Loading...
HomeMy WebLinkAbout20181080 Ver 1_Scour Hole O&M agreement_20181022& Maintenance Project Name: Df tnmrn Project Location: IKernersville, NC Cover Page Maintenance records shall be kept on the following BMP(s). This maintenance record shall be kept in a log in a known set location. Any deficient BMP elements noted in the inspection will be corrected, repaired, or replaced Immediately. These deficiencies can affect the integrity of structures, safety of the public, and the pollutant removal efficiency of the BMP(s). The BMP(s) on this project include (check all that a Bioretention Cell Dry Detention Basin Grassed Swale Green Roof Infiltration Basin Infiltration Trench Level SpreadertVFS Permeable Pavement Proprietary System Rainwater Harvesting Sand Fitter Stormwater Wetland Wel Detention Basin Disconnected Impervious Area User Defined BMP O& I acknowledge and agree by my signature below that I am responsible for the performance of the maintenance procedures listed for each BMP above, and attached O&M tables. I agree to notify NCDENR of any problems with the system or prior to any changes to the system or responsible party. Responsible Party: Title & Organization: Street address: City, state, zip: Phone number(s): G Signatur e %: Z Date:) I, J11.! A. P77 , a Notary Public for the State of N -914-y, � I Cay ofi r County of �G�--Vim;-�-_`— , do hearby certify that Jtd Iy ri Qn ..Stiu tCfi ¢ personalty appeared before me this day of 06, n,6e,- and acknowledge the due execution of the tions and ///Maintenance Agreement. Witness my hand and official seal,, seal My commission expires Section 1 Important installation procedures: Install scour hole per dimensions on approved site plan Minimum width of the PSRM apron is the standard PSRM roll PSRM must be tucked a minimum of 1 foot underneath the filter Scour hole must be installed in a flat area Immediately atter construction, stabilize the exit areas with Section 2 Scour hole inspection and maintenance activities shall be as follows: Description Method Frequency Time of Year Check for trash and debris, general Visual After every significant As needed or conditiion of the structure and remove runoff producing rainfall Monthly as a any obsructions event or monthly minimum Inspect area around structure for erosion Visual As needed As needed or vegitative failure. Eroded rills and ullies should be filled with topsoil, Remove accumulated sediment debris Mechanical or Semi -Annually All year from structure by hand Repair any displaced rip -rap to maintain Mechanical or Semi -Annually All year structure as intended and to correct by hand elevation Check filter fabric under rip -rap and Mechanical or Semi -Annually All year replace fabric if rips are found by hand Annual BMP Certification Visual Annually By August 15