Loading...
HomeMy WebLinkAbout20181400 Ver 1_Plan Sheets_10/12/2018 5:51 PMSheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A1200120512051210121512151159116011651165117011701175117511801180END BRIDGE W.P.#6 BEGIN BRIDGE W.P.#1 240'-10" (FILL FACE TO FILL FACE END BENTS) NO. 1 END BENT NO. 2 END BENTNO. 1{ BENTNO. 2{ BENTNO. 3{ BENTNO. 4{ BENTW.P. #2 W.P. #3 W.P. #4 W.P. #5 34'-1"34'-1" PLAN VIEW BOUNDARY FLOODPLAIN BOUNDARY FLOODPLAIN 33'-1"33'-1" PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION TOE OF FILL TOE OF FILL COORDINATE TABLE POINT NORTHING EASTING CP112 CP113 W.P.1 W.P.6 745302.7258 1146680.5574 745438.8308 1146606.9092 745427.0241 1146630.2923 745567.3105 1146826.0484 N54°22'23"E SCALE: 1" = 10'-0"1210DISC) (NAIL IN CP113 GROUND EXISTING MIDWAY POINT APPROXIMATE & BACKWALL CONC. CAP REINFORCED LOW CHORD EL. 1200.00 FULL POND 0.00% PROPOSED TRAIL TIE TO 12'-0"EL. 1212.00 VERTICAL CLEARANCE TOP OF MIN. 12' NAVIGATIONAL 6" TOLERANCE ADDITIONAL NAVIGATIONAL SPAN APPROACH SPANS TIMBER DECK STEEL I-BEAMS W/ 0 25 50 75 100 125 150 175 200 225 250 275 1230 1250 1190 1200 1210 1220 1240 1180 1170 1160 1150 240'-10" ( BRIDGE OUT-TO-OUT ) 33'-1"106'-6" 106'-6" RAIL CAP EDGE OF DECKBOARDS EL. 1205.7' BASE FLOOD 34'-1"33'-1"34'-1" 5'-0" 3 SPA. @ 13'-11" RAILING EXTENDED 13'-11" RAILING EXTENDED 5'-0" 3 SPA. @ FILL NO. 2 END BENT FIX EXP.FIX EXP.FIX EXP.FIX EXP.FIX EXP. ELEVATION SCALE: 1" = 10'-0" (TYP.) STEEL PILES HP12X53 (TYP.) STEEL PILES HP12X53 SPAN 1 SPAN 2 SPAN 4 SPAN 5 SPAN 3 NO. 1 END BENT 5'-0"FROM EACH END OF THE BRIDGE. THE ABOVE SIGN APPROXIMATELY 10 FEET UPON COMPLETION OF CONSTRUCTION, POST 12"X18" TONS 1.75 WEIGHT LIMIT1'-0"ROCK LINEESTIMATED (TYP.) 3'-0" DIA. COLUMN SHAFT (TYP.) 3'-6" DIA. DRILLED (LEVEL) TOP OF DECK FILL BENT NO. 1 BENT NO. 2 BENT NO. 3 BENT NO. 4 CENTER TO VISITORS PARK DEVELOPMENT TO FUTURE { BRIDGE (TYP.) ROCK SOCKET 3'-0" DIA. SB-1 LAYOUT BRIDGE Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01AMID-SPAN SPAN 4MID-SPAN SPAN 4W.P. #1 W.P. #2 W.P. #3 W.P. #4 W.P. #5 W.P. #6 END BENT 1 FILL FACE @ { BENT 1 { BENT 2 { BENT 3 { BENT 4 { BRIDGE { BRIDGE 90°0'0" (TYP.) DIMENSIONS LOCATING PILES ARE SHOWN TO CENTERLINES. DIMENSIONS LOCATING PILES ARE SHOWN TO CENTERLINES. END BENT 2 FILL FACE @ (TYP.) HP12X53 STEEL PILE 1'-6" STEEL PILES { HP12x535'-0"5'-0"90°0'0" (TYP.) (TYP. EA. END BENT) STEEL PILES { HP12x53 5'-0"5'-0"34'-1"33'-1" 34'-1"33'-1" SCALE: (NTS) SCALE: (NTS) 106'-6" 106'-6" (TYP. EA. BENT) ROCK SOCKET = 3 FT DRILLED SHAFT ~ = 3'-6" FT { COLUMN ~ = 3 FT (TYP. EA. BENT) ROCK SOCKET = 3 FT DRILLED SHAFT ~ = 3'-6" FT { COLUMN ~ = 3 FT (TYP. EA. BENT) ROCK SOCKET = 3 FT DRILLED SHAFT ~ = 3'-6" FT COLUMN ~ = 3 FT PARTIAL FOUNDATION PLAN PARTIAL FOUNDATION PLAN SB-2 LAYOUT FOUNDATION Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01ARAIL (TYP.) 4x4 TIMBER DETAIL "A" (TYP.) 2x8 CAP 4x6 TIMBER DECK { BRIDGE (TYP.) STEEL CHANNEL C12x30 LAKE SIDE FACING 6" FACE 4" FACE 6" FACE 4" FACE TOP OF DECK SHOWING END BENT & BENT DIAPHRAGMS SHOWING INTERMEDIATE DIAPHRAGMS ƒ" DIA. BOLTS (TYP.) ‡" DIA. HOLES FOR 12'-11" (OUT-TO-OUT) 11'-5" (CLEAR)1'-11"4'-7•"6'-6•"4"4"(TYP.)(TYP.)5'-0"5'-0" BOLTED TO BEAM 3x8 TIMBER NAILER ALL TIMBER SHALL BE SOUTHERN YELLOW PINE #1 DENSE GRADE, PRESSURE TREATED FOR GROUND CONTACT WITH WATERBORNE PRESERVATIVES TO A MINIMUM RETENTION OF 0.80 LBS/CU. FT. THE USE OF TREATMENT CHEMICALS CONTAINING ARSENIC OR CHROMIUM IS PROHIBITED., ALL WOOD SHALL HAVEA MINIMUM BENDING STRESS OF 1500 PSI. