Loading...
HomeMy WebLinkAbout20181416 Ver 1_PCN Form Submission_10/16/2018 5:55 PMD1�VR �irlslan af Water Resources Pre-Construction Notification (PCN) Form September 29, 2018 Ver 3 Initial Review Has this project met the requirements for acceptance in to the review process?* F Yes C' No Is this project a public transportation project?" � Yes r No Change only rf needed. BIMS # Assigned * 20181416 Is a payment required for this project?* f No paymentrequired � Fee received f Fee needed - send electronic notification Select Project Reviewer" Donna Hood:eads\drhood Information for Initial Review 1a. Name of project: R-2530B, B-4974, R-2527: NC 24/27 Widening from Albemarle to the Troy Bypass 1a. Who is the PrimaryContact?* Jeff Hemphill 1b. PrimaryContact Email:* jhemphill@ncdot.gov Date Submitted 10/16/2018 Nearest Body of Water Pee Dee River/Lake Tillery Basin Yadkin-PeeDee Water Classification WS-IV,B;CA Site Coordinates Latitude: Longitude: 35.30960 -80.07704 A. Processing Information County (or Counties) where the project is located: Stanly Montgomery Is this project a public transportation project?* r Yes r No Is this a NCDOT Project?* r Yes r No (NCDOT only) T.I.P. or state project number: R-2530B,B-4974, R-2527 WBS # (�) WBS # 34446.1.5 Ve rsion# * 1 Reviewing Office * Mooresville Regional Office - (704) 663-1699 1c. PrimaryContact Phone:* (919)707-6126 1a. Type(s) of approval sought from the Corps: �J Section 404 Permit (�tlands, streams and waters, Clean Water Act) r Section 10 Permit (navigable waters, tidal waters, Rivers and Harbors Act) 1b. What type(s) of permit(s) do you wish to seek authorization? r Nationwide Permit (NWP) CJ Regional General Permit (RGP) � Standard (IP) 1c. Has the NWP or GP number been verified bythe Corps? F Yes r No Regional General Permit (RGP) Number: RGP Numbers (for multiple RGPS): 1d. Type(s) of approval sought from the DWR: ,r! 401 Water Quality Certification - Regular � Non-404 Jurisdictional General Permit � Individual Permit 198200031 - NCDOT Bridges, Widening Projects 2015 1e. Is this notification solelyfor the record because written approval is not required? For the record only for DWR 401 Certification: For the record only for Corps Permit: r 401 Water Quality Certification - Er,�ress r Riparian Buffer Authorization 1f. Is this an after-the-fact permit application?* � Yes r No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? G Yes �' No 1g. Is payment into a mitigation bank or in-lieu fee program proposed for mitigation of impacts? � Yes r No Acceptance LetterAttachment 1h. Is the project located in any of NC's twenty coastal counties? C' Yes f� No 1j. Is the project located in a designated trout watershed? � Yes r No B. Applicant Information 1d. Who is applying for the permit? fJ Owner r Applicant (other than owner) 1e. Is there an Agent/Consultant for this project? C' Yes �' No 2. Owner Information 2a. Name(s) on recorded deed: NCDOT 2b. Deed book and page no.: 2c. Responsible party: 2d. Address Street Address 1020 Birch Ridge Drive Address Line 2 �Y Raleigh Fbstal / Zip CDde 27610 2e. Telephone Number: (919)707-6126 State / Rovince I F�gion NC Country US 2f. Fax Number: * C' Yes r No C' Yes r No 2g. Email Address:* jhemphill@ncdot.gov C. Project Information and Prior Project History =� � 1. Project Information 1b. Subdivision name: (rf appropriate) 1c. Nearest municipality I town: Albemarle, Troy 2. Project Identification 2a. Propertyldentification Number: 2c. Project Address SVeet Address Address Line 2 �Y Postal / Zip Code 3. SurFace Waters 3a. Name of the nearest body of water to proposed project:* Pee Dee River/Lake Tillery 3b. Water Resources Classification of nearest receiving water:* WS-IV,B;CA 3c. What river basin(s) is your project located in?* Yadkin-PeeDee 2b. Property size: S[ate I Rovince I Region Country 3d. Please provide the 12-digit HUC in which the project is located. 