HomeMy WebLinkAbout20071012 Ver 1_Bay City Farm Mitigation Site Closeout Request_20170825PotashC®rpa Helping Nature Provide Hand Delivered August 24, 2017 Mr. Tom Steffens U.S. Army Corps of Engineers Washington Regulatory Field Office 2407 West 5a' Street Washington, North Carolina 27889 Mr. Anthony Scarbraugh NC Division of Water Resources Department of Environmental Quality 943 Washington Square mall Washington, North Carolina, 27889 Dear Mr. Steffens and Mr. Scarbraugh: PotashCorp - Aurora RECff1V60114CpE1V;MwR AUG 25 2017 rsNOno Aeglonat Washington p Section agionai oMO9 The Bay City Farm mitigation site south of Aurora NC, approved for mitigation under a 404 permit issued to PCS Phosphate on June 10, 2009 (Action ID 200110096), and 401 Water Quality Certification DWQ #2008-0868, version 2.0 (January 15, 2009), has been verbally "signed off' as successful by the Corps of Engineers and the NC Division of Water Resources. Attached is our determination of wetland, stream and buffer mitigation credits for the site based on the 5 -year monitoring program and the mitigation ratios specified in the 404 permit. Also attached is the mitigation ledger as of 8/24/17, as required by Condition N of the 404 permit, updated to incorporate the Bay City Farm wetland, stream and buffer mitigation credits shown in the attached credit calculations. I am now requesting written approval of the successful completion of the mitigation site and the attached credit calculations. I will explain the ** footnote at the bottom of the mitigation ledger table which references mitigation linear feet needed after adjustments to stream quality (1:1 for poor/fair, 2:1 for good, and 3:1 for excellent). During the Environmental Impact Statement process, CZR Incorporated biologists utilized the Corps and DWR (DWQ) stream rating forms and scored stream segments along every intermittent and perennial stream on the NCPC, Bonnerton and South of 33 tracts, and determined the linear foot lengths of each of the segments. The rating scores were used in conjunction with field observations of physical stream features (channelized, incised, natural, channel poorly defined, etc.), to divide stream segments into the poor/fair, good and excellent categories. The linear foot lengths for each segment were then multiplied by the corresponding ratio to determine the linear feet of impacts that were required to be mitigated for. 1530 NC Hwy 306 South, Aurora, NC USA 27806 T (252) 322.4111 PotashCorp. i www.potaskorp.com Attached is the table developed by CZR that shows (among other things), the breakdown of lengths of poor, good, and excellent perennial and intermittent stream segments impacted in each 2 -year impact block. These lengths were then multiplied by either 1:1, 2:1 or 3:1 to determine the Stream Impact numbers in the mitigation ledger table. If you have any questions, please call me at (252) 322-8249, or e-mail me at jfurnessna notashcoro.com. CSincerely, V"'U4 —' Jeffrey C. Furness Senior Scientist Attachments PC: Mac Haupt, NCDWR – Raleigh w/attach (Fed Ex) S. Cooper/J. Berger, CZR Incorporated - w/attach (Fed Ex) 23-16-006 – w/attach MITIGATION CREDIT CALCULATIONS FOR BAY CITY FARM MITIGATION SITE (Based on Combined 2013 and 2014 Annual Report for the Bay City Farm Restoration Site (Sixth and Seventh Years) and Monitoring Summary, by CZR Incorporated, dated