HomeMy WebLinkAbout20181393 Ver 1_Agency Notification Letter of Consult_20180329ENERGY LAND & INFRASTRUCTURE
March 23, 2016D L9 `r 9 L9 a
401 & Buffer Permitting Unit MAR 2 d 2018
NC Department of Environmental Quality
Division of Water Resources UR
F
1650 Mail Service Center
Raleigh, NC 27699-1650
RE: AGENCY NOTIFICATION LETTER OF CONSULTATION
PIEDMONT NATURAL GAS LINE 446, BELEWS CREEK PIPELINE
GUILFORD, ROCKINGHAM, AND STOKES COUNTIES, NORTH CAROLINA
Dear 401 & Buffer Permitting Unit:
Piedmont Natural Gas (Piedmont) is planning the Line 446 Gas Pipeline in response to a request from
Duke Energy Corporation (Duke Energy) for Piedmont to provide a natural gas supply to their Belews
Creek Steam Plant. In order to meet the request, Piedmont is expanding their system with
approximately nine miles of 24 -inch diameter transmission pressure gas pipeline that will be placed
within a 60 -foot wide permanent easement. This letter is to notify your agency and request comment
since the proposed pipeline will cross a FERC -licensed lake, Belews Lake. Following is a brief description
of the project including a location map along with a plan and profile drawing of the proposed lake
crossing.
The FERC Regulatory Agency consultation process requests review, comment and permit requirements
from coordinating regulatory agencies within a 30 -day period from the certified mail delivery date to the
Agency. It is necessary to receive a documented response from all Agencies during the consultation
process. The 30 -day period for an estimated March 27, 2018 certified mail delivery date will be April 26,
2018. Please provide a response before this date.
PROPOSED PROJECT DESCRIPTION
The proposed pipeline will begin at a new tap of the existing Williams -Transco pipelines near the
intersection of US 158 and US 220 in Stokesdale, Guilford County, North Carolina. From Guilford County,
the pipeline will traverse Rockingham and Stokes Counties to the termination at the Belews Creek Steam
Plant. The northern termini of the project will be at a metering and regulating station on the Steam
Plantproperty. A USGS map showing the full route, including access roads, is enclosed.
The crossing of Belews Lake will be installed by horizontal directional drill (HDD). The estimated pipe
length of the HDD will be 3,860 feet. As shown on the enclosed plan and profile drawing, during
construction the drill rig will be placed in the temporary workspace on the east side of the lake. The drill
exit will be on the west side of the lake. The HDD start and end points are both external to the FERC
Project Boundary of Belews Lake. Temporary workspace for stringing the gas pipe prior to installation is
also on the west side of the lake. The gas line will be installed approximately 25 feet below the bottom
of the deepest part of the lake.
1420 Donelson Pike, Suite A-12. NashvillE. Tennessee 37217 www.eii-lic.com 615.383.6300
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
Piedmont is acquiring a 60 -foot wide permanent easement for the proposed gas line. This easement will
be cleared of trees to maintain sight lines along the gas line right-of-way. This will require the removal of
trees within the FERC Project Boundary (725.0 MSL elevation).
COMMENT SUBMITTAL
As discussed previously, please review this information and provide a response within 30 days
(estimated April 26, 2018) containing comments and permit requirements for the proposed gas line
crossing of Belews Lake. Responses may be sent by email to Suzanne.herron@eli-llc.com or by mail to
my attention at 1420 Donelson Pike, Suite A-12, Nashville, TN 37217.
Thank you for your consideration of this material. If you have any questions or need additional
information, please contact me at (615) 383-6300 or at the email address above.
Sincerely,
ENERGY LAND & INFRASTRUCTURE, PLLC
Suzanne rron, P.E., CPESC
PE 040556—
cc:
40556
cc: Ms. Alicia DePalma, Piedmont Natural Gas, Environmental Siting and Licensing Support
ENERGYLAND & INFRASTRUCTURE. LCC
NashvillE. TN/Cary. NC/Arlington. VA WWW.Eii-IIC.com
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
900
LLj
m
68
I/
s
na
900
Ao
cBG�N�i``
q00
STATE�RD 65
900
Qo
-- ----65------
---�
�- _
ST SDALE
s �
�R RD_. 65
68
Z o
1-9(70--\900
..
