLOTH 8" (PMS28O BLUE) /EJ MINIMUM INTO GROUND 4 LONG P. T. ~ POST (TYP.) ~ IF MU.T1Pl.E LAYERS ARE <C m REQURED TO ATTAIN 42" J Z m f0'MAX. WITH WIRE GRADE _ w J Y Construction Spedficalions w 0 2 U M/DDLEAND VERTICAL WIRES I, Fencin shall be 42" in hei ht on 6' tall fence ost 9 g p Q SHALI BE f2 f!1 GAUGEM/N O 2, Chain link fence shall be fastened securely to the fence posts with wire ties, The lower tension wire, brace and truss rods, drive anchors and post caps are not m TOPAND BOTTOM STRAND Z regwred except on the ends of the fence, SHALL BE f0 GAUGE M/N. 3. Filter cloth shall be fastened secure) fo the chain link fence with ties s aced Y P - ~i n" 4~On every 24" at the top and mid section, O o Z 4, Filter cloth shall be embedded a minimum of 8" into the ground, WIRE F/LTER FABRIC REFERENCE sECnoN02010 ELEI/A T/ON 5, When two sections of filter cloth adioin each other, they shall be overlapped - (n Z NOTES Of 1. WIRE SHALL BEA M/NIMUMOF32" LOWES D/VISlON2 by 6" and folded, o W O Z !N W/OTHAND SHALL HAVEA MIN/MUM f/ITER FABRIC STANDARD S/TE SPEC/FICATIONSAND NOTE J 6, Maintenance shall be performed as needed and sill buildups removed when "bulges" I-- ~ U OF6UNfW/RESW/THf2"STAY PRO,AECTSPEC/ALPROVISIONS SPACING, COMPACTED F/LL CONTRACTOR TO FURN/SHAND INSTALL SIGN WHEN develop in the silt fence, or when silt reaches 50~ of fence height J W 7, Filter cloth shall be tastened secure) 1o each tense ost with wire ties or W 0 v P J m ~ M/N/MUM GR4DlNG COMMENCES. SEE EROSION CONTROL PLAN 2. fILTERFABR/CSHALL BEA OF3B"lN WIDTHAND SHALL BE _ _ _ FOR LOCATION. staples at top and mid section and shall meet the following requirements for a FASTENEDADEQUATELYTOTHEWIRE. - - - - - - Geotextile Class FI • • L BE5'-0'lN - - B" 3. STEEL POST SHAL - Tensile Stren 1h 50 Ibs/in {min,) Testl MSMT 509 ORIGINAL g ISSUE DATE; 319!06 HE/GHTAND BE OF THE SELF-FASTENER Tensile Modulus 20 Ibslin (mint Test MSMT 509 AAI/!ICCTCCI NOC Flaw Rate 0.3 aal/tt !minute (mcnc.l Testl MSMT 322 PERMIT SET II AA II ~srttcrwr-c-u urr~n Filtering Efficiency 75% (min,) Test: MSMT 322 ISSUE DATE: CONSTRUCTION SET J I ISSUE DATE: EX rENS10N OF FABRIC AND E DETAIL WIRE INrO TRENCH ENC 5/L TF FENCE SUPE~,' SILT DRAWING NUMBER: S P- 11 ~ • EVI IONS R S PRE•BID SET POST BID SET ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION ~ ~ • •A~?uq ~~i P9 a'~ 9 s~~ ~ SEDMENT BASIN 6.61 t ~(N DEFINITION An earthen embankment suitably located to capture sediment, ~S ~,R~ FR~~y~ ~~r~itinLLLL~`~ PURPOSE To retain sediment on the construction site and prevent sedimentation in • ~ off-site streams, lakes, and drainageways. • Inlets -Locate the sediment inlets to the basin the greatest U distance from the principal spillway z • Dewatering -Allow the maximum reasonable detention period before the basin is completely dewatered - at least 10 hours. ~ 0 Z ~ • Inflow rate -Reduce the inflow velocity and divert all sediment-free ~ ~ rn Q N C runoff O L Site preparations -Clear, grub and stlp topsoil from areas under the Q > p r C Q - ~ CONSTRUCTION embankment to remove trees, vegetation, roots and other objectionable U- ~ 0 SPECIFICATIONS material, Delay clearing the pool area until the dam is complete and then remvoe brush, trees and other objectionable materials to facilitate Q O ~ ~ sediment cleanout Stockpile all topsoil or soil containing organic matter for use on the outer shell of the embankment to facilitate vegetative DIVERSIONS Q ~ o U r~ ~ ~ establishment Place temporary sediment control measures below the basin 6,~0 acnL N as needed, o ~ J 2. Cut-off trench - Excavate a cut-off trench along the centerline of DEFINITION A Temporary Ridge Dr Excavated Channel Or Combination F c ~o~ pr Combination Ridge And Channel ~ ~ ~ ~ the earth fill embankment. Cut the trench to stable soil material, but in Constructed Across Sloping Land Dn A Predetermined Gra no case make It less than eft deep, The cut-off trench mest extend into edetermined Grade. both abutments to at least the elevation of the riser crest, Make the PURP(JSE To Protect Work Areas From Upslope Runoff And To Dive off And To Divert Sediment-laden Water 2' MIN, COMPACTED !J ~ N SOIL ~ ~ . minimum bottom width wide enough to permit operation of excavation and To Appropriate Traps Or Stable Outlets compaction equipment but In no case less than 2 ft. Make side slopes of Z N0~ the trench no steeper than 1~1. Compaction requirements are the same as Channel Design - shape parabolic, Trapezoidal, Or V-sh rzoidal, Or V-sha ed Q N N P those far the embankment, Keep the trench dry during backfilling and side Slope: 2~1 Or Flatter compaction operations. 