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT AWS CODE, AND SHALL BE EITHER SHIELDED METAL ARC WELDING (SMAW), OR SUBMERGED ARC WELDING (SAW). ALL BOLTS SHALL BE A307 MINIMUM. DECKBOARDS SHALL HAVE „" CLEARANCE BETWEEN THEM TO FACILITATE WATER DRAINAGE FROM DECK. ALL SUPERSTRUCTURE STEEL SHALL BE GRADE 50 STRUCTURAL WEATHERING STEEL, ARCHES (ALTERNATE #4) TIMBER AESTHETIC AND STEEL PIPE PILES SHALL BE GRADE 50, HOT-DIPPED GALVANIZED. (TYP.) STEEL I-BEAM SPAN 3: W36x210 SPAN 1, 2, 4, 5: W18x46 (TYP.) STEEL CHANNEL C12x30 (TYP.) STEEL I-BEAM 2…"SIDE OF C12X30) (TYP. OUTER FLAT STEEL ANGLE L 4x4 X ƒ" BEAMS: 90 PSF PEDESTRIAN LOADING. SPECIFICATIONS. CONTROLLING ASSUMED LIVE LOAD FOR RAILINGS AND UTILITY VEHICLE WEIGHING 3,500 LB. PER NC PARKS AND RECREATION MAX DESIGN LIVE LOAD FOR TIMBER DECKING: A GATOR SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2009. BRIDGE DESIGN SPECIFICATIONS, 7TH ED. AND THE AASHTO LRFD GUIDE THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD FULL LENGTH OF BRIDGE. REFLECTORS AT A MAXIMUM OF 3'-0" SPACING HORIZONTALLY, ON BRIDGE SUPERSTRUCTURE ALONG EACH EXTERIOR LOW CHORD:3. END OF EACH CAP. ON BRIDGE SUPPORT PIERS, CONCRETE CAPS: ONE REFLECTOR ON EACH2. PLACED ON THE EXTERIOR FACE OF EACH PIPE PILE ON EACH PIER. ELEVATION AND A POINT JUST BELOW BOTTOM OF CAP. THESE SHALL BE VERTICALLY BETWEEN A POINT 6 INCHES ABOVE NORMAL WATER SURFACE ON BRIDGE SUPPORT PIERS, COLUMNS: THREE REFLECTORS EVENLY SPACED1. WHITE OR RED HIGH-VISIBILITY REFLECTORS ON THE BRIDGE AS FOLLOWS: UPON COMPLETION OF THE BRIDGE CONSTRUCTION, PERMANENTLY AFFIX GENERAL NOTES: SB-3 GENERAL NOTES TYPICAL SECTIONS / RAIL POST ORIENTATION DECKBOARD ORIENTATION PARTIAL TYPICAL SECTION PARTIAL TYPICAL SECTION SECTION @ BENT DETAIL "A" Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01APRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION BEAMS WAS 90 PSF PEDESTRIAN LOADING. SPECIFICATIONS. CONTROLLING ASSUMED LIVE LOAD FOR RAILINGS AND UTILITY VEHICLE WEIGHING 3,500 LB. PER NC PARKS AND RECREATION ASSUMED DESIGN LIVE LOAD FOR TIMBER DECKING WAS A GATOR SPECIFICATIONS FOR THE DESIGN OF PEDESTRIAN BRIDGES, 2009. BRIDGE DESIGN SPECIFICATIONS, 7TH ED. AND THE AASHTO LRFD GUIDE THIS BRIDGE HAS BEEN DESIGNED IN ACCORDANCE WITH THE AASHTO LRFD SHOWING END BENT & BENT DIAPHRAGMS SHOWING INTERMEDIATE DIAPHRAGMS5'-0"5'-0" FULL LENGTH OF BRIDGE. REFLECTORS AT A MAXIMUM OF 3'-0" SPACING HORIZONTALLY, ON BRIDGE SUPERSTRUCTURE ALONG EACH EXTERIOR LOW CHORD:3. END OF EACH CAP. ON BRIDGE SUPPORT PIERS, CONCRETE CAPS: ONE REFLECTOR ON EACH2. PLACED ON THE EXTERIOR FACE OF EACH PIPE PILE ON EACH PIER. ELEVATION AND A POINT JUST BELOW BOTTOM OF CAP. THESE SHALL BE VERTICALLY BETWEEN A POINT 6 INCHES ABOVE NORMAL WATER SURFACE ON BRIDGE SUPPORT PIERS, PIPE PILES: THREE REFLECTORS EVENLY SPACED1. WHITE OR RED HIGH-VISIBILITY REFLECTORS ON THE BRIDGE AS FOLLOWS: UPON COMPLETION OF THE BRIDGE CONSTRUCTION, PERMANENTLY AFFIX ALL TIMBER SHALL BE SOUTHERN YELLOW PINE #1 DENSE GRADE, PRESSURE TREATED FOR GROUND CONTACT WITH WATERBORNE PRESERVATIVES TO A MINIMUM RETENTION OF 0.80 LBS/CU. FT. THE USE OF TREATMENT CHEMICALS CONTAINING ARSENIC OR CHROMIUM IS PROHIBITED., ALL WOOD SHALL HAVEA MINIMUM BENDING STRESS OF 1500 PSI. ALL WELDING SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT AWS CODE, AND SHALL BE EITHER SHIELDED METAL ARC WELDING (SMAW), OR SUBMERGED ARC WELDING (SAW). ALL BOLTS SHALL BE A307 MINIMUM. DECKBOARDS SHALL HAVE „" CLEARANCE BETWEEN THEM TO FACILITATE WATER DRAINAGE FROM DECK. ALL SUPERSTRUCTURE STEEL SHALL BE GRADE 50 STRUCTURAL WEATHERING STEEL, AND STEEL PIPE PILES SHALL BE GRADE 50, HOT-DIPPED GALVANIZED. (TYP.) 4x6 POST ={ CAP { PILE (TYP.) 2x8 CAP 2'-6"7'-1"(TYP.) STEEL CHANNEL C12X30 DECK 4x6 TIMBER 2" (TYP.) (ALTERNATE #4) ARCHES (TYP.) •" THICK TIMBER 2" x 2" x •" SIDE ANGLE TO TOP OF DECK WITH END OF SPAN. CONNECT 4x6 END POST EACH (SPAN 1, 2, 4, & 5 TYP.) STEEL I-BEAM W18x46 BENT 4 SIMILAR7'-4"4'-9" ={ CAP { PILE5'-0"2'-4"(TYP.) STEEL I-BEAM W18x46 PILE (TYP.) HP12x53 STEEL(TYP.)EMBED2'-0" MIN.