Loading...
HomeMy WebLinkAbout20060252 Ver 1_COMPLETE FILE_20060215THE WOOTEN COMPANY ENGINEERING PLANNINGi ARCHITECTURE 120 North Boylan Avenue Raleigh NC 27503-1423 919.828.0531 fax 919.834.3589 TO: Division of Water Quality 401/Wetlands Unit 2321 Crabtree Blvd. Raleigh, NC 27604 WE ARE SENDING: ® Attached ? Shop Drawings ? Prints ? Copy of Letter ? Change Order F D EB Y 5 2006 TRANSN I*U' r lALI Transmittal Sent Via: UVCF( ? Regular Mail ? FedEx ® UPS ? Certified Mail ? Courier ? Pick-up DATE: 2-14-2006 TWC No.: 2801-D RE: Cape Fear Sanitary Sewer System Phase 1 b - Gravity Sewer to Relieve Breckenridge Pump Station and Service RTP Sites 23, 24, 26, & 27 ? Under separate cover via _ ? Plans ? Samples ? Other COPIES I DATE I NO. I DESCRIPTION 1 7 1 1 1 USACE Permit Material for Nationwide 12 1 THESE ARE TRANSMITTED as checked below: ? For Approval ? Reviewed ? Revise and Resubmit ® For Your Use ? Rejected ? Submit Copies for Distribution ? As Requested ? Corrected ? Return Corrected Print ? For Review and Comment ? Other: ? For Bids Due [ j ? Prints Returned after Loan to Us REMARKS: The sewer crossing across the blue line stream Kit Creek requires a Nationwide permit. It our understanding that this permit is covered under a general permit and no written concurrence from DWQ is required. Therefore, this submittal is simply a courtesy copy for your records. I trust the above information is sufficient; however, if you should any questions or require information, please do not hesitate to contact us. COPY TO: TWC file the following items: ? Specifications SIGNED: D. Lee Campbell, E.I. If enclosures are not as noted, kindly notify us at once. Office Use Only: USACE Action ID No. (If any particu 1. Processing !U FEB 15 boll DENR -WATER QW- Form Version May 2002 DWQ No 20060252 No. item is not applicable to this project, please enter "Not Applicable" or "N/A".) 1. Check all of the approval(s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification II. 2. Nationwide, Regional or General Permit Number(s) Requested: 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? Applicant Information 1. Owner/Applicant Information Name: Philli D. Stout - Director Facilities Desi n and Construction Mailing Address: County of Wake P O Box 550 Raley h NC 27602 Telephone Number: 919-856-6365 Fax Number: 919-856-6355 E-mail Address: pstoutaa,co.wake nc us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: W. Brian Johnson P.E. Company Affiliation: The Wooten Company Mailing Address: 120A Boylan Ave. Raley h NC 27603 Telephone Number: 919-828-0531 Fax Number: 919-834-3589 E-mail Address: bjohnson(a?thewootencompany com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project:_ Cape Fear Sanitary Sewer System - Phase 1B (Gravity Sewer to Relieve Breckenridge Pump Station) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Wake Nearest Town: Morrisville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From 1-40 West: Take Hi hg?waY 55 South exit. Turn ri ht onto Highway SS and follow throu h Morrisville ast Tw Alexander Drive) to Kit Creek Road Turn Left onto Kit Creek Road then right on Louis Stephens Drive and follow to the project site 5. Site coordinates, if available (UTM or Lat/Long): See Attached (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 13.5 acres total disturbed area or sewer installation 7. Nearest body of water (stream/river/sound/ocean/lake): Kit Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state.ne.us/admin/maps/.) Page 6 of 12 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Louis Stephens Drive right of way and wooded area ollowinz along creek to Breckenridge Pump Station 10. Describe the overall project in detail, including the type of equipment to be used:__ Project consists o approximately 5.450 LF of 30" 2,550 LF of 24" 620 LF of 18" 160 LE of 1 S" 1.150 LF of 14" and 1,679 LF o 10" sewer lines Equipment includes trackhoe and rubber tire backhoe. 11. Explain the purpose of the proposed work: To remove the existing Breckenridge Pump station from service to provide sewer service to a new subdivision and to serve Sites 23, 24, 25, 26, and 27 of the Research Triangle Park IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Communications via email with Todd Tu ell on Februa 28 2005 re ardin crossfn o Kit Creek where sewer is above stream bed. Email stated that Nationwide 12 could be utilized i natural stream. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 7 of 12 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1. Provide a written description of the proposed impacts: Wetlands and creeks will be impacted with the construction of the proposed gravity sewer as described below. 2. Individually list wetland impacts below: Wetland Impact Site Number (indicate on ma) Type of Impact* Mechaniz d Area of Impact (acres Located within 100-year Floodplain** (es/no Distance to Nearest Stream (linear feet) Type of Wetland*** yy1 e clearing Mechanized 0.18 Yes 325 Forested wetland yy2 clearing 0.001 Yes 55 Forested wetland * List each impact se parately and identify te mporary im pacts Im acts incl d b are not I chanized e xcavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding clearing, grading, fill, ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at htto://www.fema og_v. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 0.181 3. Individually list all intermittent and perennial stream impacts below: Stream Impact Length of Site Number (indicate on ma Type of Impact* Impact Stream Name** linear feet) S1 Utility crossing 40 Kit Creek S2 Utility crossing 40 UT to Kit Creek S3 Utility crossing 40 UT to Kit Creek S4 Utility crossing 40 UT to Kit Creek S5 Utility crossing 40 UT to Kit Creek * List enrh i-,t c ...gel.. ,._a v__.•r Average Width of Stream Before Impact Perennial or Intermittent? _(please s eci 12 Perennial 15 Perennial 15 Perennial 15 Perennial 15 Perennial - r°-• r ?..+r -U WCUILIly Lemporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 8 of 12 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.ustzs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.tor)ozone.com, www.mgquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 200 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma Type of Impact* Area of Impact acres Name of Waterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A 'k List each impart c f-t.. -A -.4- :a. . --- -- Y»-• ?Y». ••• •? ?••?•, .,,,,,IL,Ly Lcmiputary Impacts. impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): n/a rroposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Crossings have maintained an angle as near perpendicular as possible to minimize ipm a ct In addition, construction corridor across wetlands and streams have been reduced to 40 feet maximum. VIII. Mitigation Page 9 of 12 DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/ncwetlands/stnngide.html. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.nc-us4wrp/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 213 .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 2B .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify ?? Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact s uare feet Multiplier Required Mitigation 1 3 2 1.5 Total cone i extends out su teet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 1 I of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A ? W 44 Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) Page 12 of 12 Site coordinates S I - 35°51 '14 " N, 78 05325 " W S 2 - 35°50'46" N, 78 °52'50" W S 3 - 35°50'46" N, 78°5238" W S 4 - 35°50'47" N, 78 °5236" W S 5 - 35°50'49 " N, 78 °5226" W W 1 - 35°51 '11 " N, 78 05331 " W W 2 - 35°50'46" N, 78 °52'30" W ? j 2606 [-7 7 • ' J ? ? >, ? ? ? ' ,? ° ?? - C,l- ? ;';? ? ?? I? ) i f 11( ? ?'? .;mot ??'? ?,? r" ?',,(, ? i _ V F- Jl 3639 o J I " `? _ i ?\? ?J VACS ? ? !r. r ,A ??.? _l ? ?J ? i ?? ? \o?.. ? r`?i ? • tt'?`' f c% ) 1 1 ?` • .J 5?7 C ? era 4` h V ??r ?~ ?^ J i` <^ 1 1 r \ • - 11 1/ { ?\\, y c?-• ?`' ? ? `-'? --- -?1?'`' ; arc `' ?? ? _? -? ?? ? .?- ' / ? 1 /?1 ,/? J ? " ? ? 1 ? 'l `? <- '? ( r - • ' 1 . / , i ?? ? , 1 ? ? ?\% jl ? as? /y4 p ? , / ? ? \ •' ,, 1o ? l , 3-DTppOO uadSCOpvriehtCjc1999De1.nr mrVarmnnthn•1Gnnno4 c,......en......rrcn o -• { --]»v it ACJIC: 1 -- L4ruuu VC121C 14-U UatUm: NAD27 Conservation Easement Impact Impact to Conservation Easement (shown as "C 1" on sheet 3) will be total area of 261 square feet (.006 acres). We do not see a practical alternative to this design due to its proximity of the railroad, existing gas line and easement, and the existing sewer lines that the new line will connect to. Note that impacts to the conservation easement will include necessary clearing for construction and regular maintenance. The actual sewer line will not be in the conservation easement, which will help minimize the impact. This impact is approximately shown on the recorded conservation easement map (attached) by Chas H. Sells. I (rage i or l ) CURVE LENGTH RADIUS DELTA CHORD WEARING CI 253.91 1807.73 283.8) C2 13E0+ 2100.00 IM01 C3 tt.22 2300.60 14.22 • • C4 10.58 1007.73 80.50 4 CS 10080 1937.73 : t00f/ Ca 1031W 1937.73 . DO '0.. its \ \ ? C127 / j r ? ?, ? Ltl L11 IIX \ \ \\ ILO //? S // j (Je \ \ ? ` (III /?/ ?' // 0 ' \ qy94, CONSERVATION EASEMENT \ A^riL°(?j3• WETLANDS APPROVED BPY USW ARMY CORPS OF ENGINEERS \ ?J9.4< \ \ \?? 6/28/99) ?Q \ \ \ MAKE county. nc its \ \ LRUR9 N R10DICK 0Q \ REQiSTED OF DEEDS 4pY \ \ \ I.. TED D RECORDED On 02,28/ 20TH Dt 09 LSSISt \ sooKlen2884 PRBEIODLE GRAPHIC SCALE \ Ne .oo \ IN TEST ) I ImE - 100 K 1 g \ \ 0. N 4 U ? O$ 7\ CONSERVATION EASEMENTS CEDAR FORK TWS'P.. WAKE COUNTY, N.C. CURRENT OWNER: AS SHOWN PREPARED FOR RESEARCH TRIANGLE FOUNDATION OF NORTH CAROLINA, INC. CHAS. H. SELLS, INC. a.uen. ¦?. onle.a w eaewenl..r•.1. eee7w? .e?R. 39 ?? n1 IIC .1.1. »-I.e e7 Ten / 67 ¦.RDI zt. Lam m-73e -aw 67 01® t 1* 02 0 i. N... wlwexrzwc Iov ? 2 w s 40 Office Use Only: USACE Action ID No. (If any particular item is not 1. Processing @P=0WR b FEB 1 5 2006 DtNK - `NA WETLANDS AND STORMWATER BRANCH _--DWQ No. ale to this project, please enter "Not 2 Form Version May 2002 000-0252 or "N/A".) 1. Check all of the approval (s) requested for this project: ® Section 404 Permit ? Riparian or Watershed Buffer Rules ? Section 10 Permit ? Isolated Wetland Permit from DWQ ? 401 Water Quality Certification 2. Nationwide, Regional or General Permit Number(s) Requested: 12 3. If this notification is solely a courtesy copy because written approval for the 401 Certification is not required, check here: 4. If payment into the North Carolina Wetlands Restoration Program (NCWRP) is proposed for mitigation of impacts (verify availability with NCWRP prior to submittal of PCN), complete section VIII and check here: ? 5. If your project is located in any of North Carolina's twenty coastal counties (listed on page 4), and the project is within a North Carolina Division of Coastal Management Area of Environmental Concern (see the top of page 2 for further details), check here: ? II. Applicant Information 1. Owner/Applicant Information Name: Philli D. Stout -Director Facilities Desi n and Construction Mailing Address: County of Wake P O Box 550 D_1__h NC 27602 Telephone Number: 919-856-6365 Fax Number: 919-856-6355 E-mail Address: pstout@co.wake. nc us 2. Agent/Consultant Information (A signed and dated copy of the Agent Authorization letter must be attached if the Agent has signatory authority for the owner/applicant.) Name: W. Brian Johnson P.E. Company Affiliation: The Wooten Company Mailing Address: 120 N. Bo lan Ave. D-7-;-7- , NC 27603 Telephone Number: 919-828-0531 Fax Number: 919-834-3589 E-mail Address: biohnson(a thewootencompany com Page 5 of 12 III. Project Information Attach a vicinity map clearly showing the location of the property with respect to local landmarks such as towns, rivers, and roads. Also provide a detailed site plan showing property boundaries and development plans in relation to surrounding properties. Both the vicinity map and site plan must include a scale and north arrow. The specific footprints of all buildings, impervious surfaces, or other facilities must be included. If possible, the maps and plans should include the appropriate USGS Topographic Quad Map and NRCS Soil Survey with the property boundaries outlined. Plan drawings, or other maps may be included at the applicant's discretion, so long as the property is clearly defined. For administrative and distribution purposes, the USACE requires information to be submitted on sheets no larger than 11 by 17-inch format; however, DWQ may accept paperwork of any size. DWQ prefers full-size construction drawings rather than a sequential sheet version of the full-size plans. If full-size plans are reduced to a small scale such that the final version is illegible, the applicant will be informed that the project has been placed on hold until decipherable maps are provided. 1. Name of project: Cape Fear Sanitary Sewer System - Phase IB (Gravity Sewer to Relieve Breckenridge Pump Station) 2. T.I.P. Project Number or State Project Number (NCDOT Only): N/A 3. Property Identification Number (Tax PIN): N/A 4. Location County: Wake Nearest Town: Morrisville Subdivision name (include phase/lot number): N/A Directions to site (include road numbers, landmarks, etc.): From I-40 West. Take Hi,?hway SS South exit. Turn ri ht onto Hi hw SS and follow through Morrisville (past Tw Alexander Drive) to Kit Creek Road Turn Left onto Kit Creek Road then right on Lours Stephens Drive and follow to the protect site 5. Site coordinates, if available (UTM or Lat/Long): See Attached (Note - If project is linear, such as a road or utility line, attach a sheet that separately lists the coordinates for each crossing of a distinct waterbody.) 