030401050401,030401040201,030401040203,030401040202,030401040204,030401040305 4. Project Description and History 4a. Describe the existing conditions on the site and the general land use in the vicinity of the project at the time of this application:* Urban development, businesses (Albemarle) to rural,residential, recreation (Pee Dee River), cultivated land, USFS land. 4b. Have Corps permits or DWR certifications been obtained for this project (including all prior phases) in the past?* C' Yes r No C' Unknown 4d. Attach an 8 1/2 X 11 excerpt from the most recent version of the USGS topographic map indicating the location of the project site. (for DWR) 4e. Attach an 8 1/2 X 11 excerpt from the most recent version of the published County NRCS Soil Survey map depicting the project site. (for DWR) 4f. List the total estimated acreage of all existing wetlands on the property: 6.8 4g. List the total estimated linear feet of all existing streams on the property: Appro�mately 15,500 4h. Explain the purpose of the proposed project:* The purpose of these projects is to improve traffic flow and level of service (LOS) on the section of NC 24-27 between NC 740 in Albemarle to the proposed Troy Bypass, west of Troy, and to maintain a bridge across the Pee Dee River that addresses the needs of highway users. 4i. Describe the overall project in detail, including indirect impacts and the type of equipment to be used:* The proposed projects involve widening NC 24-27 from NC 740 in Albemarle located in Stanly County to the Proposed Troy Bypass (R-623), �nest of Troy in Montgomery County. TIP project R-2530B involves widening ewsting NC 24-27 from wEst of NC 740 to the Pee Dee River in Stanly County from a t�no to three-lane facility to a four-lane divided facility. R-2530B will include a 23-foot raised median from NC 740 to SR 1731 (Sweet Home Church Road) and transition to a 46-foot depressed median from east of SR 1731 to the Pee Dee River in Stanly County. Project R-2530B will also involve a superstreet design in the areas where curb and gutter is proposed and also in the open shoulder segment at STA 153+00. TIP project B-4974 involves rehabilitating existing Bridge No. 51 over the Pee Dee River on the Stanly / Montgomery County line. TIP project R-2527 involves widening existing NC 24-27 from a two-lane facility to a four-lane divided facility with a 46-foot depressed median from the Pee Dee River to the proposed Troy Bypass, wast of Troy in Montgomery County. The total length of the proposed projects is appro�mately 14.6 miles Iong.Cranes, bulldozers, barges will be utilized for the construction activities. 4j. Please upload project drawings for the proposed project. R2530B, 4974 Roadway Plansheets.pdf R-2530B, B-4974 U[ility Narrative.pdf R-2530B, B-4974 U[ilities Drawings.pdf R2527_Hyd_Preliminary_Permit_Drawings_20181008. pdf R-2530B,B-4974 Permit Drawings.pdf 5. Jurisdictional Determinations 63.O5MB 812 KB 2.15MB 9.13MB 31.32 MB Sa. Have the wetlands or streams been delineated on the property or proposed impact areas?* r Yes r No C' Unknown Comments Sb. If the Corps made a jurisdictional determination, what type of determination was made?* C' Preliminary r Approved C' Not Verified � Unknown C' WA Corps AID Number: Sc. If Sa is yes, who delineated the jurisdictional areas? Name (if known): NCDOT Personnel Agency/Consultant Company: Other: Sd. List the dates of the Corp jurisdiction determination or State determination if a determination was made by the Corps or DWR . The projects were initially verified betv�en 2006 and 2008. Ronnie Smith from ACOE and David Wainwright of DWR field reverified Ihe v�Uands and surface waters in 2012 through 2014 - more information was requested by the Corp (rapanos forms) which were submitted in 2014 along �nnth additional wetland forms but a tearsheet was not issued (to my knowiedge). Sd1. Jurisdictional determination upload R-2530B, B-4974, R-2527 Final JD request.pdf 6. Future Project Plans 6a. Is this a phased project?