Loading...
HomeMy WebLinkAbout20181414 Ver 1_Design-Maps-Site Plans_20181018DA POST-A SCM 2 =15.99 AC SCM 2 BYPASS = 8.45 AC DA POST-B SCM 1 = 27.95 AC SCM 1 BYPASS = 24.12 AC DA POST-B SCM 3 = 18.76 AC SCM 3 BYPASS = 20.90 AC DA POST-C SCM 7 = 10.02 AC SCM 7 BYPASS = 18.52 AC DA POST-C SCM 5 = 6.17 AC SCM 5 BYPASS = 10.02 AC DA POST-C SCM 4 = 31.26 AC SCM 4 BYPASS = 21.15 AC DA POST-D SCM 6 = 14.50 AC SCM 6 BYPASS = 43.91 AC DA POST-D SCM 8 = 24.11 AC SCM 8 BYPASS = 13.91 AC DA POST-D SCM 9 = 14.97 AC SCM 9 BYPASS = 17.41 AC 100' (E) SHEET FLOW 1400' (E) SHALLOW CONCENTRATED FLOW 583' (E) CHANNEL FLOW DA POST-E BYPASS = 18.82 AC (A / SCM2 BYPASS) 100' SHEET FLOW (A / SCM2 BYPASS) 606' SHALLOW CONCENTRATED FLOW (A / SCM2 BYPASS) 1445' CHANNEL FLOW (B / SCM 1 BYPASS) 495' CHANNEL FLOW (B / SCM 1 BYPASS) 1438' SHALLOW CONCENTRATED FLOW (B / SCM 3 BYPASS) 1071' SHALLOW CONCENTRATED FLOW (B / SCM 1 BYPASS) 100' SHEET FLOW (C / SCM 7 BYPASS) 100' SHEET FLOW (C / SCM 7 BYPASS) 1449' SHALLOW CONCENTRATED FLOW (D / SCM 6 BYPASS) 100' SHEET FLOW (D / SCM 6 BYPASS) 1641' SHALLOW CONCENTRATED FLOW (D / SCM 6 BYPASS) 1200' CHANNEL FLOW (C / SCM 5 BYPASS) 1814' SHALLOW CONCENTRATED FLOW (C / SCM 5 BYPASS) 100' SHEET FLOW (C / SCM 4 BYPASS) 100' SHEET FLOW (C / SCM 4 BYPASS) 1075' SHALLOW CONCENTRATED FLOW (C / SCM 4 BYPASS) 160' CHANNEL FLOW (D / SCM 8 BYPASS) 1160' SHALLOW CONCENTRATED FLOW (D / SCM 8 BYPASS) 1231' CHANNEL FLOW (D / SCM 9 BYPASS) 100' SHEET FLOW (D / SCM 9 BYPASS) 71' SHALLOW CONCENTRATED FLOW (D / SCM 9 BYPASS) 1555' CHANNEL FLOW (C / SCM 5 BYPASS) 200' CHANNEL FLOW JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.5410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICENORTH CAROLINA LICENSE NO. C-1652R:\331\40697-Purfoy_South\Calc\Stm\SIA\DWG Areas\Exhibit for Streams _ Areas (Post).dwg | Plotted by David HojsanPURFOY SOUTH PHASES 1-12FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA40697 331 331 J.CHANDLERFOR REVIEWONLY331 09/11/2018 POST-DEVELOPMENT DRAINAGE AREA MAPNAD 830 500' SCALE 1"=250' 250' LINE TABLELINEL2L3L4L5L6L7L8L9L10L11L12L13L14L15L16L17L18L19L20L21BEARINGN89°55'47"EN15°58'15"WN3°51'03"EN16°06'07"EN69°40'14"WN27°38'15"WN0°14'42"EN12°16'02"WN1°48'37"WN87°11'57"WN0°37'32"EN30°37'41"WN14°33'57"WN57°56'52"EN24°53'51"EN12°29'01"WN21°08'56"EN7°55'48"WN87°05'30"WN51°36'56"WLENGTH8.61'48.14'29.71'28.68'11.50'32.40'28.46'34.97'20.43'25.13'16.74'41.51'19.79'17.08'11.46'33.02'10.54'9.19'13.87'19.53'LINE TABLELINEL22L23L24L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41BEARINGN26°19'17"EN74°17'33"WN57°40'22"WN3°06'56"EN63°46'03"EN24°19'58"EN1°42'46"EN47°18'48"EN12°05'23"EN24°43'10"WN54°23'27"EN23°33'41"EN67°38'36"EN24°18'04"EN19°14'55"WN52°06'27"WN4°27'09"WN48°33'13"WN2°05'47"EN31°04'44"WLENGTH16.74'23.52'15.97'29.01'12.20'22.23'12.62'13.26'14.69'36.35'25.98'24.92'33.13'41.85'38.81'11.80'19.18'18.65'25.28'23.59'LINE TABLELINEL42L43L44L45L46L47L48L49L50L51L52L53L54L55L56L57L58L59L60L61BEARINGN7°01'49"WN35°26'40"WN67°17'31"WS86°22'40"WN42°26'21"WS85°07'05"WN45°00'00"WN23°04'33"WN66°11'04"WN51°53'47"WN18°52'14"WS10°05'19"WS10°45'43"WS12°51'02"WS15°19'05"WS16°43'53"WS16°37'15"WS16°03'34"WS16°05'41"WS15°47'19"WLENGTH22.88'20.44'11.71'10.22'39.91'14.09'12.42'31.08'63.31'58.90'8.67'197.08'222.01'124.35'178.55'207.53'171.51'179.48'250.69'192.22'LINE TABLELINEL62L63L64L65L66L67L68L69L70L71L72L73L74L75L76L77L78BEARINGS15°36'54"WS15°52'13"WS15°03'13"WS14°15'29"WS10°03'08"WS10°45'43"WS12°51'02"WS15°19'05"WS16°43'53"WS16°37'15"WS16°03'34"WS16°05'41"WS15°47'19"WS15°36'54"WS15°52'13"WS15°03'13"WS14°15'29"WLENGTH163.61'282.34'113.18'39.26'188.27'220.53'121.97'176.51'206.85'171.86'179.77'250.81'192.47'163.57'282.63'114.03'53.42'PURFOY RO A D PURF O Y R O A DTO BE REMOVEDTO BE REMOVEDDEMOGRAVEL ROADTO BE REMOVED PROPERTY LINE TO BE REMOVEDDEMOW TWTTTCTTTN/FLADOSCA B. DICKENSPIN: 0666-21-5041ESTATE FILE 295 PG 00-EDB 8117 PG 2311BM 1992 PG 831N/FANGIER ROADINVESTORS, LLCPIN: 0665-39-9098DB 16241 PG 530BM 2015 PG 1978N/FJENNIFER LEIGH WALTERSPIN: 0665-37-7006DB 14630 PG 1732N/FNANCY B. JOHNSTON, et alPIN: 0665-57-8802DB 16787 PG 1046N/FMARY J. FLORA &JOHN J. MOONEYDB 13907 PG 1414BM 2006 PG 110PIN: 0675-09-18861" IPFAXLE W/2" IPF WITNESS1" IPF1" IRFAXLE1/2" IRF1/2" IRF1/2" IRFAXLE1" IPF1" IPF1/2" IPFDISTURBEDAXLE2" IPF12.5' FROM CL OF CREEKCENTERLINE OFKENNIS CREEK ISPROPERTY LINEFLAGGEDPINE STUMPAXLE3/4" IPFAPPROXIMATE LOCATION OFNCDOT CLAIMED RIGHT OF WAY(NO DEDICATION INSTRUMENTFOUND OR PROVIDED)20' WATERLINEEASEMENTDB 13167 PG 2662BM 2008 PG 948-954N/FROSEMARY M. HOLLANDPIN: 0665-89-9420DB 2000 PG 588 (BACK DEED)BM 1911 PG 352,591,584 SF / 59.495 ACN/FAKINS LLCPIN: 0666-70-5143DB 8574 PG 1302BM 1989 PG 1015324,998 SF / 7.461 ACN/FADCOCK FAMILY LPPIN: 0665-59-7186DB 6377 PG 8442BM 1911 PG 357,200,017 SF / 165.290 AC TOTAL4,578,152 SF / 105.100 AC WEST OF PURFOY ROAD2,482,518 SF / 56.991 AC EAST OF PURFOY ROAD139,347 SF / 3.199 AC WITHIN R/WN/FADCOCK FAMILY LPPIN: 0665-59-7186DB 6377 PG 8442BM 1911 PG 357,200,017 SF / 165.290 AC TOTAL4,578,152 SF / 105.100 AC WEST OF PURFOY ROAD2,482,518 SF / 56.991 AC EAST OF PURFOY ROAD139,347 SF / 3.199 AC WITHIN R/WWOODENBUILDINGBARNBARNWOODENBUILDINGWOODENBUILDING1 STORYHOUSEN/FRUDOLPH BRAXTON MCLEANPIN: 0665-98-2183DB 1539 PG 548 (BACK DEED)2,849,876 SF / 65.424 ACN/FWILLIAM B. & KRISTY L. HOLLANDPIN: 0675085333DB 4423 PG 388BM 1951 PG 