6. Property size (acres): 13.5 acres (total disturbed area for sewer installation 7. Nearest body of water (stream/river/sound/ocean/lake): Kit Creek 8. River Basin: Cape Fear (Note - this must be one of North Carolina's seventeen designated major river basins. The River Basin map is available at http://h2o.enr.state nc us/admin/maps/.) Page 6of12 9. Describe the existing conditions on the site and general land use in the vicinity of the project at the time of this application: Louis Stephens Drive right of wav and wooded area ollowinz along creek to Breckenridge Pump Station 10. Describe the overall project in detail, including the type of equipment to be used: Project consists o approximately 5,450 LF of 30" 2 550 LF of 24" 620 LF of I8" 160 LF o 15 1,150 LF of 14 ". and 1 679 LF of 10" sewer lines Equipment includes trackhoe and rubber tyre backhoe. 11. Explain the purpose of the proposed work: To remove the existing Breckenridge Pump station from service to provide sewer service to a new subdivision and to serve Sites 23 24 25. 26, and 27 of the Research Triangle Park IV. Prior Project History If jurisdictional determinations and/or permits have been requested and/or obtained for this project (including all prior phases of the same subdivision) in the past, please explain. Include the USACE Action ID Number, DWQ Project Number, application date, and date permits and certifications were issued or withdrawn. Provide photocopies of previously issued permits, certifications or other useful information. Describe previously approved wetland, stream and buffer impacts, along with associated mitigation (where applicable). If this is a NCDOT project, list and describe permits issued for prior segments of the same T.I.P. project, along with construction schedules. Communications via email with Todd Tu ell on Februa 28 2005 re ardin cross in o Kit Creek where sewer is above stream bed. Email stated that Nationwide 12 could be utilized j natural stream. V. Future Project Plans Are any future permit requests anticipated for this project? If so, describe the anticipated work, and provide justification for the exclusion of this work from the current application. None VI. Proposed Impacts to Waters of the United States/Waters of the State It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to wetlands, open water, and stream channels associated with the project. The applicant must also provide justification for these impacts in Section VII below. All proposed impacts, permanent and temporary, must be listed herein, and must be clearly identifiable on an accompanying site plan. All wetlands and waters, and all streams (intermittent and perennial) must be shown on a Page 7 of 12 delineation map, whether or not impacts are proposed to these systems. Wetland and stream evaluation and delineation forms should be included as appropriate. Photographs may be included at the applicant's discretion. If this proposed impact is strictly for wetland or stream mitigation, list and describe the impact in Section VIII below. If additional space is needed for listing or description, please attach a separate sheet. 1- Provide a written description of the proposed impacts: Wetlands and creeks will he impacted with the construction o the ro osed ravi sewer as descrihed below. 2. Individually list wetland impacts below: Wetland Impact Site Number indicate on ma) Type of Impact* Me h i d =Of Impact acres Located within 100-year Floodplain** (es/no Distance to Nearest Stream (linear feet) Type of Wetland*** W1 c an ze clearing 0.18 Yes 325 Forested wetland Mechani d W2 ze clearing 0.001 Yes 55 Forested wetland * List each impact se parately and identify t emporary im pacts Im acts i I d b p nc u e, Mare not limited to: mechanized clearing, grading, fill, excavation, flooding, ditching/drainage, etc. For dams, separately list impacts due to both structure and flooding. ** 100-Year floodplains are identified through the Federal Emergency Management Agency's (FEMA) Flood Insurance Rate Maps (FIRM), or FEMA-approved local floodplain maps. Maps are available through the FEMA Map Service Center at 1-800-358-9616, or online at http://Nvww.fema Gov. *** List a wetland type that best describes wetland to be impacted (e.g., freshwater/saltwater marsh, forested wetland, beaver pond, Carolina Bay, bog, etc.) Indicate if wetland is isolated (determination of isolation to be made by USACE only). List the total acreage (estimated) of all existing wetlands on the property: Total area of wetland impact proposed: 0.181 3. Individually list all intermittent and perennial stream impacts below: Stream Impact L Site Number ndicate on ma) SI Type of Impact* ength of Impact (linear feet Stream Name** Average Width of Stream Before Impact Perennial or Intermittent? (please seci Utility crossing 40 Kit Creek 12 Perennial S2 Utility crossing 40 UT to Kit Creek 15 Perennial S3 Utility crossing 40 UT to Kit Creek 15 Perennial S4 Utility crossing 40 UT to Kit Creek 15 Perennial SS Utility crossing 40 UT to Kit Creek 15 Perennial * List each impact separately and identify temporary impacts. Impacts include, but are not limited to: culverts and associated rip-rap, dams (separately list impacts due to both structure and flooding), relocation (include linear feet before and after, and net loss/gain), stabilization activities (cement wall, rip-rap, crib wall, gabions, etc.), excavation, ditching/straightening, etc. If stream relocation is proposed, plans and profiles showing the linear footprint for both the original and relocated streams must be included. Page 8 of 12 ** Stream names can be found on USGS topographic maps. If a stream has no name, list as UT (unnamed tributary) to the nearest downstream named stream into which it flows. USGS maps are available through the USGS at 1-800-358-9616, or online at www.usgs.gov. Several internet sites also allow direct download and printing of USGS maps (e.g., www.topozone.com, www.manquest.com, etc.). Cumulative impacts (linear distance in feet) to all streams on site: 200 4. Individually list all open water impacts (including lakes, ponds, estuaries, sounds, Atlantic Ocean and any other water of the U.S.) below: Open Water Impact Site Number (indicate on ma) Type of Impact* Area of Impact (acres) Name ofWaterbody (if applicable) Type of Waterbody (lake, pond, estuary, sound, bay, ocean, etc. N/A + T icr ?h ..r e?. ..a a_ .. c. • r ?