3~1 Dr Flatter Where Vehicles J ~ ~ hi l s rocs 18~ MIN, C L ~Ihere Ve c e C W W W 3. Embankment -Take fill material from the approved areas shown on the Grades - Either A Uniform Dr A Gradually Increasing Gray plans. It should be clean mineral soil, free of roots, woody vegetation, Sudden Decreases ]n Grade Accumulate Sediment And Shop Increasing Grade Is Preferred. _ ~diment And Should Be Ex ected To P rocks and other objectionable material Scarify areas on which fill is to Cause Overtopping. A Urge Increase In Grade May Erod Grade Ma Erode. Tl'PI Y 6 CAL be placed before placing fill. The fill mn`erial must contain sufficient moisture so It can be formed by hand int,~ a ball withou crumbling. ]f Outlet -Design The Outlet To Accept Flow From The Dive w From The Diversion Plus Any ether ~ ~ water can be squeezed out of the ball, i`. Is too wet proper compaction. Contributing Areas. Divert Sediment-laden Runoff And Re Place fill material In 6 to B-inch continuous layers over the entire length Sediment Trapping Device (practice 6.60, Temporary Sedime i Runoff And Release Through A Figure 6.20n Temporary earthen civersion dike. em orar Sediment Tra And Practice LOWE'S HOME CENTERS, INC. of the fill area and then compact it. Compaction may be obtained by 6.61, Sediment Bnsin> Flow From Undisturbed Areas Can B P Y P red Areas Can Be Dispersed By A Level routing the construction hauling equipment over the fill so that the entire Spreader (practice 6.40, Level Spreader), surface of each layer Is traversed by at least one wheel or tread track COARSE HWY. 268 EAST, EAST DOCK AGGREGATE N. WILKESBORO, NC 28659 of the heavy equipment, or a compactor may be used, Construct the Small Diversions -Where The Diversion Channel Grade Is annel Grade Is Between 0.2 And 3%, A embankment to an elevation ]0% higher than the design height to allow for i Permanent Vegetative Cever [s Required. A Parabolic Ch settling ~ Deep And 1~ Ft Wlde May Be Used For Diversions With Flc A Parabolic Channel And Ridge 1.5ft ersions With Flows Up To 5 Cfs. This 3~1 MAX 336.658.4000 (V) 336.658.3257 (F) li Depth Does Not ]nclude hreeboard Or Settlement. Side clement. Side Slopes Should Be 3d pr 8' M~ ~ ~ 4. Conduit spillways -Securely attach the riser to the barrel or barrel C~NSTRUCTIDN Flatter And The Top Of The Dike Must Be At Least 2 Ft stub to make a watertight structural connection. Secure all connections At Least 2 Ft Wide THIS DRAWX+G IS TrIE PROPERTroF LOwE~s MOME CENTERS, INC. ANY USE OR REPRODUCTION IN WHOLE OR PMT IS PROHIBITED WII}i0llT THE between barrel sections by approved watertight assemblies. Place the SPECIFICATIONS 1. Remove And Properly Dispose Of All Trees, Brush, Stum PS, Brush, Stumps, And ether EXPRESSED WRITTEN CONSENT OF LOWE'SHOME CENTERS, INC. COPYRIGHT 2004 ALL RIGHB barrel and riser on a firm, smooth foundation of impervious sod. Do not Objectionable Material. use pervious material such as snn, gravel, or crushed stone ns backfill 9' TYPICAL RESERVED ~ • around the pipe or anti-seep collars. Place the flit material around the Ensure That The Minimum Constructed Cross Section Mf ',ross Section Metts All Design pipe spillway in a-',non !ayens and compact it under and around the pipe to Requirements. nt lens*. *.he same densty ns the adjacent embankment, Care must be Figure 6.20b temporary gravel diversion dike for vehicle crossing (modified from Va SWCC)~ taken not to raise the pipe from firm contact with its foundation when 3. Ensure That The Top Of The Dike ]s Not Lower At Ant rt Lower At Any Point Than The Design ccmonct~ng under the pipe haunches. Elevation Plus The Specific^cl Settlement Place a minimum depth of 2ft of hand-compacted backfill over the pipe 4. Provide Sufficient Roam Around Diversions To Permit Mc ins To Permit Machine Regrading And spillway before crossing it with construction equipment, Anchor the riser Cleanout. in place by concrete or other satlsfactroy means to prevent flotation. In na case should the pipe conduit be Instaued by cutting a trench MAINTENANCE 5. Vegetate The Ridge Immediately After Construction, Ur :onstruction, Unless It Will Remian ]n through th dam after the embankment Is