10S87°34'17"E1392.32'S87°34'17"E302.00'S2°56'43"W 186.88' S2°56'43"W 152.56'S3°44'11"W 574.64'N87°37'54"W52.93'N88°08'36"W2177.26'N88°07'52"W35.10'S1°21'31"W 885.49'S80°43'49"E142.03'S1°42'21"W 904.00'S87°37'20"E268.69'S11°49' 4 8 " W 438.94'S87°27'31"E741.65'S87°56'15"E65.71'S87°42'51"E2258.29'N88°38'40"W66.78'N88°42'45"W1707.86'N0°33'41"E232.85'N0°28'59"E1444.53'N2°12'27"E619.21'S88°42'09"E711.74'S88°20'25"E886.76'S88°20'25"E701.97'L2L3 L4L5L6L7L8L9L10L11L12L13L14L15L16L17L18L19L20L21L22L23L24L25L26L27L28L29L30L31L32L33L34L35L36L37L38L39L40L41L42L43L44L45L46L47L48L49L50L51L52MARY J. FLORA &JOHN J. MOONEYPIN: 0675-09-0962GEORGE E. BOYLES &ELISABETH BOYLESPIN: 0665-99-8993JOHN WILLIS LONG& RACHEL M. LONGPIN: 0665-99-7944MICHAEL POEHLMAN &JULIE S. POEHLMANPIN: 0665-99-6914MARY ELLENKELLY-CRAPSE ANDRICHARD WILLIAMPIN: 0665-99-4974ROBERT TAYLORRIDDICK & DANIELLECARROL CEBAKPIN: 0665-99-3935JAMES R. MCDANIELAND JOANNE V.MCDANIELPIN: 0665-99-1995STEPHEN P.KEARCHERPIN: 0665-99-0947PAPE JOINT TRUSTPIN: 0665-89-7938AKINS LLCPIN: 0666-80-5005PAULA JEANGALWITHPIN: 0666-80-1183MICHAEL G.WORTHENPIN: 0666-80-1412STEPHEN L.SAMPSON ANDGRACE D. SAMPSONPIN: 0666-80-0518MOHAMED E. KANDILAND MARIE A.KANDILPIN: 0666-70-6504STEPHEN E.WOODS & ROBINELIZABETH T.WOODSPIN: 0666-70-3409MELVIN G.JR. PAYNE &SHIRLEY F.PAYNEPIN:0666-70-1512AMBER RIDGECOMMUNITY ASSN INC.PIN: 0666-60-9526TELEPHIUSPRICE &SHAWANAPRICEPIN: 066-60-7493MATTHEW E.WATTENBURGERAND JORDAN R.WATTENBURGERPIN: 0666-60-6457JOSEPH T. BREIER& PAMELA BREIERPIN: 0666-60-5545AYANNAHOPE-GREENE &TRIM GREENEPIN: 0666-60-4580CALATLANTICGROUP, INC.PIN: 0666-60-3468CHARLES HENRY IIIYARLEY & MARIAGRACE YARLEYPIN: 0666-60-2427JASON SMITH &DEIDRA L. SMITHPIN: 0666-60-1437JASON N. FARMERPIN: 0666-60-0468ASHUNTE ROSARIO& FABIO ROSARIOPIN: 0666-50-9489RAYMOND IIIBRUNETPIN: 0666-50-8580WENDELL C.GENTRY AND MISTYD. GENTRYPIN: 0666-50-7561TYLER SEWARD ANDNICOLE SEWARDPIN: 0666-50-6561CHAD D. SHAW &KRISTIN E. SHAWPIN: 0666-50-5580JASON P. STOTTAND KARI A. STOTTPIN: 0666-50-5409DAVEY H. SCHAFFER &HEATHER ANNESCHAFFERPIN: 0666-50-4429MICHAEL L.OVENTAL &TERESA OVENTALPIN: 0666-50-3449JOHN W. GOODWIN& VICKIE GOODWINPIN: 0666-50-2469RONALDNATHANIEL GUIONPIN: 0666-50-1580MARC STUART KURTZ& SERRI A. KURTZPIN: 0666-50-0581CHARLES ANDREWSYLIVANT & JENNYREBECCA SYLIVANTPIN: 0666-40-9598CYNTHIA L. HALL &HOWARD P. HALLPIN: 0666-40-5870MICHAEL WATT &BRITT WATTPIN: 0666-40-7555RICHARD J. CECICHAND JUDITH CECICHPIN: 0675-09-2770CHARLES R. LEEAND DELAINE E. LEEPIN: 0675-09-2982RICHARD DEANPIN: 0675-09-3427IOM DEVELOPMENTS, INC.PIN: 0675-09-2363IOM DEVELOPMENTS.INC.PIN: 0675-08-2906DAVID S.HOLLINGER &NAREN C.HOLLINGERPIN: 0675-08-4872ANNA BRITTONMILLANPIN: 0675-08-4698WAVERLYDEVELOPMENTCORPORATIONPIN: 0665-87-6617MYRON SCOTTYODER & KARENLOUISE YODERPIN: 0665-87-1941DAVID A. CUTLER& KAREN A.KUTLERPIN: 0665-77-7888JAMES .BELCASTRO &BONITA ROWANBELCASTROPIN: 0665-77-4953JAMES R. LEAVITTPIN: 0665-77-2965BARRY M.JONES &KAREN J.JONESPIN:0665-77-1916RALPH L.RIDEOUT JR. &JANET L.RIDEOUTPIN:0665-67-9937JOHN R.PATTISON &KATHLEEN K.PATTISONPIN:0665-67-7958JOHN J.HYDERPIN:0665-67-6972ALAN J.INGERSOLL& GAIL B.INGERSOLLPIN:0665-67-4969EXISTING PONDTO REMAINEXISTING PONDTO REMAINEXISTINGPONDTO REMAINEXISTINGPONDWHITE STAR DRBALKAN RDRED SKELTON DROLDE WAVERLY WAYAMBER RIDGEDEVELOPMENTPH 1HOLLAND HILLSSUBDIVISION PH111HOLLAND HILLSSUBDIVISION PH1HOLLAND HILLSSUBDIVISION PH2100' POWER LINEEASEMENT TO CP&LDB 1958 PG 438DB 2448 PG 397DB 2513 PG 8OLD WAVERLYSUBDIVISION - PH 1L53 L54 L55 L56 L57 L58 L59 L60 L61 L62 L63 L64L65 L66 L67 L68 L69 L70 L71 L72 L73 L74 L75L76L77L78 EXISTINGPONDCONTROL CORNER:2064651.04' E658156.94' N70' POWER LINEEASEMENT TO CP&LDB 1958 PG 438DB 2448 PG 397DB 2513 PG 8WETLANDWETLANDWETLANDWETLAND40' HERITAGETREE BUFFER40' HERITAGETREE BUFFER40' HER I T A G E TREE B U F F E R 40' HERITAGE TREE BUFFER30' HERITAGETREE BUFFER40' HERITAGETREE BUFFER30' HERITAGETREE BUFFER30' HERITAGETREE BUFFER 30' HERITAGETREE BUFFER EXISTING FIREHYDRANT TO BERELOCATEDEXISTING FIREHYDRANT TOBE RELOCATED1" = 200'NAD 830SCALE 1"=200'400'200'NOTES:1.BOUNDARY TAKEN FROM SURVEY BY TIMMONS GROUP DATED APRIL 23, 2018.2.TOPOGRAPHIC INFORMATION TAKEN FROM GIS DATED APRIL 2018.3.WETLAND AND STREAM DELINEATION BY SOIL & ENVIRONMENTAL CONSULTANTSDATED JUNE 21, 2017 & FEBRUARY 22, 2018.4.FLOOD HAZARD SOILS FROM WAKE COUNTY GIS DATED NOVEMBER 2016.5.THE SUBJECT PROPERTY IS LOCATED IN ZONE X IN ACCORDANCE WITH FIRM MAP#3720067500K AND 3720066500K, WITH AN EFFECTIVE DATE OF OCTOBER 3, 2006.6.NO HERITAGE TREES FOUND FROM SURVEY COMPLETED BY TIMMONS GROUP DATEDAPRIL 13, 2018.PROPERTY LINEPOWER LINE EASEMENTEXISTING WETLANDSFLOOD HAZARD SOILSLEGENDJOB NO.SHEET NO.SCALEDESIGNED BYCHECKED BYDATE DRAWN BYDATEREVISION DESCRIPTION YOUR VISION ACHIEVED THROUGH OURS. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. 