• o..ru•au.y w G 1-1-ty rcuipurary impacts. impacts include, but are not limited to: fill, excavation, dredging, flooding, drainage, bulkheads, etc. 5. Pond Creation If construction of a pond is proposed, associated wetland and stream impacts should be included above in the wetland and stream impact sections. Also, the proposed pond should be described here and illustrated on any maps included with this application. Pond to be created in (check all that apply): ? uplands ? stream ? wetlands Describe the method of construction (e.g., dam/embankment, excavation, installation of draw-down valve or spillway, etc.): n/a Proposed use or purpose of pond (e.g., livestock watering, irrigation, aesthetic, trout pond, local stormwater requirement, etc.): Size of watershed draining to pond: Expected pond surface area: VII. Impact Justification (Avoidance and Minimization) Specifically describe measures taken to avoid the proposed impacts. It may be useful to provide information related to site constraints such as topography, building ordinances, accessibility, and financial viability of the project. The applicant may attach drawings of alternative, lower-impact site layouts, and explain why these design options were not feasible. Also discuss how impacts were minimized once the desired site plan was developed. If applicable, discuss construction techniques to be followed during construction to reduce impacts. Crossinu have maintained an an-le as near perpendicular as possible to minimize impact In addition, construction corridor across wetlands and streams have been reduced to 40 feet maximum. VIII. Mitigation Page 9 of 12 DWQ - In accordance with 15A NCAC 2H .0500, mitigation may be required by the NC Division of Water Quality for projects involving greater than or equal to one acre of impacts to freshwater wetlands or greater than or equal to 150 linear feet of total impacts to perennial streams. USACE - In accordance with the Final Notice of Issuance and Modification of Nationwide Permits, published in the Federal Register on March 9, 2000, mitigation will be required when necessary to ensure that adverse effects to the aquatic environment are minimal. Factors including size and type of proposed impact and function and relative value of the impacted aquatic resource will be considered in determining acceptability of appropriate and practicable mitigation as proposed. Examples of mitigation that may be appropriate and practicable include, but are not limited to: reducing the size of the project; establishing and maintaining wetland and/or upland vegetated buffers to protect open waters such as streams; and replacing losses of aquatic resource functions and values by creating, restoring, enhancing, or preserving similar functions and values, preferable in the same watershed. If mitigation is required for this project, a copy of the mitigation plan must be attached in order for USACE or DWQ to consider the application complete for processing. Any application lacking a required mitigation plan or NCWRP concurrence shall be placed on hold as incomplete. An applicant may also choose to review the current guidelines for stream restoration in DWQ's Draft Technical Guide for Stream Work in North Carolina, available at http://h2o.enr.state.nc.us/newetlands/stnnizide.html. 1. Provide a brief description of the proposed mitigation plan. The description should provide as much information as possible, including, but not limited to: site location (attach directions and/or map, if offsite), affected stream and river basin, type and amount (acreage/linear feet) of mitigation proposed (restoration, enhancement, creation, or preservation), a plan view, preservation mechanism (e.g., deed restrictions, conservation easement, etc.), and a description of the current site conditions and proposed method of construction. Please attach a separate sheet if more space is needed. N/A 2. Mitigation may also be made by payment into the North Carolina Wetlands Restoration Program (NCWRP). Please note it is the applicant's responsibility to contact the NCWRP at (919) 733-5208 to determine availability and to request written approval of mitigation prior to submittal of a PCN. For additional information regarding the application process for the NCWRP, check the NCWRP website at http://h2o.enr.state.ne.uslwm/index.htm. If use of the NCWRP is proposed, please check the appropriate box on page three and provide the following information: Amount of stream mitigation requested (linear feet): N/A Amount of buffer mitigation requested (square feet): N/A Amount of Riparian wetland mitigation requested (acres): N/A Amount of Non-riparian wetland mitigation requested (acres): N/A Amount of Coastal wetland mitigation requested (acres): N/A Page 10 of 12 IX. Environmental Documentation (required by DWQ) Does the project involve an expenditure of public (federal/state) funds or the use of public (federal/state) land? Yes ? No If yes, does the project require preparation of an environmental document pursuant to the requirements of the National or North Carolina Environmental Policy Act (NEPA/SEPA)? Note: If you are not sure whether a NEPA/SEPA document is required, call the SEPA coordinator at (919) 733-5083 to review current thresholds for environmental documentation. Yes ? No ? If yes, has the document review been finalized by the State Clearinghouse? If so, please attach a copy of the NEPA or SEPA final approval letter. Yes ? No ? X. Proposed Impacts on Riparian and Watershed Buffers (required by DWQ) It is the applicant's (or agent's) responsibility to determine, delineate and map all impacts to required state and local buffers associated with the project. The applicant must also provide justification for these impacts in Section VII above. All proposed impacts must be listed herein, and must be clearly identifiable on the accompanying site plan. All buffers must be shown on a map, whether or not impacts are proposed to the buffers. Correspondence from the DWQ Regional Office may be included as appropriate. Photographs may also be included at the applicant's discretion. Will the project impact protected riparian buffers identified within 15A NCAC 2B .0233 (Meuse), 15A NCAC 213 .0259 (Tar-Pamlico), 15A NCAC 213 .0250 (Randleman Rules and Water Supply Buffer Requirements), or other (please identify V Yes ? No ® If you answered "yes", provide the following information: Identify the square feet and acreage of impact to each zone of the riparian buffers. If buffer mitigation is required calculate the required amount of mitigation by applying the buffer multipliers. Zone* Impact s ware feet Multiplier Required Mitigation 1 3 2 1.5 Total Zone 1 extends out 30 feet perpendicular from