October 2015, (refer to this report for data) WETLAND (See enclosed Credit Figure for depiction of areas of types of mitigation). Vegetation: Overall Site 331 tpa of planted trees after 5 years Hydrology: • Nonriparian restoration: 48 of 50 wells > 6.0% hydrology over 4 normal or below normal years. The two wells <6.0% were intentionally located to measure the drainage effect of the roadside ditch along SR 1002. This width and acreage has been pulled out of the success area. Bay City Farm 501.66 acres @ 2:1= 250.83 credits plus Hollowell 5.92 acres @2:1= 2.96 credits. 250.83 + 2.96 = 253.79 credits. • Riparian restoration: 10 of 10 wells > 8.2% hydrology over 5 normal or below normal years, with 8 of 10 > 12.5% over 5 years. Bay City Farm Headwater Stream Valley 32.29 acres @ 2:1 = 16.15 credits. • Wetland enhancement: Northeast corner of Hollowell former agricultural field 3.30 acres @ 3:1= 1.10 credits, and Hollowell headwater stream valley 3.63 acres @ 3:1 = 1.21 credits. 1.10 + 1.21= 2.31 credits. • Wetland preservation: Bay City Farm 49.10 acres @ 8:1 = 6.14 credits, plus Hollowell 48.61 acres @ 8:1= 6.08 credits. 6.14 + 6.08 =12.22 credits. TOTAL WETLAND CREDITS: 284.47 (Note that wetland mitigation requirements in the 404 permit and the 401 WQC were only for total wetlands, and did not require separate accounting for riparian vs. nonriparian wetlands). STREAM (See enclosed Credit Figure for depiction of observed flow lengths). • Coastal Plain Headwater Stream Restoration 1. Bay City Farm: 4,084 I.f. @ 1:1 = 4,084 credits. 2. Hollowell: 517 I.f. @ 1:1 = 517 credits TOTAL STREAM CREDITS: 4,601 BUFFER (See enclosed Credit Figure for depiction of areas of buffer mitigation). Vegetation: Five tree plots within 0-200 feet from valley edge, including planted stems and woody native volunteers average 1,068 tpa after 5 years. • 0-100 foot buffer restoration within Bay City Farm 18.84 acres @ 1:1= 18.84 credits • 0-100 foot buffer restoration within Hollowell 2.25 acres @ 1:1= 2.25 credits • 100-200 foot buffer restoration within Bay City Farm 19.70 acres @ 2:1= 9.85 credits • 100-200 foot buffer restoration within Hollowell 2.25 acres @ 2:1= 1.13 credits • 0-100 foot buffer preservation along Gum Swamp Run within BCF 1.92 acres @ 10:1= 0.2 credits • 0-100 foot buffer preservation along Gum Swamp Run within Hollowell 1.73 acres @ 10:1= 0.2 credits • 100-200 foot buffer preservation along Gum Swamp Run within BCF 1.90 acres @ 10:1= 0.2 credits • 100-200 foot buffer preservation along Gum Swamp Run within Hollowell 1.71 acres @ 10:1= 0.2 credits TOTAL BUFFER CREDITS: 32.87 COMBINED 2013 AND 2014 ANNUAL REPORT FOR THE BAY CITY FARM RESTORATION SITE (SIXTH AND SEVENTH YEARS) AND MONITORING SUMMARY RICHLAND TOWNSHIP BEAUFORT COUNTY, NORTH CAROLINA Prepared for: PCS Phosphate Company, Inc. Prepared by: CZR Incorporated October 2015 1 _?AURORA c \ 41 n f x..... . b9. t HOLLOWELL TRACT - - - 46L ryP A - UT 3$ OS 21.74020 h_ ` 1 - LONG BY 03'§72 [ -^ BAY CITY FARM - - - - - YITIGAiIOX SITE \ o 4,000 8,000 ZNORZTHCAROLINA SCALE IN FEET SITE LOCATION - BAY CITY FARM BAY CITY FARM HOLLOWELL VICINITY MAP LEGEN PCS PHOSPHATE COMPANY, INC. BAY CITY MITIGATION BOUNDARY BAY CITY FARM/HOLLOWELL BOUNDARY SCALE: AS SHOWN APPROVED BY: DRAWN BY: BFG/TLJ — - - — DATE: 01/14/13 FILE: BCF -LOC -RPT -2012 CP#1 745.59.19 SOURCE KRTA