complete. Place Less Thnn 30 working Days 5. Emergency spillway -Install the emergency spillway in undisturbed soil. Inspect Temporary Diversions Once A Week And After Ev k And After Every Rainfall. Immediately The achievement of planned elevations, grade, design width, and entrance Remove Sediment From The Flor Area And Repair The Divei and exit channel slopes are critical to the successful operation of the Check Outlets And Make Timely Repairs As Needed. When Repair The Diversion Ridge. Carefully Needed, When The Area Protected ]s emergency spillway Permanently Stabilized, Remove The Ridge And The Channel 4nd The Channel Ta Blend With The Natural Ground Level And Appropriately Stabilize It. 6. Inlets -Discharge water into the basin in a mammer to prevent erosion. tabllize It. Use diversions with outlet protection to divert sediment-laden water to the upper end of the pool area to Improve basin trap efficiency (References Runoff Control Measures and Outlet Protection) 7. Erosion control -Construct the structure so that th distrubed area is mimized. Divert surface water away from bare areas Complete the embankment before the area is cleared. Stabilize the emergency spillway embankment and all other disturbed areas above the crest of the principal spillway Immed'~ntely after construction (References Surface Stabilization), 8, Safety -Sediment basins may attract children and can be dangerous, Avoid steep side slopes, and fence and mark basins with warning signs if trespassing is likely. Follow all state and local requirements. MAINTENANCE Check Sediment basins aFter periods of significant runoff. Remove sediment and restore the basin to its original dimensions when sediment accumulates to one-fourth the design depth. Check the embankment, spillways, and outlet For erosion damage, and inspect the embankment for piping and settlement, Make all necessary repairs immediately. Remove all trash and other debris from the riser and pool area 0 _ ll,.l ~ ~ry U V W 2 U I- SEE POND SECTION } SHEET FOR DETAILS m OF POND IN SEDIlVIENT Z ~ CONDITION z Z rr~~ o V1 o ~ I"' ~ U J W Wo m a • ~ ORIGINAL ISSUE DATE: 319106 PERMIT SET IJJUt um It: CONSTRUCTION SET ISSUE DATE: DRAWING NUMBER: sr- ""l 2 • • 15' REVISIONS PRE•BID SET POST BID SET ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION TOP OF BERM 678,5 N.T.S. EL ~ 677,50 -I 100 YR, STORAGE ELEVATION 677.36 - -I _ _ CLAY CORE (SEE I DETAIL THIS SHEET) 10 YR, STORAGE ELEVATIONS 675,82 - - - I' WEIR _ - IE, 673,00 1 - - 3 • J • - I" STORAGE ELEVATIONS 672,58 L~xav a*~ ~~.q ° ' ~ +s4 ~ 36 LF OF 36" ~'r7 h RCP/CPP m I,II~ - - - 5' X 5' CONCRETE RISER STRUCTURE } i~~~l lam. t ry ENERGY - DISSIPATING _ ~ ~ Y~ &IP9~~y^' pro; ~ ~ .i q~~~~y eee®~ ~~t , HEADWALL- - EXISTING GRADE ay ~"I - 19.75' '4....! "~~9t~fAttt#raa ~ 19,75' 2.5" PVC W/ 90' ELBOW IE ~ 671,00 • • RIP-RAP i ~ ~ EL. 671,00 ~ IE ~ ~ IE ~ 671,00 PRON, SEE ~ rn _ _ _ _ _ U DETAILS -36'~~-~ ~ IE ~ 670,60 - z PERMANENT POOL ELEVATION ~ 671,00 Z III - - ~ rn - - I ~ - Z ~ ~ BOTTOM OF POND ELEVi 667,00 - IOJ5'X10.75' ~ o a` Q ~ ~N ANTI-SEEP _ _ _ _ _ _ _ _ _ _ - I ` /C/IIA~ W 10,75'X10,75' ANTI-SEEP COLLAR, SEE i I-III-III-III-III-III-III-! I I-III-III-' -I ~ (-III- ~ c Q ~ AR EE DETAIL NOTE BOTTOM OF CLAY CORE TO BE 'KEYED' COLL S S I TIN A T I DETAILS INTO EX S G GRADE, SEE CL Y CORE DE A L 65,00 TOP ~ - ~ 0 ~ Q N ~ F Q 7' X7' X8" OF FOOTING FOOTING TOP 0 CLAY U p U c+1 CORE EL. 875.00 ~ ~ c~ 8' ~~r N 0 } ~ J n O r, c o~~ ~ ~ ~o ~ , c0 i. ~ ~ N v ~ _ ~ p~ _ NOTE )TE ~ Z ~0c I, BASIN, FRAP Q .C N N BASIN, FRAME, AND GRATE J ~ N MAY VARY IN ~Y VARY IN NONESSENTIAL W ~ W U tt4 TEFL REBAR (GALV, OR ASPNAL TEMPORARY AND PERMAI~NT CONDITIONS DIMENSIONS v1ENSI0NS EXISTING W S COATED) TACKWELD AT 3-4" O.C. EACH GRADE ~ WAY LAID IN TOP OF BASIN 2' i. - - 5'-0" 5'-0" (MINJ _ ~ CLAY "KEY" TO BE • • PLACED IN EXISTING , GRADE LOWE S HOME CENTERS, INC. 4' -0" 4' -0" 4' HWY. 268 EAST, EAST DOCK OTTOM OF CLAY N. WILKESB~RO, NC 28659 CORE EL. VARIES SMAINTAiN A M~ti'. OF 336.658.4000 336.658.3257 (F) 2' DEpTu FROM EXIST. GRADE) • • THIS DRnw>HC Is rrlE -aPERTr a LeWE's HALF OF A 48' HOME CENTERS, INC. P>;Y USE OR REPROGUCTION IN WHCIE OR PMT IS P?OHIBREO WTf}{pIJT THE DIAMETER CORRUGATED E%PRESSED WRITTEN CriN3ENT OF LDWE'3 HOME NOTE I CENTERS, Hc. coPrRICHT soa au R1GHB HALF OF A 48' METAL PIPE ATTACHED DIAMETER CORRUGATED TO BOX RESERVED O 0 • • METAL PIPE ATTACHED I I CLAY MATERIAL TO BE USED FOR CORE MUST BE TYPE TO BOX 'CL' OR 'CH' MATERIALS, AS CLASSIFIED BY THE UNIFIED SOIL CLASSIF=iCAT10N SYSTEM. 