* � Yes r No 2.59MB 7b. If yes, explain. R-2530B, B-4974, & R-2527 were originally separate but because of logical terminii issues all three projects were combined under one NEPA document. R-2530B/B-4974 are at final design with wnstruction Let currently March 19, 2019. R-2527 is at preliminary design and currently is slated to Let in 2021. Are any other NWP(s), regional generel permit(s), or individual permits(s) used, or intended to be used, to authorize any part of the proposed project or related activity? D. Proposed Impacts Inventory 1. Impacts Summary 1a. Where are the impacts associated with your project? (check all that apply): r Wetlands r Streams-tributaries r Buffers r Open Waters I� Pond Construction E. Impact Justification and Mitigation 1. Avoidance and Minimization 1a. Specifically describe measures taken to avoid or minimize the proposed impacts in designing the project: See attached Stormwater Management Plan contained in the Permit Drawings and the attached cover letter 1b. Specificallydescribe measures taken to avoid or minimize the proposed impacts through construction techniques: See attached Stormwater Management Plan contained in the Permit Drawings and the attached cover letter 2. Compensatory Mitigation for Impacts to Waters of the U.S. or Waters of the State 2a. Does the project require Compensatory Mitigation for impacts to Waters of the U.S. or Waters of the State? � Yes r No 2c. If yes, mitigation is required by (check all that apply): ,rJ DWR fJ Corps 2d. If yes, which mitigation option(s) will be used for this project? r Mitigation bank rJ Payment to in-lieu fee r Permittee Responsible program Mitigation 4. Complete if Making a Payment to In-lieu Fee Program 4a. Approval letter from in-lieu fee program is attached. f Yes r No 4b. Stream mitigation requested: Qlnear feet) 13,048 4d. Buffer mitigation requested (DWR only): (square feet) 4f. Non-riparian wetland mitigation requested: (acres) 4h. Comments 4c. If using stream mitigation, what is the stream temperature: warm 4e. Riparian wetland mitigation requested: (acres) 2.05 4g. Coastal (tidal) wetland mitigation requested: �acres) 6. Buffer mitigation (State Regulated Riparian Buffer Rules) - required by DWR 6a. Will the project result in an impact within a protected riparian buffer that requires buffer mitigation? If yes, you must fill out this entire form - please contact DWR for more information. � Yes r No F. Stormwater Management and Diffuse Flow Plan (required by DWR) 1. Diffuse Flow Plan 1a. Does the project include or is it adjacent to protected riparian buffers identified within one of the NC Riparian Buffer Protection Rules? C' Yes r No If no, explain why: 2. Stormwater Management Plan 2a. Is this a NCDOT project subject to compliance with NCDOT's Individual NPDES permit NCS000250?* r Yes r No Comments: � I G. Supplementary Information " I 1. Environmental Documentation 1a. Does the project involve an expenditure of public (federallstate/local) funds or the use of public (federallstate) land?* r Yes r No 1b. If you answered "yes" to the above, does the project require preparation of an environmental document pursuant to the requirements of the National or State (North Carolina) Environmental PolicyAct (NEPA/SEPA)?" � Yes r No 1c. If you answered "yes" to the above, has the document review been finalized by the State Clearing House?" � Yes r No NEPAor SEPAFinal Approval Letter F ONSI_F INAL_R2530 B_B4974_R2527_42017. pdf 2. Violations (DWR Requirement) 143.77MB 2a. Is the site in violation of DWR Water Quality Certification Rules (15A NCAC 2H .0500), Isolated Wetland Rules (15A NCAC 2H .1300), or DWR Surface Water or Wetland Standards or Riparian Buffer Rules (15A NCAC 2B .0200)? * f Yes r No 3. Cumulative Impacts (DWR Requirement) 3a. Will this project result in additional development, which could impact nearby downstream water quality?