HomeMy WebLinkAboutNCG550430_Compliance Evaluation Inspection_20181008 'c¢ 411 ,
ROY COOPER NORTH CAROLINA
Governor Environmental Quality
MICHAEL S.REGAN
Secretary
LINDA CULPEPPER
Interim Director
October 8, 2018
Mr Jeff Thompson �jDV'IR
Jeff Thompson Construction Company RE
CE0�E®j®EN
1942 Hamilton St NAB
Jacksonville, FL 32210 QC1 1
SUBJECT: Compliance Evaluation Inspection Water es
�esSection
Certificate of Coverage: NCG550430 permitting
South Riverside Dr, Loft 66
Ashe County
Dear Mr. Thompson,
On October 3, 2018 Kelli Park, of this office, conducted a compliance evaluation inspection on the
wastewater treatment system located at the above address. The State requires the Division of Water
Resources to inspect these types of systems every five years.
The inspection revealed that no wastewater facility was constructed. Please remember that before you
install a wastewater system you must receive an Authorization to Construct from the Division, which
includes submittal of plans for the system.
Please contact Miss Park at(336)-776-9689 or kelli park@ncdenr.gov with any questions.
Sincerely, ,
F/ a
Sherri V. Knight, P.E.
Regional Supervisor
Water Quality Regional Operations
Division of Water Resources
Attachments: EPA Water Compliance Inspection Report
Technical Bulletin
Effluent Limitation Compliance Checklist
cc: Central Files
WSJ--R—�
NPDES Unit
D
_E Q AO)
NORM NORCAROLINA
Oamaronrnt at enirommnncl Am Rry
North Carolina Department of Environmental Quality I Division of Water Resources
Winston-Salem Regional Office 1450 Hanes Mill Road,Suite 300 I Winston-Salem,North Carolina 27103
336.776.9800
United States Environmental Protection Agency Form Approved
E PA Washington,D C 20460 OMB No 2040-0057
Water Compliance Inspection Report Approval expires 8-31-98
Section A National Data System Coding(i.e.,PCS)
Transaction Code NPDES yr/mo/day Inspection Type Inspector Fac Type
1 1—�N l 2 L 3 I NCG550430 111 12 1 18/10/03 117 18 LI, 19 S 2011
211111 1 1 1 1 1 111 1 1 1 1 1 1 1. 1 I I I I I 1 1 1 I I I I I I I11 I I I I 1 r6
Inspection Work Days Facility Self-Monitoring Evaluation Rating B1 QA -Reserved —
671 1 701 I 71I I 72 Ni 731 I I' 751 1 1 1 1 1 1 180
Section B Facility Data L
Name and Location of Facility Inspected(For Industrial Users discharging to POTW,also include Entry Time/Date Permit Effective Date
POTW name and NPDES permit Number) 01 45PM 18/10/03 13/08/01
Riverside Drive/Lot 667
Riverside Dr Lot 667 Exit Time/Date Permit Expiration Date
02 OOPM 18/10/03 18/07/31
Glendale Spnngs NC 28629
Name(s)of Onsite Representative(s)/Titles(s)/Phone and Fax Number(s) Other Facility Data
///
Name,Address of Responsible OfficialTitle/Phone and Fax Number
Contacted
Jeff Thompson,1942 Hamilton St Jacksonville FL 322101/904-389-4334/9043894336
No
Section C Areas Evaluated During Inspection(Check only those areas evaluated)
Permit I Facility Site Review II Effluent/Receiving Waters
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
(See attachment summary)
Name(s)and Signature(s)of Inspector(s) Agency/Office/Phone and Fax Numbers Date
Kellii A Park'/�=w WSRO WQ//336-776-9689/ -
0/S//7
�
KJ/S// (!/g
Signature of Management Q A Reviewer Agency/Office/Phone and Fax Numbers Date
Av
EPA Form 3560-3(Rev 9-94)Previous editions are obsolete
Page# 1
NPDES yr/mo/day Inspection Type 1
31 NCG550430 j11 12J 18/10/03 117 18 I„
Section D Summary of Finding/Comments(Attach additional sheets of narrative and checklists as necessary)
Page# 2
Permit: NCG550430 Owner-Facility: Riverside Dnve/Lot 667
Inspection Date: 10/03/2018 Inspection Type: Compliance Evaluation
Permit Yes No NA NE
(If the present permit expires in 6 months or less). Has the permittee submitted a new 0 0 IN El
application?
Is the facility as described in the permit'? 0 0 • 0
#Are there any special conditions for the permit'? 0 I 0 0
Is access to the plant site restricted to the general public'? 0 0 II 0
Is the inspector granted access to all areas for inspection'? • ❑ 0 0
Comment: Plant has not been built yet
Effluent Pipe Yes No NA NE
Is right of way to the outfall properly maintained'? 0 ❑ • 0
Are the receiving water free of foam other than trace amounts and other debris'? ❑ 0 IN 0
If effluent (diffuser pipes are required) are they operating properly'? 0 0 • El
Comment No effluent as the plant has not been built yet.
Page# 3