1,00' ~~JEiR ~ ~ - IE ~ 6-3.00 2.5" PVC W/ PERMANENT POOL L00' WEIR EL. • 673,00 IFI ATI T ~ MATERIAL CLASS C ON MUS BE DETERMINED BY, OR W ELEVATION 671,00 90 ELBO IN THE PRESENCE OF, THE INDEPENDENT TESTING FIRM. 2.5' ORIFICE ' CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE S IE ~ 671,00 ~ - _ 2,5" ORIFICE EL, 671.00 PRESENCE OF SUITABLE CLAY MATERIAL ON-SITE, IF i-i > >-i i i i-iii-i i i- - - - -TOP OF FOOTING ~ 665.00 SUITABLE MATERIAL IS NOT PRESENT ON-SITE, THEN CONTRACTOR SHOULD INCLUDE IN HIS BID PRICE THE 36" OUTLET PIPE PLA INV, EL 671,00 PLAN T FOR HAULING IN MATERIAL FROM AN OFF- ITE COS S SOURCE. SECTION = _ _ _ _ _ _ _ _ COMPACTED SUBGRADE tt4 STEEL REBAR (GA OR 6' OF CRUSHED 7'X7'X8' CONCRETE FOOTING REBAR (GALV. OR ASPHALT STONE COATED) TACKWELD , 1'ACKWELD AT 3-4' O.C. EACH SCALEI N.T.S. WAY LAID IN TOP OF IN TOP OF BASIN DETENTION POND OUTLET STRUCTURE NTS MAINTENANCE PLAN ~ 1 All r i n n sediment control radices will be the k m e os o a d p c ed for stabilit and o erasion followin ever runoff roducin } Y P 9 Y P 9 • • rainfall but in no case less than once every week, Any needed o r it will m e imm i t l t m Ins in II r ti ~ epa s be ad ed a e y o a a a p ac ces as d i ned, ~ es g Q w Z _ 2. The sediment basins will be cleaned out when the level of ~ J sediment reaches the elevations spec~f~ed on the erosion control plans. ~ F Sediment shall be placed on the topsoil pile, Gravel will be cleaned m or replaced when the sediment pool no longer drams properly. Q m 3. Sediment will be removed from the sediment basins and block V Z and gravel inlet protection device when storage capacity has J .i e ~ been approximately 50`b f~,led Gravel will be cleaned or o replaced when the sediment pool no longer drains properly, ~ 4. Sediment will be removed from behind the sediment fence when Z it becomes about 0.5 feet deep at the fence, The sediment fence will be repaired as necessary to maintain a barrier, U) Z 5. All seeded areas will be fertilized, reseeded as necessar - ° Y~ W U ~ and mulched accordin to s ecifications in the ve etative Ian J g P g P ~ ~ to maintain a vigorous> dense vegetative cover, J w Wo J ma • • ORIGINAL ISSUE DATE: 6119106 r'1 A r"~ I A I ~ I / A I r1 r1 T I 11 /1 I r~ T /'1 r•1 I"'1 A I r"' 111 PERMIT SET t3H~IIV RI INVK I HWCb I l.Vh'NCKI ` CONSTRUCTION SET SVVM POND SECTION ~ QISEQ ~ ISSUE DATE: SP-17 • • REVI I N PRE-BID SET POST BID SET ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION 1=III=III=III=III=III=III=III=111=III=1 - ' ~ - N,T,S, - ~ ~ - EL ~ 675,10 ' 100 YR. STORAGE ELEVA' 4GE ELEVATION b75.b3 - - 10 YR, STORAGE ELEVATI( ~E ELEVATIONI b74,b1 - 3' WEIR =1R ' IE, 67200 2,00 I 'I- - I" STORAGE ELEVATION ~ 6 .EVATIONI b71J8 ~;g~.~~~~ , F, I- ~ ~ ~r. b°j~~ ~ 'I - 90 LF OF 36' _ • ~ RCP/CPP m L44`b ~ I - s. ~ ~ - TIE INTO ~ ~ - 5' X 5' CONCRETE ' CON BETE RI ER T T R F ` ' - C S S RUC U E ~ JUNCTION BOX 24 ~ I - 8 ~ (iNV IN 6b8J0) ~AA •bpp~ 4 ' ~,~~li~lti~• a - EXISTING GRADE ~ ~ ~°~~e~nne"-~ .,o DE ~a ~',3 19,75' - - rapt ` ~ ~ ~ ~ a~+TFt4~f 12d~ 19,75' 2,5" PVC /2,5" PVC W/ 90° ELBOW ~ ~ INV 670,00 EL, 670,C EL, b70.00 • • °rn _ ~ _ _ IEI b70,00 -36~OUTFI-OV~t PIPE - z PERM U PERMANENT POOL ELEVATION b70,00 Z I I - - - - - ~ ~ ~ ~ I 10,75'X1 J5, BOTTOM f I -I Z ~ ~D BOTTOM OF POND ELEV ~ bbb,0 _ ~ a` ANTI-SEEP ~ _ _ _ I - Q N _ ~ C 10.75'X10,75' ANTI-SEEP COLLAR, SEE ~ - - - I III III _ _ _ _ _ _ L ~ ~ ~ ~ ~ I I-III-I I ~-I ~ I 1 1 X 1 1-I ~ Q> O r (-III-~ - U- C COLLAR, SEE DETAILS DETAILS Q. ~ U.. ~ b4,00 TOP .00 TOP ~ 0 ~ Q ~ O ~ 7'X7'X8" OF FOOTING FOOTING FOOTING Q ~ c ~ ~ o U c~ ~ ~ bt~~ N 0 ~ J ~ r. C ~O~ ~ ~ ~ ~0 NOTE= N a` > z c Q .c cv ~ I, BASIN, FRAME, AND GRATE J ~ ~ - MAY VARY IN NONESSENTIAL ~jJ ~ ` tt4 STEEL REBAR (GALV, OR ASPNA TEMPORARY AND PERMANENT CONDITIONS W U DIMENSIONS ~j,J COATED) TACKWELD AT 3-4" O.C. EAC ~C WAY LAID IN TOP OF BASIN 5' -0" • • LOWE'S HOME CENTERS, INC. 4' -0" HWY. 288 EAST, EAST DOCK N, WILKESBORO, NC 28659 3,00' WEIR IE 672,00 336.658.4000 (V) 336.658.3257 (F) • • THIS DRAN7NG IS THE PROPERTY OF LOWE'S HOME CENTERS, INC. ANY USE OR REPRODUCIIDN 3,00' U 3,00' WEIR EL. b72.00 IN HOLE OR PART I9 PROHI8ITEDWTTFpUT THE E)(PRESSED WAI7TEN CONSENT OF LOWF3 HOME HALF OF A 48" DIAMETER