50 6685
� /
p v b
\ 050
THOMAS -RD ct�
T
_l
/
rnul�lesv�
a:
J srorrswo00
o L v
a - �
m
Z
15 \
I
15
%
Q
ALIGNMENT
4Tyf't'S 19$
II. v BEGIN;
1
SCALE: 1" = 2000'
1/2 0
N
1 MILE
1000
0 1000 2000 3000 4000
6000 6000 7000 FEET
CONTOUR INTERVAL 10 FEET/20
FEET
NATIONAL AMERICAN VERTICAL DATUM
OF 1988
PAGE: SOURCE:
1 of 3
USGS 7.5 -MINUTE TOPOGRAPHIC QUADRANGLE, ELLISBORO, NC 2016 & SUMMERFIELD, NC 2016
DATE: PREPARED BY: SCALE PROJECT NO.
2/1 /2018
CPD AS SHOWN
TFIGURE
17-31-3003 SITE
LINE 446 BELEWS
CREEK PIPELINE
ENERGY LAND & INFRASTRUCTURE
' IOIS PASSPORT WAY • CARY, INC 27511
STOKESDALE, NORTH CAROLINA
OFFICE 919-234-1974 • WWW.ELI-LLC.COM
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
900
' - PATRICIA.LN z
GREEMACRES DR
/a
3
HILTON RD
/
9
HIDDEN LAKE OR
BRED LOOP J�V
� Bcb_
ALIGNMENT
U
8 i^-- SRS- r,
CREEKS
SEEN
OR
`
A
900-1- 3a SUNRISEACRESDR
_ _ ROCKINGHAM CO_
6 ------
GUILFORD CO
_ _
—
ROCKINGHA_M CO 8_
— _ BERNICEDRR
(
GUILFORD CO
STOKESDALE
�
900
LESTER RD
1
1/2
SCALE: 1" = 2000'
0 1 MILE
N
1000
0 1000
2000 3000 4000 5000 6000 7000 FEET
CONTOUR INTERVAL 10 FEET/20 FEET
i
NATIONAL AMERICAN VERTICAL DATUM OF 1988
PAGE: SOURCE: USGS
2of3
7.5-MINUTE TOPOGRAPHIC QUADRANGLE, BELEWS LAKE, NC 2016 & ELLISBORO, NC 2016
DATE:PREPARED BY: SCALE PROJECT NO. FIGURE
2/l/20 18
1/2018
CPD
AS SHOWN 17-31-3003
SITE
LINE 446 BELEWS CREEK
PIPELINE/
ENERGY LAND & INFRASTRUCTURE
1015 PASSPORT WAY • CARY, INC 27511
STOKESDALE, NORTH CAROLINA
OFFICE 919-234-1974 • WWW.ELI-LLC.COM
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
RD
Trl
S
lac Ir
Lukc
800
j
VA! l r /��' o I �1� ,/
A
SCALE: 1" = 2000' N
1 112 0 1 MILE
1000 0 1000 2000 3000 4000 5000 6000 7000 FEET
CONTOUR INTERVAL 10 FEET/20 FEET
NATIONAL AMERICAN VERTICAL DATUM OF 1988
PAGE: SOURCE: USGS 7.5 -MINUTE TOPOGRAPHIC QUADRANGLE, BELEWS LAKE, NC 2016
3 of 3
Rp
C�
DATE: PREPARED BY: SCALE PROJECT NO. FIGURE
2/l/2018 CPD AS SHOWN 17-31-3003 SITE
LINE 446 BELEWS CREEK PIPELINE ENERGY LAND & INFRASTRUCTURE / 1015 PASSPORT WAY • CARY. NC 27511
STOKESDALE, NORTH CAROLINA OFFICE 919-234-1974 • WWW.ELI-LLC.COM
ENGINEERS • SURVEYORS • INFRASTRUCTURE • ENVIRONMENTAL
PROJECT NOTES
1. HDD HORIZONTAL
LENGTH = 3,820 LF
2. HDD PIPE LENGTH = 3,860 LF
3. CALCULATED APPROX
PULLBACK = 405,739 LBS
4. STEEL PIPE SPECIFICATION:
24" x .500 X65 FBE/PC API -5L.
5. CENTER LINE OF PIPE
SHOWN. ALL ELEVATIONS ARE
TO CENTER OF PIPE.
6. MAINTAIN MINIMUM 2 FT
VERTICAL SEPARATION
BETWEEN OUTSIDE OF
PROPOSED PIPE AND ALL
FOREIGN UTILITIES.
7. SEE SHEET N1f8N FOR
GEOTECH BORE DATA. W
LU
8. ALL CONSTRUCTION IL
ACTIVITIES SHALL BE IN O
ACCORDANCE WITH LOCAL
AND STATE ENVIRONMENTAL a
REGULATIONS.