near bank of channel; Zone 2 extends an additional 20 feet from the edge of Zone 1. Page 11 of 12 If buffer mitigation is required, please discuss what type of mitigation is proposed (i.e., Donation of Property, Conservation Easement, Riparian Buffer Restoration / Enhancement, Preservation or Payment into the Riparian Buffer Restoration Fund). Please attach all appropriate information as identified within 15A NCAC 2B .0242 or.0260. N/A XI. Stormwater (required by DWQ) Describe impervious acreage (both existing and proposed) versus total acreage on the site. Discuss stormwater controls proposed in order to protect surface waters and wetlands downstream from the property. N/A XII. Sewage Disposal (required by DWQ) Clearly detail the ultimate treatment methods and disposition (non-discharge or discharge) of wastewater generated from the proposed project, or available capacity of the subject facility. N/A XIII. Violations (required by DWQ) Is this site in violation of DWQ Wetland Rules (15A NCAC 2H .0500) or any Buffer Rules? Yes ? No Is this an after-the-fact permit application? Yes ? No XIV. Other Circumstances (Optional): It is the applicant's responsibility to submit the application sufficiently in advance of desired construction dates to allow processing time for these permits. However, an applicant may choose to list constraints associated with construction or sequencing that may impose limits on work schedules (e.g., draw-down schedules for lakes, dates associated with Endangered and Threatened Species, accessibility problems, or other issues outside of the applicant's control). N/A 'Of /Z Applicant/Agent's Signature Date (Agent's signature is valid only if an authorization letter from the applicant is provided.) W o4 Page 12 of 12 Site coordinates S 1 - 35°51 '14 " N, 78 05325 " W S 2 - 35°50'46" N, 78 °52'50" W S 3 - 35°50'46" N, 78 °5238" W S 4 - 35°50'47" N, 78 °5236" W S 5 - 35°50'49" N, 78 °5226" W W 1 - 35°51 '11" N, 78 053'31 " W W 2 - 35°50'46" N, 78 052'30" W Fc uT-Z-j D rrn t r, gnnn ' J { J ? ` _ FL-u - - ? ?? fif, X11 /n.-•,?? ?. l! ? ? 1 \\ ?'_ ? N '???` 'l ' '{?r' ? ? ? C / V ./ i ' ? ' i 'yv A k ,_ 7 S7--y I (?- 1 t 4 - Ss r T L C??i, 7 fl / ?oFFF f wpm !.? . ? --,,,•_,? / _-- ' `-?- ? 50"-, 7 ' ?? - ? l ? ? '?•'? $ ¢3 ? ?? ?? ? ?.r ? _1 ` 1, I ?y 1.? (' ? ?.; ? ?i? -' /? ? ? ? `?? ) - . ? 72 :. \ 1/. ? ? •D TOpOQ UadS CODVrizh [ 0 1999 Dei.arme Yarmnuth MF Od006 Cn... e n a? . nc ? e • ----- I 110v a ow1c: 1; c4,uu0 u¢[all: 14U VaIUM: 1VAU27 Conservation Easement Impact Impact to Conservation Easement (shown as "C 1" on sheet 3) will be total area of 261 square feet (.006 acres). We do not see a practical alternative to this design due to its proximity of the railroad, existing gas line and easement, and the existing sewer lines that the new line will connect to. Note that impacts to the conservation easement will include necessary clearing for construction and regular maintenance. The actual sewer line will not be in the conservation easement, which will help minimize the impact. This impact is approximately shown on the recorded conservation easement map (attached) by Chas H. Sells. (Nage 1 of 1) I ? I i ? A I ? ?z I rL. m? o= r N r7 1 ° i I 1= C3 Lm s >? M, a ?a 1 rsNO?i?Hnirouiwvl `1 \ 1?L \ ,1 6N6rAN rYTa: um1? \ \ \ us4 \ ? `? s CUR IE TABLE K RADIUS DELTA CHORD BEARMO C1 5 1007.73 265.07 C2 2300.00 L 03W'201 130.02 C3 1{. 2300.00 1{.22 • Ca a0. 1001.73 00.00 a CS 100. 1537.75 100.6{ CB 10].60 1557.73 103.6] 147 L146 14E ?Z =--:r 1?d1 1 ............ . . . . . . . . . . . . ......... ?.p Ly ??/ alb L147 \ ? / ,' ' Y' / / p / 1106 A Ig6OlT L11 tie ? f J IV- 4 00. 0 CONSERVATION EASEMENT WETLANDS (PREVIOUSLY DEL1NrM.AND APPROVED 6/28/99) U.S. ARMY CORPS OF ENGINEERS \R IJ R/(?q\ \ \ ?\ \ Y \ \\ 0 MAKE COUNTY. NC Its \ \ LAIAM N R10DICK ag \ \ mats". Of DEEDS O \ \ PRESENTED D RECORDES ON Y - 02""2004 AT 01:55:51 \ DDOK:Dn2e04 PADE:e9311 GRAPHIC SCALE \ r \ (in PEST) 1 1-b - 100 h I I I ' ff f IN ?d 1 g 1 \ O U1 \ 26, \ 1\ _i ?P'CN CA?'`?_an .` . ypr c ?/4 '?.ninrklm iF rW.UT' ' EASEMENT DEDICATION CONSERVATION EASEMENTS CEDAR FORK TWS-P., WAKE COUNTY, N.C. CURRENT OWNER: AS SHOWN PREPARED FOR RESEARCH TRIANGLE FOUNDATION /?R?(( CHAS. H. SELLS. INC. {p}5 6alrm.r rIm®a .6.16rr w wnemr.sr ?C?i?/ MM 6Mr1 I6i11,:N1O 1M TYf.?6R16 1 !u.?.re e. -/- I -.- I 02-730 1 . 'w I S. IS*-" 41111, COUNTY OF WAKE NORTH CAROLINA CAPE FEAR SANITARY SEWER SYSTEM RMOFCA" "WM4 uw ftff" Ode g, ro wr g?:; DENN Slog - PHASE 1 B (GRAVITY SEWER TO RELIEVE BRECKENRIDGE PUMP STATION AND SERVICE RTP SITES 23,24,26,& 27) MARCH 2005 A PROJECT OF THE WAKE COUNTY BOARD OF COMMISSIONERS 4 THE WOOTEN COMPANY ENGINEERING I PLANNING ARCHITECTURE 120 North Boylan knue Raleigh NC 27603.1423 919.828.0531 fax 919.8343589 CARY PROJECT NUMBER: 05-SP-048 SITE DATA 10" RECLAIMED WATER MAIN - 715 LF NR RELEASE MANHOLE - 1 UNIT 30" GRAVITY SEWER LINE - 5,450 LF 24" GRAVITY SEWER LINE - 2,550 LF 18" GRAVITY SEWER LINE - 1,595 LF 15" GRAVITY SEWER LINE - 160 LF 14" GRAVITY SEWER LINE - 1,150 10" GRAVITY SEWER LINE - 1,795 LF W DIA. MANHOLES - 8 UNITS 5' DIA. MANHOLES - 36 UNITS 4' DIA. MAHNOLES - 10 UNITS SHMT NO.,OF 0 .., . L CONTRACTOR SHALL NOTIFY THE TOWN OF MONpVLLE PUBLIC UTLIIES DEPARTMENT.TOWN OF CARY ENGINEERING DEPARTMENT AND ENGINEER 46 HOURS PRIM TO COMMENCING CONSTRUCTION OF GRAVITY SEWER LIES L THE NEW SEWER LIES SHALL E CONSTRUCTED N ACCORDANCE WITH THE TOWN OF CARY STANDARD SPECIFICATIONS AM STALL 3. CONTRACTOR SHALL SEED, MULOL AND TACK ALL DISTURBED AREAS WITHIN FIFTEEN 115) DAYS AFtt]t BA KMLNG TIMM AL SEME1 TA71011 CONMOL MEASURES SHALL BE KEPT N OPERABLE CONDITION UNTIL. A STAG OF GRASS S ESTABLISHED AND THE AEA B CAPABLE OF IFSISTNG ERDW011 BY WIND AND RAIL 4. PROVIDE STONE OR RIP TO STABILIZE STREAM ON CREEK AT SEWER LINE CROSSING AS INDICATED. RP-RAP SHALL E PLACED FROM TOP W BANK TO TOP OF BAN( TO DEPTH OF W. 5. AT A E/IKIL THE LIMITS ARE THE WIDTH OF THE PERM004M EASEMENT, THE CONTRACTOR S LIMITED TO A MAXIM CLEA NG LIMIT EQUAL TO THE TEMPORARY EASEMENT WIDTH, UNLESS OTHERWISE INDICATED. TREES WIITN THE CLEARING LIMITS WILL LE CLEAR CUT AT GROUND LEVEL. CONTRACTOR MAY CHP'1RE>s ON SITE AND SPREAD CEPS ALONG THE OEAWR LIMITS. STOPS AND OTHER EXCAVATED MATERIAL MDT CHIPPED MUST BE DISPOSED OF OFF SIM BURY WILL MDT E PERMITTED ON SINE. L ALL EXCAVATED WOOD AND WOOLS SHALL E DISPOSED OF OFF SITE BY THE CONTRACTOR BURY WILL MDT BE MmiTTED On ME L CLEM SITE ONLY AS NECESSARY TO N JLL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWNGS.INSTALL TEMPORARY EROSION CONTROL DEVICES AS SHOWN ON PLANS L NOTFY ENGINEER AND HCDEWL. LAND QUALITY SECTION AT OLIN 571.47M FOR SITE INSPECTION. PRIOR TO COM ENCNG MAIN CONSTIRIMM OPERATIONS 1 DICE EROSION CONTROL DEVICES ARE APPROVED, EEg1 CONSTRICTION OPFNATIOM CLEAR ONLY AS NECESSARY FOR INSTALLATION OF SEWER, 4. MAINTAIN EROSION CONTROL DEVICES AS NECESSARY DURING INSTALLATION OF GRAVITY SEWER ASPECT DEVICES AFTER EVERY RAINFALL EVENT AND OEAIOIT TRAPS AND/OR CHECK DAMS WHEN HAILF FULL S AS CONSTRUCTION PROGRESSES. INSTAL ADDITIONAL EROSION CONTROL DEVICES AS INDICATED ON THE DRAWINGS. CALLED FOR IN SPECIFICATIONS, OR AS DIRECTED BY ENGINEER L STABILIZE AREAS WITHIN FIFTEEN (15) WORKING DAYS AFTER CROSSING 6 COMPLETED. STAMM WITH VEGETATION AS SFECFED. 