5410 Trinity Road, Suite 102 | Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com THIS DRAWING PREPARED AT THE RALEIGH OFFICE NORTH CAROLINA LICENSE NO. C-1652 R:\331\40697-Purfoy_South\Calc\Wetland Impact\40697-C1.0-EXST ph1.dwg | Plotted by David Hojsan PURFOY SOUTH PHASES 1-12 FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA40697 331331J.CHANDLERFOR REVIEWONLY 33109/11/2018AOVERALL EXISTING CONDITIONS PHASE 1 LINE TABLELINEL1L79L80L81L82L83L84L85L86L87L88L89L90L91L92L93L94L95L96L97BEARINGS5°39'38"EN87°37'31"WS20°17'55"WS25°47'58"ES69°47'03"WS10°37'26"WS35°39'25"WS22°04'06"ES11°53'57"WN3°42'07"EN2°13'10"WN2°08'26"WS88°01'23"ES14°34'03"WN87°58'02"WS87°57'28"ES6°13'00"ES87°08'46"WN81°35'47"WN2°04'59"ELENGTH78.45'81.23'132.66'82.74'79.61'37.74'41.23'98.26'33.40'59.95'161.40'49.24'79.69'61.48'198.71'190.07'205.45'190.80'265.84'59.89'LINE TABLELINEL100L101L102L103L104L105L106L107L108L109L110L111L112L113L115L116L117L118L119L120BEARINGS24°52'30"WS25°13'25"WS24°51'27"WS25°13'43"WS14°50'04"WS36°35'26"WN72°54'28"WN38°58'42"WS10°09'14"WN86°10'34"WS5°24'13"WS3°36'41"WN89°28'44"EN3°19'42"ES86°29'08"ES86°29'08"ES86°29'08"ES86°29'08"EN89°55'47"EN15°58'15"WLENGTH38.33'62.60'81.89'37.11'69.98'204.42'54.15'73.09'112.54'19.98'53.98'78.55'218.52'32.31'152.28'50.05'134.25'167.60'8.61'48.14'LINE TABLELINEL121L122L123L124L125L126L127L128L129L130L131L132L133L134L135L136L137L138L139L140BEARINGN16°06'07"EN69°40'14"WN0°14'42"EN1°48'37"WN87°11'57"WN14°33'57"WN24°53'51"EN7°55'48"WN87°05'30"WN51°36'56"WN74°17'33"WN57°40'22"WN1°42'46"EN12°05'23"EN24°43'10"WN23°33'41"EN24°18'04"EN19°14'55"WN4°27'09"WN2°05'47"ELENGTH28.68'11.50'28.46'20.43'25.13'19.79'11.46'9.19'13.87'19.53'23.52'15.97'12.62'14.69'36.35'24.92'41.85'38.81'19.18'25.28'LINE TABLELINEL141L142L143L144L145L146L147L148L149L150L151L152L153L154L155L156L157L158L159L160BEARINGN7°01'49"WN67°17'31"WN42°26'21"WN45°00'00"WN3°51'03"EN27°38'15"WN12°16'02"WN0°37'32"EN30°37'41"WN57°56'52"EN12°29'01"WN21°08'56"EN26°19'17"EN3°06'56"EN63°46'03"EN24°19'58"EN47°18'48"EN54°23'27"EN67°38'36"EN52°06'27"WLENGTH22.88'11.71'39.91'12.42'29.71'32.40'34.97'16.74'41.51'17.08'33.02'10.54'16.74'29.01'12.20'22.23'13.26'25.98'33.13'11.80'LINE TABLELINEL161L162L163L164L165L166L167L168L169L170L171L172L173L174L179L184L189L190L191BEARINGN48°33'13"WN31°04'44"WN35°26'40"WS86°22'40"WS85°07'05"WN23°04'33"WN66°11'04"WN51°53'47"WN18°52'14"WN88°07'52"WS51°14'37"EN8°45'28"ES87°37'20"ES36°35'26"WS71°27'03"ES43°35'59"WN86°11'11"WN78°07'00"WS86°21'32"ELENGTH18.65'23.59'20.44'10.22'14.09'31.08'63.31'58.90'8.67'35.10'83.88'49.65'268.69'204.42'251.94'229.36'137.80'101.41'662.89'S87°41'48"E219.70'WTWTWTTTTTTCTTTTN/FAKINS, LLC.BM 13794 PG 1768PIN: 0665-97-4128N/FAKINSPROPERTIES, LLC.PIN: 0675-26-1822DB 13119 PG 2699BM 1986 PG 1099N/FPRENTICE G. &STEPHANIE L.MCLEANPIN:0675-26-3834DB 16904 PG2492N/FALESSANDRO &TANYA M. BIANCOPIN: 0675-27-7785DB 16667 PG 561BM 2016 PG 361N/FSHIRLEY JOBAIRDPIN: 0675-27-8972DB 4976 PG 589BM 2016 PG 361N/FPEGGY SUTTONWALTERSPIN: 0675-28-8371DB 8568 PG 1614N/FRONALD W. &GYPSIE D. OLIVEPIN: 0675-28-5399DB 8781 PG 2187BM 2001 PG 32N/FCSX TRANSPORTATIONDB 4025 PG 659BM 2000 PG 810N/FRONALD W. &GYPSIE D. OLIVEPIN:0675-18-9418DB 16022 PG 567BM 2015 PG 1720N/FRACHEL S.TURNERPIN:0675-26-1822DB 3229PG 262N/FDOROTHY ADCOCK MAYS TRUSTEEPIN: 0665-85-3753DB 14378 PG 26553,717,780 SF / 85.348 ACN/FAKINS LLCPIN: 0665-96-8722DB 11032 PG 2367836,949 SF / 19.214 ACN/FKAREN Z. TIDWELLPIN: 0675-17-2458DB 15284 PG 246 (BACK DEED)1,503,135 SF / 34.507 ACN/FKATHIE L. RUSSELL, TRUSTEETHE ANS TRUSTPIN: 0675-27-1608DB 15463 PG 12421,135,918 SF / 26.077 ACN/FAKINS LLCPIN: 0666-70-5143DB 8574 PG 1302BM 1989 PG 1015324,998 SF / 7.461 ACN/FRUDOLPH BRAXTON MCLEANPIN: 0665-98-2183DB 1539 PG 548 (BACK DEED)2,849,876 SF / 65.424 ACCEMETARYJODY B. PAXTON ANDSUSAN F. PAXTONPIN: 0675-08-7447IOM DEVELOPMENTS,INC. PIN: 0675-08-9443BRIAN KEITH WADEPIN: 0675-18-1372JULIE L. PFEIFFERPIN: 0675-18-4341IOM DEVELOPMENTS,INC. PIN: 0675-18-5659WILLIAMBANISTER &JANETBANISTERPIN:0675-26-1585ALICE C.BECKPIN:0675-26-0546MICHAEL P.FEELEY &CAROLANNF.FEELEYPIN:0675-16-8596KENNETH J.LORKIEWICZ &PATRICIALORKIEWICZPIN:0675-16-7546VINCENT A.DISENA & KELLYG. DISENAPIN: 0675-16-5566BRANDON HILL &JENNA E. HILLPIN: 067516-3683CHRISTOPHER MAHON &SUSAN HARDIN MAHONPIN: 0675-16-1686PIN: 0675-06-9699MEREDITHHIGHSMITHPIN: 0675-06-5669NICKY R. HARRELL &LORILEE J. HARELLPIN: 0675-06-5462THOMAS VANTRUELOVE, TRUELOVEENTERPRISES LLCPIN: 0675-15-2846RUSSELL P.MILETTE &DEBRA J.MILETTETRUSTEEPIN: 0665-96-2438RICHARD N. JR.WHITE & ANNETTE L.WHITEPIN: 0665-96-2715EXISTING PONDTO REMAINEXISTINGPONDWHITE STAR DRBALKAN RDRED SKELTON DR BALKAN RDBARBERRY L A K E C T OLDE WAVERLY WAY TWIN PINES WAYSABLE RIDGE DRS N C 5 5 HW Y HWY 55 PURFOY ROADOLDE WAVERLY WAYHOLLAND HILLSSUBDIVISION PH1HOLLAND HILLSSUBDIVISION PH2100' POWER LINEEASEMENT TO CP&LDB 1958 PG 438DB 2448 PG 397DB 2513 PG 8EXISTINGLAKEEXISTINGPONDN/FKATHIE L.RUSSELLPIN: 0675-27-5371DB 15463 PG1242EXISTINGPONDEXISTINGPONDKI N G S D A L E D R OVERHEAD CTGALEGA DRCONTROL CORNER:2070030.59' E656202.53' NS4°22'16"W 295.64'S41°24'32"E415.29'S88°59'17"E306.00'S86°28'43"E972.79'L113L111L109L108C1L105C2L104L179 L110L107L102L103L101L100S2 5 ° 5 4 ' 4 2 " W 50 4 . 0 1 'N10°06'46"W560.00'L106S9°57'21"E559.13'L96L1L95L94N87°55'41"W410.55'L84L85L83L82L81L80L79L1 8 4L86L87N2°05'49"W 349.29'L88L89N6 1 ° 2 5 ' 2 6 "E 2 9 3 . 