HomeMy WebLinkAbout20181468 Ver 1_Shoreline Stabilization_20181026State of North Carolina
Department of Environment and Natural Resources
DWR Division of Water Resources
15A NCAC 02H .0500 - Water Quality Certification, Shoreline Stabilization
Division of Water Resources FORM: SSGP 10-2013
Shoreline Stabilization Application Form
Three copies of the application (including attachments) and the application fee
should be sent to: -� + a 4
Division of Water Resources
401 Et Buffer Permitting Unit
1617 Mail Service Center 2 0 1 8 1 4 6 8
Raleigh, NC 27699-1617
I. Applicant Information
1. Owner Information
Name: A 11e,c\_ �
Mailing Address:
[15A NCAC 02H .0502(a)]
4bCDO
� e 1\I L
Telephone Number: -V4 5qt N1_:�-> Fax Number:
E-mail Address: Katm V Ie -&A- n C -Dov- ff)Ck'co M
2. Agent/ Contact Person Information
A signed and dated copy of the Agent Authorization letter (a form can be
downloaded here: http://www.saw.usace.army.mit/Portals/59/docs/re_qutatory/
regdocs/Permits/ SAMPLE _ AGENT_AUTHORIZATION _FORM.pdf) must be attached if the
Agent has signed this application form.
Name:
Company Affiliation:
Mailing Address:
Telephone Number: Fax Number:
E-mail Address:
Person to receive the Certification Approval:
II. Project Information [15A NCAC 02H .0502(x) 8t (b)]
Attach a vicinity map (i.e. street map) clearly showing the location of the
property with respect to local landmarks such as towns, rivers, and roads.
Provide a detailed site plan showing property boundaries and proposed
locations of vegetation clearing, structures (buildings, retaining walls, docks,
FORM: SSGP 10-2013 Page 1 of 3
3.
4.
impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/
Normal Water Level elevations, and construction access corridors. You may
use the diagram provided at the end of this application form.
Attach a photograph of the shoreline/ buffer proposed to be stabilized.
(Include a scale of some sort- a yard stick, shovel handle, etc.)
Location of the property (where work is to be conduc ed)
County: J Nearest Town: 00'ccs'/'��
Subdivision name or site address (include phase/lot number):
Directions to site - please include road names
numbers, Landmarks, etc.: _
Ir
�u e e �c� t✓ nAC4
Latitude (in decimal degrees) 351 &01,91 q2- Longitude (decimal degrees) —�®'C6-1 3(D 1
5. Describe the existing land use or condition of the site at the time of this
application (residential, undeveloped, etc.): Ce S, k44 t e,
6. Property size (acres):
7.Lak / river/ ocean adjacent to property: fes'' Ox)
8. Describe proposed work (include discussion as to how hardening of shoreline has
been avoided,. Qr why it is necessary):
V' Cox C i 5i C`.S
9. Will work be conducted from land? l4 From water? (\-,o
10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining
walls, etc.) below the normal pool lake level/ Normal Water Level in square feet
or acres:
11. Total amount of disturbance (including all clearing, back fill, excavation, rip
rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level
and 50 feet land -ward in square feet or acres:�-V ck cc,
12. Please describe the vegetation above the normal pool lake level/ Normal Water
Level and 50 feet landward to be impacted (number of trees, for instance): _
FORM: SSGP 10-2013 Page 2 of 4
46�CHt-f\- ("+
Owner/Agent's Signature' [1 5A NCAC 02H .0502(f)] Date
'Agent's signature is valid only if on authorization letter from the owner is provided.