7. CONTRACTOR SHALL TAME PAECIIIIIOIIS NTT 10 007M L7I911D 7. AFTER SITE S STAN Om REQUEST M INSPECTION BY THE ENGINEER. WON APPROVAL OF SITE STABILIZATION, REMOVE TEMPORARY EROSION CONTROL PROPERTY CORER MARKERS. ALL DISTURBED PROPERTY COMER YARIERS ARE TO E REPLACED BY A REOSTENED LAD SURVEYOR. DEVICES. DRESS OUT AREA AD SEED AND MLLOL L ALL ELEVATIONS SIMM ON THESE DRAMIGS ARE ON NCGS DATUM 9. EXISTING UTILITIES J,IRE LOCATED ON PLANS APPROXWTELY. NOTIFY UTILITY LOCATING SERVICE TO.MARK LOCATION OF DOSM UTILITIES AT LEAST 48 ®CONSTRUCTION SEQUENCE FOR TIE-IN 0 EXISTING HORS PRIOR TO' COMMENCING CONSTRUCTION ACTIVITY. CONTRACTOR REsPaIsBE FOR VERIFYING; EXACT, LOCATION OF THESE EXISTING UTIITES. PUMP STATION & EXISTING DOWNSTREAM SEWER THE COST TO REPAIR THESE FACLItEb, IF DAMAGED SHALL E 7HE RESPONSIBILITY. 0 Of I Ti[DOITRAICTON L COIF DRILL EXIST DOWNSTREAM MAWNOLE AND INSTALL NEW GRAVITY SEWER FROM EXISTING MANHOLE TO DOGHOUSE W LDO NOT OAT I-COSTRUCTON LINTS AE TO THE EDGE OF THE TEMPORARY CONRTBK IIOM EXISTING SEWER N DOGHOUSE MANHOLE AT THIS TIME. TEMPORARILY PRIG H EASEMENT. NO CONSTRICTION ACTIVITIES; SHALL OREND BIEV THESE LINTS NEW 30' SEWER AT COSTING MANHOLE IF ADDITIONAL LAG S REQUIRED FOR BORROW ON WASTE, MATERIAL LAY-00011 OR STAGING AREAS. TEEN THE EROSION CONTROL CONTRACTOR SHALL L INSTALL NEW GRAVITY SEWER FROM DOGHOUSE W B TO W 34 AND FROM E RESPONISBLE FoR SECLNN: THESE LAGS AD EROSION CONTROL PEAR. W 39 TO THE EXISTING BREC ENIIO6E PUP STATION PER PUN (EXTEND TO S' FROM EXISTING FENCE AND TEMPORARILY PURL INSTALL RECLINED WATER LINE TL CONTRACTOR SHALL NOT ENTERAL STU! EBSTIIG CONSERVATION EASEMENTS TO SAE PONT. AS SNDWN ON RAN S ' CONNECT E' TEMPORARY SEWER FROM W 42 TO PREVIOUSLY (STALLED tY IL MAXIKM CONSTRUCTION CORRIDOR WIDTH SHALL E 40 FEET AT ALL STREAM TEMPORARY SEWER AT PROPERTY LINE. AD/OR WETLAND CRURSNGS. . 1.IEW INSTALLED CRANKY SEWER SMALL E PARTIALLY CERTIFIED BY ENGINEER AO 11 NO CHANGES TO-ANY ASPECT OF. THIS SITE FUN.NCLDNG BUT MDT.LMTED T06 ACCEPTED BY THE TOWN OF CARY PRIOR TO INSTALLATION Of REMAINDER OF PROJECT. LA OSCAPFIG, GRADING. BUILDING ELEVATIONS ESPECIALLY COLORS). LIGHTING. OR U1l1TES WILL E MADE WITHOUT THE APPROVAL OF THE DEVELOPMENT FIE 5. ONCE CERTIFIED, REMOVE TEMPORARY PLUG N EXISTING MANHOLE GROW OF THE DEPARTMENT OF PLANING NO EVELOPIFNT ND CUT EXISTING SEWER THROUGH DOGHOUSE W AT THIS TAE, Q TREE PROTECTION NOTES L RBM NE PLUG AND CONNECT PREVIOUSLY INSTALLED TEMPORARY 15- SEWER TO EXISTING MMIDLE ON SOUTH SIDE OF STATION, DIVERT WASTEWATER INTO TEMPORARY SEWER PUG EXISTING S• SEWER TO PUP STATION IN EXISTING MANHOLE. COORDINATIE DIVERSION WITH TOWNS OF CARY AND MORRBVLLL I. TREE PROTECTION FENCING SHALL E PROVIDED ALONG AL CLEARING/CONSTRUCTION LIMITS OUTSIDE OF RAW. ALL OPEN SPACE, PER I ETER BUFFERS AND OPEN SPACE THAT CONTAIN NATURAL FOREST AREA OUST REMAIN WOODED AD FENOD OFF FROM ACTIVE DEVELOPMENT WITH THEE PROTECTION FENCE- SEE SHEET NL IS FOR FENCING WTAIL L THE TREE PROTECTION FENCE SHALL E MAINTAINED ON THE SITE U TL ALL SITE INOW( S COMPLETED AND THE FINAL SITE INSPECTION S SC EDILE. THE FENCING SHALL E REMOVED PRIOR TO FTMR SITE INSPECTION. 7. COFLETE REMAINDER OF WORK O.E. CONNECTION AT PUP STATKN, DEMOTION OF ERSING FA7ITIM NEW METERING STATIONS ETC.). ENGINEER SHALL COMFY REMAINDER OF NEW SEWER L ONCE CERTIFIED AND UPON APPROVAL BY TOWN OF CARY. REMOVE PLUG IN EXISTING MANHOLE ON SOUTH SIDE OF PIMP STATION AND WASTEWATER SHALL E DIRECTED INTO THE NEW II' SEWER, ONCE WASTEWATER S REDIRECTED PERMAENYLT PLUG TEMPORARY SEWER N MANHOLES ON BOTH ENDS. REMOVE A IP SECTION OF TEMPORARY SEWER FROM EACH END AND PERIWENTLT PLO- REMOVE TEMPORARY MANGLES TO OEPM OF J BELOW EXISTING GRADE AD FILL WITH SAD TO EXISTING GRADE. ® ® i ilrMm /'- _ _y I M% r ® y ® apdHo ... I ® ,?? 2 -- - 1 93 NWO01X II a L ® WB 1 L L .00 noL TO DRAWINGS MM TO DRAWNNMS ALOCATIDN MAP 90' GRAVITY SEWER - STA 10+WM TO STA. 23+00 90' GRAVITY SEWER - STA 29+ Do TO STA 98+00 SO' GWWRY SEINER - STA 38+ DO TO STA 52+00 90' NO 24' GRAVITY SERVER - STA E+00 TO STA 58+00 2C GRAWTY SEINER - STA UR+00 TO STA 80+00 21'.18', AND 10' GRAVrtY SEWER - STA BD+DO TO STA 92+00.00 NO STA10+00 TO 11+18.50 iP GRAVITY SEWER - STA 02+00 TO STA 108+48.20 EIFIECIOMM FLOW STATION STILE Rm AND 15'TEifaww LINE 10' GPAVRY SEINER OOU.ECIION LM WAND 10' GRAVITY SEINER COLLBL'IION U NE W CREEK CR09SM DETAILS METERING STATION AND DETALS 0 EX 9RECKegomE PUMP STATION HECTRICN.RANS,SCHMILL ,ANDFMG SEWER AND EROSION CONTROL. DETAILS VKV%IY MAP R IRMLA&CU WATER MANN DEMOS NOT 10 SCARE LOCATION MAP SCALFI T - 500 NIN4_ Owl- am 2 (F 2 NareM ieiY.n C+. N' 0. LA. ik6k Sala co. 001 W [a.nnt MANHOLE NO.1 \\ F a STA. TI-39.79 415' 33'27' 1 ?Ir Cwwroffm ,. i by am PL Sw i MANHOLE NO. 2 12 STA. 104.24.20 I Ii4i = ; \ m 4 415 I'?,?Ild?l 2'0665" EASEMENT fu DIETi? 1I1ypT•?1 ,,, . NOTED COIdTNWTION SEQLEMCE ON SHEET N0.2 FOR YNW10 CONNECTION TO EXISTING SEWER CONTRACTOR SWILL NOT ENTER CONSERVATION EASEMENT ORWRC COGTAUCTOIL PWOR TO. WOWS WITHIN 04 EASEMENT. CONTRACTOR SHALL CONTACT CAS COPNIY U%NC, I0-15{{-74251 AM PROVIDE A 48 HOUR ADVANCED NOTICE OF CONSTRICTION OPERATIO6. SEE TREE PROTECTION NOTES SHEET NO. 2 CONTRACTOR SHALL CONFIRM ELEVATION OF OAS LINE POOR TO KONMNO CONSTRUCTION OF ANY PORTION OF SERER IN TO ENSUE NO NOOF1CATIONS TO SERER DEPTH MANHOLE N0. S NNE NECESSARY. NEW 30" OISANITARY SETTER gN{'62344' n "MANHOLE Nq.{ STA. -: . 4164'2 01SY• \` ,. .. t 40' PERMANENT UTILITY EASEMENT MANHOLE NO.4 STA. 17-83.48 F 490,05,57" SEE CONS ANTI-SEEP COLLAR /-PROVE 70 LF SILT FENCE , % ' 1T ' - -- o. S fpsM Sd Y p \ ake `' ' „ \ " / i , ' Git AT pn+b Snw UUWtyy Ea ernent County IA II''4j 55 LF SILT Far PROVIDE t 1111TH 1 'I MANGE NO.3 ' I' N1 I?11.? E)OST. Y u'in1, i I STA. 4.07. • ?. . STA. 10?56?' 4202* 074V 215.4 4 I - PROVIDE 50 LF SLT FENCE NOTES SEE CON61URCTON SEOUENCE ON SHEET 2 FOR TE TO El0S7N0 42• SEWER 111141441111 F M 1 r~: sTCr ?errr r s n. r r r r { I j? i L{ Ir r r r .r r r I "I,l!Il , ti ?t ? .w * UXLAR ? i aw /o itl MIM DOW s vw.w wN ma AND 110*41 Nt MqR cw. HAP&M rr gxw. ' N101 f a " CONNECTION TO EXISTING MANHOLE ONaa1CTQ! MIMI vm ONa:T Al HHMINL Ms 275 Q Q h t H m v N `u u t Q 4 U m .a 0 mod ry . omh QOh i\a 255 250 1245 2351 or DIEM NfrQ NLM R '11 a 6LaHMw W. w or.. NNMM W. Haw la {AE SCAM 8 Ry OWL" APPFKMS) WMGFGW Y Y Y 0 's i s E la o? N'?1 a? \a 280 280 275 275 270 270 265 265 260 260 - 255 255 250 250 245 245 240 240 - F u 235 235 . . . . . . . ti .m 3l .fN 35. fb 36 400 37 -00 JM00 } Z d O: U Z' W 0 ? 