Loading...
HomeMy WebLinkAbout20170730 Ver 2_C203979(U-2579C) silt loss on project_20181016Wanucha, Dave From: Euliss, Amy Sent: Tuesday, October 16, 2018 10:55 AM To: Wanucha, Dave Cc: Suggs, Phillip H; Panek, Lindsey F; Kiser, Marcus K Subject: Fwd: C203979(U-2579C) silt loss on project We had sediment losses on U-2579C as part of hurricane Michael at permit sites 9 and 14. We will remove it from the streams and make any necessary repairs. Let me know if you have questions. I� Get �7uticrcrk fcrr i�7S ....................................................................... From: Panek, Lindsey F <Ifpanek@ncdot.gov> Sent: Tuesday, October 16, 2018 8:02 AM Subject: FW: C203979(U-2579C) silt loss on project To: Euliss, Amy <aeuliss@ncdot.gov>, Suggs, Phillip H<psuggs@ncdot.gov> FYI From: Panek, Lindsey F Sent: Monday, October 15, 2018 2:38 PM To: Marcus K Kiser (mkkiser@ncdot.gov) <mkkiser@ncdot.gov> Subject: C203979(U-2579C) silt loss on project Marcus, The following are the areas and amounts of off-site silt loss in both the permitted and non-permitted areas: Permitted Sites Site 9 Ramp D-We lost 15 five gallon buckets on the inlet end and 120 buckets on the outlet end of the 78" CMP. Between site 6& 7 in the JS-We lost 100 buckets Site 14 -Y1- Rt.-We lost 18 buckets of silt and 57 stone at the outlet of the existing pipe that was just repaired Non-Permitted Sites -Y1- Rt.-station 18+50, 15 five gallon buckets, 20+30, 5 buckets and 21+00, 35 buckets -Y1RPC-Between basin 6.8 and 6.9 we lost 20 buckets Let me know when you contact Amy and Phil so we can begin removing the offsite silt. Thanks, Lindsey Panek Transportation Technician VI Summit Design and Engineering Services Office: 336-747-7958 Mobi le: 336-816-3150 I!Irr�7ail �;urre,�l�ui�dc,i��:e, C�u ai�d ��ruir7 U•ii� �ci�dcr i� �ul����;�E� �C�u U•ic, I"J,�, I ul�li�; I'�Ee,�;ur;� I...aw ai�d rr�7ay I�c rll��:lu�crl �C�u �C�h•ih�rl I�artle,�,