ION. GS TOED BY: NORM Cl OB. NO VA EM 4709 COLLEGE ACRES DRIVE OF 33 FEET. 1:240. -SC TOFCGW 01 WP 13.90 A NO $1AiPVNE. SUITE 2 WDBJ. FEET. 1:24000 -SCALE. USCSfOPOTtE1t3.AD AND USLSfOPO111E140.4D. USGS OpAONNGLES AURORA SOUTH GREEN, BAYBORO AND VENDEHERE WILMINGTON. NORTH CAROLINA 28403 Wmm MWANCOOT02C 9m.ORFORAT ED TEL 910/392-9253 FIGURE 1 [RAID 901!4 [pBAYIIRf F. 910/S92-9139 Fig -1 1.0 INTRODUCTION 1.1 History. The main restoration earthwork at Bay City Farm occurred between August 2007 and March 2008. These mitigation activities were permitted under US Army Corps of Engineers (Corps) Nationwide Permit 27 dated 27 July 2007 (Action ID No. SAW -2007- 01848), NC Division of Water Quality 401 Water Quality Certification dated 24 July 2007 (Project # 07-1012 and as modified by # 2008-0868) (copies of these materials are in Supporting Document A of the Bay City As -Built Report, CZR 2009a), and Division of Land Resources Erosion and Sediment Control Plan dated 27 August 2007 (Beauf- 2008-007). Additional remedial earthwork to reduce elevations of linear hummocks occurred during August and September 2008. All earthwork was performed by Sawyer's Land Developing, Inc. under the supervision of PCS Phosphate Company Inc. (PCS), Jonathan T. Ricketts, Inc., the design engineer, and CZR Incorporated (CZR), the environmental consultants. This mitigation site is proposed as part of compensatory mitigation for impacts to wetlands associated with the PCS mine continuation authorized by Corps Action ID No. SAW -2001-10096. The site is monitored by CZR. 1.2 Location. The Bay City Farm project site is owned by PCS and is located on the west side of Bay City Road (SR 1002) approximately 4 miles south of the Town of Aurora, Richland Township, Beaufort County, North Carolina and occurs on the USGS Bayboro quadrangle (Figure 1). The approximate center of the site lies at latitude +35.241158 and longitude -76.787764 (35.14.25 degrees north, 76.46.41 degrees west). The mitigation site is comprised of the 72 -acre Hollowell Tract (forested portion on the north side of the property) and the 640 -acre Bay City Tract (prior converted agricultural fields and a forested wetland north and northeast of the concrete pads). The western boundary of the Hollowell portion of the site borders the east side of South Creek, and Gum Swamp Run drains through the northeast corner of both parcels to South Creek. The site is located within the South Creek subbasin of the Pamlico Hydrologic Unit 03020104 in the Tar -Pamlico River Basin. 1.3 Goals of the Project. As estimated in the 2008 PCS Final Environmental Impact Statement (FEIS) mitigation plan (US Army Corps of Engineers 2008a, Volume III- Appendix 1), the purpose of restoration activities at Bay City Farm is to successfully restore approximately: 529 acres of non -riparian wet hardwood flat, 25 acres of riparian wetland, 3,000 linear feet of riparian coastal headwater valley stream system, 11 acres of existing wooded parcel, 7 acres of riparian buffer, and preserve approximately: 12 acres of riparian wetland (preservation/enhancement) and 107 acres of wetland hardwood forest. Bay City Farm Mitigation Site 1 PCS Phosphate Company, Inc. 2013 and 2014 Annual Monitoring Report October 2015 2 H 0 En \ \H\A/H UM\ \ HF— H-1 C EK H-2 )OR EA NELL HF TY MITIGATION AREA PS 5 DETAIL A 0 800 1.800 --------------- SCALE