3 W 2 ' H Q yW F C7 chi cmw oeo+? ar oeo®ar Moser ND: w? acme Ma N 4 OF 4 Q 0 5 n 0 `e m C pA 0 H b 0 h 0 a Q t (5 u ?NN .?4m a\n i Nn ` APPNOVED WINNOFCMN Awmalk Do_ FIN" -DW- Oi_ Maus sjvpm cow ar ' PIgY?E 320 LF SLT FENCE R _ • "' `nom -' ` ? MW16U NO. 25 STA. 67-0027 q ;147.46"37' \\\ `` J ®SEE TREE PRO7EC11011 NOTE SHEET N(L 2 TM Nn.l Ec"Rmd Splm In TY 0* SEa 72-61100 LF RT . MVIDE 70 LF SLT FENCE -40' PERMAI ENT UTL" EASEMENT W TEIPORW CMTM=M - SW MV 24• aSNRNtT SEWER 3S' PERMAT NEW S W SEWER NO 11 7 N U1 `N5' v.E5? 01`' -? ; ?? x',11111 EASE1 SIO \ ?,v 1 \ /.2 \ 65 LF SLT FENCE SOFA '' r / \? \ iltiii" \\ PROVIDE 70 LF SLT FENCE r 57t. 70-72.15 ---------------- --------- -------- fait lD'CVJ MANHOLE NO. 27-__-_ :--i__:r."i/',.,'. '?/• CP WNiOIEINO.2E --- - -- -- i "C=10 37" / STA. 7 34 -- 414 2 pr. % 35'PERYNENT UTLITY *78 _ 4205.37.10 5. TEMPORARY TEMPORARY !' 111 ?1 i1`i ?l ' ! f .I/-• TCONSTRU9TION PERMNENTEASEIQIT R? 7• C&dfiWTION EASEMENT / = I' OAW SDE) (E ACH SUE) ® nw = gg?? Qg+ EL•275.0 °p 0n 295 295 290 290 285 285 280 280 275 275 270 270 265 265 260 260 255 255 250 250 aN S w a: 5 5 C U H r N 8 µ3 to o ? ?I N W > N m ?.,,...I.IIw,,,,,, `,a?ptR .? 1 S ?''':T1:'I t a,y4 DE%GM Or NIAIANI BY: C EOM Sr: PFaxa NO: are MMiC1 SCAM NOR Ye 9$7 7 OF 1-540 abdr Cp b-bm) ??.12? K MANHOLE NO. 47 i ? STA. n"1&M NEW 10" PVC SANITARY SEWER (COLLECTION LINE "D") Nw 17' 0.1. wmr CM ++ 5 4C 0 APPROVED 701MI OFCARY _Do_ NOTE: NORTHERN 2 LASS OF LITTLE DRIVE UNDER CONSTRUCTION COLLECTION LINE °D° 7d' a 0 U Z W O 0 3 w x 3 's 3 a v a c c a a d %k CAR, r ??Tf / 25911 DESIGNED _- D DRAWN W. CIeCKED AY: {NOIGT NJ.: DATE HAP SCAM H 8 TEMP. Dow PIT ! ifPPRO%,SIZE i LOCATION) FYeMI _ii _- WSWR03LSIZE 6 LOCATION) PROVIDE ROCK D- MANaE K0. 44 l/ MANHOLE NO. CHECK DA 'if STA. *76.5N `T 6TA11'Z?",?; MOIENO.SA \ \ ca E.*e Ra nrt. - - ?Y 1 N c,„t rr wtr to LfAri L l ! / 6 W l / (tyyy dfPowrrntl ? P°r--04" CE TIC Aw- ASEMENT PF40VIK 70 ISEWER IN 70 v II 6 ? 11 (EACH SIDE) PROVIDE 65 tF D II -' PROVIDE 5 LF IV 27 STEEL ENCASEMENT __ I U `` - \ OISEWER N 65 LF DISEWER 65 LP 20' STEEL ENCASEMENT // 8 I?4f.if 20" STEEL ENCASEMENT I ?1 ?,-LY_ / IfLU.. souanq°r[aw - 1 `^' ' \1a_ E LB LAraa ?}?IpQ ?I{L° _ TEMP. BORE PIT F.e.. swne.wa tars // II ?_--- y LOCATION) ; ; I ryy • 2?9.f2 \\ --------------------- ----- "___-_ ___ ____________ COLLECOLLECTION LINE IE "B" wr COLLECTION LIE Kw a SEWER E v ~ - g MANHOLE NO.57 E PROFILE OE - -- ------- --- -------__----- _.c .___cc SEE PROFILE BELOW D. R?? SEE SBEIOW r=====__- __c"c= -- _ ?- ----- ----- -c_ -----_:- c__c_c- l ' l ='tt - -- ?2 STA. 13.11306 %. ; --- - -- - - d2 Z'20 -- = 9560" /'' l-- ./' rr 15•?, "______ \\ Z? °„ : j'/ -- ; D•00lSO`tb 1 /, COLLECTION LIE "C i j ;'' -2d TI TY,\ W MANHOLE NO. 11' `'43'13" (1D") NEW 1D" SEN4R ,( ''^"' STA. 43.1026• `rwb` NEW 30" SETTER SEE PROFILE BELOW A. Y •y "_ ' f _ O STA. 10.0000 QO") SEE SHEET NO. 5 / % , \:: ?? q? % / MANHOLE N0.56 .t--- /vr i , 1 r .49213&W I STA. 11.66.56 W 416Z'14'SI" ?; q(ATr 111'1 =_ •n zzz PROVIDE 75 lF ' ° SILT FENCE 1 , 1 (EACH SIDE) TREE PROTECt?II NOTES PROVIDE 25 SY - ?Y ;'?1CIH SE1 srEET NO.2 r 30" NEW STABILIZATION \- , SEE sIEET SERER NO.b _ ?RQYSt] SEE itEE PROTECTION NOTES WAKE t},Mn ' SHEET NQ 2 / 20 wAn COUNTY i EASEEMEN TEMPORARY ; z CONSTRUCTION, 7 S EASEMENT CC ?' \ 11 NEW 4' SEWER SEE SHEET NO.7 MANHOLE NO. U CSTA. 73-W.32 STA. OLLECTION nn 00 (D") COLLECTION COLLECTION ° -LINE 'A' LINE "B' dx? 3ir38" (W) LINE 'C' 295 co 285 dj- 290 280 285 275 270 280 265 275 3693 270 oNSa®er DLC 260 OPRAN In DLC CHeCM W. 265 255 "'°"'O ?m o DAME MARCH MODE eDME Hat 11-w 250 Vm I'm& 255 mET 11 of 16 245 250 240 10.00 n•oo tt•oo 10.00 taco tz•oo a•DO 11 •oD 12•00 13.00 K•o0 15.00 18.00 Iroo ? -0ri- II+naYI- IW- r-NEW 24. ORAVRY SEWER SEE SHEET NO.$ MM4ROLE 24 STA. PROVIDE 46 LF SILT FOYLE STA. 4LTH" EIOII 900 EO LF SILT FENCE I W" SOD WI< NEW W OpWVRY SEWER 30' TOWN OF CARY I PERMANENT UTILITY r ' ?o II , , , r-- EASEMENT ???/ 1 ? ; h I / `, ' \ , Il it llt lji j_ IIII ' '•` I '! ! 1 11 I 1 1 1 1 1 1 1 1 1 1 1q 1 14 ?1 I /--•?-, s, ? 'r r p ` ?I llil Ill' irll.il ``` ,I I?1• _-f•: ? ?Ia- ?` -.?a f -'I i , ,•, If??? . '"?''t?'??II;I r; r,l? ? I __-- - =..i' SHEET MANHOLE NO. 52 STA. ' ' I - \?YI /I Ill __ ,? ' ? ?`•?•'??_-:' PROVIDE 45 SY B" i144'3T04u STABLIIATION ,? =----------- - VIII 7 i ? I I I I ? - NOTE' L CONTRACTOR SHALL VERPY LOCATION NO AVERT ON EMT. ENCASEMENT PPE PRIOR TO INSTALLATION OF NEW 14" d SEWER. NOTFY ENGINEER OF FN D MGS TO ALLOW FOR ANY NECESSARY AOJAISTMENTS. 2. CONTRACTOR SHAH INSTAL NEW GRAVITY SEWEit FROM MANHOLE NO. 53 TO MANHOLE NO. 54 PRIOR TO INSTALLATION OF NEW GRAVITY SEWER FROM YANIOLE 24 T PPE 6 TU1{Rm. 3 NEW SEWEII LINE 94ALL BE CENTERED NSOE DIST. ENCASEMENT PPE. , MANHOLE NO.54 '/•!i % _'-- -- STA. 16"77M , PRO 1T•SLT FETICE 4170.3038" \ / 1 MANHOLE N0.54' ; -- - STA. 14-02.93 4229'400' i Exist. Cos Line MOkar ! i / \ MANHOLE NO.55 STA 2M5aa ?. u \ \ Exist. RCBC \ Exat.a7ar MANHOLE N0.47 Rap Ro " Exit " p . COLLECTION LINE D NEW 0• SEWER STA. 11-00.00 LY Exit 12' - O _ --- __ - 3 • w _ ------ j5 Lu . ` MANHOLE N0.47 00T N CONTRACT A Aghiml rt Exit. 12" worn u. STA 10"00.00 LA* w 4900000' . 4'Powe - ce °1° °? __--_• n+ ? • Top • 297.10 - . • 2a9a7 - NEW IV SEWER - -?--?-- ` - . a y - RNT N CONTRACT) - -- ---- - - r y W A NOTE' CONTRACTOR SHALL CONFIRM AVERT ELEVATION OF MA4IOLE NO. 47 PRIOR TO BEG"" COLLELCTIONMLNE 'D" EMRENS W NOTFY ER OF FIOIMOA 3 COLLECTION L INE RDR a 0 b 1 3I omiallill N: OLC IYYLWI ew OW OE1700 m: ww PFUMM N k am-0 097@ DECEMBER ON IPAB NOR 1"eED YER lI%l ow 11A OF 16 11A ,D•DD iI•BD 12"00 Exist. 14" Steal ??. Encc,Amer,t Ppe d SEE NOTE 1HS '9 Exist. RCBC Nuts ' ?PIgE® kw4 AS 1 CREEK CROSSING DETAIL r - ,a 3 • EXIST. WWORCED CON RM 10 SBEV OGI SEWER PIPE WTO Sox CULVERT WT . r W OM ?[)L CULVERT NIRNT • 200AS •/-TO PRM POSITIVE r-E)UST. CREEK SM 3n SECTION A-A I. I. I; I ar N3+wTAIer ? I N 12• CONdETE ENCASEIDIT a TO CRORM Of PPE NMERT • 21643 •A• ® 3r UWE 3r GRAN" SEWER L3' NMI CONCRETE 94ALL RE 3.000 PAL DETAIL APPLES ONLY TO IOT CAEa ptOSSNp SEE DETAIL ON MEET b rDlt OTHER CROL CRD896A7S 2 CONCRETE ENCASEMENT DETAIL rt yi• • r 4?V4 { t REw®Rm Dl aIAN n: m aR?RRr u nRNSerRO: NAM Rx HMrA NEtP• affr 12 Q H 12 oil ? s ? Lu C 3e c LL r r T i NO i T = T m two = z 1?+ T 9 T O?