7 6 ' C3 N3°48'18"E 320.75'N86°11'39"W196.94'L189L190L191S9°07'50" W 231.62'S20°12'10"E253.28'S78°06'56"E397.17'N88°05'17"W913.98'N87°58'02"W447.41'L92L93L91L90L97L112S86°29'08"E476.31'L116L117L118S3°04'00"W 402.61'N89°00'43"E417.96'N0°59'17"W 430.45'S87°34'17"E1392.32'L119L120 L121L122L123L124L125L126L127L128L129L130L131L132L133L134L135L136L137L138L139L140L141L142L143L144L145L146L147L148L149L150L151L152L153L154L155L156L157L158L159L160L161L162L163L164L165L166L167L168L169L170L173S11°49'48"W438.94'S87°27'31"E741.65'S13°17'31"E222.20'S13°09'31"E229.92'L172S87°42'17"E559.00'L171L17480' EASEMENT TO CP&LDB 2448 PG 397DB 2513 PG 8PAULA JEANGALWITHPIN: 0666-80-1183MICHAEL G.WORTHENPIN: 0666-80-1412STEPHEN L.SAMPSON & GRACED. SAMPSONPIN: 0666-80-0518MOHAMED E. KANDIL& MARIE A. KANDILPIN: 0666-70-6504STEPHEN E.WOODS & ROBINELIZABETH T.WOODSPIN: 0666-70-3409MELVIN JR.PAYNE &SHIRLEYPAYNEPIN:0666-70-1512N/FROSEMARY M. HOLLANDPIN: 0665-89-9420DB 2000 PG 588 (BACK DEED)BM 1911 PG 35N/FADCOCK FAMILY LPPIN: 0665-59-7186DB 6377 PG 8442BM 1911 PG 35TO BE REMOVEDTO BE REMOVED PROPERTY LINE TO BE REMOVED WELL TO BEABANDONED PROPERTY LINE TO BE REMOVED PROPERTY LINE TO BE REMOVED PROPERTY LINETO BE REMOVED PROPERTY LINETO BE REMOVEDCP&L 85' POWERLINE EASEMENTDB 1958 PG 438DB 2448 PG 397DB 2513 PG 8CURVE TABLECURVEC1C2C3RADIUS102.19'178.92'255.00'LENGTH159.50'67.52'144.01'TANGENT101.17'34.17'73.98'DELTA89°25'36"21°37'23"32°21'24"CHORD BEARINGS81°18'05"WS25°44'04"WN12°22'25"WCHORD143.79'67.12'142.10'JOB NO.SHEET NO.SCALEDESIGNED BYCHECKED BYDATE DRAWN BYDATEREVISION DESCRIPTION YOUR VISION ACHIEVED THROUGH OURS. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. 5410 Trinity Road, Suite 102 | Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com THIS DRAWING PREPARED AT THE RALEIGH OFFICE NORTH CAROLINA LICENSE NO. C-1652 R:\331\40697-Purfoy_South\Calc\Wetland Impact\40697-C1.0-EXST ph2-3.dwg | Plotted by David Hojsan 09/18/18PURFOY SOUTH PHASES 13-22 FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA40697 E.ANGEB.BLACKMONJ.CHANDLERFOR REVIEWONLY1" = 250'NAD 83NOTES:1.BOUNDARY TAKEN FROM SURVEY BY TIMMONS GROUP DATED APRIL 23, 2018.2.TOPOGRAPHIC INFORMATION TAKEN FROM GIS DATED APRIL 2018.3.WETLAND AND STREAM DELINEATION BY SOIL & ENVIRONMENTAL CONSULTANTSDATED JUNE 21, 2017 & FEBRUARY 22, 2018.4.FLOOD HAZARD SOILS FROM WAKE COUNTY GIS DATED NOVEMBER 2016.5.THE SUBJECT PROPERTY IS LOCATED IN ZONE X IN ACCORDANCE WITH FIRM MAP#3720067500K AND 3720066500K, WITH AN EFFECTIVE DATE OF OCTOBER 3, 2006.6.PER WAKE COUNTY GIS, THIS SITE DOES CONTAIN FLOOD HAZARD SOIL LOCATIONS.AFTER PRELIMINARY APPROVAL, FLOOD HAZARD AREAS SHALL BE DELINEATEDAND/OR EVALUATED TO DETERMINE IF A FLOOD STUDY WILL NEED TO BECONDUCTED. THE APPLICABLE FLOOD STUDY STANDARDS PER TP-02-01 SHALL BEFOLLOWED AND A COPY OF THE RESULTS SUBMITTED AT THE TIME OFCONSTRUCTION DRAWINGS.7.NO HERITAGE TREES FOUND FROM SURVEY COMPLETED BY TIMMONS GROUP DATEDAPRIL 13, 2018.PROPERTY LINEPOWER LINE EASEMENTHERITAGE TREE BUFFEREXISTING WETLANDSFLOOD HAZARD SOILSLEGEND0SCALE 1"=250'500'250'BOVERALL EXISTING CONDITIONS PHASE 2-3 RED SKELTON DR BARBERRY L A K E C T OLDE WAVERLY WAY TWIN PINES WAYSABLE RIDGE DRHAZEL FOREST DR PURFOY ROADOLDE WAVERLY WAYEXISTINGLAKEEXISTINGPONDGALEGA DRS4°22'16"W 295.64'S41°24'32"E415.29'S88°59'17"E306.00'N87°55'41"W410.55'L84L85L83L82L81L80L79L1 8 4L86L87N2°05'49"W 349.29'L88L89N6 1 ° 2 5 ' 2 6 "E 2 9 3 . 7 6 ' C3 N3°48'18"E 320.75'N86°11'39"W196.94'L189L190L191S9°07'50" W 231.62'S20°12'10"E253.28'S78°06'56"E397.17'S3°04'00"W 402.61'N89°00'43"E417.96'N0°59'17"W 430.45'SCM 42919286898587798388828180909178931071081151091021101061111051121041131031149911810011710111628629329229830229930030130630330438638535635535435335235133533733633333429029728929628829528729414013213913814138413713613513313438714232031731630830930731031131231331431534035034934634434534834733834234134333912121127131130125129128126123124122981193058764113102912852842832825GATEKEEPER LANETWIN PINES WAY COMMA AVENUESILVER SPOTTED WAYCAROLINA PARK DRAMUR CORKTREE DR CAROLINA PARK DRIVEGATEKEEPER LANEBLACK LOCUST LANECOMMA AVENUEPURFOY ROADWHITE ADMIRAL STREETGARDEN PARK CIRCLEADONIS BLUE WAY6''W6''W 8''W8''W12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W12'' W12'' W12'' W12'' W12'' W12'' W12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W 12'' W8''W8''W8''W8''W6''WFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMFMS SSSSS8''W8''W 8''W8''W8''W8''W8''W8''W8''W 8''W 8''W8''W8''W8''W 8''W8''W8''WSSS SSSSS S SSSS SSSSSSSSSS 8''WPURFOY ROAD N/FAKINS LLCPIN: 0665-96-8722DB 11032 PG 2367836,949 SF / 19.214 ACN/FRUDOLPH BRAXTON MCLEANPIN: 0665-98-2183DB 1539 PG 548 (BACK DEED)2,849,876 SF / 65.424 ACN/FMAYS, DOROTHY ADCOCK TRUSTEE CARVILLE B CLARK III LLCPIN: 0665853753DB 014378 PG 026553,717,786 SF / 85.35 ACJOB NO.SHEET NO.SCALEDESIGNED BYCHECKED BYDATE DRAWN BYDATEREVISION DESCRIPTION YOUR VISION ACHIEVED THROUGH OURS. These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but not limited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP. 5410 Trinity Road, Suite 102 | Raleigh, NC 27607 TEL 919.866.4951 FAX 919.833.8124 www.timmons.com THIS DRAWING PREPARED AT THE RALEIGH OFFICE NORTH CAROLINA LICENSE NO. C-1652 R:\331\40697-Purfoy_South\Calc\Wetland Impact\40697-C1.0-EXST ph4.dwg | Plotted by David Hojsan PURFOY SOUTH PHASES 1-12 FUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA40697 331331J.CHANDLERFOR REVIEWONLY 33109/11/20181" = 200'NAD 830SCALE 1"=200'400'200'COVERALL EXISTING CONDITIONS PHASE 4 PROPERTY LINEPOWER LINE EASEMENTUTILITY EASEMENTEXISTING UTILITY EASEMENTEXISTING WETLANDSLEGENDAPPROVED HIDDENVALLEY SUBDIVISION WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER PUMP STATION WETLAND AND STREAM IMPACT OVERALLCWI-0.1 SITE DATA: TOTAL AREA: 381.61 ACRES TOTAL WETLANDS: 47.82 ACRES (2,082,882 SF) TOTAL OPEN WATER (PONDS): 14.82 ACRES (644,078 