CORRUGATED CENTERS, MC. COPYRIGHT 20M ALL RIGHTS ~ RESERvED METAL PIPE ATTACHED 0 0 • • I t TO BOX HALF HALF OF A 48" ~ ~ _ DIAMETER DIAMETER CORRUGATED METAL PIP TO METAL PIPE ATTACI-IED TO BOX ~ 2,5" PVC W/ PERMANENT POOL 90' ELBOW ELEVATION 670,00 2.5" ORIFIC IE~ 670,00 2.5' ORIf 2.5' ORIFICE EL, b70,00 ~ i-iii-i i i ~-iii-i i i- - - _-TOP ~ ~-TOP OF FOOTINGI bb4,00 36" OUTLET PIPE INV, EL 670,00 - - _ - PLAN SECTION - - - - - _ _ _ _ COMPACTED SUBGRADE OR 6" OF CRUSHED 7' X7' XS" ~7'X7'XS" CONCRETE FOOTING tt4 STEEL REBAR (GALV, OR ASPNAL STONE COATED) TACKWELD AT 3-4" O.C. EACH WAY LAID IN TOP OF BASIN DETENTION POND OUTLET STRUCTURE NTS m • .s • O W Y U MAINTENANCE PLAN Q W_ Z U I, All erosion and sediment control practices will be checked eck J ed cn for stability and operation following every runoff producing ~ Qm 9 rainfall but in no case less than once every week. Any needed needed ~ repairs will be made immediately to maintain all practices as es as Q m designed, 3 2, The sediment basins will be cleaned out when the level of ever of ~ sediment reaches the elevations specified on the erosion control p - o ~ control plans. Sediment shall be placed on the topsoil pile, Gravel will be clear ill be cleaned or replaced when the sediment pool no longer drains properly Q >r rl ope v, Z 3, Sediment will be removed from the sediment basins and block and block and gravel inlet protection device when storage capacity has y has ~ Z been approximately 50~ filled, Gravel will be cleaned or x ~ L1J Q z replaced when the sediment pool no longer drains properly, erlY, J t- 4. Sediment will be removed from behind the sediment fence whE G U it becomes about 0.5 feet deep at the fence, The sediment ter fence when ~ o ~ W ~ will be repaired as necessary to maintain a barrier, .,dement fence J ~ m a • • 5, All seeded areas will be fertilized, reseeded as necessary, ORIGINAL eSSarV, ISSUE DATE: 6/19106 and mulched according to specifications in the vegetative plan 'e plan ~ - - - - - - - ~ . PERMIT SET to maintain a vigorous, dense vegetative cover. tsA51N tt1 (tiUUTHEAbT C;URNER) SVVM POND SECTION E RISER ISSUE DRAWING NUMBER: SP-18 • I ~ _ _ _ ~ ~ • • REVISIONS ~ PRE-BID SET POST BID SET x ~ ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION - x x x x x _ N_ 87'3217 E 636.50' TOTAL ~ ~ _ - _ X - Y - - - - - - R' ~,,.R x ~ 108.09 x -x-x x X-Y X-~ X--x x _..n... ~ - ~ - - - - - - EXISTING VEGETATION. TO ::REMAIN _ : ~ EXIT 26 i I RM:. (~O.':. UN~IS`fii~Eb::;SUP~E~) ~ . 2.-G... _ f : EXIT 27 _ - - ~ i - - - OE X s , INTERSTATE B5 _ uc~~- U, ~ M _ UPLMhf~ ~ ~ - .r.~. , . ~ ~c F- ~ N o ~ SITE ~ ~c ~r3E ~ l ~ ~ z --uG~ti~i,,,, 3-M - ~ I-RM t 3 M j ~ ~ Os ~ ~ ~ ~ ~ NING \ wl ~ u;~usav w, Q SINE r~~ ~ ~ °Q~° v .a fl 5,,~~~- I-RM _ I-RM ~ti ~ Q 30 . ~ ~ - --a 2-C.~. r`r`:-~,, WN G 15-CH N ~ V W • • 'd ~ ~ U 2 ~ - ~~l ~ ~ I M 'g. .4,e->-o, , ~ I- o N N 4 I 20- fl 0 I ~a Ira: I wN I 111111111, / I-R ' ~ _ r M x I M 3-S I ca N Z ~ ti I ~ ~ ~ ` ap-Rc; s , ~ I 0-WN . - I ~ n - / ~ I ~ ~ , ~ 15-WB I ~/!C!NlTY MAP - 1 - 7200 ? 0 I ~ I. , I ~ ~ ; i 3- SEAL 4-M 30- 2fl I . ~ ~ 10585 I- - ~ ;9 ~ a. . a wrv wN ,o,, I_ 2-RO ,e ~~2...~. ~ I ~ t S 8 .,IFS "Vr 0 , ti,,IR, FRE I-RM ~r~ ~o,. 15-CH I I 1 I/+Inul~ ~r;..:~:1~~ ,x~ ~ ~ I ~ I ,~~w~ ..2_C ~ ~ ~ ~ 0 I I FFE' 693.00 . ~ I-R I i I RM - e~o~ - -WB I U . _ -~-~~.,.,fl-Dr'I ALL ISLANDS TO BE SODDED 3 C 2-R I ' ~ Z rn I ~ - ~ ~ L ~ S WITH BERMUDA SOD ~0 - I Z ~ mrn `~N Q - Q c m i-RM ~ ti 3-GA ~ I G Q > d I ~ ~ Q c _-C 1 I c0 lL. ~ o Q I -CH I 2-C I ~ ~ ~ Qm d Q 0~ I a ~ I Ln m Q U p U Y ~ N ~ ~ I I a ~ } N ~ i~- ~ ~ a t~ \ ~ 24-WB 2 RO c J~nO I ~ m to e ~ ~ m ten, ~ rn ~ ~ I CH \ ~ ,o~ Q ~ > p a~ 0 ~ o ~ ~M .c N m ~ ~ . - 2-Z 2-Z I-Z ~ Cn m 2-z W c PLANT LIST ~ 5-WB l + + l W U l SroP 1 I QUANTITY SYMBOL CODE SCIENTIFIC NAME COMMON NAME SIZE REQUIREMENTS SPACING ~ + + i ~ \ + + ~ l + ~ ACER AUTUMN FLAME 4' CALIPER, - - //r _ • • • RUBRUM j AS _ 30 RM RED MAPLE 10 MIN. HT, ,SHOWN i-Z 15-W ' 29' E LOWE'S HOME CENTERS INC. 