IN FEET LEGEND BAY CITY MITIGATION SITE ® SOUTH CREEK CORRIDOR EXISTING WETLANDS ® BAY CITY FARM/HOLLOWELL EXISTING WETLANDS O UPLAND (DRAINED OR FILLED WETLAND) AREAS PLANTED: ZONE 1 — TREES IN THE LOWEST CONTOURS ® ZONE 1A — SHRUB IN THE LOWEST CONTOURS [ ZONE 2 — TREES 15 ZONE 2A — SHRUBS O ZONE 3 — TREES l ZONE 3A — SHRUBS O ZONE 4 — TREES IN THE HIGHEST CONTOURS ® ZONE 4A — SHRUBS IN THE HIGHEST CONTOURS • ELECTRONIC WELL QM MANUAL WELL m TREE SAMPLING PLOT BCW -35 WELL NUMBER (BAY CITY FARM) H-5 WELL NUMBER (HOLLOWELL TRACT) F-1 WELL NUMBER (FORESTED TRACT) S-1 WELL NUMBER (STREAM ARRAY) PSI PHOTO STATION NUMBER • PHOTO STATION RAIN GAUGE ■ FLOW STATION BCF -1 FLOW STATION NUMBER (BAY CITY FARM) HF -5 FLOW STATION NUMBER (HOLLOWELL TRACT) BAY CITY MITIGATION SITE MONITORING LOCATIONS PCS PHOSPHATE COMPANY SCALE: AS SHOWN APPROVED BY: DRAWN BY: TLJ DATE: 10/07/15 FILE: ZOFaMor9_aHoro. {]OB COLIECE ACRES SUM2 CP#1745.59.19 IE 3 Am�ORYOR AT EO WIWTEL 9110%382 NC �9,3 FIGURE 2 ommwortR� mmRiuns To 910/992-9139 Fig -2 SOURCE AS BUILT UDAR PROVIDED W. JONATHAN RICKETS ENGINEERING. 34W NORTHW(E BLVD., PAUL BEACH GAROENS, RORIDA, PHONE 561 630_6700 DATED: MAY 14, 2010 LEGEND Bay City Farm Mitigation Site (712.11 acres) Restored Coastal Plain Headwater Stream at 1:1 Bay City Farm 4,084 If Hollowell 517 If Total Stream Credits = 4,601 If ® 100 Foot Buffer Restored within Bay City Form (18.84 acres) (0-100 Foot Buffer Credits at 1:1 = 18.84) ® 100 Foot Buffer Restored within Hollowell (2.25 acres) (0-100 Foot Buffer Credits at 1:1 = 2.25) ® 200 Foot Buffer Restored within Bay City Form (19.70 acres) (101-200 Foot Buffer Credits at 2:1 = 9.85) ® 200 Foot Buffer Restored within Hollowell (2.25 acres) (101-200 Foot Buffer Credits at 2:1 = 1.13) 100 Foot Buffer Preserved along Gum Swamp Run within Bay City Farm (1.92 acres) (101-200 Foot Buffer Credit at 10:1 = 0.2) ® 200 Foot Buffer Preserved along Gum Swamp Run within Bay City Farm (1.90 acres) (101-200 Foot Buffer Credit at 10:1 = 0.2) i 100 Foot Buffer Preserved along Gum Swamp Run within Hollowell (1.73 acres) (101-200 Foot Buffer Credit at 10:1 = 0.2) i i 200 Foot Buffer Preserved along Gum Swamp Run within Hollowell (1.71 acres) (101-200 Foot Buffer Credit at 10:1 = 0.2) Total buffer Credits = 32.87 Restored Wetlond at 2:1 Bay City Farm (501.66 acres = 250.83 Credits) Bay City Headwater Stream Valley (32.29 acres = 16.15 Credits) Hollqwell (5.92 acres = 2.96 Credits) (Credits = 269.94) Enhanced Wetland at 3:1 Hollowell (3.30 acres =1.10 Credits) Hollowell Headwater Stream Valley (3.63 acres = 1.21 Credits) (Credits = 2.31) Preserved Wetland at 8:1 Bay City Farm (49.10 acres = 6.14 Credits) Hollowell (48.61 acres = 6.01 Credits) (Credits = 12.22) Total Wetland Credits = 284.47 Upland (Drained or Filled Wetland) Bay City Farm (14.25 acres) Hollowell (3.05 acres) 0 800 1.800 SCALE IN FEET U d Q � m < y U N 4 IU•' U Q M 0 P7 E Q o e o o O o 0 0 0 r w W O in vw O O 1 r N�� U m .' Q M V1 V V Vl V1 h V1 Q.. 0 0 0 0 0 0 0 0 0 N O �O O Q (n p y M M a r N M T D, O� T c: o 00 06 a w 6 0 N M N N N H1 M N N a w ¢ 8 y* r n .. N O V O O O U �F �0.adaa 0.0 ado C7%'u" d� Fayye ymG1 x as V� 0. a d d 3 E pprn o .- M :i ^ r N N N N N N N N N m 1 9 O m E >� Z' N$ eo$ a n e $uNi$oQ a n,°i.•$$$$."+no m$$ n o a o q Y p Ic a .