SF) TOTAL STREAMS: 10,347 LF TOTAL PROPOSED IMPERVIOUS: 122 AC +/- (32%)NAD 830 SCALE 1"=600' 1200'600' CWI-1.2 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICECWI-1.3 CWI-1.4 CWI-1.5 CWI-1.6 CWI-1.7 CWI-1.8 CWI-1.10 CWI-1.11 CWI-1.12 1" = 600' S. HEIN S. HEIN D. HOJSAN 08/02/2018 CWI-1.13 PRELIMINARY FOR REVIEW AND REFERENCE ONLY CWI-1.9 WETLAND AND STREAM IMPACT TABLECWI-1.0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICEN / A S. HEIN S. HEIN D. HOJSAN 05/04/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY EXISTING POND TO REMAIN SCM 1 SSSANSANSANSAN0+000+501+001+502+002+503+003+504+004+504+77.88L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLOD LOD WETLAND IMPACT 2 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 3377 SF WETLAND IMPACT 3 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 1415 SF WETLAND W3 WETLAND W3 WETLAND IMPACT 1 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 356 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICENAD 83SCALE 1"=50' 100'50'0 WETLAND AND STREAM IMPACT 1,2,3CWI-1.2 1" = 50' S. HEIN S. HEIN D. HOJSAN 05/04/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY S S S S SAN SAN SANSAN SAN SAN LOD LOD LOD LOD LOD LODLOD LODLOD LODLODLODLODLODLODLODLODLODWETLAND W3 WETLAND W3 WETLAND IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 883 SF WETLAND IMPACT 4 (PERMANENT IMPACT ROAD FILL) 177 SF INTERMITTENT STREAM E WETLAND IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 225 SF STREAM IMPACT 4 (PERMANENT IMPACT ROAD FILL) 80 LF / 457 SF STREAM IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 10 LF / 73 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICENAD 83SCALE 1"=50' 100'50'0 1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 CWI-1.3 WETLAND AND STREAM IMPACT 4PRELIMINARY FOR REVIEW AND REFERENCE ONLY S SSSSS S SAN SAN SAN SANLODLODLOD LODLOD LOD LODLOD LOD LOD LODLO D WETLAND IMPACT 5 (TEMPORARY FOR CONSTRUCTION) 934 SF WETLAND IMPACT 5 (PERMANENT IMPACT ROAD FILL) 5456 SF TEMPORARY WETLAND IMPACT 5 (TEMPORARY FOR CONSTRUCTION) 718 SF WETLAND W4 WETLAND W4 RETAINING WALL RETAINING WALL S WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 CWI-1.4 WETLAND AND STREAM IMPACT 5PRELIMINARY FOR REVIEW AND REFERENCE ONLY SCM 6 SSSSSAN SAN SAN SANSANSANS A N LODLODLODLODLODLODLOD LOD LODLOD LOD LODLODLOD LODLODLODLODLOD WETLAND IMPACT 6 (TEMPORARY FOR CONSTRUCTION) 850 SF WETLAND IMPACT 6 (PERMANENT IMPACT ROAD FILL) 1249 SF WETLAND IMPACT 6 (TEMPORARY FOR CONSTRUCTION) 290 SF STREAM IMPACT 6 (PERMANENT IMPACT ROAD FILL) 80 LF / 547 SF STREAM IMPACT 6 (TEMPORARY FOR CONSTRUCTION) 10 LF / 60 SF STREAM IMPACT 6 (TEMPORARY FOR CONSTRUCTION) 10 LF / 60 SF WETLAND IMPACT 6 (PERMANENT IMPACT ROAD FILL) 176 SF WETLAND W4 WETLAND W7 STREAM H RETAINING WALL RETAINING WALL WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 6CWI-1.5 PRELIMINARY FOR REVIEW AND REFERENCE ONLY S S SAN SAN SAN SAN SANSANSAN LODLODLODLODLODLODLODLODLODLODLODLODLODLODWETLAND IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 720 SF WETLAND IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 467 SF WETLAND IMPACT 7 (PERMANENT IMPACT ROAD FILL) 3675 SF WETLAND IMPACT 7 (PERMANENT IMPACT ROAD FILL) 1820 SF WETLAND IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 100 SF STREAM IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 10 LF / 62 SF STREAM IMPACT 7 (PERMANENT IMPACT ROAD FILL) 65 LF / 450 SF STREAM IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 10 LF / 30 SF WETLAND IMPACT 7 (TEMPORARY FOR CONSTRUCTION) 707 SF WETLAND W7 WETLAND W7 STREAM H RETAINING WALL RETAINING WALL WETLAND W7 WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 7CWI-1.6 PRELIMINARY FOR REVIEW AND REFERENCE ONLY EXISTING POND S SSS SANSANSAN SANSA N LOD LODLODLOD LO D LOD LODLODLODLODL O D LODWETLAND IMPACT 8 (TEMPORARY FOR CONSTRUCTION) 207 SF WETLAND IMPACT 8 (PERMANENT IMPACT ROAD FILL) 1886 SF WETLAND IMPACT 8 (TEMPORARY FOR CONSTRUCTION) 522 SF WETLAND W7 WETLAND W7 RETAINING WALL RETAINING WALL POND 4 WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 8CWI-1.7 PRELIMINARY FOR REVIEW AND REFERENCE ONLY SSSSAN SAN SSSANSAN LODLODLODLODLODLODLODLODLODLODLOD LOD LOD LOD LO D LOD LODLODWETLAND IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 387 SF WETLAND IMPACT 9 (PERMANENT IMPACT ROAD FILL) 2137 SF WETLAND IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 320 SF WETLAND IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 201 SF WETLAND IMPACT 9 (PERMANENT IMPACT ROAD FILL) 599 SF STREAM IMPACT 9 (PERMANENT IMPACT ROAD FILL) 70 LF / 560 SF STREAM IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 10 LF / 84 SF STREAM IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 10 LF / 75 SF WETLAND IMPACT 9 (TEMPORARY FOR CONSTRUCTION) 105 SF WETLAND W4 WETLAND W9 STREAM I RETAINING WALL RETAINING WALL WETLAND W10SAN SANWETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 9CWI-1.8 PRELIMINARY FOR REVIEW AND REFERENCE ONLY S LOD LOD LOD LOD LOD LOD LOD LODLODLODLOD LODLODLODWETLAND W9 WETLAND W11 STREAM I STREAM I STREAM IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 10 LF / 89 SF WETLAND IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 25 SF WETLAND IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 36 SF STREAM IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 10 LF / 102 