Loading...
HomeMy WebLinkAboutNCG510522_Compliance Evaluation Inspection_20181016 .�.wsria;cr�, ROY COOPER NORTH CAROLINA Governor Environmental Quality MICHAEL S.REGAN Secretory LINDA CULPEPPER Interim Director October 16, 2018 RECE@� N DWS OCT E�I®E4 2018 Brent Puzak Circle K Stores, Inc. water Resources 305 Gregson Drive permitting Section Cary,NC 27511 SUBJECT: Compliance Evaluation Inspection Report Pantry# 161 Certificate of Coverage NCG510522 under NPDES General Permit NCG510000 Alamance County Dear Mr. Puzak: On September 18, 2018, Paul DiMatteo of this office met with Brad Byers, technician for ATC Group Services, LLC,to perform a Compliance Evaluation Inspection on the subject wastewater treatment facility. This type of inspection consists of two basic parts: a file review and an on-site inspection of the treatment facility. The attached inspection form notes the areas that were evaluated for this inspection. The findings and observations are outlined as follows. I. Permit The general permit became effective on October 1, 2016 and will expire on September 30, 2020. A copy of the current permit was available during the inspection. II. Self-Monitoring Program The general permit no longer requires submittal of discharge monitoring reports.Monitoring data obtained from October 2016 through July 2018 was reviewed during the inspection. It appeared that monitoring was being conducted at the location and frequencies specified by the permit.pH is measured in the field by Mr. Byers; other analysis is conducted by Con-Test Analytical under certification #652. A summary of identified permit limit exceedances follows: DE Q is) NORTH CAROLINA ueoaMient al fmtramnental arakty North Carolina Department of Environmental Quality I Division of Water Resources Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103 336.776.9800 NCG510522, Circle K Stores 9/19/2018 Parameter Permit Limit Month of Exceedance Value (µg/1) MTBE 19 µg/1 2/2017 34 (phase 1) Lead (final limit) 3 µg/1 2/2017 3.5 (phase 1) (Note: interim limit is 25 µ,g/1 until October 1, 2020. There were no exceedances of the interim limit.) 4/2017 6.1 (phase 1) 7/2017 5.9 (phase 1) 1/2018 10 (phase 1) 6.5 (phase 2) (Note: due to time constraints in reviewing this data, the above chart may not be comprehensive or may contain inaccuracies. Please submit corrections to the inspector at the contact information below.) III. Records/Reports Copies of DMRs, operator visitation logs, operation sheets, lab reports and chain-of-custody forms were available for review during the inspection. Lab data is maintained according to the permit. IV. Flow Measurement Effluent flow is measured using a 1-inch Neptune T-10 residential flow meter. Mr.Byers said they replace the meter yearly to serve as their calibration. Records of the replacement were available for review. V. Operations and Maintenance The plant is operated as required. The facility appeared to be well operated and managed. VI. Facility Site Review The site includes two groundwater remediation systems consisting of influent pumps,oil-water separators, air strippers, filters and activated carbon. No concerns were noted during the inspection. The compliance evaluation inspection is satisfactory. If you have any questions regarding the inspection or this report, please contact Paul DiMatteo at(336) 776-9691 or me at(336) 776-9800. Sincerely, Sherri V. Knight, P.E. Regional Supervisor Water Quality Regional Operations Division of Water Resources Attachments: EPA Water Compliance Inspection Report cc: WSRO NPDES Unit Central Files Rick Kleinfelter—email (rick.kleinfelter@atcgs.com) Page 2 of 2 United States Environmental Protection Agency Form Approved E PA Washington,D.0 20460 OMB No.2040-0057 Water Compliance Inspection Report Approval expires 8-31-98 Section A.National Data System Coding(i e.,PCS) Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type 1 i, I 2 I L I 3 I NCG510522 111 12 I 18/09/18 117 18[2j 19 1 2j 20 I 21111111 1111111111111111111111111 111 { 1111111 r6 Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA Reserved 671 1 701 1 71 Li 72 LI r,,J I 73I I I' 751 1 1 1 1 1 1 180 Section B Facility Data Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date POTW name and NPDES permit Number) 10 30AM 18/09/18 16/11/03 Pantry#161 Exit Time/Date Permit Expiration Date 1031 NC Hwy 87 N 12 00PM 18/09/18 20/09/30 Elon NC 27244 Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data /// Name,Address of Responsible Official/Title/Phone and Fax Number Contacted Brent Puzak,305 Gregson Dr Cary NC 2751111919-566-1549/9198710335 No Section C Areas Evaluated During Inspection(Check only those areas evaluated) U Permit • Flow Measurement II Operations&Maintenance • Records/Reports • Self-Monitoring Program II Facility Site Review • Effluent/Receiving Waters • Laboratory Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) (See attachment summary) Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date Paul DiMatteo WSRO WQ//336-776-9691/ T 2. '*.