Loading...
HomeMy WebLinkAbout20181111 Ver 1_CAMA Major Permit No. 122-18_20181031Permit Class NEW STATE OF NORTH CAROLINA Department of Environmental Quality and Coastal Resources Commission Vermtt for X Major Development in an Area of Environmental Concern pursuant to NCGS 113A-118 X Excavation and/or filling pursuant to NCGS 113-229 Permit Number 122-18 Issued to Robert M Worrell, 101 Hastings Dr., Moyock, NC 27958 Authorizing development in Currituck County at adj. to man-made canal leading to Roland Creek, at 101 Hastings Dr., near Moyock, as requested in the permittee's application dated 7/17/18, including attached workplan drawings (1) dated 7/12/18 and email correspondence dated 9/20/18. This permit, issued on October 31, 2018 is subject to compliance with the application (where consistent with the permit), all applicable regulations, special conditions and notes set forth below. Any violation >r tnese terms may oe sunject to tines, imprisonment or civii action; or may cause me permit to oe nun aria volu. 1) In accordance with commitments made by the permittee in email correspondence dated 9/20/18, the originally proposed boathouse is hereby deleted from the application and all reference to the boathouse shall be null and void. Shoreline Stabilization - Bulkhead 2) The bulkhead shall be constructed in accordance with the alignment depicted on the attached workplan drawings. (See attached sheets for Additional Conditions) This permit action may be appealed by the permittee or other qualified persons within twenty (20) days of the issuing date. This permit must be accessible on-site to Department personnel when the project is inspected for compliance. Any maintenance work or project modification not covered hereunder requires further Division approval. All work must cease when the permit expires on December 31, 2021 In issuing this permit, the State of North Carolina agrees that your project is consistent with the North Carolina Coastal Management Program. Signed by the authority of the Secretary of DEQ and the Chairman of the Coastal Resources Commission. Braxton C. Davis, Director Division of Coastal Management This permit and its conditions are hereby accepted. Signature of Permittee Robert M Worrell ADDITIONAL CONDITIONS Permit No. 122-18 Page 2 of 3 4) The alignment of the authorized bulkhead shall be staked by the permittee and verified by a representative of the Division of Coastal Management within a maximum of 30 days prior to the start of construction. Failure to initiate construction within 30 days, or erosion of the shoreline by adverse weather conditions, shall require the alignment to be re -staked by permittee and verified by DCM within a maximum of 30 days prior to the new expected start of construction. 5) The bulkhead shall be constructed prior to any backfilling activities. 6) The bulkhead shall be structurally tight so as to prevent seepage of backfill materials through the structure. 7) The fill material shall be clean and free of any pollutants except in trace quantities. 8) All backfill material shall be obtained from a high ground source and confined behind the permitted bulkhead. 9) No backfill material is to be placed within 30 feet of the normal water line, except that which will be used to backfill the area behind the permitted bulkhead. 10) All fill material to be placed below normal water level shall be confined behind the permitted bulkhead. Sedimentation and Erosion Control 11) A ground cover sufficient to restrain erosion shall be provided within 30 calendar days of any phase of grading on cut or filled slopes. At a minimum, a silt fence shall be properly installed immediately landward of the bulkhead cap immediately following completion of backfilling activities. General 12) This permit shall not be assigned, transferred, sold, or otherwise disposed of to a third party without the written approval of the Division of Coastal Management. 13) The permittee shall maintain the authorized work in good condition and in conformance with the terms and conditions of this permit. The permittee is not relieved of this requirement if he or she abandons the permitted activity without having it transferred to a third party. 14) The permittee and/or his or her contractor shall meet with a representative of the Division prior to project initiation. NOTE: This permit does not eliminate the need to obtain any additional state, federal or local permits, approvals or authorizations that may be required. NOTE: The U.S. Army Corps of Engineers authorized the project by way of Programmatic General Permit 198000291 (Action ID SAW -2018-01587) issued 10/31/18. NOTE: The N.C. Division of Water Resources authorized the proposed project by way of General Water Quality Certification 4144 and assigned the project DWR Project No. 2018-4111. Robert M Worrell ADDITIONAL CONDITIONS Permit No. 122-18 Page 3 of 3 NOTE: Future development of the permittee's property may require a modification of this permit. Contact a representative of the Division at (252) 264-3901 prior to the commencement of any such activity for this determination. The permittee is further advised that many non -water dependent activities are not authorized within 30 feet of the normal water level. NOTE: An application processing fee of $400 was received by DCM for this project. This fee also satisfied the Section 401 application processing fee requirements of the Division of Water Resources.