HomeMy WebLinkAboutNCS000495_HS 2018 SWMPA Ext Request_20181101From:Powell, Jeanette
To:"Daniel Colavito"
Subject:RE: [External] RE: NPDES MS4 Phase II Stormwater Permit Annual Reporting
Date:Thursday, November 1, 2018 1:02:00 PM
Attachments:NCS000495_HS 2018 SWMPA Ext Approval_20181101.pdf
Hi Daniel,
Extension to 11/30 approved, see attached.
J
Jeanette Powell, CPSWQ, CPESC
MS4 Program Coordinator
919-707-3620
Jeanette.Powell@ncdenr.gov
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 9th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties.
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
From: Daniel Colavito [mailto:daniel.colavito@Hollyspringsnc.us]
Sent: Thursday, November 1, 2018 10:07 AM
To: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>
Subject: [External] RE: NPDES MS4 Phase II Stormwater Permit Annual Reporting
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam.
Good morning Jeanette,
I hope that you are well. I writing to request a two-week extension for submittal of our updated
SWMP. We have completed the self-assessment/MS6I modules internally. We are also conducting a
third-party program review. This will not be complete until the week of the 12th. Both of these things
are going to generate changes to our processes, our SWMP, and most likely, our ordinance(s) as
well. I would like to have this incorporated into what we submit to the State for this year. I had
planned to have it completed by 10/31, but it took me longer than anticipated to get the contract for
the program review approved. Thanks in advance for your consideration and let me know if you have
questions.
J. Daniel Colavito, CFM
Environmental Specialist
Office 919.567.4027
Mobile 919.422.9818
daniel.colavito@hollyspringsnc.us
Hotline round
From: Powell, Jeanette <Jeanette.Powell@ncdenr.gov>
Sent: Thursday, August 16, 2018 2:36 PM
To: Daniel Colavito <daniel.colavito@Hollyspringsnc.us>
Subject: FW: NPDES MS4 Phase II Stormwater Permit Annual Reporting
Greetings Phase II MS4 Permittees,
On August 6, 2018, a mass e-mail was sent to the Municipal Separate Storm Sewer System (MS4)
Phase II permit contacts listed in DEMLR’s database. That mass mailing had two immediate results;
(1) there were an overwhelming number of e-mails returned as undeliverable, and (2) a lot of great
questions were generated.
We have since updated the contact list, and want to be sure that the MS4s are clear on the changes
to annual reporting this year. An electronic SWMPA for fiscal year 2017-2018 is required to be
submitted by October 31, 2018. An FAQ is attached to this e-mail regarding this change. If you
have questions or need technical assistance, my contact information is below and also in the FAQ.
Thanks and have a great day,
Jeanette Powell, CPSWQ, CPESC
MS4 Program Coordinator
919-707-3620
Jeanette.Powell@ncdenr.gov
North Carolina Department of Environmental Quality
Division of Energy, Mineral & Land Resources Stormwater Program
512 N. Salisbury Street, 9th Floor
1612 Mail Service Center
Raleigh, NC 27699-1612
Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be
disclosed to third parties.
https://deq.nc.gov/about/divisions/energy-mineral-land-resources/stormwater
CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you
recognize the sender and know the content is safe.
Warning: This email is subject to disclosure under the North Carolina Public Records Law
(NCGS 132-1).