(TYP.) 2x8 CAP (ALTERNATE #4) ARCHES (TYP.) •" TIMBER 1" (TYP.) (TYP.) STEEL CHANNEL C12X30 2" x 2" x •" SIDE ANGLE TO TOP OF DECK WITH END OF SPAN. CONNECT 4x6 END POST EACH AND ANGLES (TYP. EACH END OF EACH SPAN) TO PROVIDE A SEAT FOR THE ENDPOSTS EXTEND 3 DECKBOARDS 6" ON EACH SIDE COLUMN 3'-0" DIA.7'-1"(TYP.) STEEL CHANNEL C12X30 DECK 4x6 TIMBER (ALTERNATE #4) ARCHES (TYP.) •" THICK TIMBER COLUMN 3'-0" DIA. (SPAN 3) STEEL I-BEAM W36x210 (SPAN 1, 2, 4, & 5 TYP.) STEEL I-BEAM W18x46 BENT 3 SIMILAR (TYP.) 4x6 POST ={ CAP { PILE (TYP.) 2x8 CAP 2" (TYP.) 2" x 2" x •" SIDE ANGLE TO TOP OF DECK WITH END OF SPAN. CONNECT 4x6 END POST EACH 1'-6†" GENERAL NOTES: SB-4 GENERAL NOTES TYPICAL SECTIONS / PARTIAL TYPICAL SECTION PARTIAL TYPICAL SECTION SECTION @ BENT 1 SECTION @ END BENT SECTION @ BENT 2 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A4x6 RAIL 2x8 CAP & RAIL (TYP.) 4x4 TIMBER (TYP.) 2x8 CAP (TYP.) 15° BOLTED TO BEAM 3x8 TIMBER NAILER 4'-8‚"PEDESTRIAN RAILING(2 EA. SIDE @ SPANS 2 & 4) PEDESTRIAN BUMPOUT 3'-6"(TYP.) STEEL I-BEAM W18X46 4x6 TIMBER DECK 4'-2ƒ"4'-2ƒ" 18'-10‡" 4'-2ƒ"10'-5…" ‚" STEEL } (BOTH SIDES) L 6X6 X • 2" (TYP.) 1'-0" CTS, 4X6 CONNECTION TO W12 BEAM 1•"1•"OF FLANGE) (ALTERNATING SIDES FOR •" DIA. BOLT W18 BEAM FLANGE DRILL†" HOLE IN †" X 7 X 6 STEEL } †" BOLTS & STEEL PLATE NOTCH NAILER FOR 2" (BEYOND) DIAGONAL FACE RAILING LINES IN 3X8 RUNNER W36X210 or W18X46 COUNTERSUNK (TYP.) LAG BOLT W/ WASHER W/ •" X 7•" GALVANIZED DECK BOARDS ATTACHED NUT & WASHER (TYP.) COUNTERSUNK W/ MACHINE BOLT •" X 6" GALVANIZED 7"6"3"3"1•"SB-5 BUMP OUT TYPICAL SECTION / PLAN @ BUMPOUT TYPICAL SECTION @ BUMPOUT " X 7" X 6" STEEL PLATE8 5 4X6 CONNECTION TO BEAM Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01AMID-SPAN SPAN 3MID-SPAN SPAN 3W.P. #1 W.P. #2 W.P. #3 W.P. #4 W.P. #5 W.P. #8 34'-1"33'-1" SPAN 1 SPAN 2 SPAN 3 34'-1"33'-1" SPAN 3 SPAN 4 SPAN 5 { GDR. 1 { GDR. 1 { GDR. 2 { GDR. 2 END BENT 1 FILL FACE @ { BENT 1 { BENT 2 { BENT 3 { BENT 4 FIX FIXEXP. FIXEXP.FIXEXP. { BRIDGE { BRIDGE (TYP.) CROSS-BRACING L 3x3x•" 1'-8" { BRG. { BRG. 1'-8" 9'-7"8'-7" 8'-7"9'-7" { BRG.{ BRG. { BRG.{ BRG. END BENT 2 FILL FACE @ { GDR. 35'-0"5'-0"FIXEXP. { GDR. 3 EXP. 240'-10" ( BRIDGE OUT-TO-OUT ) 240'-10" ( BRIDGE OUT-TO-OUT ) 7'-11•"7'-11•" 7'-11•"7'-11•"5'-0"5'-0"(TYP.) C12X30 (TYP.) C12X30 4'-0"4'-0" 4'-0"4'-0" 4'-6•" 1'-10ˆ" 3'-2Œ"9'-6‚"3'-2Œ"4'-10" (TYP. SPANS 2 & 4) W18X46 STEEL I-BEAM 1'-10ˆ" 1'-10ˆ"1'-10ˆ" BOTH SIDES OF BRIDGE. DIMENSIONS TO C12X30 STEEL CHANNELS ARE TYPICAL FOR FLAT FACE OF THE CHANNEL. DIMENSIONS TO C12X30 STEEL CHANNELS ARE TO THE OUTER CHANNEL RAILPOST SUPPORTS, SEE SHEET SB-9. FOR W18X46 STEEL I-BEAMS IN BUMBPOUTS AND C12X30 STEEL NOTES: 2'-1‚"6 SPA. @ 4'-10" = 29'-0" 1'-10ƒ" 2'-2‚"1'-10ƒ" 2'-7ƒ" 3'-2Œ"9'-6‚"3'-2Œ"4'-10"4'-6•" 1'-10ƒ" 2'-2‚" 6 SPA. @ 4'-10" = 29'-0"1'-9ƒ" 2'-2‚" 8'-9ƒ"8'-9ƒ" 7'-8ƒ"7'-8ƒ" 7'-8ƒ"7'-8ƒ" 8'-9ƒ"8'-9ƒ" 26'-3•" 26'-3•" 21 SPA. @ 4'-10" = 101'-6" 21 SPA. @ 4'-10" = 101'-6" 106'-6" 106'-6" W18x46 STEEL I-BEAM W18x46 STEEL I-BEAM W36x210 STEEL I-BEAM W36x210 STEEL I-BEAM 2'-4‚" 26'-11•" 26'-11•" °90 0'0" (TYP.) PARTIAL FRAMING PLAN PARTIAL FRAMING PLAN SB-6 PLAN FRAMING Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01AEND BENT 1 FILL FACE @ FLANGEMIN. 32'-11" OUT-TO-OUT 7"7" { BEARING { BEARING W18x46 7"7" { BEARING { BEARING SPAN 3 ONLY STIFFENER PLATE (TYP.) 4•" X 1'-4ƒ" X •" STEEL 8'-6"8'-6" SPAN 3 ONLY (INTERIOR FACE) 8'-6"8'-6" 31'-9" { BRG. TO { BRG. 105'-2" { BRG. TO { BRG. (END BENT 2 SIMILAR)6ˆ"1" END OF BEAM DETAIL "1616{ W18x46 CAMBER REQUIREMENT W36x210 TOP OF BOTTOM FLANGE W36x210 BEAM ELEVATION W18x46 TOP OF BOTTOM FLANGE W18x46 BEAM ELEVATION (INTERIOR FACE OF WEB ONLY FOR EXTERIOR BEAMS) 3- 4•" X 1'-4ƒ" X •" STEEL STIFFENER PLATES @ 7'-11•" CTS. 7'-11•"7'-11•" 12'-1Š"8…"3'-3†"8…"3'-3†"8…" ( EXTERIOR FACE OF BEAMS AT BUMPOUTS - SPANS 2 & 4 ) ( SPANS 2 & 4 )( SPANS 2 & 4 )( SPANS 2 & 4 )( SPANS 2 & 4 ) NOTE: ALL BEAMS SHALL BE AASHTO M270 GRADE 50W WEATHERING STEEL. 