'AUTUMN FLAME' B B a ~ - - - - 6 - ~~,~;~w - - _ _ HWY. 268 EAST, EAST DOCK - N. WILKESBORO, NC 28659 4' CALIPER I ~ , . ";''~t,~ti _ _ QUERCUS WILLOW ! AS ~ 2 G 14 WO 10' MIN. HT, ~ ~ PONDSCAPING SEQUENCE AND b b PHELLOS OAK ~ SHOWN , , _ _ B6B ~ a ACER - 2-R - 2-RM 2-I 4' CALIPER, ( _ A sPEC~F~CAT~ONS F~R WETLANDS PANTS 336.658.4000 {V)336.658.3257(F) 2-RO -RM - • • SACCHARUM SUGAR 10' MIN. HT, ~ AS I-NO ~ 22 SM ~ ~ ~ C/ t , A ~ THIS CRAWING IS THE PROPERTY OF P WES TI N M ~ PONDSCAPNG S~QUENCE; HOME CENTERS, IJC. ANY USE OR RE RODUC 0 'LEGACY' MA B6B ~ ~ - I ~ I NC a -NO 1r WHOLE aR PART IS PROHIBPFC WNHUUT THE • • ~ ~ T ~ ^ H ^ V CENTERS, NC. ICOPYRIGH12W3 ALL RIDWES HOAE 1. E ~ „R ~ STABILIZATION OF ALL DISTURBED AREAS RESERVED -0 4' CALIPER, AS ~ 15- - 15-C _ TO BE PERFORMED WITHIN 72 HOURS OF FINAL GRADE • • QUERCUS ~ 4- - 7 NO NUTTALL OAK 10' MIN. HT, SHOWN I NO 2R I-NO 2. THE AQUATIC PLANTING WINDOW IS FROM APRIL 1 TO NUTTALLI BEB ~ - B 0 15-WE o JUNE 15. 15-WB 3. RECONFIRM PLANTING ELEVATIONS ONE WEEK PRIOR 4' CALIPER, AS 1 + Z ZELKOVA SERRATA GREEN VASE a ~ 15- _ w TO PLANTING, 0 ' 8 ZELKOVA 10 MIN. HT, SHOWN 1 'GREEN VASE' _ BEB ° 4. THE PLANTING PLAN SHOULD BE REVISED AS 2-R NECESSARY, AND THE SITE SHOULD BE STAKED AND I-NO w ~ 4" CALIPER, -CH I-NO QUERCUS RED AS ~ FLAGGED, ¦ 26 RO 10' MIN. HT, ;;MOWN f RUBRA OAK is t -CE BBB ~ 5, DE-WATER THE WETLANDS 24 HOURS PRIOR TO -WB ~ 2-R - 0 IRM s s PLANTING, r%~ 4" CALIPER, AS -RM FRAXINUS GREEN r, ~ 15 W m 2-RO 6. PLANT WETLAND. N 7, M L H AN WAT R A N o U C D E STOCK S EEDED. II GA 10' MIN, HT, SHOWN ~ 15- I-RO PENNSYLVANICA ASH ! B~B ss I-N I - I-G ~ a ' 8. INSPECT LANDSCAPE TWICE PER YEAR, I_G -RM I F I-RM! 9. RE N ORCE PLANTING AT END OF FIRST AND SECOND F ~ CRYPTOMERIA YOSHINO ULL 20' 19 C JAPONICA 4'-6' MIN, HT. O C Ss GROWING SEASON, 'YOSHINO' CRYPTOMERIA B B 8-SM 6 10, RESTRICT MOWING TO DESIGNATED AREAS. MAGNOLIA BRACKENS FULL s ' • • t t 11. SUPRESS WEEDS, AND VINES ON TREES AND SHRUBS GRANDIFLORA BR, BEAUTY AS s DURING YEARS 2 AND 3, 21 M N TH N 6'-8' MIN, HT. \ N I CH BRACKENS BROW SOU ER BBB ,]MOWN ~ ss - 2-RO GA I-GA i \ / ~ I BEAUTY' MAGNOL A ~ !1 D A - - I- T \MV 3-G H ILEX CORNUTA CARISSA 15" MIN, HT. 4' MARKER Q 224 C DE ENTION WETLAND PLANT LIST f o 7"W ~s _ 'CARISSA' HOLLY 5 GAL. O.C. \ QUANTITY SYMBOL SCIENTIFIC NAME COMMON NAME SIZE REQUIREMENTS SPACING PLANTING NOTES BUXUS ~ ss ~ WINTER GEM 18" MIN, HT. 3.5' °l °o}T 1 I PANICUM 3' 9 o WB MICROPHYLLA ~ ~ m ",oo" ~ ~ `2Q 8 BOXWOOD 3 GAL. O.C. >",oo 'WINTER GEM' ~s o °~~I 3,000 SWITCNGRASS 4" POTS STANDARD PLANTING 2O- ° ~p_y~ ~ (SW) VIRGATUM APART s NANDINA s w 2 • M TI A HARBOUR DWAR 8" MIN. HT, 2 ~ s N 174 DN DO ESC NANDINA 3 GAL. O.C. 7-W ~ 0 r. ` T BER 3 PLANT TUBERS 2"-3" SAGITTARIA DUCK ~ 1,220 U S I T ~ N 0 DAMP SOIL OR IN $1 Ib- LATIFOLIA POTATO APART rn 'HARBOUR DWARF „ . C Ip~l~: °y~ (DP) WATER 12"-I EEP ~ :d rid . , 8 D m ~ ~ y ~ a ~ a NAJAS AT PLANT R T 2"- Q m ~ 2O-n+1N . °T r> 400 W ER ROT 5 00 S 3 0 0S o SS - ° GUADALUPENSIS NYMPH APA T DEEP IN MUD z (WN) R - w J ~ ~ s 7-WO \ s ~ ;a ° w I LOWS S STANDARD LANDSCAPE NOTES IRIS BLUE FLAG O = I~-S5` 350 ~ I GALLON 3 STANDARD PLANTING U VIRGINICA IRIS APART IT (IR) ~ Q ~ I. ALL PLANTED AREAS SHALL RECEIVE A 3' LAYER OF SHREDDED PINE ~ 1 m ' N I I W AT EQUAL TO "WEEDBL CK" BY ~ BARK MULC OVER A 0 ML EED M 0 NI I V 0 B SCUS ROSE 270 I GALLON 3 STANDARD PLANTING o (RO) MOSCNEUTOS MALLOW APART Z = 00 EASY GARDENER OR DEWITT WEED BARRIER. ~ Q ~ z ~ 3 2 ALL I T BE AREA T R FINING PLANTING (INCLUDIN ~ D S UR D S NO EC S G ~ 0 EUPA70RIUM JOE PYE 3' J 560 I GALLON STANDARD PLANTING RIGHT-OF-WAYS) SHALL BE SEEDED, ~ ~ (,JP) FISTULOSUM WEED APART o ~-s- 0 a W Z 3. ALL WORK SHALL BE DONE IN STRICT ACCORDANCE WITH DIVISION 2 WETLAND r . i i NELIANTNUS SWAMP 3' ~ Z 0 N E C` : ~ 590 I GALLON STANDARD PLANTING 0- Z OF LOWE S STANDARD SITE SPECIFICATIONS, AREA ~ `r ~ V~ ~ (SS) ANGUSTIFOLIUS SUNFLOWER APART Q 4. THE OWNER OF TF-E PROPERTY IS RESPONSIBLE FOR THE U Z CONTINUED PROPER MAINTENANCE OF ALL LANSCAPING MATERIALS AND ~ ~ ECNINACEA O c 380 PURPLE I GALLON 3 TAN AR P A TIN W Z SHALL KEEP THEM IN A PROPER, NEAT AND ORDERLY APPEARANCE, wETLAN (PC) PURPUREA CONEFLOWER S D D L N G ~ ~ APART J FREE FROM REFUSE AND DEBRIS. ALL DEAD OR UNHEALTHY PLANT T I AREA MATERIAL SHALL BE REPLACED WITHIN 180 DAYS TO MAINTAIN THE I ~ ***CAUTION*** Z J w W QUALITY OF THE LANDSCAPING. IN NO INSTANCE WILL TI-~ CITY OF ITEA VIRGINIA 3 Q LU o UTILITIES PROTECTION SERVICE 1,060 WEFT PIRE I GALLON STANDARD PLANTING J m m o: P I F THE MAINTENANCE OF ANY VEGETATION i \ BELMONT BE RES ONS BLE OR (IT) VIRGINICA S S APART a UNLESS SUCH VEGETATION IS WITHIN THE PUBLIC RIGHT-OF-WAY OF A ~ 3 DAYS BffORE OICGING CALL • • TOLL FREE 1-800-632-4949 ORIGINAL ISSUE CITY MAINTAINED STREET OR 15 LOCATED ON PROPERTY OWNED BY THE _ ~ PLANT SOURCES DATE:6120lO6 CITY OF BELMONT. ; ! \ A arE clu sshw Foa ca*u~nrY ANO ,ae sA~tY _ . _ 680.77 \Y I s MtLLUW MAkSH I-AKM rtKmii sti 75 . 