HomeMy WebLinkAboutNCG200339_Extension Request Response Letter_20181023ROY COOPER
Governor
MICHAEL S. BEGAN
Secretary
WILLIAM E. (TOBY) VINSON, JR.
Interim Director
NORTH CAROLINA
Environmental Quality
Dear Mrs. Cloninger, CEO,
I have received your letter dated October 4, 2018. After reviewing the violation and information
available concerning your facility, an extension of 60 days (90 days after the original letter of
receipt) will be allotted for the following corrective action:
"While the intention is that the facility does not have a stormwater discharge, the permitee
shall show that such is the case. A plan showing the dimensions of the basin, estimated
stormwater runoff for a 25 year storm event, and calculations showing that the basin will
not discharge in that scenario shall be submitted to the Department of Environmental
Quality for review. This study should have previously been conducted in accordance with
Part II, Section A:8 of the Industrial Stormwater General Permit."
For all other corrective actions, the deadline for completion will remain October 24, 2018,
(30 days after the original letter of receipt). An inspection will be performed on or after that
date to confirm that all other issues have been addressed.
Thank you for your response and efforts to correct the issues at your facility.
If you have questions about this matter, please contact me at (828) 296-4500.
Sincerely,
s'"
c-- 'ta fey E. Aiken GA
Regional Engin err
Land Quality Section
Department of Environmental Quality
ec: Alaina Mormon- Environmental Specialist Alaina.morman@ncdenr.gov
Bethany Georgoulias, Environmental Engineer bethanygeorgoulias(dincderingov
Isaiah Reed- Environmantal Specialist Isaiah.Reed@ncdenr.gov
o:wmm.m o� a.w�m,�m coe�
North Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources
Asheville Regional Office 1 2090 U.S. Highway 70 1 Swannanoa, North Carolina 28778
828.296.4500