7'-7ƒ"4'-9ƒ"4'-9ƒ"2 SPA. @ 4'-0" = 8'-0" SPANS 1, 2 & 4, 5 (INTERIOR FACE) SPANS 1, 2 & 4, 5 106'-4" OUT-TO-OUT " 10•26'-" 10•26'-26'-3•"26'-3•" W36x210 1'-‰"" 10•26'-" 10•26'- (INTERIOR FACE OF WEB ONLY FOR EXTERIOR BEAMS) 3 - 7•" X 2'-10" X •" STEEL STIFFENER PLATES @ 26'-3•" CTS. STIFFENER PLATE (TYP.) 7•" X 2'-10" X •" STEEL SPAN 3 = 2ƒ" SPANS 1, 2, 4 & 5 = •" SB-7 DETAILS GIRDER Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A32'-11" OUT-TO-OUT 7"7" { BEARING { BEARING W18x46 7"7" { BEARING { BEARING SPAN 3 ONLY (EXTERIOR FACE) 31'-9" { BRG. TO { BRG. 105'-2" { BRG. TO { BRG. W36x210 BEAM ELEVATION W18x46 BEAM ELEVATION 32'-11" OUT-TO-OUT 7"7" { BEARING { BEARING W18x46 31'-9" { BRG. TO { BRG. W18x46 BEAM ELEVATION SPANS 2 & 4 (EXTERIOR FACE) TO 4X4X ƒ STEEL ANGLE C12X30 CHANNEL BOLTED TO 4X4X ƒ STEEL ANGLE C12X30 CHANNEL BOLTED 4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"2'-4•"2'-5•"4'-10" SPANS 1 & 5 (EXTERIOR FACE) W36x210 106'-4" OUT-TO-OUT TO 4X4Xƒ STEEL ANGLES @ 4'-10" CTS. 22 - C12X30 CHANNELS BOLTED 1'-11"4'-11"2'-0"4'-10"5Š"3'-6"1'-3•"8…"3'-3†"8…"3'-3†"8…"1'-2•"3'-6"6…" 2'-0"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"1'-11" SB-8 DETAILS GIRDER Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01AA A B B C C C W18x46 BEAM 'A' ELEVATION W18x46 BEAM 'B' ELEVATION W18x46 BEAM 'B' TOP OF BOTTOM FLANGE W18x46 BEAM 'C' ELEVATION W18x46 BEAM 'C' TOP OF BOTTOM FLANGE SPANS 2 & 4 (INTERIOR FACE) " STEEL BENT PLATE4 1 FRAMING PLAN OF BUMPOUT 4'-11‚"BENT PLATE ‚" STEEL 2"2"6"3"3"2" { BEAM 'C' (TYP.) C12X30 "1616"1616"1616(TYP.) 45°0'0" C12X30 CHANNEL 3‰" 6"9"3"3"1•"1•"1"1"@ 3" CTS.2 SPACESRIGHT SIDE SHOWN, LEFT SIDE SIMILAR BY ROTATION (SPANS 2 & 4) W18x46 WEB W18x46 BEAM 'A' TOP OF BOTTOM FLANGE 2‡"4'-11ˆ"6Š" (TYP.) L 4X4X ƒ (TYP.) L 6X6X • BENT } 2 SEE DETAIL, THIS SHEET (TYP. @ OUTER END OF 'C' BEAMS) ‚" STEEL BENT } BENT } 1 BENT } 3 BENT } 4 ABOUT CENTERLINE OF BUMPOUT. BEAMS 'A' AND 'B' MIRRORED SEE SHEET SB-14. FOR BENT PLATE AND ANGLE DETAILS, NOTES: SPANS 2 & 4 (OUTER END OF 'C' BEAMS) (TYP.) FOR •" ~ BOLT { †" ~ HOLE (TYP.) FOR •" ~ BOLT { †" ~ HOLE @ 3" CTS.2 SPA.6"{ BEAM { BEAM { BEAM 2Ž"3'-5"2Ž" 5'-2ˆ" 2Ž"4'-11‚" 3•"3'-3†"3•" W18x46 W18x46 W18x46 3•"4'-1…"7‰"2" 5'-2ˆ" 8‰" 6'-7…" 3" 2„"1'-0Š"2ƒ"3"3"@ 3" CTS.2 SPA.{ CHANNEL PLAN SIDE VIEW 1'-0"1'-5‰" 4'-6‚"4'-0"4'-0"4'-6‚" 3'-10†" 6'-7…" 6'-5Ž" 6"5'-5Ž"6" 3'-10†" NOTE: ALL BEAMS SHALL BE AASHTO M270 GRADE 50W WEATHERING STEEL. SPANS 2 & 4 (EXTERIOR FACE) SPANS 2 & 4 (EXTERIOR FACE) SPANS 2 & 4 SPANS 2 & 4 SPANS 2 & 4 SB-9 DETAILS GIRDER BUMPOUT Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01AMID-SPAN SPAN 3MID-SPAN SPAN 3W.P. #1 W.P. #2 W.P. #3 W.P. #4 W.P. #5 W.P. #6 34'-1"33'-1" SPAN 1 SPAN 2 SPAN 3 34'-1"33'-1" SPAN 3 SPAN 4 SPAN 5 { GDR. 1 { GDR. 1 { GDR. 2 { GDR. 2 END BENT 1 FILL FACE @ { BENT 1 { BENT 2 { BENT 3 { BENT 4 { BRIDGE { BRIDGE END BENT 2 FILL FACE @ { GDR. 35'-0"5'-0"{ GDR. 3 240'-10" ( BRIDGE OUT-TO-OUT ) 240'-10" ( BRIDGE OUT-TO-OUT )5'-0"5'-0"(TYP. SPANS 2 & 4) W18X46 STEEL I-BEAM 3'-0•"6 SPA. @ 4'-10" = 29'-0" 1'-7†"1'-8†" 3'-5" 7…" 3'-5" = 8'-0" @ 4'-0" 2 SPA. 6Š" DIMENSIONS SHOWN TYPICAL FOR BOTH SIDES OF BRIDGE. DIMENSIONS SHOWN TYPICAL FOR BOTH SIDES OF BRIDGE. (TYP. SPANS 2 & 4) W18X46 STEEL I-BEAM 3'-0•" = 8'-0" @ 4'-0" 2 SPA. 3'-5"3'-5" 2'-0•" 2'-0•" 2'-6" 2'-0•" 4'-10" 4'-10"4'-10" 2'-0•" 2'-6"4'-10"2'-0•" 2'-0•" 6 SPA. @ 4'-10" = 29'-0" 1'-2ƒ" 1'-2ƒ" 2ƒ" 2ƒ" 2ƒ" 2ƒ" 2ƒ" 2ƒ" 2ƒ" 2ƒ" 21 SPA. @ 4'-10" = 101'-6" 106'-6" 106'-6" (TYP. SPANS 1, 2, 4, 5) W18x46 STEEL I-BEAM W36x210 STEEL I-BEAM W36x210 STEEL I-BEAM 21 SPA. @ 4'-10" = 101'-6" 7…" 1'-7†"1'-8†" 6Š" SPACING RAIL POST RAIL POST SPACING - PARTIAL PLAN RAIL POST SPACING - PARTIAL PLAN SB-10 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A(EXTERIOR FACE) SPAN 3 ONLY (EXTERIOR FACE) BRIDGE RAILING BRIDGE RAILING NOTE: TIMBER RAILING ON INTERIOR FACE OF RAILING NOT SHOWN FOR CLARITY. 2x8 CAP 4x6 POST DECK 4x6 TIMBER4'-9"32'-11" RAILING SEGMENT 4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"36' -0"R35' -6"RC12X30 (TYP.) 1'-11•"1'-11•" (ALTERNATE #4) TREATMENT AESTHETIC TIMBER •" x 6" (2 BOLTS PER LOCATION) GALVANIZED LAG BOLTS WITH WASHERS. TO TIMBER POSTS USING •" X 4" IF USED, TIMBER ARCHES SHALL BE ATTACHED SPANS 1 & 5 2'-5"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"4'-10"2'-5" C12X30 (TYP.)DECK 4x6 TIMBER 2x8 CAP 40'-2" RAILING SEGMENT32'-11" RAILING SEGMENT 32'-11" RAILING SEGMENT R 36'-0"R 35'-6"R 53'-0" R 52'-6"R 36'-0"R 35'-6" 4x6 POST (2 BOLTS PER LOCATION) GALVANIZED LAG BOLTS WITH WASHERS. TO TIMBER POSTS USING •" X 4" IF