5. SEE LANDSCAPE DETAILS SHEET FOR ADDITIONAL LANDSCAPE 6 a 2 1312 WOODY STORE RD. ISSUE DATE: GAN,gII „ NOTES, 68135 , °E UTILITIES SHOWN HAVE BEEN LOCATED SILER CITY, NC 27344 CONSTRUCTION SET THE FIELD SUOUro FROM E RMV4~OR MAKES NO GUARANTTEETHTHATTTTVE UN~CCRROUND P. 919-742-1200 ISSUE DATE: CE UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES RI THE AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES 6gL4g.// ~ ~ _ NOT WARRANT THAT THE UDERCNOIRD UTILITIES SHORN ARE IN 0 DRAWING NUMBER: VE EXACT LOCATION INDICATED, ALTHOUGH HE DOES CERTIFY THAT / 681.50 67627 ll' d THEY ARE LOCATED AS ACCURATELY AS POS98LE FROM RFORMATION AVAILABLE. THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE 0 6O H2O UNDERGROUND UTILITIES, - / / 676 3 662.93 66.3 Fi SP-7 SCALE 1" 60' E • • it ~ ~ ~ JT ~,~~~~~T I A i ii I i EVISIONS R PRE-BID SET POST BID SET ~ --X_~ r ISSUE DATE ~ ISSUE DATE DATE DESCRIPTION _ . ~ - X X ~ _ _ F / A . , ~ ~ - x - ~ x x - - - - -L 87'3217 E 636, 50' TOTAL / , ~ I. r ~ x x - x- - . t / 1.~:, . ~ ~r . n~r..*r ~~i .rKi+..r....~.wn~rn+r..~+. w:. mow. ~w.--7~ . ~..w.~.r.. .w. K..~~.i{..-wc. ~ _ (108.09 X-x X- ~ X-x-X-X X x- :~n ~s << ti,~,~: _ , _ _ 528.4'1' r ~ ~ _ , ~4. EXISTING . VEGETATION: TO REMAIN. . , i-~ : : (54`:: UNDIST{Eb::$~i~~Ei?). ~ EXIT 26 1 EXIT 27 - i - _ OE \ X ~.P.. INTERSTATE 85 M 2- " _ - _ - _ ; u~ ~ I-M - - UPLMKR ~ ~ . _ N I- ~ T ~ o ~ SI E ~---uc ~~yl I-RM _ ~ ' \ ~ Z -E~- - ~ : h j stop - - P MKR 3-M - 0~ I-RM - u~ - j 3-M ~ wl ~ ~x~vsoN w. ~ ZONIN ~ ~r ~~o~> L SINE ~ ~ ~ ~°,Q~ ~ I-RM .a ~ ~ o Q -L~ _ I-RM e ~ , ~ ~ ~ ~ ~ ~ - U N ( Q, 2 C ' U I-M ~1 C~ ~ ~ ~ , ~ W • • N ~ .1 . ~ > ~ 20 0 I : ~ ~ wN SQ 1R c ~ Nflllll+~~ t-RM . , ~ I- M 3-S r X 0; N ~ I _ n_ i i,0 ~ ,9 4 O a _ ~ - ' 15 WB _ ¦ VICINITY MAP 1 7200 << ~..i. `b 6` , ::~C~::I~. I I SEAL . $ 4M _ 10586 t 1- - „ ~3O 20- I . _ r p I ENO E~~•'• ~ ~ WN . ° WN I_ 2 RO S 8 IN FS ~,P,. ~-RM 15 CN I q• PREE ~+~~NrunU'~~ N.~.... r t ~~w~ . _ ~ Q ~ ~ 2_ I I ~ FFE ~ 693.00 _ . ~ I .~d ~ I-R U I ( ~ ~ I RM - _WB _ I ALL ISLANDS TO BE SOt;DED 3-C ~ . ~ 2 R I Z ~ I ~ ~ S WITH BERMUDA SOD L~ r I l ~ ~p I ~ _r- _ ~ - I Z ~ cv U ~ I Q ` N ° - _ ti 3_GA I ~ Q>a I ~ LL Q I RM I ro lL ~ o ~ I- 2_C -CN I Y ~ Q00 ~ ~ ~c ° I ° I ~ ~ Q ~ p ~ I N C~~ ° ° ~ ~ C ~I I ~ cn 0 o x. P ~ ~ ° ~ 24-WB 2 RO ~ ~ ~ N ~ 3 o ~ ~ ~ ~ Z ~ ~ ~ > ~ 0 ~ ~M .C N m 1-Z ~ 0) 2_z ~ W ~ 2-Z PLANT LIST 5-wB j , + + j'~ oc W c~ l~ ! W E SCIENTIFIC NAME COMMON NAME SIZE REQUIREMENTS SPACING ~ ° ? + + i ! i C~UANTITY SYMBOL COD j + ~ ~ _ ~ R ~ - - ACE AUTUMN FLAME 4' CALIPER, AS • 2g' E LOWE'S HOME CENTERS, iNC, 30 RM RUBRUM RED MAPLE 10' MIN. NT, SHOWN 15 ~ I-Z AUTUMN LAME BBB - - _ - - - HWY. 268 EAST, EAST DOCK 'v '%6~, ~ 2-~ - N. WILKESBORO, NC 28659 4" CALIPER, ' 2-G - _ QUERCUS WILLOW I MIN, NT, AS \ - _ PONDSCAPING SEQUENCE AND ~ ~ ~ 14 WC PNELLOS 0 SHOWN OAK BBB \ ° - 336.658.4000 (V) 336.658.3257 {F)~ SPECIFICATIONS FOR WETLANDS PLANTS t 2-R - 2-RM 2-RO _ - -RM - s.•~~~ • 2 RO THIS DRAWING IS THE PROPERTY OF LOWES ACER ~ ~ I .r~; ° - 4 ~A~~P~R, AS ~ ' I-N0 c - ACCHARUM SUGAR ; ~ A, D PONDSCAPINC, SEQUENCE. HCNE CENTERS, INC. ANY USE OR REPRODUCTION M WHOLE OR PART IS PROHIBITED WffHOUi THE 22 SM S , 10' MIN. NT, SHOWN ~ I-NO LEGACY' MAPLE BBB i -NO E%PRESSED WRITTEN CONSENT OF LOWE5 HOAE Y7 ~ 1, TEMPORARY STABILIZATION OF ALL DISTURBED AREAS DENTERS.iNacD~iGMZaosuLRlGHrs i x - 0 - ° ° RESERVED TO BE PERFORMED WITHIN 72 HOURS OF FINAL GRADE • • 4' CALIPER, AS ` ~ ~ 15- 15-C _ QUERCUS IN NT. WN ' ` 4- I-NO ~ 2-R I-NO 2. THE AQUATIC PLANTING WINDOW IS FROM APRIL 1 TO 7 NO NUTTALL OAK 10 M SNO ~ ~ _ - _ NUTTALLI BEB B I- 0 - o JUNE 15. ~ - 15-WB ~t _ _ 15-WB 3. RECONFIRM PLANTING ELEVATIONS ONE WEEK PRIOR 4' CALIPER, AS ~ i 15- - ' ZELKOVA SERRATA GREEN VASE ~ - w TO PLANTING. 