PRELIMINARY
PLANS NO DATE REVISION(S) DESCRIPTION
A 0127118 3D% PLAN SUBMISSION
NOT FOR
CONSTRUCTION
880
860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
880
860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
401+00 402+00 403+00 404+00 405+00 406+00 407+00 408+00 409+00 410+00 411+00 412+00 413+00 414+00 415+00 416+00 417+00 418+00 419+00 420+00 421+00 422+00
PROFILE
I-= 100' HORIZONTAL
1' = 50' VERTICAL
PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY REF. DWG(S)
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE - TO INSURE THERE IS NO RISK OF
INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS 8 INFO. MANAGEMENT (RIM) POLICY 1D01
I CHK APPDJ DESCRIPTION APPROVALS
C CPD VA<G ACCOUNTN 2431 re INITIALS REGIONAL
LINE 446 — BELEWS CREEK PIPELINE SHEET — OF 118 DWG SCALE: AS SHOWN
ACCOUNT NUMBER 10700 ENGINEER Piedmont DWG DATE 0122/18 SUPERSEDED
PROJECT NUMBER 162654s E "rwE,INITIALS MGR TECH Natural Gas7 HDD -BELEWS LAKE (1 OF 2)
DRAWING BY JKC REC &STD /� DRAWING NUMBER REV/ISIOI
CHECKED BY LB "cru"E"rtuLs WK PRINCIPAL COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE, N'' PNG- X - 446 - ####### A
ENGINEER CORP.OFFICE4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE
APPROVED BY WKG 01(22/2018 CHARLOTTE, NC 28210 I PNG-DISCIPLINE-RESOURCECENTER-NUMBER
o O
o 0 0 0 0 0 0 0 0 $
-
0 0
' + +
o O
+ +
o O o 0 0 0 0 0 0
+ + + + + + + + + +
N M
Q H
O n 10O O N M O N
O O O
O O
O O O O 1 r 1
in
M
1
- —
- -- 2550
PROJECT NOTES
1. HDD HORIZONTAL
LENGTH = 3,820 LF
2. HDD PIPE LENGTH = 3,860 LF
3. CALCULATED APPROX
PULLBACK = 405,739 LBS
4. STEEL PIPE SPECIFICATION:
24" x .500 X65 FBE/PC API -5L.
5. CENTER LINE OF PIPE
SHOWN. ALL ELEVATIONS ARE
TO CENTER OF PIPE.
6. MAINTAIN MINIMUM 2 FT
VERTICAL SEPARATION
BETWEEN OUTSIDE OF
PROPOSED PIPE AND ALL
FOREIGN UTILITIES.
7. SEE SHEET N1f8N FOR
GEOTECH BORE DATA. W
LU
8. ALL CONSTRUCTION IL
ACTIVITIES SHALL BE IN O
ACCORDANCE WITH LOCAL
AND STATE ENVIRONMENTAL a
REGULATIONS.
PRELIMINARY
PLANS NO DATE REVISION(S) DESCRIPTION
A 0127118 3D% PLAN SUBMISSION
NOT FOR
CONSTRUCTION
880
860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
880
860
840
820
800
780
760
740
720
700
680
660
640
620
600
580
560
540
401+00 402+00 403+00 404+00 405+00 406+00 407+00 408+00 409+00 410+00 411+00 412+00 413+00 414+00 415+00 416+00 417+00 418+00 419+00 420+00 421+00 422+00
PROFILE
I-= 100' HORIZONTAL
1' = 50' VERTICAL
PROPRIETARY 8 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY REF. DWG(S)
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE - TO INSURE THERE IS NO RISK OF
INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS 8 INFO. MANAGEMENT (RIM) POLICY 1D01
I CHK APPDJ DESCRIPTION APPROVALS
C CPD VA<G ACCOUNTN 2431 re INITIALS REGIONAL
LINE 446 — BELEWS CREEK PIPELINE SHEET — OF 118 DWG SCALE: AS SHOWN
ACCOUNT NUMBER 10700 ENGINEER Piedmont DWG DATE 0122/18 SUPERSEDED
PROJECT NUMBER 162654s E "rwE,INITIALS MGR TECH Natural Gas7 HDD -BELEWS LAKE (1 OF 2)
DRAWING BY JKC REC &STD /� DRAWING NUMBER REV/ISIOI
CHECKED BY LB "cru"E"rtuLs WK PRINCIPAL COPYRIGHT 2014 PIEDMONT NATURAL GAS CORP. STOKESDALE, N'' PNG- X - 446 - ####### A
ENGINEER CORP.OFFICE4720 PIEDMONT ROW DRIVE RESOURCE CENTER REIDSVILLE
APPROVED BY WKG 01(22/2018 CHARLOTTE, NC 28210 I PNG-DISCIPLINE-RESOURCECENTER-NUMBER
Vp-
PROJECT NOTES 880 alts
1. HDD HORIZONTAL
860 8&0
LENGTH = 3,820 LF
2. HDD PIPE LENGTH = 3,860 LF 840 840
3. CALCULATED APPROX 820-- - - -- _ 820
PULLBACK = 405,739 LBS+73.84
1°
POINT 2
800 B00
4, STEEL PIPE SPECIFICATION: PIPES IDE
FERC PROJECT
24"x.500 X85 FBEIPC API -SL. r
780BOUNDARY 729
7
5. CENTER LINE OF PIPE
SHOWN. ALL ELEVATIONS ARE 760 780
Too
OF PIPE.