USED, TIMBER ARCHES SHALL BE ATTACHED (ALTERNATE #4) TREATMENT AESTHETIC TIMBER •" x 6"4'-9"1'-6"3'-2"3'-2"1'-6" RAILING BRIDGE SB-11 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01APRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION NOTE: TIMBER RAILING ON INTERIOR FACE OF RAILING NOT SHOWN FOR CLARITY. BRIDGE RAILING AT BUMPOUT SPANS 2 & 4 SPANS 2 & 4 BRIDGE RAILING PLAN AT BUMPOUT 32'-11"4'-2ƒ"7'-0ˆ"4'-2ƒ"10'-5…"4'-2ƒ"7'-0ˆ" (TYP.) 2x8 CAP (TYP.) STEEL I-BEAM W18x46 (TYP.) STEEL CHANNEL C12x30 (TYP.) 4x6 POST DECK 4x6 TIMBER (TYP.) STEEL CHANNEL C12x30 (ALTERNATE #4) TREATMENT AESTHETIC TIMBER •" x 6" (TYP.) STEEL I-BEAM W18x46 (ALTERNATE #4) ARCHES (TYP.) •" TIMBER4'-9"1'-11•"4'-10"6Š"3'-5"1'-8†"4'-0"4'-0"1'-7†"3'-5"7…"4'-10"1'-11•" 32'-11" (SEGMENT)3'-9"AT BUMPOUT RAILING BRIDGE SB-12 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A- TYPE I - BEARING PAD À BEARING PAD 1" 8" 4" 4" ELASTOMER IN ALL BEARINGS SHALL BE 60 DUROMETER HARDNESS. CORNER OF STIFFENER PLATE. WELD TO BOTTOM FLANGE IS ONLY REQUIRED WHEN BEARING STIFFENER IS ALSO CONNECTOR PLATE * MILL TO BEAR * Š" Š" Š" Š" Š" Š" ( FIXED ) P 1 P 2 ( EXP. ) ( TYPE I - 15 REQ' D )(TYP.)(TYP.) BEAM (TYP.) W18x46 STEEL (TYP.) 1"2‚"1•" 1"1"CROSS-BRACING L 3x3x•" (TYP.) •" CONN. }1"1" (TYP.)(TYP.) TYPICAL INTERMEDIATE DIAPHRAGM DETAIL BEARING STIFFENER / CONNECTOR PLATE ELASTOMERIC BEARING DETAILS SOLE PLATE DETAILS ( ``P'' ) PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION P1 ( 15 REQ'D )P2 ( 15 REQ'D ) 1•" 1"5 HOLE @ 2" CTS.3‚"(TYP.) •" CONN. } 1" (TYP.) 5'-0" 5'-0" ƒ" DIA. BOLTS (TYP.) ‡" DIA. HOLES FOR (TYP.) STEEL CHANNEL C12x30 TYPICAL END BENT / BENT DIAPHRAGM DETAIL À 1‚'' • HOLES SLOTTED HOLES À 1‚'' X 3ƒ" 1•" 1"5 HOLE @ 2" CTS.1ƒ"C12x30 CHANNEL CONNECTOR PLATE NOTES: DO NOT CLIP PLATE AT TOP OUTSIDE CONNECTOR PLATE INTERMEDIATE DIAPHRAGM CONNECTOR PLATE END BENT & BENT DIAPHRAGM NOTES STRAIGHT. ALL SURFACES OF BEARING PLATES SHALL BE SMOOTH AND GALVANIZED. GALVANIZED. ANCHOR BOLTS, NUTS AND WASHERS SHALL BE SHALL BE AASHTO M270 GRADE 50W AND SHALL NOT BE FOR AASHTO M270 GRADE 50W STRUCTURAL STEEL, SOLE PLATE BURRED WITH A SHARP POINTED TOOL. • TURN. THE THREAD OF THE NUT AND BOLT SHALL THEN BE ARE TO BE TIGHTENED FINGER TIGHT AND THEN BACKED OFF AT ALL FIXED POINTS OF SUPPORT, NUTS FOR ANCHOR BOLTS BRIDGE SEAT FIXED EXPANSION END VIEW À BEAM SOLE PLATE BEARING PAD WASHER SOLE } WITH STANDARD EXTENDING „'' ABOVE 1‚" • PIPE SLEEVE (TYP.) 2" THREAD ANCHOR BOLTS 1 '' • x 16" (TYP.) SWEDGE 12" À 1‚" • HOLES2•"1'-0" 1'-5" 2•"- TYPE I - BEARING PAD À BEARING PAD 1" 8" 4" 4" ( TYPE I - 15 REQ' D ) FIXED ENDS EXPANSION ENDS SLOTTED HOLES À 1‚'' X 3ƒ" 10"10"1"1"5"5"5"5"3•"1'-7"3•"1"1"1"1"1"1"1"1"•" }•" }•" }SPAN 3 = 2'-10"SPAN 1, 2, 4 & 5 = 1'-4ƒ"SPAN 3 = 2'-10"SPAN 1, 2, 4 & 5 = 1'-4ƒ"ƒ" DIA. BOLTS (TYP.) ‡" DIA. HOLES FOR SPAN 3 = 1'-10ƒ" SPAN 1, 2, 4 & 5 = 5•" ƒ" DIA. BOLTS (TYP.) ‡" DIA. HOLES FOR SPAN 3 = 2'-10"SPAN 1, 2, 4 & 5 = 1'-4ƒ"SPAN 3 = 36x210 STEEL BEAM SPAN 1, 2, 4 & 5 = W18x46 SPAN 3 = 36x210 STEEL BEAM SPAN 1, 2, 4 & 5 = W18x46 SPAN 3 = 7•" SPAN 1, 2, 4 & 5 = 4•" SPAN 3 = 7•" SPAN 1, 2, 4 & 5 = 4•" SPAN 3 = 7•" SPAN 1, 2, 4 & 5 = 4•"SPAN 3 = 2'-8"SPAN 1, 2, 4 & 5 = 1'-2ƒ"SPAN 3 = 2'-8"SPAN 1, 2, 4 & 5 = 1'-2ƒ"SPAN 3 = 2'-8"SPAN 1, 2, 4 & 5 = 1'-2ƒ"SPAN 3 = 6•" SPAN 1, 2, 4 & 5 = 3•" SPAN 3 = 6•" SPAN 1, 2, 4 & 5 = 3•" SPAN 3 = 6•" SPAN 1, 2, 4 & 5 = 3•" SPAN 3 = 2'-‚" SPAN 1, 2, 4 & 5 = 7" DETAILS STEEL SB-13 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01APRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION BENT PLATE 1 BENT PLATE 2 BENT PLATE 3 BENT PLATE 4 2"2"10‚" 6"4‚"2"2"6"6"6"2"2"9‹"135° 90°90°45° PLAN 4 3L 4X4X 2 1L 6X6 X ELEVATION 9"2‚"1•"1•" @ 3" CTS. 2 SPA. 4"4"1'-0" 2‚" 6"6"4"4"1•"1•" @ 2‚" CTS. 4 SPA.4‚"6…"9"9" DETAILS STEEL SB-14 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01A{ BRG.1'-6"1'-6"= { PILES { CAP OR W.P. #8 W.P.