0 10' MIN. NT, SHOWN ° _ g + Z LK VA 1 - 'GREEN VASE' ZE 0 88B - ° 4. THE PLANTING PLAN SHOULD BE REVISED AS ° 2-RO I-NO - NECESSARY, AND THE SITE SHOULD BE STAKED AND I-NO w F A E 4" CALIPER, AS -CN s _ I L GG D. ¦ QUERCUS RED N NT, N WN 'sf _ _ 26 RO IO' MI . S 0 aols ~ ~ RUBRA OAK B5B - - _ - 5. DE-WATER THE WETLANDS 24 HOURS PRIOR TO WB 2 RO I RM PLANTING. w" _ ~ 4' CALIPER, qS -RM ~ N m 2 RO 6. PLANT WETLAND. I ~ N 7, MULCH AND WATER STOCK AS NEEDED. FRAXINUS GREEN 15_ I „ Y'~,g _ GA 10' MIN, NT, SHOWN ~ IRO II PENNSYLVANICA ASN \ o ~ o ~ 8. INSPECT LANDSCAPE TWICE PER YEAR, BBB I-N I - I-G \ ° -RM 9. REINFORCE PLANTING AT END OF FIRST AND SECOND CRYPTOMERIA FULL- YOSNINO 20 I-RM. GROWING SEASON. C JAPONICA 4'-6' MIN, NT. O.C. ~ 8-SM 19 CRYPTOMERIA 10, RESTRICT MOWING TO DESIGNATED AREAS. 'YOSNINO' BEB \ ~ ~ . t ~ 11. SUPRESS WEEDS, AND VINES ON TREES AND SHRUBS t s t RA EN ~ MAGNOLIA B CK S FULL ss \ DURING YEARS 2 AND 3, GRANDIFLORA BR. BEAUTY - IN. NT AS I CH ` _ 6 8 M \ \ ~ 21 M 'BRACKENS BROWN SOUTHERN SI-IOWN ss ~ I G, _ 2-RO BBB \ ~ . BEAUTY' MAGNOLIA \ - M~ ~ p 3-GA - - - ETENTI N WETLAND PLANT LI T I D 0 S ILEX CORNUTA CARISSA 15" MIN. HT. 4' MARKER\ ° N s \ 7~°1' 224 o C 'CARISSA' HOLLY 5 GAL, O.C. ~ QUANTITY SYMBOL SCIENTIFIC NAME COMMON NAME SIZE REQUIREMENTS SPACING PLANTING NOTES ~ Y BUXUS ' °1~?n PAMCUM 3 WINTER GEM 8 \ ro o ° °°°°°o"; I "MIN. NT, 3.5' ` I ° ° 189 o WB MICROPNYLLA 3 GAL, O.C. ~ , 20- ° ~ ~ ` ~ ~ SWITCNGRASS 4" POTS ~ 3>000 VIRGATUM APART STANDARD PLANTING B XWOOD x ~Q'~ WINTER GEM' 0 s,; ~ y ~°~o>a N ~ " >r ~ ~ IOO"WN 30-WN (SW) w 20- • NANDINA HARBOUR DWAR 8" MIN. NT, 2' ~ ~ "~ox 1 w ' SAGITTARIA DUCK TUBERS 3 ~ PLANT TUBERS 2"-3" ~ ~ ~ - 1,220 APART INTO DAMP SOIL OR IN ~ 174 ° DN DOMESTICA NANDINA 3 GAL. O.C. 7-WO ~ ° a ~ ~ ~ . 'HARBOUR DWARF' ~ 3 ~ I~_ LATIFOLIA POTATO ~ ' IC~~P • (DP) WATER 12"-18" DEEP m 0 i~ ~ \.~oo ` NAJAS WATER 5' PLANT ROOTS 2"-3" m ' ~ 20-Y~1N oo~~' ,N - 400 0 ROOTS Z o ~ \ ° ss ~ , ? GUADALUPENSIS NYMPH APART DEEP IN MUD _ w - ~ w 7 WO ° 1 ~ ° ARD LANDSCAPE NOTES t ~0'SS 50 IRIS BLUE FLAG I GALLON 3 STANDARD PLANTING v LOWS S STAND S I IRIS AP RT ?:28O~T ~ tIR) VIRGIN CA A p N Q ~ I. ALL PLANTED AREAS SHALL RECEIVE A 3' LAYER OF SHREDDED PINE ~ s , m U 6ARK MULCH OVER A 10 MIL WEED MAT EQUAL TO "WEEDBLOCK" BY ~ 0 HIBISCUS ROSE 3' 270 I GALLON STANDARD PLANTING Z a (RO) MOSCNEUTOS MALLOW APART = m ITT D BARRIER, ~ ~ EASY GARDENER OR DEW WEE Q ~ z \ ~ ° ~ ~ - . 0 EUPATORIUM JOE PYE 3' J I TUBBED AREAS NOT RECEIVING PLANTINGS (INCLUDING - ~ 2 ALL D S 560 I GALLON STANDARD PLANTING („Jp) FISTULOSUM WEED APART D. o a RIGHT-OF-WAYS) SHALL BE SEEDED. ~ IN TRI T ACCORDANCE WITH DIVISION 2 ~r ' ~ 3. ALL WORK SI-IALL BE DONE S C WETLAND s~ eea°e°e°e° NELIANTNUS SWAMP 3' 590 I GALLON STANDARD PLANTING ~ Z 0 ~J E D : , ~ I_ ANGUSTIFOLIUS SUNFLOWER APART OF LOWE'S STANDARD SITE SPECIFICATIONS. AREA ~ \ ~ (SS) Q F- U Z 4. THE OWNER OF THE PROPERTY IS RESPONSIBLE FOR THE ~ T FALL LANSCAPING MATERIALS AND - ~ ~ a 0 ECNINACEA RPLE CONTINUED PROPER MAIN ENANCE 0 NA KEEP THEM IN A PROPER, NEAT AND ORDERLY APPEARANCE, i S LL WETLAN 380 ~ I GALLON 3 STANDARD PLANTING W z F 0 (PC) P RP REA CONE LOWER APAR I _I U U v FREE FROM REFUSE AND DEBRIS. ALL DEAD OR UNI-EALTNY PLANT AREA sJ, ***CAUTION*** z -1 w W T I HALL ~ REPLACED WITHIN 180 DAYS TO MA~ITAIN TI-E MA ER AL S ITEA VIRGINIA 3' Q MW o 1,060 I GALLON STANDARD PLANTING J W m ~ QUALITY OF TI-E LANDSCAPING. IN NO INSTANCE WILL Tl-E CITY OF - \ TI UTILITIES PROTECTION SERVICE pT) VIRGINCA SWEETSPIRE APART a • • BELMONT BE RESPONSIBLE FOR THE MAINTENANCE OF ANY VEGETA ON I N I WITHIN THE PUBLIC RIGHT-OF-WAY OF A 3 o~n eEFORE olcclHC cAU ORIGINAL ISSUE TOIL FREE 1-800-632-4949 PLANT SOURCES DATE: 6120106 UNLESS SUCH VEGETAT 0 S ; ~ CITY MAINTAINED STREET OR IS LOCATED ON PROPERTY OWNED BY THE - • r~ n"~~ !M!le•"e [M MY~~IWN eW\ YIO C°RTV / I \ w~r~• •~r e•~T CITY OF BELMONT. 680 77 MELLOW MARSH FARM rtrcmi i ati n 1312 WOODY STORE RD, ISSUE DATE: CALITgII 5. SEE LANDSCAPE DETAILS SHEET FOR ADDITIONAL LANDSCAPE E _ 6>52o ~I .35 ' U THE UNDERCROLI D UTILITIES SHOWN NAYS BEEN LOCATED SILER CITY, NC 27344 CONSTRUCTION SET FROM FIELD SURWY NIFORNATION AND EXISTING ORAWNGS, P. 919-742-1200 ISSUE DATE: NOTES, 68, OE _ CE Y THE SURWYOR NAVES NO GUARANTEE THAT THE UNDERGROUND UTUTES 940M COMPRISE ALL SUCH UTILITIES N THE AREA, 681 OTHER N SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES DRAWING NUMBER: NOT WARRANT THAT THE UNDERGROUND UTILITIES SHORN ARE IN D THE EXACT LOCATION INDICATED, ALTHOUGH IE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY AS POSSIBLE FROM (FORMATION AVAILARZ THE SURVEYOR HAS NOT PHYSICALLY LOCATED THE O 60 120 ~ 681 76.2 8,> UNDERGROUND MUTES 151 1 SP-7 - / 7 676.34 662.93 SCALE I" = 60' •