Ken just asked me about the regulatory requirements
stormwater treatment for the Green Valley project..
the draaft 401 requirements so I don't know for sur
meet the WS-IV stormwater requirements of 1" storm
have been implementing those requirements.) Have I
and just not known it? Did someone say this was a
an
upon which we are
I told him that
e but that I knew
and 5-2 drawdown.
seen the draft 401
impaired stream?
requiring
I had not seen
that they must
(The city should