Full Pond/
Normal r Level
Shoreline
5�
Lake
(At Full Pond/Normal Water Level)
Please approximately sketch the following information on this plan (provide
dimensions for each item, such as 10 ft x 100 ft)*:
1. All proposed vegetation clearing
2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level
elevation
3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level
elevation
4. Location of any proposed structures such as buildings, retaining walls, docks, etc.
FORM: SSGP 10-2013 Page 3 of 4
5. Location of any excavation or dredging below the Full Pond/ Normal Water Level
elevation
6. Location of construction access corridors
FORM: SSGP 10-2013 Page 4 of 4
�r'c' � '4✓ x � � ..J '
.,' �;, ^"' tip• r
✓ �a
�� ��, � .ii �� ,. �?' � +,• i4 ��`- — �,' . - ,��� ,tom }. v
4 - '
� �:' .- � .`j• aid f ;.� ,yC.., 4y r 1 4 ,: t.�J!' t.
•�1
�. _�. 4 �@ v-~� .. - • 7'�R��� , ' � y ..� n c',�`", J .HT1 `N\+-
"1
Womb
e
r
1 -• L 1 _' y i •��
- ._ y i� \\ .' •'� r'.��i' ,SI � •\ + .� � lam+ .
- \ S 1Y�ii4 X`ti bf"rt
� . ♦r •yT' �4.
,`.'I! if . 1 i t` Z '�• -. ), it/� o i... -y .
% • ' ! ' �. f r
1 ` ti•i.' I . R , .�Y1 ' 1' •�•�'�. 7 .. �, ••�' .�•` '�„may �-�}� �•�l.
$44
1
'°'
A yy
• r >c. m►i '` !i"1 ..� A"* � 1K • ! �6�� � � '� � �"` .;� to � .'�� �'
n.
-- _ _ - '. �.' .`�_ � `-•�. sic �.� ..
} _
�• t r. � - a ; ., n '' I � � _ - .;►-��?. �"'�. .. � �a r�t � - - gip: .✓- � �'' sr*,
^7
7' rty ...A� �'M ... _ , � �MC1�Yr+" rd �..� ` . � , r JSP 'F v'" .�f�'�G: s ~ � �r�• �. }
'r
,-
�r � I �
'.. ,tet
. •1 _
Ot
or
art -
mak,. � � ~ i }. ,r �•t�` � s� � i. P� - �^� •c_: ,
.fir. - �• �y C. ��,,,�`�c, �;.r.. 1 s�♦t.As:
All
-- tea- '� :''`. �- r � ���� � ^ P` - i' �• ,y"+'i .�7 �i '
=1 i iyt -t
1. -JR,..7 ai' • •-•' S'' ,il/�•. _ J ,.ate . w_ •. �.
3.
IF
t .radii'^^. _� •y •1.•
•'�.• ,`Y1i�•l< � v 7�� '�- � f w; �'S�.>. is
Eir
Ir
tin
I•�„�.'i7't `-� [[ ice_.! s•- `
i
•!- .. , ., - 7. _I , fig nr _ mfr ar%3'tr.Y"�.. �.
•
4w
t�' c� •i 1It r �.'� I IIIII y' ;
4
Mm
sAl.
i`...�� �„, � -� .. : Via. .�'• t
',•J--' � .� '•yam � � � 1 � Qy 9 �t �_ 5
,k�
rlo;I sip
Aim
- � " ,.» � �'• � �, �;� t �' �.�� �i. '�'�'� "fit _ V
41 j
,�.�. .moi., Sr 1,`. �F•.1r.{i
1 � T'�e`�dt' t ��+` •' ,��`'J gal � .S
.Y; i � .;t � � ai Ash*\ �w `�. �� 1 • , ' - .
N
o COro
%VS
Ra
1a2s � C
°rnelius Rd
1442
1395
F1 —42--81 Cornelius Park
1442
1395 °'
1480 °D
396
a
1 so
;] DOOLIE
Riper
Fl -1-8-01 14vy
ake Norman 0
High School
W
A
1304
Winslow Bay Commons
a�
e�
m`
W plaza Dr
yo �a tvP/d2d �r
Walmart Supercenter Q
Google My Maps ---
W
1305
21