SF STREAM IMPACT 10 (PERMANENT IMPACT ROAD FILL) 70 LF / 439 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 10CWI-1.9 PRELIMINARY FOR REVIEW AND REFERENCE ONLY S SS SANSANSAN0+000+501+001+502+002+503+003+504+004+504+70.41LODLODLODLODLODLODLODLODLODLODLOD L O D LODSTREAM IMPACT 11 (TEMPORARY IMPACT UTILITY CROSSING) 45 LF / 310 SF WETLAND IMPACT 11 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 7763 SF WETLAND W13 STREAM I STREAM H POND 1 WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 11CWI-1.10 PRELIMINARY FOR REVIEW AND REFERENCE ONLY X XXX S S SSSANSANSANSANSANSANSANSAN0+000+501+001+502+002+503+003+504+004+42.45LODLODLODLODLODLODLO D LO D LOD LODLODLODLODLODLODLODSTREAM IMPACT 12 (TEMPORARY IMPACT UTILITY CROSSING) 40 LF / 275 SF WETLAND W13 STREAM H STREAM J WETLAND IMPACT 12 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 100 SF WETLAND IMPACT 13 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 2072 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 12 & 13CWI-1.11 PRELIMINARY FOR REVIEW AND REFERENCE ONLY S S S SANSANSANSANSANS AN S ANSANLODLODLOD LOD LODLODLODLODLOD0 + 0 0 0 + 5 0 1 + 0 0 1 + 5 0 2 + 0 0 2 + 4 4 . 5 1 WETLAND IMPACT 14 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 3218 SF STREAM IMPACT 14 (TEMPORARY IMPACT UTILITY CROSSING) 21 LF / 93 SF WETLAND W13 WETLAND W13 STREAM H EXISTING SANITARY SEWER AND UTILITY EASEMENT WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 14CWI-1.12 PRELIMINARY FOR REVIEW AND REFERENCE ONLY LODLODLODLODLODLOD LODLODLODLODLODLODLOD WETLAND IMPACT 15 (PERMANENT IMPACT ROAD FILL) 737 SF WETLAND IMPACT 15 (TEMPORARY FOR CONSTRUCTION) 676 SF WETLAND IMPACT 15 (PERMANENT IMPACT ROAD FILL) 576 SF WETLAND IMPACT 15 (TEMPORARY FOR CONSTRUCTION) 789 SF WETLAND W16 RETAINING WALL RETAINING WALL WETLAND W17 WETLAND W18 STREAM K EXISTING 12" CORRUGATED PLASTIC PIPE WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATERNAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 WETLAND AND STREAM IMPACT 15CWI-1.13THIS DRAWING PREPARED AT THERALEIGH OFFICEPRELIMINARY FOR REVIEW AND REFERENCE ONLY EXISTING POND TO REMAIN SCM 1 SSSAN0+000+501+001+502+002+503+003+504+004+504+77.88L O D LODLODLODLODLODLODLODWETLAND IMPACT 2 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 3377 SF WETLAND IMPACT 3 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 1415 SF WETLAND W3 WETLAND W3 WETLAND IMPACT 1 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 356 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER 340 345 350 355 360 340 345 350 355 360 352.8352.1351.0349.9348.7349.7351.1352.4352.6353.9352.76352.06350.98349.88348.66349.71351.10352.42352.59353.94-0+50 0+00 1+00 2+00 3+00 4+00 5+00 MH 39 (4') TOP 352.04 INV IN 344.70 (SS 40-39) INV OUT 344.50 (SS 39-38) SS 40-39 336.99' OF 8" C900 @ 0.50% MH 40 (4') TOP 356.64 INV IN 346.59 (SS 41-40) INV OUT 346.39 (SS 40-39) SS 39-38 218.73' OF 8" C900 @ 0.50%NAD 830 SCALE 1"=100' 200'100' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICESSWR CROSSING DETAIL (IMPACT 1,2,3)CWI-1.14 1" = 50' S. HEIN S. HEIN D. HOJSAN 08/02/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY PROFILE SCALE 0 0 50 10 SSAN0+57.870 + 0 0 0+501+ 1 8 . 6 7 0+00 0+501+001+31.570+00 0+50 1+00 355 360 365 370 355 360 365 370 357.6359.2360.4-0+25 0+00 1+00 1+50 73.16' OF 36" RCP @ 2.35% 355 360 365 370 355 360 365 370 361.3360.5360.9361.31360.53360.9473.16' OF 36" RCP @ 2.35% 73.32' OF 36" RCP @ 2.35% 355 360 365 355 360 365 360.2359.1360.25359.1073.32' OF 36" RCP @ 2.35% 73.16' OF 36" RCP @ 2.35% NAD 8 3 SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 04/17/2018 ROAD CROSSING DETAIL (IMPACT 4)CWI-1.15 PLAN VIEW NORTH WALL PROFILE VIEWIMPACT 4 PIPE CROSSING PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY SOUTH WALL PROFILE VIEW PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) INTERMITTENT STREAM WETLAND IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 883 SF WETLAND IMPACT 4 (PERMANENT IMPACT ROAD FILL) 177 SF WETLAND IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 225 SF STREAM IMPACT 4 (PERMANENT IMPACT ROAD FILL) 80 LF / 457 SF STREAM IMPACT 4 (TEMPORARY FOR CONSTRUCTION) 10 LF / 73 SF SSSAN0+00 0+50 1+00 1+12.01 0+00 0+501+001+ 5 0 1+ 6 0 . 6 5 1+23.650+000+501+00335 340 345 350 355 335 340 345 350 355 339.9340.6340.8-0+25 0+00 1+00 1+25 60.01' OF 36" RCP @ 2.18% 335 340 345 350 355 335 340 345 350 355 320 325 330 335 340 343.2339.9339.9342.0343.22339.87339.95342.01-0+50 0+00 1+00 2+00 60.01' OF 36" RCP @ 2.18% 335 340 345 350 355 335 340 345 350 355 346.3341.1340.8346.30341.12340.78-0+50 0+00 1+00 1+50 60.01' OF 36" RCP @ 2.18%NAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN 5/4/2018 ROAD CROSSING DETAIL (IMPACT 5)CWI-1.16 PLAN VIEW NORTH WALL PROFILE VIEW IMPACT 5 PIPE CROSSING PROFILE VIEW SOUTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY TEMPORARY WETLAND IMPACT 5 FOR CONSTRUCTION 934 SF WETLAND IMPACT 5 (PERMANENT IMPACT ROAD FILL) 5456 SF TEMPORARY WETLAND IMPACT 5 FOR CONSTRUCTION 718 SF RETAINING WALL RETAINING WALL WETLAND W4 SSSAN1 + 5 7 . 3 8 0+00 0+501+001 + 5 0 1+68. 4 7 0+000+501+001+50 1+1 4 . 