HomeMy WebLinkAbout20080868 Ver 2_Mitigation Ledger -2018_20181030From:
Jeff Furness
To:
Steffens, Thomas A CIV USARMY CESAW (US)
Cc:
Scarbraugh, Anthony
Subject:
[External] RE: Mitigation Ledger Voice Mail (UNCLASSIFIED)
Date:
Tuesday, October 30, 2018 1:57:09 PM
Attachments:
Mitigation Ledaer 2018.xlsx
CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an
attachment to Report Spam. <mailto:report. spamenc.gov>
Tom:
Updated mitigation ledger for Condition N of the 404 permit for the end of 2018, incorporating Sage Gut and P
Lands Phase 1, is attached.
Jeff
Jeff Furness
Senior Scientist
Environmental Affairs
1530 NC Hwy 306 South
Aurora, North Carolina 27806
t 252-322-8249 c 252-714-6934
Jeff.Fumess@nutrien.com
www.nutrien.com
-----Original Message -----
From: Steffens, Thomas A CIV USARMY CESAW (US) [mailto:Thomas.A.Steffens@usace.army.mil]
Sent: Monday, October 29, 2018 4:35 PM
To: Jeff Furness <Jeff.Furness@nutrien.com>
Subject: [EXT] RE: Mitigation Ledger Voice Mail (UNCLASSIFIED)
WARNING: This email originated from outside of the organization. Exercise caution when viewing attachments,
clicking links, or responding to requests.
CLASSIFICATION: UNCLASSIFIED
Thanks!
You'll get both Sage and PnU lands closeout letters before COB today. Disregard request for updated ledger in the
letters.
Thomas A Steffens
Regulatory Project Manager
US Army Corps of Engineers
2407 West 5th Street
Washington, NC 27889
(910)-251-4615
We would appreciate your feedback on how we are performing our duties. Our automated Customer Service Survey
is located at:
https://urldefense.proofpoint.com/v2/url?u=http-3A_corpsmapu.usace.army.mil_cm-5Fapex_f-3Fp-3D 136-3A4-
3A0&d=DwIGaQ&c=zgHsTgBQkGAdNuoPRxUzSQ&t—hKzYGDM6BjoHj fFvH5GwfIvcA-
K 16971fgg2Dj 2TkZY&m=7TiHM-
wgf3YwnuY4XWeobD4_JVkk93F7VGfYxcT7Yx8&s=86nOKLku_RudajTdeDtKiYHcBBgO_V lynl-
FE4x_j44&e=
Thank you for taking the time to visit this site and complete the survey.
-----Original Message -----
From: Jeff Furness[mailto:Jeff.Furness&nutrien.com]
Sent: Monday, October 29, 2018 4:32 PM
To: Steffens, Thomas A CIV USARMY CESAW (US) <Thomas.A.Steffens@usace.army.mil>
Subject: [Non-DoD Source] Mitigation Ledger Voice Mail
Tom:
I received your voice mail, and I will email you an updated mitigation ledger tomorrow with sage Gut and P Lands
Phase 1 included.