#1 END BENT NO. 2 SIMILAR BY ROTATION. END BENT NO. 1 SHOWN. END BENT NO. 2 SIMILAR BY ROTATION. END BENT NO. 1 SHOWN. { BRIDGE (TYP.) STEEL PILE HP12X53 3'-0"5'-0"5'-0"3'-0" 2'-0"6'-0"6'-0"2'-0"5'-0"2'-4"1'-0"1'-4"A A 2'-0" PILE(TYP.)EMBEDMENT16'-0" 8'-0"8'-0" (TYP.) STEEL PILE { HP12X53 CONST. JT. 10"10" 1'-6"1'-6" ALONG BOTTOM EQUALLY SPACED 1'-0"1'-0"2'-0" 3'-0" 8" JOINT CONST. { HP 12X53 STEEL PILE FILL FACE { BRG. & ANCHOR BOLTS 2'-0"EMBED3'-0"1'-0"8"1'-4" OTHERWISE SHOWN. DIMENSIONS SHOWN FROM THE FACE OF CONCRETE TO BARS ARE TO CENTER OF BARS UNLESS IS 2 INCHES, UNLESS OTHERWISE NOTED. SPACING OF BARS IS FROM CENTER TO CENTER OF BARS. CLEAR DISTANCE TO FACE OF CONCRETE FOR CLASS 'A' REINFORCED CONCRETE FOR STEEL REINFORCEMENT FY = 60,000 psi. F'C = 3000 psi. MIN. AT 28 DAYS FOR STEEL H-PILES FY = 50,000 psi. PILES: EXPANSION JOINT: REINFORCEMENT: BEVELED EDGES: BEVEL ALL EXPOSED EDGES ƒ" UNLESS OTHERWISE NOTED. FOR DRIVEN PILES: HP12X53 STEEL PILES SHALL HAVE REINFORCED PILE TIPS, DUE TO THE PRESENCE OF COBBLES AND SMALL BOULDERS. MATERIALS DESIGN SPECIFICATIONS: TO 40,000 FOOT-POUNDS. THE PILE DRIVING HAMMER SHOULD HAVE AN ENERGY CAPACITY OF APPROXIMATELY 30,000 AT EACH AT EACH END BENT. PROVIDE 1" EXPANSION JOINT MATERIAL BETWEEN END OF BRIDGE AND FACE OF BACKWALL 5'-0"EL. 1216.16 @ END BENT NO. 2 EL. 1216.16 @ END BENT NO. 1 TOP OF BACKWALL 9"3"3" CL.(TYP.)2" CL.(TYP.)2" CL.(TYP.)2" CL.(TYP.)3" CL.(TYP.)2" CL. (TYP.) 2" CL. (TYP.) DECK PROPOSED EDGE OF 2"9" (TYP.)(TYP.) 9" (BAY 1)(BAY 2) EL. 1213.83 @ END BENT NO. 2 EL. 1213.83 @ END BENT NO. 1 TOP OF CAP END BENT TOP ELEV. 1 1210.83 2 1210.83 VARIES 2'-4" MAX.#4 S1 STIRRUPS #4 S2 BAR #4 H2 BARS (TYP.) (EACH FACE) (TYP. EACH BAY) @ 1'-9" CTS. 2- #4 S1 STIRRUPS (TYP. EACH END) @ 2'-0" CTS. 2- #4 S1 STIRRUPS #4 H2 #4 H3 #4 H4 4-#7 H1 BARS 4-#7 H1 BARS #4 "V" BARS (EACH FACE) (TYP. EA. PILE) 4 - #4 S3 { BRIDGE { GIRDER { GIRDER { GIRDER DECK PROPOSED EDGE OF 4- #7 H1 4- #7 H1 WINGWALL (TYP.) ALONG TOP EDGE OF 2- #4 H5 BARS 3 - #4 H2 BARS(EACH FACE)#4 "H" BARS@ 11" CTS. (TYP.)(EACH FACE)JOINT CONST. 9" (TYP. EACH END) @ 2'-0" CTS. 2- #4 S1 STIRRUPS 3" FILL FACE 9"9" (TYP. EACH BAY) @ 1'-9" CTS. 2- #4 S1 STIRRUPS 9"9" (TYP. EACH BAY) @ 1'-9" CTS. 2- #4 S1 STIRRUPS 9" (TYP. EACH END) @ 2'-0" CTS. 2- #4 S1 STIRRUPS (TYP.)EMBEDMENT1'-6"11- #4 V1 BARS @ 1'-0" CTS. (EACH FACE) 11- #4 S2 BARS @ 1'-0" CTS. 1'-0"1'-0"1'-0"1'-0" #4 V2 #4 V3 #4 S2 #4 S2 #4 V3 #4 S2 #4 S2 DRIVE HP 12X53 PILES TO REFUSAL. PILE BOTTOM ELEVATIONS ESTIMATED BASED ON BEST AVAILABLE GEOTECH BORING INFORMATION. FOR #4 "V" BARS 1'-6" EMBEDMENT END BENT NOTES #4 S2 ESTIMATED TIP ELEV. 1177 1169 SUPPLEMENTAL REPORT DATED SEPTEMBER 21, 2018 ADHERE TO THE NOTES AND RECOMMENDATIONS OF S&ME'S REPORT DATED APRIL 13, 2016 AND GEOTECHNICAL: PILE ELEVATIONS SECTION A-AELEVATION PLAN DETAILS END BENT SB-15 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01APRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 5-#9 B1 BARS 5-#9 B3 BARS 5-#9 B3 BARS A A { BRG. = { PILES { CAP PROPOSED DECK EDGE OF FOR CLASS 'A' REINFORCED CONCRETE FOR STEEL REINFORCEMENT FY = 60,000 psi. F'C = 3000 psi. MIN. AT 28 DAYS REINFORCEMENT: BEVELED EDGES: BEVEL ALL EXPOSED EDGES ƒ" UNLESS OTHERWISE NOTED. MATERIALS DESIGN SPECIFICATIONS: POINT WORK 14'-0" 7'-0"7'-0" PROPOSED DECK EDGE OF { GIRDER { BRIDGE & BENT NOTES { GIRDER { GIRDER 2" CL.(TYP.)2" CL. (TYP.) BENT NO. 4 SIMILAR. BENT NO. 1 SHOWN. BENT NO. 4 SIMILAR. BENT NO. 1 SHOWN.INTO CAP3" MIN.3" (TYP.)6" PITCH{ BRIDGE POUR 2 - DRILLED SHAFTPOUR 3 - COLUMNPOUR 4 - CAPSP-1 (TYP.)3" CL. TO~ 3'-0" COLUMN~ ~ BENT NO. 1 4 1201.00 1201.00 SHAFT ELEV. TOP OF DRILLED SHAFT ELEV. BOTTOM OF DRILLED 1169.76 ELEVATION TOP OF CAP ELEVATION BOTTOM OF CAP SOCKET ELEV. BOTTOM OF ROCK 1168.25 ROCK SOCKET BOTTOM OF BOTTOM OF CAP TOP OF CAP ROCK SOCKET DRILLED SHAFT & { CAP, COLUMN, 14'-0" 7'-0"7'-0" 5'-3"1'-9"1'-9"5'-3"1'-6"2'-6"6"5'-0"DRILLED SHAFT 3'-6" 3" 2'-0"5'-0"5'-0"2'-0"8"8"STIRRUPS @ 1'-0" CTS. 6-#4 S4 THRU #4 S9 3" 3" (TYP.)5'-0"6"DRILLED SHAFT BOTTOM OF POUR 1 - ROCK SOCKETCL. 3" CL. 6"CL.6"CONST.JT.2" CL.