(n00,?p?0 DDDOG?G?G?pp?? ?22? rnm D?DDD?y?y««DDmrn- ooo--C--CmM mmmcncncncnNNK v cncncn*** Mm2z* N-i ?.?mmrnmmm=> m m p°' rrrrrr-mom D cCzmmmmzZIM D z mm k VI j?wo(n to 14 (0 (;1 Cn (n -A U1 00 -n. n -n -n n O m 0 --i z c co ;u O Ln I N I O OD 4 00 DC- Mm 09 00 1 -n 0--i O= ?m co D C /) ; k" Om z? M C 0 C/) C: z lo m 2z C/) D M m t'S S D C7 2 N O O LTI rn l? ti cr, ? o rn ?J >OM zm o? m CD m? C_0 n m M ?r -° m Cl) m? C/) m CA) m N jzzJ N m 90-0 N C O z C7 D m m D D Z D m m C/) C/) --i m 2 D C/) m N CD G) O ro CA w z O ?9 D M O r - z C7 O c z O 7rl m fit ooe. III 11 V It pl i ®I i f ® ® d Q a 009A 33P PrPAAPaN-. II P519111119 !R01 91M?d o §Apjjjj?i 1 1 1+ = 1 +++ z i? fQ 8+ ?? ?8T888 ai IR = JAI A l 4N I VIA BM t9 91111 fail, TITAN 1118 A S Rill , p v " 1 31 I f I? A > ?o R RS• Jill 22 91 JAI a Q a $ 9 o 611>N $jig Ii j ?A 1 Jill. F i O ?a v1p 1 ! 1+ r4 r 9 r z Z g ' jr (a m rri Ila "00 A{ ' ° 10 ° N 4 WAKE MINTY COWRY OF WAKE noRlll ciwaJNA s ? . PNAW1B-SEWER EMNS1ON TO BREMMOGE KW STATION N °ro INDEX TO DRAWINGS /LOCATION MAP A A ± S? N r j ? F FEVISIONS eeliorMaFCNnaouert. THE WOOTEN COMPANY 14111111111 I PLANNING I AICNITICTIRI IIR"Bow Rwlw RAW* NC 27603-14U 21922UM h1819. M30 If w JIM I It N IN _ 8. ? . 1 S-2i 1 Cal 'c r nr ?^?,? ys ? c Q ? a , % ,-. J --> __ Q 1 ? ` a % 1 1 rn 1 ? COUNTYOFWAKE WNf! OOUNTY NORM CARMMA I ? t ti PHASE 18 -SEWER EXTENSION TO BREOXENRINE PUMP STATION W 1'%'+oN V GRAVITY SEWER UNE b STA. 10+5623 TO STA. 23+00 f4l i 1/i? ?to?l?laroMnm?ern a THEW, OTEN COMPANY 24411128116 1 ?1?110100 I AIIOIIITOOTOIIO tg ft%S*m bm WO NC 2793.un lili21. l fulluMsn s? N r4 P WAKE COUNTY COL M OF WAKE N" CAROM PHASE 18 • SEWER EXTENSION TO BRECKENRIDGE PUMP STATION 30' GRAVITY SEWER "o STA 23+00 M STA. 38+00 REVIB M m?,owuaoMnroowien? « THEWOOTEN COMPANY NNNINI[AIN• I FLANNINN I AANNIfNOTNNN U0 NNo Whmm RAW* NC 2163-Un l1fmoul allusu l N ) to U ' V o ? A o ( x1 o U3 0 c il u i 0 ( A P I Hi ll 11 11 ,1111. fi ll 1 1 111 11 1 1 111 1111 111 1 Hil l 111 111 11 . 11 1 1 .11 111 1 11 H I N 111 1111 1. .1 11 11 111 11 1 Hil l ' 111 111 11 11 Ill 11 ,1 1- 4 111 11 II __ 11 1 1 I ll fo r F il DL f3 Ill 1 111 11 11 1 11 11 r Il -- l "I --- N, -- - " -- 11. -- 5) ---- -- - " 1 4 4 44 1 E N V i f i ll I I N 11 111 1. 11111 1 Ili 11 1 111 11 11 I ll , 111 11 1 Hi ll 'I s k , I IIII III Ill 1 111 11 11 1 1 I IH II II IN I ll 1 11 Ill 1 0 . II R I II II t6' B. 1 29 0 I 3 I H i ll 1 1 I ll v N N N Ii cn m rn V O O O O t D 0 (n 0 11 0 cn 0 is 0 ul S?r r 3 ? In D8 \ b 1.89 III, ?T uJ?NNNa t+ 1 `... ` 1111, 0ouNnroFWAKE wave courrry lloRlil CAROLINA 1 v PHASE 18. SEWER El(TENSION TO BREIDIM i NE PUMP STATION --4 `ys ' ' 24' GRAVITY SEWER I ? _ 11 ? 1??{ ? ? oc ? '- v 11 •''/ /,1,1• ` 11 STA. 66+00 TO STA 80+00 r>, 41 b C7 111 g ? 111 1 1 y1, I 1,111 ? 1 1111 II11 In ??l 1 I i I I j X11 1 `\ ' ?I fIII 1;1? II ?; 1I III I 1 ?,? ;Il;f;l, II•/ u Q I I iIR I ?? X yV ? ? /I I' 11, I, f ?• I I, M P ;; I I I 1 1 I../(((? 1 Z? ? ? II 1 II11 ?? I ?r ''j p O 1;; I?;'1?11 Il \\ ' ? N II' I ;III ; 1 (I/?`11?\\; 1 ? - - ? I x111; /? f 1. jr; till / 1 nl r/ '', // ?' ' ' 11 1 S 11 ,' / I I I 1 111 r `. , ,II 1 % `I/ ?`??JII mt 1`?11`I 1111 J I I 1, 6 I ? 1,j11 /I// I, i f 1, 1 1 1 I I 1111111 ? 1 ' 1111'111 . 1??111? I 'i f??11111 '' 111' 1 l l /? '?ii11111 / f X111 ? ll , I I I ( III 1 11 j 1 1 1 '11(111 1 111 111 1 1;1 ,111'1 X11111111,11 '11111(111 1;1 1111111 .. 11 i 1.?. 1.1111 I? ui REVISM 0 PMMINEOFCARYC(Y&OM ADDMQFWCDUWMUK THE WOOTEN COMPANY ENGINEERING 1 PLANNING I ARCHITECTURE 120 ft* ftin k" REMIh NC 2760}1129 919.928.0511 lu 919.6313519 Rio ?[f PS C N Z O fil m 0 A R v _ m 0 O N Z 'V18 3Nn ND10 L 133HS' : ?" ? 1 `I 11; 1; 1\ \I ? ? 1 1 1 1? 1 / 1 1 \ 1 1 / , I 1 J ? I 11 ? ' '1 11 1Ir ,111 V ?' 11 I I I Lei ?? r' ? A / {4111 \\\\\? \ \ \ 1 1 `11 r 1 ?j '1 1 1 1 \ 1 r Ir 1 1 I I; I 111 6 1 1 11 CT l II I 1 1 1 I? i I 1 1 I I'1 I 1?1 1 1 ? I 1 1; W 1 ' I I \ 11 r I '1 1 1 1 I I' I ' ?-/YY 11 1 1? I 1 1 ' I I i ; 1 I, I' 1! l l ? , 1 1 I, I l l , ; l` ' ? 11 j 1 244 1 1 1 1, 1, MI I I l 1 .l/'/ / / I 1 m V f>• - i i i i ' ' ? 1 \ 1 1 1 1, 1 I/ \ i. 1 1 1 1 1 . ?, \ 1 1 ' ? I / i / 1 1 I I ANky; JJ j '?T I `N ON?_ hhll j? L'. ? v ? 7RZZq l , N3 b* : G' m s?q AS n D R' COUNTY OF WAKE WAKE COUNTY NORTH CAROLINA M f7D R PHASE 1B -SEWER EXTENSION TO BRECKENRIDGE PUMP STATION w N 4 j C7 ••s s 24,18', AND 10' GRAVITY SEWER ,, Up sra ea+oo To sra e2+oo Nilld h `'/",,,1111111 STA 10+00 M STA 11+18.81 1 1 1 1 1 1 i r i i / / g s? -01 1 V fit r?e I I I THE WOOTEN COMPANY ENGINEENING I PLANNING i ANCNITECT0111 120 NKS SWAN MAIINNI RaWO NC 27603.1123 919.126.0531 Ta919.9313539 REVISIONS 0 F[9 UNMOFOARYO01SO M f !2\ FVAWTOEMTWffi"OMOEMWff W 1 N N N O CL2) O 1w ad HM s HRH 8 s M s x s G ZR 8 0 n r 0 Z r m 9 ao z r0r Z r mn 059 no z NO. 45 WD) L • n•75.72 TOP 280.00 Ott •?u b rA' . r 0 r mm N C5 -o z D to I? I I0 Ili IUV) to Ic°Di) to Ic `°i) -- + 70 y? „,y ??pl1I__ aiA,4 COUIMOFWAM WAKE COUNTY NOM CAROLINA y PHASE 18 -SEWER EXTENSION TO BRECKENRIDGE PUMP STATION M 's 10' GRAVITY SEWER COLLECTOR LINES gfT _C1 ? 1 n + ,'II III , 1 1 '~ I "" TT , ., 1 , 1 1 1 1 I CCCCC , -1i ``, ?? ` I I 11`111 1 p It p ll+r Illl 1111 I I \ `` ,`? ?'? ? 11}111 I I `. `'. , ti % ?, ; 1 111 ? (T 1, „ p ;1 II, i 1'1 ?1?1 I III I11;'i+ y 1 Ill l' „ l l , rl `y H i? ffl REVISIONS 0 AMMOFCOUCTIONU+EC THE WOOTEN COMPANY ENGINEERING I?IANNIYE I ARCHITECTURE 120 NN10 B*m ANMIU• Raleigh NC 21603.1823 919.128.0531 In 919.8313589 1421 1;33 9 11R 0 5 11fffTil Wff-H I? IS tt?a` • +. $E w 3 ol. 40 ao i ?y , p vwe --- 01-1 I I II pit ' , ; ; ; ' -- ----- Q /1 I fill -J"Fll MI 11 1 lit I'\ p ` `•%j./?_? 4 ? \1'' 111 ? ``\ \ 1 I 1 , ?T + 1 1 11,; 1 71 ZZ 1 1 A' N # it A d ? i Ig IS Ni T 1t 1 it I 111llillfllll I!? I i4 + I ? II lll?llllllll ?? t it 11? 11 IIIIIV I ?? iil i t I n II IIII y '? 1 1 I ?4 + I ?I % ? 1 a., I •I it 1 L. 1` 9jyy9j r ? ,y,, T Ip4 G ??+ Z^ Y Big Q? g i 8 v THE WOOTEN COMPANY [NNINEENINC I ILANNING I NNCNITICTUN9 In WS B*m Avow RAW NO 27603-1423 919.I2MI Iw 919.131.3919 lit If I 10 N DOW WIN h r r r I' r ' i I T N 1.0 I --I 0?/? \/r N / Z % v '• rn A ------ r 0 0 + Z 0 m rrl z 0 rrl Z v a m l1b 1 1 1 i ti COLMOFWAKE w • ?, wrtla aaMrr noanl cNlouu It, N PHASE 1B • SEWER EXTENSION M BF ECKENF40M PlN11P STATION N I;, ff CRM CMMO DETAILS b m tertotaMMOrta ?? anoroooe THE WOOTEN COMPANY t??l?t[III/?IPLANNING I AOCMITICTUA! ltltalr•/?gnA?lw ftM0IIUM340 situ mitaffl.mim 1 % rr ` 111 ij 1\ 1 ? 1 11 11 1 ^1 1 1 1 , 1 1 1 1 1 1 1 ??..i?T' ? ` 11 1 1 11 ; ;\ 1 , \ 111 1 11 jll 11 1 1 111 1 1 \ 1 1 \ 1 1 ``^ ? 1 , 1 1 1 11 ` 1 ^I^ ? 11 ` 11 \^ 11\ 11 1 1 1 1 1 % ^^^^ `\1 1^ 1 11 ; 1 1 1 \ 1 1 1 1 ^1 1 1 1 1 1 1 1 1\ 1 1 ? 1 ? 1 1 1 1 1 1 1 1 ? 1 ? 1 1 1 1111 111 ? 1 11 1 11 1 11 1 1 ' 1 ?- -^^ \ 11 ? 11 1 1 1 \ 1 1 ` ; 1 1 ? ' \I 11 1 1 1 1 1 1