Jeff
Jeff Furness
Senior Scientist
Environmental Affairs
1530 NC Hwy 306 South
Aurora, North Carolina 27806
t 252-322-8249 c 252-714-6934
Jeff.Furness@nutrien.com<mailto:Jeff.Furness&nutrien.com>
Blockedhttp://www.nutrien.com <Blockedhttp://www.nutrien.com/>
For more information on Nutrien's email policy or to unsubscribe, click here:
Blockedhttps://www.nutrien.com/important-notice
Pour plus de renseignements sur la politique de courrier 6lectronique de Nutrien ou pour vous d6sabonner, cliquez
ici: Blockedhttps://www.nutrien.com/avis-important
CLASSIFICATION: UNCLASSIFIED
For more information on Nutrien's email policy or to unsubscribe, click here: hUs://www.nutrien.com/iml2ortant-
notice
Pour plus de renseignements sur la politique de courrier 6lectronique de Nutrien ou pour vous d6sabonner, cliquez
ici: htlgs://www.nutrien.com/avis-important
Nutrien (PCS Phosphate) Mitigation Ledter - 2018 (as of 10/30/18)
*An acre credit of wetland is comprised of 2:1 restoration, 3:1 enhancement, or 8-10:1 preservation
**This column reflects total mitigation linear feet needed after adjustments to stream quality (1:1 for poor/fair, 2:1 for good, and 3:1 for excellent)
***A linear foot credit is comprised of 1:1 restoration, 2.5:1 enhancement, or 5:1 preservation
'This column reflects total mitigation acres needed after adjustments for location of buffer impact: 3:1 for Zone 1 impacts, and 1.5:1 for Zone 2 impacts
^^An acre of credit of buffer is comprised of 1:1 for restoration, 2:1 for enhancement, and 10:1 for preservation on subject rural streams, and 50% credit for 100-200 feet
Note: wetland and stream impacts based on impact blocks using the Modified Alternative L boundary in the 404 permit
Project site in red indicates that the credits used in the calculations have been updated to actual, not projected
Wetland
Available
Acre Credit
Stream
Available
Credit
Buffer
Available
Credit
By Year
Impact
Site Complete
Credits*
Balance
Impact**
Credits***
Balance
Impact^
Credits^^
Balance
Available -
Available -
Available -
Acres
Acres
Impacted
Linear Feet
Linear Feet
Im acted
Acres
Acres
Impacted
Gum Run,
Parker Farm,
Bay City Farm,
20091
312
Back Creek
561.71
249.7
3,790.0
11,600.01
7,810.0
15.531
32.87
17.34
Hell Swamp,
Sage Gut,
Rutman Creek
Phases 1&2
and South
20101
513
Creek Corridor
1,685.91
1,422.6
428.0
30,732.61
38,114.6
1.561
49.96
65.74
Rutman Creek
2011
0
Phase 3
728.3
2,150.9
0.0
11,990.6
50,105.2
0
38.8
104.54
P&U Lands
2012
345
Phase 1
460.3
2,266.2
563.0
0.0
49,542.2
3.45
0
101.09
P&U Lands
2013
0
Phase 2
394.0
2,660.2
0.0
0.0
49,542.2
0
0
101.09
P&U Lands
2014
308
Phase
635.4
2,987.6
662.0
7,141.0
56,021.2
2.51
30
128.58
P&U Lands
2015
58
Phase 4
67.0
2,996.6
0.0
0.0
56,021.2
0
0
128.58
Projects
2016
178
Complete
0.0
2,818.6
3,236.0
0.0
52,785.2
0
0
128.58
Projects
2017
0
Complete
0.0
2,818.6
0.0
0.0
52,785.21
15.54
0
113.04
Projects
2018
473
Complete
0.0
2,345.6
4,800.0
0.0
47,985.2
14.49
0
98.55
*An acre credit of wetland is comprised of 2:1 restoration, 3:1 enhancement, or 8-10:1 preservation
**This column reflects total mitigation linear feet needed after adjustments to stream quality (1:1 for poor/fair, 2:1 for good, and 3:1 for excellent)
***A linear foot credit is comprised of 1:1 restoration, 2.5:1 enhancement, or 5:1 preservation
'This column reflects total mitigation acres needed after adjustments for location of buffer impact: 3:1 for Zone 1 impacts, and 1.5:1 for Zone 2 impacts
^^An acre of credit of buffer is comprised of 1:1 for restoration, 2:1 for enhancement, and 10:1 for preservation on subject rural streams, and 50% credit for 100-200 feet
Note: wetland and stream impacts based on impact blocks using the Modified Alternative L boundary in the 404 permit
Project site in red indicates that the credits used in the calculations have been updated to actual, not projected