HomeMy WebLinkAboutNC0036277_Other Correspondence_20181017benesch
Transmittal Form
To:
NCDEQ— Water Quality Section
Mooresville Regional Office
Attn: Barry Love / Debbie Luckman
610 E. Center Avenue
Mooresville, North Carolina 28115
® Mail ❑ Messenger
Delivery
WE ARE SENDING YOU:
Alfred Benesch & Company
2359 Perimeter Pointe Parkway, Suite 350
;?K Charlotte, NC 28208
RECEIVED/NCOENR/DWR www.benesch.com
P 704-521-9880
OCT 17 ?0)0 F704-521-9955
❑ Next Day Delivery
®Attached
COPIES DATE DESCRIPTION
THESE ARE TRANSMITTED as checked below
WOROS
MOORESVILLE REGIONAL OFFICE
Date:
Job No. 17000232
Subject: CPCC Merancas Campus Phase IV
Classroom Building— Private Sanitary Sewer Permit
Application —1" Submittal UPDATE
❑ UPS Ground
❑ Under separate cover:
❑ Other: Hand
® For approval ❑ Approved as submitted ❑Resubmit copies for approval
❑ For your use ❑ Approved as noted ❑Submit copies for distribution
® As requested ❑ Returned for corrections ❑Return corrected prints
❑ For review and comment
Remarks: Barry / Debbie, enclosed is the signed Flow Tracking / Acceptance for Sewer Extension application
(FTSE) to accompany the previously submitted permit application package for a new classroom
building at the Central Piedmont Community College (CPCC) Merancas Campus in Huntersville, NC.
The previous FTSE form submitted was printed from a copied PDF that apparently removed the
digital signature.
Please let us know if you have questions or require additional information.
cc: Paula Gornto, PLA
Project Manager
Signature: Lester Barnes, PE
Project Engineer
PS01-0998-06form
RECEIVEDINCDENRIDWR
OCT 17 2018 State of North Carolina
Department of Environmental Quality
DWR wOROS Division of Water Resources
M00yy��SVILV1,�,REGISPN; LOFFICE
Division of Water Resources 1''1ow'1'racicrng/Acceptance for Sewer Extension Applications
(FTSE 04-16)
Entity Requesting Allocation: BENESCH
Project Name for which flow is being requested: CPCC Merancas Campus -Paso IV Classroom Building
More than one FTSE may be required for a single project if the owner of the WWTP is not responsible for all pump
stations along the route of the proposed wastewater flow.
I. Complete this section only if you are the owner of the wastewater treatment plant.
a. WWTP Facility Name: McDowell Creek WWTP
b. WWTP Facility Permit #: NCO036277
All flows are in MGD
c. WWTP facility's permitted flow 12.00
d. Estimated obligated flow not yet tributary to the WWTP 0.49416
e. WWTP facility's actual avg. flow 5.033
f. Total flow for this specific request 0.01028
g. Total actual and obligated flows to the facility 5.554
It. Percent of permitted flow used 46.3%
II. Complete this section for each pump station you are responsible for along the route of this
proposed wastewater flow.
List pump stations located between the project connection point and the WWTP:
(A) (B) (C) (D)=(B+C) (E)=(A-D)
Design Obligated,
Pump Average Daily Approx. Not Yet Total Current
Station Firm Flow** Current Avg. Tributary Flow Plus
(Name or Capacity, * (Firm / pfl, Daily Flow, Daily Flow, Obligated Available
Number) MGD MOD MGD MGD Flow Capacity***
* The Firm Capacity of any pump station is defined as the maximum pumped flow that
can be achieved with the largest pump taken out of service.
** Design Average Daily Flow is the firm capacity of the pump station divided by a peaking
factor (pf) not less than 2.5.
*** A Planning Assessment Addendum shall be attached for each pump station located
between the project connection point and the WWTP where the Available Capacity is < 0.
Downstream Facility Name (Sewer): UNKNOWN
Downstream Permit Number: UNKNOWN
Page 1 of 6