(TYP.) 2" CL. 3'-6" 3'-0" ROCK SOCKET DRILLED SHAFT & { COLUMN, ROCK SOCKET DRILLED SHAFT & { COLUMN, &CAP { BENT &CAP { BENT3'-6"1'-9"1'-9"1'-1"1'-1"DETAIL SEE CONST. JT. 18-#11 M4 (BENT 4) 18-#11 M1 (BENT 1) 18-#11 M1 OR M4 18-#11 M1 OR M4 (TYP.) SP-2 OR SP-4 6" CL. TO OR SP-4 TO SP-2 6" CL. SP-4 (BENT 4) SP-2 (BENT 1) @ 5‚" ALONG ARC OR 18-#11 M4 (BENT 4) 18-#11 M1 (BENT 1) CONST.JT. FOR COLUMN OR DRILLED SHAFT 2'-0'' LAP SPLICE OF SPIRAL 6"6"SP-4 (BENT 4)SP-2 (BENT 1)INTO COLUMN)3" (SP-2 OR SP-4CONST.JT.6"6"SP-4 (BENT 4)SP-2 (BENT 1)FOR ROCK SOCKET OR DRILLED SHAFT 2'-0'' LAP SPLICE OF SPIRAL BENT NO. 4 SIMILAR. BENT NO. 1 SHOWN. STIRRUPS @ 1'-0" CTS. 6-#4 S4 THRU #4 S9 #4 S4 THRU S9 @ 1'-0" CTS. ROCK SOCKET 3'-0" SP-1 SP-1 (TYP) 3" CL. TO SP-4 (BENT 4) SP-2 (BENT 1) SP-3 SP-3 (TYP) 3" CL. TO DRILLED SHAFT TOP OF SP-3SP-1DRILLED SHAFT)3" (SP-1 INTOTO SP-3 3" CL. SP-3 1163.25 1164.76 3'-6" 1'-9"1'-9" 1'-0"9"9"1'-0" 3'-0" ROCK SOCKET DRILLED SHAFT & { COLUMN, &CAP { BENT @ 5‚" ALONG ARC OR 18-#11 M4 (BENT 4) 18-#11 M1 (BENT 1) TO SP-1 3" CL. SP-1 OF BARS UNLESS OTHERWISE SHOWN. DIMENSIONS SHOWN FROM THE FACE OF CONCRETE TO BARS ARE TO CENTER TO FACE OF CONCRETE IS 2 INCHES, UNLESS OTHERWISE NOTED. SPACING OF BARS IS FROM CENTER TO CENTER OF BARS. CLEAR DISTANCE 5-#9 B1 5-#9 B3 2-#5 B2 2-#5 B2 (TYP.) 3" CL. #4 S4 THRU S9 @ 1'-0" CTS. #4 'S' STIRRUPS8"3"8"(EA. FACE) #5 B2 BARS #4 S10 1214.05 1214.05 1210.05 1210.05 { BENT COLUMN 3'-0" ~ { ROCK SOCKET. { DRILLED SHAFT, AND { BRIDGE ,{ COLUMN, DRILLED SHAFT 3'-6" ~ ROCK SOCKET 3'-0" ~4'-0" MAX.VAR., 2'-6" MIN.,PLAN ELEVATION SB-16 SECTION A-A DRILLED SHAFT SECTION THRU SECTION THRU COLUMN END ELEVATION CONSTRUCTION JOINT DETAILS ROCK SOCKET SECTION THRU TABLE OF ELEVATIONS DETAILS BENTS 1 & 4 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01APRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION 5-#9 B1 BARS 5-#9 B3 BARS A A { BRG. = { PILES { CAP PROPOSED DECK EDGE OF POINT WORK 14'-0" 7'-0"7'-0" PROPOSED DECK EDGE OF { GIRDER { BRIDGE &{ GIRDER { GIRDER 2" CL.(TYP.)2" CL. (TYP.)INTO CAP3" MIN.3" (TYP.)6" PITCH{ BRIDGE POUR 2 - DRILLED SHAFTPOUR 3 - COLUMNPOUR 4 - CAP~ 3'-0" COLUMN~ ~ BENT NO. 1201.00 1201.00 SHAFT ELEV. TOP OF DRILLED SHAFT ELEV. BOTTOM OF DRILLED ELEVATION TOP OF CAP ELEVATION BOTTOM OF CAP SOCKET ELEV. BOTTOM OF ROCK ROCK SOCKET BOTTOM OF BOTTOM OF CAP TOP OF CAP ROCK SOCKET DRILLED SHAFT & { CAP, COLUMN, 14'-0" 7'-0"7'-0" 5'-3"1'-9"1'-9"5'-3"1'-6"2'-6"6"5'-0"ROCK SOCKET 3'-0" DRILLED SHAFT 3'-6" 3" 2'-0"5'-0"5'-0"2'-0" STIRRUPS @ 1'-0" CTS. 6-#4 S4 THRU #4 S9 3" 3" (TYP.)6"DRILLED SHAFT BOTTOM OF POUR 1 - ROCK SOCKETCL. 3" CL. 6"CL.6"CONST.JT. 2 3 3'-6"1'-9"1'-9"1'-1"1'-1"8"8"#5 B2 BARS (EA. FACE)) 3'-6" 1'-9"1'-9"2" CL.5-#9 B1 5-#9 B3 (TYP.) 2" CL. (TYP.) 3" CL. 1'-0"9"9"1'-0" #5 B2 (EA. FACE) #5 B2 (EA. FACE) #5 B2 (EA. FACE) #4 U1 3"1208.50 1208.50 1164.64 1159.64 1162.31 1157.31 BENT NO. 3 SIMILAR. BENT NO. 2 SHOWN. BENT NO. 3 SIMILAR. BENT NO. 2 SHOWN. 18-#11 M2 OR M3 18-#11 M2 OR M3 SP-7 (BENT 3) SP-5 (BENT 2) 18-#11 M3 (BENT 3) 18-#11 M2 (BENT 2) CONST.JT. FOR COLUMN OR DRILLED SHAFT 2'-0'' LAP SPLICE OF SPIRAL 6"6"SP-7 (BENT 3)SP-5 (BENT 2)CONST.JT.6"6"SP-7 (BENT 3)SP-5 (BENT 2)FOR ROCK SOCKET OR DRILLED SHAFT 2'-0'' LAP SPLICE OF SPIRAL 3'-6" 3'-0" ROCK SOCKET DRILLED SHAFT & { COLUMN, ROCK SOCKET DRILLED SHAFT & { COLUMN, &CAP { BENT &CAP { BENT OR SP-7 TO SP-5 6" CL. SP-7 (BENT 3) SP-5 (BENT 2) @ 5‚" ALONG ARC OR 18-#11 M3 (BENT 3) 18-#11 M2 (BENT 2) 28-#4 U1 @ 6" CTS. #4 S4 THRU S9 @ 1'-0" CTS. STIRRUPS @ 1'-0" CTS. 6-#4 S4 THRU #4 S9 SP-1 (TYP) 3" CL. TO SP-1 (TYP.)3" CL. TOSP-1 (TYP.) SP-5 OR SP-7 6" CL. TO SP-6 (TYP) 3" CL. TO SP-6 SP-1DRILLED SHAFT)3" (SP-1 INTOINTO COLUMN)3" (SP-5 OR SP-7SP-6DRILLED SHAFT TOP OF FOR CLASS 'A' REINFORCED CONCRETE FOR STEEL REINFORCEMENT FY = 60,000 psi. F'C = 3000 psi. MIN. AT 28 DAYS REINFORCEMENT: BEVELED EDGES: BEVEL ALL EXPOSED EDGES ƒ" UNLESS OTHERWISE NOTED. MATERIALS DESIGN SPECIFICATIONS: BENT NOTES OF BARS UNLESS OTHERWISE SHOWN. DIMENSIONS SHOWN FROM THE FACE OF CONCRETE TO BARS ARE TO CENTER TO FACE OF CONCRETE IS 2 INCHES, UNLESS OTHERWISE