--()ritit /ollcl,� Signature of Management Q A Reviewer A Agency/Office/Phone and Fax Numbers Date 40 I /Vj/ / ,' EPA Form 3560-3(Rev 9-94)Previous editions are obsolete Page# 1 NPDES yr/mo/day Inspection Type (Cont.) 1 31 NCG510522 111 121 18/09/18 117 18 ls f Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary) I met with Brad Byers,technician for ATC,to conduct the inspection. He brought binders filled with process control data and lab reports for monitoring conducted during the past 3 years.There are 2 phases to this system. Phase 1 is next to the Kangaroo convenience store,with a discharge at a small ditch on the other side of the store. Phase 2 is behind a house across the street,with a discharge into the same ditch. Both systems consist of pumps, oil-water separators, air strippers, filters, activated carbon, and discharge. Effluent samples are taken from a sampling line before discharge. Page# 2 Permit: NCG510522 Owner-Facility: Pantry#161 Inspection Date' 09/18/2018 Inspection Type. Compliance Evaluation Operations & Maintenance Yes No NA NE Is the plant generally clean with acceptable housekeeping? • ❑ ❑ 0 Does the facility analyze process control parameters,for ex MLSS, MCRT, Settleable • ❑ ❑ ❑ Solids, pH, DO, Sludge Judge, and other that are applicable'? Comment Permit Yes No NA NE (If the present permit expires In 6 months or less). Has the permittee submitted a new 0 ❑ • ❑ application'? Is the facility as described in the permit? IE 0 0 ❑ #Are there any special conditions for the permit? ❑ • ❑ 0 Is access to the plant site restricted to the general public? • ❑ ❑ ❑ Is the inspector granted access to all areas for inspection'? U ❑ ❑ ❑ Comment The permit includes a compliance deadline for total lead limits Effluent Pipe Yes No NA NE Is right of way to the outfall properly maintained'? • ❑ 0 0 Are the receiving water free of foam other than trace amounts and other debris'? I ❑ ❑ ❑ If effluent (diffuser pipes are required) are they operating properly? ❑ ❑ • ❑ Comment Both effluent pipes were located, draining into a small ditch by the property line Record Keeping Yes No NA NE Are records kept and maintained as required by the permit'? U ❑ ❑ 0 Is all required information readily available, complete and current'? U ❑ ❑ 0 Are all records maintained for 3 years(lab reg. required 5 years)? U 0 ❑ 0 Are analytical results consistent with data reported on DMRs? ❑ ❑ IN ❑ Is the chain-of-custody complete'? U ❑ ❑ ❑ Dates, times and location of sampling U Name of individual performing the sampling 11 Results of analysis and calibration U Dates of analysis II Name of person performing analyses III Transported COCs U Are DMRs complete do they include all permit parameters'? ❑ ❑ • ❑ Has the facility submitted its annual compliance report to users and DWQ? 001110 Page# 3 Permit: NCG510522 Owner-Facility: Pantry#161 Inspection Date 09/18/2018 Inspection Type: Compliance Evaluation Record Keeping Yes No NA NE (If the facility is=or>5 MGD permitted flow) Do they operate 24/7 with a certified operator ❑ ❑ U ❑ on each shift'? Is the ORC visitation log available and current's 00 • O Is the ORC certified at grade equal to or higher than the facility classification? ❑ 0 • 0 Is the backup operator certified at one grade less or greater than the facility classification'? ❑ ❑ E ❑ Is a copy of the current NPDES permit available on site'? ❑ ❑ 1• 0 Facility has copy of previous year's Annual Report on file for review's ❑ ❑ E ❑ Comment: Technician had 3 years of visitation logs and analytical data available.These systems are no longer required to submit quarterly) DMRs.There was an exceedence for MTBE in 2/2017 but this was reported to our office as required There were several exceedences for the final lead limit of 3 uq/l, but none for the interim limit of 25 uq/I.The most recent exceedence appeared to be in 1/2018 for both phases Hardness sampling appeared to have been conducted as required.The required parameters and many others are measured at the influent and/or effluent Flow Measurement-Effluent Yes No NA NE #Is flow meter used for reporting'? 111000 Is flow meter calibrated annually'? • 000 Is the flow meter operational'? • 000 (If units are separated) Does the chart recorder match the flow meter'? 00 • O Comment: Flow is measured using a 1" Neptune T-10 residential flow meter.The technician said that the meter is replaced yearly as their calibration, notes on the replacements were available for review. Laboratory Yes No NA NE Are field parameters performed by certified personnel or laboratory'? 00 • 0 Are all other parameters(excluding field parameters) performed by a certified lab'? • 000 #Is the facility using a contract lab'? • 000 #Is proper temperature set for sample storage(kept at less than or equal to 6 0 degrees ❑ ❑ ❑ U Celsius)' Incubator(Fecal Coliform)set to 44 5 degrees Celsius+/-0 2 degrees'? ❑ 0 • 0 Incubator(BOD)set to 20 0 degrees Celsius+/- 1 0 degrees'? 001110 Comment Field parameters (pH) are measured by the the technician Non-field parameters are measured by Con-Test Analytical, certification#652 I provided Mr. Byers a copy of the lab certification branch's technical assistance sheet for pH measurements.Their field sheet was missing buffer traceability(i.e batch numbers) and actual values obtained during calibration Page# 4 '.l Permit: NCG510522 Owner-Facility: Pantry#161 Inspection Date: 09/18/2018 Inspection Type: Compliance Evaluation Effluent Sampling Yes No NA NE Is composite sampling flow proportional? 0 0 II 0 Is sample collected below all treatment units'? • 0 D 0 Is proper volume collected? • ❑ 0 0 Is the tubing clean? 0 0 • 0 #Is proper temperature set for sample storage(kept at less than or equal to 6.0 degrees 0 0 0 • Celsius)? Is the facility sampling performed as required by the permit(frequency,sampling type • 0 0 0 representative)? Comment. Page# 5