* r Yes r No 3c. Upload a qualitative or quantitative cumulative impact analysis. R-2530B, B-4974, R-2527 ICE Summary.pdf 7.46KB 4. Sewage Disposal (DWR Requirement) 4a. Is sewage disposal required by DWR for this project?* � Yes r No � fWA 5. Endangered Species and Designated Critical Habitat (Corps Requirement) Sa. Will this project occur in or near an area with federally protected species or habitat? * r Yes r No 5b. Have you checked with the USFWS concerning Endangered Species Act impacts?* G Yes �' No Sc. If yes, indicate the USFWS Field Office you have contacted. Raleigh Sd. Is another Federal agency involved?* G Yes r No What Federal Agency is involved? USFS Se. Is this a DOT project located within Division's 1-8? � Yes r No r Unknown 5j. What data sources did you use to determine whether your site would impact Endangered Species or Designated Critical Habitat7 The BA for this project is attached - the Biological Opinion from USFWS will be forwarded upon receipt. Consultation Documentation Upload R-2530B_BA_092818.pdf 6. Essential Fish Habitat (Corps Requirement) 6a. Will this project occur in or near an area designated as an Essential Fish Habitat?* C' Yes r No 6b. What data sources did you use to determine whether your site would impact an Essential Fish Habitat?* NMF 7. Historic or Prehistoric Cultural Resources (Corps Requirement) 7.49MB 7a. Will this project occur in or near an area that the state, federal or tribal governments have designated as having historic or cultural preservation status?* � Yes r No 7b. What data sources did you use to determine whether your site would impact historic or archeological resources?* Archaeology: The undertaking, as designed, is expected to adversely affect NRHP eligible sites 31 Mg1806, 31 MG1629, 31 MG321, and the archaeological district composed of sites 31 St195, 31 St196, and 31 St204/204". FFNVA is currently in consultation with the SHPO, the Catawba Nation and the USFS for the development of an MOA and subsequent data recovery plans to mitigate these effects. 7c. Historic or Prehistoric Information Upload R-2530B, B-4974, R-2527, Historical Architecture.pdf 8. Flood Zone Designation (Corps Requirement) 8a. Will this project occur in a FEMA-designated 100-year floodplain?* G Yes �' No Sb. If yes, explain how project meets FEMA requirements: See attached permit drawings Sc. What source(s) did you use to make the floodplain determination?* FEMA Floodplain Maps Miscellaneous 680.34KB Comments Please see attached R-2530B, B-4974, R-2527 Permit Application Cover Letter for permanent and temporary impacts for this project (See Table 1 for Wetland Impacts and Table 3 for Stream Impacts). Miscellaneous attachments not previouslyrequested. 2016-10-19 R2530B 4B Merger Meeting Minutes.pdf 2018-05-16 R2530B 4C Merger Meeting Minutes.pdf R-2527 DMS.pdf R-2530B DMS.pdf R-2530B B-4974 R-2527 Permit Application Cover Letter.pdf Signature * �J By checking the box and signing below, I certify that: 55.18KB 138.02KB 69.49KB 67.13KB 220.11 KB . I have given true, accurate, and complete information on this form; • I agree that submission of this PCN form is a"transaction" subject to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I agree to conduct this hansaction by electronic means pursuant to Chapter 66, Article 40 of the NC General Statutes (the "Uniform Electronic Transactions Act"); . I understand that an electronic signature has the same legal effect and can be enforced in the same way as a written signature; AND • I intend to electronically sign and submit the PCN form. Full Name: Carla Dagnino Signature Sign Date 10/ 16/2018