6. MAINTAIN MINIMUM 2 FT 740 --�I� _ 740
VERTICAL SEPARATION WATER EL = 723120 v'
BETWEEN OUTSIDE OF 720 - - 720
PROPOSED PIPE AND ALL
FOREIGN UTILITIES. 700--_j_-� TANGENT LENGTH = 932.38" _ 700-.. ! -
7. SEE SHEET##ft FOR
GEOTECH BORE DATA. uJ 680 104' - 680
8. ALL CONSTRUCTION LL 660 \ 660
AND STATE ENVIRONMENTAL \ `_--,...`_ - --____,.,__„� / _.._ _ -
Of 640 ...._ _ / _ CP #4 I'I 640
ACTIVITIES SHALL BE IN O
ACCORDANCE WITH LOCAL
REGULATIONS. - li
620 - - STA = 431+61.84 1 620
600 DEPTH 600
PT
580 _ RADIUS CP #3 �- .
560 _ STA = 428+82.85
CURVE LENGTH 49&%'
2400 - 580
T DEPTH -3218' h-,-_- -_ 560
PC 12° SAG BEND
540 y 540
22+00 423+00 424+00 425+00 426+00 427+00 428+00 429+00 430+00 431+00 432+00 433+00 434+00 435+00 436+00 437+00 438+00 439+00 440+00 441+00 442+00
PROFILE
1" = 10V HORIZONTAL
1" = 50' VERTICAL
PROPRIETARY 6 CONFIDENTIAL ALL RIGHTS RESERVED' DO NOT SCALE THIS DRAWING' USE DIMENSIONS ONLY
PIEDMONT'S NATURAL GAS FACILITY DRAWINGS ARE CONSIDERED CONFIDENTIAL (OM -1095) - DRAWING IS CURRENT ONLY THROUGH THE LATEST REVISED DATE' TO INSURE THERE IS NO RISK OF
PRELIMINARY INAPPROPRIATE DISCLOSURE ALL PREVIOUS PAPER COPIES OF THIS DRAWING MUST BE DESTROYED IN ACCORDANCE WITH RECORDS 8 INFO. MANAGEMENT (RIM) POLICY 1001
PLANS NO DATE REWS ON(S) DESCRIPTION BY CHK APPD DESCRIPTION APPROVALS
A 01121118 30% PLAN SUBMISSION JKC CPO WKG AREA CODE 2431 TE nATIREImiTI•LS REGIONAL LINE 446 - B E L E WS CREEK PIPELINE
Aft P�p�m�ni
NOTFOR ACCOUNT NUMBER E „raE INITIALS ENGINEER Natural Gas HDD - BELEWS LAKE (2 OF 2)
PROJECT NUMBER 16265462654 6 MGR TECH ra
CONSTRUCTION DRAWING BY JKC RECBSTD STOKESDALE NC
CHECKED BY LB DATE wruvEiiµruLs WKGPRINCIPAL COPYRIG.OFFICHT 2014 4720PIEDMONT
IEDMONT ROWDRIVAL GAS ORP.
APPROVED BY WKr 01/22/2018 �G ENGINEER CORP. OFCHARLOTTE. NC 28210 DRIVE RESOURCE CENTER REIDSVILLE
REF. DWG(S)
SHEET -- OF 118 DWG SCALE: AS SHOWN
DWG DATE 01/22/18 SUPERSEDED
DRAWING NUMBER REWSIOI
P N G- X - 446 - ####### A
PNG-DISCIPLINE-RESOURCE CENTER -NUMBER