0 1 0+00 0+50 1+00 320 325 330 335 340 345 320 325 330 335 340 345 325.4327.2327.2-0+25 0+00 1+00 1+50 64.88' @ 1.51% 335 340 345 350 355 320 325 330 335 340 320 325 330 335 340 329.7327.1327.5328.7329.65327.09327.46328.66-0+50 0+00 1+00 2+00 64.88' 96"X60" RCB @ 1.51% 320 325 330 335 340 345 320 325 330 335 340 345 329.5326.9326.7327.5329.51326.87326.69327.53-0+50 0+00 1+00 2+00 64.88' 96"X60" RCB @ 1.51%NAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 6)CWI-1.17 PLAN VIEW NORTH WALL PROFILE VIEWIMPACT 6 PIPE CROSSING PROFILE VIEWSOUTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 TEMPORARY WETLAND IMPACT 6 FOR CONSTRUCTION 850 SF WETLAND IMPACT 6 (PERMANENT IMPACT ROAD FILL) 1249 SF TEMPORARY WETLAND IMPACT 6 FOR CONSTRUCTION 290 SF STREAM IMPACT 6 (PERMANENT IMPACT ROAD FILL) 80 LF / 547 SFTEMPORARY STREAM IMPACT 6 FOR CONSTRUCTION 10 LF / 60 SF TEMPORARY STREAM IMPACT 6 FOR CONSTRUCTION 10 LF / 60 SF WETLAND IMPACT 6 (PERMANENT IMPACT ROAD FILL) 176 SF WETLAND W7 STREAM H RETAINING WALL RETAINING WALL SANSAN1 + 9 8 . 8 60+000+501+001+501+59.030 + 0 0 0+501+001+501+03.97 0+00 0+5 0 1+00 315 320 325 330 335 340 345 315 320 325 330 335 340 345 320.7321.9321.8-0+25 0+00 1+00 1+50 66.45' @ 1.72% 315 320 325 330 335 340 315 320 325 330 335 340 324.7321.3321.9325.6324.73321.28321.86325.56-0+50 0+00 1+00 2+00 66.45' 168"X48" RCB @ 1.72% 315 320 325 330 335 340 315 320 325 330 335 340 325.4321.9322.4324.3325.44321.89322.38324.30-0+50 0+00 1+00 2+00 320 325 330 335 340 66.45' 168"X48" RCB @ 1.72% NAD 83 SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 7)CWI-1.18 PLAN VIEW SOUTH WALL PROFILE VIEW IMPACT 7 PIPE CROSSING PROFILE VIEW NORTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 TEMPORARY WETLAND IMPACT 7 FOR CONSTRUCTION 720 SF TEMPORARY WETLAND IMPACT 7 FOR CONSTRUCTION 467 SF WETLAND IMPACT 7 (PERMANENT IMPACT ROAD FILL) 3675 SF WETLAND IMPACT 7 (PERMANENT IMPACT ROAD FILL) 1820 SF TEMPORARY STREAM IMPACT 7 FOR CONSTRUCTION 10 LF / 62 SF STREAM IMPACT 7 (PERMANENT IMPACT ROAD FILL) 65 LF / 450 SF TEMPORARY STREAM IMPACT 7 FOR CONSTRUCTION 10 LF / 30 SF TEMPORARY WETLAND IMPACT 7 FOR CONSTRUCTION 707 SF STREAM H RETAINING WALL RETAINING WALL TEMPORARY WETLAND IMPACT 7 FOR CONSTRUCTION 100 SF 0 + 5 0 . 4 90+000 + 5 0 1+11.860 + 0 0 0+501+000+00 0+50 1+00 1+45.20 340 345 350 355 360 340 345 350 355 360 346.6348.9350.7-0+25 0+00 1+00 1+50 60.00' OF 48" RCP @ 3.55% 345 350 355 360 345 350 355 360 300 305 310 315 320 348.6349.0350.7348.60349.02350.70-0+50 0+00 1+00 1+50 60.00' OF 48" RCP @ 3.55% 345 350 355 360 345 350 355 360 351.6351.8351.59351.80-0+50 0+00 1+00 60.00' OF 48" RCP @ 3.55% NAD 8 3 SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 8)CWI-1.19 PLAN VIEW SOUTH WALL PROFILE VIEW IMPACT 8 PIPE CROSSING PROFILE VIEW NORTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS)PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 TEMPORARY WETLAND IMPACT 8 FOR CONSTRUCTION 207 SF WETLAND IMPACT 8 (PERMANENT IMPACT ROAD FILL) 1886 SF TEMPORARY WETLAND IMPACT 8 FOR CONSTRUCTION 522 SF WETLAND W7 RETAINING WALL RETAINING WALL SSAN1+41.800 + 0 0 0+501+000+000+501+001 + 5 0 1 + 8 5 . 4 6 0+00 0+50 1+00 1+30.20 SAN 295 300 305 310 315 320 325 295 300 305 310 315 320 325 307.3308.2308.3-0+50 0+00 1+00 1+50 59.97' @ 2.85% 300 305 310 315 320 325 300 305 310 315 320 325 310.5309.2308.8310.48309.17308.79-0+50 0+00 1+00 2+00 59.97' 84"X48" RCB @ 2.85% 300 305 310 315 320 325 300 305 310 315 320 325 311.5309.4309.6313.9311.51309.39309.61313.94-0+50 0+00 1+00 2+00 2+50 59.97' 84"X48" RCB @ 2.85% NAD 83 SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 9)CWI-1.20 PLAN VIEW SOUTH WALL PROFILE VIEW IMPACT 9 PIPE CROSSING PROFILE VIEW NORTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 TEMPORARY WETLAND IMPACT 9 FOR CONSTRUCTION 387 SF WETLAND IMPACT 9 (PERMANENT IMPACT ROAD FILL) 2137 SF TEMPORARY WETLAND IMPACT 9 FOR CONSTRUCTION 320 SF TEMPORARY WETLAND IMPACT 9 FOR CONSTRUCTION 201 SF WETLAND IMPACT 9 (PERMANENT IMPACT ROAD FILL) 599 SF STREAM IMPACT 9 (PERMANENT IMPACT ROAD FILL) 70 LF / 560 SF TEMPORARY STREAM IMPACT 9 FOR CONSTRUCTION 10 LF / 84 SF TEMPORARY STREAM IMPACT 9 FOR CONSTRUCTION 10 LF / 75 SF TEMPORARY WETLAND IMPACT 9 FOR CONSTRUCTION 105 SF WETLAND W9 STREAM I RETAINING WALL RETAINING WALL S 1+15. 4 8 0+000+50 1+000+000+501+00 1+24.9 6 0+65.87 0+00 0+50 320 325 330 335 340 320 325 330 335 340 322.8325.2327.2322.76325.22327.15-0+50 0+00 1+00 1+50 66.73' OF 48" RCP @ 4.38% 320 325 330 335 320 325 330 335 329.0325.2324.1329.00325.16324.07-0+50 0+00 1+00 1+50 66.73' OF 48" RCP @ 4.38% 320 325 330 335 320 325 330 335 329.7327.4329.69327.36-0+50 0+00 1+00 66.73' OF 48" RCP @ 4.38%NAD 83SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 10)CWI-1.21 PLAN VIEW SOUTH WALL PROFILE VIEW IMPACT 9 PIPE CROSSING PROFILE VIEW NORTH WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 STREAM IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 10 LF / 89 SF WETLAND IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 25 SF WETLAND IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 36 SF STREAM IMPACT 10 (TEMPORARY FOR CONSTRUCTION) 10 LF / 102 SF STREAM IMPACT 10 (PERMANENT IMPACT ROAD FILL) 70 LF / 439 SF S SS SAN0+000+501+001+502+002+503+003+504+004+504+70.41LODLODLODLODLODLOD LODSTREAM IMPACT 11 (TEMPORARY IMPACT UTILITY CROSSING) 45 LF / 310 SF WETLAND IMPACT 11 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 7763 SF WETLAND W13 STREAM I STREAM H POND 1 WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER 290 295 300 305 310 290 295 300 305 310 SS 67-66 259.52' OF 8" C900 @ 0.50% MH 67 (4') TOP 297.79 INV IN 292.04 (SS 68-67) INV OUT 291.84 (SS 67-66) SS 68-67 99.02' OF 8" PVC @ 0.50% MH 68 (4') TOP 302.08 INV IN 292.74 (SS 69-68) INV OUT 292.54 (SS 68-67) SS 69-68 242.21' OF 8" PVC @ 0.50% MH 69 (5') TOP 307.71 INV IN 294.15 (SS 70-69) INV OUT 293.95 (SS 69-68) SS 70-69 360.31' OF 8" PVC @ 1.23%297.2297.0299.6296.4296.8296.8297.8304.8306.9307.5297.16297.03299.61296.39296.80296.81297.77304.79306.85307.53-0+50 0+00 1+00 2+00 3+00 4+00 5+00NAD 830 SCALE 1"=100' 200'100' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICESSWR CROSSING DETAIL (IMPACT 11)CWI-1.22 1" = 50' S. HEIN S. HEIN D. HOJSAN 08/02/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY PROFILE SCALE 0 0 50 10 XX S S SSANSAN0+000+501+001+502+002+503+003+504+004+42.45LODLODLOD LOD LODLODLODSTREAM IMPACT 12 (TEMPORARY IMPACT UTILITY CROSSING) 40 LF / 275 SF WETLAND W13 STREAM H STREAM J WETLAND IMPACT 12 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 100 SF WETLAND IMPACT 13 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 2072 SF WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER 285 290 295 300 305 285 290 295 300 305 SS 64-63 127.31' OF 8" PVC @ 0.50% MH 64 (4') TOP 297.03 INV IN 287.23 (SS 65-64) INV OUT 287.03 (SS 64-63) SS 65-64 321.94' OF 8" PVC @ 0.50% MH 65 (4') TOP 297.59 INV IN 289.04 (SS 66-65) INV OUT 288.84 (SS 65-64) SS 66-65 259.52' OF 8" C900 @ 0.50%295.7295.0295.8299.8301.7301.5299.5296.0294.5295.71295.04295.78299.75301.66301.52299.46296.05294.47-0+50 0+00 1+00 2+00 3+00 4+00 5+00NAD 830 SCALE 1"=100' 200'100' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICESSWR CROSSING DETAIL (IMPACT 12 & 13)CWI-1.23 1" = 50' S. HEIN S. HEIN D. HOJSAN 08/02/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY PROFILE SCALE 0 0 50 10 S S S SANSANSANS ANSANLOD LODLODLODLOD 0 + 0 0 0 + 5 0 1 + 0 0 1 + 5 0 2 + 0 0 2 + 4 4 . 5 1 WETLAND IMPACT 14 (PERMANENT NO LOSS IMPACT UTILITY CROSSING) 3218 SF STREAM IMPACT 14 (TEMPORARY IMPACT UTILITY CROSSING) 21 LF / 93 SF WETLAND W13 WETLAND W13 STREAM H EXISTING SANITARY SEWER AND UTILITY EASEMENT WETLAND & STREAM IMPACT LEGEND: PERMANENT WETLANDS - GREEN PERMANENT WETLANDS (NO LOSS) - ORANGE TEMPORARY WETLANDS - PURPLE PERMANENT STREAM - RED TEMPORARY STREAM - BLUE PERMANENT OPEN WATER 280 285 290 295 300 280 285 290 295 300 290.4288.8288.0288.0288.9290.35288.83287.99288.01288.94EX MH 8 TOP 290.35 INV IN 283.20 (EX SS 9-8) INV IN 283.50 (SS 62-8) INV OUT 283.00 (EX SS 8-7) SS 62-8 244.51' OF 8" PVC @ 0.50% MH 62 (4') TOP 295.07 INV IN 284.92 (SS 63-62) INV OUT 284.72 (SS 62-8)NAD 830 SCALE 1"=100' 200'100' JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICESSWR CROSSING DETAIL (IMPACT 14)CWI-1.24 1" = 50' S. HEIN S. HEIN D. HOJSAN 08/02/2018 PRELIMINARY FOR REVIEW AND REFERENCE ONLY PROFILE SCALE 0 0 50 10 1+15.470 + 0 00+501+000+000+501+001+29.94 0+00 0+50 1+00 1+20 320 325 330 335 340 320 325 330 335 340 326.2329.3329.7-0+25 0+00 1+00 1+50 60.00' OF 48" RCP @ 3.47% 325 330 335 340 325 330 335 340 332.7329.5331.3332.67329.48331.26-0+50 0+00 1+00 1+50 60.00' OF 48" RCP @ 3.47% 325 330 335 340 325 330 335 340 329.0327.5329.6329.00327.50329.62-0+50 0+00 1+00 1+50 60.00' OF 48" RCP @ 3.47%NAD 8 3 SCALE 1"=50' 100'50'0 JOB NO. SHEET NO. SCALE DESIGNED BY CHECKED BYDATEDRAWN BY DATEREVISION DESCRIPTIONYOUR VISION ACHIEVED THROUGH OURS.These plans and associated documents are the exclusive property of TIMMONS GROUP and may not be reproduced in whole or in part and shall not be used for any purpose whatsoever, inclusive, but notlimited to construction, bidding, and/or construction staking without the express written consent of TIMMONS GROUP.PURFOY SOUTHFUQUAY-VARINA, WAKE COUNTY, NORTH CAROLINA406975410 Trinity Road, Suite 102 | Raleigh, NC 27607TEL 919.866.4951 FAX 919.833.8124 www.timmons.comTHIS DRAWING PREPARED AT THERALEIGH OFFICE1" = 50' S. HEIN S. HEIN D. HOJSAN ROAD CROSSING DETAIL (IMPACT 15)CWI-1.25 PLAN VIEW WEST WALL PROFILE VIEWIMPACT 11 PIPE CROSSING PROFILE VIEWEAST WALL PROFILE VIEW PROFILE SCALE 0 0 100 5 PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) PROPOSED GRADE EXISTING GRADE PROPOSED GRADE EXISTING GRADE BACK-TO-BACK STONE STRONG WALL (TO BE DESIGNED BY OTHERS) Contractor will follow the following construction sequence:      ·Contractor shall notify the Town of Fuquay Varina Public Works 48-hours in advance of start of work during a period of time with no rain in the forecast. ·Prior to start of work, contractor shall have all materials and ĞƋƵŝƉŵĞŶƚŽŶͲƐŝƚĞ͘&ŽƌƵƚŝůŝƚLJĐƌŽƐƐŝŶŐƐǁŝƚŚĐĂƐŝŶŐƐ͕ƚŚĞ carrier pipe shall be installed within the casing pipe prior to any open cut activities. ·Contractor shall install a temporary coffer dam on the upstream side of the proposed crossing and pump water around the open cut area to the downstream side. ·Contractor shall place the culvert or utility casing with carrier pipe at elevations shown on the approved plans and backfill in accordance with Town of Fuquay Varina specifications. ·Contractor shall restore channel and stabilize any disturbance within 24-hours of start of work. PRELIMINARY FOR REVIEW AND REFERENCE ONLY 5/4/2018 WETLAND IMPACT 15 (PERMANENT IMPACT ROAD FILL) 737 SF TEMPORARY WETLAND IMPACT 15 FOR CONSTRUCTION 676 SF WETLAND IMPACT 15 (PERMANENT IMPACT ROAD FILL) 576 SF TEMPORARY WETLAND IMPACT 15 FOR CONSTRUCTION 789 SF RETAINING WALL RETAINING WALL