Loading...
HomeMy WebLinkAbout20181468 Ver 1_Shoreline Stabilization_20181026State of North Carolina Department of Environment and Natural Resources DWR Division of Water Resources 15A NCAC 02H .0500 - Water Quality Certification, Shoreline Stabilization Division of Water Resources FORM: SSGP 10-2013 Shoreline Stabilization Application Form Three copies of the application (including attachments) and the application fee should be sent to: -� + a 4 Division of Water Resources 401 Et Buffer Permitting Unit 1617 Mail Service Center 2 0 1 8 1 4 6 8 Raleigh, NC 27699-1617 I. Applicant Information 1. Owner Information Name: A 11e,c\_ � Mailing Address: [15A NCAC 02H .0502(a)] 4bCDO � e 1\I L Telephone Number: -V4 5qt N1_:�-> Fax Number: E-mail Address: Katm V Ie -&A- n C -Dov- ff)Ck'co M 2. Agent/ Contact Person Information A signed and dated copy of the Agent Authorization letter (a form can be downloaded here: http://www.saw.usace.army.mit/Portals/59/docs/re_qutatory/ regdocs/Permits/ SAMPLE _ AGENT_AUTHORIZATION _FORM.pdf) must be attached if the Agent has signed this application form. Name: Company Affiliation: Mailing Address: Telephone Number: Fax Number: E-mail Address: Person to receive the Certification Approval: II. Project Information [15A NCAC 02H .0502(x) 8t (b)] Attach a vicinity map (i.e. street map) clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Provide a detailed site plan showing property boundaries and proposed locations of vegetation clearing, structures (buildings, retaining walls, docks, FORM: SSGP 10-2013 Page 1 of 3 3. 4. impervious surfaces, etc.), rip rap, excavation or dredging below Full Pond/ Normal Water Level elevations, and construction access corridors. You may use the diagram provided at the end of this application form. Attach a photograph of the shoreline/ buffer proposed to be stabilized. (Include a scale of some sort- a yard stick, shovel handle, etc.) Location of the property (where work is to be conduc ed) County: J Nearest Town: 00'ccs'/'�� Subdivision name or site address (include phase/lot number): Directions to site - please include road names numbers, Landmarks, etc.: _ Ir �u e e �c� t✓ nAC4 Latitude (in decimal degrees) 351 &01,91 q2- Longitude (decimal degrees) —�®'C6-1 3(D 1 5. Describe the existing land use or condition of the site at the time of this application (residential, undeveloped, etc.): Ce S, k44 t e, 6. Property size (acres): 7.Lak / river/ ocean adjacent to property: fes'' Ox) 8. Describe proposed work (include discussion as to how hardening of shoreline has been avoided,. Qr why it is necessary): V' Cox C i 5i C`.S 9. Will work be conducted from land? l4 From water? (\-,o 10. Total amount of disturbance (including all excavation, backfill, rip rap, retaining walls, etc.) below the normal pool lake level/ Normal Water Level in square feet or acres: 11. Total amount of disturbance (including all clearing, back fill, excavation, rip rap, retaining walls, etc.) above the normal pool lake level/ Normal Water Level and 50 feet land -ward in square feet or acres:�-V ck cc, 12. Please describe the vegetation above the normal pool lake level/ Normal Water Level and 50 feet landward to be impacted (number of trees, for instance): _ FORM: SSGP 10-2013 Page 2 of 4 46�CHt-f\- ("+ Owner/Agent's Signature' [1 5A NCAC 02H .0502(f)] Date 'Agent's signature is valid only if on authorization letter from the owner is provided. Full Pond/ Normal r Level Shoreline 5� Lake (At Full Pond/Normal Water Level) Please approximately sketch the following information on this plan (provide dimensions for each item, such as 10 ft x 100 ft)*: 1. All proposed vegetation clearing 2. Location of rip rap or fill to be placed above the Full Pond/ Normal Water Level elevation 3. Location of rip rap or fill to be placed below the Full Pond/ Normal Water Level elevation 4. Location of any proposed structures such as buildings, retaining walls, docks, etc. FORM: SSGP 10-2013 Page 3 of 4 5. Location of any excavation or dredging below the Full Pond/ Normal Water Level elevation 6. Location of construction access corridors FORM: SSGP 10-2013 Page 4 of 4 �r'c' � '4✓ x � � ..J ' .,' �;, ^"' tip• r ✓ �a �� ��, � .ii �� ,. �?' � +,• i4 ��`- — �,' . - ,��� ,tom }. v 4 - ' � �:' .- � .`j• aid f ;.� ,yC.., 4y r 1 4 ,: t.�J!' t. •�1 �. _�. 4 �@ v-~� .. - • 7'�R��� , ' � y ..� n c',�`", J .HT1 `N\+- "1 Womb e r 1 -• L 1 _' y i •�� - ._ y i� \\ .' •'� r'.��i' ,SI � •\ + .� � lam+ . - \ S 1Y�ii4 X`ti bf"rt � . ♦r •yT' �4. ,`.'I! if . 1 i t` Z '�• -. ), it/� o i... -y . % • ' ! ' �. f r 1 ` ti•i.' I . R , .�Y1 ' 1' •�•�'�. 7 .. �, ••�' .�•` '�„may �-�}� �•�l. $44 1 '°' A yy • r >c. m►i '` !i"1 ..� A"* � 1K • ! �6�� � � '� � �"` .;� to � .'�� �' n. -- _ _ - '. �.' .`�_ � `-•�. sic �.� .. } _ �• t r. � - a ; ., n '' I � � _ - .;►-��?. �"'�. .. � �a r�t � - - gip: .✓- � �'' sr*, ^7 7' rty ...A� �'M ... _ , � �MC1�Yr+" rd �..� ` . � , r JSP 'F v'" .�f�'�G: s ~ � �r�• �. } 'r ,- �r � I � '.. ,tet . •1 _ Ot or art - mak,. � � ~ i }. ,r �•t�` � s� � i. P� - �^� •c_: , .fir. - �• �y C. ��,,,�`�c, �;.r.. 1 s�♦t.As: All -- tea- '� :''`. �- r � ���� � ^ P` - i' �• ,y"+'i .�7 �i ' =1 i iyt -t 1. -JR,..7 ai' • •-•' S'' ,il/�•. _ J ,.ate . w_ •. �. 3. IF t .radii'^^. _� •y •1.• •'�.• ,`Y1i�•l< � v 7�� '�- � f w; �'S�.>. is Eir Ir tin I•�„�.'i7't `-� [[ ice_.! s•- ` i •!- .. , ., - 7. _I , fig nr _ mfr ar%3'tr.Y"�.. �. • 4w t�' c� •i 1It r �.'� I IIIII y' ; 4 Mm sAl. i`...�� �„, � -� .. : Via. .�'• t ',•J--' � .� '•yam � � � 1 � Qy 9 �t �_ 5 ,k� rlo;I sip Aim - � " ,.» � �'• � �, �;� t �' �.�� �i. '�'�'� "fit _ V 41 j ,�.�. .moi., Sr 1,`. �F•.1r.{i 1 � T'�e`�dt' t ��+` •' ,��`'J gal � .S .Y; i � .;t � � ai Ash*\ �w `�. �� 1 • , ' - . N o COro %VS Ra 1a2s � C °rnelius Rd 1442 1395 F1 —42--81 Cornelius Park 1442 1395 °' 1480 °D 396 a 1 so ;] DOOLIE Riper Fl -1-8-01 14vy ake Norman 0 High School W A 1304 Winslow Bay Commons a� e� m` W plaza Dr yo �a tvP/d2d �r Walmart Supercenter Q Google My Maps --- W 1305 21