+wo ai oai lmo• ore ovi .. m N ..noo0o.i vio.ioo �o O d N 0 0 N d N Vl m b t1 O 01 r O O 4D O T tD m N m O O O O V m O O O D] M � m O N .w a M b Q O O n m O Q O N Q O O O O O O O O m m .� lomm�oo .n b omo Qo m nm0000�eomoom m C M O O O O b O VI O m O M 'I m O Q O O O O O m O O O O pi N O N > t m i n O Q b O m e'1 m m O O y n m m O O O b VI m O VI O O b M q a Y N N VI t0 pl m Q O O P O N ei M N [O N Q lD VI n O T M m 9 N MI ti T N n M M N e1 N i O q N F m y N N t. Vmi O b 0 Mm O� n p O O Sp b O O O O O b O O O O O O b M a O O eQa N N N b m N 'a toil � N n M W T e0i A O y N M NI N N Q N T f Y m y 0 0 0 0 0 o a o 01 o 00 o� 0 0 0 0 0 0 0 0 0 0 0 0 0 Ei u n N N NG C O N tO O O O O N O n QO m O O O O O O O O O O O O O O I N� p p M N m m v o o 0 o b OOOo vmi e b .ni m m m ro m m n N N M p O O O O O O O O m Ol O O O InO T m d O O O O vpl O T O O m N a Vm n N 1tp0 N m0 Q Q m n fmtl d N N ei T N n O O f m x 0 0 .000 0 0 0 0 0 0 0 $ E N N N A i qL O O O O O O O O m Nm O O O n O O O O O O O O O O O O O N •� 8 M ,l b v a `0 00000 0 00 b o 0o m m Q o0 0 oin too Moo m n tti N n q N M m tO d y a Z C OI Q b e1 n Q ONi QOi W n O M O O Q mN e01 O O N N Y m g N V n O] O ei Q O N O O T V1 M n M Oi ID Oi n n m m 10 O A 0. OI N IC Vf Yf 0• W N O b n y m Q p d m vl m m vl V1 ei v'1 Q a t0 N m Q M M N n N m C ttl 9 c a n m m n e m m m o Q a n N n n o o m m o o b$ m 9 �n b n m o m m m n m n ry o Q o o m 0 0 0 $ �j 3 VI N O Q VI °m mm 0m m Q m n N T N OI N O O1 VI N O Vl m 'i VI N O N N y Q yVl nd N o n n ry T N tD O c0 n m b o O o N n Q o 0 0 o M m n 3 m 0 o m b ..o vriry a O o Q ry o b 000nio m v ma 0 0 00 Q o 0 0 000000000000.. .� N 3 O W s 0 O g m _ W f m n 3 p s z F o n o o o m b A A Q Q N N N N O NO NNQDO NON JjQ -ON 6 d WNO ONQN bmN ONNQN NON Q>O 5 O O O ON W OQ mNQ O O 0 O O O yn Z NOZ o a z z M 6 2 N K 2 m m N NEli OOt HUOOy volt o\ 4 e cp 1 2 2p%p; 2� 94 T y, Tu 2- U 0 0 Cry ceEy. tO OLEy 0 'IFF J 0,00 TON w+,zp15 PERENNIAL(1B) L.F. INTERMITUONT(1C) L.F. EF U HUDDLES CUT 2574 dNCCBS UT4 00 TOOLEY CREEK 0 687 .i- JACOBS CREEK 0 662 SUP p\� os""' TOTAL L.F. 0 3981 2p�6�2 IMPACTS OUTSIDE NCPC MODIFIED ALT L BOUNDARY ucac uaani0 ALT L - sNunxc AH0 P11 CS - N f.. XMNM<Y Ll6 RRIMF [X11MHG A1111 I.— IA PU6UC TRUST NtE/5 b L.F. (0.02 ACRES) EEY. NCPC Yd161m AIT 1 - NC HKMAY ]08 .1NGµ5 Oft to PFRFNNNL 51REW1(G\NAL)RELOCATON 220 LF. (0.18 ACRES) Syg\Lµ GREE 2p�6, z 2 YEAR IMPACT PERENNIAL INIERMfDENT BLOCK6 (1 B) (1C) TOTAL LF. zo o o zZ � ziia -2D11 zolz-ems o sa] sa] zou-zm6 0 662 fifiz 2016-2017 C0.µ ,1N\\SL�U0.5t Modi11 d Allem IvePL� NCPC PCS PHOSPHATE MINE CONTINUATION 0 1600 3200 Seale: Aa shown Drawn b : BFG TLJ Date: 11 20 09 r........i A roved 0 0 0 TOTAL Li. 0 3981 3881 INlEN41LRN1 - 126 L r X F1010 18 - 101TL Lr 1.. - vwa rom LF 163 L r un Lr. 822 Lr 15B Lr 123 LF 2020-2021 61 Lr 1056 LI "all B2 LF 128 L r mm PRpIG M � YNY 2016-207 10 - 11,. Ornl TOTAL a 2016-207 033-3033 0 1.600 1,200 ]66 L F 296 L F 13 LF 161 L F 2R4 -M23 PERENNM(1B) LF. TOTAL L.F. 206 IOr.LL L F PORTER CREEK 2.533 TOTAL L.F. INIERMMEW(1C) L.F. 4,786 PORTER CREEK (2.356) DURt1AM CREEK (2,430) St.. Impact LF Modlfled Alt6rnativa L — Benn.d6n PCS PHOSPHATE MINE CONTINUATION SaDate: 11/20/09 Approved by: As Shown Drawn by: BFG TLJ 2 YEAR IMPACT PERENNNL IMERMOTENi BLOCKS (18) (1C) TOTAL L.F. 2016-201] 1]65 1]8 1913 2018-2019 788 2304 30]2 202D-2021 0 0 0 2022-2023 0 2100 2100 zoza—zOzs a zoa zoo TOTAL LF. 2533 47Bfi ]319