NOTED. SPACING OF BARS IS FROM CENTER TO CENTER OF BARS. CLEAR DISTANCE TO SP-6 3" CL. SP-6 3'-0" ROCK SOCKET DRILLED SHAFT & { COLUMN, &CAP { BENT @ 5‚" ALONG ARC OR 18-#11 M3 (BENT 3) 18-#11 M2 (BENT 2) TO SP-1 3" CL. SP-1 2-#5 B2 2-#5 B2 DETAIL SEE CONST. JT. #4 S4 THRU S9 @ 1'-0" CTS. #4 S10 6"6"1'-8"1'-10"8"8"3"#5 B2 (EA. FACE)3"1'-8" STEP 1214.05 1214.05 1'-6†"1'-6†"{ ROCK SOCKET. { DRILLED SHAFT, AND { BRIDGE ,{ COLUMN, ROCK SOCKET 3'-0" ~ DRILLED SHAFT 3'-6" ~ COLUMN 3'-0" ~ { BENT CONST.JT. AND 3, HIGH SIDE) EL. 1214.05 (TYP. BENT 2SHORETOWARDS SHORE TOWARDS AND 3, LOW SIDE) EL. 1212.50 (TYP. BENT 2 4'-0" MAX.VAR., 2'-6" MIN.,SB-17 PLAN ELEVATION SECTION A-A CONSTRUCTION JOINT DETAILS DRILLED SHAFT SECTION THRU SECTION THRU COLUMN ROCK SOCKET SECTION THRU TABLE OF ELEVATIONS DETAILS BENT 2 & 3 Sheet Number: Date: Drawn by: Project Number: 08.23.2018 1634LAKE JAMES STATE PARK VISITOR CENTER121 W. JONES STREET, RALEIGH, NC 27603NORTH CAROLINA DIV. OF PARKS & RECREATIONRevisions No.DateConsulting Engineers, Inc.828-253-2796ASHEVILLE, NC 288061318F PATTON AVENUENOT FOR CONSTRUCTIONRWW/MAFAIN HT OR LR O CA ROFESSION GE NREINE SEALPNAL HA R DY L. W ILLI20777S V&M PROJECT NO.: 31720-05100% CONSTRUCTION DOCUMENTS / SCO SUBMITTAL (Inclusive of SCO # 14-11351-01, Cove Bridge Project)SCO#: 16-14422-01ABAR TYPES STRUCTURAL STEEL ALL BAR DIMENSIONS ARE OUT TO OUT. 8"HK. 1 2'-8"4'-7"5"PRELIMINARY PLANS DO NOT USE FOR CONSTRUCTION1'-0"1'-3'' LAP BAR N0.SIZE TYPE LENGTH WEIGHT H1 H2 H3 H4 S1 S2 S3 V1 V2 STR. STR. STR. STR. STR. STR. 15'-8" 12'-0" 2'-8" 15'-4" 2'-8" 3'-8" 3'-7" 8 7 2 4 2 4 4 4 15 10 4 4 1 2 22 4 4 44 H5 8 4 STR. 14'-0" 15'-8"256 19 102 27 10 1'-8" DIA.12 4 3 6'-6" 16 7 BILL OF MATERIAL FOR ONE END BENT 3 TIMBER DECK & NAILERS TIMBER RAIL 92,320 LBS. 1,483 C.F. 490 L.F. 84 52 V2 4 44 STR.2'-8"7 54 (FOR ONE END BENT) REINFORCING STEEL (FOR ONE END BENT) CLASS A CONCRETE BREAKDOWN POUR #1 CAP POUR #2 BACKWALL TOTAL CLASS A CONCRETE 10.1 C.Y. 634 LBS. 8.9 C.Y. 1.2 C.Y. 10.1 TOTAL SUBSTRUCTURE BILL OF MATERIAL END BENT NO. 1 BENT NO. 1 BENT NO. 2 BENT NO. 3 BENT NO. 4 END BENT NO. 2 TOTAL CU. YDS. CLASS A CONCRETE 21.6 10.1 24.0 24.8 21.1 LBS. REINFORCING STEEL NO. HP 12x53 STEEL PILES LIN. FT. 3634 5916 6349 6593 5756 634 25,882 3 6 101 101 202 SUPERSTRUCTURE BILL OF MATERIAL ELASTOMERIC BEARINGS 30 EA. S3 LENGTH 45 60 4560 POSITION OF PILE DURING WELDING. DETAIL B 0'' TO „'' 0'' TO „''0'' TO „''0'' TO „''PILE SPLICE DETAILS+10°-0°10° 0° BACK GOUGE BACK GOUGE DETAIL A DETAIL B DETAIL A PILE VERTICAL OR VERTICAL PILE HORIZONTAL2'-2"2'-5"2'-8"3'-0"3'-7"3'-3"S4S5S6S7S8S9HK.5•"5 3'-6" 5'-4"1'-5•"4 6 4'-6"33'-0"9'-1"31'-5"36'-8"8'-1"SP-1SP-2SP-3SP-4SP-5SP-6SP-72'-6" 7 1'-4"2'-6"BAR N0.SIZE TYPE LENGTH WEIGHT B1 B2 B3 S4 S6 S7 S8 S9 M1 STR. STR. STR. 13'-8" 8'-5" 8'-11" 10'-1" 11'-3" 49'-7" 59 2 5 5 2 4 9 2 24 4 5 5 2 18 4 11 S5 4 4 14'-2" 13'-8"232 13 245 11 12 57 14 15 TOTAL CLASS A CONCRETE 21.6 C.Y. 2.3 C.Y. 1 1 4 44 147 62SP-1 SP-2 SP-3 5 5 5 4 7 7 533'-10" 170'-3" 92'-10" 241 13 4742 357 114 N0.WEIGHT 5 2 5 2 2 2 2 - 10 232 13 2 11 12 14 15 - - 1 62 241 13 N0.WEIGHT 5 2 5 2 2 2 2 - 10 232 13 2 11 12 14 15 - - 1 62 241 13 N0.WEIGHT 5 2 5 2 2 2 2 - 4 232 13 2 11 12 57 14 15 - 1 1 62 241 13 114 M2 STR.51'-8"-11 18 4941 -- M3 STR.54'-0"-11 -18 5164 - M4 STR.48-1"-11 --18 4598 - - 4 44 -4 7 -SP-4 SP-5 SP-6 7 7 595'-8" 154'-9" 510'-7" 1 1 -- 398 103 - 1 -- 103 - - 1 -44SP-7 7 626'-8"-1 419 - - - - - - - BILL OF MATERIAL FOR:BENT 1 BENT 2 BENT 3 BENT 4 - - - - - - - - - - - - - - -- - - - -44 8 28 28 118 ---6'-4"118 REINFORCING STEEL BENT 1 = 5916 LBS. 341 143 143 BENT 2 = 6349 LBS.BENT 4 = 5756 LBS.BENT 3 = 6593 LBS. CLASS A CONCRETE BREAKDOWN 1.3 C.Y.POUR #1 ROCK SOCKET POUR #2 DRILLED SHAFT 24.0 C.Y. 2.1 C.Y. 1.3 C.Y. 24.8 C.Y. 2.1 C.Y. 1.3 C.Y. 21.1 C.Y. 2.3 C.Y. 1.3 C.Y. 11.7 C.Y.11.2 C.Y.13.0 C.Y.13.8 C.Y. 6.3 C.Y.7.6 C.Y.7.6 C.Y.6.3 C.Y.POUR #4 CAP 111.7 POUR #3 COLUMN 39'-0"4'-1"124 336 12 33 12 33 12 33S10 8 9'-5" 10'-7" U1 2 5'-1•" 3'-2"HK.5•"6" PITCH3'-2" MATERIAL BILL OF SB-18